Project Title
Field Instrument Calibration
Project Objectives
- To ensure that the instrument readings are accurate for process control
- To verify response of the sensors at various parameter ranges
- To fulfil statutory obligation for audit purposes
Technical Details/Specifications
Project Scope
Page 1 of 3
Key Deliverables
2. Project scheduling
- Project execution time shall be during the day
- An estimate of 30 working days including mobilization and demobilization
RESPONSIBILITIES MATRIX
Note: The contractor is responsible for any task required for the project and not listed in the matrix below.
S\N RESPONSIBILITES CONTRACTOR FIPL
1. Personal Safety Equipment X
2. Site Safety Orientation and on-site security X
3. All tools required for the work scope described herein X
4. All materials and consumable required for the job X
Normal plant service required (light, heat, water,
5. X
compressed air, electricity)
6. Site Preparation activities X
7. Wash and Sanitary facilities X
8. First aid facility & fire protection X
Page 2 of 3
All Lifting equipment and Manpower-
9. • Mobile Cranes, Crane Operators, Lifting X
tackles, Hoists, Skids, Winch etc.
Qualified Labor including Labor supervision, skilled
and unskilled manpower and equipment operators
10. that may be required in connection with the Works. X
This should be in full compliance with NERC’s local
content law and FIPL’s MOU with host community
X (Only for
All drawings and specifications, technical information materials and
11. and equipment manuals required to perform the equipment provided
work scope by the client for the
project)
4. Sign-off
Name Signature Date
(MM/DD/YYYY)
Project Manager Samuel Duruibe 10/23/2023
Page 3 of 3