You are on page 1of 251

INDEX

S/No Subject Appendix

1 INDEX

2 STATEMENT OF CASE

3 AE PART-I

4 AE PART-II

5 DATA SHEET

6 CHECK LIST AS PER INFORMATION ASKED BY DTE

7 DETAILS OF SANCTIONED JOBS


A

8 ABSTRACT OF QUANTITY : FORMATION WORK (CUTTING)


B

9 DETAILS OF EARTH WORK


C

10 DETAILS OF JUNGLE CLEARANCE


D
E
DETAIL FOR DISPOSAL OF EXCAVATED EARTH INDICATING DISPOSAL LOCATION DULY APPROVED BY COMPETENT
11 AUTHORITY, EXTRA LEAD CALCULATION ETC.
F
12 DETAILS OF PERMANENT WORKS PROPOSED
G
13 ABSTRACTS OF QUANTITIES : PERMANENT WORKS

14 DETAILED QUANTITY CALCULATION OF PERMANENT STRUCTURE


H

15 DETAILS OF WATER GAP


I

16 GRADIENT CHART
J

17 DETAILS OF LINED DRAIN


K

18 DETAILS OF ROAD FURNITURE


L

19 REQUIREMENT OF MATERIALS
M

20 EXTRA TPT CHARGES


N

21 ROYALTY CHARGES
O
P
22 COMPARATIVE STATEMENT OF COST FOR SIMILAR WORK

23 QUARRY CHART AS PER APPROVED BOO IN TRIPLICATE DULY CTC


Q

24 DISTANCE CHART
R
S
25 COST ANALYSISTHROUGH DEPARTMENTAL COLLECTION Vs CONTRACT MATERIAL IF ANY

LEAD CALCULATION FOR ROAD LIFT CHARGES

26 ROAD LIFT CHARGES (FORMATION WORK)


T

27 ROAD LIFT CHARGES (PERMANENT WORK)


U

ROAD LIFT CHARGES (SURFACING_


V
V
28 CREDIT FOR CP TRADESMAN

29 CREDIT FOR RETRIEVED STONE


W
X
30 PRORATA RATE ANALYSIS
RATE ANALYSIS IN RESPECT OF THOSE ITEMS, WHICH ARE NOT GIVEN IN DGBR SSR, HAS BEEN CORRECTLY WORKED AS
31 OUT

32 DRAWINGS FOR-LSEC, & X-SECTIONS AND PLAN OF ROAD


Y

33 DRAWINGS FOR PMT WORKS


Z

34 REINFORCEMENT CALCULATIONS WITH BAR BENDING SCHEDULE AA

35 ROYALTY LETTER FOR SAND AND STONE FROM J&K GOVT IN TRIPLICATE DULY CTC
AB

36 COPY OF LATTER FOR CHANGE IN ALINGEMENT FROM MO4 IN TRIPLICATE DULY CTC
AC
AD
37 COPY OF LATTER FOR INCLUSION OF ROADS IN GS LTTP VIDE MO4 LETTER IN TRIPLICATE DULY CTC
AE
38 COPY OF THE DEPUTY COMMISSIONER LETTER FOR DUMPING SIDE OF MUCKDISPOSAL IN TRIPLICATE DULY CTC

39 LETTERS FROM FOREST AUTHORITY IN TRIPLICATE DULY CTC


AF

40 COPY OF CA/SO IF REQUIRED IN TRIPLICATE DULY CTC


AG
41 INDEX MAP AH
42 EQVT CL-9 AI
43 SUMMARY OF QUANTITY AI
44 REQUIREMENT OF MATERIALS AJ
45 PAYMENT DESIGN AK
46 TYPICAL CROSS SECTION AL
47 BERM FILLING QUANTITY CALCULATION AM
48 CBR VALUE WITH SOIL CLASSIFICATIONS AN
49 MSA CALCULATION AS PER IRC 37:2018 AO
50 DAILY TRAFFIC CENSUS REPORT AR
51 CONTRACT COMPARISON SHEET i.e. CONTRACT Vs DEPT IF REQUIRED AQ
52 AR
CERTIFICATE REGARDING PREPARATION / CHECKING OF ESTIMATE

Name of Area /State : J & K (UT)

Name of Project/TF/RCC : Swastik / 758 BRTF / 129 RCC

Name of works CONSTRUCTION/IMPROVEMENT OF ROAD BASOLI-BANI-


BHADERWAH FROM CL-9 TO NHDL SPECIFICATIONS (FMN,
PMT SURF & BR WK) BETWEEN KM 102.00 TO KM 112.00
THROUGH DEPARTMENTAL MODE.

It is certified that provisions made in this AE are strictly accordance with provisions of
SOPs issued by Dte GBR.

1 Name and Signature of the : Shri Jadhav Rakesh M, JE (Civ)


supervisor who prepared this AE. 368 RMPL / 114 RCC (GREF)

2 Name and Signature of the : Shri S C Garkoti, JE (Civ)


supervisor who scrutinised this E2 OIC/ 114 RCC (GREF)
AE.

3 Name and Signature of the : Shri Pramod Kumar


officer who checked the AE at EE (Civ)
RCC level. Officer Commanding

4 Name and Signature of the :


supervisor who checked the AE HQ 35 BRTF (GREF)
at TF level.

5 Name and Signature of the :


officer who scrutinized and finally OIC E2 Wks
checked the AE. HQ 35 BRTF (GREF)

6 Name and Signature of the :


supervisor who scrutinized the
AE at project level.

7 Name and Signature of the :


officer who checked the AE at (P)
HQ level.

Page 2 of 251
ADMINISTRATIVE APPROVAL
PART-I
Name of State/Area Jammu & Kashmir Job No : 247/17 (BCN)
Name of Project/TF/Unit BEACON/35 TF/114 RCC
Name of Work CONSTRUCTION/IMPROVEMENT OF ROAD BASOLI-BANI-BHADERWAH FROM CL-
9 TO NHDL SPECIFICATIONS (FMN, PMT SURF & BR WK) BETWEEN KM 102.00 TO
KM 112.00 THROUGH DEPARTMENTAL MODE.

S/No Name of work Fmn works Pmt Works Surf Works Shifting of G/Total (Rs)
( Rs) (Rs) (Rs) utilities (PHE &
Electricity)
PHE
A Work assessed as per SSR
1 Cost of Works 173859881.00 179183965.00 150822494.00 1911268.80 505777608.80
2 Road lift charges 2508306.00 22576852.00 6656628.00 31741786.00
3 Extra tpt charges - - 3667904.00 3667904.00
4 Credit for retrieved Stone (-) - -25466806.00 -6289816.00 -31756622.00
5 Credit for GREF Tradesmen (-) -3715525.00 -9157123.00 -1108893.00 -13981541.00
6 Credit for GREF PNR (-) -6757205.00 -5614816.00 -1593146.00 -13965167.00
7 Deduct cost of works based on SSR
- -26543164.00 -45270604.00 -71813768.00
2016
Total (A) 165895457.00 134978908.00 106884567.00 1911268.80 409670200.80
B Add escalation charges
1 For the year 2021-22 @15.44% for 5122852.00 2084074.00 -
7206926.00
20% Fmn and 10% Pmt works
2 For the year 2022-23 @ 15.44% for 20491407.00 8336297.00 8251489.00
80% Fmn, 40% Pmt and 50% surf 37079193.00
works
3 For the year 2023-24 @ 15.44% for - 10420372.00 8251489.00
18671861.00
50% Pmt and 50% works
Total ( B) 25614259.00 20840743.00 16502978.00 62957980.00
G/Total (A+B ) 191509716.00 155819651.00 123387545.00 1911268.80 472628180.80
C Add following charges on (A+B)

a) Physical Contingencies @ 5% 9575486.00 7790983.00 6169377.00 23535846.00


b) Quality control charges @ 1% 1915097.00 1558197.00 1233875.00 4707169.00
c) Lab Cess @ 1% 1915097.00 1558197.00 1233875.00 4707169.00
d) Road side accomodation @ 2%
3830194.00 3116393.00 6946587.00
Total ( C ) 17235874.00 14023770.00 8637127.00 - 39896771.00
D Cost of contract Works (Through
supply contract)
a) Cost of Contract works - 19077667.00 33355152.00 52432819.00
b) OH Gantry - 599000.00 - 599000.00
c) Add Supervision charges @
- - - -
2.00%
d) Quality control charges @ 1.00%
- 190777.00 333552.00 524329.00
Total (D) - 19867444.00 33688704.00 53556148.00
G/Total (A+B+C+D) 208745590.00 189710865.00 165713376.00 1911268.80 566081099.80
E Royalty charges (E) - 1430472.00 522145.00 - 1952617.00
G/Total (A to E) 208745590.00 191141337.00 166235521.00 1911268.80 568033716.80
Say Rs (Lacs) 2087.46 1911.41 1662.36 19.11 5680.340

Station : Chandigarh (G S Narula)


Col
Dir (Estg & Br)
Dated : _______ Oct 2021. For ADGBR (NW)

Page 3 of 251 Part I


ADMINISTRATIVE APPROVAL
PART - II
Job No : 247/17 (BCN)
Altd up to 2001-2400 & 2401-2700 Mtr
SSR-2016 (ZONE "J")
Name of State/ Area JAMMU & KASHMIR
Name of Project/TF BEACON/35 BRTF/114 RCC
Name of works CONSTRUCTION/IMPROVEMENT OF ROAD BASOLI-BANI-BHADERWAH FROM CL-9 TO NHDL SPECIFICATIONS (FMN, PMT SURF & BR WK) BETWEEN KM 102.00 TO
KM 112.00 THROUGH DEPARTMENTAL MODE.

SL No SSR 2016 Item Brief specifications A/U QTY RATE AMOUNT Remark
No
1 FORMATION WORKS
F-101 Jungle clearance incl cutting down trees not exceeding 30 cm grith measured at 1 m above GL &
clearing away shurbs, brushwood, under growth and grubbing up roots in area having annual rainfall
upto 200 cm.
Altitude 2101-2400 Mtr 10Sqm 3,490.50 314.32 1,097,134.00
Altitude 2401-2700 Mtr 10Sqm 5,129.20 337.71 1,732,182.00
F-103 Cutting down trees 30 Cm to 75 Cm
Altitude 2101-2400 Mtr No. 60.00 1,221.00 73,260.00
Altitude 2401-2700 Mtr No. 90.00 1,311.86 118,067.00
F-103+ Cutting down trees 75 Cm to 100 Cm
F-104 Altitude 2101-2400 Mtr No. 14.00 2,133.61 29,871.00
Altitude 2401-2700 Mtr No. 23.00 2,292.71 52,732.00
F-401 Rough excavation in Soil/SMB, getting out and disposing all excavated material lead upto 3 m and
upto 1.50 m deep (75% machine and 25 % by manual labour)
Altitude 2101-2400 Mtr Cum 61,611.41 154.31 9,507,257.00
Altitude 2401-2700 Mtr Cum 132,977.46 162.55 21,615,487.00
F-402 Rough excavation in soft rock requiring blasting upto 50% of quantities and getting out with lead upto
3m and not exceeding 1.5m deep (75% by machine and 25% by manual labour)
Altitude 2101-2400 Mtr Cum 98,426.80 343.71 33,830,275.00
Altitude 2401-2700 Mtr Cum 86,944.78 362.06 31,479,225.00
F-403 Rough excavation in hard rock by drilling and compressor blasting and getting out incl stacking of
serviceable material and disposal of unserviceable material lead upto 3m and 1.5m deep (75% by
machine and 25% by manual labour)
Altitude 2101-2400 Mtr Cum 37,914.18 329.78 12,503,337.00
Altitude 2401-2700 Mtr Cum 89,632.39 344.75 30,900,766.00
F-701 Earth work in embankment upto 1.5 mtr height in hill roads
Altitude 2101-2400 Mtr Cum 14,092.75 61.05 860,362.00
Altitude 2401-2700 Mtr Cum 9,923.53 63.02 625,381.00
F-802+F-802A Disposal of excavated earth with vehicle and Add to F-802 for every additional KM per Cum after
initial 5 KM lead
Altitude 2101-2400 Mtr Cum/Km 121,648.41 93.15 11,331,314.00
Altitude 2401-2700 Mtr 200,678.76 90.21 18,103,231.00
Total
Altitude 2101-2400 Mtr 69,232,810.00
Altitude 2401-2700 Mtr 104,627,071.00
Credit for deployment of GREF Tradesman
Altitude 2101-2400 Mtr - 1,392,856.00
Altitude 2401-2700 Mtr - 2,322,669.00

Page 4 of 251
SL No SSR 2016 Item Brief specifications A/U QTY RATE AMOUNT Remark
No
Credit for deployment of GREF : PNR
Altitude 2101-2400 Mtr - 2,863,532.00
Altitude 2401-2700 Mtr - 3,893,673.00
Road lift charges from rail head to store coy
Altitude 2101-2400 Mtr 997,513.00
Altitude 2401-2700 Mtr 1,510,793.00
2 PERMANENT WORKS
P-101 Excvn intrenches not exceeding 1.2 m width and 1.5 mtr depth in soil/soil mixed witnh boulders incl
dressing bottom and sides getting out and disposing all excavated material lead upto 3 mtrs and lift
upto 1.50m. ( by manual means)
Altitude 2101-2400 Mtr Cum 3,627.59 502.08 1,821,341.00
Altitude 2401-2700 Mtr Cum 13,094.20 641.95 8,405,819.00
P-102 Excvn intrenches not exceeding 1.2 m width and 1.5 mtr depth in Soft rock (SR) as in item P 101
requiring blasting upto 50% of Qty and getting out and disposing all excavated materials lead upto 3
mtrs and lift upto 1.5 mtr. ( by manual means)
Altitude 2101-2400 Mtr Cum 3,717.21 1,137.25 4,227,402.00
Altitude 2401-2700 Mtr 5,655.02 1,442.97 8,160,023.00
P-103 Excvn intrenches not exceeding 1.2 m width and 1.5 mtr depth in Hard rock by drilling with
compressor blasting and getting out including stacking up serviceable materials and disposal of
unserviceable material lead upto 3m not excceding 1.50m lift ( by manual means).
Altitude 2101-2400 Mtr Cum 742.36 762.21 565,837.00
Altitude 2401-2700 Mtr 3,241.53 951.56 3,084,511.00
P-107 Hard core comprising of broken road material size 5 cm graded downwards spread in layers not
exceeding 15 cm incl watering ramming, finishing to required level and gradient including cost of
stone metal.
Altitude 2101-2400 Mtr Cum 12.56 2,074.69 26,058.00
Altitude 2401-2700 Mtr 29.83 2,200.83 65,651.00
P-201 Plain Cement concrete 1:5:10 (1 Cement:5 Sand:10 stone aggregate of size 40mm graded
downwards) in foundation or elsewhere.(excluding the cost of centering/shuttering).
Altitude 2101-2400 Mtr Cum 338.81 3,723.64 1,261,620.00
Altitude 2401-2700 Mtr 588.83 3,913.87 2,304,623.00
P-202 Cement concrete 1:4:08 ( 1Cement:4 Sand:8 stone aggregate of size 40mm graded downwards) in
foundation or elsewhere.(excluding the cost of centering/shuttering).
Altitude 2101-2400 Mtr Cum 1,216.59 3,972.07 4,832,368.00
Altitude 2401-2700 Mtr 3,546.89 4,162.38 14,763,488.00
P-203 Cement concrete 1:3:6 ( 1Cement:3 Sand:6 stone aggregate of size 40mm graded downwards) in
foundation or elsewhere. (excluding the cost of centering/shuttering).
Altitude 2101-2400 Mtr Cum 1,190.09 4,285.58 5,100,231.00
Altitude 2401-2700 Mtr 2,521.07 4,475.19 11,282,246.00
P-207 Reinforced cement concrete M 25 nearly corresponding to nominal Mix , 1cement :1.25 sand :2.5
stone aggregate of size 20 mm & 10mm graded downwards ( excluding the cost of reinforcement
and centering / shuttering )
Altitude 2101-2400 Mtr Cum 57.12 7,805.81 445,868.00
Altitude 2401-2700 Mtr 135.66 8,159.63 1,106,935.00
P-205 Reinforced cement concrete 1:2:4 (1 Cement : 2 Coarse sand : 4 stone aggregate gauge 2 cm
graded downwards) (excluding the cost of reinforcement/centering/shuttering)
Altitude 2101-2400 Mtr Cum 2.80 6,701.84 18,765.00
Altitude 2401-2700 Mtr - 7,274.52 -

Page 5 of 251
SL No SSR 2016 Item Brief specifications A/U QTY RATE AMOUNT Remark
No
P-209 Centering/shuttering ( steel ) including strutting propping and removal of form work ( Considering
10 times to be used)
Altitude 2101-2400 Mtr 10 Sqm 460.62 5,577.96 2,569,324.00
Altitude 2401-2700 Mtr 914.87 5,955.25 5,448,261.00
P-302 Laying reinforcement incl cutting/bending,binding providing hooks overlaps etc bars upto 12 mm.
(labour only)
Altitude 2101-2400 Mtr 100 Kg 57.48 1,889.09 108,583.00
Altitude 2401-2700 Mtr 120.77 2,029.67 245,129.00
P-303 Laying reinforcement incl cutting/bending,binding providing hooks overlaps etc bars above 12 mm.
(labour only)
Altitude 2101-2400 Mtr 100 Kg - 1,337.20 -
Altitude 2401-2700 Mtr - 1,524.76 -
P-501 Walling of rubble stone laid dry, well bonded faced with selected stones
Altitude 2101-2400 Mtr Cum 1,562.91 3,338.73 5,218,120.00
Altitude 2401-2700 Mtr 3,301.31 3,578.18 11,812,668.00
P-505 Random/polygonal rubble walling in cement mortor 1:6 brought to course 45 cm high well bonded
(material and labour)
Altitude 2101-2400 Mtr Cum 3,523.31 4,226.27 14,890,463.00
Altitude 2401-2700 Mtr 11,481.83 4,486.59 51,514,281.00
P-601 Filling stone/selected material in layers well packed behind retaining walls,Breast walls,abutment/
wing wall of bridges or culvert(labour and material.
Altitude 2101-2400 Mtr Cum 2,414.52 1,130.88 2,730,527.00
Altitude 2401-2700 Mtr 6,743.56 1,212.95 8,179,600.00
P-801 White Washing (two Coats )Prepared by slaking freshly burnt Class C lime confirming to IS 712-
1964,the quantity of gum to be used shall be @ 4 kg/Cum of cream
Altitude 2101-2400 Mtr 10 Sqm 243.45 165.05 40,182.00
Altitude 2401-2700 Mtr 739.43 175.87 130,043.00
F-701 Earth work embankment by filling with earth free from roots etc spreading in layers not exceeding 30
cm including watering and finishing to required slope and level not exceeding 1.5 m high above the
base in ordinary soil in hill roads where cut & fill method
Altitude 2101-2400 Mtr Cum 35.68 61.05 2,178.00
Altitude 2401-2700 Mtr 84.74 63.02 5,340.00
MP-12 Cost of steel
Altitude 2101-2400 Mtr MT 5.75 53,180.00 305,672.00
Altitude 2401-2700 Mtr 12.08 53,180.00 642,270.00
P807 Weep hole (Laying PVC pipe 4" dia)
Altitude 2101-2400 Mtr Mtr 4,212.62 199.86 841,934.00
Altitude 2401-2700 Mtr 14,101.29 199.86 2,818,284.00
G06 Providing & fixing of warning signs of triangular shape 60 cm
Altitude 2101-2400 Mtr Nos 112.00 2,883.58 322,961.00
Altitude 2401-2700 Mtr 126.00 2,969.77 374,191.00
G07 Providing & fixing of warning signs of rectangular shape 80 cm x 60 cm
Altitude 2101-2400 Mtr Nos 4.00 3,671.72 14,687.00
Altitude 2401-2700 Mtr 5.00 3,771.95 18,860.00
G-08 Providing and fixing of Ordinary Km stone incuding all aspects
Altitude 2101-2400 Mtr Nos 4.00 2,883.20 11,533.00
Altitude 2401-2700 Mtr 6.00 3,081.76 18,491.00
G-09 Providing and fixing of sub Km stone incuding all aspects
Altitude 2101-2400 Mtr Nos 12.00 789.88 9,479.00
Page 6 of 251
SL No SSR 2016 Item Brief specifications A/U QTY RATE AMOUNT Remark
No
Altitude 2401-2700 Mtr 28.00 823.62 23,061.00

Page 7 of 251
SL No SSR 2016 Item Brief specifications A/U QTY RATE AMOUNT Remark
No
G 10 Providing and fixing of 5 th km stone incuding all aspects
Altitude 2101-2400 Mtr Nos - 4,233.09 -
Altitude 2401-2700 Mtr 1.00 4,378.34 4,378.00
T001 Providing/Fixing Road Delineators (600 mm)
Altitude 2101-2400 Mtr Nos 121.00 681.24 82,430.00
Altitude 2401-2700 Mtr 209.00 683.03 142,753.00
T003 Metal beam Crash Barrier (Type- A, "W")
Altitude 2101-2400 Mtr Mtr 550.00 1,734.28 953,854.00
Altitude 2401-2700 Mtr 1,204.00 1,754.60 2,112,538.00
T004 Providing /Fixing of Cat Eyes ( Solar Type)
Altitude 2101-2400 Mtr Nos 241.00 181.01 43,623.00
Altitude 2401-2700 Mtr 417.00 181.01 75,481.00
TOTAL
Altitude 2101-2400 Mtr 46,445,040.00
Altitude 2401-2700 Mtr 132,738,925.00
Supply of Fabricated Over Head single pole Tubular Gantry of 10 m span made of MS pipes with RA-I
two numbers High intensive Micro Prismatic Over Head sign Board of size 12 m x 2.136 m and
height 6m each at Km 102.000 and Km 126.950
Altitude 2101-2400 Mtr Nos 1.00 599,000.00 599,000.00
Altitude 2401-2700 Mtr
Road lift charges for constructional stores from rail head/Store Coy to mid work site
Altitude 2101-2400 Mtr 5,877,458.00
Altitude 2401-2700 Mtr 16,699,394.00
Extra transportation charges for Sand/Stone
Altitude 2101-2400 Mtr -
Altitude 2401-2700 Mtr -
Cost of materials based on SSR [ proposed to be procured through Contact ]
Altitude 2101-2400 Mtr - 7,450,588.00
Altitude 2401-2700 Mtr - 19,092,576.00
Credit for deployment of GREF Tradesman
Altitude 2101-2400 Mtr - 2,084,064.00
Altitude 2401-2700 Mtr - 7,073,059.00
Credit for deployment of GREF PNR
Altitude 2101-2400 Mtr - 1,366,135.00
Altitude 2401-2700 Mtr - 4,248,681.00
Credit for retrieved stone from formation cutting in HR
Altitude 2101-2400 Mtr - 6,282,495.00
Altitude 2401-2700 Mtr - 19,184,311.00
Cost of materials based on current CA rates
Altitude 2101-2400 Mtr 5,583,870.00
Altitude 2401-2700 Mtr 13,493,797.00
Royalty charges for Stone and Sand
Altitude 2101-2400 Mtr 369,636.00
Altitude 2401-2700 Mtr 1,060,836.00

Page 8 of 251
SL No SSR 2016 Item Brief specifications A/U QTY RATE AMOUNT Remark
No
3 SURFACING WORK

P-101 Excvn intrenches not exceeding 1.2 m width and 1.5 mtr depth in soil/soil mixed witnh boulders incl
dressing bottom and sides getting out and disposing all excavated material lead upto 3 mtrs and lift
upto 1.50m. ( by manual means)
Altitude 2101-2400 Mtr Cum 793.17 502.08 398,235.00
Altitude 2401-2700 Mtr 1386.83 641.95 890,275.00
P-103 Excvn intrenches not exceeding 1.2 m width and 1.5 mtr depth in Hard rock by drilling with
compressor blasting and getting out including stacking up serviceable materials and disposal of
unserviceable material lead upto 3m not excceding 1.50m lift ( by manual means).
Altitude 2101-2400 Mtr Cum 471.67 762.21 359,512.00
Altitude 2401-2700 Mtr 206.09 951.56 196,111.00
F- 701 Earthwork in embankment by filling with earth free from roots etc. spreading in layers not exceeding
30 cm including watering and finishing to required slope & level not exceeding 1.5 m high above the
base in ordinary soil in hill roads where cut & fill method is adopted.
Altitude 2101-2400 Mtr Cum 1870.68 61.05 114,205.00
Altitude 2401-2700 Mtr 3251.12 63.02 204,886.00
S-101 Preparation of sub-grade in SMB by excavating upto 20 cm avg depth, dressing excavated earth to
required camber or super elevation and consolidating with power roller incl disposal of surplus earth
within a lead of 30 mtr.
Altitude 2101-2400 Mtr 10 Sqm 918.94 465.39 427,664.00
Altitude 2401-2700 Mtr 2,348.47 488.15 1,146,407.00
S-102 Preparation of sub-grade in SR by excavating upto 20 cm avg depth, filling with small stone metal
out of excavated material,dressing to required camber or super elevation and consolidating with
power roller incl disposal of surplus earth within a lead of 30 mtr.
Altitude 2101-2400 Mtr 10 Sqm 2,028.53 796.05 1,614,813.00
Altitude 2401-2700 Mtr 591.02 836.17 494,192.00
S-103 Preparation of sub-grade in hard rock by excavating upto 20 cm avg depth, filling with small stone
metal out of excavated material, dressing to required camber or super elevation and consolidating
with power roller incl disposal of surplus material within a lead of 30 mtr
Altitude 2101-2400 Mtr 10 Sqm 335.58 761.20 255,447.00
Altitude 2401-2700 Mtr 2,683.35 791.60 2,124,137.00
S206 Providing sand blanketing to a depth of 25 mm spraying water, compacting with power roller all
complete.
Altitude 2101-2400 Mtr 10 Sqm 279.33 420.07 117,340.00
Altitude 2401-2700 Mtr 2,545.12 439.39 1,118,301.00
S-109D GSB 15 cm thick (compacted ) with stone aggregate conforming to grading No V as per Tables-400-
1 of MORT&H specifications for Road and Bridge Works including supply of material, watering and
compaction all complete.
Altitude 2101-2400 Mtr 10 Sqm 2,500.39 3,961.46 9,905,207.00
Altitude 2401-2700 Mtr 2,501.27 4,182.47 10,461,466.00
S-404 Providing, laying, spreading and compacting graded stone aggregate grading as per Table-400-13
and satisfying the physical reqmt as per Table No. 400-12 of MORT&H specifications for WMM
specifications to a thickness of 75 mm, including premixing the material with water to OMC in
mechanical mix (Pug Mill) laying in uniform layers in sub base/base course on a well prepared base
and compacting with power vibratory roller to achieve the desired density including guarding.

Altitude 2101-2400 Mtr 10 Sqm 4,830.78 2,309.15 11,154,986.00


Altitude 2401-2700 Mtr 4,845.12 2,412.79 11,690,257.00

Page 9 of 251
SL No SSR 2016 Item Brief specifications A/U QTY RATE AMOUNT Remark
No
S-405 Providing, laying, spreading and compacting graded stone aggregate grading as per Table-400-13
and satisfying the physical reqmt as per Table No. 400-12 of MORT&H specifications for WMM
specifications to a thickness of 100 mm, including premixing the material with water to OMC in
mechanical mix (Pug Mill) laying in uniform layers in sub base/base course on a well prepared base
and compacting with power vibratory roller to achieve the desired density including guarding.

Altitude 2101-2400 Mtr 10 Sqm 271.41 3,045.43 826,572.00


Altitude 2401-2700 Mtr 2,205.48 3,205.95 7,070,646.00
S-809 Providing and applying Prime coat with bitumen emulsion on prepared surface of granular base
including clearing of road surface and spraying primer @ 7.50 Kg per 10 sqm. ( Using BPD with
manual labour.
Altitude 2101-2400 Mtr 10 Sqm 2,634.26 726.68 1,914,264.00
Altitude 2401-2700 Mtr 4,495.28 747.18 3,358,783.00
S511 Providing and laying 50 mm thick DBM layer, precoated stone aggregate physical
requirements/grading/mix composition requirement as per Table - 500-8/9/10 respectively of
MORT&H specifications for road and bridge works with 4.250% asphalt VG-10 penetration grade as
per MoSRT&H data book and rolled to the required specification.
Altitude 2101-2400 Mtr 10 Sqm 2,634.26 5,193.17 13,680,160.00
Altitude 2401-2700 Mtr 4,495.28 5,248.01 23,591,274.00
S-814 Providing and applying tack coat with bitumen emulsion using EPD @ 2.50 Kg/10 Sqm on prepared
bituminous/ granular surface cleaned with mechanical broom, all complete .
Altitude 2101-2400 Mtr 10 Sqm 2,634.26 166.40 438,341.00
Altitude 2401-2700 Mtr 4,495.28 167.00 750,712.00
S512A Bituminous Concrete 30 mm thick using bitumen VG-10 (80/100)
Altitude 2101-2400 Mtr 10 Sqm 2,634.26 3,685.01 9,707,274.00
Altitude 2401-2700 Mtr 4,495.28 3,743.89 16,829,834.00
P-802A Road marking with thermoplastic paint (2.5 mm thick) confirming to MOST : 803.40 including
preparation of surface and application
Altitude 2101-2400 Mtr 10 Sqm 86.51 4,338.15 375,274.00
Altitude 2401-2700 Mtr 149.74 4,380.40 655,925.00
S-401 Scarifying existing BT surface in the manner to avoid any horizontal shear failure with overlaid WBM
work
Altitude 2101-2400 Mtr 10 Sqm 528.49 951.74 502,986.00
Altitude 2401-2700 Mtr 605.27 1,022.57 618,934.00
C-101 Cost of carriage of ready mix of DBM & AC
Altitude 2101-2400 Mtr MT/KM 4,852,647.00
Altitude 2401-2700 Mtr 12,975,427.00
Total
Altitude 2101-2400 Mtr 56,644,927.00
Altitude 2401-2700 Mtr 94,177,567.00
Credit for deployment of GREF Tradesman
Altitude 2101-2400 Mtr - 345,977.00
Altitude 2401-2700 Mtr - 762,916.00
Credit for deployment of GREF PNR
Altitude 2101-2400 Mtr - 540,394.00
Altitude 2401-2700 Mtr - 1,052,752.00

Page 10 of 251
SL No SSR 2016 Item Brief specifications A/U QTY RATE AMOUNT Remark
No
Road lift charges for constructional stores from rail head Pathankot to mid point of work site Rs
Altitude 2101-2400 Mtr 2466832.00
Altitude 2401-2700 Mtr 4189796.00
Extra Tpt charges for stone and sand Rs
Altitude 2101-2400 Mtr 1,473,938.00
Altitude 2401-2700 Mtr 2,193,966.00
Credit for retrieved stone from formation cutting in HR Rs
Altitude 2101-2400 Mtr - 3,046,848.00
Altitude 2401-2700 Mtr - 3,242,968.00
Cost of materials based on SSR [ proposed to be procured through Contact ] Rs
Altitude 2101-2400 Mtr -17042893.00
Altitude 2401-2700 Mtr -28227711.00
Add cost of material proposed through Supply contract Rs
Altitude 2101-2400 Mtr 12,985,787.00
Altitude 2401-2700 Mtr 20,369,365.00
Royalty charges for Stone & sand Rs
Altitude 2101-2400 Mtr 244,745.00
Altitude 2401-2700 Mtr 277,400.00
4 SHIFTING UTILITIES

Shifting of Water Supply line under (J& K Dept ,PHE Division Kathua) 1,097,268.80
Shifting of Electricity utilities under (J& K Dept ,PHE Division Kathua) 814,000.00

Station : C/o 56 APO (Rajeev Chandra)


EE (Civ)
Joint Dir (Estg & Plg)
Dated : _______Oct 2021 For ADGBR (NW)

Page 11 of 251
DESIGN AND CONSTRUCTION OF 90 M (45 M + 45 M) MAJOR PERMANENT SARTHAL BRIDGE
WITH PSC BOX GIRDER TYPE SUPERSTRUCTURE ON OPEN FOUNDATION OVER KANDILLU
NALLAH AT KM 114.250 ON BASOLI-BANI-BHADERWAH ROAD UNDER 114 RCC/35 BRTF OF
PROJECT BEACON IN J & k STATE

1 Name of Bridge : SARTHAL Bridge


2 Location of Bridge : At Km 114.250 on Basoli-Bani-
Bhaderwah Road
3 Span of Bridge : 90 m
4 Type of Foundation : Open foundation
5 Depth of Superstructure :
6 Total Height of Abutment :
Deck Level : 2443.00 m
7 Foundation Level :
Bhaderwah Side Abutment (A1) : 2427.000 m
Bani Side Abutment (A2) : 2427.000 m
8 Height of Abutment
Bhaderwah Side Abutment (A1) : 16.00 m
Bani Side Abutment (A2) : 16.00 m
For Project Beacon rate (BR SSR 2019 circulated vide HQ Dte GBR Letter No.
33733/DGBR/BRSSR-2019/92/D&S dated 19 Jul 2019)
9 Super Structure (Table-2) :
Longer span i.e 90 m span per m rate considered = 6.18 lakh
10 Sub Structure (Table-1) :
For sub structure of 90 m span upto 10 m height substructure = 6.02 lakh
per m rate
11 The Height of Abutment of Bridge :
Both side (i.e. Atalgarh and Kapra) : 16.000 m
12 ABUTMENT :
Per m rate for 16.00 m height of both side Abutment = 9.63 lakh/m
Therefore, per m cost of Bridge for Project Beacon
13 Rate for Superstructure 11 m width = 6.18 lakh/m
Cost for 12m width superstructure (6.18/11x12) = 6.74 lakh/m
Therefore, per m cost of Bridge for Project Beacon
14 Work done through Execution Contract
Substructure
Cost of Work as per SSR - 2019 (X) : 9.63 lakh/m
Over head charges (Y) @ 10% of X as the work is within 50 : 0.96 lakh/m
Crs
Contractor's Profit : 1.06 lakh/m
(Z = 10% of (X+Y))
Total cost of Substructure (C=X+Y+Z) 11.65 lakh/m

Superstructure
Cost of Work as per SSR - 2019 (X) : 6.74 lakh/m
Over head charges (Y) @ 10% of X as the work is within 50 : 0.67 lakh/m
Crs
Contractor's Profit : 0.74 lakh/m
(Z = 10% of (X+Y))
Total cost of Superstructure (C=X+Y+Z) 8.15 lakh/m

(Pramod Kumar)
EE (Civ)
Officer Commanding
PRORATA RATE ANALYSIS, DGBR SSR-2016 Appendix ' AQ '
Project:Beacon
Machine Manpower Component
Component
Code Brief Description Zone J Zone J Cost in (Rs) Zone J Zone J 2100 to 2401 to
of V/E/P 2400 (J) 2700 (J) 7% 3%

C101 Carriage of Constructional Stores 17.65 17.65 6.04 6.45 6.45 18.28 18.98 15% 6%
C102 Carriage of Constructional Material (manually ) 148.22 148.22 147.48 147.48 158.54 170.34 25% 9%
C103 Extra Lead for C-102 33.62 33.62 33.62 33.62 35.97 38.66 32% 12%
D101 Preparation of DPR 79845.30 79845.30 70677.97 70677.97 84792.76 90447 48% 15%
D102 Preparation of DPR (New road) 424396.85 424396.85 413515.33 413515.33 453342.92 486424.15
D103 Dismantling of Structures 1106.83 1106.83 127.39 346.71 346.71 1134.92 1166.48
F101 Jungle Clearance Rainfall upto 200 cm 293.85 293.85 292.39 292.39 314.32 337.71
F102 Jungle Clearance Rainfall above 200 cm 563.21 563.21 560.41 560.41 602.44 647.27
F103 Cutting down tree 30 cm to 75 cm girth 1141.49 1141.49 1135.81 1135.81 1221 1311.86
F104 Add to F103 for every additional 25 cm girth or part there off 852.91 852.91 852.91 852.91 912.61 980.85

F105 Credit for non retrievable trees to F-103 67.25 67.25 67.25 67.25 71.96 77.34
F106 Credit for non retrievable trees to F-104 112.09 112.09 112.09 112.09 119.94 128.9
F201 Mannual Rough Excavation in SMB 297.74 297.74 296.26 296.26 318.48 342.18
F201A Rough Excavation in SMB using Excavator 35.07 35.07 14.68 10.04 10.04 36.22 37.46
F202 Mannual Rough Excavation in SR 701.91 701.91 3.46 662.82 662.82 748.41 801.54
F203 Mannual Rough Excavation in HR 484.58 484.58 6.92 408.68 408.68 513.4 546.3
F301 Rough Excavation by Machine in SMB 96.69 96.69 52.00 19.11 19.11 99.59 102.68
F302 Rough Excavation by Machine in SR 213.28 213.28 82.93 57.59 57.59 219.8 226.9
F303 Rough Excavation by Machine in HR 279.20 279.20 86.39 85.98 85.98 287.81 297.28
F401 Rough Excavation in SMB 75% Machine & 25% manual 146.95 146.95 39.00 88.39 88.39 154.31 162.55
F402 Rough Excavation in SR 75% Machine & 25% manual 327.43 327.43 62.19 206.01 206.01 343.71 362.06
F403 Rough Excavation in HR 75% Machine & 25% manual 316.44 316.44 64.79 162.80 162.80 329.78 344.75
F502 Earth work in Excavation SR by Manual 740.08 740.08 5.14 700.89 700.89 789.29 845.52
F503 Earth work in Excavation HR by Manual 581.26 581.26 6.92 505.12 505.12 616.83 657.45
F701 Earth work in embankment upto 1.5 mtr height in hill roads 59.21 59.21 28.18 14.12 14.12 61.05 63.02
F702 Earth work in embankment above 1.5 mtr height in plain area 347.98 347.98 41.93 59.05 59.05 353.37 359.35
(upto 3.00 mtr)
F703 Additional lift to F-701 & 702 151.46 151.46 151.46 151.46 162.06 174.18
F704 Additional lift to F-203, 303, 403 & 503 215.20 215.20 215.20 215.20 230.26 247.48
F801 Turfing on Slopes 459.26 459.26 42.16 369.56 369.56 486.4 517.23
F802 Disposal of excavated earth with vehicle upto 5 KM initial lead 85.98 85.98 31.49 15.59 15.59 88.01 90.21
F802-A Add to F-802 for every additional KM per Cum after initial 5 KM 3.83 3.83 3.83 3.83 4.09 4.4
lead
G01 Temporary culvert upto 2 mtr span 59377.28 59377.28 6814.88 6814.88 59854.32 60399.51
G02 Unlined drain in SMB 189.85 189.85 188.91 188.91 203.08 218.19
G03 Unlined drain in SR 411.37 411.37 409.32 409.32 440.02 472.76
G04 Unlined drain in HR 298.26 298.26 260.17 260.17 316.47 337.28
G05 Providing & fixing of warning signs of triangular shape 90 cm 3460.03 3460.03 73.44 1142.52 1142.52 3542.21 3635.81

G06 Providing & fixing of warning signs of triangular shape 60 cm 2807.89 2807.89 73.44 1049.85 1049.85 2883.58 2969.77

G07 Providing & fixing of warning signs of rectangular shape 80 cm 3583.75 3583.75 73.87 1225.13 1225.13 3671.72 3771.95
x 60 cm
G08 Providing & fixing ordinary KM stone 2708.99 2708.99 126.25 2434.61 2434.61 2883.2 3081.76
G09 Providing & fixing Sub KM stone 760.14 760.14 56.60 400.57 400.57 789.88 823.62
G10 Providing & Fixing Fifth KM stone 4105.37 4105.37 169.15 1752.14 1752.14 4233.09 4378.34
G11 Errection/Launching/Delaunching of ty BB 4731.00 4731.00 4707.46 4707.46 5060.52 5437.12
H01 Preparation of Hyd data 23754.82 23754.82 20174.82 20174.82 25167.06 26781.04
M101 Collection of Rubble Stone 718.62 718.62 45.62 592.07 592.07 761.44 810.17
M101A Collection of Stone Bouldres 634.35 634.35 57.31 508.01 508.01 671.63 713.99
M102 Collection of Bond Stone 1066.19 1066.19 45.62 938.77 938.77 1133.27 1209.74
M103 Collection of Shingle 1003.21 1003.21 56.26 881.56 881.56 1066.61 1138.82
M104 Collection of Sand 1590.82 1590.82 56.26 1466.25 1466.25 1695.15 1814.14
M104A Collection of Sand by Machine(JCB) 501.14 501.14 102.10 316.04 316.04 526.33 554.68
M104B Collection of Sand (25% manualy & 75% by Machine (JCB)) 773.57 773.57 90.64 603.59 603.59 818.54 869.55

M201 Breaking of Stone by Crusher to metal (26.5 mm nominal size) 1196.35 1196.35 262.76 723.20 723.20 1254.86 1320.6

M202 Manual Breaking of Stone to metal (26.5 mm nominal size) 2310.45 2310.45 50.18 2159.98 2159.98 2463.16 2637.46

M203 Breaking of Stone to metal (26.5 mm nominal size) 75% 1443.79 1443.79 215.77 1074.76 1074.76 1525.5 1617.95
Machine & 25% Manual
M204 Breaking of Chips( 13.2 mm nominal size) by Crusher from 1243.97 1243.97 271.76 754.04 754.04 1304.9 1373.38
stone bouder by Machine
M205 Breaking Jhama Bricks (Manually) 2072.46 2072.46 1007.92 1007.92 2143.02 2223.65
M206 Stone Dressing 1193.94 1193.94 1188.00 1188.00 1277.1 1372.14
M207 Breaking of Chips 12.5 mm by crusher from river shingle 1619.86 1619.86 281.19 1139.55 1139.55 1708.06 1807.66

M301 Extra lead for M101 to M105 & M201 to M205 8.87 8.87 2.66 3.36 3.36 9.19 9.53
M302 Crushing of Chippings (6.7 mm nominal size ) by Crusher from 1532.28 1532.28 259.14 843.09 843.09 1599.07 1674.3
stone
Code Brief Description Zone J Zone J Cost in (Rs) Zone J Zone J 2100 to 2401 to
of V/E/P 2400 (J) 2700 (J) 7% 3%

M302A Crusher Sand (2.36 mm nominal size ) by Crusher from stone 1553.42 1553.42 264.50 752.28 752.28 1614.01 1682.13

P101 Excavation in Trenches in SMB 379.69 379.69 1748.41 1748.41 502.08 641.95
P102 Excavation in Trenches in SR 869.73 869.73 3.46 3820.24 3820.24 1137.25 1442.97
P103 Excavation in Trenches in HR 596.50 596.50 6.92 2364.27 2364.27 762.21 951.56
P104 Additional Depth for P-101 118.83 118.83 118.83 118.83 127.15 136.65
P105 Additional lead for P-101 to P-103 118.83 118.83 118.83 118.83 127.15 136.65
P106 Additional Depth for P-102 & P-103 145.26 145.26 145.26 145.26 155.43 167.05
P107 Hard core 1964.31 1964.31 1576.83 1576.83 2074.69 2200.83
P108 Dewatering of abutment excavation in area of rainfall upto 200 3341.55 3341.55 266.54 1743.05 1743.05 3471.56 3619
mm
P109 Dewatering of abutment excavation in area of rainfall above 4009.88 4009.88 319.85 2091.67 2091.67 4165.89 4342.82
200 mm
P201 PCC 1: 5:10 3556.00 3556.00 319.52 2257.96 2257.96 3723.64 3913.87
P202 PCC 1:4:8 3804.36 3804.36 318.71 2259.31 2259.31 3972.07 4162.38
P203 PCC 1:3:6 4118.29 4118.29 366.54 2232.75 2232.75 4285.58 4475.19
P204 PCC 1:2:4 6662.62 6662.62 437.69 3894.42 3894.42 6948.36 7273.04
P205 RCC 1:2:4 6662.62 6662.62 462.39 3894.42 3894.42 6949.1 7274.52
P206 RCC M-20 7114.55 7114.55 475.01 4226.65 4226.65 7424.66 7777.04
P207 RCC M-25 7494.43 7494.43 478.23 4243.43 4243.43 7805.81 8159.63
P208 RCC M-30 7517.08 7517.08 478.42 4244.44 4244.44 7828.54 8182.45
P209 Centering /Shuttering (Steel) 5247.83 5247.83 4716.18 4716.18 5577.96 5955.25
P301 Precast Slab RCC 1:2:4 23250.35 23250.35 421.89 9767.24 9767.24 23946.72 24740.75
P302 Laying Reinforcement upto 12 mm dia 1766.08 1766.08 1757.29 1757.29 1889.09 2029.67
P303 Laying Reinforcement above 12mm dia 1173.09 1173.09 2344.47 2344.47 1337.2 1524.76
P304 Masonry work with Concrete Hollow Block 5144.16 5144.16 197.98 3712.43 3712.43 5409.97 5712.91
P305 Concrete Pavement belting 67.25 67.25 67.25 67.25 71.96 77.34
P306 Concrete Pavement brooming 135.17 135.17 134.50 134.50 144.59 155.35
P401 Brick Masonary 1:6 5968.15 5968.15 21.38 1777.11 1777.11 6093.19 6236
P402 Brick Masonary 1:4 6124.39 6124.39 22.77 1778.30 1778.30 6249.55 6392.5
P501 RRM Dry 3129.03 3129.03 50.18 2974.25 2974.25 3338.73 3578.18
P502 Sausage Wall 4320.22 4320.22 56.13 3260.90 3260.90 4550.17 4812.73
P504A Open Weave Jute Geotextiles (For Control of Surficial Soil 82.68 82.68 33.14 33.14 85 87.65
Erosion)
P505 RRM 1:6 3998.17 3998.17 82.50 3223.15 3223.15 4226.27 4486.59
P506 RRM 1:4 4258.00 4258.00 85.62 3228.79 3228.79 4486.59 4747.46
P507 RRM 1:3 4467.51 4467.51 87.46 3230.85 3230.85 4696.29 4957.38
P508 Lined drain 1085.28 1085.28 16.54 1039.41 1039.41 1158.53 1242.18
P601 Filling of Stones 1058.88 1058.88 50.18 1007.10 1007.10 1130.88 1212.95
P602 Stone Pitching 1598.97 1598.97 57.03 1432.82 1432.82 1700.97 1817.31
P603 Dry Boulder Filling 3043.52 3043.52 56.15 2182.96 2182.96 3198.01 3374.34
P701 Plastering 1.2 cm thick in CM 1:6 1917.38 1917.38 23.74 1449.22 1449.22 2019.54 2136.19
P702 Plastering 2.5 cm thick in CM 1:6 2971.67 2971.67 37.68 2224.57 2224.57 3128.53 3307.62

P703 Flush Pointing in CM 1:3 1559.57 1559.57 9.46 1279.53 1279.53 1649.42 1752.07
P801 White washing 155.57 155.57 0.14 135.24 135.24 165.05 175.87
P802 Painting 1887.76 1887.76 799.57 799.57 1943.73 2007.7
P802A Road marking with thermo plastic paint 2.5 mm thick 4300.46 4300.46 196.55 454.33 454.33 4338.15 4380.4

P803 Laying Hume pipe of size 0.90 to 1.20 Mtrs in dia 765.22 765.22 83.60 153.03 153.03 778.44 793.19
P804 False ceiling with Ply wood 4 mm thick 21181.95 21181.95 14429.06 14429.06 22191.99 23346.31
P805 RCC M-35 7664.15 7664.15 479.30 4249.04 4249.04 7975.96 8330.26
P806 RCC M-40 7752.33 7752.33 480.05 4252.92 4252.92 8064.43 8419.07
P807 Weep hole using PVC pipe 199.86 199.86 199.86 199.86
P808 Brick masonry in CM 1:3 6305.15 6305.15 21.42 1347.06 1347.06 6400.09 6508.49

P809 Lined drain with PCC 1:3:6 2604.98 2604.98 148.08 902.03 902.03 2672.56 2749.17
P810 Add cost of "quick setting compound" in cemented work 0.42 0.42 0.42 0.42
P811 Add cost of "Zinga" coating on TMT/Re-inforcement Bars 5.27 5.27 5.27 5.27
P812 Cement Plaster 6 mm thick in CM 1:3 for Ceiling 2917.33 2917.33 6.98 2299.69 2299.69 3078.52 3262.71
P813 Pre Cast Box Culverts (PCBC 2mx2mx1m) 50182.39 50182.39 584.62 869.29 869.29 50260.78 50347.86
P814 Reinforced Earth Structure - Assembling , joining and laying of 801.92 801.92 15.15 15.15 802.98 804.19
reinforcing elements with reinforcing element of steel/aluminium
P815 strips/polymeric
Reinforced Earthstrips
Structure - Assembling , joining and laying of 125.81 125.81 22.72 22.72 127.4 129.21
reinforcing elements with reinforcing element of synthetic
P816 geogrid
Reinforced Earth Structure - Facing Elements of RCC 2063.13 2063.13 334.39 32.57 32.57 2075.44 2088.07
S101 Preparation of Subgrade in SMB 444.96 444.96 137.60 232.89 232.89 465.39 488.15
S102 Preparation of Subgrade in SR 760.32 760.32 169.90 437.73 437.73 796.05 836.17
S103 Preparation of Subgrade in HR 733.89 733.89 186.85 310.03 310.03 761.2 791.6
S104 GSB 10 cm thick with Sand, Mooram & Gravel 1866.84 1866.84 339.58 1175.51 1175.51 1959.31 2063.54
S105 GSB 15 cm thick with Sand, Mooram & Gravel 2745.47 2745.47 475.74 1706.46 1706.46 2879.19 3029.98
S106 GSB 10 cm thick with Brick Aggregate 4111.22 4111.22 183.00 2284.95 2284.95 4276.66 4464.95
S107 GSB 15 cm thick with Brick Aggregate 5845.00 5845.00 274.50 3107.19 3107.19 6070.74 6327.55
S108 GSB 10 cm thick with stone Aggregate (Grading 1 ) 2630.32 2630.32 424.96 1821.52 1821.52 2770.57 2929.04
S108A GSB 10 cm thick with stone Aggregate (Grading 2 ) 2880.20 2880.20 465.98 1844.88 1844.88 3023.32 3184.89
S108B GSB 10 cm thick with stone Aggregate (Grading 3 ) 2640.23 2640.23 430.68 1889.06 1889.06 2785.38 2949.42
S108C GSB 10 cm thick with stone Aggregate (Grading 4 ) 2647.48 2647.48 429.88 1886.85 1886.85 2792.46 2956.3

S108D GSB 10 cm thick with stone Aggregate (Grading 5 ) 2675.50 2675.50 433.05 1837.49 1837.49 2817.12 2977.11

S108E GSB 10 cm thick with stone Aggregate (Grading 6 ) 2712.50 2712.50 438.37 1755.33 1755.33 2848.52 3002.1

S109 GSB 15 cm thick with stone Aggregate (Grading 1 ) 3695.44 3695.44 618.84 2502.04 2502.04 3889.14 4107.87

S109A GSB 15 cm thick with stone Aggregate (Grading 2 ) 3806.21 3806.21 634.42 2409.59 2409.59 3993.91 4205.71
Code Brief Description Zone J Zone J Cost in (Rs) Zone J Zone J 2100 to 2401 to
of V/E/P 2400 (J) 2700 (J) 7% 3%

S109B GSB 15 cm thick with stone Aggregate (Grading 3 ) 3712.96 3712.96 627.40 2603.34 2603.34 3914.02 4141.11

S109C GSB 15 cm thick with stone Aggregate (Grading 4 ) 3723.69 3723.69 626.21 2600.04 2600.04 3924.47 4151.26

S109D GSB 15 cm thick with stone Aggregate (Grading 5 ) 3765.71 3765.71 630.96 2525.99 2525.99 3961.46 4182.47

S109E GSB 15 cm thick with stone Aggregate (Grading 6 ) 3819.77 3819.77 638.94 2402.75 2402.75 4007.13 4218.52

S201 Shingling 50 mm 957.23 957.23 98.20 776.49 776.49 1014.53 1079.6

S202 Shingling 75 mm 1364.89 1364.89 135.44 1110.36 1110.36 1446.68 1539.57

S203 Shingling 100 mm 1590.57 1590.57 150.30 1303.02 1303.02 1686.29 1795.04

S204 Spreading Shingle 15 cm consolidated 2240.11 2240.11 192.66 1864.50 1864.50 2376.41 2531.35

S205 Lime Soil stabilisation 2553.21 2553.21 167.35 1493.55 1493.55 2662.78 2787.28
S206 Sand blanketing 25 mm 402.97 402.97 48.46 223.40 223.40 420.07 439.39
S207 Providing of sand layer 100 mm 1206.91 1206.91 155.97 546.82 546.82 1249.87 1298.3
S401 Scarifing existing BT surface 889.77 889.77 0.00 885.34 885.34 951.74 1022.57
S402 WBM 7.5 cm Grading 1 with Type A stone screening 2083.28 2083.28 332.49 1706.70 1706.70 2212.73 2359.24
S402A WBM 7.5 cm Grading 1 with Type B stone screening 2171.59 2171.59 352.87 1694.16 1694.16 2300.77 2446.89
S402B WBM 7.5 cm Grading 2 with Type B stone screening 2175.81 2175.81 348.80 1741.54 1741.54 2308.19 2457.97
S403 WBM 10 cm Grading 1 with Type A stone screening 2577.24 2577.24 420.70 2095.83 2095.83 2736.57 2916.86
S404 WMM 75 mm Thick 2216.80 2216.80 447.44 1127.61 1127.61 2309.15 2412.79
S405 WMM 100 mm Thick 2902.80 2902.80 579.24 1789.32 1789.32 3045.43 3205.95
S405A WMM 150 mm Thick 4197.06 4197.06 817.95 2154.75 2154.75 4372.43 4569.35
S501 2 cm thick BT with sand seal coat over WBM surface using 2501.99 2501.99 130.73 1163.53 1163.53 2587.36 2684.36
bitumen VG-10 (80/100) & firewood
S501A 2 cm thick BT with sand seal coat over WBM surface with HMP 2020.17 2020.17 205.59 379.70 379.70 2052.92 2089.46
& Paver using bitumen VG-10 (80/100)
S501B 2.5 cm thick BT with sand seal coat over WBM surface with 2418.32 2418.32 245.66 459.76 459.76 2457.87 2502.03
HMP & Paver using bitumen VG-10 ()
S501C 2 cm thick BT with HMP & Paver using bitumen VG-10 () 1686.11 1686.11 200.36 358.31 358.31 1717.2 1751.88

S501D 2.5 cm thick BT with HMP & Paver using bitumen VG-10 () 2083.12 2083.12 240.22 437.67 437.67 2120.97 2163.19

S502 2.5 cm BT with sand seal coat using bitumen VG-10 (80/100) & 2953.54 2953.54 191.77 1362.98 1362.98 3054.71 3169.5
Firewood
S505 Liquid seal coat using bitumen VG-10 (80/100) & Firewood 1137.76 1137.76 58.48 544.84 544.84 1177.65 1223

S506 Surface Dressing Renewal coat (Two coat) using bitumen VG- 2760.67 2760.67 132.01 982.43 982.43 2833.41 2915.96
10 (80/100) & F/wood
S506A Surface Dressing Renewal coat (Two coat) using bitumen VG- 3648.94 3648.94 132.01 991.26 991.26 3722.29 3805.55
10 (80/100) & LDO
S507 BUSG 7.5 cm using bitumen VG-10 (80/100) & F/wood 4063.64 4063.64 353.54 2375.12 2375.12 4240.5 4441.12

S507A BUSG 7.5 cm using bitumen VG-10 (80/100) & LDO 4964.82 4964.82 353.54 2375.12 2375.12 5141.69 5342.3
S508 BM 75 mm thick using bitumen VG-10 (80/100) 5918.61 5918.61 736.00 1362.56 1362.56 6036.07 6167.16
S509 DBM 75 mm thick using bitumen VG-10 () 7433.90 7433.90 692.66 559.92 559.92 7493.87 7559.44
S510 BM 50 mm thick using bitumen VG-10 (80/100) 4388.07 4388.07 480.18 1680.22 1680.22 4520.09 4668.91
S511 DBM 50 mm thick using bitumen VG-10 () 5143.43 5143.43 466.28 510.69 510.69 5193.17 5248.01
S512 Bituminous Concrete (Asphaltic Concrete) 25 mm thick using 2900.78 2900.78 861.98 461.96 461.96 2958.98 3021.79
bitumen VG-10 (80/100)
S512A Bituminous Concrete 30 mm thick using bitumen VG-10 () 3631.95 3631.95 409.36 582.53 582.53 3685.01 3743.89
S513 Bituminous Concrete 40 mm thick using bitumen VG-10 4679.75 4679.75 459.65 721.34 721.34 4744.04 4815.53
(80/100)
S513A Bituminous Concrete 50 mm thick using bitumen VG-10 () 6171.35 6171.35 580.65 1245.93 1245.93 6275.99 6393.08

S515 Surface Dressing Renewal coat using bitumen VG-10 (80/100) 1113.04 1113.04 75.43 410.61 410.61 1144.04 1179.16
& F/wood
S515A Surface Dressing Renewal coat using bitumen VG-10 (80/100) 1444.32 1444.32 75.43 410.61 410.61 1475.32 1510.43
& LDO
S601 2.5 Cm Thick BT with liquid seal coat using bitumen VG-10 2982.48 2982.48 153.73 1275.97 1275.97 3076.41 3183.1
(80/100) & F/wood
S602 2 Cm Thick BT with liquid seal coat using bitumen VG-10 2635.13 2635.13 134.23 1136.97 1136.97 2718.74 2813.73
(80/100) & F/wood
S603 Premixed sand seal coat using bitumen VG-10 (80/100) & 414.27 414.27 20.88 34.33 34.33 417.3 420.67
F/wood
S604 2 cm Liquid seal coat using CB Emulsion 3129.84 3129.84 141.79 987.25 987.25 3203.2 3286.44
S605 2 cm Premixed Seal Coat with CBE 2858.16 2858.16 141.79 930.33 930.33 2927.54 3006.22
S606 Two Coats Surface Dressing with CBE 1888.09 1888.09 99.44 521.60 521.60 1927.59 1972.3
S607 Mix Seal Surfacing Type 'A' using bitumen VG-10 (80/100) & 2208.61 2208.61 101.45 927.82 927.82 2276.6 2353.87
F/wood
S607A Mix Seal Surfacing Type 'A' using bitumen VG-10 (80/100) & 2776.76 2776.76 101.45 927.82 927.82 2844.75 2922.02
LDO
S608 Mix Seal Surfacing Type 'B' using bitumen VG-10 (80/100) & 2041.55 2041.55 100.66 899.57 899.57 2107.54 2182.52
F/wood
S608A Mix Seal Surfacing Type 'B' using bitumen VG-10 (80/100) & 2533.46 2533.46 100.66 899.57 899.57 2599.45 2674.44
LDO

S609 SDBC 25 mm thick using bitumen VG-10 (80/100) 2617.06 2617.06 331.43 595.83 595.83 2668.71 2726.32
S611 2cm Thick BT with Sand Seal Coat on existing BT surface using 2465.42 2465.42 130.57 1127.39 1127.39 2548.25 2642.36
bitumen VG-10 (80/100) & F/wood
S701 Expansion Joint A 12mm x 100mm 1171.10 1171.10 147.95 147.95 1181.46 1193.29
S702 Expansion Joint A 12mm x 150mm 1429.80 1429.80 147.95 147.95 1440.16 1451.99
S703 Expansion Joint A 12mm x 200mm 1749.03 1749.03 208.47 208.47 1763.62 1780.3
S704 Expansion Joint A 12mm x 250mm 2007.73 2007.73 208.47 208.47 2022.32 2039
Code Brief Description Zone J Zone J Cost in (Rs) Zone J Zone J 2100 to 2401 to
of V/E/P 2400 (J) 2700 (J) 7% 3%

S705 Expansion Joint A 20mm x 100mm 1687.33 1687.33 168.12 168.12 1699.1 1712.55
S706 Expansion Joint A 20mm x 150mm 2081.56 2081.56 168.12 168.12 2093.33 2106.78
S707 Expansion Joint A 20mm x 200mm 2536.31 2536.31 228.64 228.64 2552.31 2570.61
S708 Expansion Joint A 20mm x 250mm 2930.54 2930.54 228.64 228.64 2946.54 2964.84
S709 Expansion Joint B 12mm x 100mm 1102.35 1102.35 147.95 147.95 1112.71 1124.54
S710 Expansion Joint B 12mm x 150mm 1361.05 1361.05 147.95 147.95 1371.41 1383.24
S711 Expansion Joint B 12mm x 200mm 1680.28 1680.28 208.47 208.47 1694.87 1711.55
S712 Expansion Joint B 12mm x 250mm 1938.98 1938.98 208.47 208.47 1953.57 1970.25
S713 Expansion Joint B 20mm x 100mm 1585.08 1585.08 168.12 168.12 1596.85 1610.3
S714 Expansion Joint B 20mm x 150mm 1979.31 1979.31 120.52 120.52 1987.75 1997.39
S715 Expansion Joint B 20mm x 200mm 2434.06 2434.06 228.64 228.64 2450.06 2468.36
S716 Expansion Joint B 20mm x 250mm 2828.29 2828.29 228.64 228.64 2844.29 2862.59
S717 Add Reinforcement to S-701 & S-716 475.95 475.95 344.60 344.60 500.07 527.64
S801 60m x 10 mm Dummy Construction Joint Grade A 1446.15 1446.15 400.12 400.12 1474.16 1506.17
S802 30m x 10 mm Dummy Construction Joint Grade A 726.05 726.05 239.88 239.88 742.84 762.03

S803 60m x 10 mm Dummy Construction Joint Grade B 1325.17 1325.17 399.78 399.78 1353.15 1385.14
S804 30m x 10 mm Dummy Construction Joint Grade B 675.44 675.44 239.88 239.88 692.23 711.42
S805 Add or Deduct for every 5 mm depth of joint from S-801 111.39 111.39 31.98 31.98 113.63 116.19

S806 Add or Deduct for every 5 mm depth of joint from S-803 103.06 103.06 31.98 31.98 105.3 107.86

S807 Add or Deduct for every 5 mm depth of joint from S-802 67.58 67.58 23.96 23.96 69.26 71.17

S808 Add or Deduct for every 5 mm depth of joint from S-804 72.64 72.64 23.96 23.96 74.32 76.23

S809 Prime Coat with Bitumen Emulsion 708.73 708.73 3.57 254.91 254.91 726.68 747.18
S810 CSB 7.5 CM Thick 2384.65 2384.65 447.94 1364.99 1364.99 2493.64 2616.28
S811 CSB 10 CM Thick 2929.90 2929.90 556.24 1758.46 1758.46 3069.68 3227.04
S812 SDBC 40 mm using bitumen VG-10 (80/100) 3889.26 3889.26 435.68 775.42 775.42 3956.61 4031.71
S813 Mastic Asphalt 25 mm thick using bitumen VG-10 (80/100) 6916.37 6916.37 1064.44 2233.15 2233.15 7104.62 7315.21

S814 Tack Coat using Bitumen Emulsion 165.86 165.86 3.64 6.09 6.09 166.4 167
S815 Tack Coat using Bitumen VG-10 (80/100) 120.78 120.78 3.64 6.09 6.09 121.32 121.92
S901 2 cm thick BT with sand seal coat over WBM surface using 3040.40 3040.40 130.73 1163.53 1163.53 3125.77 3222.77
LDO & bitumen VG-10 (80/100)
S902 2.5 cm BT with sand seal coat using LDO & bitumen VG-10 3603.59 3603.59 162.26 1382.61 1382.61 3705.24 3820.72
(80/100)
S905 Liquid seal coat using LDO & bitumen VG-10 (80/100) 1405.86 1405.86 58.48 544.84 544.84 1445.76 1491.1
S910 2.5 Cm Thick BT with liquid seal coat using LDO & bitumen VG- 3698.81 3698.81 153.73 1275.97 1275.97 3792.74 3899.43
10 (80/100)

S911 2 Cm Thick BT with liquid seal coat using LDO & bitumen VG- 3271.44 3271.44 134.23 1136.97 1136.97 3355.05 3450.04
10 (80/100)
S912 Premixed sand seal coat using LDO & bitumen VG-10 (80/100) 601.02 601.02 20.88 34.33 34.33 604.05 607.42

S915 2cm Thick BT with Sand Seal Coat on existing BT surface using 3021.26 3021.26 130.57 1127.39 1127.39 3104.1 3198.2
bitumenVG-10 (80/100) & LDO
S916 DBM 100 mm thick using bitumen VG-10 () 9738.31 9738.31 888.80 1623.28 1623.28 9878.6 10035.13

S917 Non Frost Susceptable Stone Base (NFSSB) 15 cm thick 4195.51 4195.51 768.56 2724.94 2724.94 4409.32 4650.37
S1001 Add for variation in cost of bitumen VG-30 (60/70) in place of -3.71 -3.71 -3.71 -3.71
VG-10 (80/100)
S1002 Add anti-stripping compound in all bituminous work 3.52 3.52 3.52 3.52
S1003 Add for variation in cost of bitumen VG-40 (30/40) in place of 2.81 2.81 2.81 2.81
VG-10 (80/100)
S1004 Add for variation in cost of CRMB in place of VG-10 (80/100) 0.54 0.54 0.54 0.54

S1005 Warm mix asphalt additive with 0.50% dosage 2.67 2.67 2.67 2.67
S1006 Add Nano technology based reactive pentrative organo Silane 1777.95 1777.95 1777.95 1777.95
antistripping compound bitumen additive

T001 Providing/Fixing Road Delineators (600 mm) 679.67 679.67 22.42 22.42 681.24 683.03
T002 Providing/Fixing Road Delineators ( 900 mm) 623.57 623.57 22.42 22.42 625.14 626.93
T003 Metal beam Crash Barrier (Type- A, "W") 1716.50 1716.50 1.17 253.54 253.54 1734.28 1754.6
T004 Providing/Fixing Cats Eyes 181.01 181.01 181.01 181.01
MP-12 Cost of Steel 53.18 53.18 53.18 53.18
FE-001 1.80 M high fencing with 2.40 angle iron (50x50x6)mm posts 33546.84 33546.84 4863.09 4863.09 33887.25 34276.30
placed every 3 m centre to centre embedded in cement
concrete block, every 15th posts last but one end post and
corner post shall be strutted on both sides and end post on one
side only and provided with 12 horizontal lines and two
diagonals inter woven with horizontal wires of barbed wire 9.38
Kg/100 M (min) between two posts and fixed with GI stables,
turn buckles etc. complete . (Cost earthwork and concrete to be
taken separately.)

