Professional Documents
Culture Documents
VIEW-A
P1HTF13BQ003 & P1HTF14BQ003
A
EL +4.950m
CL. OF PIPE
08,09 NOTES:-
10,11 01. ALL DIMENSIONS ARE IN MM AND ALL ELEVATIONS ARE
IN METER.
02. SURFACE PREPARATION & PAINTING PROCEDURE SHALL BE
03 AS PER DRG. No.- SH1-HEG-P0HT-GE-M05-SPC-0001.
920
18 THK.
AND STRENGTH.
04. WHEREVER THE FILLET SIZE IS NOT GIVEN ASSUME IT
B 04 B
02 TYP. AS 0.7 TIMES MINIMUM THICKNESS INVOLVED.
20 THK. 05. FINISHED GROUND LEVEL ELEVATION OF PLANT AREA
25
200
200
EL +4.030m
20
TYP
125
125
TOF OF GROUTING
REFERENCE DRAWING
20
575 REFER DRG. No.- SH1-HEG-P1HTF-M-M05-ISO-3001 (SHT 02 OF22)
05 03 02. PIPING ARRANGEMENT PLAN ABSORBER & PUMP HOUSE
01 M 1:10
(UNIT-1) REFER DRG. No. SH1-HEG-P1HT-M-M05-DGA-5002.
PEDESTAL
PLAN 23
1330
11
1600
94
R6
11.2
59.
R7
5
SECTION-BB
550
445
1600
221
18 THK.
02 150 315 400 6 315 150
6 1280
75
18
75
575
300
300
75
120
75
07 06 & 07 Battery Limits X
1:5
2 1330 2
06 HAMON OTHER (Z = positive up)
Z Y
01 gap gap 06 130 10 90
NO WELD
04 05 03
50
50
06
07 07
04
10
1:5 05
01 50 70
1:5
M 1:10
100
50 70
90
1600 5
5
80
55
75 5 x 290 = 1450 75
8
125
200
14 THK.
70
120
75
120
120
425
575
20 THK.
75