Professional Documents
Culture Documents
PRACTICAL WORKSHEET
(Carry Out lnspection on GTE Air lnlet and Reduction Gear System)
Course: Part-66 AML Category 81.1 fl; 81.2tr; 81.3tr; 81.an; B2n
Module:15
Sub-Module:15 3 ATA Chapter: MM72
Students Name: 1) ld. No:
2l ld. No:
3) ld. No:
4l ld. No:
5) ld. No:
'i . References:
a. T 53-L-1 Lycoming Maintenance Manual Chapter 72
b. T 53-L-1 lllustrated Part and Breakdown manual
c. Task Card PWS 15.3
3 Required Materials:
; Rags
b Clean Water & Liquid Soap
4. Required Manpower:
Max 5 students in a group
Procedure:
3. Students read and understand the WARNING and CAUTION notes as stipulated in the
Engine Maintenance Manual (EMM) / Engine Service Manual (ESM).
4. Students carry out the practical as per the task card in accordance with EMM i ESM.
lnstructor: Signature:
Date:
MALAYSIAN INSTITUTE OF AVIATION TECHNOLOGY
TASK CARD
Prac. Hour
Reference Number: P 15.3 4
EQUIPMENT
□ AIRCRAFT MODEL:
COMPONENT DESCRIPTION:
□ ENGINE T53-L-1 LYCOMING
□ MOCK-UP REGISTRATION/SERIAL NO: ITEM AIR INLET/REDUCTION GEAR
ATA CHAPTER: LE 00050-LE 00094 MODEL/TYPE N/A
SECT. 3 PART NO. N/A
ZONE/SYSTEM SERIAL NO. N/A
AIR INLET/ REDUCTION GEAR POSITION N/A
PERSONNEL
MANHOUR
TASK DESCRIPTION 0900 HRS
START
CARRY OUT INSPECTION ON AIR INLET AND REDUCTION GEAR SYSTEM.
YES NO