Name of the Institution : Sanjay Gandhi Polytechnic Name of the Programme : Civil Engineering Semester: 3rd

Name of the Faculty : ROHITH B Designation :Lecturer Course Name and Code: BUILDING DRAWING
20CE31P
USING CADD/ 20CE32P

Contact Hours per week : 4 Lecture: 3hours/week & Tutorial or Activity: 1hour/week Total Credits: 4 Contant Hours per semester: 39+13=52 52
If any change in
Teaching aids and
Unit Title Hours alloted planned content
Planned date for content resources used for Methodology adopted to validate the Remarks by program
Sl.No. and course Planned content delivery for planned delivery : specify
delivery planned content learning ** coordinator or HOD
outcomes content delivery revised date of
delivery
content delivery

Building bye laws,functions of local authority,Building bye laws to be


1 CO-1 30/11/2021 TO 8/12/2022 8
practiced,margins and built up areas,building planning

Single line diagram of residential, commercial and industrial building, plan


2 CO-2 14/12/2022 TO 12/01/2022 20
section and elevation of residential ,commercial and industrial building.

3 CO-3 Introdution to plumbing,water supply and sanitary work 18/01/2022 TO 24/01/2022 8

Wiring accessories,safety devices,types of wiring system and tjrie


4 CO-4 applications,building basic services,fire and its management,rain water 25/1/2022 TO 9/2/2022 16
harvesting and soak pit.

ith appropriate assessment weightage to validate the outcome.( Methodologies Adopted such as CIE ( Continuous Internal Evaluation ) - IA tests
s, Semester , Quiz , Student activity , case study etc. and SEE ( Semester End Examination )

Course Co -Ordinator Program Co -Ordinator Principal


Note :

1. Faculty is advise to deliver one hour per in rach theory course. However in special cases the faculty may deliver maximum of two hours per day in each theory course in consultation with the program coordinator ( HOD) with justification
urvey questionnaire assesment from the students to be conducted by the programme coordinator ( HOD) and forwarded to IQAC for Analysis.
ality Assurance Cell ( IQAC) is authorized to monitor the course plan and its effective delivery
ional classes / remedial classes to be appropriately recorded in the remarks by program coordinator ( HOD)
If any change in
Hours alloted planned content Teaching aids and
Unit Title
Planned date for content for planned delivery : resources used for Methodology adopted to
Sl.No. and course Planned content delivery. Lecture (Knowledge criteria) Learning outcomes achieved
delivery content specify revised planned content validate the learning **
outcomes
delivery date of content delivery
delivery

planning,climatic parameters and building bye laws applicable to


laws to be practiced,margins and built up areas,building planning
CO1:Building bye laws,functions of local authority,Building bye

1.Building bye laws: introduction ,objects ,importance and important terms


30-11-21 1
used in building bye laws

Prepare a site plan by using concepts of building


2.Functions of local authority ,responsibility of owner,applicability and

that type of building for a given location.


principle s underlying building bye laws ,setbacksor building line,light 30-11-21 1+1=2
plane,floor space index

problem solving sessions


3.building bye laws to be practices : off street parking ,fire protection ,min
01-12-21 2+1=3
plot size,,thickness of wall etc
Activity: study and compare the building bye laws for building bye laws for
01-12-21 3+1=4
1 different typologies of building Chalk , talk
1.Building bye laws: fenestration ,ventilation sills of opening ,stair case
07-12-21 4+1=5
,ramps ,roofs,parpets, and terrace , water tanks, refuse/area or disposal site
2.Margin and maximum builtup area,plinth areas for different types of
07-12-21 5+1=6
building ,permissible builtup area in margins ,projections in margins
,margins,from common-factors,shape,size
3. Building planning plot,open spaces,floor
and area ratio,carpet
topography area
of site key
,climatic
08-12-21 6+1=7
conditions of the site ,safety precautions to be followed at site during
building
Activity: 1. practice drawing of site construction.
plan with setbacks and orientations for
different dimensions 08-12-21 7+1=8
2.Study the elements of sustainabl planning as per NBC 2016
Given the floor area or carpet areas of rooms,plan thr building and draw a
CO-2: Single line diagram of residential, commercial and industrial building, plan section and elevation of

single line diagram of the building


1. Residential building. 14/12/2022 & 15/12/2022 8+3=11
2. Commercial building.
3. Industrial building.

Prepare a single line diagram ,building drawing including plan, elevation and section for a given
Activity:prepare manual drawing of single line diagrams for different
typology of buildings considering building bye laws 15/12/2022 11+1=12

Given the floor area or carpet areas of rooms,plan thr building and draw a
single line diagram of the building
residential ,commercial and industrial building.

1. Residential building. 21/2022 & 22/1/2022 12+3=15


2. Commercial building.
3. Industrial building.
Activity:prepare manual drawing of single line diagrams for different
22/1/2022 15+1=16
typology of buildings considering building bye laws

type of building for a given location


Draw the following views for Residential buildings
2 1. Plan

problem solving sessions


28/1/2022 & 29/1/2022 16+3=19
2. Elevation
Chalk , talk
3. Section
Activity:Create 3-D model of residential buildings using software’s like
ARCHICAD, REVIT ARCHITECT URE, SKETCH UP, 3DS MAX 29/1/2022 19+1=20

Draw the following views for Residential buildings


1. Plan
4/1/2022 & 5/1/2022 20+3=23
2. Elevation
3. Section
Create 3-D model of commercial buildings using software’s like
ARCHICAD, REVIT ARCHITECT URE, SKETCH UP, 3DS MAX 5/1/2022 23+1=24