FE-002 1.20 M high fencing with 1.80 M R.C.C. posts of Standard 16098.14 16098.14 3382.03 3382.03 16334.88 16605.45
design placed every 3 M apart, embedded in cement, concrete
blocks, every 15th post, last but one end post and corner post
shall be strutted on both sides and end post one side only,
provided nine horizontal lines and two diagonals of barbed wire
9.38 Kg per 100 M (Min) between the two posts fitted and fixed
with G.I. staples on wooden plugs or G.I. binding wire tied to 6
mm bar nibs fixed while casting the post(Cost of earth work and
concrete to be taken separately).
Code Brief Description Zone J Zone J Cost in (Rs) Zone J Zone J 2100 to 2401 to
of V/E/P 2400 (J) 2700 (J) 7% 3%

ME-001 Providing and application of Plymeric Waterproofing membrane 5984.55 5984.55 2944.12 2944.12 6190.64 6426.17
on structural concrete surface including cleaning of surface
duly free from dust, sharp projection and moisture for coating
with cold stick primer @ 250 Gram per Sqm before treating with
Polymeric waterprofoofing membrane

ME-002 In situ anti corrosive treatment by applying inhibitor admixture 5685.16 5685.16 3616.62 3616.62 5938.33 6227.66
and sealed cement slurry for crrision protection of mild steel
reinforcement /HYSD bars in accordance witb MORT&H
Appendix 1000-1 (Fourth Revision) including surface
preparation and surface pre-treatment

ME-003 Construction of Sub -base (100mm) by providing laying and 1324.08 1324.08 21259.46 46336.00 46336.00 5205.39 9550.05
spreading on a prepared subgrade, pulverising, adding the
designed quantity of soil stabliser @ 3% to the spread soil,
mixing in place with rotavator, grading with the motor grader
and compacting with the road roller at OMC to achieve the
desired unconfirmed compressive strenth and to form a layer of
sub-base.

ME-004 Construction of base(150mm) by providing laying and 1971.42 1971.42 24564.38 47105.11 47105.11 6005.71 10511.05
spreading on a prepared subgrade, pulverising, adding the
designed quantity of soil stabliser @ 5% to the spread soil,
mixing in place with rotavator, grading with the motor grader
and compacting with the road roller at OMC to achieve the
desired un confirmed compressive strenth and to form a layer of
base.

ME-005 Cement treated crushed rock or combination as per clouse 2848.44 2848.44 21259.46 46336.00 46336.00 6729.75 11074.41
403.2 and table 400.4 by providing,laying and spreading
material on a prepared sub grade, adding the designed quantity
of cement to the spread material, mixing in place wih rotavator,
grading with the motor grader and compacting with the road
roller at OMC to achieve the desired un confirmed compressive
strenth and to form a layer of sub-base (100mm).

ME-005A Cement treated crushed rock or combination as per clouse 3794.10 3794.10 3794.10 3794.10
403.2 and table 400.4 by providing,laying and spreading
material on a prepared sub grade, adding the designed quantity
of cement to the spread material, mixing in place wih rotavator,
grading with the motor grader and compacting with the road
roller at OMC to achieve the desired un confirmed compressive
strenth and to form a layer of base (150mm).

Station : C/o 56 APO

Dated : _______May 2021


ABSTRACT OF QUANTITIES (SURF WORKS)
( Km 102.000 to Km 112.00 net length 10.000 Km)

Altitude Altitude
2101-2400 2401-2700 KM
S/No Items of works A/U
M M eqvt Cl-9

A SURF WORKS Zone''J'' Zone''J''


1 Preparation of sub-grade in SMB Sqm 9189.36 23484.72
2 Preparation of sub-grade in SR Sqm 20285.32 5910.18
3 Preparation of sub-grade in HR Sqm 3355.84 26833.46
4 Scarifing existing BT surface Sqm 5,284.91 6,052.73
5 Sand Blanketing 25 mm in HR Sqm 2793.34 25451.21
6 GSB 15 cm thick I layer Sqm 25003.93 25012.65 3.031
7 WMM 7.5 cm thick II nd layer Sqm 24709.78 24777.30 2.999
8 WMM 7.5 cm thick III rd layer Sqm 23597.98 23673.90 2.865
9 WMM 10 cm thick Ist layer Sqm 2714.14 22054.76 1.982
10 DBM 50 cm thick Sqm 26342.60 44952.80 8.642
11 BC 3.00 cm thick Sqm 26342.60 44952.80 8.642
12 Prime Coat Sqm 26342.60 44952.80
13 Tack Coat Sqm 26342.60 44952.80
14 Berm Filling Cum 1870.68 3251.12
15 Road marking Sqm 865.06 1497.41
Total Scope of Surfacing works in Eqvt Cl-9 Km 28.161

Station : C/o 56 APO (Ashok Kumar Ram)


AE(Civ)
SO-3 (Estg & Br)
Dated : _______Sep 2021 for Chief Engineer

Page 18
DETAILS OF SURFACING WORKS ON BASOLI-BANI-BHADERWAH ROAD
S/No Location (Km) TYPE Length in Water gaps Net length Crust Prepration Sand Width of Width of Base (WMM) Width of Width Preparation of Sub grade (Sqm) Credit for Credit for Excvn in Excvn in Scarifyin Sand GSBC 150 Wet mix macadam base 250 mm DBM 50 BC 30 mm Prime coat Tack Coat
OF Mtr in mtr in Mtr thickness of Blanketin Sub Base Base ofBase sand GSB 150 trenches trenches g of 2.0 Blanketin mm thick thick MM TH Th (Sqm) with on DBM in
SOIL (MM) subgrade g (GSBC) Course (BC) blanketing mm (SMB) (HR) cm BT g (Sqm) (Sqm) (Sqm) Bitumen one layer
From To
(DBM) 25 mm in (Existing (Sqm) Emulsion (Sqm)
HR portion Pavemen (Sqm)
1st layer 1st layer 2nd layer 3rd (75 SMB SR HR (Existing t Width 1st layer 2nd layer 3rd layer
(100 MM) (75 MM) MM) width 3.75 m) 100 mm 75 mm 75 mm
3.75m) thick thick thick

(A) ALTITUDE 2101 TO 2400 m (KM 102.00 TO 105.675


1 102.000 102.025 SMB 25 25.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 220.00 0.00 93.75 37.88 0.00 93.75 0.00 126.25 182.50 182.50 175.00 175.00 175.00 175.00
2 102.025 102.125 SMB 100 100.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 880.00 0.00 0.00 0.00 0.00 0.00 0.00 880.00 730.00 730.00 700.00 700.00 700.00 700.00
3 102.125 102.425 SMB 300 48.20 251.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 2215.84 0.00 944.25 381.48 0.00 944.25 0.00 1271.59 1838.14 1838.14 1762.60 1762.60 1762.60 1762.60
4 102.425 102.450 SMB 25 25.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 220.00 0.00 0.00 0.00 0.00 0.00 0.00 220.00 182.50 182.50 175.00 175.00 175.00 175.00
5 102.450 102.500 HR 50 50.00 205.00 8.80 8.80 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 440.00 0.00 365.00 350.00 350.00 350.00 350.00
6 102.500 102.650 SR 150 3.20 146.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1291.84 0.00 0.00 0.00 0.00 0.00 0.00 1291.84 1071.64 1071.64 1027.60 1027.60 1027.60 1027.60
7 102.650 102.700 SMB 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
8 102.700 102.750 HR 50 50.00 205.00 8.80 8.80 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 440.00 0.00 365.00 350.00 350.00 350.00 350.00
9 102.750 102.800 SR 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
10 102.800 102.850 HR 50 50.00 205.00 8.80 8.80 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 440.00 0.00 365.00 350.00 350.00 350.00 350.00
11 102.850 102.900 SR 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
12 102.900 102.975 HR 75 3.20 71.80 205.00 8.80 8.80 7.30 7.00 7.00 631.84 0.00 0.00 0.00 0.00 0.00 631.84 0.00 524.14 502.60 502.60 502.60 502.60
13 102.975 103.100 SMB 125 3.20 121.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1071.84 0.00 456.75 184.53 0.00 456.75 0.00 615.09 889.14 889.14 852.60 852.60 852.60 852.60
14 103.100 103.250 SR 150 150.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1320.00 0.00 0.00 0.00 0.00 0.00 0.00 1320.00 1095.00 1095.00 1050.00 1050.00 1050.00 1050.00
15 103.250 103.300 SMB 50 3.20 46.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 411.84 0.00 0.00 0.00 0.00 0.00 0.00 411.84 341.64 341.64 327.60 327.60 327.60 327.60
16 103.300 103.350 SR 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
17 103.350 103.675 SMB 325 3.20 321.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 2831.84 0.00 0.00 0.00 0.00 0.00 0.00 2831.84 2349.14 2349.14 2252.60 2252.60 2252.60 2252.60
18 103.675 103.700 SMB 25 25.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 220.00 0.00 93.75 37.88 0.00 93.75 0.00 126.25 182.50 182.50 175.00 175.00 175.00 175.00
19 103.700 103.725 HR 25 25.00 205.00 8.80 8.80 7.30 7.00 7.00 220.00 93.75 0.00 0.00 13.31 93.75 126.25 0.00 182.50 175.00 175.00 175.00 175.00
20 103.725 104.000 SR 275 275.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 2420.00 0.00 0.00 0.00 0.00 0.00 0.00 2420.00 2007.50 2007.50 1925.00 1925.00 1925.00 1925.00
21 104.000 104.125 HR 125 125.00 205.00 8.80 8.80 7.30 7.00 7.00 1100.00 468.75 0.00 0.00 66.56 468.75 631.25 0.00 912.50 875.00 875.00 875.00 875.00
22 104.125 104.150 SR 25 25.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 220.00 0.00 0.00 0.00 0.00 0.00 0.00 220.00 182.50 182.50 175.00 175.00 175.00 175.00
23 104.150 104.250 SR 100 100.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 880.00 0.00 375.00 0.00 53.25 375.00 0.00 505.00 730.00 730.00 700.00 700.00 700.00 700.00
24 104.250 104.350 SR 100 100.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 880.00 0.00 0.00 0.00 0.00 0.00 0.00 880.00 730.00 730.00 700.00 700.00 700.00 700.00
25 104.350 104.950 SR 600 6.40 593.60 380.00 8.80 8.80 7.30 7.30 7.00 7.00 5223.68 0.00 2226.00 0.00 316.09 2226.00 0.00 2997.68 4333.28 4333.28 4155.20 4155.20 4155.20 4155.20
26 104.950 105.025 SR 75 75.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 660.00 0.00 281.25 113.63 0.00 281.25 0.00 378.75 547.50 547.50 525.00 525.00 525.00 525.00
27 105.025 105.100 SR 75 75.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 660.00 0.00 0.00 0.00 0.00 0.00 0.00 660.00 547.50 547.50 525.00 525.00 525.00 525.00
28 105.100 105.600 SR 500 500.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 4400.00 0.00 0.00 0.00 0.00 0.00 0.00 4400.00 3650.00 3650.00 3500.00 3500.00 3500.00 3500.00
29 105.600 105.650 SR 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
30 105.650 105.675 SR 25 25.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 220.00 0.00 0.00 0.00 0.00 0.00 0.00 220.00 182.50 182.50 175.00 175.00 175.00 175.00
Total 3675.00 70.60 3604.40 8511.36 19935.52 3271.84 562.50 4470.75 755.40 449.21 5033.25 2709.34 23976.13 2714.14 23597.98 23597.98 25230.80 25230.80 25230.80 25230.80
Add Extra for curves (ref Appx'A') 678.00 349.80 84.00 28.13 223.54 37.77 22.46 251.66 84.00 1027.80 1111.80 1111.80 1111.80 1111.80 1111.80
Net Qty (A) 9189.36 20285.32 3355.84 590.63 4694.29 793.17 471.67 5284.91 2793.34 25003.93 2714.14 24709.78 23597.98 26342.60 26342.60 26342.60 26342.60

Page 19
S/No Location (Km) TYPE Length in Water gaps Net length Crust Prepration Sand Width of Width of Base (WMM) Width of Width Preparation of Sub grade (Sqm) Credit for Credit for Excvn in Excvn in Scarifyin Sand GSBC 150 Wet mix macadam base 250 mm DBM 50 BC 30 mm Prime coat Tack Coat
OF Mtr in mtr in Mtr thickness of Blanketin Sub Base Base ofBase sand GSB 150 trenches trenches g of 2.0 Blanketin mm thick thick MM TH Th (Sqm) with on DBM in
SOIL (MM) subgrade g (GSBC) Course (BC) blanketing mm (SMB) (HR) cm BT g (Sqm) (Sqm) (Sqm) Bitumen one layer
From To
(DBM) 25 mm in (Existing (Sqm) Emulsion (Sqm)
HR portion Pavemen (Sqm)
1st layer 1st layer 2nd layer 3rd (75 SMB SR HR (Existing t Width 1st layer 2nd layer 3rd layer
(100 MM) (75 MM) MM) width 3.75 m) 100 mm 75 mm 75 mm
3.75m) thick thick thick

(B) ALTITUDE 2401 TO 2700 m (KM 105.675 TO 112.000)


31 105.675 105.750 SR 75 75.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 660.00 0.00 0.00 0.00 0.00 0.00 0.00 660.00 547.50 547.50 525.00 525.00 525.00 525.00
32 105.750 105.950 SMB 200 3.20 196.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1731.84 0.00 0.00 0.00 0.00 0.00 0.00 1731.84 1436.64 1436.64 1377.60 1377.60 1377.60 1377.60
33 105.950 106.000 SR 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
34 106.000 106.400 SMB 400 3.20 396.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 3491.84 0.00 0.00 0.00 0.00 0.00 0.00 3491.84 2896.64 2896.64 2777.60 2777.60 2777.60 2777.60
35 106.400 106.500 HR 100 100.00 205.00 8.80 8.80 7.30 7.00 7.00 880.00 0.00 0.00 0.00 0.00 0.00 880.00 0.00 730.00 700.00 700.00 700.00 700.00
36 106.500 106.600 SMB 100 100.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 880.00 0.00 0.00 0.00 0.00 0.00 0.00 880.00 730.00 730.00 700.00 700.00 700.00 700.00
37 106.600 106.750 HR 150 150.00 205.00 8.80 8.80 7.30 7.00 7.00 1320.00 0.00 0.00 0.00 0.00 0.00 1320.00 0.00 1095.00 1050.00 1050.00 1050.00 1050.00
38 106.750 106.850 SMB 100 3.20 96.80 205.00 8.80 8.80 7.30 7.30 7.00 7.00 851.84 0.00 0.00 0.00 0.00 0.00 0.00 851.84 706.64 706.64 677.60 677.60 677.60 677.60
39 106.850 106.900 SR 50 50.00 205.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
40 106.900 106.950 SMB 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
41 106.950 107.050 HR 100 3.20 96.80 205.00 8.80 8.80 7.30 7.00 7.00 851.84 0.00 0.00 0.00 0.00 0.00 851.84 0.00 706.64 677.60 677.60 677.60 677.60
42 107.050 107.100 SMB 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
43 107.100 107.250 SR 150 3.20 146.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1291.84 0.00 0.00 0.00 0.00 0.00 0.00 1291.84 1071.64 1071.64 1027.60 1027.60 1027.60 1027.60
44 107.250 107.450 HR 200 200.00 205.00 8.80 8.80 7.30 7.00 7.00 1760.00 0.00 0.00 0.00 0.00 0.00 1760.00 0.00 1460.00 1400.00 1400.00 1400.00 1400.00
45 107.450 107.500 SMB 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
46 107.500 107.700 HR 200 200.00 205.00 8.80 8.80 7.30 7.00 7.00 1760.00 0.00 0.00 0.00 0.00 0.00 1760.00 0.00 1460.00 1400.00 1400.00 1400.00 1400.00
47 107.700 107.750 SR 50 3.20 46.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 411.84 0.00 175.50 0.00 0.00 175.50 0.00 236.34 341.64 341.64 327.60 327.60 327.60 327.60
48 107.750 107.850 SMB 100 100.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 880.00 0.00 375.00 151.50 0.00 375.00 0.00 505.00 730.00 730.00 700.00 700.00 700.00 700.00
49 107.850 107.925 HR 75 75.00 205.00 8.80 8.80 7.30 7.00 7.00 660.00 0.00 0.00 0.00 0.00 0.00 660.00 0.00 547.50 525.00 525.00 525.00 525.00
50 107.925 108.000 SR 75 75.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 660.00 0.00 281.25 0.00 0.00 281.25 0.00 378.75 547.50 547.50 525.00 525.00 525.00 525.00
51 108.000 108.050 SMB 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 187.50 75.75 0.00 187.50 0.00 252.50 365.00 365.00 350.00 350.00 350.00 350.00
52 108.050 108.100 SMB 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 187.50 75.75 0.00 187.50 0.00 252.50 365.00 365.00 350.00 350.00 350.00 350.00
53 108.100 108.225 SR 125 125.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1100.00 0.00 468.75 0.00 0.00 468.75 0.00 631.25 912.50 912.50 875.00 875.00 875.00 875.00
54 108.225 108.250 HR 25 25.00 205.00 8.80 8.80 7.30 7.00 7.00 220.00 0.00 0.00 0.00 0.00 0.00 220.00 0.00 182.50 175.00 175.00 175.00 175.00
55 108.250 108.350 SMB 100 100.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 880.00 0.00 375.00 151.50 0.00 375.00 0.00 505.00 730.00 730.00 700.00 700.00 700.00 700.00
56 108.350 108.400 SR 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 187.50 0.00 0.00 187.50 0.00 252.50 365.00 365.00 350.00 350.00 350.00 350.00
57 108.400 108.800 HR 400 3.20 396.80 205.00 8.80 8.80 7.30 7.00 7.00 3491.84 0.00 0.00 0.00 0.00 0.00 3491.84 0.00 2896.64 2777.60 2777.60 2777.60 2777.60
58 108.800 108.900 SMB 100 3.20 96.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 851.84 0.00 0.00 0.00 0.00 0.00 0.00 851.84 706.64 706.64 677.60 677.60 677.60 677.60
59 108.900 108.950 HR 50 50.00 205.00 8.80 8.80 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 440.00 0.00 365.00 350.00 350.00 350.00 350.00
60 108.950 109.000 SMB 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
61 109.000 109.475 SMB 475 3.20 471.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 4151.84 0.00 1769.25 714.78 0.00 1769.25 0.00 2382.59 3444.14 3444.14 3302.60 3302.60 3302.60 3302.60
62 109.475 109.500 SMB 25 25.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 220.00 0.00 0.00 0.00 0.00 0.00 0.00 220.00 182.50 182.50 175.00 175.00 175.00 175.00
63 109.500 109.700 HR 200 6.40 193.60 205.00 8.80 8.80 7.30 7.00 7.00 1703.68 0.00 0.00 0.00 0.00 0.00 1703.68 0.00 1413.28 1355.20 1355.20 1355.20 1355.20
64 109.700 109.750 SMB 50 3.20 46.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 411.84 0.00 0.00 0.00 0.00 0.00 0.00 411.84 341.64 341.64 327.60 327.60 327.60 327.60
65 109.750 109.950 HR 200 200.00 205.00 8.80 8.80 7.30 7.00 7.00 1760.00 0.00 0.00 0.00 0.00 0.00 1760.00 0.00 1460.00 1400.00 1400.00 1400.00 1400.00
66 109.950 110.000 HR 50 50.00 205.00 8.80 8.80 7.30 7.00 7.00 440.00 187.50 0.00 0.00 26.62 187.50 252.50 0.00 365.00 350.00 350.00 350.00 350.00
67 110.000 110.200 HR 200 200.00 205.00 8.80 8.80 7.30 7.00 7.00 1760.00 0.00 0.00 0.00 0.00 0.00 1760.00 0.00 1460.00 1400.00 1400.00 1400.00 1400.00
68 110.200 110.350 SMB 150 3.20 146.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1291.84 0.00 0.00 0.00 0.00 0.00 0.00 1291.84 1071.64 1071.64 1027.60 1027.60 1027.60 1027.60
69 110.350 110.425 HR 75 75.00 205.00 8.80 8.80 7.30 7.00 7.00 660.00 0.00 0.00 0.00 0.00 0.00 660.00 0.00 547.50 525.00 525.00 525.00 525.00
70 110.425 110.500 HR 75 75.00 205.00 8.80 8.80 7.30 7.00 7.00 660.00 281.25 0.00 0.00 39.94 281.25 378.75 0.00 547.50 525.00 525.00 525.00 525.00
71 110.500 110.575 SMB 75 75.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 660.00 0.00 281.25 113.63 0.00 281.25 0.00 378.75 547.50 547.50 525.00 525.00 525.00 525.00
72 110.575 110.600 SMB 25 25.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 220.00 0.00 0.00 0.00 0.00 0.00 0.00 220.00 182.50 182.50 175.00 175.00 175.00 175.00
73 110.600 110.850 HR 250 6.4 243.60 205.00 8.80 8.80 7.30 7.00 7.00 2143.68 913.50 0.00 0.00 129.72 913.50 1230.18 0.00 1778.28 1705.20 1705.20 1705.20 1705.20
74 110.850 111.000 SMB 150 3.20 146.80 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1291.84 0.00 0.00 0.00 0.00 0.00 0.00 1291.84 1071.64 1071.64 1027.60 1027.60 1027.60 1027.60
75 111.000 111.025 SMB 25 25.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 220.00 0.00 93.75 37.88 0.00 93.75 0.00 126.25 182.50 182.50 175.00 175.00 175.00 175.00
76 111.025 111.100 SMB 75 75.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 660.00 0.00 0.00 0.00 0.00 0.00 0.00 660.00 547.50 547.50 525.00 525.00 525.00 525.00
77 111.100 111.300 HR 200 200.00 205.00 8.80 8.80 7.30 7.00 7.00 1760.00 0.00 0.00 0.00 0.00 0.00 1760.00 0.00 1460.00 0.00 1400.00 1400.00 1400.00 1400.00
78 111.300 111.350 SMB 50 50.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 440.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
79 111.350 111.750 HR 400 6.40 393.60 205.00 8.80 8.80 7.30 7.00 7.00 3463.68 0.00 0.00 0.00 0.00 0.00 3463.68 0.00 2873.28 2755.20 2755.20 2755.20 2755.20
80 111.750 111.900 SMB 150 150.00 380.00 8.80 8.80 7.30 7.30 7.00 7.00 1320.00 0.00 0.00 0.00 0.00 0.00 0.00 1320.00 1095.00 1095.00 1050.00 1050.00 1050.00 1050.00
81 111.900 112.000 HR 100 3.20 96.80 205.00 8.80 8.80 7.30 7.00 7.00 851.84 0.00 0.00 0.00 0.00 0.00 851.84 0.00 706.64 677.60 677.60 677.60 677.60
Total 6325.00 60.80 6264.20 23094.72 5443.68 26586.56 1382.25 4382.25 1320.79 196.28 5764.50 25204.31 24156.15 22054.76 23673.90 23673.90 43849.40 43849.40 43849.40 43849.40
Add Extra for curves (ref Appx'A') 390.00 466.50 246.90 69.11 219.11 66.04 9.81 288.23 246.90 856.50 1103.40 1103.40 1103.40 1103.40 1103.40
Net Qty (B) 23484.72 5910.18 26833.46 1451.36 4601.36 1386.83 206.09 6052.73 25451.21 25012.65 22054.76 24777.30 23673.90 44952.80 44952.80 44952.80 44952.80

G/Total

Page 20
Berm
filling

12.98
51.90
130.68
12.98
25.95
76.19
25.95
25.95
25.95
25.95
25.95
37.26
63.21
77.85
24.29
25.95
167.01
12.98
12.97
142.73
64.88
12.98
51.90
51.90
308.08
38.93
38.92
259.50
25.95
12.97
1870.68

1870.68

Page 21
Berm
filling

38.93
102.14
25.95
205.94
51.90
51.90
77.85
50.24
25.95
25.95
50.24
25.95
76.19
103.80
25.95
103.80
24.29
51.90
38.93
38.93
25.95
25.95
64.88
12.98
51.90
25.95
205.94
50.24
25.95
25.95
244.86
12.98
100.48
24.29
103.80
25.95
103.80
76.19
38.93
38.93
38.93
12.97
126.43
76.19
12.98
38.92
103.80
25.95
204.28
77.85
50.24
3251.12

3251.12

Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61
Page 62
Page 63
Page 64
Page 65
Page 66
Page 67
Page 68
Page 69
Page 70
Page 71
Page 72
DETAILS OF SURFACING WORKS ON BASOLI-BANI-BHADERWAH ROAD
Pls refer Road Specification Policy as per annexure to HQ DGBR Letter No. 21801/PC/DGBR/41/TP (Plg) dated 12 Jan 2017.
S/ Location in Km Length (M) W/gap Net length Soil CBR Crust Preparat Sand Width of Width of Base Width of Width of Preparation of Sub grade (Sqm) Credit for Credit for Credit for Excavation Excavation Scarifying of Sand GSBC 150 Wet mix macadam base 250 mm DBM 50 BC 30 mm Prime coat Tack Coat
No (M) in (M) classi- values thickness ion of Blenketing Sub (WMM) Base Base sand GSB 150 mm WBM 75 in trenches in trenches 2.0 cm BT Blenketing 25 mm thick thick mm thick thick with on DBM in
From To fication (MM) Sub Base (DBM) (BC) SMB SR HR blanketing (Existing mm (SMB) (HR) (Sqm) mm (Sqm) (Sqm) (Sqm) Bitumen one layer
grade (GSBC) 25 mm in Pavement (Existing Emulsion (Sqm)
HR Width 3.75 Pavement (Sqm)
portion(Exis m) Width 3.75
1st layer 1st layer 2nd layer 3rd layer ting width m) Single layer 1st layer 2nd layer 3rd layer
(100 MM) (75 MM) (75 MM) 3.75m) (150 mm (100 mm (75 mm (75 mm
thick) thick) thick) thick)
A Attitude 2101-2400 Mtr (Km 102.00-Km 105.675)
1 102.000 102.450 450.00 48.20 401.80 SMB 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 3535.84 - - 1,038.00 - 419.36 2497.84 2933.14 2933.14 2812.60 2812.60 2812.60 2812.60
2 102.450 102.500 50.00 - 50.00 HR 205.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 440.00 - 1,038.00 440.00 365.00 350.00 350.00 350.00 350.00
3 102.500 102.650 150.00 3.20 146.80 SR 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 1291.84 - 1291.84 1071.64 1071.64 1027.60 1027.60 1027.60 1027.60
4 102.650 102.700 50.00 - 50.00 SMB 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 440.00 - - - 440.00 365.00 365.00 350.00 350.00 350.00 350.00
5 102.700 102.750 50.00 - 50.00 HR 205.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 440.00 - 440.00 365.00 350.00 350.00 350.00 350.00
6 102.750 102.800 50.00 - 50.00 SR 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 440.00 - - 440.00 365.00 365.00 350.00 350.00 350.00 350.00
7 102.800 103.075 275.00 - 275.00 HR 205.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 2420.00 456.75 - - 2,420.00 2007.50 1925.00 1925.00 1925.00 1925.00
8 103.075 103.250 175.00 - 175.00 SR 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 1540.00 - - 1540.00 1277.50 1277.50 1225.00 1225.00 1225.00 1225.00
9 103.250 103.300 50.00 3.20 46.80 SMB 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 411.84 - 0.00 - - - 411.84 341.64 341.64 327.60 327.60 327.60 327.60
10 103.300 103.350 50.00 3.20 46.80 SR 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 411.84 - 0.00 - 0.00 411.84 341.64 341.64 327.60 327.60 327.60 327.60
12 103.350 103.700 350.00 3.20 346.80 SMB 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 3051.84 - - 0.00 93.75 - 37.88 2958.09 2531.64 2531.64 2427.60 2427.60 2427.60 2427.60
13 103.700 103.800 100.00 6.40 93.60 HR 205.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 823.68 93.75 - - 184.53 449.21 93.75 729.93 683.28 655.20 655.20 655.20 655.20
14 103.800 103.900 100.00 3.20 96.80 SR 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 851.84 - 113.63 3,163.50 851.84 706.64 706.64 677.60 677.60 677.60 677.60
15 103.900 104.050 150.00 - 150.00 HR 205.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 1320.00 468.75 - 851.25 1095.00 1050.00 1050.00 1050.00 1050.00
16 104.050 104.950 900.00 - 900.00 SR 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 7920.00 - 2601.00 0.00 - 281.25 5319.00 6570.00 6570.00 6300.00 6300.00 6300.00 6300.00
17 104.950 105.675 725.00 - 725.00 SR 480.00 8.80 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 6380.00 281.25 - - 6098.75 5292.50 5292.50 5075.00 5075.00 5075.00 5075.00
TOTAL 3675.00 70.60 3604.40 Total (A) 7439.52 18835.52 5443.68 562.50 4470.75 0.00 755.40 449.21 4576.50 4881.18 22261.04 4515.78 21796.34 21796.34 25230.80 25230.80 25230.80 25230.80
Add for curves (Ref.Appendix'A') 678.00 349.80 84.00 28.13 223.54 0.00 37.77 22.46 228.83 84.00 1027.80 1111.80 1111.80 1111.80 1111.80 1111.80 1111.80 1111.80

Net Total (A) 8117.52 19185.32 5527.68 590.63 4694.29 0.00 793.17 471.67 4805.33 4965.18 23288.84 5627.58 22908.14 22908.14 26342.60 26342.60 26342.60 26342.60
B Attitude 2401-2700 Mtr (Km 105.675 to Km 112.00)
18 105.675 105.750 75.00 - 75.00 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 675.00 660.00 547.50 547.50 525.00 525.00 525.00 525.00
19 105.750 105.950 200.00 3.20 196.80 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 1771.20 - - 1731.84 1436.64 1436.64 1377.60 1377.60 1377.60 1377.60
20 105.950 106.000 50.00 - 50.00 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 450.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
21 106.000 106.400 400.00 3.20 396.80 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 3571.20 - - 3491.84 2896.64 2896.64 2777.60 2777.60 2777.60 2777.60
22 106.400 106.500 100.00 - 100.00 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 900.00 880.00 730.00 700.00 700.00 700.00 700.00
23 106.500 106.600 100.00 - 100.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 900.00 - - 880.00 730.00 730.00 700.00 700.00 700.00 700.00
24 106.600 106.750 150.00 - 150.00 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 1350.00 1,320.00 1095.00 1050.00 1050.00 1050.00 1050.00
25 106.750 106.850 100.00 3.20 96.80 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 871.20 - - 851.84 706.64 706.64 677.60 677.60 677.60 677.60
26 106.850 106.900 50.00 - 50.00 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 450.00 - 440.00 365.00 365.00 350.00 350.00 350.00 350.00
27 106.900 106.950 50.00 - 50.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 450.00 - - 440.00 365.00 365.00 350.00 350.00 350.00 350.00
28 106.950 107.050 100.00 3.20 96.80 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 871.20 851.84 706.64 706.64 677.60 677.60 677.60 677.60
29 107.050 107.100 50.00 - 50.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 450.00 - - 440.00 365.00 365.00 350.00 350.00 350.00 350.00
30 107.100 107.250 150.00 3.20 146.80 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 1321.20 - 1291.84 1071.64 1071.64 1027.60 1027.60 1027.60 1027.60
31 107.250 107.450 200.00 200.00 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 1800.00 1760.00 1460.00 1460.00 1400.00 1400.00 1400.00 1400.00
32 107.450 107.500 50.00 50.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 450.00 - - 440.00 365.00 365.00 350.00 350.00 350.00 350.00
33 107.500 107.750 250.00 3.20 246.80 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 2221.20 0.00 175.50 0.00 175.50 1996.34 1801.64 1801.64 1727.60 1727.60 1727.60 1727.60
34 107.750 107.850 100.00 100.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 900.00 - - 375.00 151.50 375.00 505.00 730.00 730.00 700.00 700.00 700.00 700.00
35 107.850 108.000 150.00 150.00 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 1350.00 0.00 281.25 0.00 281.25 1038.75 1095.00 1095.00 1050.00 1050.00 1050.00 1050.00
36 108.000 108.050 50.00 50.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 450.00 - - 187.50 75.75 187.50 252.50 365.00 365.00 350.00 350.00 350.00 350.00
37 108.050 108.100 50.00 50.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 450.00 - - 187.50 75.75 187.50 252.50 365.00 365.00 350.00 350.00 350.00 350.00
38 108.100 108.250 150.00 150.00 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 1350.00 0.00 468.75 0.00 468.75 851.25 1095.00 1095.00 1050.00 1050.00 1050.00 1050.00
39 108.250 108.350 100.00 100.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 900.00 - - 375.00 151.50 375.00 505.00 730.00 730.00 700.00 700.00 700.00 700.00
40 108.350 108.800 450.00 3.20 446.80 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 4021.20 0.00 187.50 0.00 187.50 3744.34 3261.64 3261.64 3127.60 3127.60 3127.60 3127.60
41 108.800 108.900 100.00 3.20 96.80 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 871.20 - - 851.84 706.64 706.64 677.60 677.60 677.60 677.60
42 108.900 108.950 50.00 50.00 SR 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - 450.00 440.00 365.00 365.00 350.00 350.00 350.00 350.00
43 108.950 109.500 550.00 3.20 546.80 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 4921.20 - - 1,769.25 714.78 1,769.25 3042.59 3991.64 3991.64 3827.60 3827.60 3827.60 3827.60
44 109.500 109.700 200.00 6.40 193.60 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 1742.40 1,703.68 1413.28 1355.20 1355.20 1355.20 1355.20
45 109.700 109.750 50.00 3.20 46.80 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 421.20 - - 411.84 341.64 341.64 327.60 327.60 327.60 327.60
46 109.750 110.200 450.00 450.00 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 4050.00 187.50 187.50 26.62 187.50 3,960.00 3285.00 3150.00 3150.00 3150.00 3150.00
47 110.200 110.350 150.00 3.20 146.80 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 1321.20 - - 1291.84 1071.64 1071.64 1027.60 1027.60 1027.60 1027.60
48 110.350 110.500 150.00 150.00 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 1350.00 281.25 281.25 39.94 281.25 1,320.00 1095.00 1095.00 1095.00 1050.00 1050.00 1050.00 1050.00
49 110.500 110.600 100.00 100.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 900.00 - - 281.25 113.63 281.25 598.75 730.00 730.00 700.00 700.00 700.00 700.00
50 110.600 110.850 250.00 6.40 243.60 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 2192.40 913.50 0.00 129.72 913.50 2,143.68 1778.28 1705.20 1705.20 1705.20 1705.20
51 110.850 111.100 250.00 3.20 246.80 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 2221.20 - - 93.75 93.75 2078.09 1801.64 1801.64 1727.60 1727.60 1727.60 1727.60
52 111.100 111.300 200.00 200.00 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 1800.00 37.88 1,760.00 1460.00 1400.00 1400.00 1400.00 1400.00
53 111.300 111.350 50.00 50.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 450.00 - - 440.00 365.00 365.00 350.00 350.00 350.00 350.00
54 111.350 111.750 400.00 6.40 393.60 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 3542.40 3,463.68 2873.28 2755.20 2755.20 2755.20 2755.20
55 111.750 111.900 150.00 150.00 SMB 480.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 1350.00 - - 1320.00 1095.00 1095.00 1050.00 1050.00 1050.00 1050.00
56 111.900 112.000 100.00 3.20 96.80 HR 205.00 9.00 8.80 8.80 7.30 7.30 7.30 7.00 7.00 - - 871.20 851.84 706.64 677.60 677.60 677.60 677.60
TOTAL 6325.00 60.80 6264.20 Total (B) 23619.60 14959.80 17798.40 1382.25 4851.00 0.00 1320.79 196.28 5764.50 17402.88 33339.83 14436.48 32387.18 32387.18 43849.40 43849.40 43849.40 43849.40
Add for curves (Ref.Appendix'A') 390.00 466.50 246.90 69.11 242.55 0.00 66.04 9.81 288.23 246.90 856.50 1103.40 1103.40 1103.40 1103.40 1103.40 1103.40 1103.40

Net Total (B) 24009.60 15426.30 18045.30 1451.36 5093.55 0.00 1386.83 206.09 6052.73 17649.78 34196.33 15539.88 33490.58 33490.58 44952.80 44952.80 44952.80 44952.80
Grand Total for all altitude 32127.12 34611.62 23572.98 2041.99 9787.84 0.00 2180.00 677.76 10858.06 22614.96 57485.17 21167.46 56398.72 56398.72 71295.40 71295.40 71295.40 71295.40

(Ashok Kumar Ram)


AE(Civ)
SO-III (Estg & BR)
for Chief Engineer

Page 73 of 251
Berm filling
(Cum)

208.53
14.70
76.19
25.95
14.70
25.95
80.85
90.83
13.76
24.29
179.99
27.52
50.24
44.10
467.10
213.15
1557.84

1557.84

22.05
102.14
14.70
205.94
29.40
51.90
44.10
50.24
25.95
25.95
28.46
25.95
76.19
58.80
25.95
72.56
51.90
44.10
25.95
25.95
44.10
51.90
131.36
50.24
14.70
283.79
56.92
24.29
132.30
76.19
44.10
51.90
71.62
128.09
58.80
25.95
115.72
77.85
28.46
2476.44

2476.44
4034.29

Page 74 of 251
Appendix " "
CREDIT FOR EXISTING PAVEMENT (Km 102.000 to Km 112.00)
S/No Location (Km) TYPE Length in Water gaps Net length Existing Total Proposed Proposed Excavation in trenches Excavation in Credit for Sand Credit for GSB Existing Area of Scarifying Remarks
OF Mtr in mtr in Mtr width of width width for width for (SMB) trenches (HR) Blanketing 25 150 mm WBM 75 mm 02 of 2.0 cm
SOIL carriage Balance Balance mm in HR (Existing layer (Sqm) BT (Sqm)
From To Depth Qty in Depth Qty in
way (Mtr) GSB 150 WMB 75 Portion (Width Pavement (Width 3.75 m)
(0.15+0.15) Cum (0.075+0.0 Cum
mm/WMB mm (02) 3.75 m) Width 3.75 m)
0.30 m 75) 0.15 m
75 mm (02)

(A) ALTITUDE 2101 TO 2400 m (KM 102.00 TO 105.675

1 102.000 102.025 SMB 25 25.00 3.75 3.75 5.05 0.30 37.88 93.75 93.75
2 102.025 102.125 SMB 100 100.00
3 102.125 102.425 SMB 300 48.20 251.80 3.75 3.75 5.05 0.30 381.48 944.25 944.25
4 102.425 102.450 SMB 25 25.00
5 102.450 102.500 HR 50 50.00
6 102.500 102.650 SR 150 3.20 146.80
7 102.650 102.700 SMB 50 50.00
8 102.700 102.750 HR 50 50.00
9 102.750 102.800 SR 50 50.00
10 102.800 102.850 HR 50 50.00
11 102.850 102.900 SR 50 50.00
12 102.900 102.975 HR 75 3.20 71.80
13 102.975 103.100 SMB 125 3.20 121.80 3.75 3.75 5.05 3.55 0.30 184.53 456.75 456.75
14 103.100 103.250 SR 150 150.00
15 103.250 103.300 SMB 50 3.20 46.80
16 103.300 103.350 SR 50 50.00
17 103.350 103.675 SMB 325 3.20 321.80
18 103.675 103.700 SMB 25 25.00 3.75 3.75 5.05 0.30 37.88 93.75 93.75
19 103.700 103.725 HR 25 25.00 3.75 3.75 3.55 0.15 13.31 93.75 93.75
20 103.725 104.000 SR 275 275.00
21 104.000 104.125 HR 125 125.00 3.75 3.75 3.55 0.15 66.56 468.75 468.75
22 104.125 104.150 SR 25 25.00
23 104.150 104.250 SR 100 100.00 3.75 3.75 3.55 0.15 53.25 375.00 375.00
24 104.250 104.350 SR 100 100.00
25 104.350 104.950 SR 600 6.40 593.60 3.75 3.75 3.55 0.15 316.09 2226.00 2226.00
26 104.950 105.025 SR 75 75.00 3.75 3.75 5.05 0.30 113.63 281.25 281.25
27 105.025 105.100 SR 75 75.00
28 105.100 105.600 SR 500 500.00
29 105.600 105.650 SR 50 50.00
30 105.650 105.675 SR 25 25.00
3675.00 70.60 755.40 449.21 562.50 4470.75 0.00 5033.25
(B) ALTITUDE 2401 TO 2700 m (KM 105.675 TO 112.000)
31 105.675 105.750 SR 75 75.00
32 105.750 105.950 SMB 200 3.20 196.80
33 105.950 106.000 SR 50 50.00
34 106.000 106.400 SMB 400 3.20 396.80
35 106.400 106.500 HR 100 100.00
36 106.500 106.600 SMB 100 100.00
37 106.600 106.750 HR 150 150.00
38 106.750 106.850 SMB 100 3.20 96.80
S/No Location (Km) TYPE Length in Water gaps Net length Existing Total Proposed Proposed Excavation in trenches Excavation in Credit for Sand Credit for GSB Existing Area of Scarifying Remarks
OF Mtr in mtr in Mtr width of width width for width for (SMB) trenches (HR) Blanketing 25 150 mm WBM 75 mm 02 of 2.0 cm
SOIL carriage Balance Balance mm in HR (Existing layer (Sqm) BT (Sqm)
From To Depth Qty in Depth Qty in
way (Mtr) GSB 150 WMB 75 Portion (Width Pavement (Width 3.75 m)
(0.15+0.15) Cum (0.075+0.0 Cum
mm/WMB mm (02) 3.75 m) Width 3.75 m)
0.30 m 75) 0.15 m
75 mm (02)

39 106.850 106.900 SR 50 50.00


40 106.900 106.950 SMB 50 50.00
41 106.950 107.050 HR 100 3.20 96.80
42 107.050 107.100 SMB 50 50.00
43 107.100 107.250 SR 150 3.20 146.80
44 107.250 107.450 HR 200 200.00
45 107.450 107.500 SMB 50 50.00
46 107.500 107.700 HR 200 200.00
47 107.700 107.750 SR 50 3.20 46.80 3.75 3.75 3.55 0.00 175.50 175.50
48 107.750 107.850 SMB 100 100.00 3.75 3.75 5.05 0.30 151.50 375.00 375.00
49 107.850 107.925 HR 75 75.00
50 107.925 108.000 SR 75 75.00 3.75 3.75 3.55 0.00 281.25 281.25
51 108.000 108.050 SMB 50 50.00 3.75 3.75 5.05 0.30 75.75 187.50 187.50
52 108.050 108.100 SMB 50 50.00 3.75 3.75 5.05 0.30 75.75 187.50 187.50
53 108.100 108.225 SR 125 125.00 3.75 3.75 3.55 0.00 468.75 468.75
54 108.225 108.250 HR 25 25.00
55 108.250 108.350 SMB 100 100.00 3.75 3.75 5.05 0.30 151.50 375.00 375.00
56 108.350 108.400 SR 50 50.00 3.75 3.75 3.55 0.00 187.50 187.50
57 108.400 108.800 HR 400 3.20 396.80
58 108.800 108.900 SMB 100 3.20 96.80
59 108.900 108.950 HR 50 50.00
60 108.950 109.000 SMB 50 50.00
61 109.000 109.475 SMB 475 3.20 471.80 3.75 3.75 5.05 0.30 714.78 1769.25 1769.25
62 109.475 109.500 SMB 25 25.00
63 109.500 109.700 HR 200 6.40 193.60
64 109.700 109.750 SMB 50 3.20 46.80
65 109.750 109.950 HR 200 200.00
66 109.950 110.000 HR 50 50.00 3.75 3.75 3.55 0.15 26.62 187.50 187.50
67 110.000 110.200 HR 200 200.00
68 110.200 110.350 SMB 150 3.20 146.80
69 110.350 110.425 HR 75 75.00
70 110.425 110.500 HR 75 75.00 3.75 3.75 3.55 0.15 39.94 281.25 281.25
71 110.500 110.575 SMB 75 75.00 3.75 3.75 5.05 0.30 113.63 281.25 281.25
72 110.575 110.600 SMB 25 25.00
73 110.600 110.850 HR 250 6.4 243.60 3.75 3.75 3.55 0.15 129.72 913.50 913.50
74 110.850 111.000 SMB 150 3.20 146.80
75 111.000 111.025 SMB 25 25.00 3.75 3.75 5.05 0.30 37.88 93.75 93.75
76 111.025 111.100 SMB 75 75.00
77 111.100 111.300 HR 200 200.00
78 111.300 111.350 SMB 50 50.00
79 111.350 111.750 HR 400 6.40 393.60
80 111.750 111.900 SMB 150 150.00
81 111.900 112.000 HR 100 3.20 96.80
6325.00 60.80 6264.20 1320.79 196.28 1382.25 4382.25 0.00 5764.50

G/Total 10000.00 131.40 2076.19 645.49 1944.75 8853.00 0.00 10797.75

(Ashok Kumar Ram)


AE(Civ)
S/No Location (Km) TYPE Length in Water gaps Net length Existing Total Proposed Proposed Excavation in trenches Excavation in Credit for Sand Credit for GSB Existing Area of Scarifying Remarks
OF Mtr in mtr in Mtr width of width width for width for (SMB) trenches (HR) Blanketing 25 150 mm WBM 75 mm 02 of 2.0 cm
SOIL carriage Balance Balance mm in HR (Existing layer (Sqm) BT (Sqm)
From To Depth Qty in Depth Qty in
way (Mtr) GSB 150 WMB 75 Portion (Width Pavement (Width 3.75 m)
(0.15+0.15) Cum (0.075+0.0 Cum
mm/WMB mm (02) 3.75 m) Width 3.75 m)
0.30 m 75) 0.15 m
75 mm (02)

SO-III (Estg & Br)


for Chief Engineer
EXTRA DETAILS OF SURFACING WORKS ON BBB ROAD (EXTRA CURVE DETAILS)

S/ Location Curve Soil Extra Radius Length of Avg. Extra Width of Surfacing (Area) Remark
No in Km No. Classific width at (R) in Curve Extra
ation center Mtr (Mtr) width Preparation Sand GSBC WMM DBM BC Prime Coat Tack coat
point (Mtr) (Mtr) of Subgrade Blanketing (Sqm) (Sqm) (Sqm) (Sqm) (Sqm) (Sqm)
(Sqm) (Sqm)

A Attitude 2101-2400 Mtr (Km 102.00-Km 105.675)


1 #REF! #REF! SMB 3.14 #REF! 100.00 1.500 150.000 - 150.00 150.00 150.00 150.00 150.00 150.00
2 #REF! #REF! SMB 3.05 #REF! 130.00 1.500 195.000 - 195.00 195.00 195.00 195.00 195.00 195.00
3 #REF! #REF! SMB 3.25 #REF! 97.00 1.500 145.500 - 145.50 145.50 145.50 145.50 145.50 145.50
4 #REF! #REF! SR 2.95 #REF! 59.00 1.500 88.500 88.50 88.50 88.50 88.50 88.50 88.50
5 #REF! #REF! SMB 3.08 #REF! 125.00 1.500 187.500 - 187.50 187.50 187.50 187.50 187.50 187.50
6 #REF! #REF! HR 2.77 #REF! 70.00 1.200 84.000 84.000 - 84.00 84.00 84.00 84.00 84.00
7 104.950 #REF! SR 3.08 #REF! 119.00 1.500 178.500 178.50 178.50 178.50 178.50 178.50 178.50
8 105.200 #REF! SR 2.85 #REF! 69.00 1.200 82.800 82.80 82.80 82.80 82.80 82.80 82.80
Total 1111.80 84.00 1027.80 1111.80 1111.80 1111.80 1111.80 1111.80
B Attitude 2401-2700 Mtr (Km 5.675 to Km 12.000)
9 105.920 HC9 SMB 3.08 #REF! 113.00 1.500 169.500 - 169.50 169.50 169.50 169.50 169.50 169.50
10 106.740 HC10 HR 2.70 #REF! 72.00 1.200 86.400 86.400 - 86.40 86.40 86.40 86.40 86.40
11 107.040 HC11 SR 3.04 #REF! 118.00 1.500 177.000 177.00 177.00 177.00 177.00 177.00 177.00
12 107.730 HC12 SR 3.08 #REF! 140.00 1.500 210.000 210.00 210.00 210.00 210.00 210.00 210.00
13 108.290 HC13 SMB 2.77 #REF! 50.00 1.200 60.000 - 60.00 60.00 60.00 60.00 60.00 60.00
14 108.400 HC14 SR 2.95 #REF! 53.00 1.500 79.500 79.50 79.50 79.50 79.50 79.50 79.50
15 110.230 HC15 SMB 3.08 #REF! 107.00 1.500 160.500 - 160.50 160.50 160.50 160.50 160.50 160.50
16 111.280 HC16 HR 3.08 #REF! 107.00 1.500 160.500 160.500 160.50 160.50 160.50 160.50 160.50
Total 1103.40 246.90 856.50 1103.40 1103.40 1103.40 1103.40 1103.40

Page 78 of 251
CREDIT FOR EXISTING PAVEMENT (Km 102.000 to Km 112.00)

S/No Location (Km) TYPE OF Length in Water gaps Net length in Existing Total Excavation in Credit for Sand Existing Area Remarks
SOIL Mtr in mtr Mtr width of width trenches Blanketing 25 of GSB (Sqm)
carriage mm in HR
From To Depth 0.15 Qty in
way (Mtr) Portion (Width
m Cum
3.75 m)

(A) ALTITUDE 2101 TO 2400 m (KM 102.00 TO 105.675

1 102.000 102.025 SMB 25 25.00 3.75 3.75 0.15 14.06 108.75


2 102.025 102.125 SMB 100 100.00 3.75 3.75
3 102.125 102.425 SMB 300 33.20 266.80 3.75 3.75 0.15 150.07 1160.58
4 102.425 102.450 SMB 25 25.00 3.75 3.75
5 102.450 102.500 HR 50 50.00 3.75 3.75
6 102.500 102.650 SR 150 3.20 146.80 3.75 3.75
7 102.650 102.700 SMB 50 50.00 3.75 3.75
8 102.700 102.750 HR 50 50.00 3.75 3.75
9 102.750 102.800 SR 50 50.00 3.75 3.75
10 102.800 102.850 HR 50 50.00 3.75 3.75
11 102.850 102.900 SR 50 50.00 3.75 3.75
12 102.900 102.975 HR 75 3.20 71.80 3.75 3.75
13 102.975 103.100 HR 125 3.20 121.80 3.75 3.75 456.75
14 103.100 103.250 HR 150 150.00 3.75 3.75
15 103.250 103.300 SMB 50 3.20 46.80 3.75 3.75
16 103.300 103.350 SR 50 50.00 3.75 3.75
17 103.350 103.675 SMB 325 3.20 321.80 3.75 3.75
18 103.675 103.700 SMB 25 25.00 3.75 3.75 0.15 14.06 101.25
19 103.700 103.725 HR 25 25.00 3.75 3.75 93.75
20 103.725 104.000 HR 275 275.00 3.75 3.75
21 104.000 104.125 HR 125 125.00 3.75 3.75 468.75
22 104.125 104.150 HR 25 25.00 3.75 3.75
23 104.150 104.250 HR 100 100.00 3.75 3.75 375.00
24 104.250 104.350 HR 100 100.00 3.75 3.75
25 104.350 104.950 HR 600 6.40 593.60 3.75 3.75 2226.00
26 104.950 105.025 SMB 75 3.20 71.80 3.75 3.75 0.15 40.39 290.79
27 105.025 105.100 SMB 75 75.00 3.75 3.75
28 105.100 105.600 HR 500 500.00 3.75 3.75
29 105.600 105.650 SR 50 50.00 3.75 3.75
30 105.650 105.675 HR 25 25.00 3.75 3.75
3675.00 58.80 218.58 3620.25 1661.37
(B) ALTITUDE 2401 TO 2700 m (KM 105.675 TO 112.000)

31 105.675 105.750 HR 75 75.00 3.75 3.75


31 105.750 105.950 SMB 200 3.20 196.80 3.75 3.75
32 105.950 106.000 HR 50 50.00 3.75 3.75
33 106.000 106.400 SMB 400 3.20 396.80 3.75 3.75
34 106.400 106.500 HR 100 100.00 3.75 3.75
35 106.500 106.600 SMB 100 100.00 3.75 3.75
36 106.600 106.750 HR 150 150.00 3.75 3.75
37 106.750 106.850 SMB 100 3.20 96.80 3.75 3.75
38 106.850 106.900 SR 50 50.00 3.75 3.75
39 106.900 106.950 SMB 50 50.00 3.75 3.75
40 106.950 107.050 HR 100 3.20 96.80 3.75 3.75
41 107.050 107.100 SMB 50 50.00 3.75 3.75
42 107.100 107.250 SR 150 3.20 146.80 3.75 3.75
43 107.250 107.450 HR 200 200.00 3.75 3.75
44 107.450 107.500 SMB 50 50.00 3.75 3.75
45 107.500 107.700 HR 200 200.00 3.75 3.75
46 107.700 107.750 HR 50 3.20 46.80 3.75 3.75 175.50
47 107.750 107.850 SMB 100 100.00 3.75 3.75 0.15 56.25 405.00
48 107.850 107.925 HR 75 75.00 3.75 3.75
49 107.925 108.000 HR 75 75.00 3.75 3.75 281.25
50 108.000 108.050 SMB 50 50.00 3.75 3.75 0.15 28.12 202.50
51 108.050 108.100 SMB 50 50.00 3.75 3.75 0.15 28.12 202.50
52 108.100 108.225 HR 125 125.00 3.75 3.75 468.75
53 108.225 108.250 HR 25 25.00 3.75 3.75
54 108.250 108.350 SMB 100 100.00 3.75 3.75 0.15 56.25 405.00
55 108.350 108.400 HR 50 50.00 3.75 3.75 187.50
56 108.400 108.800 HR 400 3.20 396.80 3.75 3.75
S/No Location (Km) TYPE OF Length in Water gaps Net length in Existing Total Excavation in Credit for Sand Existing Area Remarks
SOIL Mtr in mtr Mtr width of width trenches Blanketing 25 of GSB (Sqm)
carriage mm in HR
From To Depth 0.15 Qty in
way (Mtr) Portion (Width
m Cum
3.75 m)

57 108.800 108.900 SMB 100 3.20 96.80 3.75 3.75


58 108.900 108.950 HR 50 50.00 3.75 3.75
59 108.950 109.000 SMB 50 50.00 3.75 3.75
60 109.000 109.475 SMB 475 3.20 471.80 3.75 3.75 0.15 265.39 1910.79
61 109.475 109.500 SMB 25 25.00 3.75 3.75
62 109.500 109.700 HR 200 6.40 193.60 3.75 3.75
63 109.700 109.750 SMB 50 3.20 46.80 3.75 3.75
64 109.750 109.950 HR 200 200.00 3.75 3.75
65 109.950 110.000 HR 50 50.00 3.75 3.75 187.50
66 110.000 110.200 HR 200 200.00 3.75 3.75
67 110.200 110.350 SMB 150 3.20 146.80 3.75 3.75
68 110.350 110.425 HR 75 75.00 3.75 3.75
69 110.425 110.500 HR 75 75.00 3.75 3.75 281.25
70 110.500 110.575 SMB 75 75.00 3.75 3.75 0.15 42.19 303.75
71 110.575 110.600 SMB 25 25.00 3.75 3.75
72 110.600 110.850 HR 250 6.4 243.60 3.75 3.75 913.50
73 110.850 111.000 SMB 150 3.20 146.80 3.75 3.75
74 111.000 111.025 SMB 25 25.00 3.75 3.75 0.15 14.06 101.25
75 111.025 111.100 SMB 75 75.00 3.75 3.75
76 111.100 111.300 HR 200 200.00 3.75 3.75
77 111.300 111.350 SMB 50 50.00 3.75 3.75
78 111.350 111.750 HR 400 6.40 393.60 3.75 3.75
79 111.750 111.900 SMB 150 150.00 3.75 3.75
80 111.900 112.000 HR 100 3.20 96.80 3.75 3.75
6325.00 60.80 6264.20 490.38 2495.25 3530.79

G/Total 10000.00 119.60 708.96 6115.50 5192.16


CREDIT FOR DEPLOYING GREF TRADESMAN FOR SURFACING WORKS

ALTD 2101- ALTD 2401- ALTD 2101- ALTD 2401-


Sr 2400 MTRS 2700 MTRS 2400 MTRS 2700 MTRS
Code Item of work A/U Trade Norms
No.
ZONE "J" ZONE "J" ZONE "J" ZONE "J"
Qty Qty Requirement Requirement
MTDVR 0.0079 7.26 18.55
1 S-101 Preparation of sub-grade in SMB 10 sqm 918.936 2348.472 RRDVR 0.0054 4.96 12.68
OEM 0.038 34.92 89.24
MTDVR 0.0082 16.63 4.85
RRDVR 0.004 8.11 2.36
2 S-102 Preparation of sub-grade in SR 10 sqm 2028.532 591.018 Comp Dvr 0.00625 12.68 3.69
Driller 0.0125 25.36 7.39
OEM 0.0094 19.03 5.55
MTDVR 0.0082 2.75 22
RRDVR 0.004 1.34 10.73
3 S-103 Preparation of sub-grade in HR 10sqm 335.584 2683.346 Comp Dvr 0.0126 4.23 33.81
Driller 0.0252 8.46 67.62
OEM 0.0564 18.93 151.34
MT DVR 0.0041 7.64 13.28
4 F-701 Earth Filling Cum 1870.68 3251.12 OEM 0.0017 3.12 5.42
RR DVR 0.0020 3.74 6.5
MT DVR 0.0057 1.58 14.39
5 S206 Sand Blanketing 25mm 10Sqm 279.334 2545.121
RR DVR 0.0050 1.40 12.73
Granular sub base 15 Cm thick MT DVR 0.0111 27.75 27.76
6 S-109 10Sqm 2,500.39 2501.265
(consolidated) RR DVR 0.0526 131.52 131.57
MT DVR 0.0417 201.44 202.04
RR DVR 0.0317 153.14 153.59
7 S-404 WMM 7.5cm thick 10Sqm 4830.776 4845.12
OEM 0.0112 54.10 54.27
DES 0.0048 23.19 23.26
MT DVR 0.0075 2.04 16.54
8 S-403 WBM 10 cm thick 10Sqm 271.414 2205.476
RR DVR 0.0269 7.30 59.33
MT DVR 0.0467 0.00 209.93
COMP DVR 0.0094 42.26
9 S-511 BM 50 mm thick consolidated 10Sqm 2634.26 4495.28 RR DVR 0.0269 0.00 120.92
OEM 0.0188 0.00 84.51
DES 0.0094 0.00 42.26
10 S-809 Prime coat with bitumen emulsion 10Sqm 2634.26 4495.28 MT DVR 0.0021 5.53 9.44
MT DVR 0.0287 75.60 129.01
RR DVR 0.0538 141.72 241.85
11 S-512A Asphalt Concrete 30 mm thick 10Sqm 2634.26 4495.28 OEM 0.0115 30.29 51.7
DES 0.0058 15.28 26.07
COMP DVR 0.0058 15.28 26.07
MT DVR 0.0011 0.10 0.16
12 S-814 Tack coat with bitumen emulsion 10Sqm 86.5056 149.7408
COMP DVR 0.0013 0.11 0.19
0.2000
Road marking with thermoplastic
13 P-802A 10 sqm 86.5056 149.7408 DES 17.30 29.95
paint (2.5 mm thick)

Total Nos of Tradesman to be deployed Total 1083.83 2164.81


ADD 7% HAA 7% 75.87 324.72 15%
Say 1159.70 2489.53

(A) Rate of CP Tradesman (SSR 2016) 745.64 765.98 Per Day


(i) Total Nos of Tradesman to be deployed 1159.6981 2489.5315 Day
(ii) Considering GREF CPL Tradesman ratio 1:1.5
(iii) GREF tradesman reqd (1/2.5) 464 996 Day
(v) Credit for GREF tradesman in lieu of CPLS Total 345977.00 762916.00

G/Total -345977.00 -762916.00


CREDIT FOR DEPLOYING GREF PNR FOR SURFACING WORKS

ALTD 2101- ALTD 2401- ALTD 2101- ALTD 2401-


Sr 2400 MTRS 2700 MTRS 2400 MTRS 2700 MTRS
Code Item of work A/U Trade Norms
No.
ZONE "J" ZONE "J" ZONE "J" ZONE "J"
Qty Qty Requirement Requirement
1
S-101 Preparation of sub-grade in SMB 10 sqm 918.936 2348.472

MAZ 0.2756 253.26 647.24


2

S-102 Preparation of sub-grade in SR 10 sqm 2028.532 591.018

MAZ 0.5953 1207.59 351.83


3

S-103 Preparation of sub-grade in HR 10sqm 335.584 2683.346

MAZ 0.3144 105.51 843.64


4
F-701 Earth Filling Cum 1870.68 3251.12
MAz 0.0103 19.27 33.49
5
S206 Sand Blanketing 25mm 10Sqm 279.334 2545.121
MAZ 0.1707 47.68 434.45
6
S-109 Granular sub base 15 Cm thick (consolidated) 10Sqm 2,500.39 2501.265
MAZ 1.2275 3069.23 3070.3

7 S-404 WMM 7.5cm thick 10Sqm 4830.776 4845.12

MAZ 0.2383 1151.17 1154.59


8
S-403 WBM 10 cm thick 10Sqm 271.414 2205.476
MAZ 0.7107 192.89 1567.43
9
S-511 DBM 50 mm thick consolidated 10Sqm 2634.26 4495.28
MAZ 0.6811 0.00 3061.74
10
S-809 Prime coat with bitumen emulsion 10Sqm 2634.26 4495.28
MAZ 0.3761 990.75 1690.67
11

S-512A Asphalt Concrete 30 mm thick 10Sqm 2634.26 4495.28

MAZ 0.3224 849.29 1449.28


12
S-814 Tack coat with bitumen emulsion 10Sqm 86.5056 149.7408
MAZ 0.0057 0.49 0.85
13
P-802A Road marking with thermoplastic paint (2.5 mm thick)
10 sqm 86.5056 149.7408 MAZ 0.400 34.60 59.9
Total Nos of CPLs to be deployed Total 7921.73 14365.41
Say 7922.00 14365.00
Total Nos of Mate to be deployed Total
ADD 7% & 15% for HAA 554.54 2154.75 15%
Say 554.54 2154.75
Total Nos of Maz to be deployed Total 8476.27 16520.16
ADD 7% HAA
Say 8476.27 16520.16

CP Mate reqd (10/11) Day


(A) Rate of CP Mate Per Day 500 550
(i) Credit for GREF PNR in lieu of CPLS Total 0 0

(B) Rate of CP Mazdoor ((basic rate/365)*280)*1.04 700.9 700.9 Per Day 517 517
(i) Total Nos of CPL to be deployed 8476.27 16520.16 Day
(ii) Considering Pnr CPL is 1:10 771 1502
(v) Credit for GREF PNR in lieu of CPLS Total 540394 1052752

G/Total -540394 -1052752


Appendix ' A'
SUMMARY OF KM WISE ABTRACT OF EARTH WORK QUANTITY
S/No Location Distance Bridge Net Length Earth work quantity in cutting (Cum) Total Quantity in Total KM Eqvt
(Mtr) Gap/Culvert (Mtr) cutting Quantity in Cl-9
From (Km) To (Km) ( Mtr) SMB SR HR (Cum) filling (Cum)

Altd 2100-2400 mtr


1 102.00 105.675 3,675.00 70.60 3,604.40 61,611.41 98,426.80 37,914.18 197,952.39 14,092.75 6.58

Total 3,675.00 70.60 3,604.40 61,611.41 98,426.80 37,914.18 197,952.39 14,092.75 6.58
30083.949
Altd 2401-2700 mtr
2 105.675 112.000 6,325.00 60.80 6,264.20 132,977.46 86,944.78 89,632.39 309,554.63 9,923.53 11.43

Total 6,325.00 60.80 6,264.20 132,977.46 86,944.78 89,632.39 309,554.63 9,923.53 11.43
27082.644
G/Total 10000.00 131.40 9868.60 194588.88 185371.58 127546.56 507507.01 24016.28 18.01

28179.18

Page 83 of 251 Abst FMN


Appendix

S.No Start End Proposed Design Cut Area Cut Volume Fill Area Fill Cum. Cut Cum. Fill Type of
Station( Station( Attitude Length( (Sq.m.) (Cu.m.) (Sq.m.) Volume Vol. (Cu.m.) Vol. strata
Km) Km) (m) m) (Cu.m.) (Cu.m.)

