You are on page 1of 4

亚吉铁路技术培训结业考试试卷

Final Examination for the Ethio-Djibouti Technician Training


Course: ________________________ Duration:____________________
No. 1 2 3 4 5 Total

Score

Signature of the Examiner: ________________________


Ⅰ. Choice question. (For each question there are four choices marked A, B, C and D.
You should choose the ONE that best fits into the question, then write the
corresponding letter in brackets) (2 points per question,total 30points)
1.( C )Normally, two adjacent 25 kV AC traction sub stations works as in .
A.Parallel B. Series C. Independent D. Cannot say
2.( C )OCS isolators in your contry can be operated through .
A. Remote control B. Local control by operator
C. Manually D. All of the above
3.( D )Determination of maximum span length does not depend upon .
A.Blow-off. B. superelevation of track. C. total length of pantograph D. Gradient.
4.( B )For main line,maximum tensioning length in AC traction is .
A. 2000 m B. 1600 m C.1000 m D. 750 m
5.( C )Which type of overlap is formed at the end of every tension length.
A. Insulated overlap B. Un-insulated overlap
C. Either Insulated overlap or un-insulated overlap D. None of the above.
6.( D )The fittings, which is used to transfer the weight of contact wire to the
catenary wire is called .
A. Section insulator B. Electrical connection C. Cantilever assembly D. Droppers
7.( A )Material of AC catenary wire is .
A. stranded copper B. stranded aluminum C. solid copper D. Bronze
8.( B )In AC traction, maximum stagger of contact wire is .
A. 500mm B. 400 mm C. 300 mm D. 200 mm
9.( A )Tolerance of contact wire stagger is .
A. ± 30 mm B. ± 20 mm C. ± 10 mm D. Zero
10.( A )When temperature increases, then length of conductors .
A. Increases B. Decreases C. Remains same D. None of above
11.( C )Distance between midpoint anchor & anchoring structure should not be
more than .
A. 1600 m. B. 1500 m C. 800 m. D. 600 m
12.( A )The reason of midpoint anchor arrangement is “To restrict the OHE
movement .
A. Along the track B. Across the track
C. Both across & along the track D. Neither across nor along the track
13.( B )In entire span length, elasticity of OHE will be .
A. Maximum at support & minimum at mid span
B. Minimum at support & maximum at mid span
C. Remains same at support & mid span
D. Cannot say
14.( A )In AC traction, distance between two OHE’s conductor in insulated overlap
is kept .
A. 500 mm. B. 380 mm. C. 300 mm. D. 200 mm.
15.( A )In AC traction , Which electrical connection distribute the current between
catenary wire & contact wire.
A. “H” Jumper B. “D” jumper C. “G” jumper D. “M” jumper
Ⅱ.True or false question. (2 points per question,total 20points)
1.( T )The distance between suspension point and rail level is contact wire height
.
2.( F )In insulated overlap, disconnector is installed on anchor mast.
3.( F )The suspension insulator can be used in catilever assembly .
4.( T )In Ethiopia-Djibouti Railway , pulley tensioning device is widly used.
5.( F )When the porcelain glaze peeling area on the insulator surface is greater
than 200mm2, it needs to be replaced
6.( F )rated current carrying capacity of the electrical connecting wires shall
benot be greater thanthe rated current carrying capacity of the connected contact
suspension and power supply lines .
7..( F )Torque wrench is used for straightening the contact wire without
damaging the wire.
8..( T )The main line refers to the line connecting the station and running
through the station.
9..( T )The increase of action times of lightning arrester is due to the action of
lightning arrester due to overvoltage.
10.( T )Before carrying out vehicle inspection, it must be confirmed that the
vehicle has been braked.
Ⅲ.Blank-filling question (1 point per question,20points)
1. There components of electrified railway is elctric train, traction substation and
OCS .
2. If specification of contact wire is CTHA-120, C refers to contact wire .
3.If specfication of steel mast is G,13 refers to mast's length .
4.For node 5 in headspan,its funciton is like single suspension mast .
5.Insulators are classified by structure,they are suspension insulator 、 rod insulator
、 pin insulator .
6..The nominal voltage of overhead contact system is 25 kV,short-term maximum
voltage ( 5s ) is 29 kV, the feeding line voltage is 27.5 kV , the minimum
operating voltage is 20kV.
7..During the operation of ladder car, the car shall be stable and cooperate up and
down. The speed shall not exceed 5 km / h to prevent falling off the road on the
curve.
8.Any work carried out at a place 2 m above the ground is called aerial work.
9.The first work ticket of OCS is used for power off working .
10.In the section with track circuit, the insulation state of car ladder wheels must also
be checked to prevent short circuit of track and causing red light strip .
11.The distance between the catenary wire joint and the suspension point shall not be
less than 2 m.
12.Limit value of dropper offset at the limit temperature, the deviation of the dropper
along the line direction shall not be greater than 1/3 of its length.
13.Distance from the bottom of the tensioning weight to the ground should be greater
than 200 mm.
14.The protection methods of centralized grounding can be divided into double
insulation protection and non-insulated protection .
Ⅳ.Multiple-choice questions (2 points per question,total 10)
1. OCS maintenance operations are divided into? ( ABC )
A.Power off working B.Indirect live working
C. Away from live working D. None of above
2.Electrical properties of insulators are as ( ABCD )
A.Dry flashover voltage B.Wet flash over voltage
C.Leakage distance D.Breakdown voltage
3.In order to reduce the wear of the contact wire, which measures
should be adopted .(ABCD)
A.Track condition should be good .
B.Zigzag arrangement of contact wire
C.Proper tension in the contact wire&pre-stress tension should be executed on the
catenary wire and contact wire at the time of erection.
D.hard spots on contact wire should be minimum
4.Which factor affects the stagger of contact wire .(ABCD)
A.Lateral wind B. Swing of pantograph
C.Toatal length of strip of pantograph D. Operating speed of electric vehicle
5.The arrangement of the cantilever assembly depends upon the .( ABC )
A.Height of contact wire B.Mast gauge C.System height D.None of the above
Ⅴ.Short-answer question (total 20points)
1. Please wirte name of mast based on pole function as much as possible(at least 5)?
(5points)
single suspension mast, transition mast, mid –span mast, tensioning mast, turnout
mast, registration mast, portal structure mast, flexible head span mast,
2.What are the five parts of OCS?(5points)
(1)Mast and foundation. (2) Registration device (3) Support device
(4)Overhead contact line(OCL) (5)additive wire

3.Please write technical requirements for Registration device.(5points)


(1)within allowable deviation of lateral position of contact wire
(2) it should be adaptive to stretching and shortening of wires of catenary suspension
due to tempreture change
(3) uplift of contact wire may not lead to mechnical collision between pantograph and
any part of registration device
(4)moving parties of registration devices should have minmum mass to realize satisfy
contact quality.

4.What’s funciton of midpoint anchor?(5points)


(1)It shortens the scope of tensioning device, makes the tensile force of tensioning
section more uniform, and ensures that the catenary suspension is in good working
condition.
(2)After setting up the mid-anchor, the accident scope can be limitted. When the
breakage accident happens on one side of the mid-anchor, the catenary equipment on
the other side will not be affected, which is beneficial to the emergency repair
accident and shorten the repair time of the accident.
(3)It avoids running of wires to one end under change of load, such as wind.

You might also like