Draw the following views for Residential buildings


1. Plan
2. Elevation 11/01/2022 TO 12/01/2022 24+3=27
3. Section

Activity:Create 3-D model of Industrial buildings using software’s like


ARCHICAD, REVIT ARCHITECT URE, SKETCH UP, 3DS MAX 12-01-22 27+1=28
If any change in
Hours alloted planned content Teaching aids and
Unit Title
Planned date for content for planned delivery : resources used for Methodology adopted to
Sl.No. and course Planned content delivery. Lecture (Knowledge criteria) Learning outcomes achieved
delivery content specify revised planned content validate the learning **
outcomes
delivery date of content delivery
delivery

Prepare plumbingdrawing using standard symbols and legends along with recommending the location,type
1. Introduction to plumbing:
Pipe Materials used in building construction works for water supply work -
Plastic Pipes, High Density Polyethylene Pipes, Densified cast iron pipes,
GI pipes, Stoneware pipes, Asbestos Cement pipes, and Concrete pipes, Hot 18-01-22 28+1=29
water pipes with insulation.
CO-3: Introdution to plumbing,water supply and sanitary work

2. Water supply fittings, their description and uses, water main, service

of material,fittings and fixtures for a given building.


pipes, supply pipe,distribution pipe, domestic storage tank, stop cock, 18-01-22 29+1=30
ferrule, gooseneck, water tap, aerators, water meter.

3.Merits and Demerits. Connections from water main to buildings. Factors

problem solving sessions


affecting the suitability of plumbing material and accessories for Water 19/01/2022 30+1=31
supply work, Water pressure test for leakage during installation of pipes.

3 Activity:Conduct Market analysis on water supply fittings, fixtures, Chalk , talk


accessories, tools and equipment and prepare report. 19/01/2022 31+1=32

1. Importance of Sanitary work for building. Different types of Sanitary


pipes and pipe materials used in building construction works for drainage
and waste disposal. 22-01-22 32+1=33

2. Sanitary Fittings- Water Closets, Flushing Cisterns, Urinals, Inspection


Chambers, Traps, Anti-syphonage. Connections from building to sewer 22-01-22 33+1=34
main.

3. Inspection, Testing and Maintenance of sanitary line in building. Factors


affecting the suitability of sanitary material and accessories for Sanitary
24-02-22 34+1=35
work.

Activity:Conduct Market analysis on Sanitary fittings, fixtures, accessories,


tools and equipment and present a report. 24-02-22 35+1=36

Course Co -Ordinator Program Co -Ordinator Principal


If any change in
Hours alloted planned content Teaching aids and
Unit Title
Planned date for content for planned delivery : resources used for Methodology adopted to
Sl.No. and course Planned content delivery. Lecture (Knowledge criteria) Learning outcomes achieved
delivery content specify revised planned content validate the learning **
outcomes
delivery date of content delivery
delivery

1. Wiring accessories: SP (single pole switch), DP (double pole switch),


ICDP (Iron Clad Double Pole main switch), ICTP (Iron Clad Triple Pole
25-01-22 36+1=37
CO-3,4: Wiring accessories,safety devices,types of wiring system and tjrie applications,building basic services,fire and its

switch),
change over switch, modular switches, 2 pin socket ,3 pin socket, 2 pin plug
2. Safety devices: Types of fuse units and Materials for fuse wire, Glass
cartridge fuse, types of HRC fuse, Kit kat fuse. Types of MCB, MCCB, 25-01-22 37+1=38
RCCB, ELCB
3.Types Types
of wiring of Earthing-
systems and theirPipe earthing, Plate
applications: earthing,
Surface conduit,Lightning Chalk & talk

Prepare electrical drawing and fire fighting layout appropriate for a given building
concealed conduit, PVC casing capping. Types of wires, cables used
for different current and voltage rating, Connection from Electric source to 27/01/2022 38+1=39
building based on electricity load.
1Activity:Conduct Market analysis on Electrical wiring, fittings, fixtures,
accessories, tools and equipment and present a report.
2. Study on energy saving using Solar Panel installations with accessories in 27/01/2022 39+1=40
buildings.
management,rain water harvesting and soak pit.

Building Basic Services


1. Preparation of water supply Layout for residential building.
28/02/2022 & 29/02/2022 40+3=43
2. Preparation of Sanitary Layout for residential building.

problem solving sessions


3. Preparation of Electrical Layout for residential building.
Chalk & talk
Activity:.Prepare basic service layouts like Water supply, Sanitary, Electrical
layout for your college building using any Application software and
4 demonstrate. 29/02/2022 43+1=44

1 Fire classifications, Importance of providing Fire fighting system and fire


safety requirements in Commercial and Industrial Building. 01-02-22 44+1=45

2. Components of the fire fighting system and its applications in


01-02-22 45+1=46
Commercial and Industrial Building.. Chalk & talk
3.Location of fire fighting system, installations and Code of Practice
for fire safety in different typologies of Buildings. Fire ratings. 02/02/2022 46+1=47

Activity:Conduct Field visit and study the firefighting system


installations,fire safety measures and demonstrate 02/02/2022 47+1=48

1. Importance of conservation of rain water by Rain water harvesting


unit in buildings. Components of the rainwater harvesting system. 08-02-22 48+1=49

2. Methods of Rainwater harvesting, Benefits of rainwater harvesting unit


08-02-22 49+1=50
in buildings
Chalk & talk
3.Purpose of using Soak pit with Septic tank and Manhole and its sizing
based on the requirement for different typologies of building. 9/02/2022 50+1=51

Activity:Prepare Rain water harvesting unit layout for your college


building using any Application software and demonstrat e. 9/02/2022 51+1=52