1 102+000 102+025 2112.27 25 47.18 1466.66 - - 1,466.66 - SMB


2 102+025 102+050 2215.57 25 70.16 1543.73 - - 3,010.39 - SMB
3 102+050 102+075 2216.43 25 53.34 1388.38 - - 4,398.76 - SMB
4 102+075 102+100 2217.29 25 57.73 1216.25 - - 5,615.01 - SMB
5 102+100 102+125 2218.16 25 39.57 735.25 - - 6,350.26 - SMB
6 102+125 102+150 2219.02 25 19.25 410.66 - - 6,760.93 - SMB
7 102+150 102+175 2219.88 25 13.60 445.81 - - 7,206.74 - SMB
8 102+175 102+200 2220.75 25 22.06 673.28 - - 7,880.01 - SMB
9 102+200 102+225 2221.61 25 31.80 460.38 - 283.69 8,340.39 283.69 SMB
10 102+225 102+250 2222.47 25 5.03 101.00 22.695 633.15 8,441.39 916.84 SMB
11 102+250 102+275 2223.34 25 3.05 42.26 27.957 753.46 8,483.65 1,670.30 SMB
12 102+275 102+300 2224.20 25 0.33 116.66 32.32 546.85 8,600.31 2,217.15 SMB
13 102+300 102+325 2225.06 25 9.00 112.53 11.428 225.23 8,712.84 2,442.38 SMB
14 102+325 102+350 2225.92 25 - - 6.59 182.25 8,712.84 2,624.63 SMB
15 102+350 102+375 2226.79 25 - - 7.99 311.00 8,712.84 2,935.63 SMB
16 102+375 102+400 2227.65 25 - 57.75 16.89 211.13 8,770.59 3,146.75 SMB
17 102+400 102+425 2228.61 25 4.62 878.50 - - 9,649.09 3,146.75 SMB
18 102+425 102+450 2229.76 25 65.66 1656.15 - - 11,305.24 3,146.75 SMB
19 102+450 102+475 2231.06 25 66.83 1645.78 - - 12,951.01 3,146.75 HR
20 102+475 102+500 2232.37 25 64.83 1338.30 - - 14,289.31 3,146.75 HR
21 102+500 102+525 2233.68 25 42.23 1006.23 - - 15,295.54 3,146.75 SR
22 102+525 102+550 2234.99 25 38.26 871.73 - - 16,167.26 3,146.75 SR
23 102+550 102+575 2236.30 25 31.47 528.03 - 12.00 16,695.29 3,158.75 SR
24 102+575 102+600 2237.61 25 10.77 684.43 0.96 12.00 17,379.71 3,170.75 SR
25 102+600 102+625 2238.93 25 43.99 2007.58 - - 19,387.29 3,170.75 SR
26 102+625 102+650 2240.24 25 116.62 2533.88 - - 21,921.16 3,170.75 SR
27 102+650 102+675 2241.55 25 86.09 2257.65 - - 24,178.81 3,170.75 SMB
28 102+675 102+700 2242.84 25 94.52 2251.81 - - 26,430.63 3,170.75 SMB
29 102+700 102+725 2244.07 25 85.62 2777.29 - - 29,207.91 3,170.75 HR
30 102+725 102+750 2245.24 25 136.56 3146.53 - - 32,354.44 3,170.75 HR
31 102+750 102+775 2246.35 25 115.16 2935.84 - - 35,290.28 3,170.75 SR
32 102+775 102+800 2247.41 25 119.71 3104.45 - - 38,394.73 3,170.75 SR
33 102+800 102+825 2248.43 25 128.65 3863.44 - - 42,258.16 3,170.75 HR
34 102+825 102+850 2249.45 25 180.42 3796.43 - - 46,054.59 3,170.75 HR
35 102+850 102+875 2250.47 25 123.29 2985.88 - - 49,040.46 3,170.75 SR
36 102+875 102+900 2251.49 25 115.58 3255.63 - - 52,296.09 3,170.75 SR
37 102+900 102+925 2252.51 25 144.87 3352.88 - - 55,648.96 3,170.75 HR
38 102+925 102+950 2253.53 25 123.36 2595.13 - - 58,244.09 3,170.75 HR
39 102+950 102+975 2254.55 25 84.25 1808.84 - - 60,052.93 3,170.75 HR
40 102+975 103+000 2255.57 25 60.46 975.11 - 24.99 61,028.04 3,195.74 HR
41 103+000 103+025 2256.59 25 17.55 825.30 1.999 87.25 61,853.34 3,282.99 HR
42 103+025 103+050 2257.61 25 48.47 1111.28 4.981 62.26 62,964.61 3,345.25 HR
43 103+050 103+075 2258.63 25 40.43 1033.13 - - 63,997.74 3,345.25 HR
44 103+075 103+100 2259.65 25 42.22 1039.35 - - 65,037.09 3,345.25 SR
45 103+100 103+125 2260.67 25 40.93 660.33 - - 65,697.41 3,345.25 SR
46 103+125 103+150 2261.69 25 11.90 437.35 - - 66,134.76 3,345.25 SR
47 103+150 103+175 2262.71 25 23.09 556.98 - - 66,691.74 3,345.25 SR
48 103+175 103+200 2263.73 25 21.47 1739.73 - - 68,431.46 3,345.25 SR
49 103+200 103+225 2264.75 25 117.71 2985.00 - - 71,416.46 3,345.25 SR
50 103+225 103+250 2265.77 25 121.09 2263.14 - - 73,679.60 3,345.25 SR
51 103+250 103+275 2266.79 25 59.96 1931.09 - - 75,610.69 3,345.25 SMB
52 103+275 103+300 2267.81 25 94.53 3260.30 - - 78,870.99 3,345.25 SMB
53 103+300 103+325 2268.83 25 166.30 3425.23 - - 82,296.21 3,345.25 SR
54 103+325 103+350 2269.86 25 107.72 2552.36 - - 84,848.58 3,345.25 SR
55 103+350 103+375 2270.91 25 96.47 3400.74 - - 88,249.31 3,345.25 SMB
56 103+375 103+400 2271.99 25 175.59 4207.50 - - 92,456.81 3,345.25 SMB
57 103+400 103+425 2273.10 25 161.01 3374.13 - - 95,830.94 3,345.25 SMB
58 103+425 103+450 2274.24 25 108.92 3222.50 - - 99,053.44 3,345.25 SMB
59 103+450 103+475 2275.41 25 148.88 4420.75 - - 103,474.19 3,345.25 SMB
60 103+475 103+500 2276.58 25 204.78 4288.25 - - 107,762.44 3,345.25 SMB
61 103+500 103+525 2277.75 25 138.28 3716.00 - - 111,478.44 3,345.25 SMB
62 103+525 103+550 2278.93 25 159.00 3622.13 - - 115,100.56 3,345.25 SMB
63 103+550 103+575 2280.10 25 130.77 3663.38 - - 118,763.94 3,345.25 SMB
64 103+575 103+600 2281.27 25 162.30 2873.38 - - 121,637.31 3,345.25 SMB
65 103+600 103+625 2282.44 25 67.57 1423.90 - - 123,061.21 3,345.25 SMB
66 103+625 103+650 2283.62 25 46.34 1011.06 - 10.84 124,072.28 3,356.09 SMB
67 103+650 103+675 2284.79 25 34.54 643.29 0.867 250.09 124,715.56 3,606.18 SMB
68 103+675 103+700 2285.96 25 16.92 738.34 19.14 286.35 125,453.90 3,892.53 SMB
69 103+700 103+725 2287.13 25 42.15 1261.90 3.768 47.10 126,715.80 3,939.63 HR
70 103+725 103+750 2288.30 25 58.81 1333.81 - - 128,049.61 3,939.63 HR
71 103+750 103+775 2289.48 25 47.90 1183.11 - 215.88 129,232.73 4,155.50 HR
72 103+775 103+800 2290.65 25 46.75 1355.19 17.27 215.88 130,587.91 4,371.38 HR

Page 84 of 251
S.No Start End Proposed Design Cut Area Cut Volume Fill Area Fill Cum. Cut Cum. Fill Type of
Station( Station( Attitude Length( (Sq.m.) (Cu.m.) (Sq.m.) Volume Vol. (Cu.m.) Vol. strata
Km) Km) (m) m) (Cu.m.) (Cu.m.)

73 103+800 103+825 2291.82 25 61.67 1495.85 - - 132,083.76 4,371.38 SR


74 103+825 103+850 2292.99 25 58.00 1323.66 - - 133,407.43 4,371.38 SR
75 103+850 103+875 2294.17 25 47.89 1345.30 - - 134,752.73 4,371.38 SR
76 103+875 103+900 2295.34 25 59.73 1273.99 - - 136,026.71 4,371.38 SR
77 103+900 103+925 2296.51 25 42.19 932.31 - 16.38 136,959.03 4,387.75 HR
78 103+925 103+950 2297.68 25 32.40 1046.08 1.31 16.38 138,005.10 4,404.13 HR
79 103+950 103+975 2298.85 25 51.29 900.59 - - 138,905.69 4,404.13 HR
80 103+975 104+000 2300.03 25 20.76 462.21 - 10.29 139,367.90 4,414.41 HR
81 104+000 104+025 2301.20 25 16.22 388.71 0.823 27.54 139,756.61 4,441.95 HR
82 104+025 104+050 2302.37 25 14.88 780.86 1.38 18.88 140,537.48 4,460.83 HR
83 104+050 104+075 2303.54 25 47.59 1099.61 0.13 1.63 141,637.09 4,462.45 SR
84 104+075 104+100 2304.71 25 40.38 640.33 - - 142,277.41 4,462.45 SR
85 104+100 104+125 2305.89 25 10.85 378.30 - - 142,655.71 4,462.45 SR
86 104+125 104+150 2307.06 25 19.42 441.78 - 12.25 143,097.49 4,474.70 SR
87 104+150 104+175 2308.23 25 15.92 351.18 0.98 68.10 143,448.66 4,542.80 SR
88 104+175 104+200 2309.41 25 12.17 238.05 4.468 193.35 143,686.71 4,736.15 SR
89 104+200 104+225 2310.70 25 6.87 383.05 11.00 137.50 144,069.76 4,873.65 SR
90 104+225 104+250 2312.17 25 23.77 556.25 - - 144,626.01 4,873.65 SR
91 104+250 104+275 2313.78 25 20.73 570.66 - - 145,196.68 4,873.65 SR
92 104+275 104+300 2315.39 25 24.92 727.63 - - 145,924.30 4,873.65 SR
93 104+300 104+325 2317.01 25 33.29 983.98 - - 146,908.28 4,873.65 SR
94 104+325 104+350 2318.62 25 45.43 753.39 - 84.29 147,661.66 4,957.94 SR
95 104+350 104+375 2320.24 25 14.84 583.56 6.74 132.36 148,245.23 5,090.30 SR
96 104+375 104+400 2321.85 25 31.85 767.56 3.85 120.99 149,012.79 5,211.29 SR
97 104+400 104+425 2323.46 25 29.56 625.75 5.83 146.55 149,638.54 5,357.84 SR
98 104+425 104+450 2325.08 25 20.50 369.26 5.89 211.56 150,007.80 5,569.40 SR
99 104+450 104+475 2326.69 25 9.04 306.24 11.03 223.76 150,314.04 5,793.16 SR
100 104+475 104+500 2328.27 25 15.46 277.20 6.87 228.96 150,591.24 6,022.13 SR
101 104+500 104+525 2329.74 25 6.72 176.60 11.45 216.05 150,767.84 6,238.18 SR
102 104+525 104+550 2331.11 25 7.41 229.31 5.83 221.80 150,997.15 6,459.98 SR
103 104+550 104+575 2332.37 25 10.94 305.74 11.91 212.48 151,302.89 6,672.45 SR
104 104+575 104+600 2333.53 25 13.52 335.70 5.09 193.10 151,638.59 6,865.55 SR
105 104+600 104+625 2334.59 25 13.33 252.00 10.36 371.63 151,890.59 7,237.18 SR
106 104+625 104+650 2335.59 25 6.83 123.55 19.37 566.26 152,014.14 7,803.44 SR
107 104+650 104+675 2336.59 25 3.06 147.45 25.931 652.26 152,161.59 8,455.70 SR
108 104+675 104+700 2337.58 25 8.74 231.43 26.25 606.13 152,393.01 9,061.83 SR
109 104+700 104+725 2338.58 25 9.77 150.75 22.24 681.25 152,543.76 9,743.08 SR
110 104+725 104+750 2339.76 25 2.29 61.65 32.26 854.38 152,605.41 10,597.45 SR
111 104+750 104+775 2341.22 25 2.65 185.20 36.09 864.38 152,790.61 11,461.83 SR
112 104+775 104+800 2342.88 25 12.17 233.88 33.06 736.50 153,024.49 12,198.33 SR
113 104+800 104+825 2344.55 25 6.54 248.29 25.86 623.50 153,272.78 12,821.83 SR
114 104+825 104+850 2346.22 25 13.32 250.55 24.02 473.25 153,523.33 13,295.08 SR
115 104+850 104+875 2347.89 25 6.72 240.34 13.84 246.13 153,763.66 13,541.20 SR
116 104+875 104+900 2349.56 25 12.51 275.26 5.85 116.75 154,038.93 13,657.95 SR
117 104+900 104+925 2351.23 25 9.52 182.18 3.49 117.25 154,221.10 13,775.20 SR
118 104+925 104+950 2352.90 25 5.06 63.39 5.89 187.50 154,284.49 13,962.70 SR
119 104+950 104+975 2354.57 25 0.01 713.04 9.11 118.09 154,997.53 14,080.79 SR
120 104+975 105+000 2356.24 25 57.03 1432.01 0.34 8.09 156,429.54 14,088.88 SR
121 105+000 105+025 2357.91 25 57.53 1443.56 0.31 3.88 157,873.10 14,092.75 SR
122 105+025 105+050 2359.58 25 57.96 1364.61 - - 159,237.71 14,092.75 SR
123 105+050 105+075 2361.25 25 51.21 1158.14 - - 160,395.85 14,092.75 SR
124 105+075 105+100 2362.92 25 41.44 989.54 - - 161,385.39 14,092.75 SR
125 105+100 105+125 2364.59 25 37.73 799.44 - - 162,184.83 14,092.75 SR
126 105+125 105+150 2366.26 25 26.23 1070.18 - - 163,255.00 14,092.75 SR
127 105+150 105+175 2367.89 25 59.39 1540.19 - - 164,795.19 14,092.75 SR
128 105+175 105+200 2369.43 25 63.83 1562.40 - - 166,357.59 14,092.75 SR
129 105+200 105+225 2370.92 25 61.16 1574.49 - - 167,932.08 14,092.75 SR
130 105+225 105+250 2372.40 25 64.80 1146.11 - - 169,078.19 14,092.75 SR
131 105+250 105+275 2373.89 25 26.89 1165.39 - - 170,243.58 14,092.75 SR
132 105+275 105+300 2375.37 25 66.34 1614.69 - - 171,858.26 14,092.75 SR
133 105+300 105+325 2376.85 25 62.84 1565.01 - - 173,423.28 14,092.75 SR
134 105+325 105+350 2378.34 25 62.37 1392.44 - - 174,815.71 14,092.75 SR
135 105+350 105+375 2379.82 25 49.03 1351.63 - - 176,167.34 14,092.75 SR
136 105+375 105+400 2381.31 25 59.10 1448.00 - - 177,615.34 14,092.75 SR
137 105+400 105+425 2382.81 25 56.74 1616.00 - - 179,231.34 14,092.75 SR
138 105+425 105+450 2384.32 25 72.54 1856.00 - - 181,087.34 14,092.75 SR
139 105+450 105+475 2385.84 25 75.94 2497.38 - - 183,584.71 14,092.75 SR
140 105+475 105+500 2387.37 25 123.85 2322.00 - - 185,906.71 14,092.75 SR
141 105+500 105+525 2388.89 25 61.91 1547.88 - - 187,454.59 14,092.75 SR
142 105+525 105+550 2390.41 25 61.92 1729.00 - - 189,183.59 14,092.75 SR
143 105+550 105+575 2391.93 25 76.40 1930.75 - - 191,114.34 14,092.75 SR
144 105+575 105+600 2393.46 25 78.06 1846.63 - - 192,960.96 14,092.75 SR
145 105+600 105+625 2394.98 25 69.67 1912.13 - - 194,873.09 14,092.75 SR
146 105+625 105+650 2396.50 25 83.30 1692.28 - - 196,565.36 14,092.75 SR

Page 85 of 251
S.No Start End Proposed Design Cut Area Cut Volume Fill Area Fill Cum. Cut Cum. Fill Type of
Station( Station( Attitude Length( (Sq.m.) (Cu.m.) (Sq.m.) Volume Vol. (Cu.m.) Vol. strata
Km) Km) (m) m) (Cu.m.) (Cu.m.)

147 105+650 105+675 2398.02 25 52.08 1387.03 - - 197,952.39 14,092.75 SR


148 105+675 105+700 2399.55 25 58.88 2058.63 - - 200,011.01 14,092.75 SR
149 105+700 105+725 2401.07 25 105.81 2650.75 - - 202,661.76 14,092.75 SR
150 105+725 105+750 2402.59 25 106.25 2450.88 - - 205,112.64 14,092.75 SR
151 105+750 105+775 2404.11 25 89.82 3109.75 - - 208,222.39 14,092.75 SMB
152 105+775 105+800 2405.64 25 158.96 3687.13 - - 211,909.51 14,092.75 SMB
153 105+800 105+825 2407.16 25 136.01 3428.63 - - 215,338.14 14,092.75 SMB
154 105+825 105+850 2408.68 25 138.28 3397.75 - - 218,735.89 14,092.75 SMB
155 105+850 105+875 2410.20 25 133.54 2727.75 - - 221,463.64 14,092.75 SMB
156 105+875 105+900 2411.73 25 84.68 2112.13 - - 223,575.76 14,092.75 SMB
157 105+900 105+925 2413.25 25 84.29 2139.88 - - 225,715.64 14,092.75 SMB
158 105+925 105+950 2414.86 25 86.90 3125.13 - - 228,840.76 14,092.75 SMB
159 105+950 105+975 2416.56 25 163.11 4548.75 - - 233,389.51 14,092.75 SR
160 105+975 106+000 2418.32 25 200.79 3175.25 - - 236,564.76 14,092.75 SR
161 106+000 106+025 2420.07 25 53.23 2086.63 - - 238,651.39 14,092.75 SMB
162 106+025 106+050 2421.82 25 113.70 2651.38 - - 241,302.76 14,092.75 SMB
163 106+050 106+075 2423.58 25 98.41 2575.00 - - 243,877.76 14,092.75 SMB
164 106+075 106+100 2425.33 25 107.59 2215.88 - - 246,093.64 14,092.75 SMB
165 106+100 106+125 2427.09 25 69.68 1698.50 - - 247,792.14 14,092.75 SMB
166 106+125 106+150 2428.84 25 66.20 1483.88 - - 249,276.01 14,092.75 SMB
167 106+150 106+175 2430.60 25 52.51 1298.00 - - 250,574.01 14,092.75 SMB
168 106+175 106+200 2432.35 25 51.33 1570.00 - - 252,144.01 14,092.75 SMB
169 106+200 106+225 2434.11 25 74.27 1410.89 - - 253,554.90 14,092.75 SMB
170 106+225 106+250 2435.86 25 38.60 1328.26 - - 254,883.16 14,092.75 SMB
171 106+250 106+275 2437.61 25 67.66 1400.00 - - 256,283.16 14,092.75 SMB
172 106+275 106+300 2439.37 25 44.34 1129.75 - - 257,412.91 14,092.75 SMB
173 106+300 106+325 2441.12 25 46.04 1266.88 - - 258,679.79 14,092.75 SMB
174 106+325 106+350 2442.88 25 55.31 1235.25 - - 259,915.04 14,092.75 SMB
175 106+350 106+375 2444.63 25 43.51 1369.14 - - 261,284.18 14,092.75 SMB
176 106+375 106+400 2446.39 25 66.02 1528.28 - - 262,812.45 14,092.75 SMB
177 106+400 106+425 2448.14 25 56.24 1215.76 - - 264,028.21 14,092.75 HR
178 106+425 106+450 2449.89 25 41.02 1531.50 - - 265,559.71 14,092.75 HR
179 106+450 106+475 2451.65 25 81.50 2061.38 - - 267,621.09 14,092.75 HR
180 106+475 106+500 2453.40 25 83.41 2287.75 - - 269,908.84 14,092.75 HR
181 106+500 106+525 2455.16 25 99.61 2026.88 - - 271,935.71 14,092.75 SMB
182 106+525 106+550 2456.91 25 62.54 1561.63 - - 273,497.34 14,092.75 SMB
183 106+550 106+575 2458.67 25 62.39 1765.88 - - 275,263.21 14,092.75 SMB
184 106+575 106+600 2460.42 25 78.88 2029.75 - - 277,292.96 14,092.75 SMB
185 106+600 106+625 2462.18 25 83.50 2111.13 - - 279,404.09 14,092.75 HR
186 106+625 106+650 2463.93 25 85.39 2420.89 - - 281,824.98 14,092.75 HR
187 106+650 106+675 2465.68 25 108.28 3217.51 - - 285,042.49 14,092.75 HR
188 106+675 106+700 2467.44 25 149.12 2657.00 - - 287,699.49 14,092.75 HR
189 106+700 106+725 2469.19 25 63.44 1517.63 - - 289,217.11 14,092.75 HR
190 106+725 106+750 2470.95 25 57.97 1559.38 - - 290,776.49 14,092.75 HR
191 106+750 106+775 2472.70 25 66.78 1393.25 - - 292,169.74 14,092.75 SMB
192 106+775 106+800 2474.46 25 44.68 1571.38 - - 293,741.11 14,092.75 SMB
193 106+800 106+825 2476.21 25 81.03 2484.50 - - 296,225.61 14,092.75 SMB
194 106+825 106+850 2477.97 25 117.73 3313.00 - - 299,538.61 14,092.75 SMB
195 106+850 106+875 2479.72 25 147.31 2543.75 - - 302,082.36 14,092.75 SR
196 106+875 106+900 2481.47 25 56.19 1597.38 - - 303,679.74 14,092.75 SR
197 106+900 106+925 2483.23 25 71.60 1558.25 - - 305,237.99 14,092.75 SMB
198 106+925 106+950 2484.98 25 53.06 1216.25 - - 306,454.24 14,092.75 SMB
199 106+950 106+975 2486.67 25 44.24 1349.75 - - 307,803.99 14,092.75 SR
200 106+975 107+000 2488.27 25 63.74 1024.63 - - 308,828.61 14,092.75 SR
201 107+000 107+025 2489.79 25 18.23 374.00 - - 309,202.61 14,092.75 SR
202 107+025 107+050 2491.21 25 11.69 651.95 - - 309,854.56 14,092.75 SR
203 107+050 107+075 2492.54 25 40.47 1149.73 - - 311,004.29 14,092.75 SMB
204 107+075 107+100 2493.79 25 51.51 1142.40 - - 312,146.69 14,092.75 SMB
205 107+100 107+125 2495.01 25 39.88 1046.03 - - 313,192.71 14,092.75 SR
206 107+125 107+150 2496.24 25 43.80 1019.93 - - 314,212.64 14,092.75 SR
207 107+150 107+175 2497.46 25 37.79 1063.83 - - 315,276.46 14,092.75 SR
208 107+175 107+200 2498.68 25 47.31 1070.63 - - 316,347.09 14,092.75 SR
209 107+200 107+225 2499.90 25 38.34 1030.34 - - 317,377.43 14,092.75 SR
210 107+225 107+250 2501.12 25 44.09 1042.64 - - 318,420.06 14,092.75 SR
211 107+250 107+275 2502.34 25 39.32 1133.49 - - 319,553.55 14,092.75 SR
212 107+275 107+300 2503.57 25 51.36 1306.39 - - 320,859.94 14,092.75 SR
213 107+300 107+325 2504.79 25 53.15 1315.70 - - 322,175.64 14,092.75 SR
214 107+325 107+350 2506.01 25 52.10 1252.18 - - 323,427.81 14,092.75 SR
215 107+350 107+375 2507.23 25 48.07 1703.15 - - 325,130.96 14,092.75 SR
216 107+375 107+400 2508.45 25 88.18 1997.59 - - 327,128.55 14,092.75 SR
217 107+400 107+425 2509.67 25 71.63 1347.31 - - 328,475.86 14,092.75 SR
218 107+425 107+450 2510.90 25 36.16 743.40 - - 329,219.26 14,092.75 SR
219 107+450 107+475 2512.12 25 23.31 765.85 - - 329,985.11 14,092.75 SMB
220 107+475 107+500 2513.34 25 37.96 794.38 - - 330,779.49 14,092.75 SMB

Page 86 of 251
S.No Start End Proposed Design Cut Area Cut Volume Fill Area Fill Cum. Cut Cum. Fill Type of
Station( Station( Attitude Length( (Sq.m.) (Cu.m.) (Sq.m.) Volume Vol. (Cu.m.) Vol. strata
Km) Km) (m) m) (Cu.m.) (Cu.m.)

221 107+500 107+525 2514.56 25 25.59 651.75 - - 331,431.24 14,092.75 SR


222 107+525 107+550 2515.78 25 26.55 658.20 - - 332,089.44 14,092.75 SR
223 107+550 107+575 2517.00 25 26.11 834.10 - - 332,923.54 14,092.75 SR
224 107+575 107+600 2518.23 25 40.62 791.61 - - 333,715.15 14,092.75 SR
225 107+600 107+625 2519.45 25 22.71 547.98 - - 334,263.13 14,092.75 SR
226 107+625 107+650 2520.67 25 21.13 485.11 - - 334,748.24 14,092.75 SR
227 107+650 107+675 2521.89 25 17.68 422.76 - 1.94 335,171.00 14,094.69 SR
228 107+675 107+700 2523.11 25 16.14 246.49 0.155 43.31 335,417.49 14,138.00 SR
229 107+700 107+725 2524.33 25 3.58 94.10 3.31 90.75 335,511.59 14,228.75 SR
230 107+725 107+750 2525.56 25 3.95 51.85 3.95 214.00 335,563.44 14,442.75 SR
231 107+750 107+775 2526.78 25 0.20 67.73 13.17 245.50 335,631.16 14,688.25 SMB
232 107+775 107+800 2528.00 25 5.22 125.44 6.47 111.88 335,756.60 14,800.13 SMB
233 107+800 107+825 2529.22 25 4.82 219.98 2.48 31.00 335,976.58 14,831.13 SMB
234 107+825 107+850 2530.44 25 12.78 459.16 - - 336,435.74 14,831.13 SMB
235 107+850 107+875 2531.66 25 23.95 552.81 - - 336,988.55 14,831.13 SR
236 107+875 107+900 2532.89 25 20.27 471.73 - - 337,460.28 14,831.13 SR
237 107+900 107+925 2534.12 25 17.47 441.68 - 29.63 337,901.95 14,860.75 SR
238 107+925 107+950 2535.37 25 17.87 342.75 2.37 77.88 338,244.70 14,938.63 SR
239 107+950 107+975 2536.62 25 9.55 516.73 3.86 48.25 338,761.43 14,986.88 SR
240 107+975 108+000 2537.89 25 31.79 497.20 - 12.63 339,258.63 14,999.50 SR
241 108+000 108+025 2539.16 25 7.99 257.25 1.01 14.04 339,515.88 15,013.54 SMB
242 108+025 108+050 2540.45 25 12.59 308.54 0.113 1.41 339,824.41 15,014.95 SMB
243 108+050 108+075 2541.75 25 12.09 392.98 - 11.90 340,217.39 15,026.85 SMB
244 108+075 108+100 2543.06 25 19.35 526.71 0.952 46.78 340,744.10 15,073.63 SMB
245 108+100 108+125 2544.36 25 22.79 578.28 2.79 86.25 341,322.38 15,159.88 SR
246 108+125 108+150 2545.67 25 23.47 424.34 4.11 102.88 341,746.71 15,262.75 SR
247 108+150 108+175 2546.98 25 10.48 358.20 4.12 53.38 342,104.91 15,316.13 SR
248 108+175 108+200 2548.28 25 18.18 370.48 0.15 1.88 342,475.39 15,318.00 SR
249 108+200 108+225 2549.59 25 11.46 729.06 - - 343,204.45 15,318.00 SR
250 108+225 108+250 2550.90 25 46.87 1073.00 - 19.38 344,277.45 15,337.38 SR
251 108+250 108+275 2552.21 25 38.97 725.38 1.55 25.25 345,002.83 15,362.63 SMB
252 108+275 108+300 2553.56 25 19.06 379.14 0.47 49.63 345,381.96 15,412.25 SMB
253 108+300 108+325 2554.96 25 11.27 353.08 3.5 97.50 345,735.04 15,509.75 SMB
254 108+325 108+350 2556.41 25 16.97 332.81 4.3 78.63 346,067.85 15,588.38 SMB
255 108+350 108+375 2557.91 25 9.65 596.16 1.99 24.88 346,664.01 15,613.25 SR
256 108+375 108+400 2559.42 25 38.04 1083.59 - - 347,747.60 15,613.25 SR
257 108+400 108+425 2560.93 25 48.65 1265.93 - - 349,013.53 15,613.25 SR
258 108+425 108+450 2562.44 25 52.63 1253.18 - - 350,266.70 15,613.25 SR
259 108+450 108+475 2563.95 25 47.63 1106.21 - - 351,372.91 15,613.25 SR
260 108+475 108+500 2565.46 25 40.87 1110.25 - - 352,483.16 15,613.25 SR
261 108+500 108+525 2566.97 25 47.95 1333.75 - - 353,816.91 15,613.25 SR
262 108+525 108+550 2568.48 25 58.75 1641.25 - - 355,458.16 15,613.25 SR
263 108+550 108+575 2569.99 25 72.55 1794.88 - - 357,253.04 15,613.25 SR
264 108+575 108+600 2571.50 25 71.04 1604.50 - - 358,857.54 15,613.25 SR
265 108+600 108+625 2573.01 25 57.32 1713.50 - - 360,571.04 15,613.25 SR
266 108+625 108+650 2574.52 25 79.76 1799.75 - - 362,370.79 15,613.25 SR
267 108+650 108+675 2576.03 25 64.22 1633.38 - - 364,004.16 15,613.25 SR
268 108+675 108+700 2577.54 25 66.45 1493.13 - - 365,497.29 15,613.25 SR
269 108+700 108+725 2579.05 25 53.00 1373.63 - - 366,870.91 15,613.25 SR
270 108+725 108+750 2580.56 25 56.89 2012.00 - - 368,882.91 15,613.25 SR
271 108+750 108+775 2582.07 25 104.07 2119.00 - - 371,001.91 15,613.25 SR
272 108+775 108+800 2583.58 25 65.45 2282.50 - - 373,284.41 15,613.25 SR
273 108+800 108+825 2585.09 25 117.15 2047.63 - - 375,332.04 15,613.25 SMB
274 108+825 108+850 2586.60 25 46.66 1546.75 - - 376,878.79 15,613.25 SMB
275 108+850 108+875 2588.11 25 77.08 1744.00 - - 378,622.79 15,613.25 SMB
276 108+875 108+900 2589.62 25 62.44 1404.13 - - 380,026.91 15,613.25 SMB
277 108+900 108+925 2591.13 25 49.89 1399.25 - - 381,426.16 15,613.25 SR
278 108+925 108+950 2592.64 25 62.05 1404.50 - - 382,830.66 15,613.25 SR
279 108+950 108+975 2594.16 25 50.31 1303.13 - - 384,133.79 15,613.25 SMB
280 108+975 109+000 2595.67 25 53.94 1012.35 - 34.75 385,146.14 15,648.00 SMB
281 109+000 109+025 2597.18 25 27.05 561.16 2.78 134.63 385,707.30 15,782.63 SMB
282 109+025 109+050 2598.69 25 17.85 383.50 7.99 295.38 386,090.80 16,078.00 SMB
283 109+050 109+075 2600.20 25 12.84 350.20 15.64 350.88 386,441.00 16,428.88 SMB
284 109+075 109+100 2601.71 25 15.18 333.26 12.43 375.13 386,774.26 16,804.00 SMB
285 109+100 109+125 2603.22 25 11.48 214.25 17.58 467.88 386,988.51 17,271.88 SMB
286 109+125 109+150 2604.73 25 5.66 173.31 19.85 452.63 387,161.83 17,724.50 SMB
287 109+150 109+175 2606.18 25 8.21 297.51 16.36 371.25 387,459.34 18,095.75 SMB
288 109+175 109+200 2607.55 25 15.60 221.51 13.34 381.63 387,680.85 18,477.38 SMB
289 109+200 109+225 2608.86 25 2.13 343.76 17.19 361.75 388,024.61 18,839.13 SMB
290 109+225 109+250 2610.17 25 25.38 427.10 11.75 348.88 388,451.71 19,188.00 SMB
291 109+250 109+275 2611.48 25 8.79 378.74 16.16 282.25 388,830.45 19,470.25 SMB
292 109+275 109+300 2612.78 25 21.51 434.20 6.42 161.63 389,264.65 19,631.88 SMB
293 109+300 109+325 2614.09 25 13.23 214.11 6.51 181.88 389,478.76 19,813.75 SMB
294 109+325 109+350 2615.40 25 3.90 194.26 8.04 175.63 389,673.03 19,989.38 SMB

Page 87 of 251
S.No Start End Proposed Design Cut Area Cut Volume Fill Area Fill Cum. Cut Cum. Fill Type of
Station( Station( Attitude Length( (Sq.m.) (Cu.m.) (Sq.m.) Volume Vol. (Cu.m.) Vol. strata
Km) Km) (m) m) (Cu.m.) (Cu.m.)

295 109+350 109+375 2616.71 25 11.64 509.25 6.01 77.94 390,182.28 20,067.31 SMB
296 109+375 109+400 2618.02 25 29.10 663.91 0.23 20.31 390,846.19 20,087.63 SMB
297 109+400 109+425 2619.33 25 24.01 449.78 1.40 55.63 391,295.96 20,143.25 SMB
298 109+425 109+450 2620.63 25 11.97 710.60 3.05 38.50 392,006.56 20,181.75 SMB
299 109+450 109+475 2621.94 25 44.88 978.03 0.03 0.38 392,984.59 20,182.13 SMB
300 109+475 109+500 2623.25 25 33.36 817.80 - - 393,802.39 20,182.13 SMB
301 109+500 109+525 2624.56 25 32.06 941.95 - - 394,744.34 20,182.13 SR
302 109+525 109+550 2625.87 25 43.29 894.93 - - 395,639.26 20,182.13 SR
303 109+550 109+575 2627.18 25 28.30 733.80 - - 396,373.06 20,182.13 SR
304 109+575 109+600 2628.48 25 30.40 775.14 - - 397,148.20 20,182.13 SR
305 109+600 109+625 2629.79 25 31.61 799.58 - - 397,947.78 20,182.13 SR
306 109+625 109+650 2631.10 25 32.36 723.61 - - 398,671.39 20,182.13 SR
307 109+650 109+675 2632.41 25 25.53 804.51 - - 399,475.90 20,182.13 HR
308 109+675 109+700 2633.72 25 38.83 1217.46 - - 400,693.36 20,182.13 HR
309 109+700 109+725 2635.03 25 58.57 1321.91 - - 402,015.28 20,182.13 SMB
310 109+725 109+750 2636.34 25 47.19 1141.43 - - 403,156.70 20,182.13 SMB
311 109+750 109+775 2637.64 25 44.13 1020.35 - - 404,177.05 20,182.13 HR
312 109+775 109+800 2638.95 25 37.50 890.34 - - 405,067.39 20,182.13 HR
313 109+800 109+825 2640.26 25 33.73 763.10 - - 405,830.49 20,182.13 HR
314 109+825 109+850 2641.57 25 27.32 714.79 - - 406,545.28 20,182.13 HR
315 109+850 109+875 2642.88 25 29.86 705.71 - - 407,250.99 20,182.13 HR
316 109+875 109+900 2644.19 25 26.60 605.04 - - 407,856.03 20,182.13 HR
317 109+900 109+925 2645.49 25 21.81 485.14 - - 408,341.16 20,182.13 HR
318 109+925 109+950 2646.80 25 17.00 337.66 - 30.13 408,678.83 20,212.25 HR
319 109+950 109+975 2648.11 25 10.01 330.61 2.41 30.13 409,009.44 20,242.38 HR
320 109+975 110+000 2649.42 25 16.44 344.70 - - 409,354.14 20,242.38 HR
321 110+000 110+025 2650.73 25 11.14 403.58 - - 409,757.71 20,242.38 HR
322 110+025 110+050 2652.04 25 21.15 631.00 - - 410,388.71 20,242.38 HR
323 110+050 110+075 2653.34 25 29.33 907.58 - - 411,296.29 20,242.38 HR
324 110+075 110+100 2654.65 25 43.28 1185.91 - - 412,482.20 20,242.38 HR
325 110+100 110+125 2655.95 25 51.60 1352.09 - - 413,834.29 20,242.38 HR
326 110+125 110+150 2657.18 25 56.57 1357.98 - - 415,192.26 20,242.38 HR
327 110+150 110+175 2658.35 25 52.07 1628.25 - - 416,820.51 20,242.38 HR
328 110+175 110+200 2659.49 25 78.19 1844.40 - - 418,664.91 20,242.38 HR
329 110+200 110+225 2660.64 25 69.36 1552.05 - - 420,216.96 20,242.38 SMB
330 110+225 110+250 2661.78 25 54.80 1168.00 - - 421,384.96 20,242.38 SMB
331 110+250 110+275 2662.93 25 38.64 1162.18 - - 422,547.14 20,242.38 SMB
332 110+275 110+300 2664.07 25 54.34 1490.93 - - 424,038.06 20,242.38 SMB
333 110+300 110+325 2665.22 25 64.94 1418.60 - - 425,456.66 20,242.38 SMB
334 110+325 110+350 2666.36 25 48.55 1433.36 - - 426,890.03 20,242.38 SMB
335 110+350 110+375 2667.50 25 66.12 1728.24 - - 428,618.26 20,242.38 HR
336 110+375 110+400 2668.65 25 72.14 1376.65 - - 429,994.91 20,242.38 HR
337 110+400 110+425 2669.79 25 37.99 651.25 - 27.38 430,646.16 20,269.75 HR
338 110+425 110+450 2670.94 25 14.11 341.86 2.19 194.13 430,988.03 20,463.88 HR
339 110+450 110+475 2672.08 25 13.24 395.54 13.34 168.00 431,383.56 20,631.88 HR
340 110+475 110+500 2673.23 25 18.40 433.66 0.10 69.25 431,817.23 20,701.13 HR
341 110+500 110+525 2674.37 25 16.29 398.91 5.44 86.38 432,216.14 20,787.50 SMB
342 110+525 110+550 2675.52 25 15.62 446.05 1.47 20.35 432,662.19 20,807.85 SMB
343 110+550 110+575 2676.66 25 20.06 799.28 0.158 1.98 433,461.46 20,809.83 SMB
344 110+575 110+600 2677.79 25 43.88 719.50 - 5.23 434,180.96 20,815.05 SMB
345 110+600 110+625 2678.91 25 13.68 274.20 0.418 28.35 434,455.16 20,843.40 HR
346 110+625 110+650 2680.02 25 8.26 211.50 1.85 192.38 434,666.66 21,035.78 HR
347 110+650 110+675 2681.12 25 8.66 463.44 13.54 369.25 435,130.10 21,405.03 HR
348 110+675 110+700 2682.22 25 28.41 735.68 16.00 394.63 435,865.78 21,799.65 HR
349 110+700 110+725 2683.30 25 30.44 608.98 15.57 597.50 436,474.75 22,397.15 HR
350 110+725 110+750 2684.38 25 18.28 364.34 32.23 683.63 436,839.09 23,080.78 HR
351 110+750 110+775 2685.45 25 10.87 315.25 22.46 485.88 437,154.34 23,566.65 HR
352 110+775 110+800 2686.51 25 14.35 326.44 16.41 327.38 437,480.78 23,894.03 HR
353 110+800 110+825 2687.57 25 11.77 714.58 9.78 122.25 438,195.35 24,016.28 HR
354 110+825 110+850 2688.62 25 45.40 1294.19 - - 439,489.54 24,016.28 HR
355 110+850 110+875 2689.68 25 58.13 1223.25 - - 440,712.79 24,016.28 SMB
356 110+875 110+900 2690.74 25 39.73 1214.59 - - 441,927.38 24,016.28 SMB
357 110+900 110+925 2691.79 25 57.44 1354.24 - - 443,281.61 24,016.28 SMB
358 110+925 110+950 2692.85 25 50.90 1243.20 - - 444,524.81 24,016.28 SMB
359 110+950 110+975 2693.91 25 48.56 1028.96 - - 445,553.78 24,016.28 SMB
360 110+975 111+000 2694.96 25 33.76 824.15 - - 446,377.93 24,016.28 SMB
361 111+000 111+025 2696.02 25 32.17 1091.74 - - 447,469.66 24,016.28 SMB
362 111+025 111+050 2697.08 25 55.17 1341.83 - - 448,811.49 24,016.28 SMB
363 111+050 111+075 2698.13 25 52.18 1259.48 - - 450,070.96 24,016.28 SMB
364 111+075 111+100 2699.19 25 48.58 1128.38 - - 451,199.34 24,016.28 SMB
365 111+100 111+125 2700.25 25 41.69 1503.69 - - 452,703.03 24,016.28 HR
366 111+125 111+150 2701.30 25 78.60 2222.06 - - 454,925.09 24,016.28 HR
367 111+150 111+175 2702.36 25 99.16 2000.15 - - 456,925.24 24,016.28 HR
368 111+175 111+200 2703.39 25 60.85 1475.38 - - 458,400.61 24,016.28 HR

Page 88 of 251
S.No Start End Proposed Design Cut Area Cut Volume Fill Area Fill Cum. Cut Cum. Fill Type of
Station( Station( Attitude Length( (Sq.m.) (Cu.m.) (Sq.m.) Volume Vol. (Cu.m.) Vol. strata
Km) Km) (m) m) (Cu.m.) (Cu.m.)

369 111+200 111+225 2704.21 25 57.18 1602.88 - - 460,003.49 24,016.28 HR


370 111+225 111+250 2704.77 25 71.05 2080.50 - - 462,083.99 24,016.28 HR
371 111+250 111+275 2705.07 25 95.39 2060.38 - - 464,144.36 24,016.28 HR
372 111+275 111+300 2705.11 25 69.44 1639.25 - - 465,783.61 24,016.28 HR
373 111+300 111+325 2704.89 25 61.70 1518.13 - - 467,301.74 24,016.28 SMB
374 111+325 111+350 2704.43 25 59.75 1515.13 - - 468,816.86 24,016.28 SMB
375 111+350 111+375 2703.93 25 61.46 1394.50 - - 470,211.36 24,016.28 HR
376 111+375 111+400 2703.43 25 50.10 1369.75 - - 471,581.11 24,016.28 HR
377 111+400 111+425 2702.93 25 59.48 1640.25 - - 473,221.36 24,016.28 HR
378 111+425 111+450 2702.43 25 71.74 1868.88 - - 475,090.24 24,016.28 HR
379 111+450 111+475 2701.93 25 77.77 1777.13 - - 476,867.36 24,016.28 HR
380 111+475 111+500 2701.44 25 64.40 1838.88 - - 478,706.24 24,016.28 HR
381 111+500 111+525 2700.94 25 82.71 1879.38 - - 480,585.61 24,016.28 HR
382 111+525 111+550 2700.44 25 67.64 1701.38 - - 482,286.99 24,016.28 HR
383 111+550 111+575 2699.94 25 68.47 1824.63 - - 484,111.61 24,016.28 HR
384 111+575 111+600 2699.44 25 77.50 1671.88 - - 485,783.49 24,016.28 HR
385 111+600 111+625 2698.94 25 56.25 1520.63 - - 487,304.11 24,016.28 HR
386 111+625 111+650 2698.44 25 65.40 1492.88 - - 488,796.99 24,016.28 HR
387 111+650 111+675 2697.94 25 54.03 1403.75 - - 490,200.74 24,016.28 HR
388 111+675 111+700 2697.44 25 58.27 1417.00 - - 491,617.74 24,016.28 SR
389 111+700 111+725 2696.95 25 55.09 1342.88 - - 492,960.61 24,016.28 HR
390 111+725 111+750 2696.45 25 52.34 1029.88 - - 493,990.49 24,016.28 HR
391 111+750 111+775 2696.04 25 30.05 1354.13 - - 495,344.61 24,016.28 SMB
392 111+775 111+800 2695.80 25 78.28 2007.06 - - 497,351.68 24,016.28 SMB
393 111+800 111+825 2695.74 25 82.29 1985.03 - - 499,336.70 24,016.28 SMB
394 111+825 111+850 2695.86 25 76.52 2051.68 - - 501,388.38 24,016.28 SMB
395 111+850 111+875 2696.15 25 87.62 1874.94 - - 503,263.31 24,016.28 SMB
396 111+875 111+900 2696.62 25 62.38 1298.09 - - 504,561.40 24,016.28 SMB
397 111+900 111+925 2697.17 25 41.47 1060.36 - - 505,621.76 24,016.28 HR
398 111+925 111+950 2697.73 25 43.36 973.00 - - 506,594.76 24,016.28 HR
399 111+950 111+975 2698.28 25 34.48 671.63 - - 507,266.39 24,016.28 HR
400 111+975 112+000 2698.84 25 19.25 240.63 - - 507,507.01 24,016.28 HR
401 112+000 - 2699.39 - - 0.00 - - - - HR
Total Fill
Total Cut Volume Obtained from Roadway Cutting (Cum)= 507507.0125 24016.28
Volume=

Altd 2100-2400 mtr


S/No Location Earth work quantity in cutting (Cum) Total Quantity in filling (Cum) Length
From To (Km) SMB SR HR SMB SR HR SMB SR HR
(Km)
1 102.000 105.675 61611.41 98426.8 37914.175 3694.025 9,655.93 742.8 900 2200 575

Altd 2401-2700 mtr


S/No Location Earth work quantity in cutting (Cum) Total Quantity in filling (Cum) Length
From (Km) To (Km) SMB SR HR SMB SR HR SMB SR HR

2 105.675 112.000 132977.4625 86944.775 89632.3875 5396.3 807.00 3720.225 2650 1850 1825

Page 89 of 251
APPX " C "
DETAILS OF DISPOSAL OF EXCAVATED EARTH

Srl No Location Dumping Qty of cutting Deduct Qty of Net Qty (cum) Considering Net wt of Lead Initial Extra lead Disposal of Add to F-802 for Total rates Amount
From To point (SMB+SR+HR) filling (cum) 2/3rd Qty to be excavated earth involved lead excavated earth every additional
(cum) disposed to be disposed with vehicle upto KM per Cum after
(cum) @1.60 5 KM initial lead initial 5 KM lead
MT/Cum (MT)

Altd 2100-2400 mtr


A Qty of earth to be disposed within the initial lead of road
102.00 103.00 110.175 61028.0375 3195.7375 57832.30 38554.87 61687.79 7.675 5.00 2.68 88.01 4.09 98.95 3815033.30
103.00 104.00 110.175 78339.86 1218.68 77121.19 51414.13 82262.61 6.675 5.00 1.68 88.01 4.09 94.86 4877182.93
104.00 105.00 110.175 17061.64 9674.46 7387.18 4924.78 7879.65 5.675 5.00 0.67 88.01 4.09 90.77 447025.97
105.00 105.650 110.175 40135.83 3.88 40131.95 26754.63 42807.41 4.850 5.00 0 88.01 4.09 88.01 2354674.99
Altd 2401-2700 mtr Total (A) 121648.41 194637.46 93.15 11493917.20
B 105.650 107.00 110.175 112263.25 0.00 112263.25 74842.17 119747.47 3.850 5.00 0 90.21 4.40 90.21 6751512.16
107.00 108.00 110.175 30430.01 906.75 29523.26 19682.18 31491.49 2.675 5.00 0 90.21 4.40 90.21 1775529.46
108.00 108.05 110.175 565.79 15.45 550.34 366.89 587.02 2.150 5.00 0 90.21 4.40 90.21 33097.15
108.05 109.00 110.175 45321.73 633.05 44688.68 29792.45 47667.92 1.650 5.00 0 90.21 4.40 90.21 2687576.91
109.00 110.00 110.175 24208.00 4594.38 19613.63 13075.75 20921.20 0.675 5.00 0 90.21 4.40 90.21 1179563.41
110.00 111.00 110.275 37023.79 3773.90 33249.89 22166.59 35466.54 -0.225 5.00 0 90.21 4.40 90.21 1999648.08
111.00 112.00 112.150 61129.09 0.00 61129.09 40752.73 65204.37 0.650 5.00 0 90.21 4.40 90.21 3676303.77
200678.76 321086.01 90.21 18103230.94
G/Total (A+B) 322327.17 515723.47 29597148.14
Annexure-______
FULL TITLE OF CONSTRUCTION/IMPROVEMENT OF ROAD BASOLI-BANI-
PROJECT- BHADERWAH FROM CL-9 TO NHDL SPECIFICATIONS (FMN,
PMT SURF & BR WK) BETWEEN KM 102.00 TO KM 112.00
THROUGH DEPARTMENTAL MODE.

FILE NO-__________________________
DATE OF PROPOSEL-____________________
DETAIL OF MUCK/DEBRIES TO BE PRODUCED

NAME OF CONSTRUCTION/IMPROVEMENT OF ROAD BASOLI-BANI-BHADERWAH


FROM CL-9 TO NHDL SPECIFICATIONS (FMN, PMT SURF & BR WK)
WORK- BETWEEN KM 102.00 TO KM 112.00 THROUGH DEPARTMENTAL MODE.

Detail of quantity to be produced and used during the construction


Sr No Description Qty
1 Total quantity of muck to generated from the project 322327.17 Cum
2 Qty of muck to be disposed at Km 110.175 281574.44 Cum
3 Qty of muck to be disposed at Km 112.15 40752.73 Cum
4 Quantity of muck to be disposed 322327.17 Cum
5 Total quantity of muck to be disposed after considering Swelling factor for 394204.22 Cum
loose muck @ 40% at Km 110.175

6 Total quantity of muck to be disposed after considering Swelling factor for 57053.822 Cum
loose muck @ 40% at Km 112.15

7 Total area required for dumping of muck 394204.22 cum @ 2.79 ha


2.97Mcum/21.0 hec at km 110.175 (As per PCF & HoFF, Govt of J&K 27873.03 Sqm
circular No. PCCF/FCA/3118/4969-5027 dated 17 Mar 2021. ) l=225 x b=124 Sqm
8 Total area required for dumping of muck 57053..822 cum @ 0.40 ha
2.97Mcum/21.0 hec at km 112.15 ( (As per PCF & HoFF, Govt of J&K 4034.11 Sqm
circular No. PCCF/FCA/3118/4969-5027 dated 17 Mar 2021. ) l=80.00 m x b=50.40 m Sqm
(1 ha = 10000 sqm)
Appendix
(A) JUNGLE CLEARANCE

ALTD LOCATION WATER-GAPS NET LENGTH AVERAGE AREA SQM


FROM MTR TO MTR FROM KM TO KM MTR WIDTH MTR

2101 2400 102.00 105.975 70.60 3,904.40 8.94 34,905.00


2401 2700 105.975 112.000 60.80 5,964.20 8.60 51,292.00
Total 217.98 131.40 9,868.60 86,197.00

(B) CUTTING DOWN TREES


ALTD LOCATION NO OF TREES
FROM MTR TO MTR FROM KM TO KM 30-75 CM 75-100 CM
2,101.00 2,400.00 102.000 105.975 60 14
2,401.00 2,700.00 105.975 112.000 90 23
Total 150 37
Appendix
ROAD LIFT CHARGES ( FORMATION WORKS )
Lead calculation

1 Ex-Rail head Pathankot


Pathankot to Jammu = 108.00 Km --- A (Plain area)
Jammu to Batote = 123.00 Km (Hill area)
Batote to Puldoda (Via KPRA) = 54.98 Km (Hill area)
Puldoda to Bhaderwah = 28.63 Km (Hill area)
Bhaderwah to starting point of worksite = 30.85 Km (High Altt area)

Km 112.00 to mid sector = (112.00-102)/2 = 5.00 Km (High Altt area)


Total Hill area 206.61 Km ---- B
Total High Altitute area 35.85 Km ---- C

2 Ex-Supply Coy
Km 56 (Supply Coy) to Batote 67.00 Km (Hill area)
Batote to Puldoda (Via KPRA) = 54.98 Km (Hill area)
Puldoda to Bhaderwah = 28.63 Km (Hill area)
Bhaderwah to starting point of worksite = 30.85 Km (High Altt area)
Km 112.00 to mid sector = (112.00-102)/2 = 5.00 Km (High Altt area)
Total Hill area 150.61 Km ---- E
Total High Altitute area 35.85 Km ---- F

ALTITUDE : ALTITUDE : 2401-


2101-2400m 27000m
A) Formation works
ZONE "J" ZONE "J"
Cost of work Rs 69232810.00 104627071.00
Credit for deployment of GREF Tradesman Rs -1392856.00 -2322669.00
Credit for deployment of GREF : PNR -2863532.00 -3893673.00
Total cost of work 64976422.00 98410729.00
Road lift charges

Ex-Rail head Pathankot


(Dx0.006x0.25xA) Rs 105262.00 159425.00 (Plain)
100
(Dx0.0066x0.25xB) Rs 221503.00 335480.00 (Hill)
100
(Dx0.008x0.25xC) Rs 46588.00 70560.00 (High Altt)
100
Ex-Supply Coy (Km 56 NH-1A)
(Dx0.0066x0.75xE) Rs 484396.00 733647.00 (Hill)
100
(Dx0.0066x0.75xF) Rs 139764.00 211681.00 (High Altt)
100
TOTAL 'A' Rs 997513.00 1510793.00
SAY Rs 997,513.00 1,510,793.00

Page 93 of Road Lift (Fmn)


Appendix
CREDIT FOR DEPLOYING GREF TRDESMAN FOR FMN WORKS
ALTD 2101-2400 MTRS
ZONE "J"
Sr No. Code Item of work A/U Qty Trade Norms Requirement
1 F-401 Rough excavation in soil/SMB Cum 61611.4125 OEM 0.0029 178.67
OEM 0.0044 434.44
Rough Excavation in SR 75% Machine &
2 F-402 Cum 98426.8 Comp Dvr 0.0031 307.58
25% manual
DLR 0.0063 615.17
OEM 0.0044 166.82
Rough Excavation in HR 75% Machine &
3 F-403 Cum 37914.175 Comp Dvr 0.0063 238.86
25% manual
DLR 0.0125 473.93
OEM 0.0017 23.96
4 F-701 Earthwork in embankment filling Cum 14092.75 MTDVR 0.0041 57.78
RRDVR 0.002 28.19
CompDvr 0.0042 0
5 G04 Unlined Drain in HR Cum 0
Dlr 0.0083 0
MT DVR 0.012 1459.78
6 F-802&F-802A Disposal of earth Cum 121648.41
OEM 0.0028 340.62
7 F-103 Cutting down trees 30 Cm to 75 Cm Nos 60 0.5 30.00
8 F-103+104 Cutting down trees 75 Cm to 100 Cm Nos 14 0.6429 9.00
Earth work in embankment upto 1.5 mtr
9 F702 Cum 0 0.0411 0.00
height in hill roads

Total Nos of Tradesman to be deployed Total 4364.80


Add 7% HAA 7% 305.54
Say 4670.34
(A) Rate of CP Tradesman (SSR 2016) 745.64
(i) Total Nos of Tradesman to be deployed Day 4670.34
(ii) Considering GREF CPL Tradesman ratio 1:5 0
(iii) GREF tradesman reqd (1/2.5) 1868.13
(v) Credit for GREF tradesman in lieu of CPLS Day 1868
(v) Credit for GREF tradesman in lieu of CPLS Total 1392856.00
ALTD 2400-2700 MTRS
ZONE "J"

Sr No. Code Item of work A/U Qty Trade Norms Requirement


1 F-401 Rough excavation in soil/SMB Cum 132977.4625 OEM 0.0029 385.63
OEM 0.0044 383.76
Rough Excavation in SR 75% Machine &
2 F-402 Cum 86944.775 Comp Dvr 0.0031 271.70
25% manual
DLR 0.0063 543.40
OEM 0.0044 394.38
Rough Excavation in HR 75% Machine &
3 F-403 Cum 89632.3875 Comp Dvr 0.0063 564.68
25% manual
DLR 0.0125 1120.40
OEM 0.0017 16.87
4 F-702 Earthwork in embankment filling Cum 9923.525 MTDVR 0.0041 40.69
RRDVR 0.002 19.85
CompDvr 0.0042 0.00
5 G04 Unlined Drain in HR Cum 0.00
Dlr 0.0083 0.00
MT DVR 0.012 2408.15
6 F-802&F-802A Excvn intrenches not exceeding
Disposal of earth 1.2 m width Cum 200678.76
and 1.5 mtr depth in soil/soil mixed witnh OEM 0.0028 561.90
boulders incl dressing bottom and sides
7 F-103 Nos 90.00 0.5 45.00
Excvn intrenches
getting out and not exceeding
disposing 1.2 m width
all excavated
and 1.5 mtr
material leaddepth
upto in Soft rock
3 mtrs (SR)
and lift as 1.50m.
upto in item
P 101 requiring
( byblasting
manualupto 50% of Qty and
means)
8 F-103+104 Nos 23.00 0.6429 14.79
getting out and disposing all excavated
materials lead upto 3 mtrs and lift upto 1.5
Earth workmtr.in( by manual means)
embankment upto 1.5 mtr
9 F702 Cum 0 0.0411 0.00
height in hill roads

Total Nos of Tradesman to be deployed Total 6771.21


Add 7% HAA 15% 1015.68
Say 7786.89
(A) Rate of CP Tradesman (SSR 2016) 745.64
(i) Total Nos of Tradesman to be deployed Day 7786.89
(ii) Considering GREF CPL Tradesman ratio 1:5 0
(iii) GREF tradesman reqd (1/2.5) 3114.76
(v) Credit for GREF tradesman in lieu of CPLS Day 3115
(v) Credit for GREF tradesman in lieu of CPLS Total 2322669.00

G/Total -2322669.00
CREDIT FOR DEPLOYING GREF PNR FOR FMN WORKS
ALTD 2101-2400 MTRS
ZONE "J"
Sr No. Code Item of work A/U Qty Trade Norms

1 F-401 Rough excavation in soil/SMB Cum 61611.4125


MAZ 0.1275

Rough Excavation in SR 75% Machine &


2 F-402 Cum 98426.8
25% manual

MAZ 0.2873

Rough Excavation in HR 75% Machine &


3 F-403 Cum 37914.175
25% manual

MAZ 0.2102

4 F-702 Earthwork in embankment filling Cum 14092.75

MAZ 0.0103

5 G04 Unlined Drain in HR Cum 0


MAZ 0.3696

6 F-802&F-802A Disposal of earth Cum 121648.41


MAZ 0.0028
Jungle clearance incl cutting down trees not
exceeding 30 cm grith measured at 1 m
above GL & clearing away shurbs,
7 F-101 10 Sqm 3490.5 0.4348
brushwood, under growth and grubbing up
roots in area having annual rainfall upto 200
cm.
8 F103 Cutting down trees 30 Cm to 75 Cm Nos 60 1
9 F103+104 Cutting down trees 75 Cm to 100 Cm Nos 14 2.0714

