Brief description of the 1) Dismentling, Washing, cleaning, painting and assembly of FIAT Bogies.
operations / tasks / activity at 2) Manufacture and repair of fabricated structures and components.
the workshop / Location:
Work method sequence
(Include sketches if required)
Total number of workers at 128 Contract 04
the location/workshop Workers
Temporary supports and NIL
props needed to facilitate the
works.
Required personnel Safety Hard Hats Safety Hearing Eye Respiratory Hi-Vis
protective boot Gloves protection protection Protection Clothing
equipment: √ √ √ x √ √ x
Used in operation /
activity √ √ √ x √ √ x
(observation): √/X
Other observations
NIL
/ Remarks:
Store room location High roof area pole No. 1/5 (Material)
(for High roof area pole No. 1/3 and 1/4 (Paint and thinner)
workshop/Location) Low roof area pole No. 22/6, 22/7, 21/6, 21/7.
& Area of store
room
Type & Details of
Enclosure and open.
materials stored in
Components: Steel and metal bonded rubber
Store rooms
Gases: O2, C2H2, LPG Cylinders
(Provide quantity &
Paint and solvents: Epoxy paint, Thinner, Hardener containers.
MSDS here hazard
Grease:
is present)
Transformer /
Generator if NIL
present @ locatin
Electrical Substation if used NIL
Electrical Meter Room NIL
Any Gas utility: (O2/N2 etc.) Gas required: O2, LPG
LPG / CNG etc. Quantum (10-12 Cyl Oxygen Cylinders, 03 Cyl LPG / month)