You are on page 1of 1

P1HTF11BQ003,P1HTF12BQ003

VIEW-A
P1HTF13BQ003 & P1HTF14BQ003

A
EL +4.950m
CL. OF PIPE

08,09 NOTES:-
10,11 01. ALL DIMENSIONS ARE IN MM AND ALL ELEVATIONS ARE
IN METER.
02. SURFACE PREPARATION & PAINTING PROCEDURE SHALL BE
03 AS PER DRG. No.- SH1-HEG-P0HT-GE-M05-SPC-0001.

920
18 THK.
AND STRENGTH.
04. WHEREVER THE FILLET SIZE IS NOT GIVEN ASSUME IT
B 04 B
02 TYP. AS 0.7 TIMES MINIMUM THICKNESS INVOLVED.
20 THK. 05. FINISHED GROUND LEVEL ELEVATION OF PLANT AREA
25

200

200
EL +4.030m

20
TYP

125

125
TOF OF GROUTING
REFERENCE DRAWING

20
575 REFER DRG. No.- SH1-HEG-P1HTF-M-M05-ISO-3001 (SHT 02 OF22)
05 03 02. PIPING ARRANGEMENT PLAN ABSORBER & PUMP HOUSE
01 M 1:10
(UNIT-1) REFER DRG. No. SH1-HEG-P1HT-M-M05-DGA-5002.
PEDESTAL

PLAN 23
1330

11
1600

94
R6
11.2

59.
R7

5
SECTION-BB

550
445
1600

135 1330 135

221
18 THK.
02 150 315 400 6 315 150

6 1280

75
18

75
575

300

300
75
120

75
07 06 & 07 Battery Limits X
1:5

2 1330 2
06 HAMON OTHER (Z = positive up)
Z Y
01 gap gap 06 130 10 90
NO WELD
04 05 03

50

50
06
07 07

04

10
1:5 05
01 50 70
1:5
M 1:10

100
50 70

90
1600 5
5
80

55

75 5 x 290 = 1450 75
8
125
200

14 THK.
70
120
75

120

120
425
575

20 THK.
75

You might also like