Total Nos of MAZ to be deployed Total


Say
Total Nos of Mate to be deployed Total
Add 7% HAA 7%
Say
Total Nos of Maz to be deployed Total
Add 7% HAA 7%
Say

CP Mate reqd (10/11)


(A) Rate of CP Mate
(i) Credit for GREF PNR in lieu of CPLS Total

(B) Rate of CP Mazdoor


(i) Total Nos of CPL to be deployed
(ii) Considering Pnr CPL is 1:10
(v) Credit for GREF PNR in lieu of CPLS Total

G/Total -2863532.00
CREDIT FOR DEPLOYING GREF PNR FOR FMN WORKS
ALTD 2401-2700 MTRS
ZONE "J"
Sr No. Code Item of work A/U Qty Trade Norms
1 F-401 Rough excavation in soil/SMB Cum 132977.4625
MAZ 0.1275
2 F-402 Cum 86944.775
MAZ 0.2873
3 F-403 Cum 89632.3875
MAZ 0.2102
4 F-702 Earthwork in embankment filling Cum 9923.525
MAZ 0.0103
5 G04 Unlined Drain in HR Cum 0
MAZ 0.3696

6 F-802&F-802A Disposal of earth Cum 200678.76


MAZ 0.0028

7 F-101 0 10 Sqm 5129.2 0.4348

8 F103 not exceeding 30 cm 0including watering and Nos 90 1


9 F103+104 finishing to required slope & level not Nos 23 2.0714
10 G03 exceeding 1.5 m 2101-2400
Altitude high aboveMtr
the base in Mtr 0 0.6087

Total Nos of CPLs to be deployed Total


Say
Total Nos of Maz to be deployed Total
Add 15% HAA 15%
Total

CP Mate reqd (10/11)


(A) Rate of CP Mate
(i) Credit for GREF PNR in lieu of CPLS Total

(B) Rate of CP Mazdoor


(i) Total Nos of CPL to be deployed
(ii) Considering Pnr CPL is 1:10
(v) Credit for GREF PNR in lieu of CPLS Total

G/Total -3893673.00

G/Total (A+B) -6757205.00

0.00
0
0
0
Appendix
EPLOYING GREF PNR FOR FMN WORKS

Requirement

7855.46

28278.02

7969.56

145.16

340.62

1517.67

60.00
29.00

46195.49
46195
0

0
46195
3233.65
49429

637.19
49429
4494
2863532
EPLOYING GREF PNR FOR FMN WORKS

Requirement

16954.63

28278.02

7969.56

145.16

561.90

2230.18

90.00
47.64
0.00

56277.09
56277.00
56277.00
8441.55
64719

5883.50

650.74
64719
5884
3828954
Appendix ' I'

STRUCTURE WISE QUANTITIES FOR PROPOSED PERMANENT WORKS

Excvn in trenches in PCC RCC RRM IN CM Laying reinforcement


Length Type of Flush White Centering/ Earth Hard
S/No Location Type of structure RR Dry Back filling PVC PIPE Weight of steel
(m) Soil pointing washing Shuttering filling Core
SMB SR HR 1:4:8 1:3:6 1:2:4 M25 1:6 1:4 Upto 12mm above 12mm

(Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Mtr) (Sqm) (Sqm) (Sqm) (Cum) ( Kg) (Kg) (KG) (Cum)
ALTITUDE 2101 - 2400 MTRs (KM 102.00 TO 105.675)

1 102.000 T/wall 48X3 (PCC 1:3:6) 48 SMB 202.56 28.80 204.768 60.77 362.88 -
2 102.000 B/wall 88X3 88 SMB 458.48 78.23 293.13 183.39 131.38 -
3 Err:509 R/wall 16X3 Err:509 SMB Err:509 Err:509 Err:509 Err:509 Err:509 -
4 102.050 R/wall 24X3 0 SMB 0.00 0.00 0.00 0.00 0.00 -
5 102.075 R/wall 48X4 48 SMB 296.928 54.53 110.93 123.50 80.64 -
6 102.150 R/wall 32X3 0 SMB 0.00 0.00 0.00 0.00 0.00 -
7 102.150 B/wall 48X2.5 48 SMB 202.512 32.93 109.15 67.44 181.87 -
8 120.200 B/wall 32X3 0 SMB 0.00 0.00 0.00 0.00 0.00 -
9 102.250 T/wall 24X2 (PCC 1:3:6) 24 SMB 78.86 9.36 72.216 22.68 53.04 54.43 -
10 102.250 R/wall 24X3 24 SMB 94.92 16.80 41.35 32.78 30.38 -
11 102.250 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
12 102.605 T/wall 24X2 (PCC 1:3:6) 24 SR 78.864 9.36 72.216 22.68 53.04 54.43 -
13 102.605 R/wall 24X3 24 SR 94.92 16.80 41.35 32.78 30.38 -
14 102.605 RCC culvert 2 Mtr span 1 SR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
15 102.725 T/wall 48X2 (PCC 1:3:6) 48 SR 157.728 18.72 144.432 45.36 106.08 108.86 -
16 102.725 R/wall 48X4 48 SR 296.93 54.53 110.93 123.50 80.64 -
17 102.825 T/wall 48X2 (PCC 1:3:6) 48 HR 157.73 18.72 144.432 45.36 106.08 108.86 -
18 102.825 R/wall 48X4 48 HR 296.93 54.53 110.93 123.50 80.64 -
19 102.875 T/wall 16X2 (PCC 1:3:6) 16 SMB 52.58 6.24 48.144 15.12 35.36 36.29 -
20 102.875 R/wall 16X2 16 SMB 35.18 5.70 19.30 8.34 13.66 -
21 102.900 T/wall 24X2 (PCC 1:3:6) 24 HR 78.86 9.36 72.216 22.68 53.04 54.43 -
22 102.900 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
23 102.900 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
24 102.950 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
25 102.950 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
26 102.975 R/wall 48X3 48 HR 189.84 33.60 82.70 65.57 60.77 -
27 103.025 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
28 103.025 B/wall 24X2.5 24 HR 101.26 16.46 54.58 33.72 90.94 -
29 103.050 R/wall 128X3 126 HR 498.33 88.20 217.10 172.12 159.52 -
30 103.050 B/wall 56X2 56 HR 189.504 28.45 112.34 46.09 56.06 -
31 103.250 T/wall 24X2 (PCC 1:3:6) 24 SMB 78.86 9.36 72.216 22.68 53.04 54.43 -
32 103.250 R/wall 24X3 24 SMB 94.92 16.80 41.35 32.78 30.38 -
33 103.250 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
34 103.270 R/wall 104X3 104 SMB 411.32 72.80 179.19 142.06 131.66 -
35 103.500 T/wall 48X2 (PCC 1:3:6) 48 SR 157.728 18.72 144.432 45.36 106.08 108.86 -
36 103.500 R/wall 48X2 48 SR 105.55 17.09 57.89 25.01 40.99 -
37 103.500 R/wall 16X3 16 SR 63.28 11.20 27.57 21.86 20.26 -
38 103.575 T/wall 48X2 (PCC 1:3:6) 48 SR 157.728 18.72 144.432 45.36 106.08 108.86 -
39 103.575 R/wall 48X3 48 SR 189.84 33.60 82.70 65.57 60.77 -
40 103.625 T/wall 48X2 (PCC 1:3:6) 48 SMB 157.73 18.72 144.432 45.36 106.08 108.86 -
41 103.625 R/wall 48X3 48 SMB 189.84 33.60 82.70 65.57 60.77 -
42 103.675 T/wall 24X2 (PCC 1:3:6) 24 SMB 78.86 9.36 72.216 22.68 53.04 54.43 -
43 103.675 R/wall 24X3 24 SMB 94.92 16.80 41.35 32.78 30.38 -
44 103.675 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
45 103.725 T/wall 8X2 (PCC 1:3:6) 8 SMB 26.29 3.12 24.072 7.56 17.68 18.14 -
46 103.725 R/wall 8X3 8 HR 31.64 5.60 13.78 10.93 10.13 -
47 103.750 T/wall 104X2 (PCC 1:3:6) 104 HR 341.74 40.56 312.936 98.28 229.84 235.87 -
48 103.750 R/wall 104X3 104 HR 411.32 72.80 179.19 142.06 131.66 -
49 103.875 B/wall 24X2 24 HR 81.216 28.45 48.14 19.75 24.02 -
50 103.900 R/wall 144X2 144 HR 316.656 51.26 173.66 75.02 122.98 -
51 103.900 R/wall 64X4 64 HR 395.90 72.70 147.90 164.67 107.52 -
52 104.050 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
53 104.050 R/wall 32X4 32 HR 197.95 36.35 73.95 82.34 53.76 -
54 104.100 R/wall 32X2 32 HR 70.368 11.39 38.59 16.67 27.33 -
55 104.135 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
56 104.100 B/wall 32X3 32 HR 0 28.45 106.59 66.69 47.78 -
57 104.150 T/wall 24X2 (PCC 1:3:6) 24 HR 78.86 9.36 72.216 22.68 53.04 54.43 -
58 104.150 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
59 104.175 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
60 104.175 R/wall 64X3 64 HR 253.12 72.70 110.27 87.42 81.02 -
61 104.275 T/wall 24X2 (PCC 1:3:6) 24 HR 78.86 9.36 72.216 22.68 53.04 54.43 -
62 104.275 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
63 104.300 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
64 104.300 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
65 104.350 T/wall 160X2 (PCC 1:3:6) 160 HR 525.76 62.40 481.44 151.20 353.60 362.88 -
66 104.350 R/wall 160X3 160 HR 632.8 112.00 275.68 218.56 202.56 -
67 104.575 T/wall 48X2 (PCC 1:3:6) 48 HR 157.73 18.72 144.432 45.36 106.08 108.86 -
68 104.575 R/wall 48X3 48 HR 189.84 33.60 82.70 65.57 60.77 -
69 104.575 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
70 104.675 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
71 104.675 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
72 104.700 T/wall 48X2 (PCC 1:3:6) 48 HR 157.73 18.72 144.432 45.36 106.08 108.86 -
73 104.700 R/wall 48X3 48 HR 189.84 33.60 82.70 65.57 60.77 -
74 104.700 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
75 104.750 T/wall 104X2 (PCC 1:3:6) 104 HR 341.74 40.56 312.936 98.28 229.84 235.87 -
76 104.750 R/wall 104X3 104 HR 411.32 72.80 179.19 142.06 131.66 -

Page 99 of PMT Wks Qty


Excvn in trenches in PCC RCC RRM IN CM Laying reinforcement
Length Type of Flush White Centering/ Earth Hard
S/No Location Type of structure RR Dry Back filling PVC PIPE Weight of steel
(m) Soil pointing washing Shuttering filling Core
SMB SR HR 1:4:8 1:3:6 1:2:4 M25 1:6 1:4 Upto 12mm above 12mm

(Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Mtr) (Sqm) (Sqm) (Sqm) (Cum) ( Kg) (Kg) (KG) (Cum)
77 105.000 T/wall 32X2 (PCC 1:3:6) 32 SMB 105.15 12.48 96.288 30.24 70.72 72.58 -
78 105.000 R/wall 32X3 32 SMB 126.56 22.40 55.14 43.71 40.51 -
79 105.000 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
80 105.200 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
81 105.200 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
82 105.250 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
83 105.250 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
84 105.250 B/wall 16X2.5 16 HR 67.50 10.98 36.38 22.48 60.62 -
85 105.275 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
86 105.275 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
87 105.325 T/wall 48X2 (PCC 1:3:6) 48 HR 157.73 18.72 144.432 45.36 106.08 108.86 -
88 105.325 B/wall 16X2 16 HR 54.144 28.45 32.10 13.17 16.02 -
89 105.425 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
90 105.550 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
91 105.550 R/wall 8X3 8 HR 31.64 5.60 13.78 10.93 10.13 -
92 105.600 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
93 105.600 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
94 105.650 T/wall 48X2 (PCC 1:3:6) 48 HR 157.73 18.72 144.432 45.36 106.08 108.86 -
95 105.650 R/wall 48X3 48 HR 189.84 33.60 82.70 65.57 60.77 -
On R/Wall 792 277.20 166.32
96 Parapet wall
and Culvert
97 102 TO 105.675 Line Drain 849 SMB 288.52 84.86 110.318 16.97 560.08
TOTAL Err:509 1436.79 9245.05 Err:509 4244.60 693.27 57.12 Err:509 - Err:509 Err:509 3005.68 - - 5623.80 35.68 5085.18 - 5085.18 12.56
ALTITUDE 2401 - 2700 MTRs (km 105.675 to km 112.000)
97 105.725 R/wall 16X3 16 SMB 63.28 11.20 27.57 21.86 20.26 -
98 105.800 T/wall 56X2 (PCC 1:3:6) 56 SMB 184.02 21.84 168.504 52.92 123.76 127.01 -
99 105.800 R/wall 56X3 56 SMB 221.48 39.20 96.49 76.50 70.90 -
100 105.800 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 4.46 635.65 - 635.65 1.57
101 105.900 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
102 105.900 B/wall 16X3 16 HR 166.72 14.22 53.30 33.34 23.89 -
103 105.950 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
104 105.950 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
105 106.000 T/wall 16X2 (PCC 1:3:6) 16 SMB 52.58 6.24 48.144 15.12 35.36 36.29 -
106 106.000 R/wall 16X3 16 SMB 63.28 11.20 27.57 21.86 20.26 -
107 106.000 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
108 106.025 T/wall 8X2 (PCC 1:3:6) 8 SMB 26.29 3.12 24.072 7.56 17.68 18.14 -
109 106.025 R/wall 16X3 16 SMB 63.28 11.20 27.57 21.86 20.26 -
110 106.150 R/wall 16X3 16 SMB 63.28 11.20 27.57 21.86 20.26 -
111 106.150 B/wall 24X2 24 SMB 81.216 28.45 48.14 19.75 24.02 -
112 106.200 R/wall 16X3 16 SMB 63.28 11.20 27.57 21.86 20.26 -
113 106.200 B/wall 56X2 56 SMB 189.504 28.45 112.34 46.09 56.06 -
114 106.350 T/wall 24X2 (PCC 1:3:6) 24 HR 78.86 9.36 72.216 22.68 53.04 54.43 -
115 106.350 R/wall 56X3 56 HR 221.48 39.20 96.49 76.50 70.90 -
116 106.400 B/wall 56X2 56 HR 189.504 28.45 112.34 46.09 56.06 -
117 106.425 R/wall 48X2 48 HR 105.552 17.09 57.89 25.01 40.99 -
118 106.425 B/wall 32X2 32 HR 108.288 28.45 64.19 26.34 32.03 -
119 106.500 R/wall 8X3 8 SMB 31.64 5.60 13.78 10.93 10.13 -
120 106.500 B/wall 48X3 48 HR 166.72 42.67 159.89 100.03 71.66 -
121 106.625 R/wall 40X3 40 HR 158.2 28.00 68.92 54.64 50.64 -
122 106.700 R/wall 16X3 16 SMB 63.28 11.20 27.57 21.86 20.26 -
123 106.775 T/wall 32X2 (PCC 1:3:6) 32 SR 105.152 12.48 96.288 30.24 70.72 72.58 -
124 106.775 R/wall 48X3 48 SR 189.84 33.60 82.70 65.57 60.77 -
125 106.800 T/wall 56X2 (PCC 1:3:6) 56 SR 184.016 21.84 168.504 52.92 123.76 127.01 -
126 106.800 R/wall 56X3 56 SR 221.48 39.20 96.49 76.50 70.90 -
127 106.800 RCC culvert 2 Mtr span 1 SR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
128 106.850 R/wall 32X2 32 HR 70.368 11.39 38.59 16.67 27.33 -
129 106.900 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
130 106.925 T/wall 64X2 (PCC 1:3:6) 64 HR 210.30 24.96 192.576 60.48 141.44 145.15 -
131 106.925 R/wall 80X4 80 HR 494.88 90.88 184.88 205.84 134.40 -
132 107.000 T/wall 16X2 (PCC 1:3:6) 16 SR 52.576 6.24 48.144 15.12 35.36 36.29 -
133 107.000 R/wall 16X3 16 SR 63.28 11.20 27.57 21.86 20.26 -
134 107.000 RCC culvert 2 Mtr span 1 SR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
135 107.100 T/wall 40X2 (PCC 1:3:6) 40 SR 131.44 15.60 120.36 37.80 88.40 90.72 -
136 107.100 R/wall 40X4 40 SR 247.44 45.44 92.44 102.92 67.20 -
137 107.100 RCC culvert 2 Mtr span 1 SR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
138 107.250 B/wall 16X2 16 HR 54.144 28.45 32.10 13.17 16.02 -
139 107.350 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
140 107.350 B/wall 32X2 32 HR 108.288 28.45 64.19 26.34 32.03 -
141 107.425 R/wall 8X3 8 HR 31.64 5.60 13.78 10.93 10.13 -
142 107.500 R/wall 16X4 16 HR 98.98 18.18 36.98 41.17 26.88 -
143 107.550 T/wall 48X2 (PCC 1:3:6) 48 HR 157.73 18.72 144.432 45.36 106.08 108.86 -
144 107.550 R/wall 48X3 48 HR 189.84 33.60 82.70 65.57 60.77 -
145 107.625 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
146 107.700 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
147 107.700 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
148 107.700 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
149 107.825 T/wall 64X2 (PCC 1:3:6) 64 HR 210.30 24.96 192.576 60.48 141.44 145.15 -
150 107.825 B/wall 32X2.5 32 HR 135.01 21.95 72.77 44.96 121.25 -
151 107.925 T/wall 40X2 (PCC 1:3:6) 40 HR 131.44 15.60 120.36 37.80 88.40 90.72 -
152 107.925 R/wall 40X3 40 HR 158.2 28.00 68.92 54.64 50.64 -
153 107.950 T/wall 144X2 (PCC 1:3:6) 144 HR 473.18 56.16 433.296 136.08 318.24 326.59 -
154 107.950 R/wall 176X4 176 HR 1088.74 199.94 406.74 452.85 295.68 -

Page 100 of PMT Wks Qty


Excvn in trenches in PCC RCC RRM IN CM Laying reinforcement
Length Type of Flush White Centering/ Earth Hard
S/No Location Type of structure RR Dry Back filling PVC PIPE Weight of steel
(m) Soil pointing washing Shuttering filling Core
SMB SR HR 1:4:8 1:3:6 1:2:4 M25 1:6 1:4 Upto 12mm above 12mm

(Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Mtr) (Sqm) (Sqm) (Sqm) (Cum) ( Kg) (Kg) (KG) (Cum)
155 107.950 B/wall 176X2 176 SMB 595.58 28.45 353.06 144.85 176.18 -
156 108.225 R/wall 240X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
157 108.250 R/wall 16X2 16 SMB 35.18 5.70 19.30 8.34 13.66 -
158 108.270 T/wall 24X2 (PCC 1:3:6) 24 SMB 78.86 9.36 72.216 22.68 53.04 54.43 -
159 108.270 R/wall 40X3 40 SMB 158.20 28.00 68.92 54.64 50.64 -
160 108.325 R/wall 72X2 72 HR 158.328 25.63 86.83 37.51 61.49 -
161 108.450 R/wall 28X3 28 HR 110.74 19.60 48.24 38.25 35.45 -
162 108.650 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
163 108.650 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
164 108.725 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
165 108.725 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
166 108.725 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
167 108.750 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
168 108.800 T/wall 8X2 (PCC 1:3:6) 8 SMB 26.29 3.12 24.072 7.56 17.68 18.14 -
169 108.800 R/wall 16X3 16 SMB 63.28 11.20 27.57 21.86 20.26 -
170 108.850 T/wall 32X2 (PCC 1:3:6) 32 SMB 105.15 12.48 96.288 30.24 70.72 72.58 -
171 108.850 R/wall 32X3 32 SMB 126.56 22.40 55.14 43.71 40.51 -
172 108.850 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
173 108.900 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
174 108.900 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
175 108.975 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
176 108.975 R/wall 16X2 16 HR 35.184 5.70 19.30 8.34 6.83 -
177 109.025 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
178 109.025 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
179 109.050 T/wall 24X2 (PCC 1:3:6) 24 HR 78.86 9.36 72.216 22.68 53.04 54.43 -
180 109.050 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
181 109.100 T/wall 24X2 (PCC 1:3:6) 24 HR 78.86 9.36 72.216 22.68 53.04 54.43 -
182 109.100 R/wall 24X4 24 HR 148.46 27.26 55.46 61.75 40.32 -
183 109.125 T/wall 8X2 (PCC 1:3:6) 8 SMB 26.29 3.12 24.072 7.56 17.68 18.14 -
184 109.125 R/wall 8X2 8 SMB 17.59 2.85 9.65 4.17 6.83 -
185 109.400 T/wall 40X2 (PCC 1:3:6) 40 SMB 131.44 15.60 120.36 37.80 88.40 90.72 -
186 109.400 R/wall 72X2 72 SMB 158.33 25.63 86.83 37.51 61.49 -
187 109.400 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
188 109.400 R/wall 72X3 72 SMB 284.76 50.40 124.06 98.35 91.17 -
189 109.475 R/wall 8X3 8 SMB 31.64 5.60 13.78 10.93 10.13 -
190 109.500 T/wall 48X2 (PCC 1:3:6) 48 HR 157.73 18.72 144.432 45.36 106.08 108.86 -
191 109.500 R/wall48X3 48 HR 189.84 33.60 82.70 65.57 60.77 -
192 109.500 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
193 109.625 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
194 109.625 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
195 109.625 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
196 109.700 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
197 109.700 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
198 109.700 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
199 109.750 R/wall 8X2 8 HR 17.592 2.85 9.65 4.17 6.83 -
200 109.775 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
201 109.775 R/wall 16X2 16 HR 35.184 5.70 19.30 8.34 13.66 -
202 109.800 T/wall 24X2 (PCC 1:3:6) 24 HR 78.86 9.36 72.216 22.68 53.04 54.43 -
203 109.800 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
204 109.950 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
205 110.025 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
206 110.025 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
207 110.050 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
208 110.050 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
209 110.075 T/wall 24X2 (PCC 1:3:6) 24 HR 78.86 9.36 72.216 22.68 53.04 54.43 -
210 110.075 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
211 110.150 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
212 110.150 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
213 110.200 T/wall 32X2 (PCC 1:3:6) 32 SMB 105.15 12.48 96.288 30.24 70.72 72.58 -
214 110.200 R/wall 32X3 32 SMB 126.56 22.40 55.14 43.71 40.51 -
215 110.200 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
216 110.250 T/wall 24X2 (PCC 1:3:6) 24 SMB 78.86 9.36 72.216 22.68 53.04 54.43 -
217 110.250 R/wall 24X3 24 SMB 94.92 16.80 41.35 32.78 30.38 -
218 110.425 R/wall 24X4 24 SMB 148.464 27.26 55.46 61.75 40.32 -
219 110.500 R/wall 8X3 8 HR 31.64 5.60 13.78 10.93 10.13 -
220 110.525 T/wall 48X2 (PCC 1:3:6) 48 HR 157.73 18.72 144.432 45.36 106.08 108.86 -
221 110.525 R/wall 48X3 48 HR 189.84 33.60 82.70 65.57 60.77 -
222 110.625 T/wall 24X2 (PCC 1:3:6) 24 SMB 78.86 9.36 72.216 22.68 53.04 54.43 -
223 110.625 R/wall 24X3 24 SMB 94.92 16.80 41.35 32.78 30.38 -
224 110.625 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
225 110.675 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
226 110.675 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
227 110.700 T/wall 8X2 (PCC 1:3:6) 8 HR 26.29 3.12 24.072 7.56 17.68 18.14 -
228 110.700 R/wall 8X3 8 HR 31.64 5.60 13.78 10.93 10.13 -
229 110.825 T/wall 24X1.5 (PCC 1:3:6) 24 HR 34.86 4.70 33.048 15.91 84.00 -
230 110.825 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
231 110.825 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
232 110.875 R/wall 88X2 88 HR 193.512 31.33 106.13 45.85 75.15 -
233 110.875 R/wall 88X3 88 HR 348.04 61.60 151.62 120.21 111.41 -
234 110.925 R/wall 32X2 32 HR 70.368 11.39 38.59 16.67 27.33 -
235 110.925 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
236 110.975 T/wall 24X1 (PCC 1:3:6) 24 HR 40.512 3.84 31.584 12.70 27.00 66.70 -

Page 101 of PMT Wks Qty


Excvn in trenches in PCC RCC RRM IN CM Laying reinforcement
Length Type of Flush White Centering/ Earth Hard
S/No Location Type of structure RR Dry Back filling PVC PIPE Weight of steel
(m) Soil pointing washing Shuttering filling Core
SMB SR HR 1:4:8 1:3:6 1:2:4 M25 1:6 1:4 Upto 12mm above 12mm

(Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Mtr) (Sqm) (Sqm) (Sqm) (Cum) ( Kg) (Kg) (KG) (Cum)
237 110.975 R/wall 24X3 24 HR 94.92 16.80 41.35 32.78 30.38 -
238 110.975 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
239 111.000 R/wall 16X3 16 SMB 63.28 11.20 27.57 21.86 20.26 -
240 111.150 R/wall 8X3 8 SMB 31.64 5.60 13.78 10.93 10.13 -
241 111.250 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
242 111.250 R/wall 32X4 32 HR 197.95 36.35 73.95 82.34 53.76 -
243 111.300 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
244 111.300 R/wall 56X2 56 HR 123.144 19.94 67.54 29.18 47.82 -
245 111.300 B/wall 16X2 16 HR 54.144 28.45 32.10 13.17 16.02 -
246 111.375 R/wall 8X3 8 HR 31.64 5.60 13.78 10.93 10.13 -
247 111.450 T/wall 24X1 (PCC 1:3:6) 24 SMB 40.51 3.84 31.584 12.70 27.00 66.70 -
248 111.450 R/wall 24X3 24 SMB 94.92 16.80 41.35 32.78 30.38 -
249 111.450 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
250 111.552 R/wall 8X2 8 HR 17.592 2.85 9.65 4.17 6.83 -
251 111.575 T/wall 32X2 (PCC 1:3:6) 32 HR 105.15 12.48 96.288 30.24 70.72 72.58 -
252 111.575 R/wall 32X3 32 HR 126.56 22.40 55.14 43.71 40.51 -
253 111.575 RCC culvert 2 Mtr span 1 HR 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
254 111.725 T/wall 16X2 (PCC 1:3:6) 16 HR 52.58 6.24 48.144 15.12 35.36 36.29 -
255 111.725 R/wall 16X3 16 HR 63.28 11.20 27.57 21.86 20.26 -
256 111.875 T/wall 8X2 (PCC 1:3:6) 8 SMB 26.29 3.12 24.072 7.56 17.68 18.14 -
257 111.875 R/wall 32X3 32 SMB 126.56 22.40 55.14 43.71 40.51 -
258 111.900 T/wall 32X2 (PCC 1:3:6) 32 SMB 105.15 12.48 96.288 30.24 70.72 72.58 -
259 111.900 R/wall 32X3 32 SMB 126.56 22.40 55.14 43.71 40.51 -
260 111.900 RCC culvert 2 Mtr span 1 SMB 134.22 22.34 2.18 86.66 7.14 40.55 42.00 224.35 5.44 635.65 - 635.65 1.57
261 112.000 R/wall 32X3 32 SMB 126.56 22.40 55.14 43.71 40.51 -
On R/Wall 2072 725.20 435.12
262 Parapet wall
and Culvert
km 105.700 to 2612 SMB 887.94 261.16 339.508 52.23 1723.66
263 Line Drain
112.000
TOTAL 6436.48 1597.88 12113.16 3343.14 5463.09 1646.51 135.66 5467.29 0.00 4058.06 6003.96 3981.36 - - 9850.25 102.38 12077.29 - 12077.29 29.83
Total Quantity Err:509 3034.67 21358.21 Err:509 9707.69 2339.77 192.78 Err:509 0.00 Err:509 Err:509 6987.04 - - 15474.05 138.06 17162.47 - 17162.47 42.39

(Dhirendra Tiwari)
AE (Civ)
SO (Estg & DPR)
For Commander

Page 102 of PMT Wks Qty


LOCATION STATEMENT OF CROSS DRAINAGE WORKS AND WATER GAP

S/No. Location in BRIDGE RCC cul span in mtr Water gaps Remarks
Km (m)
2m span 3 M Span 6m span

Altitude 2101-2400 mtr


1 102.225 45.000 45.00
1 102.250 1 3.20
2 102.605 1 3.20
3 102.900 1 3.20
4 103.250 1 3.20
5 103.675 1 3.20
6 104.575 1 3.20
7 104.700 1 3.20
8 105.000 1 3.20
Altitude 2401-2700 mtr 70.60
9 105.800 1 3.20
10 106.000 1 3.20
11 106.800 1 3.20
12 107.000 1 3.20
13 107.100 1 3.20
14 107.700 1 3.20
15 108.725 1 3.20
16 108.850 1 3.20
17 109.400 1 3.20
18 109.500 1 3.20
19 109.625 1 3.20
20 109.700 1 3.20
21 110.200 1 3.20
22 110.625 1 3.20
23 110.825 1 3.20
24 110.975 1 3.20
25 111.450 1 3.20
26 111.575 1 3.20
27 111.900 1 3.20
60.80
TOTAL 27 - - 131.40

Page 103 of 251


Appendix ' K '
LOC STATEMENT AND DETAILS OF LINED

S/No Location(KM) Length Water gap Length ( mtr) Lined drain in Lined drain in Lined drain in Remarks
(mtr ) ( mtr ) SMB ( mtr) SR ( mtr) HR ( mtr)
From To

Altitude 2100 - 2400 mtrs ( Km 102.00 to Km 105.675 )


1 102.00 105.675 3,675.00 70.60 3,604.40 848.60 2,187.20 568.60

Altitude 2401 - 2700 mtrs ( Km 105.675 to Km 112.00 )

1 105.675 112.000 6,325.00 60.80 6,264.20 2,611.60 1,837.20 1,815.40

Total 3460.20 4024.40 2384.00

LOC OF DRAIN
QUANTITIES OF CRASH BARRIER, CAT EYES,
DELINEATORS,WARNING/MANDATORY ROAD SIGNS BOARD
AND INFORMATORY ROAD SIGN BOARDS
Altitude 2101 - 3000 mtrs
Length of Road involved 10000 mtr
a) Crash Barrier
Location involved
Km 102.250 - Km 102.500 250 m Altitude 2101-
Km 103.400 - Km 103.700 300 m 2400 m
Km 106.000 - Km 106.400 400 m
Km 107.350 - Km 107.550 200 m
Km 108.190 - Km 108.290 100 m
Km 108.560 - Km 108.680 120 m Altitude 2401-
Km 109.110 - Km 109.182 72 m 2700 m
Km 109.825 - Km 109.877 52 m
Km 110.250 - Km 110.350 100 m
Km 111.110 - Km 111.270 160 m
Total 1754 m
Quantity calculation :
Total length of crash barrier 1754 mtr
No of Vertical post = (2800/2)+1 878 Nos
Excavation =1401 x 0.30X0.30X0.90 71.12 Cum
PCC 1: 2:4 = 1401 x 0.30 x 0.30 x 0.90 71.12 Cum

b) Delineators Altitude
Total length of Curve (Incl Transition Curve) involved @
720.88 mtrs 2101-2400 m
20% of length of road
Total length of Curve (Incl Transition Curve) involved @
1247.84 mtrs 2401-2700 m
20% of length of road
Quantity calculation : Altitude

Total No of delineators @ 6m C/C 121 Nos 2101-2400 m

Total No of delineators @ 6m C/C 209 Nos 2401-2700 m


Total 330 Nos
Excavation 822 x 0.30X0.30X0.45 13.37 Cum
PCC 1: 4 : 8 = 822 x 0.30 x 0.30 x 0.60 17.82 Cum

C) Cat eyes
Quantity calculation : Altitude

Total No of cat eyes @ 3m C/C 241 Nos 2101-2400 m

Total No of cat eyes @ 3m C/C 417 Nos 2401-2700 m


Say 658 Nos
Page 105 of 251
Appendix ' L '
QUANTITY CALCUALTION FOR KILOMETER STONES AND ROAD SIGN POST

S/No Items A/U Qty for 1 Qty for 5th Qty for Ord Qty for road Qty for sub
No Km stone KM stone Sign Post km stones
(
Warning/Man
datory)
Sector Km 102.000 to Km 126.650
5TH KILOMETER STONES ( Nos) 5
1 Excvn Cum 0.2 1.000
2 PCC 1:4:8 Cum 0.15 0.750
3 RCC 1:2:4 Cum 0.1859 0.930
4 Steel 12 mm 100 Kg 0.1785 0.893
ORDINARY KM STONES ( Nos) 20
1 Excvn Cum 0.1815 3.630
2 PCC 1:4:8 Cum 0.1421 2.842
3 RCC 1:2:4 Cum 0.0951 1.902
4 Steel 12 mm 100 Kg 0.0913 1.826
Sub Km stones ( Nos) 100
1 Excvn Cum 0.042 4.200
2 PCC 1:4:8 Cum 0.0375 3.750
3 RCC 1:2:4 Cum 0.00975 0.975
4 Steel 6 mm 100 Kg 0.01 1.000
Warning/Mandatory ROAD SIGN POST ( Nos) 247
1 Excvn Cum 0.045 11.115
2 PCC 1:4:8 Cum 0.054 13.338
SUMMARY ( 5th Km Stone, Ord Km Stone, Sub Km stone and Warning/Mandatory Road sign post)
1 Excvn Cum 19.95
2 PCC 1:4:8 Cum 20.68
3 RCC 1:2:4 Cum 3.81
4 Steel 12 mm 100 Kg 2.72
5 Steel 6 mm 100 Kg 1.00

Err:509
Err:509
Err:509
Err:509

Page 106 of 251 Rd Side Fur


DETAIL QTY CALCULATION FOR ROAD SIGNS (Warning/Mandatory) (As per IRC 67 of 1977)
SL ITEM OF WORK A/U NO L B H QTY
NO
1 2 3 4 5 6 7 8

1 Excavation in trenches Cum 1 0.40 0.40 0.45 0.07

2 PCC 1:4:8 Cum 1 0.40 0.40 0.45 0.07


1 0.30 0.30 0.15 0.01
Total PCC 1:3:6 Cum 0.08
3 Centering & shuttering Sqm 4 0.30 0.15 0.18
4 Angle Iron (50x50x5mm) Mtr 1 2.42 - - 2.42
Wt of angle iron@ 3.80 Kg/Mtr Kg - - . - 9.20

5 MS Plate Triangular(60x60x3.15) Sqm 1 - 0.60/2 0.52 0.16


Wt of plate 24.15 Kg/Sqm Kg - - - - 3.86

6 Painting (Two coat)


Front & back Sqm 2 - 0.60/2 0.52 0.31

Angle Iron 1 (0.05+0.05)*2 2.02 0.40


Total 0.710

DETAIL QTY CALCULATION FOR ROAD SIGN POST (INFORMATORY)


SL ITEM OF WORK A/U NO L B H QTY
NO
1 2 3 4 5 6 7 8

1 Excavation in trenches Cum 1 0.75 0.75 0.45 0.25

2 PCC 1:4:8 Cum 1 0.75 0.75 0.75 0.42

3 Centering & shuttering Sqm 4 0.75 0.15 0.45


4 Angle Iron (50x50x5mm) Mtr 2 2.70 - - 5.40
Wt of angle iron@ 3.80 Kg/Mtr Kg - 5.40 - - 20.52

5 MS Plate (600x850x3.15) Sqm 1 0.60 - 0.80 0.48


Wt of plate 24.15 Kg/Sqm Kg 1 0.48 - - 11.59

6 Painting (Two coat)


Front & back Sqm 2 0.60 0.80 0.96
Perimeter Sqm

Angle Iron Sqm 2 (0.05+0.05)*2 2.30 0.92

Total Sqm 1.88


S/No Items Nos L B H Qty
A 5th KM STONE
1 Excavation in trenches 1 0.55 0.65 0.6 0.215
2 PCC 1:4:8 1 0.55 0.65 0.6 0.215
Deduct km stone 1 0.25 0.5 0.45 0.056
Total 0.159
3 RCC 1:2:4 1 0.5 0.25 1.275 0.159
Half circle portion ((π/4*(0.5)2)) x0.25 x 1/2 0.025
Total 0.184
Shuttering-Bottom portion 1 0.50 0.25 - 0.125
Side of rectangular portion 2 0.25 1.275 0.638
perimeter of semicircular 1 1/2x2x22/7x.25x.25 = 0.196
Total 0.959
Plastering 12mm upto 130mm 2 0.50 0.13 0.13
height from GL-front & back 0
Both sides 2 0.25 0.13 0.065
Total 0.195
Painting rectangular front&bac 2 - 0.5 0.825 0.825
sides 2 0.25 0.825 0.413
semicircular portion front & 2 1/2x22/7x.25x.25= 0.196
back 1 1/2x2x22/7x.25x.25= 0.196
Perimeter Total 1.630
4 Steel @10% 0f RCC 19

B SUB KM STONE
S/No Items Nos L B H Qty
1 Excavation in trenches 1 0.35 0.3 0.4 0.042
2 PCC 1:4:8 1 0.35 0.3 0.4 0.042
Deduct km stone 1 0.15 0.1 . 0.3 0.005
Total 0.037
3 RCC 1:2:4 1 0.15 0.1 0.65 0.01
Shuttering 2 0.15 - 0.65 0.195
2 0.10 0.65 0.13
top & bottom 2 0.15 0.10 - 0.03
Total 0.355
Painting four sides 2 0.15 - 0.35 0.105
top 2 0.10 0.35 0.07
1 0.15 0.10 0.015
Total 0.19
4 Steel @10% 0f RCC 1

C ORDINARY KM STONE
1 Excavation in trenches 0.55 0.65 0.6 0.215
2 PCC 1:4:8 0.55 0.65 0.6 0.215
Deduct km stone 0.25 0.35 0.45 0.039
Total 0.176
3 RCC 1:2:4 0.35 0.25 0.935 0.082
Half circle portion ((π/4*(0.35)2)) x0.25 x 1/2 0.012
Total 0.094
Shuttering-Bottom portion 1 0.35 0.25 - 0.088
Side of rectangular portion 2 - 0.25 0.935 0.468
perimeter of semicircular 1 1/2(2x22/7 x0.25 0.138
x0.175)
Total 0.694
Plastering 12mm thick upto 2 0.35 - 0.10 0.07
10mm height-front & back
both sides 2 - 0.25 0.10 0.05
Total 0.12
Painting rectangular front&
back 2 0.35 0.485 0.34
sides 2 - 0.25 0.485 0.243
semicircular portion front & 2 1/2x22/7x.175x.175= 0.096
back 1 1/2x2x22/7x.175x.25= 0.138
Total 0.817
4 Steel @10% 0f RCC 10
6 Reinforcement
Main bar 10 mm dia 200mm C/C 2 (8/0.20)+1 5.45 446.9
Distribution bar 8 mm dia 200 mm 2 (4.6/0.20)+1 7.9 379.2
Vertical inner face 10 mm dia 20 1 (8/0.20)+1 2.95 120.95
Vertical outer face 10 mm dia 20 1 (8/0.15)+1 1.5 81.5
Outer face upto 10 mm dia 200 m 1 (0.8/0.20)+1 7.9 39.5
Main bar 10 mm dia 200mm C/C 2 (8/0.20)+1 2.7 221.4
Distribution bar 10 mm dia 200 m 2 (2.0/0.20)+1 7.9 173.8
Total 10 mm dia bar 1084.05
Total 8 mm dia bar 379.2
Wt. of 10 mm dia bar 5% wastage 54.2025
Wt. of 8 mm dia bar 5% wastage 18.96
Up to 12 mm dia steel 1536.4125
Weight of steel
S/No Item A/U Qty Wt mtr T/Wt MT
1 10mm mtr 1138.2525 0.62 0.70571655 0.86099895
2 8mm mtr 398.16 0.39 0.1552824

7 Laying PVC pipe 4" dia 74 (0.40+0.20)/2 22.2


D Boundry Stone
Excvn 1 0.5 0.5 0.75 0.188
a) RCC 1:2:4 1 (0.0314+.0018) 0.0166 0.9 0.015
b) PCC 1:4:8 for fixing 1 0.5 0.5 0.75 0.188
ii) Deduction for B/stone qty 1 (0.0314+.0018) 0.0166 0.6 0
Total 0.188
c) Form work 1 2x3.14x0.166 1.0048 0.9 0.904

Using form work for For 1no boundry stone 0.0452


20 nos of Guard stone
A/U

cum
cum
cum
cum
cum
cum
cum
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Kgs

A/U
cum
cum
cum
cum
cum
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Kgs

cum
cum
cum
cum
cum
cum
cum
Sqm
Sqm

Sqm
Sqm
Sqm

Sqm
Sqm

Sqm
Sqm
Sqm
Sqm
Sqm
kgs
mtr

Cum
Cum
Cum
Cum
Cum
Sqm

Sqm
Appx ' '
DRAWING SHOWING PROPOSED DELINEATOR

Rectangular white reflector

15 cm Size 10x8 cm

0.80 mtr 15 cm
15 cm Painted black & white strips
15 cm 15 cm wide
15 cm
GL 5 cm GL

0.45 mtr PCC


1:3:6

X-SEC
0.30 mtr

0.30 mtr

PLAN

QUANTITY CALCULATION FOR FIXING OF DELINEATOR

S/No Particulars L (M) B(M) H(M) Qty


1 Excavation in trenches 0.30 0.30 0.45 0.04 Cum
2 PCC 1:2:4 0.30 0.30 0.45 0.04 Cum
Appx ' '

DRAWING SHOWING PROPOSED ROAD SIGNS (INFORMATORY)

0.60

0.80

Mild Steel angle irons


(50x50x5 mm)

1.50 Mtr

0.30

GL GL
0.40 Mtr

PCC 1:4:8
0.45

Excvn 0.253
0.75 PCC 1:4:8 0.422

0.75
App

REQUIREMENT OF CONSTRUCTIONAL MATERIAL- SSR 2016 : PMT works

S/No Item of work A/U Quantity ( As Total Qty Norms


per Abst of involved
PMT)

(A) Metal 40 mm ( Through Supply Contract)


Altitude 2100 - 2400 mtrs
1 PCC 1:5:10 Cum 338.814 338.81 0.980 Cum/Cum
2 PCC 1:3:6 Cum 1190.09 1190.09 0.920 Cum/Cum
3 PCC 1:4:8 Cum 1228.52 1228.52 0.970 Cum/Cum
4 Hard core Cum 12.56 12.56 1.050 Cum/Cum
Total:'-
Altitude 2401 - 2700 mtrs

1 PCC 1:5:10 Cum 588.835 588.83 0.980 Cum/Cum


2 PCC 1:3:6 Cum 2521.07 2521.07 0.920 Cum/Cum
3 PCC 1:4:8 Cum 3560.50 3560.50 0.970 Cum/Cum
4 Hard core Cum 29.83 29.83 1.050 Cum/Cum
Total:'-

(B) Chips 20 mm ( Through Supply Contract)


Altitude 2100 - 2400 mtrs
1 PCC 1:2:4 Cum 5.28 5.28 0.600 Cum/Cum
2 RCC M 25 Cum 57.12 57.12 0.600 Cum/Cum
3 RCC 1:2:4 Cum 2.80 2.80 0.600 Cum/Cum
Total:'-
Altitude 2401 - 2700 mtrs
1 PCC 1:2:4 Cum 1.21 1.21 0.600 Cum/Cum
2 RCC M 25 Cum 135.66 135.66 0.600 Cum/Cum
3 RCC 1:2:4 Cum 0.00 0.00 0.600 Cum/Cum
Total:'-

(C) Chips 10 mm ( Through Supply Contract)


Altitude 2100 - 2400 mtrs
1 PCC 1:2:4 Cum 5.28 5.28 0.300 Cum/Cum
2 RCC M 25 Cum 57.12 57.12 0.300 Cum/Cum
3 RCC 1:2:4 Cum 2.80 2.80 0.300 Cum/Cum
Total:'-
Altitude 2401 - 2700 mtrs
1 PCC 1:2:4 Cum 1.21 1.21 0.300 Cum/Cum
2 RCC M 25 Cum 135.66 135.66 0.300 Cum/Cum
3 RCC 1:2:4 Cum 0.00 0.00 0.300 Cum/Cum
Total:'-

Page 114 of 251 Const Mat PMT


S/No Item of work A/U Quantity ( As Total Qty Norms
per Abst of involved
PMT)

(D) Sand ( Through Supply Contract)


Altitude 2100 - 2400 mtrs
1 PCC 1:5:10 Cum 338.814 338.81 0.490 Cum/Cum
2 PCC 1:2:4 Cum 5.28 5.28 0.450 Cum/Cum
3 RCC M 25 Cum 57.12 57.12 0.450 Cum/Cum
4 RCC 1:2:4 Cum 2.80 2.80 0.450 Cum/Cum
5 PCC 1:3:6 Cum 1190.09 1190.09 0.460 Cum/Cum
6 PCC 1:4:8 Cum 1228.52 1228.52 0.480 Cum/Cum
Total:'-
Altitude 2401 - 2700 mtrs
1 PCC 1:5:10 Cum 588.835 588.83 0.490 Cum/Cum
2 PCC 1:2:4 Cum 1.21 1.21 0.450 Cum/Cum
3 RCC M 25 Cum 135.66 135.66 0.450 Cum/Cum
4 RCC 1:2:4 Cum 0.00 0.00 0.450 Cum/Cum
5 PCC 1:3:6 Cum 2521.07 2521.07 0.460 Cum/Cum
6 PCC 1:4:8 Cum 3560.50 3560.50 0.480 Cum/Cum
Total:'-

(D) Rubble stones ( Through Departmental)


Altitude 2100 - 2400 mtrs
1 Back filling with stone Cum 2414.52 2414.52 1.100 Cum/Cum
RRM 1:6 Cum 3523.31 3523.31 1.100 Cum/Cum
RRM Dry Cum 1562.91 1562.91 1.100 Cum/Cum
Total:'-
Altitude 2401 - 2700 mtrs
2 Back filling with stone Cum 6743.56 6743.56 1.100 Cum/Cum
RRM 1:6 Cum 11481.83 11481.83 1.100 Cum/Cum
RRM Dry Cum 3301.31 3301.31 1.100 Cum/Cum
Total:'-
G/Total:'-

Page 115 of 251 Const Mat PMT


Appendix ' M '

CONSTRUCTIONAL MATERIAL- SSR 2016 : PMT works

Requirement of material
( cum)

332.04
1094.88
1191.67
13.19
2631.78

577.06
2319.38
3453.68
31.32
6381.44

3.17
34.27
1.68
39.12

0.73
81.40
0.00
82.13

1.58
17.14
0.84
19.56

0.36
40.70
0.00
41.06

Page 116 of 251 Const Mat PMT


Requirement of material
( cum)

166.02
2.37
25.70
1.26
547.44
589.69
1332.48

288.53
0.55
61.05
0.00
1159.69
1709.04
3218.86

2655.97
3875.64
1719.20
8250.81

7417.91
12630.02
3631.44
23679.36
31930.17

Page 117 of 251 Const Mat PMT


RATE COMPARISION BETWEEN SSR AND CONTRACT RATES : PMT WORKS

ZONE "J"
Altitude 2101 - 2400 mtrs
CA No.CDR 35 BRTF/07/2019-20 CA NO. CE(P) BCN/12/2021-22 CA NO. CE(P) BCN/22/2020-21 CA NO. CE(P) BCN/18/2020-21 CA NO. CE(P) BCN/18/2018-19 SSR Rate

SSR rate after


Latest CA deducting admin
Escalation Total rate Escalation Total rate Escalation Total rate Escalation Total rate Escalation Total rate Rate CA Lowest of overhead
S/No. Item Avg of 05 Lowest of Amount (Rs)
A/U Net Qty Rate @ 7% per after adding Rate @ 7% per after adding Rate @ 7% per after adding Rate @ 7% per after adding Rate @ 7% per after adding NO. CE(P) column 6 & charges (After Qty (Gross) Rate Amount (Rs)
year escalation year escalation year escalation year escalation year escalation
CA rate
BCN/12/202 7 adding
column 8 & 9 As per CA
1-22 escalation as
applicable)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Stone Metal 40 mm cum 2368.60 2100.00 147.00 2247.00 1591.00 0.00 1591.00 1648.50 115.40 1763.90 1390.00 97.30 1487.30 981.00 206.01 1187.01 1655.24 1591.00 1591.00 2223.94 1591.00 3768445.78 2631.78 1926.49 5070097.85
2 Stone Chips 20 mm cum 37.16 2200.00 154.00 2354.00 1661.00 0.00 1661.00 1648.50 115.40 1763.90 1450.00 101.50 1551.50 1281.00 269.01 1550.01 1776.08 1661.00 1661.00 2281.71 1661.00 61729.40 39.12 1976.53 77321.85
3 Stone Chips 10 mm cum 18.58 2200.00 154.00 2354.00 1661.00 0.00 1661.00 1648.50 115.40 1763.90 1450.00 101.50 1551.50 1281.00 269.01 1550.01 1776.08 1661.00 1661.00 2621.30 1661.00 30864.70 19.56 2270.70 44414.89
4 Sand cum 1265.86 2100.00 147.00 2247.00 1361.00 0.00 1361.00 1648.50 115.40 1763.90 1350.00 94.50 1444.50 881.00 185.01 1066.01 1576.48 1361.00 1361.00 1956.88 1361.00 1722830.02 1332.48 1695.15 2258753.47

Total 5583870.00 Total Rs 7450588.06

ZONE "J"
Altitude 2401-2700 mtrs
CONTRACT Rates

S/No. Item Escalation


A/U Net Qty Rate @ 7% per Amount (Rs) Qty (Gross) Rate Amount (Rs)
year

1 Stone Metal 40 mm cum 5743.30 2100.00 147.00 2247.00 1591.00 0.00 1591.00 1648.50 115.40 1763.90 1390.00 97.30 1487.30 981.00 206.01 1187.01 1655.24 1591.00 1591.00 2348.73 1591.00 9137583.94 6381.44 2034.59 12983614.01
2 Stone Chips 20 mm cum 78.02 2200.00 154.00 2354.00 1661.00 0.00 1661.00 1648.50 115.40 1763.90 1450.00 101.50 1551.50 1281.00 269.01 1550.01 1776.08 1661.00 1661.00 2409.66 1661.00 129597.03 82.13 2087.37 171435.70
3 Stone Chips 10 mm cum 39.01 2200.00 154.00 2354.00 1661.00 0.00 1661.00 1648.50 115.40 1763.90 1450.00 101.50 1551.50 1281.00 269.01 1550.01 1776.08 1661.00 1661.00 2757.04 1661.00 64790.63 41.06 2388.29 98063.19
4 Sand cum 3057.92 2100.00 147.00 2247.00 1361.00 0.00 1361.00 1648.50 115.40 1763.90 1350.00 94.50 1444.50 881.00 185.01 1066.01 1576.48 1361.00 1361.00 2094.24 1361.00 4161825.04 3218.86 1814.14 5839462.68

Total 13493797.00 Total Rs 19092576.00

G/Total 19077667.00 26543164.06

Page 118 of 251 Contract Cost


ISION BETWEEN SSR AND CONTRACT RATES : PMT WORKS

Reference Item No. of


DGBR SSR 2009

15
M-101A + M-201
M-101A + M-204
M-101A + M-302
M-104

Reference Item No. of


DGBR SSR 2016

M-101A + M-201
M-101A + M-204
M-101A + M-302
M-104

G/Total

Page 119 of 251 Contract Cost


COST OF WORKS AS PER DGBR SSR 2016 & PROPOSED THROUGH SUPPLY CONTRACT : PMT WORKS

ZONE "J"
A Altitude 2101 - 2400 mtrs SSR 2016 CONTRACT
S/No. Item A/U Qty Rate Amt Reference DGBR Rate Escalation @ Amount Remark
SSR 2016 2.6%

1 Stone Metal 40 mm cum 2631.78 1926.49 5070097.85 M-101A + M-201 2100.00 2207.10 5227741.47 Contract Rate of the
materials has been
considered as per
CA No.CDR 35
BRTF/07/2019-20
2 Stone Chips 20 mm cum 39.12 1976.53 77321.85 M-101A + M-204 2200.00 2312.20 81407.94
3 Stone Chips 10 mm cum 19.56 2270.70 44414.89 M-101A + M-302 2200.00 2312.20 40703.97
4 Sand cum 1332.48 1695.15 2258753.47 M-104 2100.00 2207.10 2646824.95
Total Rs 7450588.00 7996678.00

ZONE "J"
B Altitude 2401 - 2700 mtrs SSR 2016 Reference DGBR CONTRACT
SSR 2016

1 Stone Metal 40 mm cum 6381.44 2034.59 12983614.01 M-101A + M-201 2100.00 2207.10 12676028.60 Contract Rate of the
2 Stone Chips 20 mm cum 82.13 2087.37 171435.70 M-101A + M-204 2200.00 2312.20 170910.89 materials has been
considered as per
3 Stone Chips 10 mm cum 41.06 2388.29 98063.19 M-101A + M-302 2200.00 2312.20 85445.04 CA No.CDR 35
4 Sand cum 3218.86 1814.14 5839462.68 M-104 2100.00 2207.10 6393911.32 BRTF/07/2019-20

Total 19092576.00 19326296.00


G/Total Rs 26543164.00 27322974.00

Page 120
Appendix ' '

COST OF WORKS AS PER CURRENT MARKET/CONTRACT RATES : PMT Works

ZONE "I"
Altitude 2101 - 2400 mtrs
Reference CA
S/No. Item A/U Qty Rate Amt(Rs) Remarks
/Supply Order

1 Stone Metal 40 mm cum 2368.60 1648.50 3904640.40 CA No. CE (P) BCN /22/2020-21 Net Quantity
considered
2 Stone Chips 20 mm cum 37.16 1648.50 61264.85 CA No. CE (P) BCN /22/2020-21 Net Quantity
considered
3 Stone Chips 10 mm cum 18.58 1648.50 30632.43 CA No. CE (P) BCN /22/2020-21 Net Quantity
considered
4 Sand cum 1265.86 1648.50 2086763.62 CA No. CE (P) BCN /22/2020-21 Net Quantity
considered
Total Rs 6083301.00

ZONE "J"
Altitude 2401 - 2700 mtrs

Reference CA
S/No. Item A/U Qty Rate Amt(Rs) Remarks
/Supply Order

1 Stone Metal 40 mm cum 5743.30 1648.50 9467823.46 CA No. CE (P) BCN /22/2020-21 Net Quantity
considered
2 Stone Chips 20 mm cum 78.02 1648.50 128621.74 CA No. CE (P) BCN /22/2020-21 Net Quantity
considered
3 Stone Chips 10 mm cum 39.01 1648.50 64303.04 CA No. CE (P) BCN /22/2020-21 Net Quantity
considered
4 Sand cum 3057.92 1648.50 5040976.17 CA No. CE (P) BCN /22/2020-21 Net Quantity
considered
Total Rs 14701724.00

Page 121 of 251 Contract Cost


ROAD LIFT CHARGES (PERMANENT WORKS)

Altitude 2101-200 Altitude 2401 - 2700


mtrs mtrs

ZONE "J" ZONE "J"

COST OF WORKS Amount in Rs.


