INSPECTION REPORT

Format No:
GURUKRUPA ENGINEERING WORKS CWPL/STR./
STAGE-INSPECTION REPORT FOR TANK (BASE PLATE) 01
PROJECT: Aluminium Tank Fabrication at AB-3

Report No: GEW/SI/T


Client: Jubilant Life Sciences Ltd. Vendor : GURUKRUPA ENGINEERING WORKS
2105 C/LS-3
Date: 23-07-2018
Consultant: C&W P.O.No. 550020
Ref.Drg.No.with Rev:
7203-6311-FAB-351-
Area/ Description of Work: AB-3 Project
1-Rev 0
Bevel Angle Observation
SL. Item/Mar
Drawing No. with Rev. Quantity Horizontal Vertical Dimension Actual Remarks
No. k No:
As per Drg. Actual As per Drg. Actual As per Drg. Dimension
0 0 0 0
1 7203-6311-FAB-351-1-Rev 0 SR03B 1 45 ±5 30 ±5 20mmX1220mmX2366mm
0 0 0 0
2 7203-6311-FAB-351-1-Rev 0 SR03A 1 45 ±5 30 ±5 20mmX1220mmX2440mm
0 0 0 0
3 7203-6311-FAB-351-1-Rev 0 SR03A 1 45 ±5 30 ±5 20mmX1220mmX2440mm
0 0 0 0
4 7203-6311-FAB-351-1-Rev 0 SR03A 1 45 ±5 30 ±5 20mmX1220mmX2440mm
5 7203-6311-FAB-351-1-Rev 0 SR03A 1 450±50 300±50 20mmX1220mmX2440mm
6 7203-6311-FAB-351-1-Rev 0 SR03A 1 450±50 300±50 20mmX1220mmX2440mm
0 0 0 0
7 7203-6311-FAB-351-1-Rev 0 SR03A 1 45 ±5 30 ±5 20mmX1220mmX2440mm
0 0 0 0
8 7203-6311-FAB-351-1-Rev 0 SR03A 1 45 ±5 30 ±5 20mmX1220mmX2440mm
0 0 0 0
9 7203-6311-FAB-351-1-Rev 0 SR03A 1 45 ±5 30 ±5 20mmX1220mmX2440mm
0 0 0 0
10 7203-6311-FAB-351-1-Rev 0 SR03A 1 45 ±5 30 ±5 20mmX1220mmX2440mm
0 0 0 0
11 7203-6311-FAB-351-1-Rev 0 SR03A 1 45 ±5 30 ±5 20mmX1220mmX2440mm

Page 1 of 2
INSPECTION REPORT

Format No:
GURUKRUPA ENGINEERING WORKS CWPL/STR./
STAGE-INSPECTION REPORT FOR TANK (BASE PLATE) 01
PROJECT: Aluminium Tank Fabrication at AB-3

Report No: GEW/SI/T


Client: Jubilant Life Sciences Ltd. Vendor : GURUKRUPA ENGINEERING WORKS
2105 C/LS-3
Date: 23-07-2018
Consultant: C&W P.O.No. 550020
Ref.Drg.No.with Rev:
7203-6311-FAB-351-
Area/ Description of Work: AB-3 Project
1-Rev 0
Bevel Angle Observation
SL. Item/Mar
Drawing No. with Rev. Quantity Horizontal Vertical Dimension Actual Remarks
No. k No:
As per Drg. Actual As per Drg. Actual As per Drg. Dimension

Visual check before release for welding


(Camber, Sweep, Diagonal, Straightness, Temporary support to control distortion, Welding joint
Configuration, Misalignment, etc)

AGENCY NAME OF INSPECTOR SIGNATURE DATE


VENDOR

CWIPL

TPI

CLIENT/ CONSULTANT

Page 2 of 2