CENTRAL RAILWAY Loco Workshop, Parel, Mumbai-12

INFORMATION: GENERAL & OPERATIONAL


Workshop/Location Fabrication Shop, High roof area, Bay Number of Location (AS per
No.-1 Map/Plan:
Client Chandrashekhar Kalyankar Contact No. 7400085789
Manager/Engineer/Supervisor 9869373590
2
Total Workshop / Location 2304 m Roof Height High / Low
area approx Mtr.
List of Machinery in the Ground machines:
workshop/Location (with Portable: Fixed:
numbers & power Welding plant: 8 Nos Minor pad pressing M/c: 1 No.
requirement/description of Fixtures: 5 Nos Damper testing machine: 1 No. (At low roof)
necessary) Gas cutting plant: 2 Nos Air compressor: 2 Nos

Brief description of the 1) Dismentling, Washing, cleaning, painting and assembly of FIAT Bogies.
operations / tasks / activity at 2) Manufacture and repair of fabricated structures and components.
the workshop / Location:
Work method sequence
(Include sketches if required)
Total number of workers at 128 Contract 04
the location/workshop Workers
Temporary supports and NIL
props needed to facilitate the
works.

Required personnel Safety Hard Hats Safety Hearing Eye Respiratory Hi-Vis
protective boot Gloves protection protection Protection Clothing
equipment: √ √ √ x √ √ x
Used in operation /
activity √ √ √ x √ √ x
(observation): √/X
Other observations
NIL
/ Remarks:
Store room location High roof area pole No. 1/5 (Material)
(for High roof area pole No. 1/3 and 1/4 (Paint and thinner)
workshop/Location) Low roof area pole No. 22/6, 22/7, 21/6, 21/7.
& Area of store
room
Type & Details of
Enclosure and open.
materials stored in
Components: Steel and metal bonded rubber
Store rooms
Gases: O2, C2H2, LPG Cylinders
(Provide quantity &
Paint and solvents: Epoxy paint, Thinner, Hardener containers.
MSDS here hazard
Grease:
is present)
Transformer /
Generator if NIL
present @ locatin
Electrical Substation if used NIL
Electrical Meter Room NIL
Any Gas utility: (O2/N2 etc.) Gas required: O2, LPG
LPG / CNG etc. Quantum (10-12 Cyl Oxygen Cylinders, 03 Cyl LPG / month)

Gas Storage Details Method of storage: Enclosure for cylinder storage.


Safety precaution provided: Provision of stand and chain.
Battery ban / Power back up NIL

Monitoring/Inspection requirements for the


activity: (e.g. noise/dust/heat/smoke
detector/monitoring/safety inspection by; EHS
and fire safety department)
Housing keeping control measures
(observations)
Waste Management
Generation & requirements:
 Classification of waste generated:
Hazardous or non-hazardous.
 Segregation method.
 How waste is transported to
designated waste collection areas etc.
Are you aware of activity specific HIRA that If, Yes. Do you have
was conducted by your IMS team? the copy of the
same? Please
provide.
Are any hazardous substance/activity to be
used
Passive Fire measures adapted if any: Are these measures
(Risk and hazard cannot be eliminated – sufficient or anything
consider both personnel & material) extra needs to be
done?