1 Cost of Permanent works 46445040.00 132738925.00
2 Extra TPt Charges - -
Less credit for retrieved stone from formation cutting in
3 -6282495.00 -19184311.00
HR
4 Less credit for deployment of GP Trades men -2084064.00 -7073059.00
5 Less credit for deployment of GP PNR -1366135.00 -4248681.00
Deduct cost of materials based on SSR rates( proposed
6 -7450588.00 -19092576.00
through Contract)
7 Net cost of Pmt Wks 29261758.00 83140298.00
ROAD LIFT CHARGES
(A) FROM RAIL HEAD
1 In Plain area
0.95 Net Cost PMT 0.06 108.00 =Rs:- 1801353.82 5118116.74
100
2 In Hilly Area
0.95 Net Cost PMT 0.06 185.26 =Rs:- 3089988.97 8779465.82
100
3 In HA area
0.95 Net Cost PMT 0.052 57.35 =Rs:- 829011.94 2355439.47
100

(B) FROM STORE COY

1 In Hill area
0.05 Net Cost PMT 0.06 129.26 =Rs:- 113471.25 322401.45
100
(i) In HA area
0.05 Net Cost PMT 0.052 57.35 =Rs:- 43632.21 123970.50
100
Total :- Rs. 5,877,458.00 Rs. 16,699,394.00

Page 122 of Road Lift (PMT)


EXTRA TPT CHARGES : PMT WORKS
Location(Km) Mid of Quarry Lead Initial lead Extra lead Qty reqd for Qty available Proposed to Net quantity Rate Amount in Rs.
sector location involved Pmt works from HR be Collected required
From To (km) cutting

Altitude 2101 - 2400 mtrs

ZONE "J"
(A) Stone
102.000 105.675 Lead from Quarry Chart 5.000 8250.81 8250.81 - - 9.19 -
Total PMT works -
Altitude 2401 - 2700 mtrs
ZONE "J"

(A) Stone
105.700 112.025 108.863 - - 5.000 9.75 23679.36 29877.46 - - 9.53 -
Total PMT works -

EXTRA TPT CHARGES : Surf Works

Location(Km) Mid of Quarry Lead Initial lead Extra lead Qty reqd for Qty available proposed to Net quantity Rate Amount
sector location involved Surf works from HR be collected required
From To cutting

Altitude 2101 - 2400 mtrs

ZONE "J"
(A) Stone (From fmn cutting to crusher)
102.000 105.675 Lead from Quarry Chart 9.750 4001.43 4001.43 - 4,001.43 8.87 39,013.93
(B) Sand lead from quarry chart 90.805 1423.50 8.87 1146545.86
(c) S/Metal from cruher to work site 9.750 3334.52 8.87 288377.98
Total 1473938.00
Altitude 2401-2700 mtrs

ZONE "J"
(A) Stone (From fmn cutting to crusher)
105.675 112.000 Lead from Quarry Chart 9.750 4002.82 4002.82 - 4,002.82 9.53 39,027.54
(B) Sand lead from quarry chart 90.805 2132.03 9.53 1844995.14
(c) S/Metal from cruher to work site 9.750 3335.69 9.53 309943.70
Total 2193966.00
Total Surfworks 3667904.00
CREDIT FOR RETRIVED STONE FROM FORMATION CUTTING

Qty ( cum) Qty ( cum) Rate per Rate per Amount in Rs. Amount in Rs.
Cum Cum

S.No Description Zone''J" Zone''J" Zone''J" Zone''J"


( A) Altitude ( B) Altitude ( A) Altitude ( B) Altitude 2401
2101 - 2400 2401 - 2700 2101 - 2400 - 2700 mtrs
mtrs mtrs mtrs
1 Quantity of Fmn cutting in HR 37914.18 89632.39
2 1/3 rd quantity of Fmn cutting 12638.06 29877.46
3 Quantity of stone required for Pmt Wks( Rubble stones) 8250.81 23679.36
4 Quantity of stone to be considered for credit of Pmt works 8250.81 23679.36
5 Quantity of stone required for surfacing Wks 4001.43 4002.82
6 Quantity of Stone Required to be collected for PMT Works - -
7 Quantity of Stone Required to be collected for surf Works - -
8 Quantity of stone to be considered for credit of Surf works 4001.43 4002.82
9 Credit for Pmt works by retrived stone from formation cutting 8250.81 23679.36 761.44 810.17 -6282495.00 -19184311
(item No M'-101)
10 Credit for Surf works by retrived stone from formation cutting 4001.43 4002.82 761.44 810.17 -3046848.00 -3242968
(item No M'-101)
11 Balance retrieved stone after use in 385.82 2195.27
12 Qty of stone required for material proposed through supply
contract for both altitude (Pmt & Surf) excluding sand
13 Balance retrieved stone 2581.10

Page 124 of 251 Credit HR


GSBC (Through Departmental Resources)

S/No Items A/U Altitude 2101 - 2400 mtrs Stone Metal Stone Chips 13.2mm Stone Chips 6.7mm (cum) Req of Sand (cum)
( Zone''I" ) 26.5mm(cum) (cum) Stone (cum)

Norms Qty Norms Qty Norms Qty Norms Qty


1 GSB 15 cm thick(Stone agg) Sqm 25003.93 0.06514 1628.76 0.03145 786.37 0.03677 919.39 4001.43 0.05344 1336.21

3 Sand Blanketing 25mm sqm 2793.34 0.03125 87.29


Total 1628.76 786.37 919.39 4001.43 1423.50

S/No Items A/U Altitude 2401 - 2700 mtrs Stone Metal Stone Chips 13.2mm Stone Chips 6.7mm (cum) Req of Sand (cum)
( Zone ''J" ) 26.5mm(cum) (cum) Stone (cum)
Norms Qty Norms Qty Norms Qty Norms Qty
1 GSB 15 cm thick(Stone agg) Sqm 25012.65 0.06514 1629.32 0.03145 786.65 0.03677 919.72 4002.82 0.05344 1336.68

3 Sand Blanketing 25mm sqm 25451.21 0.03125 795.35


Total 1629.32 786.65 919.72 4002.82 2132.03

G/Total 3258.08 1573.02 1839.11 8004.25 3555.53

(Through supply contracts)


WMM Matrials
S/No Items A/U Altitude 2101 - 2400 mtrs S/Chips 26.50 mm(cum) S/Chips 13.20 Stone Chips 6.7mm (cum) Sand (cum) Stone Chips 22.4mm Stone Chips 11.2 mm Crusher dust
mm(cum) (cum) (cum) (cum)
Norms Qty Norms Qty Norms Qty Norms Qty Norms Qty Norms Qty Norms Qty
1 WMM 7.5 cm thick II nd layer Sqm 24709.78 0.0332 821.35 0.0214 528.54 0.03002 741.79 0.02181 538.92 - -
2 WMM 7.5 cm thick III rd layer Sqm 23597.98 784.40 504.76 708.41 514.67
0.0332 0.0214 0.03002 0.02181 - -

3 WMM 10 cm thick Ist layer Sqm 2714.14 0.04431 120.26 0.02852 77.41 0.03669 99.58 0.02908 78.93 - -
DBM & BC Materials 1726.01 1110.71 1549.78 1132.52 -
4 DBM 50 cm thick Sqm 26342.60 0.01717 452.30 0.02402 632.75 0.02746 723.37 0.00757 199.41
5 BC 3.00 cm thick Sqm 26342.60 0.01076 283.45 0.02084 548.98 0.00 0.01125 296.35
735.75 1181.73 723.37 495.76
Total 1726.01 1110.71 2285.53 2314.25 723.37 495.76 0.00

WMM Matrials
S/No Items A/U Altitude 2401 - 2700 mtrs S/Chips 26.50 mm(cum) S/Chips 13.20 Stone Chips 6.7mm (cum) Sand (cum) Stone Chips 22.4mm Stone Chips 11.2 mm Crusher dust
mm(cum) (cum) (cum) (cum)
Norms Qty Norms Qty Norms Qty Norms Qty Norms Qty Norms Qty Norms Qty
1 WMM 7.5 cm thick II nd layer Sqm 24777.30 823.60 529.99 743.81 540.39
0.0332 0.0214 0.03002 0.02181 - -

2 WMM 7.5 cm thick III rd layer Sqm 23673.90 786.92 506.38 710.69 516.33
0.0332 0.0214 0.03002 0.02181 - -

3 WMM 10 cm thick Ist layer Sqm 22054.76 0.04431 977.25 0.02852 629.00 0.03669 809.19 0.02908 641.35 - -
DBM & BC Materials 2587.77 1665.37 2263.69 1698.07 -
4 DBM 50 cm thick Sqm 44952.80 0.01717 771.84 0.02402 1079.77 0.02746 1234.40 0.00757 340.29
5 BC 3.00 cm thick Sqm 44952.80 0.01076 483.69 0.02084 936.82 0.00 0.01125 505.72
1255.53 2016.59 1234.40 846.01
Total 2587.77 1665.37 3519.22 3714.66 1234.40 846.01 0.00

G/Total 4313.78 2776.08 5804.75 6028.91 1957.77 1341.77 0.00


RATE COMPARISION BETWEEN SSR AND CONTRACT RATES : SURF Works

Altitude 2101 - 2400 mtrs


Reference Item No.
Latest CA
As per Contract As per Contract As per CA As per CA As per CA rate BCN SSR Rate after deducting of
Escalation Escalatio Escalatio Escalation Lowest of DGBR SSR 2016
CA No. CE (P) Rate after CA No. CE (P) Rate after NO. CE(P) Rate after NO. CE(P) Escalation @ Rate after NO. CE(P) Rate after CA NO. admin overhead charges Lowest of
SSR - 2016 rates @ 7% n @ 7% n @ 7% @ 7% Avg of 05 CA Column 6 & Contract Amount
S/No. Item BCN/18/2018-19 escalation BCN/17/2018-19 escalation BCN/18/2020- escalation BCN/22/2020- 7% annually escalation BCN/12/2021- escalation CE(P) (After adding escalation column 8 & 9
annually annually annually annually 7
21 21 22 BCN/12/202 as applicable)
1-22
A/U Qty Rate Amount (Rs) Rate Rate Rate Rate Rate (1+2+3+4+5)/5 Amount
WMM 1 2 3 4 5 6 7 8 9 10
1 S/METAL 26.50 MM cum 1726.01 1926.49 3325141.00 981.00 206.01 1187.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1661.00 0.00 1661.00 1589.28 1661.00 1589.28 2223.94 1589.28 2605960.79 M-101A + M-201
2 S/CHIPS 13.20 MM cum 1110.71 1976.53 2195351.64 981.00 206.01 1187.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1661.00 0.00 1661.00 1589.28 1661.00 1589.28 2281.71 1589.28 1676969.84 M-101A + M-204
3 S/CHIPS 6.7MM cum 1549.78 2270.70 3519085.45 1281.00 269.01 1550.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1657.88 1641.00 1657.88 2621.30 1657.88 2440884.75 M-101A + M-302
4 Crsher sand cum - 2285.64 0.00 881.00 185.01 1066.01 1350.00 283.50 1633.50 1350.00 94.50 1444.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1509.67 1641.00 1641.00 2638.54 1641.00 0.00 M-101A + M-302A
5 SAND cum 1132.52 1695.15 1919791.28 881.00 185.01 1066.01 1350.00 283.50 1633.50 1350.00 94.50 1444.50 1648.00 115.36 1763.36 1361.00 0.00 1361.00 1453.67 1361.00 1361.00 1956.88 1361.00 1464291.73 M-104
Rs. 10,959,369.00 Rs. 8,188,107.00

DBM & BC
1 S/CHIPS 22.4MM cum 723.37 1976.53 1429762.51 1281.00 269.01 1550.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1657.88 1641.00 1657.88 2281.71 1657.88 1139299.00 M-101A + M-204
2 S/CHIPS 11.2MM cum 495.76 1976.53 979884.51 1281.00 269.01 1550.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1657.88 1641.00 1657.88 2281.71 1657.88 780816.00 M-101A + M-204
3 S/CHIPS 6.7MM cum 735.75 2270.70 1670667.53 1281.00 269.01 1550.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1657.88 1641.00 1657.88 2621.30 1657.88 1158797.35 M-101A + M-302
4 SAND cum 1181.73 1695.15 2003209.61 981.00 206.01 1187.01 1350.00 283.50 1633.50 1350.00 94.50 1444.50 1648.00 115.36 1763.36 1531.00 0.00 1531.00 1511.87 1531.00 1531.00 1956.88 1531.00 1718767.20 M-104
Rs. 6,083,524.00 Rs. 4,797,680.00
Altitude 2401 - 2700 mtrs Total Rs. 17,042,893.00 Rs. 12,985,787.00
WMM
1 S/METAL 26.50 MM cum 2587.77 2034.59 5265050.96 981.00 206.01 1187.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1661.00 0.00 1661.00 1589.28 1661.00 1589.28 2348.73 1589.28 3907061.47 M-101A + M-201
2 S/CHIPS 13.20 MM cum 1665.37 2087.37 3476243.38 981.00 206.01 1187.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1661.00 0.00 1661.00 1589.28 1661.00 1589.28 2409.66 1589.28 2514405.44 M-101A + M-204
3 S/CHIPS 6.7MM cum 2263.69 2388.29 5406348.19 1281.00 269.01 1550.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1657.88 1641.00 1657.88 2757.04 1657.88 3565284.36 M-101A + M-302
4 Crsher sand cum - 2396.12 0.00 881.00 185.01 1066.01 1350.00 283.50 1633.50 1350.00 94.50 1444.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1509.67 1641.00 1641.00 2766.08 1641.00 0.00 M-101A + M-302A
5 SAND cum 1698.07 1814.14 3080536.71 881.00 185.01 1066.01 1350.00 283.50 1633.50 1350.00 94.50 1444.50 1648.00 115.36 1763.36 1361.00 0.00 1361.00 1453.67 1361.00 1361.00 2094.24 1361.00 2195519.61 M-104
Rs. 17,228,179.00 Rs. 12,182,271.00

DBM & BC
1 S/CHIPS 22.4MM cum 1234.40 2087.37 2576649.53 1281.00 269.01 1550.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1657.88 1641.00 1657.88 2409.66 1657.88 1944165.06 M-101A + M-204
2 S/CHIPS 11.2MM cum 846.01 2087.37 1765935.89 1281.00 269.01 1550.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1657.88 1641.00 1657.88 2409.66 1657.88 1332455.51 M-101A + M-204
3 S/CHIPS 6.7MM cum 1255.53 2388.29 2998569.74 1281.00 269.01 1550.01 1474.00 309.54 1783.54 1450.00 101.50 1551.50 1648.00 115.36 1763.36 1641.00 0.00 1641.00 1657.88 1641.00 1657.88 2757.04 1657.88 1977444.56 M-101A + M-302
4 SAND cum 2016.59 1814.14 3658376.58 981.00 206.01 1187.01 1350.00 283.50 1633.50 1350.00 94.50 1444.50 1648.00 115.36 1763.36 1531.00 0.00 1531.00 1511.87 1531.00 1531.00 2094.24 1531.00 2933029.33 M-104
Rs. 10,999,532.00 Rs. 8,187,094.00
Total Rs. 28,227,711.00 Rs. 20,369,365.00

G/Total Rs. 45,270,604.00 Rs. 33,355,152.00


CREDIT FOR DEPLOYING GREF TRDESMAN FOR PMT WORKS

ALTD ALTD
ALTD 2101-2400 ALTD 2401-
2101-2400 2401-2700
MTRS 2700 MTRS
MTRS MTRS

Sr No. Code Item of work A/U Qty Qty Trade Norms Requirement Requirement
0.1088 36.86 64.07
P-201 PCC 1:5:10 Cum 338.8136 588.8348
DLR 0.0083 30.98 47.13
DES 0.0042 15.49 23.56
2 P-102 Exvn in trenches in SR Cum 3717.21468 5655.0193

DLR 0.0167 12.4 54.13


DES 0.0083 6.16 26.9
3 P-103 Exvn in trenches in HR cum 742.36356 3241.53048

MT DVR 0.0115 13.99 40.79


MSN 0.05 60.83 177.34
4 P-202 PCC 1:4:8 Cum 1216.5869 3546.88605 DES 0.05 60.83 177.34

MT DVR 0.0149 17.73 37.56


MSN 0.05 59.5 126.05
5 P-203 PCC 1:3:6 Cum 1190.0912 2521.06535 DES 0.05 59.5 126.05

MT DVR 0.0191 0 0
MSN 0.2857 0 0
6 P-204 PCC 1:2:4 Cum 0 0 DES 0.1429 0 0

MTDVR 0.0191 0.05 0


MSN 0.2857 0.8 0
7 P-205 RCC 1:2:4 Cum 2.8 0.00 DES 0.1429 0.4 0

MT DVR 0.0282 1.61 3.83


MSN 0.1429 8.16 19.39
8 P-207 RCC M-25 Cum 57.12 135.66 DES 0.1429 8.16 19.39

CARPENTER 2.8302 394.71 2589.26


9 P-209 Centering /Shuttering (Steel) 10Sqm 460.6208 914.8669

B/SMITH 1.0989 6.06 132.72


Laying Reinforcement upto 12 mm
10 P302 100Kg 57.4787541 120.772916
dia

B/SMITH 0.7299 30.66 0


Laying Reinforcement above 12mm
11 P303 100Kg 0 0
dia

MSN 1.0870 1698.88 3588.52


12 P-501 RRM Dry cum 1562.90572 3301.30627

MT DVR 0.0051 17.97 58.56


MSN 1.087 3829.84 12480.75
13 P-505 RRM 1:6 Cum 3,523.31 11481.834

0
14 P-601 Filling of Stones Cum 2414.515 6743.55875
MT DVR 0.0041 0.15 0.35
RR DVR 0.002 0.07 0.17
Earth work in embankment upto 1.5
15 F-701 Cum 35.68 84.74 OEM 0.0017 0.06 0.14
mtr height in hill roads

0.1123 61.765 135.21


16 T003 Metal Beam crash barrier Mtr 550 1204
MTDVR 0.0333 0.13 0.17
MSN 0.0054 0.02 0.03
B/Smith 0.38 1.52 1.90
Providing & fixing of warning signs of
17 G-07 Nos 4 5 Painter 0.2 0.8 1.00
rectangular shape 80 cm x 60 cm
DES 0.0054 0.02 0.03

MTDVR 0.0333 0.13 0.20


MSN 0.0233 0.09 0.14
B/Smith 0.0989 0.4 0.59
Painter 0.0374 0.15 0.22
18 G-08 Providing & fixing ordinary KM stone Nos 4 6
Carpenter 0.1307 0.52 0.78
DES 0.0155 0.06 0.09

Page 127
MTDVR 0.0333 0.4 0.93
MSN 0.0019 0.02 0.05
B/Smith 0.0103 0.12 0.29
Painter 0.0095 0.11 0.27
19 G-09 Providing & fixing Sub KM stone Nos 12 28
Carpenter 0.049 0.59 1.37
DES 0.0026 0.03 0.07

MTDVR 0.0333 0 0.93


MSN 0.0084 0 0.24
B/Smith 0.194 0 0.19
Painter 0.082 0 0.08
20 G-10 Providing & Fixing Fifth KM stone Nos 0 1
Carpenter 0.1691 0 0.17
DES 0.0235 0 0.02

B/smith/
Fitter/
0.1111 26.78 46.33
welder/
21 T004 Providing and fixing of cat eyes Nos 241 417 Operator
MTDVR 0.0012 0.29 0.50

22 P-801 White Wash 10 Sqm 243.4521 739.425543 T/Man 0.0002 0.04869042 0.15
23 P-807 Weep hole Mtr 4212.62 14101.291 T/Man 0.0016 6.740192 22.56
24 G-06 Warning sign triangular shape Nos 112 126 T/Man 0.5205 58.296 65.58

Total Nos of Tradesman to be deployed Total 6530.88 20074.09


ADD 7% & 15% HAA 7% 457.16 3011.11
Say 6988.04 23085.20

(A) Rate of CP Tradesman (SSR 2016) 745.64 765.98


(i) Total Nos of Tradesman to be deployed 6988.04 23085.20
(ii) Considering GREF CPL Tradesman ratio 1:5
(iii) GREF tradesman reqd (1/2.5) 2795 9234
(v) Credit for GREF tradesman in lieu of CPLS Total 2084064.00 7073059.00
(v) Credit for GREF tradesman in lieu of CPLS 2084064 7073059

G/Total (Rs) -2084064 -7073059

Page 128
ING GREF TRDESMAN FOR PMT WORKS

Page 129
15%

Per Day
Day

Day

Page 130
CREDIT FOR DEPLOYING GREF PNR FOR PMT WORKS

ALTD
ALTD 2101- ALTD 2101- ALTD 2401-
2401-2700
2400 MTRS 2400 MTRS 2700 MTRS
MTRS

Sr No. Code Item of work A/U Qty Qty Trade Norms Requirement Requirement
MAZ 0.5618 2037.98 7356.32
1 P-101 Excavation in Trenches in SMB Cum 3627.59124 13094.196
2 P-102 Exvn in trenches in SR Cum 3717.21468 5655.0193 MAZ 0.7393 2748.14 4180.76
3 P-103 Exvn in trenches in HR cum 742.36356 3241.5305 MAZ 0.7393 548.83 2396.46
4 P-202 PCC 1:4:8 Cum 1216.5869 3546.8861 MAZ 1.4302 1739.96 5072.76
5 P-203 PCC 1:3:6 Cum 1190.0912 2521.0654 MAZ 1.4753 1755.74 3719.33
7 P-205 RCC 1:2:4 Cum 2.8 0.00 MAZ 3.9535 11.07 0
8 P-207 Laying
RCC M-25 Cum 57.12 135.66 MAZ 4.1423 236.61 561.94
9 P-209 Reinforce
Laying
Centering /Shuttering (Steel) 10Sqm 460.6208 914.8669 MAZ 3.11 433.73 2845.24
ment
Reinforce
10 P302 100Kg 57.4787541 120.77292 MAZ 1.0989 6.06 132.72
upto 12
ment
11 P303 mm 100Kg 0 0 MAZ 0.7299 30.66 0
above
12 P-501 RRM
dia Dry cum 1562.90572 3301.3063 MAZ 1.9565 3057.83 6459.01
12mm
13 P-505 RRM
dia 1:6
Earth Cum 3,523.31 11481.834 MAZ 2.1739 7659.33 24960.36
14 work inof Stones
P-601 Filling Cum 2414.515 6743.5588
embankm MAZ 0.5291 1277.52 3568.02
15 F-701 ent upto Cum 35.68 84.74 MAZ 0.0103 0.37 0.87
1.5 mtr
Providing/Fixing Road Delineators
16 T001 height in Nos 121 209
(600 mm) MAZ 0.0333 4.03 6.96
17 P-107 hill
Hard roads
Core Cum 12.56 29.83 0.6667 8.374 19.89
18 P-201 PCC 1:5:10 Cum 94.38 241.69 1.4113 133.198 341.10
19 P-801 White washing 10 Sqm 243.4521 739.42554 0.2009 48.910 148.55
20 P-807 Weep Hole Mtr 4212.62 14101.291 0.021 88.465 296.13

21 G-06 Providing & fixing of warning signs of Nos 112 126 0.7177 80.3824 90.43
triangular shape 60 cm

Providing & fixing of warning signs of


22 G-07 Nos 4 5
rectangular shape 80 cm x 60 cm MAZ 0.7699 3.08 3.85

23 G-08 Nos 4 6 0.9434 3.7736 5.66


Providing
Metal beam& fixing
Crashordinary KM stone
Barrier (Type- A,
24 T-003 "W") Mtr 550 1204 0.2222 122.21 267.53

25 G-09 Providing & fixing Sub KM stone Nos 12 28 0.3653 4.3836 10.23

26 G-10 Providing & Fixing Fifth KM stone Nos 0 1 1.2175 0 1.22


27 T004 Providing and fixing of cat eyes Nos 241 417 MAZ 0.0200 4.82 8.34

Total Nos of CPLs to be deployed Total 22045.46 62453.66


Say 22045.00 62454.00
Total Nos of Mate to be deployed Total
ADD 7% & 15% HAA 7% 1543.15 9368.10 15%
Say 1543.15 9368.10
Total Nos of Maz to be deployed Total 23588.15 71822.10
ADD 7% & 15% HAA 7% 15%
Say 23588.15 71822.10

CP Mate reqd (10/11) Day


(A) Rate of CP Mate Per Day
(i) Credit for GREF PNR in lieu of CPLS Total 0 0

(B) Rate of CP Mazdoor 637.19 650.74 Per Day


(i) Total Nos of CPL to be deployed 23588.15 71822.10 Day
(ii) Considering Pnr CPL is 1:10 2144 6529
(v) Credit for GREF PNR in lieu of CPLS Total 1366135 4248681

G/Total (Rs) -1366135 -4248681

Page 131
CENTRE AND EDGE LINE MARKING BY ROAD MARKING PAINT

1 Altitude 2101 - 2400m

Sector Km 102.000 to Km 105.675 = 3675.00 m


Deduct Culvert gaps
= 70.60 m
Net length = 3604.40 m

Painting on Left/Right Edge 0.100m wide = 2 x 3604.40 x 0.1 = 720.88 Sqm


Painting on Centre Line 0.100m wide
( Considering 3m length strip and 3m length
gap) = 40% x 3604.40 x 0.1 = 144.18 Sqm

Total 865.06 Sqm

Altitude 2401 - 2700m

Sector Km105.70 to Km 112.00 = 6300.00 m


Deduct Culvert gaps = 60.80 m
Net length = 6239.20 m

Painting on Left/Right Edge 0.100m wide = 2 x 6239.20 x 0.1 = 1247.84 Sqm

Painting on Centre Line 0.100m wide


( Considering 3m length strip and 3m length = 40% x 6239.20 x 0.1 = 249.57 Sqm
gap)

Total 1497.41 Sqm

G/Total 2362.46 Sqm


Page 132
ROAD LIFT CHARGES : SURFACING WOKRS

Altitude 2101 - Altitude 2401 - 2700


2400 mtrs mtrs

ZONE "J" ZONE "J"


1 Cost of surfacing works = Rs 56644927.00 94177567.00
2 Extra Tpt charges = Rs 1473938.00 2193966.00
Less credit for retrieved stone from formation = Rs -3046848.00 -3242968.00
3 cutting in HR

4 Less credit for deployment of = Rs -345977.00 -762916.00


GREF Trades men
5 Less credit for deployment of = Rs -540394.00 -1052752.00
GREF PNR Trades men
Deduct cost of works as per SSR 2016 = Rs -17042893.00 -28227711.00
6
Net cost of work = Rs 37142753.00 63085186.00
A. From Ex-Rail head

1 In plain area
(0.30x108.00x cost of Surfacing Worksx0.030)/100 = 361027.56 613188.01
2 In hill area
(0.30x185.26xcost of surfacing worksx0.029)/100 = 598652.78 1016783.06
3 In HA Area
(0.30x57.35x Cost of surfacing Works x 0.025)/ 100 = 159760.27 271345.16
B. From Store Coy

1 In Hill area
(0.30x129.26x cost of surfacing workx 0.029)/100 = 974617.67 1655341.40
2 In HA area
(0.7x50.63xcost of Surfacing Works x 0.025)/100 = 372773.95 633138.70
Total = 2466832.23 4189796.32
Say = Rs. 2,466,832.00 Rs. 4,189,796.00

Page 133
LEAD CALCULATION FOR ROAD LIFT CHARGES

1 Ex-Rail head Pathankot


Pathankot to Jammu = 108.00 Km --- A (Plain area)
Jammu to Batote = 105.28 Km (Hill area)
Batote to Puldoda (Via KPRA) = 51.35 Km (Hill area)
Puldoda to Bhaderwah = 28.63 Km (Hill area)
Bhaderwah to starting point of worksite = 50.85 Km (High Altt area)
Km 115.00 to mid sector = (115.00-102)/2 = 6.50 Km (High Altt area)
Total Hill road 185.26 Km ---- B
Total High Altitute ar 57.35 Km ---- C

2 Ex-Supply Coy
Km 56 (Supply Coy) to Batote 49.28 Km (Hill area)
Batote to Puldoda (Via KPRA) = 51.35 Km (Hill area)
Puldoda to Bhaderwah = 28.63 Km (Hill area)
Bhaderwah to starting point of worksite = 50.85 Km (High Altt area)
Km 115.00 to mid sector = (115.00-102)/2 = 6.50 Km (High Altt area)
Total Hill area 129.26 Km ---- E
Total High Altitute ar 57.35 Km ---- F
ROYALTY CHARGES (PMT WORKS)

S/ Item A/U Quantity Rate Amt (Rs)


No
ALTITUDE : 2101-2400m
1 Sand MT 25.00 -
2 Stone MT 18481.81 20.00 369,636.00
369636.00
ALTITUDE : 2401-27000m
1 Sand MT - 25.00 -
2 Stone MT 53041.78 20.00 1,060,836.00
1060836.00
G/Total 1430472.00

ROYALTY CHARGES (Surf WORKS)


ALTITUDE : 2101-2400m
1 Sand MT 2619.24 25.00 65,481.00
2 Stone MT 8963.20 20.00 179,264.00
244745.00
ALTITUDE : 2401-27000m
1 Sand MT 3922.93 25.00 98,073.00
2 Stone MT 8966.33 20.00 179,327.00
277400.00
522145.00
RA - I
LOCATION OF OVERHEAD GANTRY
(a) Km 102.000

COST OF WORK PROPOSED THROUGH SUPPLY ORDER : OVER HEAD GANTRY 10 m Span

S/No. Items of Works A/U Qty Rate Amount in Rs. Remarks


1 Supply of Fabricated Over Head Nos 1 599000.00 599000.00 CA CE (P) BCN/08/2013-14
single pole Tubular Gantry of 10 m
span made of MS pipes with two
numbers High intensive Micro
Prismatic Over Head sign Board of
size 12 m x 2.136 m and height 6m
each at Km 102.000 and Km 127.575
on B-B-B road.

Total 599000.00
DISTANCE CHART

Srinagar

Khilani at km 45
on B-K road

End point of tunnel at km 130 on J-S road Puldoda at km


Batote at km 123.00 on J-S old alignment (7 km from at km 130 on J-S road) 51.00 Kistwar 110 km
Length of tunnel
9.28 Km J-S Old alignment raod 7 Km on P-G Rd
Stone & Sand Water point at km 2.85
Quarry Jaighati at km 9.800

Khilani Puldoda
road alignment
Chinta at km 10.400 from Kapra
Starting point of tunnel at km 89 on J-S road

Naska

Balot

1001 (I) ESPL at km 56 on J-S road Drudu at km 19.10 on Bhalra at km 2.4 from Kapra
Puldoda - Bhaderwah road Durdu-Kondra-
Bhalra road km
7.965
Kapra 7.60 from Atalgarh

Jammu 108 km from Pathankot Bhaderwah at Km 28.630/at Km


165.850 of Basoli-Bani-Bhaderwah
road

Atalgarh at km 0.00
3 km road

Basoli Basoli-Bani-Bhaderwah road

Pathankot
Appendix - " AP "
DISTANCE - CHART

1001 SUPPLY COY

2.0 KM
START OF WORKSITE

UDHAMPUR AT NH-IA

PATHANKOT
BASOLI PLAIN AREA
BHARDERWA
Middle point

PHULDODA

RAIL HEAD
JAMMU
BATOTE
END POINT OF

12.85 38.1 28.63 54.98 KM 67.00 KM 56.00 KM 108.00


WORK SITE

KM 5 KM PLAIN AREA 0.000

HILL AREA

Dis chart Page 138


Appendix ' AQ '
PRORATA RATE ANALYSIS, DGBR SSR-2016
Project:Beacon
Machine
Manpower Component
Component 2100 to 2401 to 2701 to 3101 to 3301 to
Code Brief Description
Cost in (Rs) 2400m 2700m 3100m 3300m 3600m
Zone I Zone J
of V/E/P
C101 Carriage of Constructional Stores 6.04 6.09 6.45 17.90 18.98 19.81 20.44 21.65
C102 Carriage of Constructional Material (manually ) 139.01 147.48 149.44 170.34 185.09 195.41 219.01
C103 Extra Lead for C-102 31.69 33.62 33.91 38.66 42.03 44.38 49.76
D101 Preparation of DPR 66615.49 70677.97 80424.85 90447.00 97514.79 102462.25 113770.73
D102 Preparation of DPR (New road) 389767.89 413515.33 427813.68 486424.15 527775.68 556721.75 622884.21
D103 Dismantling of Structures 127.39 326.68 346.71 1105.45 1166.48 1204.97 1233.06 1292.35
F101 Jungle Clearance Rainfall upto 200 cm 275.61 292.39 296.28 337.71 366.95 387.42 434.20
F102 Jungle Clearance Rainfall above 200 cm 528.24 560.41 567.86 647.27 703.31 742.54 832.21
F103 Cutting down tree 30 cm to 75 cm girth 1070.02 1135.81 1150.27 1311.86 1425.44 1504.95 1686.68
F104 Add to F103 for every additional 25 cm girth or part there off 803.77 852.91 860.03 980.85 1066.14 1125.84 1262.31
F105 Credit for non retrievable trees to F-103 63.39 67.25 67.83 77.34 84.06 88.77 99.53
F106 Credit for non retrievable trees to F-104 105.65 112.09 113.05 128.90 140.11 147.96 165.89
F201 Mannual Rough Excavation in SMB 279.25 296.26 300.19 342.18 371.81 392.54 439.95
F201A Rough Excavation in SMB using Excavator 14.68 9.46 10.04 35.59 37.46 38.91 40.05 42.10
F202 Mannual Rough Excavation in SR 3.46 624.76 662.82 707.59 801.54 867.93 914.43 1020.58
F203 Mannual Rough Excavation in HR 6.92 385.21 408.68 488.23 546.30 587.38 616.19 681.79
F301 Rough Excavation by Machine in SMB 52.00 18.01 19.11 98.41 102.68 106.15 109.05 113.66
F302 Rough Excavation by Machine in SR 82.93 54.26 57.59 216.23 226.90 235.14 241.66 253.37
F303 Rough Excavation by Machine in HR 86.39 81.02 85.98 282.49 297.28 308.47 317.08 333.43
F401 Rough Excavation in SMB 75% Machine & 25% manual 39.00 83.32 88.39 148.86 162.55 172.56 179.92 195.23
F402 Rough Excavation in SR 75% Machine & 25% manual 62.19 194.16 206.01 331.01 362.06 384.53 400.81 435.64
F403 Rough Excavation in HR 75% Machine & 25% manual 64.79 153.42 162.80 319.72 344.75 362.97 376.31 404.31
F502 Earth work in Excavation SR by Manual 5.14 660.64 700.89 746.13 845.52 915.76 964.98 1077.27
F503 Earth work in Excavation HR by Manual 6.92 476.10 505.12 585.71 657.45 708.17 743.73 824.76
F701 Earth work in embankment upto 1.5 mtr height in hill roads 28.18 13.30 14.12 60.17 63.02 65.28 67.11 70.22
F702 Earth work in embankment above 1.5 mtr height in plain area (upto 3.00 mtr) 41.93 55.62 59.05 348.30 359.35 366.52 371.91 382.61
F703 Additional lift to F-701 & 702 142.77 151.46 152.76 174.18 189.33 199.93 224.16
F704 Additional lift to F-203, 303, 403 & 503 202.85 215.20 217.05 247.48 269.00 284.06 318.50
F801 Turfing on Slopes 42.16 348.31 369.56 463.56 517.23 555.45 582.58 642.98
F802 Disposal of excavated earth with vehicle upto 5 KM initial lead 31.49 14.68 15.59 87.04 90.21 92.71 94.75 98.18
F802-A Add to F-802 for every additional KM per Cum after initial 5 KM lead 3.83 3.83 4.09 4.40 4.78 5.05 5.66
G01 Temporary culvert upto 2 mtr span 6420.09 6814.88 59429.92 60399.51 61081.00 61558.04 62648.42
G02 Unlined drain in SMB 178.06 188.91 191.41 218.19 237.08 250.31 280.53
G03 Unlined drain in SR 385.82 409.32 414.76 472.76 513.70 542.35 607.84
G04 Unlined drain in HR 245.21 260.17 300.42 337.28 363.30 381.51 423.14
G05 Providing & fixing of warning signs of triangular shape 90 cm 73.44 1076.18 1142.52 3472.03 3635.81 3752.27 3834.45 4019.45
G06 Providing & fixing of warning signs of triangular shape 60 cm 73.44 988.96 1049.85 2819.23 2969.77 3076.96 3152.65 3322.83
G07 Providing & fixing of warning signs of rectangular shape 80 cm x 60 cm 73.87 1154.05 1225.13 3596.89 3771.95 3896.68 3984.65 4182.89
G08 Providing & fixing ordinary KM stone 126.25 2294.26 2434.61 2803.37 3081.76 3329.01 3503.22 3896.54
G09 Providing & fixing Sub KM stone 56.60 377.46 400.57 765.68 823.62 865.38 895.12 960.91
G10 Providing & Fixing Fifth KM stone 169.15 1650.92 1752.14 4129.38 4378.34 4558.63 4686.35 4971.77
G11 Errection/Launching/Delaunching of ty BB 4437.20 4707.46 4769.99 5437.12 5907.86 6237.38 6990.58
H01 Preparation of Hyd data 19016.57 20174.82 23927.73 26781.04 28798.53 30210.76 33438.73
M101 Collection of Rubble Stone 45.62 558.03 592.07 724.93 810.17 870.75 913.56 1009.66
M101A Collection of Stone Bouldres 57.31 478.80 508.01 640.31 713.99 766.51 803.79 886.79
M102 Collection of Bond Stone 45.62 884.82 938.77 1075.41 1209.74 1304.99 1372.07 1523.64
M103 Collection of Shingle 56.26 830.88 881.56 1012.13 1138.82 1228.66 1292.06 1434.80
M104 Collection of Sand 56.26 1382.00 1466.25 1604.58 1814.14 1962.45 2066.78 2303.06
M104A Collection of Sand by Machine(JCB) 102.10 297.81 316.04 506.73 554.68 589.34 614.53 668.16
M104B Collection of Sand (25% manualy & 75% by Machine (JCB)) 90.64 568.86 603.59 781.20 869.55 932.62 977.59 1076.89
M201 Breaking of Stone by Crusher to metal (26.5 mm nominal size) 262.76 681.58 723.20 1210.04 1320.60 1400.80 1459.31 1582.90
M202 Manual Breaking of Stone to metal (26.5 mm nominal size) 50.18 2035.94 2159.98 2329.74 2637.46 2854.97 3007.67 3354.77
M203 Breaking of Stone to metal (26.5 mm nominal size) 75% Machine & 25% Manual
215.77 1012.97 1074.76 1458.49 1617.95 1731.90 1813.61 1992.04
M204 Breaking of Chips( 13.2 mm nominal size) by Crusher from stone bouder by Machine
271.76 710.66 754.04 1258.18 1373.38 1456.94 1517.87 1646.67
M205 Breaking Jhama Bricks (Manually) 950.02 1007.92 2080.77 2223.65 2324.44 2395.00 2556.26
M206 Stone Dressing 1118.28 1188.00 1202.15 1372.14 1490.94 1574.10 1764.18
M207 Breaking of Chips 12.5 mm by crusher from river shingle 281.19 1074.01 1139.55 1637.34 1807.66 1930.05 2018.26 2209.02
M301 Extra lead for M101 to M105 & M201 to M205 2.66 3.16 3.36 8.97 9.53 9.95 10.26 10.88
M302 Crushing of Chippings (6.7 mm nominal size ) by Crusher from stone 259.14 794.49 843.09 1546.74 1674.30 1766.38 1833.17 1975.84
M302A Crusher Sand (2.36 mm nominal size ) by Crusher from stone 264.50 709.02 752.28 1561.67 1682.13 1765.29 1825.89 1954.19
P101 Excavation in Trenches in SMB 1748.41 1748.41 480.28 641.95 816.79 939.18 1218.93
P102 Excavation in Trenches in SR 3.46 3820.24 3820.24 1089.45 1442.97 1825.10 2092.62 2703.96
P103 Excavation in Trenches in HR 6.92 2364.27 2364.27 732.24 951.56 1188.19 1353.90 1732.39
P104 Additional Depth for P-101 112.01 118.83 119.85 136.65 148.54 156.86 175.87
P105 Additional lead for P-101 to P-103 112.01 118.83 119.85 136.65 148.54 156.86 175.87
P106 Additional Depth for P-102 & P-103 136.92 145.26 146.50 167.05 181.58 191.74 214.98
P107 Hard core 1486.21 1576.83 1976.79 2200.83 2358.52 2468.90 2721.19
P201 PCC 1: 5:10 319.52 2128.06 2257.96 3595.38 3913.87 4149.25 4316.89 4687.75
P202 PCC 1:4:8 318.71 2129.33 2259.31 3843.69 4162.38 4397.87 4565.58 4936.63
P203 PCC 1:3:6 366.54 2104.31 2232.75 4158.19 4475.19 4709.46 4876.75 5244.99
P204 PCC 1:2:4 437.69 3670.19 3894.42 6701.10 7273.04 7675.61 7961.35 8597.59
P205 RCC 1:2:4 462.39 3670.19 3894.42 6701.84 7274.52 7677.84 7964.32 8601.30
P206 RCC M-20 475.01 3983.49 4226.65 7177.09 7777.04 8213.96 8524.07 9214.59
P207 RCC M-25 478.23 3999.30 4243.43 7557.20 8159.63 8598.32 8909.71 9603.01
P208 RCC M-30 478.42 4000.23 4244.44 7579.84 8182.45 8621.25 8932.71 9626.17
P209 Centering /Shuttering (Steel) 4442.08 4716.18 5531.23 5955.25 6426.87 6757.01 7511.59
P301 Precast Slab RCC 1:2:4 421.89 9201.78 9767.24 23352.68 24740.75 25730.13 26426.50 28001.91
P302 Laying Reinforcement upto 12 mm dia 1655.11 1757.29 1779.24 2029.67 2205.40 2328.41 2609.58
P303 Laying Reinforcement above 12mm dia 2316.29 2344.47 1267.02 1524.76 1759.20 1923.32 2298.43
P304 Masonry work with Concrete Hollow Block 197.98 3498.18 3712.43 5184.50 5712.91 6090.09 6355.90 6955.82
P305 Concrete Pavement belting 63.39 67.25 67.83 77.34 84.06 88.77 99.53
P306 Concrete Pavement brooming 126.77 134.50 136.28 155.35 168.80 178.21 199.73
P401 Brick Masonary 1:6 21.38 1674.13 1777.11 5978.89 6236.00 6414.35 6539.39 6824.37
P402 Brick Masonary 1:4 22.77 1675.24 1778.30 6135.69 6392.50 6571.01 6696.18 6981.39
P501 RRM Dry 50.18 2802.15 2974.25 3153.63 3578.18 3877.11 4086.81 4564.19
P502 Sausage Wall 56.13 3072.18 3260.90 4347.20 4812.73 5140.50 5370.45 5893.87
P504A Open Weave Jute Geotextiles (For Control of Surficial Soil Erosion) 31.23 33.14 82.96 87.65 90.97 93.28 98.59
P505 RRM 1:6 82.50 3036.72 3223.15 4020.57 4486.59 4811.38 5039.48 5557.66
P506 RRM 1:4 85.62 3042.03 3228.79 4280.36 4747.46 5072.91 5301.49 5820.67
P507 RRM 1:3 87.46 3043.97 3230.85 4489.94 4957.38 5283.09 5511.87 6031.43
P508 Lined drain 16.54 979.34 1039.41 1094.23 1242.18 1346.62 1419.87 1586.68
P601 Filling of Stones 50.18 949.22 1007.10 1073.93 1212.95 1315.17 1387.17 1549.81
P602 Stone Pitching 57.03 1350.23 1432.82 1612.08 1817.31 1962.30 2064.31 2295.27
P603 Dry Boulder Filling 56.15 2057.36 2182.96 3062.90 3374.34 3594.32 3748.81 4099.77
P701 Plastering 1.2 cm thick in CM 1:6 23.74 1364.86 1449.22 1925.05 2136.19 2281.82 2383.98 2616.57
Machine
Manpower Component
Component 2100 to 2401 to 2701 to 3101 to 3301 to
Code Brief Description
Cost in (Rs) 2400m 2700m 3100m 3300m 3600m
Zone I Zone J
of V/E/P
P702 Plastering 2.5 cm thick in CM 1:6 37.68 2095.04 2224.57 2983.25 3307.62 3531.21 3688.06 4045.12
P703 Flush Pointing in CM 1:3 9.46 1205.02 1279.53 1567.98 1752.07 1880.30 1970.16 2175.16
P801 White washing 0.14 127.49 135.24 156.71 175.87 189.40 198.87 220.51
P802 Painting 753.08 799.57 1893.76 2007.70 2087.65 2143.62 2271.56
P802A Road marking with thermo plastic paint 2.5 mm thick 196.55 428.01 454.33 4309.86 4380.40 4431.73 4469.43 4548.02
P803 Laying Hume pipe of size 0.90 to 1.20 Mtrs in dia 83.60 144.22 153.03 744.62 793.19 811.00 824.22 851.21
P804 False ceiling with Ply wood 4 mm thick 13598.50 14429.06 21299.14 23346.31 24789.22 25799.25 28107.90
P805 RCC M-35 479.30 4004.57 4249.04 7725.38 8330.26 8769.55 9081.36 9775.58
P806 RCC M-40 480.05 4008.25 4252.92 7813.64 8419.07 8858.76 9170.87 9865.74
P807 Weep hole using PVC pipe 198.12 199.86 199.86 199.86 199.86
P808 Brick masonry in CM 1:3 21.42 1269.04 1347.06 6282.32 6508.49 6643.84 6738.78 6954.95
P809 Lined drain with PCC 1:3:6 148.08 850.14 902.03 2601.01 2749.17 2843.81 2911.40 3060.17
P810 Add cost of "quick setting compound" in cemented work 0.42 0.42 0.42 0.42 0.42
P811 Add cost of "Zinga" coating on TMT/Re-inforcement Bars 5.27 5.27 5.27 5.27 5.27
P812 Cement Plaster 6 mm thick in CM 1:3 for Ceiling 6.98 2166.77 2299.69 2916.72 3262.71 3492.88 3654.07 4022.23
P813 Pre Cast Box Culverts (PCBC 2mx2mx1m) 584.62 819.00 869.29 49765.61 50347.86 50452.33 50530.72 50687.35
P814 Reinforced Earth Structure - Assembling , joining and laying of reinforcing elements with
reinforcing element of steel/aluminium strips/polymeric strips 14.27 15.15 799.56 804.19 805.70 806.76 809.19
P815 Reinforced Earth Structure - Assembling , joining and laying of reinforcing elements with
reinforcing element of synthetic geogrid 21.40 22.72 125.94 129.21 131.49 133.08 136.71
P816 Reinforced Earth Structure - Facing Elements of RCC 334.39 30.68 32.57 2029.58 2088.07 2101.36 2113.67 2128.92
S101 Preparation of Subgrade in SMB 137.60 219.46 232.89 450.96 488.15 515.57 536.00 577.39
S102 Preparation of Subgrade in SR 169.90 412.54 437.73 768.98 836.17 885.04 920.78 995.91
S103 Preparation of Subgrade in HR 186.85 292.10 310.03 740.54 791.60 828.21 855.52 910.73
S104 GSB 10 cm thick with Sand, Mooram & Gravel 339.58 1107.85 1175.51 1884.75 2063.54 2191.28 2283.75 2482.02
S105 GSB 15 cm thick with Sand, Mooram & Gravel 475.74 1608.25 1706.46 2770.79 3029.98 3214.90 3348.63 3635.93
S106 GSB 10 cm thick with Brick Aggregate 183.00 2153.66 2284.95 4135.08 4464.95 4698.93 4864.37 5235.45
S107 GSB 15 cm thick with Brick Aggregate 274.50 2928.63 3107.19 5878.12 6327.55 6646.50 6872.24 7377.63
S108 GSB 10 cm thick with stone Aggregate (Grading 1 ) 424.96 1716.76 1821.52 2663.08 2929.04 3123.94 3264.20 3568.39
S108A GSB 10 cm thick with stone Aggregate (Grading 2 ) 465.98 1738.77 1844.88 2908.69 3184.89 3383.36 3526.48 3835.64
S108B GSB 10 cm thick with stone Aggregate (Grading 3 ) 430.68 1780.41 1889.06 2676.57 2949.42 3151.25 3296.40 3611.57
S108C GSB 10 cm thick with stone Aggregate (Grading 4 ) 429.88 1778.34 1886.85 2683.60 2956.30 3157.88 3302.86 3617.65
S108D GSB 10 cm thick with stone Aggregate (Grading 5 ) 433.05 1731.81 1837.49 2708.13 2977.11 3173.85 3315.46 3622.46
S108E GSB 10 cm thick with stone Aggregate (Grading 6 ) 438.37 1654.37 1755.33 2739.49 3002.10 3190.78 3326.80 3620.81
S109 GSB 15 cm thick with stone Aggregate (Grading 1 ) 618.84 2358.16 2502.04 3742.16 4107.87 4376.64 4570.35 4989.24
S109A GSB 15 cm thick with stone Aggregate (Grading 2 ) 634.42 2271.01 2409.59 3845.04 4205.71 4465.70 4653.40 5057.97
S109B GSB 15 cm thick with stone Aggregate (Grading 3 ) 627.40 2453.64 2603.34 3765.07 4141.11 4420.26 4621.32 5056.68
S109C GSB 15 cm thick with stone Aggregate (Grading 4 ) 626.21 2450.53 2600.04 3775.44 4151.26 4430.05 4630.84 5065.64
S109D GSB 15 cm thick with stone Aggregate (Grading 5 ) 630.96 2380.74 2525.99 3812.23 4182.47 4454.00 4649.75 5072.84
S109E GSB 15 cm thick with stone Aggregate (Grading 6 ) 638.94 2264.56 2402.75 3857.84 4218.52 4477.96 4665.32 5068.93
S201 Shingling 50 mm 98.20 731.83 776.49 966.35 1079.60 1160.19 1217.49 1344.68
S202 Shingling 75 mm 135.44 1046.50 1110.36 1377.77 1539.57 1654.67 1736.46 1918.18
S203 Shingling 100 mm 150.30 1228.10 1303.02 1605.44 1795.04 1929.86 2025.58 2238.57
S204 Spreading Shingle 15 cm consolidated 192.66 1757.29 1864.50 2259.71 2531.35 2723.58 2859.87 3163.97
S205 Lime Soil stabilisation 167.35 1407.66 1493.55 2570.74 2787.28 2941.66 3051.23 3295.22
S206 Sand blanketing 25 mm 48.46 210.54 223.40 401.00 439.39 463.19 480.28 517.48
S207 Providing of sand layer 100 mm 155.97 515.28 546.82 1195.02 1298.30 1357.66 1400.61 1492.78
S401 Scarifing existing BT surface 0.00 834.51 885.34 897.10 1022.57 1111.10 1173.08 1314.73
S402 WBM 7.5 cm Grading 1 with Type A stone screening 332.49 1609.49 1706.70 2125.69 2359.24 2539.88 2669.33 2952.38
S402A WBM 7.5 cm Grading 1 with Type B stone screening 352.87 1596.78 1694.16 2211.64 2446.89 2626.89 2756.07 3037.72
S402B WBM 7.5 cm Grading 2 with Type B stone screening 348.80 1641.41 1741.54 2217.98 2457.97 2642.59 2774.96 3064.08
S403 WBM 10 cm Grading 1 with Type A stone screening 420.70 1975.33 2095.83 2630.72 2916.86 3139.06 3298.39 3646.34
S404 WMM 75 mm Thick 447.44 1062.78 1127.61 2241.20 2412.79 2538.97 2631.33 2825.17
S405 WMM 100 mm Thick 579.24 1704.84 1789.32 2956.49 3205.95 3402.26 3544.89 3848.56
S405A WMM 150 mm Thick 817.95 2030.69 2154.75 4242.84 4569.35 4809.36 4984.73 5354.03
S501 2 cm thick BT with sand seal coat over WBM surface using bitumen VG-10 (80/100) &
firewood 130.73 1096.68 1163.53 2514.41 2684.36 2804.64 2890.01 3080.09
S501A 2 cm thick BT with sand seal coat over WBM surface with HMP & Paver using bitumen
VG-10 (80/100) 205.59 357.80 379.70 2028.29 2089.46 2133.60 2166.35 2233.27
S501B 2.5 cm thick BT with sand seal coat over WBM surface with HMP & Paver using bitumen
VG-10 () 245.66 433.24 459.76 2428.27 2502.03 2555.37 2594.92 2675.86
S501C 2 cm thick BT with HMP & Paver using bitumen VG-10 () 200.36 337.77 358.31 1695.04 1751.88 1793.72 1824.81 1888.15
S501D 2.5 cm thick BT with HMP & Paver using bitumen VG-10 () 240.22 412.60 437.67 2093.92 2163.19 2214.16 2252.00 2329.24
S502 2.5 cm BT with sand seal coat using bitumen VG-10 (80/100) & Firewood 191.77 1284.65 1362.98 2969.41 3169.50 3311.55 3412.71 3636.54
S505 Liquid seal coat using bitumen VG-10 (80/100) & Firewood 58.48 513.51 544.84 1143.94 1223.00 1279.23 1319.13 1408.06
S506 Surface Dressing Renewal coat (Two coat) using bitumen VG-10 (80/100) & F/wood
132.01 926.00 982.43 2772.14 2915.96 3018.16 3090.89 3252.04
S506A Surface Dressing Renewal coat (Two coat) using bitumen VG-10 (80/100) & LDO
132.01 934.31 991.26 3660.99 3805.55 3908.64 3981.99 4144.55
S507 BUSG 7.5 cm using bitumen VG-10 (80/100) & F/wood 353.54 2238.63 2375.12 4116.35 4441.12 4689.24 4866.10 5256.73
S507A BUSG 7.5 cm using bitumen VG-10 (80/100) & LDO 353.54 2238.63 2375.12 5017.53 5342.30 5590.42 5767.28 6157.91
S508 BM 75 mm thick using bitumen VG-10 (80/100) 736.00 1283.97 1362.56 5968.38 6167.16 6325.49 6442.95 6683.04
S509 DBM 75 mm thick using bitumen VG-10 () 692.66 527.92 559.92 7401.89 7559.44 7636.21 7696.19 7806.56
S510 BM 50 mm thick using bitumen VG-10 (80/100) 480.18 1584.12 1680.22 4448.83 4668.91 4851.34 4983.36 5266.60
S511 DBM 50 mm thick using bitumen VG-10 () 466.28 481.35 510.69 5115.76 5248.01 5313.07 5362.81 5458.51
S512 Bituminous Concrete (Asphaltic Concrete) 25 mm thick using bitumen VG-10 (80/100)
861.98 435.29 461.96 2925.33 3021.79 3093.85 3152.05 3251.82
S512A Bituminous Concrete 30 mm thick using bitumen VG-10 () 409.36 548.90 582.53 3643.84 3743.89 3814.43 3867.48 3972.97
S513 Bituminous Concrete 40 mm thick using bitumen VG-10 (80/100) 459.65 679.74 721.34 4692.56 4815.53 4901.46 4965.74 5094.94
S513A Bituminous Concrete 50 mm thick using bitumen VG-10 () 580.65 1174.16 1245.93 6195.20 6393.08 6535.09 6639.73 6856.50
S515 Surface Dressing Renewal coat using bitumen VG-10 (80/100) & F/wood 75.43 387.02 410.61 1118.64 1179.16 1222.48 1253.49 1321.45
S515A Surface Dressing Renewal coat using bitumen VG-10 (80/100) & LDO 75.43 387.02 410.61 1449.92 1510.43 1553.76 1584.76 1652.72
S601 2.5 Cm Thick BT with liquid seal coat using bitumen VG-10 (80/100) & F/wood 153.73 1202.65 1275.97 2995.98 3183.10 3315.31 3409.24 3618.00
S602 2 Cm Thick BT with liquid seal coat using bitumen VG-10 (80/100) & F/wood 134.23 1071.64 1136.97 2646.93 2813.73 2931.45 3015.07 3201.01
S603 Premixed sand seal coat using bitumen VG-10 (80/100) & F/wood 20.88 32.35 34.33 414.17 420.67 424.73 427.76 433.88
S604 2 cm Liquid seal coat using CB Emulsion 141.79 930.51 987.25 3142.10 3286.44 3389.41 3462.78 3624.99
S605 2 cm Premixed Seal Coat with CBE 141.79 876.88 930.33 2868.99 3006.22 3103.50 3172.88 3325.99
S606 Two Coats Surface Dressing with CBE 99.44 491.61 521.60 1895.30 1972.30 2027.44 2066.94 2153.38
S607 Mix Seal Surfacing Type 'A' using bitumen VG-10 (80/100) & F/wood 101.45 874.52 927.82 2218.24 2353.87 2449.69 2517.68 2669.18
S607A Mix Seal Surfacing Type 'A' using bitumen VG-10 (80/100) & LDO 101.45 874.52 927.82 2786.66 2922.02 3017.85 3085.84 3237.33
S608 Mix Seal Surfacing Type 'B' using bitumen VG-10 (80/100) & F/wood 100.66 847.89 899.57 2050.92 2182.52 2275.50 2341.49 2488.44
S608A Mix Seal Surfacing Type 'B' using bitumen VG-10 (80/100) & LDO 100.66 847.89 899.57 2542.83 2674.44 2767.42 2833.41 2980.36
S609 SDBC 25 mm thick using bitumen VG-10 (80/100) 331.43 561.50 595.83 2628.92 2726.32 2795.85 2847.50 2952.77
S611 2cm Thick BT with Sand Seal Coat on existing BT surface using bitumen VG-10 (80/100)
& F/wood 130.57 1062.62 1127.39 2477.54 2642.36 2759.01 2841.85 3026.15
S809 Prime Coat with Bitumen Emulsion 3.57 240.27 254.91 711.02 747.18 772.78 790.73 831.62
S810 CSB 7.5 CM Thick 447.94 1286.43 1364.99 2405.77 2616.28 2766.21 2875.20 3107.04
S811 CSB 10 CM Thick 556.24 1663.43 1758.46 2963.58 3227.04 3419.58 3559.36 3857.40
S812 SDBC 40 mm using bitumen VG-10 (80/100) 435.68 730.73 775.42 3903.10 4031.71 4122.33 4189.68 4326.82
S813 Mastic Asphalt 25 mm thick using bitumen VG-10 (80/100) 1064.44 2104.54 2233.15 6953.73 7315.21 7570.46 7758.71 8147.95
S814 Tack Coat using Bitumen Emulsion 3.64 5.73 6.09 166.01 167.00 167.71 168.25 169.33
S815 Tack Coat using Bitumen VG-10 (80/100) 3.64 5.73 6.09 120.93 121.92 122.63 123.17 124.25
Machine
Manpower Component
Component 2100 to 2401 to 2701 to 3101 to 3301 to
Code Brief Description
Cost in (Rs) 2400m 2700m 3100m 3300m 3600m
Zone I Zone J
of V/E/P
S901 2 cm thick BT with sand seal coat over WBM surface using LDO & bitumen VG-10
(80/100) 130.73 1096.68 1163.53 3051.93 3222.77 3343.04 3428.41 3618.50
S902 2.5 cm BT with sand seal coat using LDO & bitumen VG-10 (80/100) 162.26 1304.86 1382.61 3619.68 3820.72 3963.84 4065.49 4291.58
S905 Liquid seal coat using LDO & bitumen VG-10 (80/100) 58.48 513.51 544.84 1412.05 1491.10 1547.34 1587.23 1676.16
S910 2.5 Cm Thick BT with liquid seal coat using LDO & bitumen VG-10 (80/100) 153.73 1202.65 1275.97 3712.32 3899.43 4031.64 4125.57 4334.34
S911 2 Cm Thick BT with liquid seal coat using LDO & bitumen VG-10 (80/100) 134.23 1071.64 1136.97 3283.23 3450.04 3567.76 3651.37 3837.32
S912 Premixed sand seal coat using LDO & bitumen VG-10 (80/100) 20.88 32.35 34.33 600.92 607.42 611.48 614.51 620.63
S915 2cm Thick BT with Sand Seal Coat on existing BT surface using bitumenVG-10 (80/100)
& LDO 130.57 1062.62 1127.39 3033.38 3198.20 3314.86 3397.69 3581.99
S916 DBM 100 mm thick using bitumen VG-10 () 888.80 1529.74 1623.28 9759.01 10035.13 10224.12 10364.41 10650.80
S917 Non Frost Susceptable Stone Base (NFSSB) 15 cm thick 768.56 2568.10 2724.94 4240.01 4650.37 4945.92 5159.72 5618.77
S1001 Add for variation in cost of bitumen VG-30 (60/70) in place of VG-10 (80/100) -3.71 -3.71 -3.71 -3.71 -3.71
S1002 Add anti-stripping compound in all bituminous work 3.52 3.52 3.52 3.52 3.52
S1003 Add for variation in cost of bitumen VG-40 (30/40) in place of VG-10 (80/100) 2.81 2.81 2.81 2.81 2.81
S1004 Add for variation in cost of CRMB in place of VG-10 (80/100) 0.54 0.54 0.54 0.54 0.54
S1005 Warm mix asphalt additive with 0.50% dosage 2.67 2.67 2.67 2.67 2.67
S1006 Add Nano technology based reactive pentrative organo Silane antistripping compound
bitumen additive 1777.95 1777.95 1777.95 1777.95 1777.95
T001 Providing/Fixing Road Delineators (600 mm) 21.13 22.42 679.86 683.03 685.28 686.84 690.43
T002 Providing/Fixing Road Delineators ( 900 mm) 21.13 22.42 623.76 626.93 629.18 630.74 634.33
T003 Metal beam Crash Barrier (Type- A, "W") 1.17 238.86 253.54 1718.50 1754.60 1779.99 1797.77 1838.37
T004 Providing/Fixing Cats Eyes 180.24 181.01 181.01 181.01 181.01
MP-12 Cost of Steel 53.18 53.18 53.18 53.18 53.18

0
0
0
0
Appx -AN
SOIL CLASSIFICATION

S/No Location Distance Soil Classification


(Mtr)
From (Km) To (Km) SMB SR HR

1 102.000 102.450 450 SMB


2 102.450 102.725 275 SR
3 102.725 102.775 50 SMB
4 102.775 102.850 75 HR
5 102.850 102.875 25 SMB
6 102.875 103.225 350 HR
7 103.225 103.300 75 SMB
8 103.300 103.400 100 HR
9 103.400 103.425 25 SMB
10 103.425 103.600 175 SR
11 103.600 103.725 125 SMB
12 103.725 103.850 125 HR
13 103.850 103.875 25 SR
14 103.875 104.825 950 HR
15 104.825 105.050 225 SMB
16 105.050 105.425 375 HR
17 105.425 105.500 75 SMB
18 105.500 105.675 175 HR
19 105.675 105.850 175 SMB
20 105.850 105.975 125 HR
21 105.975 106.325 350 SMB
22 106.325 106.425 100 HR
23 106.425 106.500 75 SMB
24 106.500 106.650 150 HR
25 106.650 106.725 75 SMB
26 106.725 106.825 100 SR
27 106.825 106.925 100 HR
28 106.925 107.200 275 SR
29 107.200 107.700 500 HR
30 107.700 107.800 100 SMB
31 107.800 107.950 150 HR
32 107.950 108.000 50 SMB
33 108.000 108.125 125 HR
34 108.125 108.150 25 SMB
35 108.150 108.225 75 HR
36 108.225 108.300 75 SMB
37 108.300 108.675 375 HR
38 108.675 108.700 25 SMB
39 108.700 108.750 50 HR
40 108.750 108.850 100 SMB
41 108.850 109.100 250 HR
42 109.100 109.450 350 SMB
43 109.450 109.700 250 HR
44 109.700 109.725 25 SMB
45 109.725 109.800 75 HR
46 109.800 109.825 25 SMB
47 109.825 109.850 25 HR
48 109.850 109.875 25 SMB
49 109.875 110.175 300 HR
50 110.175 110.475 300 SMB
51 110.475 110.550 75 HR
52 110.550 110.650 100 SMB
53 110.650 110.975 325 HR
54 110.975 111.200 225 SMB
55 111.200 111.400 200 HR
56 111.400 111.450 50 SMB
57 111.450 111.850 400 HR
58 111.850 112.000 150 SMB
59 112.000 112.125 125 HR
60 112.125 112.400 275 SMB
61 112.400 112.450 50 HR
62 112.450 113.025 575 SMB
63 113.025 113.050 25 SR
64 113.050 113.075 25 SMB
65 113.075 113.175 100 SR
66 113.175 113.925 750 SMB
67 113.925 113.975 50 HR
68 113.975 114.075 100 SMB
69 114.075 114.150 75 HR
70 114.150 114.375 225 SMB
71 114.375 114.525 150 SR
72 114.525 117.650 3125 SMB
73 117.650 118.200 550 SR
74 118.200 120.325 2125 SMB
75 120.325 122.350 2025 SR
76 122.350 122.425 75 SMB
77 122.425 122.475 50 HR
78 122.475 125.050 2575 SMB
79 125.050 125.300 250 SR
80 125.300 126.025 725 SMB
81 126.025 126.125 100 HR
82 126.125 126.550 425 SMB
83 126.550 126.700 150 HR
84 126.700 127.600 900 SMB
85 127.600 127.700 100 SMB
25700

Err:509
Err:509
Err:509
Appx -"AN"

Soil Sample Test Result in respect of BBB Road Fraom Km 102.00 to


127.700

S/No Location Soil CBR Value Remarks


From To Classification (%) obtained
1 102.000 102.425 SMB 6.28
2 102.425 102.450 HR
3 102.450 102.575 SR 7.28
4 102.575 102.650 SMB 6.32
5 102.650 102.675 HR
6 102.675 102.725 SR 7.13
7 102.725 102.750 SMB 6.31
8 102.750 102.825 HR
9 102.825 102.850 SMB 6.12
10 102.850 103.200 HR
11 103.200 103.250 SMB 6.15
12 103.250 103.300 SR 7.35
13 103.300 103.650 SMB 6.24
14 103.650 103.750 HR
15 103.750 103.850 HR
16 103.850 103.950 HR
17 103.950 104.050 HR
18 104.050 104.150 HR
19 104.150 104.250 HR
20 104.250 104.350 HR
21 104.350 104.450 HR
22 104.450 104.550 HR
23 104.550 104.650 HR
24 104.650 104.750 HR
25 104.750 104.875 HR
26 104.875 104.900 SMB 6.12
27 104.900 104.925 HR
28 104.925 105.050 SMB 6.2
29 105.050 105.425 HR
30 105.425 105.500 HR
31 105.500 105.550 HR
32 105.550 105.600 SR 7.45
33 105.600 105.700 HR
34 105.700 105.875 SMB 6.38
35 105.875 105.950 HR
36 105.950 106.350 SMB 6.32
37 106.350 106.450 HR
38 106.450 106.525 SMB 6.24
39 106.525 106.675 HR
40 106.675 106.775 SMB 6.32
41 106.775 106.825 SR 7.6
42 106.825 106.875 SMB 6.28
43 106.875 107.000 HR
44 107.000 107.050 SMB 6.27
45 107.050 107.200 SR 7.6
46 107.200 107.375 HR
47 107.375 107.425 SMB 6.25
48 107.425 107.700 HR
49 107.700 107.800 SMB 6.24
S/No Location Soil CBR Value Remarks
From To Classification (%) obtained
50 107.800 107.950 HR
51 107.950 108.050 SMB 6.21
52 107.800 108.125 HR
53 108.125 108.150 SMB 6.24
54 108.150 108.225 HR
55 108.225 108.275 SMB 6.19
56 108.275 108.300 SMB 6.23
57 108.300 108.750 HR
58 108.750 108.825 SMB 6.21
59 108.825 109.100 HR
60 109.100 109.475 SMB 6.25
61 109.475 109.700 HR
62 109.700 109.725 SMB 6.27
63 109.725 110.175 HR
64 110.175 110.325 SMB 6.27
65 110.325 110.350 HR
66 110.350 110.475 SMB 6.57
67 110.475 110.550 HR
68 110.550 110.650 SMB 6.47
69 110.650 110.950 HR
70 110.950 111.200 SMB 6.21
71 111.200 111.400 HR
72 111.400 111.450 SMB 6.42
73 111.450 111.850 HR
74 111.850 112.000 SMB 6.25
75 112.000 112.125 HR
76 112.125 112.400 SMB 6.32
77 112.400 112.450 HR
78 112.450 113.025 SMB 6.32
79 113.025 113.050 SR 7.8
80 113.050 113.075 SMB 6.42
81 113.075 113.175 SR 7.12
82 113.175 113.275 SMB 6.25
83 113.275 113.375 SMB 6.34
84 113.375 113.475 SMB 6.21
85 113.475 113.575 SMB 6.34
86 113.575 113.675 SMB 6.12
87 113.675 113.775 SMB 6.39
88 113.775 113.875 SMB 6.21
89 113.875 113.975 SMB 6.42
90 113.975 114.050 SMB 6.21
91 114.050 114.150 HR
92 114.150 114.250 SMB 6.17
93 114.250 114.375 SMB 6.24
94 114.375 114.525 SR 7.41
95 114.525 114.625 SMB 6.14
96 114.625 114.725 SMB 6.21
97 114.725 114.825 SMB 6.27
98 114.825 114.900 SMB 6.14
99 114.725 115.400 SMB 7.6
100 115.400 115.500 SMB 6.14
101 115.500 115.600 SMB 6.14
102 115.600 115.700 SMB 6.14
103 115.700 115.800 SMB 6.14
S/No Location Soil CBR Value Remarks
From To Classification (%) obtained
104 115.800 115.900 SMB 6.14
105 115.900 116.400 SMB 6.14
106 116.400 116.500 SMB 6.14
107 116.500 116.600 SMB 6.14
108 116.600 116.700 SMB 6.14
109 116.700 116.800 SMB 6.14
110 116.800 116.900 SMB 6.14
111 116.900 117.000 SMB 6.14
112 117.000 117.100 SMB 6.14
113 117.100 117.200 SMB 6.14
114 117.200 117.300 SMB 6.14
115 117.300 117.400 SMB 6.14
116 117.400 117.500 SMB 6.14
117 117.500 117.600 SMB 6.14
118 117.600 117.700 SMB 6.14
119 117.700 117.800 SMB 6.14
120 117.800 118.100 SR 7.6
121 118.100 118.125 SMB 6.14
122 118.125 118.150 SR 7.14
123 118.150 118.275 SR 7.14
124 118.275 118.375 SMB 6.14
125 118.375 118.475 SMB 6.14
126 118.475 118.575 SMB 6.14
127 118.575 118.675 SMB 6.14
128 118.675 118.775 SMB 6.14
129 118.775 118.875 SMB 6.14
130 118.875 118.975 SMB 6.14
131 118.975 119.075 SMB 6.14
132 119.075 119.175 SMB 6.14
133 119.175 119.275 SMB 6.14
134 119.275 119.375 SMB 6.14
135 119.375 119.475 SMB 6.14
136 119.475 119.950 SMB 6.14
137 119.950 120.050 SMB 6.14
138 120.050 120.150 SMB 6.14
S/No Location Soil CBR Value Remarks
From To Classification (%) obtained
139 120.150 120.250 SMB 6.14
140 120.250 120.350 SMB 6.14
141 120.350 120.700 SMB 6.14
142 120.700 120.800 SMB 6.14
143 120.800 120.900 SMB 6.14
144 120.900 121.000 SMB 6.14
145 121.000 121.100 SMB 6.14
146 121.100 121.200 SMB 6.14
147 121.200 121.300 SMB 6.14
148 121.300 121.700 SMB 6.14
149 121.200 121.300 SMB 6.14
150 121.300 121.400 SMB 6.14
151 121.400 121.500 SMB 6.14
152 121.500 121.600 SMB 6.14
153 121.600 121.700 SMB 6.14
154 121.700 121.800 SMB 6.14
155 121.800 122.775 SMB 6.14
156 122.775 122.875 SMB 6.14
157 122.875 122.975 SMB 6.14
158 122.975 123.075 SMB 6.14
159 123.075 123.175 SMB 6.14
160 123.175 123.275 SMB 6.14
161 123.275 123.675 SMB 6.14
162 123.675 123.775 SMB 6.14
163 123.775 123.875 SMB 6.14
164 123.875 123.975 SMB 6.14
165 123.975 124.075 SMB 6.14
166 124.075 124.175 SMB 6.14
167 124.175 124.275 SMB 6.14
168 124.275 124.375 SMB 6.14
169 124.375 124.875 SMB 6.14
170 124.875 124.975 SMB 6.14
171 124.975 125.075 SMB 6.14
172 125.075 125.175 SMB 6.14
173 125.175 125.275 SMB 6.14
174 125.275 125.375 SMB 6.14
175 125.375 125.475 SMB 6.14
176 125.475 125.575 SMB 6.14
177 125.575 126.000 SMB 6.14
178 126.000 126.100 SMB 6.14
179 126.100 126.400 SMB 6.14
180 126.400 126.500 SMB 6.14
181 126.500 126.900 SMB 6.14
182 126.900 127.000 SMB 6.14
183 127.000 127.575 SMB 6.14
184 127.575 127.700 SMB 6.14

