BAR BENDING SCHEDULE FOR PIER AT CHAINAGE 13+670

Length of Total
Bar Dia. Spacing c/c Nos of Unit wt. Total Wt.
S.No Bar Mark Shape / Size (mm) Each Length Remarks
(mm) (mm ) Bar (kg/m) (MT)
(mm) (m)
Pier Footing & Stem

Raft Bottom
1 25 150 67 8800 586.66667 3.858 2.263

600

600
Main

7700
11840
Raft Bottom

600

600
2 16 100 77 12976 999.152 1.580 1.579
Distribution

1340
3908

3908
3 Raft Top Main 25 200 60 9956 597.36 3.858 2.305
###

###
11840
Raft Top
4 16 200 47 12976 609.872 1.580 0.964
600

600
Distribution

11840
300

300

4a 16 200 66 12376 816.816 1.580 1.291

300
10184

5 Vertical Main 16 80 10720 857.6 1.580 1.355

300
300
110184

6 Vertical Main 16 80 110720 8857.6 1.580 13.995

300
7500
1200

1200

7 Ring 12 100 1103 17400 19192.2 0.889 17.062

7500
1040
100

100

8 Link Bar 10 150 60 1200 72 0.617 0.044

CONTRACTOR Page 1/1 CONSULTANT