0
0
0
Appendix ' AK '

A Design traffic
Traffic Census (Counted during 2018-19 at Km 7.500 Dett Chiril on Basoli-Bani road )
i) Car/Jeep/Taxi/Van/Three wheelers = 295 Nos
ii) Bus = 216 Nos
iii) Two axle Truck/Tractor = 5 Nos
iv) Multi axle truck/Tractor = 0 Nos
516 Nos
v) Restricted to 50% = 258 Nos
Say 258 commercial veh per day
75% traffic census have been considered of B-K road, since volume of trffic on this road is anticipated.
Cumulative number of statnderd axles 'N' = 365x(1+r)15-1)xAxDxF
r
Initial traffic in the year of completion of construction in terms of the number of commercial vehicle per day 'A'
Number of commercial vehs as per last count (yr 2003) 'P' = 258 Nos
Number of year between last count and the year of completion of construction 'X' (2012- = 5 Yrs
2007)
Lane distribution factor 'D' = 0.75
Vehicle damage factor 'F' = 2.5
Design life in years 'n' = 15 years
Annual groth rate of commercial vehs 'r' (7.5%) = 0.075
Calculation design traffic
A= 258 (+0.075)3 = 320.51 CVD
N = =
365x((1+0.075)15-1)x258x0.75x2.5
4.61 msa
, 0.075
Say 5 msa
B PAVEMENT DESIGN
Pavement composition Pvmt thick in mm Sub base base Bituminous layers
GSB WBM DBM AC
Total Pvmt thickness for CBR 2% & 5 msa (as 795 450 250 70 25
per IRC : 37)
Proposed Pvmt combination 790 450 225 75 40
Total Pvmt thickness for CBR 3% & 5 msa (as 690 335 250 60 25
per IRC : 37)
Proposed Pvmt combination 640 300 225 75 40
Total Pvmt thickness for CBR 4% & 5 msa (as 620 285 250 60 25
per IRC : 37)

Proposed Pvmt combination 590 250 225 75 40

Total Pvmt thickness for CBR 5% & 5 msa (as 580 250 250 55 25
per IRC : 37)
Proposed Pvmt combination 590 250 225 75 40

Total Pvmt thickness for CBR 6% & 5 msa (as 535 210 250 50 25
per IRC : 37)

Proposed Pvmt combination 490 150 225 75 40


Total Pvmt thickness for CBR 10% & 5 msa (as 475 150 250 50 25
per IRC : 37)
Proposed Pvmt combination 490 150 225 75 40

Note: - At hard rock stretches provide a levelling course of WBM 100 mm as per Para 6.4.3 of TI No 14

Err:509
Err:509
Err:509

Page 148 of Pavt Design


Appendix ' AO '

DESIGN TRAFFIC
I Present Traffic on B-B-B
Design of daily traffic as per traffic census data collected during apr 2019 at KM 102.00
a) Light commercial Vehicles :- 445 Nos
b) Bus :- 434 Nos
c) Two Axile truck /tanker :- 145 Nos
d) Multi Axil truck /tanker : 134 Nos
e) Car/Taxies/Van/Three wheelers :- 342 Nos
TOTAL 1500 Nos
II Design Treffic
n
a) Using formula is N = 365 X [( 1 + r ) -1] XA X D X F
0.075
WHERE ;-
N = Cumulative number of standard axis
A = Initial traffic in the year of complition
D = Lane distribution factor ( For two lane -0.75 )
F = Vehicle damage factor ( Say 2.50 )
n = Design life in year ( 15 year for NH )
r = Annual growth rate of traffic . ( 7.5% average )
x
b) Using formula is A = X(1+r)
WHERE ;-
A = Initial traffic in the year of complition
P = Number of commercial vehicles at last count 1500 CVD durig 2018
r = Annual growth rate of traffic . ( 7.5% average )
x = Number of year required for completion say 6 years
6
I) A = 1500 x ( 1 + 0.075 )
A = 2314.95
15
ii) N = 365 x [( 1 + 0.075 ) - 1 ] X A X 0.75 X 2.50
0.075
N = 365XAX0.75X(2.96-1 )X2.5
0.075
N = 41402881
N = 41.40288 MSA
SAY N = 41.00 MSA

Err:509
Err:509
Err:509
COMPARATIVE STATEMENT
Fmn works
Sl. No. Job No Name of Work Scope of Cost Cost per Remarks
Work (In Lacs) Km
(Km Eqvt (In Lacs)
Cl-9)

FMN WORKS OF BASOLI-BANI-


BHADEWAH ROAD BETWEEN KM
128.00 TO KM 135.00 (NET LENGTH
1 247/88 7.000 KMs) TO NHDL 24.534 1233 50.26
SPECIFICATIONS (FOR 12.00 MTR
FMN WIDTH)

FMN WORKS OF BASOLI-BANI-


BHADEWAH ROAD BETWEEN KM
102.00 TO KM 126.950 (NET
2 NYA LENGTH 24.950.700 KMs) TO NHDL 18.010 Err:509 Err:509 This AE
SPECIFICATIONS (FOR 10.00 MTR
FMN WIDTH)

Pmt Works(Rs)

PMT WORKS OF BASOLI-BANI-


BHADEWAH ROAD BETWEEN KM
128.00 TO KM 135.00 (NET LENGTH
1 247/88 1143 163
7.000 KMs) TO NHDL
SPECIFICATIONS (FOR 12.00 MTR
FMN WIDTH)
NYA PMT WORKS OF BASOLI-BANI-
BHADEWAH ROAD BETWEEN KM
102.00 TO KM 126.950 (NET
2 LENGTH 26.950 KMs) TO NHDL Err:509 Err:509 This AE
SPECIFICATIONS (FOR 10.00 MTR
FMN WIDTH)

Surf Works(Rs)

SURF WORKS OF BASOLI-BANI-


BHADEWAH ROAD BETWEEN KM
89.00 TO KM 102.00 (NET LENGTH
1 247/91 47.03 2112.33 44.91
7.000 KMs) TO NHDL
SPECIFICATIONS (FOR 12.00 MTR
FMN WIDTH)

SURF WORKS OF BASOLI-BANI-


BHADEWAH ROAD BETWEEN KM
102.00 TO KM 126.950 (NET
LENGTH 26.950 KMs) TO NHDL
2 NYA SPECIFICATIONS (FOR 10.00 MTR 28.16 Err:509 Err:509 This AE
FMN WIDTH)
Appendix ' C'
KM WISE EARTH WORK QUANTITY

S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

ALTITUDE : 2100-2400m
102.000 SMB 45.668 0
1 102.000 102.025 SMB 25 47.175 46.422 0.000 0.000 1160.550 0.000 0.000 0.000 0.000
2 102.025 102.050 SMB 25 70.156 58.666 0.000 0.000 1466.650 0.000 0.000 0.000 0.000
3 102.050 102.075 SMB 25 52.551 61.354 0.000 0.000 1533.850 0.000 0.000 0.000 0.000
4 102.075 102.100 SMB 25 57.73 55.141 0.000 0.000 1378.525 0.000 0.000 0.000 0.000
5 102.100 102.125 SMB 25 39.6 48.665 0.000 0.000 1216.625 0.000 0.000 0.000 0.000
6 102.125 102.150 SMB 25 19.176 29.388 0.000 0.000 734.700 0.000 0.000 0.000 0.000
7 102.150 102.175 SMB 25 13.603 16.390 0.000 0.000 409.750 0.000 0.000 0.000 0.000
8 102.175 102.200 SMB 25 22.062 17.833 0.000 0.000 445.825 0.000 0.000 0.000 0.000
9 102.200 102.225 SMB 25 31.749 26.906 0.000 0.000 672.650 0.000 0.000 0.000 0.000
10 102.225 102.250 SMB 25 5.029 22.79 18.389 11.395 0.000 459.725 0.000 0.000 284.875 0.000
11 102.250 102.275 SMB 25 3.048 27.96 4.039 11.395 13.980 100.975 0.000 0.000 284.875 349.500
12 102.275 102.300 SMB 25 0.331 32.32 1.690 0.000 30.140 42.250 0.000 0.000 0.000 753.500
13 102.300 102.325 SMB 25 9.002 11.43 4.667 0.000 21.875 116.675 0.000 0.000 0.000 546.875
14 102.325 102.350 SMB 25 51.41 4.501 0.000 31.420 112.525 0.000 0.000 0.000 785.500
15 102.350 102.375 SMB 25 65.514 0.000 0.000 58.462 0.000 0.000 0.000 0.000 1461.550
16 102.375 102.400 SMB 25 102.93 0.000 0.000 84.222 0.000 0.000 0.000 0.000 2105.550
17 102.400 102.425 SMB 25 4.619 2.310 0.000 51.465 57.750 0.000 0.000 0.000 1286.625
18 102.425 102.450 HR 25 58.833 31.726 0.000 0.000 0.000 0.000 793.150 0.000 0.000
19 102.450 102.475 SR 25 66.832 62.833 0.000 0.000 0.000 1570.825 0.000 0.000 0.000
20 102.475 102.500 SR 25 64.877 65.855 0.000 0.000 0.000 1646.375 0.000 0.000 0.000
21 102.500 102.525 SR 25 42.234 53.556 0.000 0.000 0.000 1338.900 0.000 0.000 0.000
22 102.525 102.550 SR 25 38.264 40.249 0.000 0.000 0.000 1006.225 0.000 0.000 0.000
23 102.550 102.575 SR 25 31.474 34.869 0.000 0.000 0.000 871.725 0.000 0.000 0.000
24 102.575 102.600 SMB 25 10.768 21.121 0.000 0.000 528.025 0.000 0.000 0.000 0.000
25 102.600 102.625 SMB 25 43.986 27.377 0.000 0.000 684.425 0.000 0.000 0.000 0.000
26 102.625 102.650 SMB 25 92.105 68.046 0.000 0.000 1701.150 0.000 0.000 0.000 0.000
27 102.650 102.675 HR 25 86.087 89.096 0.000 0.000 0.000 0.000 2227.400 0.000 0.000
28 102.675 102.700 SR 25 94.522 90.305 0.000 0.000 0.000 2257.625 0.000 0.000 0.000
29 102.700 102.725 SR 25 85.623 90.073 0.000 0.000 0.000 2251.825 0.000 0.000 0.000
30 102.725 102.750 SMB 25 136.638 111.131 0.000 0.000 2778.275 0.000 0.000 0.000 0.000
31 102.750 102.775 HR 25 115.162 125.900 0.000 0.000 0.000 0.000 3147.500 0.000 0.000
32 102.775 102.800 HR 25 119.705 117.434 0.000 0.000 0.000 0.000 2935.850 0.000 0.000
33 102.800 102.825 HR 25 128.651 124.178 0.000 0.000 0.000 0.000 3104.450 0.000 0.000
34 102.825 102.850 SMB 25 180.424 154.538 0.000 0.000 3863.450 0.000 0.000 0.000 0.000
35 102.850 102.875 HR 25 169.602 175.013 0.000 0.000 0.000 0.000 4375.325 0.000 0.000
36 102.875 102.900 HR 25 158.817 164.210 0.000 0.000 0.000 0.000 4105.250 0.000 0.000

Page 151 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

37 102.900 102.925 HR 25 146.056 152.437 0.000 0.000 0.000 0.000 3810.925 0.000 0.000
38 102.925 102.950 HR 25 123.36 134.708 0.000 0.000 0.000 0.000 3367.700 0.000 0.000
39 102.950 102.975 HR 25 92.781 108.071 0.000 0.000 0.000 0.000 2701.775 0.000 0.000
40 102.975 103.000 HR 25 60.457 76.619 0.000 0.000 0.000 0.000 1915.475 0.000 0.000
Total Km 102.00 to 103.000 19464.35 10943.50 32484.80 569.75 7289.10
41 103.000 103.025 HR 25 17.552 1.999 39.005 1.000 0.000 0.000 0.000 975.125 25.000 0.000
42 103.025 103.050 HR 25 48.472 4.981 33.012 3.490 0.000 0.000 0.000 825.300 87.250 0.000
43 103.050 103.075 HR 25 40.651 44.562 2.491 0.000 0.000 0.000 1114.050 62.275 0.000
44 103.075 103.100 HR 25 42.017 0 41.334 0.000 0.000 0.000 0.000 1033.350 0.000 0.000
45 103.100 103.125 HR 25 40.928 41.473 0.000 0.000 0.000 0.000 1036.825 0.000 0.000
46 103.125 103.150 HR 25 11.898 26.413 0.000 0.000 0.000 0.000 660.325 0.000 0.000
47 103.150 103.175 HR 25 19.422 15.660 0.000 0.000 0.000 0.000 391.500 0.000 0.000
48 103.175 103.200 HR 25 21.468 20.445 0.000 0.000 0.000 0.000 511.125 0.000 0.000
49 103.200 103.225 SMB 25 117.716 69.592 0.000 0.000 1739.800 0.000 0.000 0.000 0.000
50 103.225 103.250 SMB 25 121.051 119.384 0.000 0.000 2984.600 0.000 0.000 0.000 0.000
51 103.250 103.275 SR 25 59.961 90.506 0.000 0.000 0.000 2262.650 0.000 0.000 0.000
52 103.275 103.300 SR 25 94.526 77.244 0.000 0.000 0.000 1931.100 0.000 0.000 0.000
53 103.300 103.325 SMB 25 166.298 130.412 0.000 0.000 3260.300 0.000 0.000 0.000 0.000
54 103.325 103.350 SMB 25 289.669 227.984 0.000 0.000 5699.600 0.000 0.000 0.000 0.000
55 103.350 103.375 SMB 25 96.469 193.069 0.000 0.000 4826.725 0.000 0.000 0.000 0.000
56 103.375 103.400 SMB 25 240.262 168.366 0.000 0.000 4209.150 0.000 0.000 0.000 0.000
57 103.400 103.425 SMB 25 261.416 250.839 0.000 0.000 6270.975 0.000 0.000 0.000 0.000
58 103.425 103.450 SMB 25 177.568 219.492 0.000 0.000 5487.300 0.000 0.000 0.000 0.000
59 103.450 103.475 SMB 25 407.739 292.654 0.000 0.000 7316.350 0.000 0.000 0.000 0.000
60 103.475 103.500 SMB 25 330.883 369.311 0.000 0.000 9232.775 0.000 0.000 0.000 0.000
61 103.500 103.525 SMB 25 333.251 332.067 0.000 0.000 8301.675 0.000 0.000 0.000 0.000
62 103.525 103.550 SMB 25 335.956 334.604 0.000 0.000 8365.100 0.000 0.000 0.000 0.000
63 103.550 103.575 SMB 25 256.809 296.383 0.000 0.000 7409.575 0.000 0.000 0.000 0.000
64 103.575 103.600 SMB 25 192.011 224.410 0.000 0.000 5610.250 0.000 0.000 0.000 0.000
65 103.600 103.625 SMB 25 67.592 129.802 0.000 0.000 3245.050 0.000 0.000 0.000 0.000
66 103.625 103.650 SMB 25 46.342 56.967 0.000 0.000 1424.175 0.000 0.000 0.000 0.000
67 103.650 103.675 HR 25 34.543 40.443 0.000 0.000 0.000 0.000 1011.075 0.000 0.000
68 103.675 103.700 HR 25 16.931 25.737 0.000 0.000 0.000 0.000 643.425 0.000 0.000
69 103.700 103.725 HR 25 42.147 29.539 0.000 0.000 0.000 0.000 738.475 0.000 0.000
70 103.725 103.750 HR 25 58.805 50.476 0.000 0.000 0.000 0.000 1261.900 0.000 0.000
71 103.750 103.775 HR 25 47.784 53.295 0.000 0.000 0.000 0.000 1332.375 0.000 0.000
72 103.775 103.800 HR 25 46.749 7.48 47.267 3.740 0.000 0.000 0.000 1181.675 93.500 0.000
73 103.800 103.825 HR 25 61.666 54.208 3.740 0.000 0.000 0.000 1355.200 93.500 0.000
74 103.825 103.850 HR 25 58.002 59.834 0.000 0.000 0.000 0.000 1495.850 0.000 0.000
75 103.850 103.875 HR 25 47.891 52.947 0.000 0.000 0.000 0.000 1323.675 0.000 0.000
76 103.875 103.900 HR 25 59.733 53.812 0.000 0.000 0.000 0.000 1345.300 0.000 0.000

Page 152 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

77 103.900 103.925 HR 25 42.186 50.960 0.000 0.000 0.000 0.000 1274.000 0.000 0.000
78 103.925 103.950 HR 25 32.399 1.31 37.293 0.655 0.000 0.000 0.000 932.325 16.375 0.000
79 103.950 103.975 HR 25 51.287 41.843 0.655 0.000 0.000 0.000 1046.075 16.375 0.000
80 103.975 104.000 HR 25 21.699 36.493 0.000 0.000 0.000 0.000 912.325 0.000 0.000
Total Km 103.000 to 104.000 85383.40 4193.75 22401.28 394.28 0.00
81 104.000 104.025 HR 25 16.217 0.823 18.958 0.412 0.000 0.000 0.000 473.950 10.300 0.000
82 104.025 104.050 HR 25 14.88 1.38 15.549 1.102 0.000 0.000 0.000 388.725 27.550 0.000
83 104.050 104.075 HR 25 47.589 0.13 31.235 0.755 0.000 0.000 0.000 780.875 18.875 0.000
84 104.075 104.100 HR 25 40.452 44.021 0.065 0.000 0.000 0.000 1100.525 1.625 0.000
85 104.100 104.125 HR 25 10.846 25.649 0.000 0.000 0.000 0.000 641.225 0.000 0.000
86 104.125 104.150 HR 25 19.418 15.132 0.000 0.000 0.000 0.000 378.300 0.000 0.000
87 104.150 104.175 HR 25 15.924 17.671 0.000 0.000 0.000 0.000 441.775 0.000 0.000
88 104.175 104.200 HR 25 12.507 14.216 0.000 0.000 0.000 0.000 355.400 0.000 0.000
89 104.200 104.225 HR 25 6.874 9.691 0.000 0.000 0.000 0.000 242.275 0.000 0.000
90 104.225 104.250 HR 25 23.906 15.390 0.000 0.000 0.000 0.000 384.750 0.000 0.000
91 104.250 104.275 HR 25 20.981 22.444 0.000 0.000 0.000 0.000 561.100 0.000 0.000
92 104.275 104.300 HR 25 24.923 22.952 0.000 0.000 0.000 0.000 573.800 0.000 0.000
93 104.300 104.325 HR 25 33.287 29.105 0.000 0.000 0.000 0.000 727.625 0.000 0.000
94 104.325 104.350 HR 25 45.431 39.359 0.000 0.000 0.000 0.000 983.975 0.000 0.000
95 104.350 104.375 HR 25 14.849 6.743 30.140 3.372 0.000 0.000 0.000 753.500 84.300 0.000
96 104.375 104.400 HR 25 31.845 3.846 23.347 5.295 0.000 0.000 0.000 583.675 132.375 0.000
97 104.400 104.425 HR 25 29.565 5.833 30.705 4.840 0.000 0.000 0.000 767.625 121.000 0.000
98 104.425 104.450 HR 25 20.5 5.891 25.033 5.862 0.000 0.000 0.000 625.825 146.550 0.000
99 104.450 104.475 HR 25 9.041 11.034 14.771 8.463 0.000 0.000 0.000 369.275 211.575 0.000
100 104.475 104.500 HR 25 15.458 6.867 12.250 8.951 0.000 0.000 0.000 306.250 223.775 0.000
101 104.500 104.525 HR 25 6.718 11.406 11.088 3.434 5.703 0.000 0.000 277.200 85.850 142.575
102 104.525 104.550 HR 25 7.398 5.834 7.058 2.917 5.703 0.000 0.000 176.450 72.925 142.575
103 104.550 104.575 HR 25 10.935 11.89 9.167 2.917 5.945 0.000 0.000 229.175 72.925 148.625
104 104.575 104.600 HR 25 13.524 5.088 12.230 2.544 5.945 0.000 0.000 305.750 63.600 148.625
105 104.600 104.625 HR 25 13.332 10.36 13.428 7.724 0.000 0.000 0.000 335.700 193.100 0.000
106 104.625 104.650 HR 25 6.828 19.37 10.080 5.180 9.685 0.000 0.000 252.000 129.500 242.125
107 104.650 104.675 HR 25 3.056 25.93 4.942 0.000 22.650 0.000 0.000 123.550 0.000 566.250
108 104.675 104.700 HR 25 8.745 28.453 5.901 0.000 27.192 0.000 0.000 147.525 0.000 679.800
109 104.700 104.725 HR 25 9.775 28.551 9.260 0.000 28.502 0.000 0.000 231.500 0.000 712.550
110 104.725 104.750 HR 25 2.286 33.239 6.031 0.000 30.895 0.000 0.000 150.775 0.000 772.375
111 104.750 104.775 HR 25 2.646 43.97 2.466 0.000 38.605 0.000 0.000 61.650 0.000 965.125
112 104.775 104.800 HR 25 12.18 34.374 7.413 0.000 39.172 0.000 0.000 185.325 0.000 979.300
113 104.800 104.825 HR 25 6.54 30.05 9.360 0.000 32.212 0.000 0.000 234.000 0.000 805.300
114 104.825 104.850 HR 25 13.323 24.02 9.932 0.000 27.035 0.000 0.000 248.300 0.000 675.875
115 104.850 104.875 HR 25 6.721 13.84 10.022 0.000 18.930 0.000 0.000 250.550 0.000 473.250
116 104.875 104.900 SMB 25 12.506 5.8 9.614 2.900 6.920 240.350 0.000 0.000 72.500 173.000

Page 153 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

117 104.900 104.925 HR 25 9.515 3.49 11.011 4.645 0.000 0.000 0.000 275.275 116.125 0.000
118 104.925 104.950 SMB 25 5.059 4.48 7.287 3.985 0.000 182.175 0.000 0.000 99.625 0.000
119 104.950 104.975 SMB 25 0.024 9.09 2.542 6.785 0.000 63.550 0.000 0.000 169.625 0.000
120 104.975 105.000 SMB 25 57.301 0.337 28.663 4.714 0.000 716.575 0.000 0.000 117.850 0.000
Total Km 104.000 to 105.000 1202.65 0.00 14925.18 2171.55 7627.35
121 105.000 105.025 SMB 25 59.129 0.31 58.215 0.155 0.324 1455.375 0.000 0.000 3.875 8.100
122 105.025 105.050 SMB 25 57.955 58.542 0.155 0.000 1463.550 0.000 0.000 3.875 0.000
123 105.050 105.075 HR 25 51.214 54.585 0.000 0.000 0.000 0.000 1364.625 0.000 0.000
124 105.075 105.100 HR 25 41.437 46.326 0.000 0.000 0.000 0.000 1158.150 0.000 0.000
125 105.100 105.125 HR 25 37.726 39.582 0.000 0.000 0.000 0.000 989.550 0.000 0.000
126 105.125 105.150 HR 25 26.229 31.978 0.000 0.000 0.000 0.000 799.450 0.000 0.000
127 105.150 105.175 HR 25 59.385 42.807 0.000 0.000 0.000 0.000 1070.175 0.000 0.000
128 105.175 105.200 HR 25 56.739 58.062 0.000 0.000 0.000 0.000 1451.550 0.000 0.000
129 105.200 105.225 HR 25 61.162 58.951 0.000 0.000 0.000 0.000 1473.775 0.000 0.000
130 105.225 105.250 HR 25 64.797 62.980 0.000 0.000 0.000 0.000 1574.500 0.000 0.000
131 105.250 105.275 HR 25 26.892 45.845 0.000 0.000 0.000 0.000 1146.125 0.000 0.000
132 105.275 105.300 HR 25 66.339 46.616 0.000 0.000 0.000 0.000 1165.400 0.000 0.000
133 105.300 105.325 HR 25 62.836 64.588 0.000 0.000 0.000 0.000 1614.700 0.000 0.000
134 105.325 105.350 HR 25 62.365 62.601 0.000 0.000 0.000 0.000 1565.025 0.000 0.000
135 105.350 105.375 HR 25 78.669 70.517 0.000 0.000 0.000 0.000 1762.925 0.000 0.000
136 105.375 105.400 HR 25 88.606 83.638 0.000 0.000 0.000 0.000 2090.950 0.000 0.000
137 105.400 105.425 HR 25 87.742 88.174 0.000 0.000 0.000 0.000 2204.350 0.000 0.000
138 105.425 105.450 SMB 25 168.347 128.045 0.000 0.000 3201.125 0.000 0.000 0.000 0.000
139 105.450 105.475 SMB 25 156.667 162.507 0.000 0.000 4062.675 0.000 0.000 0.000 0.000
140 105.475 105.500 SMB 25 155.354 156.011 0.000 0.000 3900.275 0.000 0.000 0.000 0.000
141 105.500 105.525 HR 25 102.668 129.011 0.000 0.000 0.000 0.000 3225.275 0.000 0.000
142 105.525 105.550 HR 25 99.293 100.981 0.000 0.000 0.000 0.000 2524.525 0.000 0.000
143 105.550 105.575 SR 25 111.047 105.170 0.000 0.000 0.000 2629.250 0.000 0.000 0.000
144 105.575 105.600 SR 25 135.637 123.342 0.000 0.000 0.000 3083.550 0.000 0.000 0.000
145 105.600 105.625 HR 25 132.442 134.040 0.000 0.000 0.000 0.000 3351.000 0.000 0.000
146 105.625 105.650 HR 25 148.904 140.673 0.000 0.000 0.000 0.000 3516.825 0.000 0.000
147 105.650 105.675 HR 25 152.48 150.692 0.000 0.000 0.000 0.000 3767.300 0.000 0.000
148 105.675 105.700 HR 25 162.412 157.446 0.000 0.000 0.000 0.000 3936.150 0.000 0.000
149 105.700 105.725 SMB 25 228.186 195.299 0.000 0.000 4882.475 0.000 0.000 0.000 0.000
150 105.725 105.750 SMB 25 250.436 239.311 0.000 0.000 5982.775 0.000 0.000 0.000 0.000
151 105.750 105.775 SMB 25 231.983 241.210 0.000 0.000 6030.250 0.000 0.000 0.000 0.000
152 105.775 105.800 SMB 25 247.404 239.694 0.000 0.000 5992.350 0.000 0.000 0.000 0.000
153 105.800 105.825 SMB 25 243.31 245.357 0.000 0.000 6133.925 0.000 0.000 0.000 0.000
154 105.825 105.850 SMB 25 233.83 238.570 0.000 0.000 5964.250 0.000 0.000 0.000 0.000
155 105.850 105.875 SMB 25 235.936 234.883 0.000 0.000 5872.075 0.000 0.000 0.000 0.000
156 105.875 105.900 HR 25 168.531 202.234 0.000 0.000 0.000 0.000 5055.850 0.000 0.000

Page 154 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

157 105.900 105.925 HR 25 164.767 166.649 0.000 0.000 0.000 0.000 4166.225 0.000 0.000
158 105.925 105.950 HR 25 172.506 168.637 0.000 0.000 0.000 0.000 4215.925 0.000 0.000
159 105.950 105.975 SMB 25 255.08 213.793 0.000 0.000 5344.825 0.000 0.000 0.000 0.000
160 105.975 106.000 SMB 25 307.587 281.334 0.000 0.000 7033.350 0.000 0.000 0.000 0.000
Total Km 105.000 to 106.000 67319.28 5712.80 55190.33 7.75 8.10
161 106.000 106.025 SMB 25 349.086 328.337 0.000 0.000 8208.425 0.000 0.000 0.000 0.000
162 106.025 106.050 SMB 25 384.852 366.969 0.000 0.000 9174.225 0.000 0.000 0.000 0.000
163 106.050 106.075 SMB 25 360.419 372.636 0.000 0.000 9315.900 0.000 0.000 0.000 0.000
164 106.075 106.100 SMB 25 206.639 283.529 0.000 0.000 7088.225 0.000 0.000 0.000 0.000
165 106.100 106.125 SMB 25 157.781 182.210 0.000 0.000 4555.250 0.000 0.000 0.000 0.000
166 106.125 106.150 SMB 25 124.011 140.896 0.000 0.000 3522.400 0.000 0.000 0.000 0.000
167 106.150 106.175 SMB 25 123.854 140.896 0.000 0.000 3522.400 0.000 0.000 0.000 0.000
168 106.175 106.200 SMB 25 135.793 123.933 0.000 0.000 3098.325 0.000 0.000 0.000 0.000
169 106.200 106.225 SMB 25 136.418 130.136 0.000 0.000 3253.400 0.000 0.000 0.000 0.000
170 106.225 106.250 SMB 25 108.242 122.330 0.000 0.000 3058.250 0.000 0.000 0.000 0.000
171 106.250 106.275 SMB 25 108.242 108.242 0.000 0.000 2706.050 0.000 0.000 0.000 0.000
172 106.275 106.300 SMB 25 125.884 117.063 0.000 0.000 2926.575 0.000 0.000 0.000 0.000
173 106.300 106.325 SMB 25 124.254 125.069 0.000 0.000 3126.725 0.000 0.000 0.000 0.000
174 106.325 106.350 SMB 25 66.263 95.259 0.000 0.000 2381.475 0.000 0.000 0.000 0.000
175 106.350 106.375 HR 25 61.164 63.714 0.000 0.000 0.000 0.000 1592.850 0.000 0.000
176 106.375 106.400 HR 25 131.395 96.280 0.000 0.000 0.000 0.000 2407.000 0.000 0.000
177 106.400 106.425 HR 25 76.336 103.866 0.000 0.000 0.000 0.000 2596.650 0.000 0.000
178 106.425 106.450 HR 25 64.681 70.509 0.000 0.000 0.000 0.000 1762.725 0.000 0.000
179 106.450 106.475 SMB 25 126.588 95.635 0.000 0.000 2390.875 0.000 0.000 0.000 0.000
180 106.475 106.500 SMB 25 143.396 134.992 0.000 0.000 3374.800 0.000 0.000 0.000 0.000
181 106.500 106.525 SMB 25 137.895 140.646 0.000 0.000 3516.150 0.000 0.000 0.000 0.000
182 106.525 106.550 HR 25 102.388 120.142 0.000 0.000 0.000 0.000 3003.550 0.000 0.000
183 106.550 106.575 HR 25 116.732 109.560 0.000 0.000 0.000 0.000 2739.000 0.000 0.000
184 106.575 106.600 HR 25 144.595 130.664 0.000 0.000 0.000 0.000 3266.600 0.000 0.000
185 106.600 106.625 HR 25 153.441 149.018 0.000 0.000 0.000 0.000 3725.450 0.000 0.000
186 106.625 106.650 HR 25 170.662 162.052 0.000 0.000 0.000 0.000 4051.300 0.000 0.000
187 106.650 106.675 HR 25 161.631 166.147 0.000 0.000 0.000 0.000 4153.675 0.000 0.000
188 106.675 106.700 SMB 25 327.705 244.668 0.000 0.000 6116.700 0.000 0.000 0.000 0.000
189 106.700 106.725 SMB 25 262.124 294.915 0.000 0.000 7372.875 0.000 0.000 0.000 0.000
190 106.725 106.750 SMB 25 279.393 270.759 0.000 0.000 6768.975 0.000 0.000 0.000 0.000
191 106.750 106.775 SMB 25 255.59 267.492 0.000 0.000 6687.300 0.000 0.000 0.000 0.000
192 106.775 106.800 SR 25 183.944 219.767 0.000 0.000 0.000 5494.175 0.000 0.000 0.000
193 106.800 106.825 SR 25 225.913 204.929 0.000 0.000 0.000 5123.225 0.000 0.000 0.000
194 106.825 106.850 SMB 25 379.906 302.910 0.000 0.000 7572.750 0.000 0.000 0.000 0.000
195 106.850 106.875 SMB 25 410.374 395.140 0.000 0.000 9878.500 0.000 0.000 0.000 0.000
196 106.875 106.900 HR 25 221.781 316.078 0.000 0.000 0.000 0.000 7901.950 0.000 0.000

Page 155 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

197 106.900 106.925 HR 25 215.084 218.433 0.000 0.000 0.000 0.000 5460.825 0.000 0.000
198 106.925 106.950 SR 25 244.807 229.946 0.000 0.000 0.000 5748.650 0.000 0.000 0.000
199 106.950 106.975 SR 25 261.178 252.993 0.000 0.000 0.000 6324.825 0.000 0.000 0.000
200 106.975 107.000 SR 25 260.663 260.921 0.000 0.000 0.000 6523.025 0.000 0.000 0.000
Total Km 106.000 to 107.000 119616.55 29213.90 42661.58 0.00 0.00
201 107.000 107.025 SMB 25 165.17 212.917 0.000 0.000 5322.925 0.000 0.000 0.000 0.000
202 107.025 107.050 SMB 25 8.779 86.975 0.000 0.000 2174.375 0.000 0.000 0.000 0.000
203 107.050 107.075 SR 25 40.466 24.623 0.000 0.000 0.000 615.575 0.000 0.000 0.000
204 107.075 107.100 SR 25 51.512 45.989 0.000 0.000 0.000 1149.725 0.000 0.000 0.000
205 107.100 107.125 SR 25 39.88 45.696 0.000 0.000 0.000 1142.400 0.000 0.000 0.000
206 107.125 107.150 SR 25 43.802 41.841 0.000 0.000 0.000 1046.025 0.000 0.000 0.000
207 107.150 107.175 SR 25 37.792 40.797 0.000 0.000 0.000 1019.925 0.000 0.000 0.000
208 107.175 107.200 SR 25 47.314 42.553 0.000 0.000 0.000 1063.825 0.000 0.000 0.000
209 107.200 107.225 HR 25 38.336 42.825 0.000 0.000 0.000 0.000 1070.625 0.000 0.000
210 107.225 107.250 HR 25 44.091 41.214 0.000 0.000 0.000 0.000 1030.350 0.000 0.000
211 107.250 107.275 HR 25 39.32 41.706 0.000 0.000 0.000 0.000 1042.650 0.000 0.000
212 107.275 107.300 HR 25 51.359 45.340 0.000 0.000 0.000 0.000 1133.500 0.000 0.000
213 107.300 107.325 HR 25 53.152 52.256 0.000 0.000 0.000 0.000 1306.400 0.000 0.000
214 107.325 107.350 HR 25 52.104 52.628 0.000 0.000 0.000 0.000 1315.700 0.000 0.000
215 107.350 107.375 HR 25 48.065 50.085 0.000 0.000 0.000 0.000 1252.125 0.000 0.000
216 107.375 107.400 SMB 25 88.182 68.124 0.000 0.000 1703.100 0.000 0.000 0.000 0.000
217 107.400 107.425 SMB 25 71.624 79.903 0.000 0.000 1997.575 0.000 0.000 0.000 0.000
218 107.425 107.450 HR 25 54.97 63.297 0.000 0.000 0.000 0.000 1582.425 0.000 0.000
219 107.450 107.475 HR 25 23.312 39.141 0.000 0.000 0.000 0.000 978.525 0.000 0.000
220 107.475 107.500 HR 25 37.956 30.634 0.000 0.000 0.000 0.000 765.850 0.000 0.000
221 107.500 107.525 HR 25 25.594 31.775 0.000 0.000 0.000 0.000 794.375 0.000 0.000
222 107.525 107.550 HR 25 26.546 26.070 0.000 0.000 0.000 0.000 651.750 0.000 0.000
223 107.550 107.575 HR 25 26.11 26.328 0.000 0.000 0.000 0.000 658.200 0.000 0.000
224 107.575 107.600 HR 25 40.618 33.364 0.000 0.000 0.000 0.000 834.100 0.000 0.000
225 107.600 107.625 HR 25 22.711 31.665 0.000 0.000 0.000 0.000 791.625 0.000 0.000
226 107.625 107.650 HR 25 21.127 21.919 0.000 0.000 0.000 0.000 547.975 0.000 0.000
227 107.650 107.675 HR 25 17.682 19.405 0.000 0.000 0.000 0.000 485.125 0.000 0.000
228 107.675 107.700 HR 25 16.139 0.155 16.911 0.078 0.000 0.000 0.000 422.775 1.950 0.000
229 107.700 107.725 SMB 25 3.957 2.54 10.048 1.348 0.000 251.200 0.000 0.000 33.700 0.000
230 107.725 107.750 SMB 25 3.948 4.25 3.953 3.395 0.000 98.825 0.000 0.000 84.875 0.000
231 107.750 107.775 SMB 25 0.2 24.599 2.074 2.125 12.300 51.850 0.000 0.000 53.125 307.500
232 107.775 107.800 SMB 25 5.218 6.47 2.709 3.235 12.300 67.725 0.000 0.000 80.875 307.500
233 107.800 107.825 HR 25 4.817 2.48 5.018 4.475 0.000 0.000 0.000 125.450 111.875 0.000
234 107.825 107.850 HR 25 12.781 8.799 1.240 0.000 0.000 0.000 219.975 31.000 0.000
235 107.850 107.875 HR 25 23.952 18.367 0.000 0.000 0.000 0.000 459.175 0.000 0.000
236 107.875 107.900 HR 25 20.273 22.113 0.000 0.000 0.000 0.000 552.825 0.000 0.000

Page 156 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

237 107.900 107.925 HR 25 17.465 18.869 0.000 0.000 0.000 0.000 471.725 0.000 0.000
238 107.925 107.950 HR 25 17.869 2.37 17.667 1.185 0.000 0.000 0.000 441.675 29.625 0.000
239 107.950 107.975 SMB 25 9.551 3.86 13.710 3.115 0.000 342.750 0.000 0.000 77.875 0.000
240 107.975 108.000 SMB 25 31.787 20.669 1.930 0.000 516.725 0.000 0.000 48.250 0.000
Total Km 107.000 to 108.000 12527.05 6037.48 18934.90 553.15 615.00
241 108.000 108.025 HR 25 7.989 1.01 19.888 0.505 0.000 0.000 0.000 497.200 12.625 0.000
242 108.025 108.050 HR 25 12.591 0.113 10.290 0.562 0.000 0.000 0.000 257.250 14.050 0.000
Total Km 108.00 to 108.050 0.000 0.000 754.450 26.675 0.000
Total Km 102.00 to 108.050 305513.275 56101.425 187352.500 3723.150 15539.550
ALTITUDE : 2401-2700m
243 108.050 108.075 HR 25 12.092 12.342 0.057 0.000 0.000 0.000 308.550 1.425 0.000
244 108.075 108.100 HR 25 19.346 0.952 15.719 0.476 0.000 0.000 0.000 392.975 11.900 0.000
245 108.100 108.125 HR 25 22.791 2.78 21.069 1.866 0.000 0.000 0.000 526.725 46.650 0.000
246 108.125 108.150 SMB 25 23.471 4.1 23.131 3.440 0.000 578.275 578.275 578.275 86.000 0.000
247 108.150 108.175 HR 25 10.476 4.86 16.974 4.480 0.000 0.000 0.000 424.350 112.000 0.000
248 108.175 108.200 HR 25 19.31 0.15 14.893 2.505 0.000 0.000 0.000 372.325 62.625 0.000
249 108.200 108.225 HR 25 11.458 15.384 0.075 0.000 0.000 0.000 384.600 1.875 0.000
250 108.225 108.250 SMB 25 46.867 29.163 0.000 0.000 729.075 0.000 0.000 0.000 0.000
251 108.250 108.275 SMB 25 38.973 1.55 42.920 0.775 0.000 1073.000 0.000 0.000 19.375 0.000
252 108.275 108.300 SMB 25 19.057 0.07 29.015 0.810 0.000 725.375 0.000 0.000 20.250 0.000

Page 157 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

253 108.300 108.325 HR 25 11.274 3.49 15.166 1.780 0.000 0.000 0.000 379.150 44.500 0.000
254 108.325 108.350 HR 25 16.972 4.3 14.123 3.895 0.000 0.000 0.000 353.075 97.375 0.000
255 108.350 108.375 HR 25 9.653 1.99 13.313 3.145 0.000 0.000 0.000 332.825 78.625 0.000
256 108.375 108.400 HR 25 31.52 20.587 0.995 0.000 0.000 0.000 514.675 24.875 0.000
257 108.400 108.425 HR 25 48.647 40.084 0.000 0.000 0.000 0.000 1002.100 0.000 0.000
258 108.425 108.450 HR 25 52.627 50.637 0.000 0.000 0.000 0.000 1265.925 0.000 0.000
259 108.450 108.475 HR 25 47.672 50.150 0.000 0.000 0.000 0.000 1253.750 0.000 0.000
260 108.475 108.500 HR 25 65.272 56.472 0.000 0.000 0.000 0.000 1411.800 0.000 0.000
261 108.500 108.525 HR 25 71.611 68.442 0.000 0.000 0.000 0.000 1711.050 0.000 0.000
262 108.525 108.550 HR 25 83.707 77.659 0.000 0.000 0.000 0.000 1941.475 0.000 0.000
263 108.550 108.575 HR 25 99.782 91.745 0.000 0.000 0.000 0.000 2293.625 0.000 0.000
264 108.575 108.600 HR 25 106.011 102.897 0.000 0.000 0.000 0.000 2572.425 0.000 0.000
265 108.600 108.625 HR 25 93.585 99.798 0.000 0.000 0.000 0.000 2494.950 0.000 0.000
266 108.625 108.650 HR 25 101.337 97.461 0.000 0.000 0.000 0.000 2436.525 0.000 0.000
267 108.650 108.675 HR 25 80.985 91.161 0.000 0.000 0.000 0.000 2279.025 0.000 0.000
268 108.675 108.700 HR 25 86.536 83.761 0.000 0.000 0.000 0.000 2094.025 0.000 0.000
269 108.700 108.725 HR 25 74.378 80.457 0.000 0.000 0.000 0.000 2011.425 0.000 0.000
270 108.725 108.750 HR 25 82.501 78.440 0.000 0.000 0.000 0.000 1961.000 0.000 0.000
271 108.750 108.775 SMB 25 145.399 113.950 0.000 0.000 2848.750 0.000 0.000 0.000 0.000
272 108.775 108.800 SMB 25 164.787 155.093 0.000 0.000 3877.325 0.000 0.000 0.000 0.000
273 108.800 108.825 SMB 25 196.82 180.804 0.000 0.000 4520.100 0.000 0.000 0.000 0.000
274 108.825 108.850 HR 25 137.252 167.036 0.000 0.000 0.000 0.000 4175.900 0.000 0.000
275 108.850 108.875 HR 25 128.114 132.683 0.000 0.000 0.000 0.000 3317.075 0.000 0.000
276 108.875 108.900 HR 25 158.65 143.382 0.000 0.000 0.000 0.000 3584.550 0.000 0.000
277 108.900 108.925 HR 25 157.323 157.987 0.000 0.000 0.000 0.000 3949.675 0.000 0.000
278 108.925 108.950 HR 25 160.974 159.149 0.000 0.000 0.000 0.000 3978.725 0.000 0.000
279 108.950 108.975 HR 25 127.368 144.171 0.000 0.000 0.000 0.000 3604.275 0.000 0.000
280 108.975 109.000 HR 25 135.754 131.561 0.000 0.000 0.000 0.000 3289.025 0.000 0.000
Total Km 108.050 to 109.000 14351.90 578.28 57195.85 607.48 0.00
281 109.000 109.025 HR 25 27.048 2.78 81.401 1.390 0.000 0.000 0.000 2035.025 34.750 0.000
282 109.025 109.050 HR 25 17.845 5.97 22.447 4.375 0.000 0.000 0.000 561.175 109.375 0.000
283 109.050 109.075 HR 25 12.835 15.64 15.340 2.985 7.820 0.000 0.000 383.500 74.625 195.500
284 109.075 109.100 HR 25 15.181 12.43 14.008 0.000 14.035 0.000 0.000 350.200 0.000 350.875
285 109.100 109.125 SMB 25 11.794 17.58 13.488 0.000 15.005 337.200 0.000 0.000 0.000 375.125
286 109.125 109.150 SMB 25 5.66 19.85 8.727 0.000 18.715 218.175 0.000 0.000 0.000 467.875
287 109.150 109.175 SMB 25 8.205 16.36 6.933 0.000 18.105 173.325 0.000 0.000 0.000 452.625
288 109.175 109.200 SMB 25 15.596 13.37 11.901 0.000 14.865 297.525 0.000 0.000 0.000 371.625
289 109.200 109.225 SMB 25 2.125 17.91 8.861 0.000 15.640 221.525 0.000 0.000 0.000 391.000
290 109.225 109.250 SMB 25 25.376 11.75 13.751 0.000 14.830 343.775 0.000 0.000 0.000 370.750
291 109.250 109.275 SMB 25 8.792 15.16 17.084 0.000 13.455 427.100 0.000 0.000 0.000 336.375

Page 158 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

292 109.275 109.300 SMB 25 21.507 6.42 15.150 3.210 7.580 378.750 0.000 0.000 80.250 189.500
293 109.300 109.325 SMB 25 13.229 6.51 17.368 6.465 0.000 434.200 0.000 0.000 161.625 0.000
294 109.325 109.350 SMB 25 3.926 8.04 8.578 7.275 0.000 214.450 0.000 0.000 181.875 0.000
295 109.350 109.375 SMB 25 11.641 6.01 7.784 7.025 0.000 194.600 0.000 0.000 175.625 0.000
296 109.375 109.400 SMB 25 29.099 0.225 20.370 3.118 0.000 509.250 0.000 0.000 77.950 0.000
297 109.400 109.425 SMB 25 24.014 1.4 26.557 0.813 0.000 663.925 0.000 0.000 20.325 0.000
298 109.425 109.450 SMB 25 11.968 3.05 17.991 2.225 0.000 449.775 0.000 0.000 55.625 0.000
299 109.450 109.475 SMB 25 44.885 0.03 28.427 1.540 0.000 710.675 0.000 0.000 38.500 0.000
300 109.475 109.500 HR 25 33.362 39.124 0.015 0.000 0.000 0.000 978.100 0.375 0.000
301 109.500 109.525 HR 25 32.062 32.712 0.000 0.000 0.000 0.000 817.800 0.000 0.000
302 109.525 109.550 HR 25 43.294 37.678 0.000 0.000 0.000 0.000 941.950 0.000 0.000
303 109.550 109.575 HR 25 28.3 35.797 0.000 0.000 0.000 0.000 894.925 0.000 0.000
304 109.575 109.600 HR 25 30.404 29.352 0.000 0.000 0.000 0.000 733.800 0.000 0.000
305 109.600 109.625 HR 25 31.607 31.006 0.000 0.000 0.000 0.000 775.150 0.000 0.000
306 109.625 109.650 HR 25 32.359 31.983 0.000 0.000 0.000 0.000 799.575 0.000 0.000
307 109.650 109.675 HR 25 25.53 28.945 0.000 0.000 0.000 0.000 723.625 0.000 0.000
308 109.675 109.700 HR 25 38.831 32.181 0.000 0.000 0.000 0.000 804.525 0.000 0.000
309 109.700 109.725 SMB 25 58.566 48.699 0.000 0.000 1217.475 0.000 0.000 0.000 0.000
310 109.725 109.750 HR 25 47.187 52.877 0.000 0.000 0.000 0.000 1321.925 0.000 0.000
311 109.750 109.775 HR 25 44.127 45.657 0.000 0.000 0.000 0.000 1141.425 0.000 0.000
312 109.775 109.800 HR 25 37.501 40.814 0.000 0.000 0.000 0.000 1020.350 0.000 0.000
313 109.800 109.825 HR 25 33.726 35.614 0.000 0.000 0.000 0.000 890.350 0.000 0.000
314 109.825 109.850 HR 25 27.322 30.524 0.000 0.000 0.000 0.000 763.100 0.000 0.000
315 109.850 109.875 HR 25 29.861 28.592 0.000 0.000 0.000 0.000 714.800 0.000 0.000
316 109.875 109.900 HR 25 26.596 28.229 0.000 0.000 0.000 0.000 705.725 0.000 0.000
317 109.900 109.925 HR 25 21.807 24.202 0.000 0.000 0.000 0.000 605.050 0.000 0.000
318 109.925 109.950 HR 25 17.004 19.406 0.000 0.000 0.000 0.000 485.150 0.000 0.000
319 109.950 109.975 HR 25 10.009 13.507 0.000 0.000 0.000 0.000 337.675 0.000 0.000
320 109.975 110.000 HR 25 16.44 13.225 0.000 0.000 0.000 0.000 330.625 0.000 0.000
Total Km 109.000 to 110.000 6791.73 0.00 19115.53 1010.90 3501.25
321 110.000 110.025 HR 25 21.53 18.985 0.000 0.000 0.000 0.000 474.625 0.000 0.000
322 110.025 110.050 HR 25 39.47 30.500 0.000 0.000 0.000 0.000 762.500 0.000 0.000
323 110.050 110.075 HR 25 48.03 43.750 0.000 0.000 0.000 0.000 1093.750 0.000 0.000
324 110.075 110.100 HR 25 81.33 64.680 0.000 0.000 0.000 0.000 1617.000 0.000 0.000
325 110.100 110.125 HR 25 94.16 87.745 0.000 0.000 0.000 0.000 2193.625 0.000 0.000
326 110.125 110.150 HR 25 88.29 91.225 0.000 0.000 0.000 0.000 2280.625 0.000 0.000

Page 159 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

327 110.150 110.175 HR 25 83.65 85.970 0.000 0.000 0.000 0.000 2149.250 0.000 0.000
328 110.175 110.200 SMB 25 103.37 93.510 0.000 0.000 2337.750 0.000 0.000 0.000 0.000
329 110.200 110.225 SMB 25 79.55 91.460 0.000 0.000 2286.500 0.000 0.000 0.000 0.000
330 110.225 110.250 SMB 25 73.19 76.370 0.000 0.000 1909.250 0.000 0.000 0.000 0.000
331 110.250 110.275 SMB 25 64.42 68.805 0.000 0.000 1720.125 0.000 0.000 0.000 0.000
332 110.275 110.300 SMB 25 83.09 73.755 0.000 0.000 1843.875 0.000 0.000 0.000 0.000
333 110.300 110.325 SMB 25 91.13 87.110 0.000 0.000 2177.750 0.000 0.000 0.000 0.000
334 110.325 110.350 HR 25 70.42 80.775 0.000 0.000 0.000 0.000 2019.375 0.000 0.000
335 110.350 110.375 SMB 25 99.68 85.050 0.000 0.000 2126.250 0.000 0.000 0.000 0.000
336 110.375 110.400 SMB 25 98.03 98.855 0.000 0.000 2471.375 0.000 0.000 0.000 0.000
337 110.400 110.425 SMB 25 54.82 76.425 0.000 0.000 1910.625 0.000 0.000 0.000 0.000
338 110.425 110.450 SMB 25 33.17 2.19 43.995 1.095 0.000 1099.875 0.000 0.000 27.375 0.000
339 110.450 110.475 SMB 25 23.07 13.34 28.120 1.095 6.670 703.000 0.000 0.000 27.375 166.750
340 110.475 110.500 HR 25 35.98 29.525 0.000 6.670 0.000 0.000 738.125 0.000 166.750
341 110.500 110.525 HR 25 33.51 5.44 34.745 2.720 0.000 0.000 0.000 868.625 68.000 0.000
342 110.525 110.550 HR 25 35.76 1.47 34.635 3.455 0.000 0.000 0.000 865.875 86.375 0.000
343 110.550 110.575 SMB 25 4.91 0.158 20.335 0.814 0.000 508.375 0.000 0.000 20.350 0.000
344 110.575 110.600 SMB 25 67.04 35.975 0.079 0.000 899.375 0.000 0.000 1.975 0.000
345 110.600 110.625 SMB 25 34 0.418 50.520 0.209 0.000 1263.000 0.000 0.000 5.225 0.000
346 110.625 110.650 SMB 25 16.29 1.85 25.145 1.134 0.000 628.625 0.000 0.000 28.350 0.000
347 110.650 110.675 HR 25 25.46 13.54 20.875 0.925 6.770 0.000 0.000 521.875 23.125 169.250
348 110.675 110.700 HR 25 57.46 16 41.460 0.000 14.770 0.000 0.000 1036.500 0.000 369.250
349 110.700 110.725 HR 25 59.56 15.57 58.510 0.000 15.785 0.000 0.000 1462.750 0.000 394.625
350 110.725 110.750 HR 25 39.89 31.72 49.725 0.000 23.645 0.000 0.000 1243.125 0.000 591.125
351 110.750 110.775 HR 25 29.8 22.28 34.845 0.000 27.000 0.000 0.000 871.125 0.000 675.000
352 110.775 110.800 HR 25 37.53 17.04 33.665 0.000 19.660 0.000 0.000 841.625 0.000 491.500
353 110.800 110.825 HR 25 22.6 9.78 30.065 4.890 8.520 0.000 0.000 751.625 122.250 213.000
354 110.825 110.850 HR 25 81.11 51.855 4.890 0.000 0.000 0.000 1296.375 122.250 0.000
355 110.850 110.875 HR 25 96.47 88.790 0.000 0.000 0.000 0.000 2219.750 0.000 0.000
356 110.875 110.900 HR 25 60.01 78.240 0.000 0.000 0.000 0.000 1956.000 0.000 0.000
357 110.900 110.925 HR 25 97.2 78.605 0.000 0.000 0.000 0.000 1965.125 0.000 0.000
358 110.925 110.950 HR 25 78.75 87.975 0.000 0.000 0.000 0.000 2199.375 0.000 0.000
359 110.950 110.975 SMB 25 76.22 77.485 0.000 0.000 1937.125 0.000 0.000 0.000 0.000
360 110.975 111.000 SMB 25 59.08 67.650 0.000 0.000 1691.250 0.000 0.000 0.000 0.000
Total Km 110.000 to 111.000 27514.13 0.00 31428.63 532.65 3237.25

Page 160 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

361 111.000 111.025 SMB 25 11.136 35.108 0.000 0.000 877.700 0.000 0.000 0.000 0.000
362 111.025 111.050 SMB 25 21.15 16.143 0.000 0.000 403.575 0.000 0.000 0.000 0.000
363 111.050 111.075 SMB 25 29.356 25.253 0.000 0.000 631.325 0.000 0.000 0.000 0.000
364 111.075 111.100 SMB 25 43.276 36.316 0.000 0.000 907.900 0.000 0.000 0.000 0.000
365 111.100 111.125 SMB 25 51.597 47.437 0.000 0.000 1185.925 0.000 0.000 0.000 0.000
366 111.125 111.150 SMB 25 56.474 54.036 0.000 0.000 1350.900 0.000 0.000 0.000 0.000
367 111.150 111.175 SMB 25 52.068 54.271 0.000 0.000 1356.775 0.000 0.000 0.000 0.000
368 111.175 111.200 SMB 25 78.192 65.130 0.000 0.000 1628.250 0.000 0.000 0.000 0.000
369 111.200 111.225 HR 25 59.367 68.780 0.000 0.000 0.000 0.000 1719.500 0.000 0.000
370 111.225 111.250 HR 25 54.804 57.086 0.000 0.000 0.000 0.000 1427.150 0.000 0.000
371 111.250 111.275 HR 25 38.636 46.720 0.000 0.000 0.000 0.000 1168.000 0.000 0.000
372 111.275 111.300 HR 25 54.338 46.487 0.000 0.000 0.000 0.000 1162.175 0.000 0.000
373 111.300 111.325 HR 25 64.936 59.637 0.000 0.000 0.000 0.000 1490.925 0.000 0.000
374 111.325 111.350 HR 25 48.552 56.744 0.000 0.000 0.000 0.000 1418.600 0.000 0.000
375 111.350 111.375 HR 25 66.117 57.335 0.000 0.000 0.000 0.000 1433.375 0.000 0.000
376 111.375 111.400 HR 25 72.142 69.130 0.000 0.000 0.000 0.000 1728.250 0.000 0.000
377 111.400 111.425 SMB 25 37.995 55.069 0.000 0.000 1376.725 0.000 0.000 0.000 0.000
378 111.425 111.450 SMB 25 14.11 26.053 0.000 0.000 651.325 0.000 0.000 0.000 0.000
379 111.450 111.475 HR 25 13.239 13.675 0.000 0.000 0.000 0.000 341.875 0.000 0.000
380 111.475 111.500 HR 25 18.404 15.822 0.000 0.000 0.000 0.000 395.550 0.000 0.000
381 111.500 111.525 HR 25 16.289 17.347 0.000 0.000 0.000 0.000 433.675 0.000 0.000
382 111.525 111.550 HR 25 15.624 15.957 0.000 0.000 0.000 0.000 398.925 0.000 0.000
383 111.550 111.575 HR 25 20.156 17.890 0.000 0.000 0.000 0.000 447.250 0.000 0.000
384 111.575 111.600 HR 25 43.882 32.019 0.000 0.000 0.000 0.000 800.475 0.000 0.000
385 111.600 111.625 HR 25 13.678 28.780 0.000 0.000 0.000 0.000 719.500 0.000 0.000
386 111.625 111.650 HR 25 8.258 10.968 0.000 0.000 0.000 0.000 274.200 0.000 0.000
387 111.650 111.675 HR 25 8.662 8.460 0.000 0.000 0.000 0.000 211.500 0.000 0.000
388 111.675 111.700 HR 25 28.413 18.538 0.000 0.000 0.000 0.000 463.450 0.000 0.000
389 111.700 111.725 HR 25 30.441 29.427 0.000 0.000 0.000 0.000 735.675 0.000 0.000
390 111.725 111.750 HR 25 18.277 24.359 0.000 0.000 0.000 0.000 608.975 0.000 0.000
391 111.750 111.775 HR 25 10.87 14.574 0.000 0.000 0.000 0.000 364.350 0.000 0.000
392 111.775 111.800 HR 25 14.453 12.662 0.000 0.000 0.000 0.000 316.550 0.000 0.000
393 111.800 111.825 HR 25 11.765 13.109 0.000 0.000 0.000 0.000 327.725 0.000 0.000
394 111.825 111.850 HR 25 45.401 28.583 0.000 0.000 0.000 0.000 714.575 0.000 0.000
395 111.850 111.875 SMB 25 58.134 51.768 0.000 0.000 1294.200 0.000 0.000 0.000 0.000
396 111.875 111.900 SMB 25 39.726 48.930 0.000 0.000 1223.250 0.000 0.000 0.000 0.000
397 111.900 111.925 SMB 25 57.441 48.584 0.000 0.000 1214.600 0.000 0.000 0.000 0.000
398 111.925 111.950 SMB 25 50.898 54.170 0.000 0.000 1354.250 0.000 0.000 0.000 0.000
399 111.950 111.975 SMB 25 48.558 49.728 0.000 0.000 1243.200 0.000 0.000 0.000 0.000
400 111.975 112.000 SMB 25 33.759 41.159 0.000 0.000 1028.975 0.000 0.000 0.000 0.000
Total Km 111.000 to 112.000 17728.88 0.00 19102.23 0.00 0.00

Page 161 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

401 112.000 112.025 HR 25 32.173 0.9 32.966 0.450 0.000 0.000 0.000 824.150 11.250 0.000
402 112.025 112.050 HR 25 55.166 43.670 0.450 0.000 0.000 0.000 1091.750 11.250 0.000
403 112.050 112.075 HR 25 52.18 9.43 53.673 4.715 0.000 0.000 0.000 1341.825 117.875 0.000
404 112.075 112.100 HR 25 48.578 50.379 4.715 0.000 0.000 0.000 1259.475 117.875 0.000
405 112.100 112.125 HR 25 41.692 4.04 45.135 2.020 0.000 0.000 0.000 1128.375 50.500 0.000
406 112.125 112.150 SMB 25 78.603 12.87 60.148 8.455 0.000 1503.700 0.000 0.000 211.375 0.000
407 112.150 112.175 SMB 25 99.162 88.883 6.435 0.000 2222.075 0.000 0.000 160.875 0.000
408 112.175 112.200 SMB 25 127.292 113.227 0.000 0.000 2830.675 0.000 0.000 0.000 0.000
409 112.200 112.225 SMB 25 94.873 111.083 0.000 0.000 2777.075 0.000 0.000 0.000 0.000
410 112.225 112.250 SMB 25 126.745 110.809 0.000 0.000 2770.225 0.000 0.000 0.000 0.000
411 112.250 112.275 SMB 25 142.467 134.606 0.000 0.000 3365.150 0.000 0.000 0.000 0.000
412 112.275 112.300 SMB 25 37.993 90.230 0.000 0.000 2255.750 0.000 0.000 0.000 0.000
413 112.300 112.325 SMB 25 135.735 86.864 0.000 0.000 2171.600 0.000 0.000 0.000 0.000
414 112.325 112.350 SMB 25 145.508 4.78 140.622 2.390 0.000 3515.550 0.000 0.000 59.750 0.000
415 112.350 112.375 SMB 25 163.82 9.47 154.664 2.390 4.735 3866.600 0.000 0.000 59.750 118.375
416 112.375 112.400 SMB 25 161.087 16.32 162.454 0.000 12.895 4061.350 0.000 0.000 0.000 322.375
417 112.400 112.425 HR 25 237.925 7.27 199.506 3.635 8.160 0.000 0.000 4987.650 90.875 204.000
418 112.425 112.450 HR 25 255.869 13.95 246.897 3.635 6.975 0.000 0.000 6172.425 90.875 174.375
419 112.450 112.475 SMB 25 195.29 21.91 225.580 0.000 17.930 5639.500 0.000 0.000 0.000 448.250
420 112.475 112.500 SMB 25 204.14 14.71 199.715 0.000 18.310 4992.875 0.000 0.000 0.000 457.750
421 112.500 112.525 SMB 25 207.502 15.02 205.821 0.000 14.865 5145.525 0.000 0.000 0.000 371.625
422 112.525 112.550 SMB 25 157.715 19.97 182.609 0.000 17.495 4565.225 0.000 0.000 0.000 437.375
423 112.550 112.575 SMB 25 158.217 17.15 157.966 0.000 18.560 3949.150 0.000 0.000 0.000 464.000
424 112.575 112.600 SMB 25 155.555 22.83 156.886 0.000 19.990 3922.150 0.000 0.000 0.000 499.750
425 112.600 112.625 SMB 25 136.745 26.94 146.150 0.000 24.885 3653.750 0.000 0.000 0.000 622.125
426 112.625 112.650 SMB 25 108.233 31.43 122.489 0.000 29.185 3062.225 0.000 0.000 0.000 729.625
427 112.650 112.675 SMB 25 207.502 25.95 157.868 0.000 28.690 3946.700 0.000 0.000 0.000 717.250
428 112.675 112.700 SMB 25 157.715 13.86 182.609 0.000 19.905 4565.225 0.000 0.000 0.000 497.625
429 112.700 112.725 SMB 25 158.721 15.7 158.218 0.000 14.780 3955.450 0.000 0.000 0.000 369.500
430 112.725 112.750 SMB 25 76.778 16.28 117.750 0.000 15.990 2943.750 0.000 0.000 0.000 399.750
431 112.750 112.775 SMB 25 71.706 8.62 74.242 0.000 12.450 1856.050 0.000 0.000 0.000 311.250
432 112.775 112.800 SMB 25 94.137 13.64 82.922 0.000 11.130 2073.050 0.000 0.000 0.000 278.250
433 112.800 112.825 SMB 25 82.285 16.9 88.211 0.000 15.270 2205.275 0.000 0.000 0.000 381.750
434 112.825 112.850 SMB 25 76.517 4.03 79.401 2.015 8.450 1985.025 0.000 0.000 50.375 211.250
435 112.850 112.875 SMB 25 87.617 2.05 82.067 3.040 0.000 2051.675 0.000 0.000 76.000 0.000
436 112.875 112.900 SMB 25 62.378 0.51 74.998 1.280 0.000 1874.950 0.000 0.000 32.000 0.000
437 112.900 112.925 SMB 25 41.469 1.43 51.924 0.970 0.000 1298.100 0.000 0.000 24.250 0.000
438 112.925 112.950 SMB 25 43.479 42.474 0.715 0.000 1061.850 0.000 0.000 17.875 0.000
439 112.950 112.975 SMB 25 13.69 28.585 0.000 0.000 714.625 0.000 0.000 0.000 0.000
440 112.975 113.000 SMB 25 24.52 19.105 0.000 0.000 477.625 0.000 0.000 0.000 0.000
Total Km 112.000 to 113.000 97279.50 0.00 16805.65 1182.75 8016.25

Page 162 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

441 113.000 113.025 SMB 25 31.34 27.930 0.000 0.000 698.250 0.000 0.000 0.000 0.000
442 113.025 113.050 SR 25 24.07 1.09 27.705 0.545 0.000 0.000 692.625 0.000 13.625 0.000
443 113.050 113.075 SMB 25 15.11 5.07 19.590 3.080 0.000 489.750 0.000 0.000 77.000 0.000
444 113.075 113.100 SR 25 20.59 6.91 17.850 5.990 0.000 0.000 446.250 0.000 149.750 0.000
445 113.100 113.125 SR 25 19.9 5.79 20.245 6.350 0.000 0.000 506.125 0.000 158.750 0.000
446 113.125 113.150 SR 25 9.19 4.34 14.545 5.065 0.000 0.000 363.625 0.000 126.625 0.000
447 113.150 113.175 SR 25 15.66 0.56 12.425 2.450 0.000 0.000 310.625 0.000 61.250 0.000
448 113.175 113.200 SMB 25 8.33 5.8 11.995 3.180 0.000 299.875 0.000 0.000 79.500 0.000
449 113.200 113.225 SMB 25 15.37 11.99 11.850 2.900 5.995 296.250 0.000 0.000 72.500 149.875
450 113.225 113.250 SMB 25 20.82 15.51 18.095 0.000 13.750 452.375 0.000 0.000 0.000 343.750
451 113.250 113.275 SMB 25 7.41 22.05 14.115 0.000 18.780 352.875 0.000 0.000 0.000 469.500
452 113.275 113.300 SMB 25 38.28 20.22 22.845 0.000 21.135 571.125 0.000 0.000 0.000 528.375
453 113.300 113.325 SMB 25 13.53 26.16 25.905 0.000 23.190 647.625 0.000 0.000 0.000 579.750
454 113.325 113.350 SMB 25 34.33 20.31 23.930 0.000 23.235 598.250 0.000 0.000 0.000 580.875
455 113.350 113.375 SMB 25 35.28 20.06 34.805 0.000 20.185 870.125 0.000 0.000 0.000 504.625
456 113.375 113.400 SMB 25 56.04 19.11 45.660 0.000 19.585 1141.500 0.000 0.000 0.000 489.625
457 113.400 113.425 SMB 25 15.77 32.75 35.905 0.000 25.930 897.625 0.000 0.000 0.000 648.250
458 113.425 113.450 SMB 25 26.24 36.89 21.005 0.000 34.820 525.125 0.000 0.000 0.000 870.500
459 113.450 113.475 SMB 25 19.02 40.85 22.630 0.000 38.870 565.750 0.000 0.000 0.000 971.750
460 113.475 113.500 SMB 25 6.19 45.43 12.605 0.000 43.140 315.125 0.000 0.000 0.000 1078.500
461 113.500 113.525 SMB 25 0.06 43.7 3.125 0.000 44.565 78.125 0.000 0.000 0.000 1114.125
462 113.525 113.550 SMB 25 7.55 25.69 3.805 0.000 34.695 95.125 0.000 0.000 0.000 867.375
463 113.550 113.575 SMB 25 11.87 21.61 9.710 0.000 23.650 242.750 0.000 0.000 0.000 591.250
464 113.575 113.600 SMB 25 3.45 31.61 7.660 0.000 26.610 191.500 0.000 0.000 0.000 665.250
465 113.600 113.625 SMB 25 5.89 34.88 4.670 0.000 33.245 116.750 0.000 0.000 0.000 831.125
466 113.625 113.650 SMB 25 2.66 40.34 4.275 0.000 37.610 106.875 0.000 0.000 0.000 940.250
467 113.650 113.675 SMB 25 7.04 36.66 4.850 0.000 38.500 121.250 0.000 0.000 0.000 962.500
468 113.675 113.700 SMB 25 0.21 45.3 3.625 0.000 40.980 90.625 0.000 0.000 0.000 1024.500
469 113.700 113.725 SMB 25 1.79 46.83 1.000 0.000 46.065 25.000 0.000 0.000 0.000 1151.625
470 113.725 113.750 SMB 25 6.03 45.61 3.910 0.000 46.220 97.750 0.000 0.000 0.000 1155.500
471 113.750 113.775 SMB 25 5.82 44.73 5.925 0.000 45.170 148.125 0.000 0.000 0.000 1129.250
472 113.775 113.800 SMB 25 15.73 33.34 10.775 0.000 39.035 269.375 0.000 0.000 0.000 975.875
473 113.800 113.825 SMB 25 12.67 33.79 14.200 0.000 33.565 355.000 0.000 0.000 0.000 839.125
474 113.825 113.850 SMB 25 23.17 19.24 17.920 0.000 26.515 448.000 0.000 0.000 0.000 662.875
475 113.850 113.875 SMB 25 27.67 19.76 25.420 0.000 19.500 635.500 0.000 0.000 0.000 487.500
476 113.875 113.900 SMB 25 26.68 13.75 27.175 0.000 16.755 679.375 0.000 0.000 0.000 418.875
477 113.900 113.925 SMB 25 54.31 11.46 40.495 0.000 12.605 1012.375 0.000 0.000 0.000 315.125
478 113.925 113.950 SMB 25 53.12 11.18 53.715 0.000 11.320 1342.875 0.000 0.000 0.000 283.000
479 113.950 113.975 SMB 25 40.39 12.96 46.755 0.000 12.070 1168.875 0.000 0.000 0.000 301.750
480 113.975 114.000 SMB 25 38.81 0.14 39.600 0.070 6.480 990.000 0.000 0.000 1.750 162.000
Total Km 113.000 to 114.000 16936.88 2319.25 0.00 740.75 22094.25

Page 163 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

481 114.000 114.025 SMB 25 63.23 51.020 0.070 0.000 1275.500 0.000 0.000 1.750 0.000
482 114.025 114.050 SMB 25 51.16 57.195 0.000 0.000 1429.875 0.000 0.000 0.000 0.000
483 114.050 114.075 HR 25 49.11 50.135 0.000 0.000 0.000 0.000 1253.375 0.000 0.000
484 114.075 114.100 HR 25 72.71 60.910 0.000 0.000 0.000 0.000 1522.750 0.000 0.000
485 114.100 114.125 HR 25 50.56 61.635 0.000 0.000 0.000 0.000 1540.875 0.000 0.000
486 114.125 114.150 HR 25 35.6 43.080 0.000 0.000 0.000 0.000 1077.000 0.000 0.000
487 114.150 114.175 SMB 25 57.49 46.545 0.000 0.000 1163.625 0.000 0.000 0.000 0.000
488 114.175 114.200 SMB 25 71.08 64.285 0.000 0.000 1607.125 0.000 0.000 0.000 0.000
489 114.200 114.225 SMB 25 88.93 80.005 0.000 0.000 2000.125 0.000 0.000 0.000 0.000
490 114.225 114.250 SMB 25 82.73 85.830 0.000 0.000 2145.750 0.000 0.000 0.000 0.000
491 114.250 114.275 25 41.365 0.000 0.000 1034.125 1034.125 1034.125 0.000 0.000
492 114.275 114.300 25 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
493 114.300 114.325 25 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
494 114.325 114.350 25 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
495 114.350 114.375 25 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
496 114.375 114.400 SR 25 13.37 6.685 0.000 0.000 0.000 167.125 0.000 0.000 0.000
497 114.400 114.425 SR 25 54.52 33.945 0.000 0.000 0.000 848.625 0.000 0.000 0.000
498 114.425 114.450 SR 25 41.28 47.900 0.000 0.000 0.000 1197.500 0.000 0.000 0.000
499 114.450 114.475 SR 25 21.3 31.290 0.000 0.000 0.000 782.250 0.000 0.000 0.000
500 114.475 114.500 SR 25 45.78 33.540 0.000 0.000 0.000 838.500 0.000 0.000 0.000
501 114.500 114.525 SR 25 17.64 31.710 0.000 0.000 0.000 792.750 0.000 0.000 0.000
502 114.525 114.550 SMB 25 25.19 21.415 0.000 0.000 535.375 535.375 535.375 0.000 0.000
503 114.550 114.575 SMB 25 10.5 0.18 17.845 0.090 0.000 446.125 0.000 0.000 2.250 0.000
504 114.575 114.600 SMB 25 1.76 10.79 6.130 0.090 5.395 153.250 0.000 0.000 2.250 134.875
505 114.600 114.625 SMB 25 0.29 16.18 1.025 0.000 13.485 25.625 0.000 0.000 0.000 337.125
506 114.625 114.650 SMB 25 37.93 10.87 19.110 0.000 13.525 477.750 0.000 0.000 0.000 338.125
507 114.650 114.675 SMB 25 17.42 10.21 27.675 0.000 10.540 691.875 0.000 0.000 0.000 263.500
508 114.675 114.700 SMB 25 16.78 13.14 17.100 0.000 11.675 427.500 0.000 0.000 0.000 291.875
509 114.700 114.725 SMB 25 25.46 11.52 21.120 0.000 12.330 528.000 0.000 0.000 0.000 308.250
510 114.725 114.750 SMB 25 31.71 9.74 28.585 0.000 10.630 714.625 0.000 0.000 0.000 265.750
511 114.750 114.775 SMB 25 33.18 6.68 32.445 0.000 8.210 811.125 0.000 0.000 0.000 205.250
512 114.775 114.800 SMB 25 18.92 3.28 26.050 1.640 3.340 651.250 0.000 0.000 41.000 83.500
513 114.800 114.825 SMB 25 15.9 6.87 17.410 1.640 3.435 435.250 0.000 0.000 41.000 85.875
514 114.825 114.850 SMB 25 8.47 6.64 12.185 3.320 3.435 304.625 0.000 0.000 83.000 85.875
515 114.850 114.875 SMB 25 12.84 3.43 10.655 5.035 0.000 266.375 0.000 0.000 125.875 0.000
516 114.875 114.900 SMB 25 18.04 15.440 1.715 0.000 386.000 0.000 0.000 42.875 0.000
Total Km 114.000 to 114.900 17510.875 6196.250 6963.500 340.000 2400.000
Total Km 108.050 to 114.900 198113.875 9093.775 150611.375 4414.525 39249.000
ALTITUDE : 2701-3000m
517 114.900 114.925 SMB 25 21.19 1.97 19.615 0.985 0.000 490.375 0.000 0.000 24.625 0.000
518 114.925 114.950 SMB 25 9.81 3.61 15.500 2.790 0.000 387.500 0.000 0.000 69.750 0.000

Page 164 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

519 114.950 114.975 SMB 25 19.76 1.81 14.785 2.710 0.000 369.625 0.000 0.000 67.750 0.000
520 114.975 115.000 SMB 25 44.88 0.045 32.320 0.928 0.000 808.000 0.000 0.000 23.200 0.000
Total Km 114.900 to 115.000 2055.50 0.00 0.00 185.33 0.00
521 115.000 115.025 SMB 25 53.61 49.245 0.023 0.000 1231.125 0.000 0.000 0.575 0.000
522 115.025 115.050 SMB 25 38.55 46.080 0.000 0.000 1152.000 0.000 0.000 0.000 0.000
523 115.050 115.075 SMB 25 38.53 38.540 0.000 0.000 963.500 0.000 0.000 0.000 0.000
524 115.075 115.100 SMB 25 33.83 36.180 0.000 0.000 904.500 0.000 0.000 0.000 0.000
525 115.100 115.125 SMB 25 21.33 27.580 0.000 0.000 689.500 0.000 0.000 0.000 0.000
526 115.125 115.150 SMB 25 15.9 18.615 0.000 0.000 465.375 0.000 0.000 0.000 0.000
527 115.150 115.175 SMB 25 64.59 40.245 0.000 0.000 1006.125 0.000 0.000 0.000 0.000
528 115.175 115.200 SMB 25 89.69 77.140 0.000 0.000 1928.500 0.000 0.000 0.000 0.000
529 115.200 115.225 SMB 25 57.75 73.720 0.000 0.000 1843.000 0.000 0.000 0.000 0.000
530 115.225 115.250 SMB 25 57.99 57.870 0.000 0.000 1446.750 0.000 0.000 0.000 0.000
531 115.250 115.275 SMB 25 74.67 66.330 0.000 0.000 1658.250 0.000 0.000 0.000 0.000
532 115.275 115.300 SMB 25 51.22 62.945 0.000 0.000 1573.625 0.000 0.000 0.000 0.000
533 115.300 115.325 SMB 25 52.71 51.965 0.000 0.000 1299.125 0.000 0.000 0.000 0.000
534 115.325 115.350 SMB 25 63.65 58.180 0.000 0.000 1454.500 0.000 0.000 0.000 0.000
535 115.350 115.375 SMB 25 83.53 73.590 0.000 0.000 1839.750 0.000 0.000 0.000 0.000
536 115.375 115.400 SMB 25 62.89 73.210 0.000 0.000 1830.250 0.000 0.000 0.000 0.000
537 115.400 115.425 SMB 25 66.92 64.905 0.000 0.000 1622.625 0.000 0.000 0.000 0.000
538 115.425 115.450 SMB 25 86.48 76.700 0.000 0.000 1917.500 0.000 0.000 0.000 0.000
539 115.450 115.475 SMB 25 58.54 72.510 0.000 0.000 1812.750 0.000 0.000 0.000 0.000
540 115.475 115.500 SMB 25 53.29 55.915 0.000 0.000 1397.875 0.000 0.000 0.000 0.000
541 115.500 115.525 SMB 25 47.09 50.190 0.000 0.000 1254.750 0.000 0.000 0.000 0.000
542 115.525 115.550 SMB 25 42.28 44.685 0.000 0.000 1117.125 0.000 0.000 0.000 0.000
543 115.550 115.575 SMB 25 36.52 39.400 0.000 0.000 985.000 0.000 0.000 0.000 0.000
544 115.575 115.600 SMB 25 37.85 37.185 0.000 0.000 929.625 0.000 0.000 0.000 0.000
545 115.600 115.625 SMB 25 47.13 42.490 0.000 0.000 1062.250 0.000 0.000 0.000 0.000
546 115.625 115.650 SMB 25 61.63 54.380 0.000 0.000 1359.500 0.000 0.000 0.000 0.000
547 115.650 115.675 SMB 25 51.69 56.660 0.000 0.000 1416.500 0.000 0.000 0.000 0.000
548 115.675 115.700 SMB 25 40.21 45.950 0.000 0.000 1148.750 0.000 0.000 0.000 0.000
549 115.700 115.725 SMB 25 49.02 44.615 0.000 0.000 1115.375 0.000 0.000 0.000 0.000
550 115.725 115.750 SMB 25 40.44 44.730 0.000 0.000 1118.250 0.000 0.000 0.000 0.000
551 115.750 115.775 SMB 25 50.6 45.520 0.000 0.000 1138.000 0.000 0.000 0.000 0.000
552 115.775 115.800 SMB 25 25.63 38.115 0.000 0.000 952.875 0.000 0.000 0.000 0.000
553 115.800 115.825 SMB 25 39.8 32.715 0.000 0.000 817.875 0.000 0.000 0.000 0.000
554 115.825 115.850 SMB 25 31.21 35.505 0.000 0.000 887.625 0.000 0.000 0.000 0.000
555 115.850 115.875 SMB 25 24.98 28.095 0.000 0.000 702.375 0.000 0.000 0.000 0.000
556 115.875 115.900 SMB 25 16.53 20.755 0.000 0.000 518.875 0.000 0.000 0.000 0.000
557 115.900 115.925 SMB 25 15.59 16.060 0.000 0.000 401.500 0.000 0.000 0.000 0.000
558 115.925 115.950 SMB 25 7.88 1.4 11.735 0.700 0.000 293.375 0.000 0.000 17.500 0.000

Page 165 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

559 115.950 115.975 SMB 25 15.96 0.37 11.920 0.885 0.000 298.000 0.000 0.000 22.125 0.000
560 115.975 116.000 SMB 25 10.02 12.990 0.185 0.000 324.750 0.000 0.000 4.625 0.000
Total Km 115.000 to 116.000 45879.00 0.00 0.00 44.83 0.00
561 116.000 116.025 SMB 25 15.11 12.565 0.000 0.000 314.125 0.000 0.000 0.000 0.000
562 116.025 116.050 SMB 25 22.7 18.905 0.000 0.000 472.625 0.000 0.000 0.000 0.000
563 116.050 116.075 SMB 25 27.53 25.115 0.000 0.000 627.875 0.000 0.000 0.000 0.000
564 116.075 116.100 SMB 25 43.9 35.715 0.000 0.000 892.875 0.000 0.000 0.000 0.000
565 116.100 116.125 SMB 25 45.27 44.585 0.000 0.000 1114.625 0.000 0.000 0.000 0.000
566 116.125 116.150 SMB 25 34.82 40.045 0.000 0.000 1001.125 0.000 0.000 0.000 0.000
567 116.150 116.175 SMB 25 11.23 23.025 0.000 0.000 575.625 0.000 0.000 0.000 0.000
568 116.175 116.200 SMB 25 3.31 9.23 7.270 4.615 0.000 181.750 0.000 0.000 115.375 0.000
569 116.200 116.225 SMB 25 0.82 7.71 2.065 4.615 3.855 51.625 0.000 0.000 115.375 96.375
570 116.225 116.250 SMB 25 3.24 20.09 2.030 0.000 13.900 50.750 0.000 0.000 0.000 347.500
571 116.250 116.275 SMB 25 1.75 20.96 2.495 0.000 20.525 62.375 0.000 0.000 0.000 513.125
572 116.275 116.300 SMB 25 3.72 20.99 2.735 0.000 20.975 68.375 0.000 0.000 0.000 524.375
573 116.300 116.325 SMB 25 0.7 24.39 2.210 0.000 22.690 55.250 0.000 0.000 0.000 567.250
574 116.325 116.350 SMB 25 1.11 23.09 0.905 0.000 23.740 22.625 0.000 0.000 0.000 593.500
575 116.350 116.375 SMB 25 5.11 17.21 3.110 0.000 20.150 77.750 0.000 0.000 0.000 503.750
576 116.375 116.400 SMB 25 18.23 9.76 11.670 0.000 13.485 291.750 0.000 0.000 0.000 337.125
577 116.400 116.425 SMB 25 27.15 8.09 22.690 0.000 8.925 567.250 0.000 0.000 0.000 223.125
578 116.425 116.450 SMB 25 5.3 6.4 16.225 0.000 7.245 405.625 0.000 0.000 0.000 181.125
579 116.450 116.475 SMB 25 12.5 6.51 8.900 3.255 3.200 222.500 0.000 0.000 81.375 80.000
580 116.475 116.500 SMB 25 20.1 5.52 16.300 6.015 0.000 407.500 0.000 0.000 150.375 0.000
581 116.500 116.525 SMB 25 16.97 9.2 18.535 7.360 0.000 463.375 0.000 0.000 184.000 0.000
582 116.525 116.550 SMB 25 0 19.28 8.485 4.600 9.640 212.125 0.000 0.000 115.000 241.000
583 116.550 116.575 SMB 25 1.98 24.4 0.990 0.000 21.840 24.750 0.000 0.000 0.000 546.000
584 116.575 116.600 SMB 25 3.11 16.98 2.545 0.000 20.690 63.625 0.000 0.000 0.000 517.250
585 116.600 116.625 SMB 25 1.11 29.95 2.110 0.000 23.465 52.750 0.000 0.000 0.000 586.625
586 116.625 116.650 SMB 25 0.75 32.81 0.930 0.000 31.380 23.250 0.000 0.000 0.000 784.500
587 116.650 116.675 SMB 25 0.19 30.92 0.470 0.000 31.865 11.750 0.000 0.000 0.000 796.625
588 116.675 116.700 SMB 25 0.46 32.97 0.325 0.000 31.945 8.125 0.000 0.000 0.000 798.625
589 116.700 116.725 SMB 25 0 38.95 0.230 0.000 35.960 5.750 0.000 0.000 0.000 899.000
590 116.725 116.750 SMB 25 0 29.57 0.000 0.000 34.260 0.000 0.000 0.000 0.000 856.500
591 116.750 116.775 SMB 25 0 25.1 0.000 0.000 27.335 0.000 0.000 0.000 0.000 683.375
592 116.775 116.800 SMB 25 2.95 13.93 1.475 0.000 19.515 36.875 0.000 0.000 0.000 487.875
593 116.800 116.825 SMB 25 6.09 7.74 4.520 3.870 6.965 113.000 0.000 0.000 96.750 174.125
594 116.825 116.850 SMB 25 10.41 3.76 8.250 5.750 0.000 206.250 0.000 0.000 143.750 0.000
595 116.850 116.875 SMB 25 30.22 20.315 1.880 0.000 507.875 0.000 0.000 47.000 0.000
596 116.875 116.900 SMB 25 25.23 27.725 0.000 0.000 693.125 0.000 0.000 0.000 0.000
597 116.900 116.925 SMB 25 7.35 12.615 0.000 3.675 315.375 0.000 0.000 0.000 91.875
598 116.925 116.950 SMB 25 2.43 5.13 1.215 2.565 3.675 30.375 0.000 0.000 64.125 91.875

Page 166 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

599 116.950 116.975 SMB 25 3.28 1.39 2.855 3.260 0.000 71.375 0.000 0.000 81.500 0.000
600 116.975 117.000 SMB 25 0.02 0.64 1.650 1.015 0.000 41.250 0.000 0.000 25.375 0.000
Total Km 116.000 to 117.000 10345.00 0.00 0.00 1220.00 11522.50
601 117.000 117.025 SMB 25 34.56 17.290 0.320 0.000 432.250 0.000 0.000 8.000 0.000
602 117.025 117.050 SMB 25 64.94 49.750 0.000 0.000 1243.750 0.000 0.000 0.000 0.000
603 117.050 117.075 SMB 25 0.61 42.86 32.775 0.000 21.430 819.375 0.000 0.000 0.000 535.750
604 117.075 117.100 SMB 25 108.52 54.565 0.000 21.430 1364.125 0.000 0.000 0.000 535.750
605 117.100 117.125 SMB 25 132.64 120.580 0.000 0.000 3014.500 0.000 0.000 0.000 0.000
606 117.125 117.150 SMB 25 93.94 113.290 0.000 0.000 2832.250 0.000 0.000 0.000 0.000
607 117.150 117.175 SMB 25 94.45 94.195 0.000 0.000 2354.875 0.000 0.000 0.000 0.000
608 117.175 117.200 SMB 25 104.64 99.545 0.000 0.000 2488.625 0.000 0.000 0.000 0.000
609 117.200 117.225 SMB 25 104.37 104.505 0.000 0.000 2612.625 0.000 0.000 0.000 0.000
610 117.225 117.250 SMB 25 110.26 107.315 0.000 0.000 2682.875 0.000 0.000 0.000 0.000
611 117.250 117.275 SMB 25 107.83 109.045 0.000 0.000 2726.125 0.000 0.000 0.000 0.000
612 117.275 117.300 SMB 25 100.36 104.095 0.000 0.000 2602.375 0.000 0.000 0.000 0.000
613 117.300 117.325 SMB 25 127.68 114.020 0.000 0.000 2850.500 0.000 0.000 0.000 0.000
614 117.325 117.350 SMB 25 96.09 111.885 0.000 0.000 2797.125 0.000 0.000 0.000 0.000
615 117.350 117.375 SMB 25 134.38 115.235 0.000 0.000 2880.875 0.000 0.000 0.000 0.000
616 117.375 117.400 SMB 25 134.56 134.470 0.000 0.000 3361.750 0.000 0.000 0.000 0.000
617 117.400 117.425 SMB 25 127.43 130.995 0.000 0.000 3274.875 0.000 0.000 0.000 0.000
618 117.425 117.450 SMB 25 77.41 102.420 0.000 0.000 2560.500 0.000 0.000 0.000 0.000
619 117.450 117.475 SMB 25 41.09 59.250 0.000 0.000 1481.250 0.000 0.000 0.000 0.000
620 117.475 117.500 SMB 25 39.97 2.04 40.530 1.020 0.000 1013.250 0.000 0.000 25.500 0.000
621 117.500 117.525 SMB 25 0.81 13.44 20.390 7.740 0.000 509.750 0.000 0.000 193.500 0.000
622 117.525 117.550 SMB 25 0.09 28.32 0.450 6.720 14.160 11.250 0.000 0.000 168.000 354.000
623 117.550 117.575 SMB 25 1.16 37.51 0.625 0.000 32.915 15.625 0.000 0.000 0.000 822.875
624 117.575 117.600 SMB 25 0.83 53.86 0.995 0.000 45.685 24.875 0.000 0.000 0.000 1142.125
625 117.600 117.625 SMB 25 0.42 43.48 0.625 0.000 48.670 15.625 0.000 0.000 0.000 1216.750
626 117.625 117.650 SMB 25 7.19 41.35 3.805 0.000 42.415 95.125 0.000 0.000 0.000 1060.375
627 117.650 117.675 SMB 25 1.89 51.75 4.540 0.000 46.550 113.500 0.000 0.000 0.000 1163.750
628 117.675 117.700 SMB 25 99.25 0.945 0.000 75.500 23.625 0.000 0.000 0.000 1887.500
629 117.700 117.725 SMB 25 0 69.72 0.000 0.000 84.485 0.000 0.000 0.000 0.000 2112.125
630 117.725 117.750 SMB 25 0.11 43.98 0.055 0.000 56.850 1.375 0.000 0.000 0.000 1421.250
631 117.750 117.775 SMB 25 43.16 0.055 0.000 43.570 1.375 0.000 0.000 0.000 1089.250
632 117.775 117.800 SMB 25 7.06 13.9 3.530 0.000 28.530 88.250 0.000 0.000 0.000 713.250
633 117.800 117.825 SR 25 18.33 1.29 12.695 0.645 6.950 0.000 317.375 0.000 16.125 173.750
634 117.825 117.850 SR 25 38.93 28.630 0.645 0.000 0.000 715.750 0.000 16.125 0.000
635 117.850 117.875 SR 25 66.81 52.870 0.000 0.000 0.000 1321.750 0.000 0.000 0.000
636 117.875 117.900 SR 25 70.06 68.435 0.000 0.000 0.000 1710.875 0.000 0.000 0.000
637 117.900 117.925 SR 25 64.77 67.415 0.000 0.000 0.000 1685.375 0.000 0.000 0.000
638 117.925 117.950 SR 25 60.74 62.755 0.000 0.000 0.000 1568.875 0.000 0.000 0.000

Page 167 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

639 117.950 117.975 SR 25 66.99 63.865 0.000 0.000 0.000 1596.625 0.000 0.000 0.000
640 117.975 118.000 SR 25 24.94 45.965 0.000 0.000 0.000 1149.125 0.000 0.000 0.000
Total Km 117.000 to 118.000 46294.25 10065.75 0.00 427.25 14228.50
641 118.000 118.025 SR 25 11.1 0.05 18.020 0.025 0.000 0.000 450.500 0.000 0.625 0.000
642 118.025 118.050 SR 25 31.99 21.545 0.025 0.000 0.000 538.625 0.000 0.625 0.000
643 118.050 118.075 SR 25 14.57 23.280 0.000 0.000 0.000 582.000 0.000 0.000 0.000
644 118.075 118.100 SR 25 7.13 2.36 10.850 1.180 0.000 0.000 271.250 0.000 29.500 0.000
645 118.100 118.125 SMB 25 11.33 5.55 9.230 3.955 0.000 230.750 0.000 0.000 98.875 0.000
646 118.125 118.150 SR 25 5.64 18.78 8.485 2.775 9.390 0.000 212.125 0.000 69.375 234.750
647 118.150 118.175 25 2.820 0.000 9.390 70.500 70.500 70.500 0.000 234.750
648 118.175 118.200 25 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
649 118.200 118.225 25 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
650 118.225 118.250 25 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
651 118.250 118.275 25 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
652 118.275 118.300 SMB 25 3.69 35.68 1.845 0.000 17.840 46.125 0.000 0.000 0.000 446.000
653 118.300 118.325 SMB 25 0 36.39 1.845 0.000 36.035 46.125 0.000 0.000 0.000 900.875
654 118.325 118.350 SMB 25 0 42.99 0.000 0.000 39.690 0.000 0.000 0.000 0.000 992.250
655 118.350 118.375 SMB 25 58.99 0.000 0.000 50.990 0.000 0.000 0.000 0.000 1274.750
656 118.375 118.400 SMB 25 52.49 26.245 0.000 29.495 656.125 0.000 0.000 0.000 737.375
657 118.400 118.425 SMB 25 28.64 26.245 0.000 14.320 656.125 0.000 0.000 0.000 358.000
658 118.425 118.450 SMB 25 25.19 0.000 0.000 26.915 0.000 0.000 0.000 0.000 672.875
659 118.450 118.475 SMB 25 0.13 23.43 0.065 0.000 24.310 1.625 0.000 0.000 0.000 607.750
660 118.475 118.500 SMB 25 5.97 9.22 3.050 0.000 16.325 76.250 0.000 0.000 0.000 408.125
661 118.500 118.525 SMB 25 21.38 2.985 0.000 15.300 74.625 0.000 0.000 0.000 382.500
662 118.525 118.550 SMB 25 26.64 0.000 0.000 24.010 0.000 0.000 0.000 0.000 600.250
663 118.550 118.575 SMB 25 0 37.28 0.000 0.000 31.960 0.000 0.000 0.000 0.000 799.000
664 118.575 118.600 SMB 25 0.19 33.95 0.095 0.000 35.615 2.375 0.000 0.000 0.000 890.375
665 118.600 118.625 SMB 25 0.02 37.41 0.105 0.000 35.680 2.625 0.000 0.000 0.000 892.000
666 118.625 118.650 SMB 25 1.52 38.46 0.770 0.000 37.935 19.250 0.000 0.000 0.000 948.375
667 118.650 118.675 SMB 25 0 40.89 0.760 0.000 39.675 19.000 0.000 0.000 0.000 991.875
668 118.675 118.700 SMB 25 0 54.11 0.000 0.000 47.500 0.000 0.000 0.000 0.000 1187.500
669 118.700 118.725 SMB 25 3.96 26.27 1.980 0.000 40.190 49.500 0.000 0.000 0.000 1004.750
670 118.725 118.750 SMB 25 11.2 15.69 7.580 0.000 20.980 189.500 0.000 0.000 0.000 524.500
671 118.750 118.775 SMB 25 10.21 10.17 10.705 0.000 12.930 267.625 0.000 0.000 0.000 323.250
672 118.775 118.800 SMB 25 2.87 14.09 6.540 0.000 12.130 163.500 0.000 0.000 0.000 303.250
673 118.800 118.825 SMB 25 20.19 3.84 11.530 1.920 7.045 288.250 0.000 0.000 48.000 176.125
674 118.825 118.850 SMB 25 29.17 24.680 1.920 0.000 617.000 0.000 0.000 48.000 0.000
675 118.850 118.875 SMB 25 35.37 32.270 0.000 0.000 806.750 0.000 0.000 0.000 0.000
676 118.875 118.900 SMB 25 29.44 32.405 0.000 0.000 810.125 0.000 0.000 0.000 0.000
677 118.900 118.925 SMB 25 21.01 25.225 0.000 0.000 630.625 0.000 0.000 0.000 0.000
678 118.925 118.950 SMB 25 26.85 23.930 0.000 0.000 598.250 0.000 0.000 0.000 0.000

Page 168 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

679 118.950 118.975 SMB 25 26.77 26.810 0.000 0.000 670.250 0.000 0.000 0.000 0.000
680 118.975 119.000 SMB 25 14.04 20.405 0.000 0.000 510.125 0.000 0.000 0.000 0.000
Total Km 118.000 to 119.000 7503.00 2125.00 70.50 295.00 15891.25
681 119.000 119.025 SMB 25 21.55 17.795 0.000 0.000 444.875 0.000 0.000 0.000 0.000
682 119.025 119.050 SMB 25 28.92 25.235 0.000 0.000 630.875 0.000 0.000 0.000 0.000
683 119.050 119.075 SMB 25 22.03 25.475 0.000 0.000 636.875 0.000 0.000 0.000 0.000
684 119.075 119.100 SMB 25 30.35 26.190 0.000 0.000 654.750 0.000 0.000 0.000 0.000
685 119.100 119.125 SMB 25 46.9 38.625 0.000 0.000 965.625 0.000 0.000 0.000 0.000
686 119.125 119.150 SMB 25 64.32 55.610 0.000 0.000 1390.250 0.000 0.000 0.000 0.000
687 119.150 119.175 SMB 25 56.78 60.550 0.000 0.000 1513.750 0.000 0.000 0.000 0.000
688 119.175 119.200 SMB 25 28.95 42.865 0.000 0.000 1071.625 0.000 0.000 0.000 0.000
689 119.200 119.225 SMB 25 41.09 35.020 0.000 0.000 875.500 0.000 0.000 0.000 0.000
690 119.225 119.250 SMB 25 25.28 33.185 0.000 0.000 829.625 0.000 0.000 0.000 0.000
691 119.250 119.275 SMB 25 23.63 24.455 0.000 0.000 611.375 0.000 0.000 0.000 0.000
692 119.275 119.300 SMB 25 22.81 23.220 0.000 0.000 580.500 0.000 0.000 0.000 0.000
693 119.300 119.325 SMB 25 33.85 28.330 0.000 0.000 708.250 0.000 0.000 0.000 0.000
694 119.325 119.350 SMB 25 35.69 34.770 0.000 0.000 869.250 0.000 0.000 0.000 0.000
695 119.350 119.375 SMB 25 46 40.845 0.000 0.000 1021.125 0.000 0.000 0.000 0.000
696 119.375 119.400 SMB 25 57.28 51.640 0.000 0.000 1291.000 0.000 0.000 0.000 0.000
697 119.400 119.425 SMB 25 21.65 39.465 0.000 0.000 986.625 0.000 0.000 0.000 0.000
698 119.425 119.450 SMB 25 45.75 33.700 0.000 0.000 842.500 0.000 0.000 0.000 0.000
699 119.450 119.475 SMB 25 37.1 41.425 0.000 0.000 1035.625 0.000 0.000 0.000 0.000
700 119.475 119.500 SMB 25 16.41 26.755 0.000 0.000 668.875 0.000 0.000 0.000 0.000
701 119.500 119.525 SMB 25 10.56 0.09 13.485 0.045 0.000 337.125 0.000 0.000 1.125 0.000
702 119.525 119.550 SMB 25 10.81 10.685 0.045 0.000 267.125 0.000 0.000 1.125 0.000
703 119.550 119.575 SMB 25 15.81 0.37 13.310 0.185 0.000 332.750 0.000 0.000 4.625 0.000
704 119.575 119.600 SMB 25 16.92 0.11 16.365 0.240 0.000 409.125 0.000 0.000 6.000 0.000
705 119.600 119.625 SMB 25 10.75 0.13 13.835 0.120 0.000 345.875 0.000 0.000 3.000 0.000
706 119.625 119.650 SMB 25 6.06 0.03 8.405 0.080 0.000 210.125 0.000 0.000 2.000 0.000
707 119.650 119.675 SMB 25 17.16 11.610 0.015 0.000 290.250 0.000 0.000 0.375 0.000
708 119.675 119.700 SMB 25 47.77 32.465 0.000 0.000 811.625 0.000 0.000 0.000 0.000
709 119.700 119.725 SMB 25 95.85 71.810 0.000 0.000 1795.250 0.000 0.000 0.000 0.000
710 119.725 119.750 SMB 25 141.62 118.735 0.000 0.000 2968.375 0.000 0.000 0.000 0.000
711 119.750 119.775 SMB 25 165.63 153.625 0.000 0.000 3840.625 0.000 0.000 0.000 0.000
712 119.775 119.800 SMB 25 177.36 171.495 0.000 0.000 4287.375 0.000 0.000 0.000 0.000
713 119.800 119.825 SMB 25 193.87 185.615 0.000 0.000 4640.375 0.000 0.000 0.000 0.000
714 119.825 119.850 SMB 25 190.31 192.090 0.000 0.000 4802.250 0.000 0.000 0.000 0.000
715 119.850 119.875 SMB 25 183.68 186.995 0.000 0.000 4674.875 0.000 0.000 0.000 0.000
716 119.875 119.900 SMB 25 127.35 155.515 0.000 0.000 3887.875 0.000 0.000 0.000 0.000
717 119.900 119.925 SMB 25 109.35 118.350 0.000 0.000 2958.750 0.000 0.000 0.000 0.000
718 119.925 119.950 SMB 25 114.39 111.870 0.000 0.000 2796.750 0.000 0.000 0.000 0.000

Page 169 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

719 119.950 119.975 SMB 25 61.98 88.185 0.000 0.000 2204.625 0.000 0.000 0.000 0.000
720 119.975 120.000 SMB 25 3.25 32.615 0.000 0.000 815.375 0.000 0.000 0.000 0.000
Total Km 119.000 to 120.000 60305.38 0.00 0.00 18.25 0.00
721 120.000 120.025 SMB 25 121.27 62.260 0.000 0.000 1556.500 0.000 0.000 0.000 0.000
722 120.025 120.050 SMB 25 110.65 115.960 0.000 0.000 2899.000 0.000 0.000 0.000 0.000
723 120.050 120.075 SMB 25 71.6 91.125 0.000 0.000 2278.125 0.000 0.000 0.000 0.000
724 120.075 120.100 SMB 25 53.66 62.630 0.000 0.000 1565.750 0.000 0.000 0.000 0.000
725 120.100 120.125 SMB 25 49.92 51.790 0.000 0.000 1294.750 0.000 0.000 0.000 0.000
726 120.125 120.150 SMB 25 48.87 49.395 0.000 0.000 1234.875 0.000 0.000 0.000 0.000
727 120.150 120.175 SMB 25 55.36 52.115 0.000 0.000 1302.875 0.000 0.000 0.000 0.000
728 120.175 120.200 SMB 25 51.84 53.600 0.000 0.000 1340.000 0.000 0.000 0.000 0.000
729 120.200 120.225 SMB 25 42.62 47.230 0.000 0.000 1180.750 0.000 0.000 0.000 0.000
730 120.225 120.250 SMB 25 41.64 42.130 0.000 0.000 1053.250 0.000 0.000 0.000 0.000
731 120.250 120.275 SMB 25 62.36 52.000 0.000 0.000 1300.000 0.000 0.000 0.000 0.000
732 120.275 120.300 SMB 25 70.58 66.470 0.000 0.000 1661.750 0.000 0.000 0.000 0.000
733 120.300 120.325 SMB 25 119.11 94.845 0.000 0.000 2371.125 0.000 0.000 0.000 0.000
734 120.325 120.350 SMB 25 157.99 138.550 0.000 0.000 3463.750 0.000 0.000 0.000 0.000
735 120.350 120.375 SMB 25 160.86 159.425 0.000 0.000 3985.625 0.000 0.000 0.000 0.000
736 120.375 120.400 SMB 25 203.23 182.045 0.000 0.000 4551.125 0.000 0.000 0.000 0.000
737 120.400 120.425 SMB 25 201.36 202.295 0.000 0.000 5057.375 0.000 0.000 0.000 0.000
738 120.425 120.450 SMB 25 205.38 203.370 0.000 0.000 5084.250 0.000 0.000 0.000 0.000
739 120.450 120.475 SMB 25 194.47 199.925 0.000 0.000 4998.125 0.000 0.000 0.000 0.000
740 120.475 120.500 SMB 25 174.99 184.730 0.000 0.000 4618.250 0.000 0.000 0.000 0.000
741 120.500 120.525 SMB 25 111.91 143.450 0.000 0.000 3586.250 0.000 0.000 0.000 0.000
742 120.525 120.550 SMB 25 108.44 110.175 0.000 0.000 2754.375 0.000 0.000 0.000 0.000
743 120.550 120.575 SMB 25 117.66 113.050 0.000 0.000 2826.250 0.000 0.000 0.000 0.000
744 120.575 120.600 SMB 25 119.3 118.480 0.000 0.000 2962.000 0.000 0.000 0.000 0.000
745 120.600 120.625 SMB 25 168.51 143.905 0.000 0.000 3597.625 0.000 0.000 0.000 0.000
746 120.625 120.650 SMB 25 168.48 168.495 0.000 0.000 4212.375 0.000 0.000 0.000 0.000
747 120.650 120.675 SMB 25 185.91 177.195 0.000 0.000 4429.875 0.000 0.000 0.000 0.000
748 120.675 120.700 SMB 25 173.39 179.650 0.000 0.000 4491.250 0.000 0.000 0.000 0.000
749 120.700 120.725 SMB 25 163.2 168.295 0.000 0.000 4207.375 0.000 0.000 0.000 0.000
750 120.725 120.750 SMB 25 129.65 146.425 0.000 0.000 3660.625 0.000 0.000 0.000 0.000
751 120.750 120.775 SMB 25 90.55 110.100 0.000 0.000 2752.500 0.000 0.000 0.000 0.000
752 120.775 120.800 SMB 25 116.54 103.545 0.000 0.000 2588.625 0.000 0.000 0.000 0.000
753 120.800 120.825 SMB 25 134.59 125.565 0.000 0.000 3139.125 0.000 0.000 0.000 0.000
754 120.825 120.850 SMB 25 168.98 151.785 0.000 0.000 3794.625 0.000 0.000 0.000 0.000
755 120.850 120.875 SMB 25 173.73 171.355 0.000 0.000 4283.875 0.000 0.000 0.000 0.000
756 120.875 120.900 SMB 25 170 171.865 0.000 0.000 4296.625 0.000 0.000 0.000 0.000
757 120.900 120.925 SMB 25 160.64 165.320 0.000 0.000 4133.000 0.000 0.000 0.000 0.000
758 120.925 120.950 SMB 25 195.17 177.905 0.000 0.000 4447.625 0.000 0.000 0.000 0.000

Page 170 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

759 120.950 120.975 SMB 25 168.68 181.925 0.000 0.000 4548.125 0.000 0.000 0.000 0.000
760 120.975 121.000 SMB 25 182.15 175.415 0.000 0.000 4385.375 0.000 0.000 0.000 0.000
Total Km 120.000 to 121.000 127894.75 0.00 0.00 0.00 0.00
761 121.000 121.025 SMB 25 194.91 188.530 0.000 0.000 4713.250 0.000 0.000 0.000 0.000
762 121.025 121.050 SMB 25 175.43 185.170 0.000 0.000 4629.250 0.000 0.000 0.000 0.000
763 121.050 121.075 SMB 25 156.27 165.850 0.000 0.000 4146.250 0.000 0.000 0.000 0.000
764 121.075 121.100 SMB 25 148.11 152.190 0.000 0.000 3804.750 0.000 0.000 0.000 0.000
765 121.100 121.125 SMB 25 124.92 136.515 0.000 0.000 3412.875 0.000 0.000 0.000 0.000
766 121.125 121.150 SMB 25 143.24 134.080 0.000 0.000 3352.000 0.000 0.000 0.000 0.000
767 121.150 121.175 SMB 25 153.39 148.315 0.000 0.000 3707.875 0.000 0.000 0.000 0.000
768 121.175 121.200 SMB 25 118.56 135.975 0.000 0.000 3399.375 0.000 0.000 0.000 0.000
769 121.200 121.225 SMB 25 138.63 128.595 0.000 0.000 3214.875 0.000 0.000 0.000 0.000
770 121.225 121.250 SMB 25 188.09 163.360 0.000 0.000 4084.000 0.000 0.000 0.000 0.000
771 121.250 121.275 SMB 25 266.11 0.04 227.100 0.020 0.000 5677.500 0.000 0.000 0.500 0.000
772 121.275 121.300 SMB 25 269.72 267.915 0.020 0.000 6697.875 0.000 0.000 0.500 0.000
773 121.300 121.325 SMB 25 306.11 287.915 0.000 0.000 7197.875 0.000 0.000 0.000 0.000
774 121.325 121.350 SMB 25 268.99 287.550 0.000 0.000 7188.750 0.000 0.000 0.000 0.000
775 121.350 121.375 SMB 25 344.93 306.960 0.000 0.000 7674.000 0.000 0.000 0.000 0.000
776 121.375 121.400 SMB 25 238.41 291.670 0.000 0.000 7291.750 0.000 0.000 0.000 0.000
777 121.400 121.425 SMB 25 234.11 236.260 0.000 0.000 5906.500 0.000 0.000 0.000 0.000
778 121.425 121.450 SMB 25 156.7 195.405 0.000 0.000 4885.125 0.000 0.000 0.000 0.000
779 121.450 121.475 SMB 25 198.75 177.725 0.000 0.000 4443.125 0.000 0.000 0.000 0.000
780 121.475 121.500 SMB 25 209.72 204.235 0.000 0.000 5105.875 0.000 0.000 0.000 0.000
781 121.500 121.525 SMB 25 208.77 209.245 0.000 0.000 5231.125 0.000 0.000 0.000 0.000
782 121.525 121.550 SMB 25 229.12 218.945 0.000 0.000 5473.625 0.000 0.000 0.000 0.000
783 121.550 121.575 SMB 25 219.63 224.375 0.000 0.000 5609.375 0.000 0.000 0.000 0.000
784 121.575 121.600 SMB 25 150.4 185.015 0.000 0.000 4625.375 0.000 0.000 0.000 0.000
785 121.600 121.625 SMB 25 116.17 133.285 0.000 0.000 3332.125 0.000 0.000 0.000 0.000
786 121.625 121.650 SMB 25 134.53 125.350 0.000 0.000 3133.750 0.000 0.000 0.000 0.000
787 121.650 121.675 SMB 25 115.79 125.160 0.000 0.000 3129.000 0.000 0.000 0.000 0.000
788 121.675 121.700 SMB 25 123.67 119.730 0.000 0.000 2993.250 0.000 0.000 0.000 0.000
Total Km 120.000 to 121.700 134060.500 0.000 0.000 1.000 0.000
Total Km 114.900.000 to 121.700 434337.375 12190.750 70.500 2191.650 41642.250
ALTITUDE : 3001-3300m
789 121.700 121.725 SMB 25 62.24 92.955 0.000 0.000 2323.875 0.000 0.000 0.000 0.000
790 121.725 121.750 SMB 25 110.68 86.460 0.000 0.000 2161.500 0.000 0.000 0.000 0.000
791 121.750 121.775 SMB 25 93.46 102.070 0.000 0.000 2551.750 0.000 0.000 0.000 0.000
792 121.775 121.800 SMB 25 85.36 89.410 0.000 0.000 2235.250 0.000 0.000 0.000 0.000
793 121.800 121.825 SMB 25 83.51 84.435 0.000 0.000 2110.875 0.000 0.000 0.000 0.000
794 121.825 121.850 SMB 25 77.13 80.320 0.000 0.000 2008.000 0.000 0.000 0.000 0.000
795 121.850 121.875 SMB 25 39.31 58.220 0.000 0.000 1455.500 0.000 0.000 0.000 0.000

Page 171 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

796 121.875 121.900 SMB 25 74.27 56.790 0.000 0.000 1419.750 0.000 0.000 0.000 0.000
797 121.900 121.925 SMB 25 78.93 76.600 0.000 0.000 1915.000 0.000 0.000 0.000 0.000
798 121.925 121.950 SMB 25 109.16 94.045 0.000 0.000 2351.125 0.000 0.000 0.000 0.000
799 121.950 121.975 SMB 25 65.74 87.450 0.000 0.000 2186.250 0.000 0.000 0.000 0.000
800 121.975 122.000 SMB 25 59.42 62.580 0.000 0.000 1564.500 0.000 0.000 0.000 0.000
Total Km 121.700 to 122.000 24283.38 0.00 0.00 0.00 0.00
801 122.000 122.025 SMB 25 50.35 54.885 0.000 0.000 1372.125 0.000 0.000 0.000 0.000
802 122.025 122.050 SMB 25 96.11 73.230 0.000 0.000 1830.750 0.000 0.000 0.000 0.000
803 122.050 122.075 SMB 25 141.52 118.815 0.000 0.000 2970.375 0.000 0.000 0.000 0.000
804 122.075 122.100 SMB 25 175.45 158.485 0.000 0.000 3962.125 0.000 0.000 0.000 0.000
805 122.100 122.125 SMB 25 129.99 152.720 0.000 0.000 3818.000 0.000 0.000 0.000 0.000
806 122.125 122.150 SMB 25 181.87 155.930 0.000 0.000 3898.250 0.000 0.000 0.000 0.000
807 122.150 122.175 SMB 25 244.69 213.280 0.000 0.000 5332.000 0.000 0.000 0.000 0.000
808 122.175 122.200 SMB 25 381.17 312.930 0.000 0.000 7823.250 0.000 0.000 0.000 0.000
809 122.200 122.225 SMB 25 221.61 301.390 0.000 0.000 7534.750 0.000 0.000 0.000 0.000
810 122.225 122.250 SMB 25 291.96 256.785 0.000 0.000 6419.625 0.000 0.000 0.000 0.000
811 122.250 122.275 SMB 25 276.6 284.280 0.000 0.000 7107.000 0.000 0.000 0.000 0.000
812 122.275 122.300 SMB 25 327.2 301.900 0.000 0.000 7547.500 0.000 0.000 0.000 0.000
813 122.300 122.325 SMB 25 287.94 307.570 0.000 0.000 7689.250 0.000 0.000 0.000 0.000
814 122.325 122.350 SMB 25 264.3 276.120 0.000 0.000 6903.000 0.000 0.000 0.000 0.000
815 122.350 122.375 SMB 25 234.34 249.320 0.000 0.000 6233.000 0.000 0.000 0.000 0.000
816 122.375 122.400 SMB 25 315.01 274.675 0.000 0.000 6866.875 0.000 0.000 0.000 0.000
817 122.400 122.425 SMB 25 435.82 375.415 0.000 0.000 9385.375 0.000 0.000 0.000 0.000
818 122.425 122.450 SMB 25 394.79 415.305 0.000 0.000 10382.625 0.000 0.000 0.000 0.000
819 122.450 122.475 SMB 25 462.75 428.770 0.000 0.000 10719.250 0.000 0.000 0.000 0.000
820 122.475 122.500 SMB 25 383.46 423.105 0.000 0.000 10577.625 0.000 0.000 0.000 0.000
821 122.500 122.525 SMB 25 248.96 316.210 0.000 0.000 7905.250 0.000 0.000 0.000 0.000
822 122.525 122.550 SMB 25 244.3 246.630 0.000 0.000 6165.750 0.000 0.000 0.000 0.000
823 122.550 122.575 SMB 25 344.83 294.565 0.000 0.000 7364.125 0.000 0.000 0.000 0.000
824 122.575 122.600 SMB 25 336.01 340.420 0.000 0.000 8510.500 0.000 0.000 0.000 0.000
825 122.600 122.625 SMB 25 331.25 333.630 0.000 0.000 8340.750 0.000 0.000 0.000 0.000
826 122.625 122.650 SMB 25 328.74 329.995 0.000 0.000 8249.875 0.000 0.000 0.000 0.000
827 122.650 122.675 SMB 25 248.36 288.550 0.000 0.000 7213.750 0.000 0.000 0.000 0.000
828 122.675 122.700 SMB 25 337.57 292.965 0.000 0.000 7324.125 0.000 0.000 0.000 0.000
829 122.700 122.725 SMB 25 347.59 342.580 0.000 0.000 8564.500 0.000 0.000 0.000 0.000
830 122.725 122.750 SMB 25 411.2 379.395 0.000 0.000 9484.875 0.000 0.000 0.000 0.000
831 122.750 122.775 SMB 25 384.68 397.940 0.000 0.000 9948.500 0.000 0.000 0.000 0.000
832 122.775 122.800 SMB 25 354.84 369.760 0.000 0.000 9244.000 0.000 0.000 0.000 0.000
833 122.800 122.825 SMB 25 335.74 345.290 0.000 0.000 8632.250 0.000 0.000 0.000 0.000
834 122.825 122.850 SMB 25 339.72 337.730 0.000 0.000 8443.250 0.000 0.000 0.000 0.000
835 122.850 122.875 SMB 25 334.91 337.315 0.000 0.000 8432.875 0.000 0.000 0.000 0.000

Page 172 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

836 122.875 122.900 SMB 25 327.38 331.145 0.000 0.000 8278.625 0.000 0.000 0.000 0.000
837 122.900 122.925 SMB 25 331.57 329.475 0.000 0.000 8236.875 0.000 0.000 0.000 0.000
838 122.925 122.950 SMB 25 299.98 315.775 0.000 0.000 7894.375 0.000 0.000 0.000 0.000
839 122.950 122.975 SMB 25 338.85 319.415 0.000 0.000 7985.375 0.000 0.000 0.000 0.000
840 122.975 123.000 SMB 25 339.3 339.075 0.000 0.000 8476.875 0.000 0.000 0.000 0.000
Total Km 122.000 to 123.000 293069.25 0.00 0.00 0.00 0.00
841 123.000 123.025 SMB 25 274.02 306.660 0.000 0.000 7666.500 0.000 0.000 0.000 0.000
842 123.025 123.050 SMB 25 257.84 265.930 0.000 0.000 6648.250 0.000 0.000 0.000 0.000
843 123.050 123.075 SMB 25 152.47 205.155 0.000 0.000 5128.875 0.000 0.000 0.000 0.000
844 123.075 123.100 SMB 25 99.08 125.775 0.000 0.000 3144.375 0.000 0.000 0.000 0.000
845 123.100 123.125 SMB 25 76.21 87.645 0.000 0.000 2191.125 0.000 0.000 0.000 0.000
846 123.125 123.150 SMB 25 66.92 71.565 0.000 0.000 1789.125 0.000 0.000 0.000 0.000
847 123.150 123.175 SMB 25 108.77 87.845 0.000 0.000 2196.125 0.000 0.000 0.000 0.000
848 123.175 123.200 SMB 25 86.71 97.740 0.000 0.000 2443.500 0.000 0.000 0.000 0.000
849 123.200 123.225 SMB 25 110.9 98.805 0.000 0.000 2470.125 0.000 0.000 0.000 0.000
850 123.225 123.250 SMB 25 111.45 111.175 0.000 0.000 2779.375 0.000 0.000 0.000 0.000
851 123.250 123.275 SMB 25 131.01 121.230 0.000 0.000 3030.750 0.000 0.000 0.000 0.000
852 123.275 123.300 SMB 25 121.54 126.275 0.000 0.000 3156.875 0.000 0.000 0.000 0.000
853 123.300 123.325 SMB 25 85.56 103.550 0.000 0.000 2588.750 0.000 0.000 0.000 0.000
854 123.325 123.350 SMB 25 133.2 109.380 0.000 0.000 2734.500 0.000 0.000 0.000 0.000
855 123.350 123.375 SMB 25 154.62 143.910 0.000 0.000 3597.750 0.000 0.000 0.000 0.000
856 123.375 123.400 SMB 25 348.64 251.630 0.000 0.000 6290.750 0.000 0.000 0.000 0.000
857 123.400 123.425 SMB 25 208.31 278.475 0.000 0.000 6961.875 0.000 0.000 0.000 0.000
858 123.425 123.450 SMB 25 197.65 202.980 0.000 0.000 5074.500 0.000 0.000 0.000 0.000
859 123.450 123.475 SMB 25 98.04 147.845 0.000 0.000 3696.125 0.000 0.000 0.000 0.000
860 123.475 123.500 SMB 25 89.74 93.890 0.000 0.000 2347.250 0.000 0.000 0.000 0.000
861 123.500 123.525 SMB 25 22.88 56.310 0.000 0.000 1407.750 0.000 0.000 0.000 0.000
862 123.525 123.550 SMB 25 4.55 0.97 13.715 0.485 0.000 342.875 0.000 0.000 12.125 0.000
863 123.550 123.575 SMB 25 33.54 19.045 0.485 0.000 476.125 0.000 0.000 12.125 0.000
864 123.575 123.600 SMB 25 8.61 21.075 0.000 0.000 526.875 0.000 0.000 0.000 0.000
865 123.600 123.625 SMB 25 18.37 13.490 0.000 0.000 337.250 0.000 0.000 0.000 0.000
866 123.625 123.650 SMB 25 14.73 16.550 0.000 0.000 413.750 0.000 0.000 0.000 0.000
867 123.650 123.675 SMB 25 13.9 14.315 0.000 0.000 357.875 0.000 0.000 0.000 0.000
868 123.675 123.700 SMB 25 15.57 14.735 0.000 0.000 368.375 0.000 0.000 0.000 0.000
869 123.700 123.725 SMB 25 18.75 0.11 17.160 0.055 0.000 429.000 0.000 0.000 1.375 0.000
870 123.725 123.750 SMB 25 11.17 2.44 14.960 1.275 0.000 374.000 0.000 0.000 31.875 0.000
871 123.750 123.775 SMB 25 5.64 1.43 8.405 1.935 0.000 210.125 0.000 0.000 48.375 0.000
872 123.775 123.800 SMB 25 3.55 2.13 4.595 1.780 0.000 114.875 0.000 0.000 44.500 0.000
873 123.800 123.825 SMB 25 3.23 5.4 3.390 3.765 0.000 84.750 0.000 0.000 94.125 0.000
874 123.825 123.850 SMB 25 6.81 5.020 2.700 0.000 125.500 0.000 0.000 67.500 0.000
875 123.850 123.875 SMB 25 0.18 3.83 3.495 1.915 0.000 87.375 0.000 0.000 47.875 0.000

Page 173 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

876 123.875 123.900 SMB 25 11.99 6.085 1.915 0.000 152.125 0.000 0.000 47.875 0.000
877 123.900 123.925 SMB 25 19 15.495 0.000 0.000 387.375 0.000 0.000 0.000 0.000
878 123.925 123.950 SMB 25 6.03 12.515 0.000 0.000 312.875 0.000 0.000 0.000 0.000
879 123.950 123.975 SMB 25 27.33 16.680 0.000 0.000 417.000 0.000 0.000 0.000 0.000
880 123.975 124.000 SMB 25 17.36 22.345 0.000 0.000 558.625 0.000 0.000 0.000 0.000
Total Km 123.000 to 124.000 83421.00 0.00 0.00 407.75 0.00
881 124.000 124.025 SMB 25 5.28 0.8 11.320 0.400 0.000 283.000 0.000 0.000 10.000 0.000
882 124.025 124.050 SMB 25 15.34 0.39 10.310 0.595 0.000 257.750 0.000 0.000 14.875 0.000
883 124.050 124.075 SMB 25 13.41 0.55 14.375 0.470 0.000 359.375 0.000 0.000 11.750 0.000
884 124.075 124.100 SMB 25 22.63 18.020 0.275 0.000 450.500 0.000 0.000 6.875 0.000
885 124.100 124.125 SMB 25 20.84 0.034 21.735 0.017 0.000 543.375 0.000 0.000 0.425 0.000
886 124.125 124.150 SMB 25 9.58 3.6 15.210 1.817 0.000 380.250 0.000 0.000 45.425 0.000
887 124.150 124.175 SMB 25 10.02 2.6 9.800 3.100 0.000 245.000 0.000 0.000 77.500 0.000
888 124.175 124.200 SMB 25 4.86 7.440 1.300 0.000 186.000 0.000 0.000 32.500 0.000
889 124.200 124.225 SMB 25 35.15 20.005 0.000 0.000 500.125 0.000 0.000 0.000 0.000
890 124.225 124.250 SMB 25 77.01 56.080 0.000 0.000 1402.000 0.000 0.000 0.000 0.000
891 124.250 124.275 SMB 25 63.93 70.470 0.000 0.000 1761.750 0.000 0.000 0.000 0.000
892 124.275 124.300 SMB 25 84.47 74.200 0.000 0.000 1855.000 0.000 0.000 0.000 0.000
893 124.300 124.325 SMB 25 76.11 80.290 0.000 0.000 2007.250 0.000 0.000 0.000 0.000
894 124.325 124.350 SMB 25 96.87 86.490 0.000 0.000 2162.250 0.000 0.000 0.000 0.000
895 124.350 124.375 SMB 25 118.04 107.455 0.000 0.000 2686.375 0.000 0.000 0.000 0.000
896 124.375 124.400 SMB 25 123.7 120.870 0.000 0.000 3021.750 0.000 0.000 0.000 0.000
897 124.400 124.425 SMB 25 175.83 149.765 0.000 0.000 3744.125 0.000 0.000 0.000 0.000
898 124.425 124.450 SMB 25 153.72 164.775 0.000 0.000 4119.375 0.000 0.000 0.000 0.000
899 124.450 124.475 SMB 25 180.66 167.190 0.000 0.000 4179.750 0.000 0.000 0.000 0.000
900 124.475 124.500 SMB 25 181.13 180.895 0.000 0.000 4522.375 0.000 0.000 0.000 0.000
901 124.500 124.525 SMB 25 165.82 173.475 0.000 0.000 4336.875 0.000 0.000 0.000 0.000
902 124.525 124.550 SMB 25 160.87 163.345 0.000 0.000 4083.625 0.000 0.000 0.000 0.000
903 124.550 124.575 SMB 25 116.31 138.590 0.000 0.000 3464.750 0.000 0.000 0.000 0.000
904 124.575 124.600 SMB 25 101.05 108.680 0.000 0.000 2717.000 0.000 0.000 0.000 0.000
905 124.600 124.625 SMB 25 89.36 95.205 0.000 0.000 2380.125 0.000 0.000 0.000 0.000
906 124.625 124.650 SMB 25 79.09 84.225 0.000 0.000 2105.625 0.000 0.000 0.000 0.000
907 124.650 124.675 SMB 25 72.72 75.905 0.000 0.000 1897.625 0.000 0.000 0.000 0.000
908 124.675 124.700 SMB 25 75.37 74.045 0.000 0.000 1851.125 0.000 0.000 0.000 0.000
909 124.700 124.725 SMB 25 62.2 68.785 0.000 0.000 1719.625 0.000 0.000 0.000 0.000
910 124.725 124.750 SMB 25 75.04 68.620 0.000 0.000 1715.500 0.000 0.000 0.000 0.000
911 124.750 124.775 SMB 25 71.28 73.160 0.000 0.000 1829.000 0.000 0.000 0.000 0.000
912 124.775 124.800 SMB 25 66.27 68.775 0.000 0.000 1719.375 0.000 0.000 0.000 0.000
913 124.800 124.825 SMB 25 77.91 72.090 0.000 0.000 1802.250 0.000 0.000 0.000 0.000
914 124.825 124.850 SMB 25 75.42 76.665 0.000 0.000 1916.625 0.000 0.000 0.000 0.000
915 124.850 124.875 SMB 25 58.12 66.770 0.000 0.000 1669.250 0.000 0.000 0.000 0.000

Page 174 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

916 124.875 124.900 SMB 25 57.52 57.820 0.000 0.000 1445.500 0.000 0.000 0.000 0.000
917 124.900 124.925 SMB 25 171.57 114.545 0.000 0.000 2863.625 0.000 0.000 0.000 0.000
918 124.925 124.950 SMB 25 114.65 143.110 0.000 0.000 3577.750 0.000 0.000 0.000 0.000
919 124.950 124.975 SMB 25 123.39 119.020 0.000 0.000 2975.500 0.000 0.000 0.000 0.000
920 124.975 125.000 SMB 25 124.74 124.065 0.000 0.000 3101.625 0.000 0.000 0.000 0.000
Total Km 124.000 to 125.000 83839.75 0.00 0.00 199.35 0.00
921 125.000 125.025 SMB 25 119.06 121.900 0.000 0.000 3047.500 0.000 0.000 0.000 0.000
922 125.025 125.050 SMB 25 128.07 123.565 0.000 0.000 3089.125 0.000 0.000 0.000 0.000
923 125.050 125.075 SMB 25 132.54 130.305 0.000 0.000 3257.625 0.000 0.000 0.000 0.000
924 125.075 125.100 SMB 25 144.91 138.725 0.000 0.000 3468.125 0.000 0.000 0.000 0.000
925 125.100 125.125 SMB 25 44.33 94.620 0.000 0.000 2365.500 0.000 0.000 0.000 0.000
926 125.125 125.150 SMB 25 95.12 69.725 0.000 0.000 1743.125 0.000 0.000 0.000 0.000
927 125.150 125.175 SMB 25 116.27 105.695 0.000 0.000 2642.375 0.000 0.000 0.000 0.000
928 125.175 125.200 SMB 25 117.46 116.865 0.000 0.000 2921.625 0.000 0.000 0.000 0.000
929 125.200 125.225 SMB 25 139.88 128.670 0.000 0.000 3216.750 0.000 0.000 0.000 0.000
930 125.225 125.250 SMB 25 127.96 133.920 0.000 0.000 3348.000 0.000 0.000 0.000 0.000
931 125.250 125.275 SMB 25 127.28 127.620 0.000 0.000 3190.500 0.000 0.000 0.000 0.000
932 125.275 125.300 SMB 25 128.18 127.730 0.000 0.000 3193.250 0.000 0.000 0.000 0.000
933 125.300 125.325 SMB 25 122.98 125.580 0.000 0.000 3139.500 0.000 0.000 0.000 0.000
934 125.325 125.350 SMB 25 135.03 129.005 0.000 0.000 3225.125 0.000 0.000 0.000 0.000
935 125.350 125.375 SMB 25 131.77 133.400 0.000 0.000 3335.000 0.000 0.000 0.000 0.000
936 125.375 125.400 SMB 25 125.27 128.520 0.000 0.000 3213.000 0.000 0.000 0.000 0.000
937 125.400 125.425 SMB 25 95.92 110.595 0.000 0.000 2764.875 0.000 0.000 0.000 0.000
938 125.425 125.450 SMB 25 60.68 78.300 0.000 0.000 1957.500 0.000 0.000 0.000 0.000
939 125.450 125.475 SMB 25 35.88 48.280 0.000 0.000 1207.000 0.000 0.000 0.000 0.000
940 125.475 125.500 SMB 25 26.18 0.062 31.030 0.031 0.000 775.750 0.000 0.000 0.775 0.000
941 125.500 125.525 SMB 25 31.69 28.935 0.031 0.000 723.375 0.000 0.000 0.775 0.000
942 125.525 125.550 SMB 25 49.01 40.350 0.000 0.000 1008.750 0.000 0.000 0.000 0.000
943 125.550 125.575 SMB 25 35.39 42.200 0.000 0.000 1055.000 0.000 0.000 0.000 0.000
944 125.575 125.600 SMB 25 30.52 32.955 0.000 0.000 823.875 0.000 0.000 0.000 0.000
945 125.600 125.625 SMB 25 18.09 4.11 24.305 2.055 0.000 607.625 0.000 0.000 51.375 0.000
946 125.625 125.650 SMB 25 24.62 21.355 2.055 0.000 533.875 0.000 0.000 51.375 0.000
947 125.650 125.675 SMB 25 49.32 36.970 0.000 0.000 924.250 0.000 0.000 0.000 0.000
948 125.675 125.700 SMB 25 71.37 60.345 0.000 0.000 1508.625 0.000 0.000 0.000 0.000
949 125.700 125.725 SMB 25 59.55 65.460 0.000 0.000 1636.500 0.000 0.000 0.000 0.000
950 125.725 125.750 SMB 25 19.65 39.600 0.000 0.000 990.000 0.000 0.000 0.000 0.000
951 125.750 125.775 SMB 25 54.11 36.880 0.000 0.000 922.000 0.000 0.000 0.000 0.000
952 125.775 125.800 SMB 25 34.28 3.39 44.195 0.000 1.695 1104.875 0.000 0.000 0.000 42.375
953 125.800 125.825 SMB 25 18.02 12.72 26.150 0.000 8.055 653.750 0.000 0.000 0.000 201.375
954 125.825 125.850 SMB 25 8.57 20.22 13.295 0.000 16.470 332.375 0.000 0.000 0.000 411.750
955 125.850 125.875 SMB 25 13.32 6.23 10.945 0.000 13.225 273.625 0.000 0.000 0.000 330.625

Page 175 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

956 125.875 125.900 SMB 25 8.34 4.21 10.830 2.105 3.115 270.750 0.000 0.000 52.625 77.875
957 125.900 125.925 SMB 25 11.92 11.65 10.130 2.105 5.825 253.250 0.000 0.000 52.625 145.625
958 125.925 125.950 SMB 25 28.76 20.340 0.000 5.825 508.500 0.000 0.000 0.000 145.625
959 125.950 125.975 SMB 25 14.75 21.755 0.000 0.000 543.875 0.000 0.000 0.000 0.000
960 125.975 126.000 SMB 25 9.98 20 12.365 10.000 0.000 309.125 0.000 0.000 250.000 0.000
Total Km 125.000 to 126.000 70085.25 0.00 0.00 459.55 1355.25
961 126.000 126.025 SMB 25 26.98 0.34 18.480 10.170 0.000 462.000 0.000 0.000 254.250 0.000
962 126.025 126.050 SMB 25 31.34 29.160 0.170 0.000 729.000 0.000 0.000 4.250 0.000
963 126.050 126.075 SMB 25 21.73 1.41 26.535 0.705 0.000 663.375 0.000 0.000 17.625 0.000
964 126.075 126.100 SMB 25 13.82 0.45 17.775 0.930 0.000 444.375 0.000 0.000 23.250 0.000
965 126.100 126.125 SMB 25 8.89 2.31 11.355 1.380 0.000 283.875 0.000 0.000 34.500 0.000
966 126.125 126.150 SMB 25 45.98 27.435 1.155 0.000 685.875 0.000 0.000 28.875 0.000
967 126.150 126.175 SMB 25 38.2 42.090 0.000 0.000 1052.250 0.000 0.000 0.000 0.000
968 126.175 126.200 SMB 25 47.14 0.57 42.670 0.285 0.000 1066.750 0.000 0.000 7.125 0.000
969 126.200 126.225 SMB 25 17.51 1.98 32.325 1.275 0.000 808.125 0.000 0.000 31.875 0.000
970 126.225 126.250 SMB 25 46.08 31.795 0.990 0.000 794.875 0.000 0.000 24.750 0.000
971 126.250 126.275 SMB 25 20.38 33.230 0.000 0.000 830.750 0.000 0.000 0.000 0.000
972 126.275 126.300 SMB 25 48.22 34.300 0.000 0.000 857.500 0.000 0.000 0.000 0.000
973 126.300 126.325 SMB 25 55.97 52.095 0.000 0.000 1302.375 0.000 0.000 0.000 0.000
974 126.325 126.350 SMB 25 60.51 58.240 0.000 0.000 1456.000 0.000 0.000 0.000 0.000
975 126.350 126.375 SMB 25 59 59.755 0.000 0.000 1493.875 0.000 0.000 0.000 0.000
976 126.375 126.400 SMB 25 83.55 71.275 0.000 0.000 1781.875 0.000 0.000 0.000 0.000
977 126.400 126.425 SMB 25 69.61 76.580 0.000 0.000 1914.500 0.000 0.000 0.000 0.000
978 126.425 126.450 SMB 25 91.47 80.540 0.000 0.000 2013.500 0.000 0.000 0.000 0.000
979 126.450 126.475 SMB 25 75.16 83.315 0.000 0.000 2082.875 0.000 0.000 0.000 0.000
980 126.475 126.500 SMB 25 54.21 64.685 0.000 0.000 1617.125 0.000 0.000 0.000 0.000
981 126.500 126.525 SMB 25 38.27 46.240 0.000 0.000 1156.000 0.000 0.000 0.000 0.000
982 126.525 126.550 SMB 25 21.85 30.060 0.000 0.000 751.500 0.000 0.000 0.000 0.000
983 126.550 126.575 SMB 25 34.68 28.265 0.000 0.000 706.625 0.000 0.000 0.000 0.000
984 126.575 126.600 SMB 25 31.7 33.190 0.000 0.000 829.750 0.000 0.000 0.000 0.000
985 126.600 126.625 SMB 25 105.76 68.730 0.000 0.000 1718.250 0.000 0.000 0.000 0.000
986 126.625 126.650 SMB 25 28.57 67.165 0.000 0.000 1679.125 0.000 0.000 0.000 0.000
987 126.650 126.675 SMB 25 61.2 44.885 0.000 0.000 1122.125 0.000 0.000 0.000 0.000
988 126.675 126.700 SMB 25 35.45 48.325 0.000 0.000 1208.125 0.000 0.000 0.000 0.000
989 126.700 126.725 SMB 25 53.67 44.560 0.000 0.000 1114.000 0.000 0.000 0.000 0.000
990 126.725 126.750 SMB 25 43.06 48.365 0.000 0.000 1209.125 0.000 0.000 0.000 0.000
991 126.750 126.775 SMB 25 64.07 53.565 0.000 0.000 1339.125 0.000 0.000 0.000 0.000
992 126.775 126.800 SMB 25 133.55 98.810 0.000 0.000 2470.250 0.000 0.000 0.000 0.000
993 126.800 126.825 SMB 25 111.65 122.600 0.000 0.000 3065.000 0.000 0.000 0.000 0.000
994 126.825 126.850 SMB 25 126.42 119.035 0.000 0.000 2975.875 0.000 0.000 0.000 0.000
995 126.850 126.875 SMB 25 120.93 123.675 0.000 0.000 3091.875 0.000 0.000 0.000 0.000

Page 176 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

996 126.875 126.900 SMB 25 92.83 106.880 0.000 0.000 2672.000 0.000 0.000 0.000 0.000
997 126.900 126.925 SMB 25 106.68 99.755 0.000 0.000 2493.875 0.000 0.000 0.000 0.000
998 126.925 126.950 SMB 25 70.02 88.350 0.000 0.000 2208.750 0.000 0.000 0.000 0.000
999 126.950 126.975 SMB 25 116.58 93.300 0.000 0.000 2332.500 0.000 0.000 0.000 0.000
1000 126.975 127.000 SMB 25 95.2 105.890 0.000 0.000 2647.250 0.000 0.000 0.000 0.000
Total Km 126.000 to 127.000 59132.00 0.00 0.00 426.50 0.00
1001 127.000 127.025 SMB 25 83.59 46.785 0.000 0.000 1169.625 0.000 0.000 0.000 0.000
1002 127.025 127.050 SMB 25 53.67 68.630 0.000 0.000 1715.750 0.000 0.000 0.000 0.000
1003 127.050 127.075 SMB 25 67.82 60.745 0.000 0.000 1518.625 0.000 0.000 0.000 0.000
1004 127.075 127.100 SMB 25 51.69 59.755 0.000 0.000 1493.875 0.000 0.000 0.000 0.000
1005 127.100 127.125 SMB 25 19.16 2.03 35.425 1.015 0.000 885.625 0.000 0.000 25.375 0.000
1006 127.125 127.150 SMB 25 88.6 53.880 1.015 0.000 1347.000 0.000 0.000 25.375 0.000
1007 127.150 127.175 SMB 25 14.89 10.76 51.745 0.000 5.380 1293.625 0.000 0.000 0.000 134.500
1008 127.175 127.200 SMB 25 3.05 9.54 8.970 0.000 10.150 224.250 0.000 0.000 0.000 253.750
1009 127.200 127.225 SMB 25 0.42 23.35 1.735 0.000 16.445 43.375 0.000 0.000 0.000 411.125
1010 127.225 127.250 SMB 25 5.4 1.32 2.910 0.660 11.675 72.750 0.000 0.000 16.500 291.875
1011 127.250 127.275 SMB 25 17.06 11.230 0.660 0.000 280.750 0.000 0.000 16.500 0.000
1012 127.275 127.300 SMB 25 64.42 40.740 0.000 0.000 1018.500 0.000 0.000 0.000 0.000
1013 127.300 127.325 SMB 25 47.01 55.715 0.000 0.000 1392.875 0.000 0.000 0.000 0.000
1014 127.325 127.350 SMB 25 58.01 52.510 0.000 0.000 1312.750 0.000 0.000 0.000 0.000
1015 127.350 127.375 SMB 25 73.05 65.530 0.000 0.000 1638.250 0.000 0.000 0.000 0.000
1016 127.375 127.400 SMB 25 71.22 72.135 0.000 0.000 1803.375 0.000 0.000 0.000 0.000
1017 127.400 127.425 SMB 25 56.47 63.845 0.000 0.000 1596.125 0.000 0.000 0.000 0.000
1018 127.425 127.450 SMB 25 131.76 94.115 0.000 0.000 2352.875 0.000 0.000 0.000 0.000
1019 127.450 127.475 SMB 25 147.75 139.755 0.000 0.000 3493.875 0.000 0.000 0.000 0.000
1020 127.475 127.500 SMB 25 121.84 134.795 0.000 0.000 3369.875 0.000 0.000 0.000 0.000
1021 127.500 127.525 SMB 25 123.05 122.445 0.000 0.000 3061.125 0.000 0.000 0.000 0.000
1022 127.525 127.550 SMB 25 153.37 138.210 0.000 0.000 3455.250 0.000 0.000 0.000 0.000
1023 127.550 127.575 SMB 25 82.39 117.880 0.000 0.000 2947.000 0.000 0.000 0.000 0.000
Total Km 127.000 to127.575 37487.125 0.000 0.000 83.750 1091.250
Total Km 121.700 to 127.575 651317.750 0.000 0.000 1576.900 2446.500
ALTITUDE : 3301-3600m
301 127.575 127.600 SMB 25 40.96 61.675 0.000 0.000 1541.875 0.000 0.000 0.000 0.000
302 127.600 127.625 SMB 25 20.15 30.555 0.000 0.000 763.875 0.000 0.000 0.000 0.000
303 127.625 127.650 SMB 25 30.99 25.570 0.000 0.000 639.250 0.000 0.000 0.000 0.000
304 127.650 127.675 SMB 25 18.01 24.500 0.000 0.000 612.500 0.000 0.000 0.000 0.000
305 127.675 127.700 SMB 25 11.81 14.910 0.000 0.000 372.750 0.000 0.000 0.000 0.000
Total Km 127.000 to127.575 3930.25 0.00 0.00 0.00 0.00
Total Km 127.575 to 127.700 3930.25 0.00 0.00 0.00 0.00

G/Total Km127.575to Km 127.700 3930.25 0.00 0.00 0.00 8.10

Page 177 of EW QTY


S/No Location Soil Distance X-Sec area in X-Sec area in filling Mean area Mean area Mean area in Earth work Earth work
Classificati (Mtr) cutting (Sqm) (Sqm) in filling filling above Earth work quantity in cutting (Cum) in filling in filling
on (Sqm) upto 1.5 m 1.5 m (Sqm) upto 1.5 m above 1.5 m
From (Km) To (Km) Filling upto Filling (Sqm) SMB SR HR
1.50 m above to
1.50 m

Err:509
Err:509
Err:509

Page 178 of EW QTY


PLATE-III of IRC :9-1972
TRAFFIC CENSUS
WEEKLY TRAFFIC SUMMARY
FROM (DATE) 24-May-19 TO (DATE) 30-May-19

DETAILS OF CENSUS POINT: Location km 102.200 Village Khadwa Road Classification Class-9

Kilometrage/Mileage Km 102.200 on Basoli-Bani-Bhaderwah Road


Route No (If any)
District: Kathua State: Jammu & Kashmir(UT)

PERIOD REMARKS
FAST VEHICLES
FROM TO
DATE HOUR DATE HOUR CARS, JEEPS, MOTOR ANIMAL MINI BUSES TRUCKS Two Axle Multi Axle truck/ Other TOTAL
VANS, THREE CYCLES & DRAWN truck/ Tanker/ Tatra/ (Specify) (COL 8
WHEELERS SCOOTERS VEHICLES Tanker Smarch/Pinaka TO 12)

1 2 3 4 5 6 7 8 9 10 11 12 13 15 16
24-May-19 0600 24-May-19 1800 420 124 10 103 132 144 250 629

25-May-19 0600 25-May-19 1800 448 160 8 120 132 150 240 642

26-May-19 0600 26-May-19 1800 440 182 9 122 140 152 245 659

27-May-19 0600 27-May-19 1800 420 155 7 110 148 136 241 635

28-May-19 0600 28-May-19 1800 380 160 10 117 168 120 248 653

29-May-19 0600 29-May-19 1800 395 145 8 125 152 140 239 656

30-May-19 0600 30-May-19 1800 402 134 8 130 166 128 250 674

Total for the week 2905 1060 60 827 1038 970 1713 4548

Average Daily traffic for the week 415 151 9 118 148 139 245 650
DESIGN TRAFFIC IS CONSIDERED IN TERMS OF THE CUMMULATIVE NUMBER OF
STANDARD AXLES BY USING THE FOLLOWING EQUATION BASED ON IRC : 37-2018

N= 365X((1+r)^n-1)XAXDXF
r
Where,
N= Cummulative number of standard axles to be catered for during the design
period of 'n' years in terms of Millian Standard Axles (msa)
A= Initial traffic in the year of completion of construction in terms of the number of
Commercial Vehicle per Day (CVD)
D= Lateral distribution factor= 0.50 (as per Clause 4.5.1.2 of IRC :-37-2018)
F= Vehicle Damage Factor (VDF) = 1.70 (as per table No. 4.2 of IRC : 37-2018)
n= Desaign period in years= 15 years as per Clause 4.3.1 of IRC 37: 2018
r= Annual growth rate of commercial vehicle (for 5 percent annual growth rate,
r=0.05) as per Clause 4.2.2 of IRC 37:2018
The traffic in the year of completion is estimated using the following norms:-
A= P(1+r)^x
where,
P= Number of commercial vehicles per day as per last count (650 CV/day as per
traffic census enclosed)
x= Number of years between the last count and the year of completion of
construction= 3 years
A= P(1+r)^x
= 650(1+0.05)^3
= 752.46
Say 752.00 CV/day

Design traffic N = 365x((1+r)^n-1)xAxDxF


r
= 365*((1+0.05)^15-1)*752*0.50*1.70
0.05

= 5034452 say
msa 5.03 (5034452/1000000)
Say 5.00
DESIGN CALCULATION OF PROPOSED PAVEMENT FOR
CBR AVG 12%

(A) PAVEMENT DESIGN FOR CBR 12% Thickness


Pavement thickness Sub Base 150 MM
required as per Plate
Base 250 MM
7 of IRC : 37-2018
Page No.40 Bituminous Surface (DBM 80 MM
Total 480 MM

(B) PROPOSED
Sub Base
GSBC 150 MM
Base
WMM Ist layer 100 MM
WMM Ist layer 75 MM
WMM IInd layer 75 MM
Total Base 250 MM
Bituminous Surface
DBM 50 MM
BC 30 MM
TOTAL PROPOSED THICKNESS 480 MM

Page 181 of 251


CBR Value Calculating as Per 80th Percentile Method Bet Km 102 to 112.00 at BBB rd
S/No CBR CBR in ascending Desending order %
order
1 13.11 7.19 28 100
2 22.84 7.61 27 96
3 11.28 8.18 26 93
4 23.26 11.28 25 89
5 22.84 11.42 24 86
6 7.19 13.11 23 82
7 23.12 13.96 22 79
8 20.87 14.10 21 75
9 22.84 14.38 20 71
10 11.42 14.80 19 68
11 23.97 15.23 18 64
12 23.69 17.48 17 61
13 24.96 19.03 16 57
14 23.69 20.02 15 54
15 22.42 20.30 14 50
16 24.11 20.87 13 46
17 19.03 22.42 12 43
18 23.26 22.56 11 39
19 20.02 22.84 10 36
20 23.69 23.12 9 32
21 11.28 23.26 8 29
22 7.61 23.69 7 25
23 23.97 23.97 6 21
24 23.69 24.10 5 18
25 22.84 24.11 4 14
26 14.1 24.25 3 11
27 23.26 24.53 2 7
28 22.56 24.96 1 4
LOCATION : KM 102.00 TO KM 128.00 BASOLI-BANI-BHADERWAH ROAD
Sieve Analysis

% age passing by weight Atter berg Limits Proctor Test


S/No Location in Km through ISS CBR Value (%) Remark

4.75 mm 0.075 mm LL (%) PL PI MDD (gm/cc) OMC (%)

1 102.000 54.67 28.4 32.8 18.9 13.9 1.96 10.29 13.11 ###
2 102.200 45.67 57.5 25.72 NP 2.09 10.37 22.84 ###
3 102.400 54.33 28.2 32.86 18.93 13.93 1.96 10.27 11.28 ###
4 102.600 46.33 57.8 25.72 NP 2.09 10.31 23.26 ###
5 102.800 65.67 29.2 29.58 NP 2.03 12.29 23.97 ###
6 103.000 44.67 56.3 25.72 NP 2.09 10.29 22.84 ###
7 103.200 68.67 22.5 25.89 NP 2.01 7.64 20.3 ###
8 103.400 55.33 27.15 32.92 18.91 14.01 1.84 10.23 7.19 ###
9 103.600 49 27.2 34.04 NP 2.02 13.32 23.12 ###
10 103.800 44 62.6 25.72 NP 2.09 10.29 23.69 ###
11 104.000 49.67 27.5 33.03 NP 2.01 13.32 20.87 ###
12 104.200 69.33 20.5 29.61 NP 2.04 12.29 22.84 ###
13 104.400 35.33 15.4 33.06 NP 1.85 13.03 14.38 ###
14 104.600 36 21 29.2 NP 1.97 10.4 13.96 ###
15 104.800 43.67 41.2 52.33 NP 1.85 5.91 11.42 ###
16 105.000 34.67 15.35 36.75 NP 1.84 13.33 14.38 ###
17 105.200 69.67 21.2 29.52 NP 2.04 12.29 23.97 ###
18 105.400 45.33 58.5 25.72 NP 2.09 10.31 23.69 ###
19 105.600 37.33 21.45 22.23 NP 2.08 14.19 24.96 ###
20 105.800 52.33 30.25 32.07 NP 1.93 9.28 23.69 ###
21 106.000 49.33 27.4 33.06 NP 2.01 13.31 22.42 ###
22 106.200 69.33 20.5 29.61 NP 2.04 12.29 24.11 ###
23 106.400 67.33 21.1 28.12 NP 2.01 11.16 19.03 ###
24 106.600 55.67 20.85 29.56 NP 2.08 10.32 23.26 ###
25 106.800 52.33 19.85 30.16 NP 2.07 10.27 20.02 ###
26 107.000 54.67 19.85 29.36 NP 2.09 10.27 24.1 ###
27 107.200 49.33 52.6 25.72 NP 2.07 10.37 17.48 ###
28 107.400 45.67 58.6 25.72 NP 2.09 10.27 23.12 ###
29 107.600 53.33 20.15 29.58 NP 2.09 10.18 23.26 ###
30 107.800 52.33 19.2 30.42 NP 2.09 9.42 23.69 ###
31 108.000 52.67 19.3 30.38 NP 2.08 10.02 24.11 ###
32 108.200 41.67 39.2 53.33 NP 1.84 5.31 11.28 ###
33 108.400 55.33 27.8 32.95 18.94 14.01 1.88 10.25 8.18 ###
34 108.600 37.33 21.45 22.23 NP 1.96 1.97 14.8 ###
35 108.800 40.33 38.25 53.23 NP 1.83 5.2 11.42 ###
36 109.000 65.33 29.33 34.52 20.02 14.5 1.79 1.97 7.61 ###
37 109.200 69.33 21.5 28.67 NP 2.06 13.09 24.11 ###
38 109.400 48.67 19.2 22.41 NP 2.05 10.34 14.8 ###
39 109.600 35.67 30.6 43.75 NP 2.03 8.14 14.38 ###
40 109.800 70.67 22.6 29.58 NP 2.04 12.29 23.69 ###
41 10.000 68.67 22.5 29.63 NP 2.03 12.69 22.84 ###
42 110.200 48.33 10.7 26.25 NP 2.04 10.5 24.53 ###
43 110.400 69.33 20.5 29.61 NP 2.04 12.29 23.97 ###
44 110.600 52 16.9 26.37 NP 2.03 8.14 23.69 ###
45 110.800 68.67 19.6 28.69 NP 2.03 13.08 24.25 ###
46 111.000 44.33 61.6 25.72 NP 2.09 10.33 23.69 ###
47 111.200 45.67 57.5 25.72 NP 2.08 10.29 22.84 ###
48 111.400 72.33 42.8 68.45 NP 1.63 17.56 15.23 ###
49 111.600 34.33 15.4 36.5 NP 1.85 12.29 13.96 ###
50 111.800 3667 19.4 30.5 NP 1.88 12.16 14.1 ###
51 111.200 52.67 30.4 32.07 NP 1.94 9.38 23.26 ###
52 112.200 63.33 31.5 34.34 NP 1.94 1061 22.56 ###
53 112.400 61.67 34.12 27.16 NP 10.15 13.4
54 112.600 88.67 26.3 28.56 21.33 7.23 1.71 17.69 6.77
55 112.800 97.67 30.6 37.6 29.3 8.3 1.74 17.73 7.19
56 13.000 98.33 76.15 42.04 28 14.04 1.57 17.49 12.27
57 113.200 43.33 28.15 35.61 NP 2.01 9.09 22.42
58 113.400 68.67 21.2 26.6 NP 1.99 6.43 21
59 13.600 57.33 50.6 35.85 25.01 10.84 1.8 14.54 8.04
60 113.800 44.33 59.4 25.72 NP 2.09 10.36 23.41
61 114.000 59.67 25.2 36 NP 2.01 10.31 17.34
62 114.200 58.33 23.05 36.2 NP 1.99 10.22 13.96
63 114.400 59.67 25.3 35.6 NP 1.98 10.33 13.11
64 114.600 28.67 67.05 49.58 36.8 12.78 1.78 14.92 8.4
65 114.800 70.33 29.1 28.63 NP 2.03 11.17 18.61
66 115.000 71.33 22.5 28.63 NP 2.05 10.26 23.69
67 115.200 60.33 21.5 29.16 NP 1.98 12.41 15.65
68 115.400 69.33 20.5 29.61 NP 2.04 12.29 24.1
69 115.600 87.67 37.5 29.36 NP 1.96 8.61 12.27
70 115.800 99.67 28.5 38.2 28.33 9.87 1.73 17.71 8.18
71 116.000 50.33 28.4 33.02 NP 2.01 13.34 21.57
72 116.200 49.67 27.6 33.09 NP 2.02 13.29 21.71
73 116.400 49.33 27.4 33.06 NP 2.01 13.31 22.84
74 116.600 99.83 84.6 33.17 22.82 10.35 1.7 17.03 10.15
75 116.800 97.33 83.6 34.16 23.26 10.9 1.73 18.03 9.87
76 117.000 98.33 84 32.08 21.96 10.12 1.72 16.98 10.57
77 117.200 87.33 37.45 29.34 NP 1.96 7.71 12.41
78 117.400 89.67 27.3 28.66 21.63 7.03 1.72 18.68 10.12
79 117.600 96.67 82.2 40.16 28.6 11.56 1.63 18.96 6.77
80 117.800 98.33 83.6 34.06 24.03 10.03 1.73 16.98 7.05
81 118.000 38.33 29.6 35.41 NP 2.07 8.63 22.28
82 118.200 41.67 39.2 53.33 NP 1.84 5.31 11.42
83 118.400 34.33 15.6 36.25 NP 1.85 13.31 14.8
84 118.600 97.33 74.6 41.6 26.9 14.9 1.63 17.21 7.9
85 118.800 99.83 96.3 38.89 26.12 12.77 1.69 13.28 7.05
86 119.000 98 85.2 38.31 27.84 10.47 1.62 20.15 7.61
87 119.200 68.33 21.1 26.81 NP 1.99 5.46 20.87
88 119.400 61.33 25.85 22.5 NP 1.95 9.66 11
89 119.600 98.67 76.2 42.8 27.96 14.84 1.61 17.39 7.61
90 119.800 34.67 15.2 36.6 NP 1.84 12.31 14
91 120.000 98.33 85.2 32.08 23.02 9.06 1.69 18.06 6.77
92 120.200 68.5 20.95 26.8 NP 1.99 5.43 21.15
93 120.400 97.67 85.1 46.33 31.52 14.81 1.79 15.54 7.9
94 120.600 94.32 80.5 35.11 23.95 11.16 1.72 15.27 8.8
95 120.800 99.33 84.2 39.52 23.95 15.57 1.74 16.03 7.61
96 121.000 98 84.2 37.17 22.82 14.35 1.7 17.03 7.19
97 121.200 99.33 85.3 39.33 27.9 11.43 1.65 19.32 6.33
98 121.400 98.67 84.6 38.33 27.85 10.48 1.63 19.18 6.77
99 121.600 98.33 76.15 42.84 28 14.84 1.57 17.49 8.04
100 121.800 90.67 85.1 36.1 NP 1.96 14.12 17.34
101 122.000 97.67 83.2 40.33 28.6 11.73 1.63 18.96 7.05
102 122.200 95.33 80.2 40.13 27.12 13.01 1.69 13.9 7.4
103 122.400 49.67 69.1 27.3 NP 1.98 12.54 22.28
104 122.600 44.67 59.8 25.72 NP 2.09 10.28 23.41
105 122.800 49.33 27.5 29.63 NP 2.01 13.31 21.2
106 123.000 82.33 72.2 34.1 23.1 11 1.78 15.96 9.87
107 123.200 98.67 84 33.17 22.82 10.35 1.7 17.03 7.61
108 123.400 61.67 26.1 22.5 NP 1.96 11.03 11.2
109 123.600 75.33 29.1 31.1 NP 2.01 14.06 19.46
110 123.800 70.33 22.5 30.26 NP 2.05 13.03 22.28
111 124.000 90.33 31.2 32.76 23.09 9.67 1.68 17.08 10.43
112 124.200 91.67 28.4 28.56 24.53 4.03 1.71 19.58 15.23
113 124.400 72.67 60.1 44.8 31.1 13.7 1.65 17.54 11.28
114 124.600 75.33 64.25 44.8 32.44 12.36 1.52 18.55 7.33
115 124.800 81.33 78.1 39.1 39.1 1.84 14.52 14.66
116 125.000 88.67 75.3 31.16 NP 1.92 15.96 18.33
117 125.200 79.33 65.4 30.12 NP 1.94 11.09 17.77
118 125.400 80.67 76.1 29.16 NP 1.92 16.14 18.89
119 125.600 58.33 49.8 22.12 NP 1.86 13.16 14.38
120 125.800 62.67 63.2 29.1 NP 1.94 15.75 21.71
121 126.000 50.33 59.2 30.16 NP 1.98 16.12 16.36
122 126.200 49.67 60.8 26.12 NP 2.09 11.18 19.46
123 126.400 46.33 57.6 25.74 NP 2.08 10.47 23.41
124 126.600 44.67 56.3 25.72 NP 2.09 10.32 23.26
125 126.800 69.33 21.1 25.89 NP 2.01 7.46 20.59
126 127.000 68.67 20.9 26.82 NP 1.99 5.45 21.15
127 127.200 65.33 24.12 27.1 NP 1.98 6.16 14.38
128 127.400 52.33 56.15 36.83 23.43 13.4 1.83 7.13 7.61
129 127.600 59.67 61.2 39.12 25.05 14.07 1.84 9.76 12.69
130 127.800 29.67 15.6 30.54 NP 2.09 10.16 20.87
131 128.000 24.67 16.95 32.37 NP 2.1 9.09 19.88

Note :- The test has been carried out for samples received from unit concern. Assurance of the test results is
limited to the samples received at this Field Laboratory.

(Ashok Kumar Ram)


AE(Civ)
SO-3 (Estg & Br)
for Chief Engineer
DETAILS OF TRAFFIC SIGN BOARD/POSTS

S/NO LOCATION IN KMS PARTICU A/U Altitude Altitude Total


LARS 2001 to 2401 to
2400 m 2700 m
A) Informatory sign rectangular shape 80cm x 30 cm(As per IRC 67-2001)
Bridges Nos - -
Others
Nos 4 5
info
TOTAL Nos 4 5 9
S.No Items A/U Norms QTY QTY T/QTY
1 Excvn Cum 0.072 0.288 0.360 0.648
2 PCC 1:4:8 Cum 0.0855 0.342 0.428 0.770
B) Warning Sign 600 mm triangular (as per IRC 67-2001 )
102.00 to 112.00 Rt bend Nos 54 62
102.00 to 112.00 Lt bend Nos 58 64
TOTAL 112 126 238
S.No Items A/U Norms QTY QTY T/QTY
1 Excvn Cum 0.072 8.064 9.072 17.136
2 PCC 1:4:8 Cum 0.0855 9.576 10.773 20.349

c) 5th km Stone Nos 0 2


TOTAL 0 2 2
S.No Items A/U Norms QTY QTY T/QTY
1 Excvn Cum 0.215 0.000 0.430 0.430
2 PCC 1:4:8 Cum 0.159 0.000 0.318 0.318
3 RCC 1:2:4 Cum 0.184 0.000 0.368 0.368
4 Steel 12 mm kg 19 0.000 38.000 38.000
5 Plastering 12 mm sqm 0.195 0.000 0.390 0.390
6 Painting sqm 1.63 0.000 3.260 3.260
7 C/S sqm 19 0.000 38.000 38.000

D) Ordinary km Stone Nos 4 6


TOTAL 4 6 10
S.No Items A/U Norms QTY QTY T/QTY
1 Excvn Cum 0.215 0.860 1.290 2.150
2 PCC 1:4:8 Cum 0.176 0.704 1.056 1.760
3 RCC 1:2:4 Cum 0.094 0.376 0.564 0.940
4 Steel 12 mm kg 10 40.000 60.000 100.000
5 Plastering 12 mm sqm 0.12 0.480 0.720 1.200
6 Painting sqm 0.817 3.268 4.902 8.170
7 C/S sqm 0.694 2.776 4.164 6.940

E) Sub km stone Nos 12 28


TOTAL 12 28 40.00
1 Excvn Cum 0.042 0.504 1.176 1.680
2 PCC 1:4:8 Cum 0.037 0.444 1.036 1.480
3 RCC 1:2:4 Cum 0.01 0.120 0.280 0.400
4 Steel 6 mm kg 1 12.000 28.000 40.000
5 Plastering 12 mm sqm 0 0.000 0.000 0.000
6 Painting sqm 0.19 2.280 5.320 7.600
7 C/S sqm 0.355 4.260 9.940 14.200

OVER HEAD INFO/DIRECTION BOARD


i) Earthwork in Excavation Cum 2 1.7 1.7 1.37 7.92
ii) PCC (1:4:8) Cum 2 1.7 1.7 0.15 0.87
iii) PCC (1:2:4) Anchoring Post Cum 2 1.4 1.4 1.22 4.78
iv) Steel upto 12mm Kg 200.00
vi) Centering/Shuttering Sqm 8 1.4 1.22 13.66
vii) Earth filling Cum 2 1.7 1.7 1.22 7.05
Deduction Cum 2 1.4 1.4 1.22 4.78
Net Qty 2.27
G/Total
Excvn Cum 9.72 12.33 22.04
PCC 1:4:8 Cum 11.066 13.6105 24.68
RCC 1:2:4 Cum 0.496 1.212 1.71
Steel 6 mm kg 12 28 40.00
Steel 12 mm kg 40 98 138.00
Plastering 12 mm sqm
Painting sqm
C/S sqm
LOCATION STATEMENT OF PROPOSED R/WALL, B/WALL,T/WALL AND RCC CULVERTS

Toe Wall (Ht in mtr) R/wall ( Ht in Mtr) B/Wall ( Ht in Mtr) RCC cul span in mtr
Location in Remark
S/No.
Km s
1m ht 1.5m ht 2m ht 3m ht 2.00 3.00 4.00 2.00 2.50 3.00 4.00 2.00 3.00 6.00

ALTITUDE 2101 - 2400 MTRs (KM 102.00 TO 105.675)

1 102.000 48.00 48.00

2 102.000 88.00

4 102.050

5 102.050 48.00

6 102.150 48.00
102.200 32.00

7 102.250 8.00 24.00 24.00 1.00

8 102.605 8.00 24.00 24.00 1.00

9 102.725

10 102.825

11 102.875 16.00 16.00

12 102.900 8.00 24.00 24.00 1.00

13 102.950

14 102.975

15 103.025 24.00

16 103.050 56.00

17 103.250 8.00 24.00 24.00 1.00

18 103.270

103.500 48.00 48.00


19
20 103.575 48.00

103.625 48.00 48.00


21
103.675 8.00 24.00 24.00 1.00
22
103.725
23
103.750
24
25 103.875 24.00

103.900
26
27 104.050

28 104.100 32.00

29 104.150

30 104.175

31 104.275

32 104.300

33 104.350

34 104.575 8.00 48.00 48.00 1.00

35 104.675 16.00 32.00

36 104.700 8.00 48.00 48.00 1.00

37 104.750 104.00 104.00

38 105.000 8.00 32.00 32.00 1.00

39 105.200

40 105.250 8.00 16.00 16.00

41 105.275

42 105.325 48.00 16.00

43 105.425 32.00

44 105.550 8.00 8.00

45 105.600 16.00 16.00

46 105.650 48.00 48.00

TOTAL 64.00 - 608.00 48.00 64.00 648.00 48.00 96.00 88.00 152.00 - 8.00 - - -

TOTAL 184.00 24.00 1,168.00 - 368.00 1,300.00 328.00 408.00 32.00 64.00 - 19.00 - -

G/Total 248.00 24.00 1,776.00 48.00 432.00 1,948.00 376.00 504.00 120.00 216.00 - 27.00 - -

Page 186 of LOC STATEMENT


Appendix ' I'

STRUCTURE WISE QUANTITIES FOR PROPOSED PERMANENT WORKS

Excvn in trenches in PCC RCC (1:2:4) RRM IN CM RR Dry Laying reinforcement


Length Nos of Type of
S/No Location Type of structure Back filling Weep hole Flush pointing Centering/Shuttering Earth filling Qty per Qty per unit Weight of steel Hard Core White wash
(m) unit Soil SMB SR HR 1:4:8 1:3:6 1:05:10 M25 1:6 1:4 Qty Upto 12mm above 12mm
Qty per Qty per unit
Qty per unit Qty per unit Qty per unit Qty per unit Qty per unit
unit unit Qty per
(Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) Qty per unit (Mtr) Qty per unit (Sqm) Qty per unit (Sqm) Qty per unit (Cum) ( Kg) (Kg) (KG) Qty per unit (Cum) Qty per unit (Sqm)
unit
ALTITUDE 2101 - 2400 MTRs (KM 102.00 TO 105.675)

1 102.000 T/wall 48X3 48 6 SMB 30.30 181.82 5.63 33.75 - 26.26 157.59 10.13 60.75 22.80 136.80 - -
2 102.000 R/Wall 48 x3 48 6 SMB 31.64 189.81 5.60 33.59 13.76 82.57 10.95 65.70 10.13 60.75 25.35 152.10 21.62 129.74
3 102.000 B/wall 88X3 88 11 SMB 43.06 473.62 7.11 78.24 20.65 227.18 16.66 183.29 11.34 124.74
4 102.050 R/wall 24X3 0 0 SMB 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
4 102.075 R/wall 48X4 48 6 SMB 49.49 296.96 9.09 54.54 18.50 110.99 20.58 123.49 13.43 80.55 35.36 212.16 25.31 151.88
5 102.150 R/wall 32X3 0 0 SMB 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
5 102.150 B/wall 48X2.5 48 6 SMB 34.60 207.60 5.49 32.94 18.28 109.68 11.24 67.44 9.69 58.14 33.01 198.06 24.68 148.08
6 112.200 B/wall 32X3 32 4 SMB 43.06 172.22 7.11 28.45 20.65 82.61 16.66 66.65 11.34 45.36
7 102.250 T/wall 24X2 24 3 SMB 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
8 102.250 R/wall 24X3 24 3 SMB 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
9 102.250 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
10 102.250 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
11 102.605 T/wall 24X2 24 3 SR 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
12 102.605 R/wall 24X3 24 3 SR 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
13 102.605 RCC culvert 2 Mtr span 1 1 SR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
14 102.605 T/wall 8 X1 mtr 8 1 SR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
15 102.725 T/wall 48X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
16 102.725 R/wall 48X4 0 0 HR 49.49 0.00 9.09 0.00 18.50 0.00 20.58 0.00 13.43 0.00 35.36 0.00 25.31 0.00
17 102.825 T/wall 48X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
18 102.825 R/wall 48X4 0 0 HR 49.49 0.00 9.09 0.00 18.50 0.00 20.58 0.00 13.43 0.00 35.36 0.00 25.31 0.00
15 102.875 T/wall 16X2 16 2 SR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
16 102.875 R/wall 16X2 16 2 SR 17.22 34.44 2.85 5.70 9.65 19.29 4.17 8.33 6.83 13.65 18.70 37.40 17.98 35.95
17 102.900 T/wall 24X2 24 3 HR 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
18 102.900 R/wall 24X3 24 3 HR 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
19 102.900 RCC culvert 2 Mtr span 1 1 HR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
20 102.900 T/wall 8 X1 mtr 8 1 HR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
21 102.950 T/wall 16X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
22 102.950 R/wall 16X3 0 0 SR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
23 102.975 R/wall 48X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
24 103.025 R/wall 24X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
21 103.025 B/wall 24X2.5 24 3 HR 34.60 103.80 5.49 16.47 18.28 54.84 11.24 33.72 9.69 29.07 33.01 99.03 24.68 74.04
22 103.050 R/wall 126X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
22 103.050 B/wall 56X2 56 7 HR 27.07 189.46 4.06 28.39 16.71 116.99 6.58 46.03 8.01 56.07 22.00 154.00
23 103.250 T/wall 24X2 24 3 SMB 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
24 103.250 R/wall 24X3 24 3 SMB 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
25 103.250 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
26 103.250 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
27 103.270 R/wall 104X3 0 0 SMB 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
27 103.500 T/wall 48X2 48 6 SMB 15.82 94.92 2.88 17.29 14.17 85.01 6.83 40.95 13.60 81.60
28 103.500 R/wall 48X2 48 6 SMB 17.22 103.32 2.85 17.11 9.65 57.88 4.17 24.99 6.83 40.95 18.70 112.20 17.98 107.85
29 103.500 R/wall 16X3 0 0 SMB 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
30 103.575 T/wall 48X2 0 0 SMB 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
29 103.575 R/wall 48X3 48 6 SMB 31.64 189.81 5.60 33.59 13.76 82.57 10.95 65.70 10.13 60.75 25.35 152.10 21.62 129.74
30 103.625 T/wall 48X2 48 6 SMB 15.82 94.92 2.88 17.29 14.17 85.01 6.83 40.95 13.60 81.60
31 103.625 R/wall 48X3 48 6 SMB 31.64 189.81 5.60 33.59 13.76 82.57 10.95 65.70 10.13 60.75 25.35 152.10 21.62 129.74
32 103.675 T/wall 24X2 24 3 SMB 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
33 103.675 R/wall 24X3 24 3 SMB 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
34 103.675 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
35 103.675 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
36 103.725 T/wall 8X2 0 0 SR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
37 103.725 R/wall 8X3 0 0 SR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
38 103.750 T/wall 104X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
39 103.750 R/wall 104X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
36 103.875 B/wall 24X2 24 3 SR 27.07 81.20 3.12 9.36 16.05 48.16 6.58 19.73 8.01 24.03 22.00 66.00 23.18 69.54
37 103.900 R/wall 144X2 0 0 HR 17.22 0.00 2.85 0.00 9.65 0.00 4.17 0.00 6.83 0.00 18.70 0.00 17.98 0.00
38 103.900 R/wall 64X4 0 0 HR 49.49 0.00 9.09 0.00 18.50 0.00 20.58 0.00 13.43 0.00 35.36 0.00 25.31 0.00
39 104.050 T/wall 32X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
40 104.050 R/wall 32X4 0 0 HR 49.49 0.00 9.09 0.00 18.50 0.00 20.58 0.00 13.43 0.00 35.36 0.00 25.31 0.00
41 104.100 R/wall 32X2 0 0 HR 17.22 0.00 2.85 0.00 9.65 0.00 4.17 0.00 6.83 0.00 18.70 0.00 17.98 0.00
42 104.135 R/wall 32X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
37 104.100 B/wall 32X3 32 4 SR 43.06 172.22 7.11 28.45 20.65 82.61 16.66 66.65 11.34 45.36
38 104.150 T/wall 24X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
39 104.150 R/wall 24X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
40 104.175 T/wall 32X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
41 104.175 R/wall 64X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00
42 104.275 T/wall 24X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
43 104.275 R/wall 24X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
44 104.300 T/wall 32X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
45 104.300 R/wall 32X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
46 104.350 T/wall 160X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
47 104.350 R/wall 160X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
38 104.575 T/wall 48X2 48 6 SR 15.82 94.92 2.88 17.29 14.17 85.01 6.83 40.95 13.60 81.60
39 104.575 R/wall 48X3 48 6 SR 31.64 189.81 5.60 33.59 13.76 82.57 10.95 65.70 10.13 60.75 25.35 152.10 21.62 129.74
40 104.575 RCC culvert 2 Mtr span 1 1 SR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
41 104.575 T/wall 8 X1 mtr 8 1 SR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
42 104.675 T/wall 16X2 16 2 SR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
43 104.675 R/wall 32X3 32 4 SR 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
44 104.700 T/wall 48X2 48 6 SR 15.82 94.92 2.88 17.29 14.17 85.01 6.83 40.95 13.60 81.60
45 104.700 R/wall 48X3 48 6 SR 31.64 189.81 5.60 33.59 13.76 82.57 10.95 65.70 10.13 60.75 25.35 152.10 21.62 129.74
46 104.700 RCC culvert 2 Mtr span 1 1 SR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
47 104.700 T/wall 8 X1 mtr 8 1 SR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
48 104.750 T/wall 104X2 104 13 SR 15.82 205.66 2.88 37.47 14.17 184.18 6.83 88.73 13.60 176.80
49 104.750 R/wall 104X3 104 13 SR 31.64 411.26 5.60 72.77 13.76 178.91 10.95 142.35 10.13 131.63 25.35 329.55 21.62 281.10
50 105.000 T/wall 32X2 32 4 SMB 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
51 105.000 R/wall 32X3 32 4 SMB 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
52 105.000 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
53 105.000 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
54 105.200 T/wall 8X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
55 105.200 R/wall 16X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
54 105.250 T/wall 8X2 8 1 SR 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
55 105.250 R/wall 16X3 16 2 SR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
56 105.250 B/wall 16X2.5 16 2 SR 34.60 69.20 5.49 10.98 18.28 36.56 11.24 22.48 9.69 19.38 33.01 66.02 24.68 49.36
57 105.275 T/wall 16X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
58 105.275 R/wall 16X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
57 105.325 T/wall 48X2 48 6 SR 15.82 94.92 2.88 17.29 14.17 85.01 6.83 40.95 13.60 81.60
58 105.325 B/wall 16X2 16 2 SR 27.07 54.13 4.06 8.11 16.71 33.43 6.58 13.15 8.01 16.02 22.00 44.00 23.18 46.36
59 105.425 R/wall 32X3 32 4 SR 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
60 105.550 T/wall 8X2 8 1 SR 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
61 105.550 R/wall 8X3 8 1 SR 31.64 31.64 5.60 5.60 13.76 13.76 10.95 10.95 10.13 10.13 25.35 25.35 21.62 21.62
62 105.600 T/wall 16X2 16 2 SR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
63 105.600 R/wall 16X3 16 2 SR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
64 105.650 T/wall 48X2 48 6 SR 15.82 94.92 2.88 17.29 14.17 85.01 6.83 40.95 13.60 81.60
65 105.650 R/wall 48X3 48 6 SR 31.64 189.81 5.60 33.59 13.76 82.57 10.95 65.70 10.13 60.75 25.35 152.10 21.62 129.74
On R/Wall 412 412 SMB 0.35 144.20 0.00 0.00
66 Parapet wall (Nos)
and Culvert
Lined Drain (Kerb Channel) 2187.20 2187 SR 0.290 634.29 0.13 290.8976 0.094 205.5968 0.03 65.62 0.78 1706.02
67 102 TO 105.675
per Mtr
Lined Drain (Kerb Channel) 568.60 569 HR 0.290 164.89 0.13 75.6238 0.094 53.4484 0.03 17.06 0.78 443.51
68 102 TO 105.675
per Mtr
Lined Drain (Kerb Channel) 848.60 849 SMB 0.290 246.09 0.13 112.8638 0.094 79.7684 0.03 25.46 0.78 661.91
69 102 TO 105.675
per Mtr
3625.19 3717.21 742.36 1213.79 1190.09 338.81 57.12 3523.31 0.00 1562.91 2414.52 4212.62 4606.21 35.68 5085.18 5085.18 12.56 2434.52
TOTAL
- -
ALTITUDE 2401 - 2700 MTRs (km 105.675 to km 112.000)
70 105.725 R/wall 16X3 16 2 SR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
71 105.800 T/wall 56X2 56 7 SMB 15.82 110.74 2.88 20.18 14.17 99.17 6.83 47.78 13.60 95.20
72 105.800 R/wall 56X3 56 7 SMB 31.64 221.45 5.60 39.18 13.76 96.33 10.95 76.65 10.13 70.88 25.35 177.45
73 105.800 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
74 105.800 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
75 105.900 T/wall 16X2 16 2 SMB 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
76 105.900 B/wall 16X3 16 2 SMB 43.06 86.11 7.11 14.23 20.65 41.31 16.66 33.33 11.34 22.68
Page 187 of PMT Wks Qty
Excvn in trenches in PCC RCC (1:2:4) RRM IN CM RR Dry Laying reinforcement
Length Nos of Type of
S/No Location Type of structure Back filling Weep hole Flush pointing Centering/Shuttering Earth filling Qty per Qty per unit Weight of steel Hard Core White wash
(m) unit Soil SMB SR HR 1:4:8 1:3:6 1:05:10 M25 1:6 1:4 Qty Upto 12mm above 12mm
Qty per Qty per unit
Qty per unit Qty per unit Qty per unit Qty per unit Qty per unit
unit unit Qty per
(Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) Qty per unit (Mtr) Qty per unit (Sqm) Qty per unit (Sqm) Qty per unit (Cum) ( Kg) (Kg) (KG) Qty per unit (Cum) Qty per unit (Sqm)
unit
77 105.950 T/wall 32X2 32 4 SR 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
78 105.950 R/wall 32X3 32 4 SR 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
79 106.000 T/wall 16X2 16 2 SMB 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
80 106.000 R/wall 16X3 16 2 SMB 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
81 106.000 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
82 106.000 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
83 106.025 T/wall 8X2 8 1 SMB 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
84 106.025 R/wall 16X3 16 2 SMB 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
85 106.150 R/wall 16X3 0 0 SMB 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
85 106.150 B/wall 24X2 24 3 SMB 27.07 81.20 4.06 12.17 16.71 50.14 6.58 19.73 8.01 24.03 22.00 66.00 23.18 69.54
86 106.200 R/wall 16X3 0 0 SMB 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
86 106.200 B/wall 56X2 56 7 SMB 27.07 189.46 4.06 28.39 16.71 116.99 6.58 46.03 8.01 56.07 22.00 154.00
87 106.350 T/wall 24X2 24 3 SMB 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
88 106.350 R/wall 56X3 56 7 SMB 31.64 221.45 5.60 39.18 13.76 96.33 10.95 76.65 10.13 70.88 25.35 177.45
89 106.400 B/wall 56X2 56 7 SR 27.07 189.46 4.06 28.39 16.71 116.99 6.58 46.03 8.01 56.07 22.00 154.00
90 106.425 R/wall 48X2 0 0 HR 17.22 0.00 2.85 0.00 9.65 0.00 4.17 0.00 6.83 0.00 18.70 0.00 17.98 0.00
90 106.425 B/wall 32X2 32 4 HR 27.07 108.26 4.06 16.22 16.71 66.85 6.58 26.30 8.01 32.04 22.00 88.00 23.18 92.72
91 106.500 R/wall 8X3 8 1 SMB 31.64 31.64 5.60 5.60 13.76 13.76 10.95 10.95 10.13 10.13 25.35 25.35 21.62 21.62
92 106.500 B/wall 48X3 48 6 SMB 43.06 258.34 7.11 42.68 20.65 123.92 16.66 99.98 11.34 68.04
93 106.625 R/wall 40X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00
93 106.700 R/wall 16X3 16 2 HR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
94 106.775 T/wall 32X2 0 0 SMB 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
95 106.775 R/wall 48X3 0 0 SMB 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
94 106.800 T/wall 56X2 56 7 SMB 15.82 110.74 2.88 20.18 14.17 99.17 6.83 47.78 13.60 95.20
95 106.800 R/wall 56X3 56 7 SMB 31.64 221.45 5.60 39.18 13.76 96.33 10.95 76.65 10.13 70.88 25.35 177.45
96 106.800 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
97 106.800 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
98 106.850 R/wall 32X2 32 4 SR 17.22 68.88 2.85 11.41 9.65 38.59 4.17 16.66 6.83 27.30 18.70 74.80 17.98 71.90
99 106.900 R/wall 32X3 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
100 106.925 T/wall 64X2 0 0 SMB 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
100 106.925 R/wall 40X4 40 5 SMB 49.49 247.47 9.09 45.45 18.50 92.49 20.58 102.91 13.43 67.13 35.36 176.80 25.31 126.57
101 107.000 T/wall 16X2 16 2 HR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
102 107.000 R/wall 16X3 16 2 HR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
103 107.000 RCC culvert 2 Mtr span 1 1 HR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
104 107.000 T/wall 8 X1 mtr 8 1 HR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
105 107.100 T/wall 40X2 40 5 SR 15.82 79.10 2.88 14.41 14.17 70.84 6.83 34.13 13.60 68.00
106 107.100 R/wall 40X4 40 5 SR 49.49 247.47 9.09 45.45 18.50 92.49 20.58 102.91 13.43 67.13 35.36 176.80 25.31 126.57
107 107.100 RCC culvert 2 Mtr span 1 1 SR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
108 107.100 T/wall 8 X1 mtr 8 1 SR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
109 107.250 B/wall 16X2 16 2 SR 27.07 54.13 4.06 8.11 16.71 33.43 6.58 13.15 8.01 16.02 22.00 44.00 23.18 46.36
110 107.350 T/wall 32X2 32 4 SR 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
111 107.350 B/wall 32X2 32 4 SR 27.07 108.26 4.06 16.22 16.71 66.85 6.58 26.30 8.01 32.04 22.00 88.00 23.18 92.72
112 107.425 R/wall 8X3 8 1 SR 31.64 31.64 5.60 5.60 13.76 13.76 10.95 10.95 10.13 10.13 25.35 25.35 21.62 21.62
113 107.500 R/wall 16X4 16 2 SR 49.49 98.99 9.09 18.18 18.50 37.00 20.58 41.16 13.43 26.85 35.36 70.72 25.31 50.63
114 107.550 T/wall 48X2 0 0 SR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
115 107.550 R/wall 48X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
116 107.625 R/wall 16X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
114 107.700 T/wall 32X2 32 4 SR 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
115 107.700 R/wall 32X3 32 4 SR 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
116 107.700 RCC culvert 2 Mtr span 1 1 SR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
117 107.700 T/wall 8 X1 mtr 8 1 SR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
118 107.825 T/wall 64X2 64 8 SMB 15.82 126.56 2.88 23.06 14.17 113.34 6.83 54.60 13.60 108.80
119 107.825 B/wall 32X2.5 32 4 SMB 34.60 138.40 5.49 21.96 18.28 73.12 11.24 44.96 9.69 38.76 33.01 132.04 24.68 98.72
120 107.925 T/wall 40X2 0 0 SR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
121 107.925 R/wall 40X3 0 0 SR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00
120 107.950 T/wall 144X2 144 18 SR 15.82 284.76 2.88 51.88 14.17 255.02 6.83 122.85 13.60 244.80
121 107.950 R/wall 176X4 176 22 SR 49.49 1088.87 9.09 199.97 18.50 406.95 20.58 452.79 13.43 295.35 35.36 777.92 25.31 556.89
122 107.950 B/wall 176X2 176 22 SR 27.07 595.45 4.06 89.23 16.71 367.69 6.58 144.65 8.01 176.22 22.00 484.00 23.18 509.96
123 108.225 R/wall 24X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
123 108.250 R/wall 16X2 16 2 SMB 17.22 34.44 2.85 5.70 9.65 19.29 4.17 8.33 6.83 13.65 18.70 37.40 17.98 35.95
124 108.270 T/wall 24X2 24 3 SMB 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
125 108.270 R/wall 40X3 40 5 SMB 31.64 158.18 5.60 27.99 13.76 68.81 10.95 54.75 10.13 50.63 25.35 126.75
126 108.325 R/wall 48X2 48 6 SMB 17.22 103.32 2.85 17.11 9.65 57.88 4.17 24.99 6.83 40.95 18.70 112.20 17.98 107.85
127 108.450 R/wall 28X3 28 3.5 SR 31.64 110.72 5.60 19.59 13.76 48.17 10.95 38.33 10.13 35.44 25.35 88.73 21.62 75.68
128 108.650 T/wall 32X2 32 4 SR 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
129 108.650 R/wall 32X3 32 4 SR 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
130 108.725 T/wall 32X2 32 4 SR 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
131 108.725 R/wall 32X3 32 4 SR 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
132 108.725 RCC culvert 2 Mtr span 1 1 SR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
133 108.725 T/wall 8 X1 mtr 8 1 SR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
134 108.750 R/wall 16X3 16 2 SR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
135 108.800 T/wall 8X2 8 1 SMB 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
136 108.800 R/wall 16X3 16 2 SMB 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
137 108.850 T/wall 32X2 32 4 SMB 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
138 108.850 R/wall 32X3 32 4 SMB 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
139 108.850 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
140 108.850 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
141 108.900 T/wall 16X2 16 2 SR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
142 108.900 R/wall 24X3 24 3 SR 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
143 108.975 R/wall 16X3 16 2 SMB 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
144 108.975 R/wall 16X2 16 2 SMB 17.22 34.44 2.85 5.70 9.65 19.29 4.17 8.33 6.83 13.65 18.70 37.40 17.98 35.95
145 109.025 T/wall 8X2 8 1 SMB 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
146 109.025 R/wall 16X3 16 2 SMB 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
147 109.050 T/wall 24X2 24 3 SMB 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
148 109.050 R/wall 16X3 16 2 SMB 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
149 109.100 T/wall 24X2 24 3 SMB 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
150 109.100 R/wall 24X4 24 3 SMB 49.49 148.48 9.09 27.27 18.50 55.49 20.58 61.74 13.43 40.28 35.36 106.08 25.31 75.94
151 109.125 T/wall 8X2 8 1 SMB 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
152 109.125 R/wall 8X2 8 1 SMB 17.22 17.22 2.85 2.85 9.65 9.65 4.17 4.17 6.83 6.83 18.70 18.70 17.98 17.98
153 109.400 T/wall 40X2 40 5 SMB 15.82 79.10 2.88 14.41 14.17 70.84 6.83 34.13 13.60 68.00
154 109.400 R/wall 72X2 72 9 SMB 17.22 154.98 2.85 25.67 9.65 86.82 4.17 37.49 6.83 61.43 18.70 168.30 17.98 161.78
155 109.400 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
156 109.400 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
157 109.400 R/wall 72X3 72 9 SMB 31.64 284.72 5.60 50.38 13.76 123.86 10.95 98.55 10.13 91.13 25.35 228.15
158 109.475 R/wall 8X3 8 1 SMB 31.64 31.64 5.60 5.60 13.76 13.76 10.95 10.95 10.13 10.13 25.35 25.35 21.62 21.62
159 109.500 T/wall 48X2 48 6 SR 15.82 94.92 2.88 17.29 14.17 85.01 6.83 40.95 13.60 81.60
160 109.500 R/wall48X3 48 6 SR 31.64 189.81 5.60 33.59 13.76 82.57 10.95 65.70 10.13 60.75 25.35 152.10 21.62 129.74
161 109.500 RCC culvert 2 Mtr span 1 1 SR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
162 109.500 T/wall 8 X1 mtr 8 1 SR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
163 109.625 T/wall 16X2 16 2 SR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
164 109.625 R/wall 16X3 16 2 SR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
165 109.625 RCC culvert 2 Mtr span 1 1 SR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
166 109.625 T/wall 8 X1 mtr 8 1 SR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
167 109.700 T/wall 16X2 16 2 SMB 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
168 109.700 R/wall 16X3 16 2 SMB 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
169 109.700 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
170 109.700 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
171 109.750 R/wall 8X2 8 1 HR 17.22 17.22 2.85 2.85 9.65 9.65 4.17 4.17 6.83 6.83 18.70 18.70 17.98 17.98
172 109.775 T/wall 8X2 8 1 HR 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
173 109.775 R/wall 16X2 16 2 HR 17.22 34.44 2.85 5.70 9.65 19.29 4.17 8.33 6.83 13.65 18.70 37.40 17.98 35.95
174 109.800 T/wall 24X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
175 109.800 R/wall 24X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
176 109.950 R/wall 16X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
177 110.025 T/wall 8X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
178 110.025 R/wall 16X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
179 110.050 T/wall 8X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
180 110.050 R/wall 16X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
181 110.075 T/wall 24X2 0 0 HR 15.82 0.00 2.88 0.00 14.17 0.00 6.83 0.00 13.60 0.00
182 110.075 R/wall 24X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
174 110.150 T/wall 8X2 8 1 HR 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
175 110.150 R/wall 16X3 16 2 HR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
176 110.200 T/wall 32X2 32 4 SMB 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
Page 188 of PMT Wks Qty
Excvn in trenches in PCC RCC (1:2:4) RRM IN CM RR Dry Laying reinforcement
Length Nos of Type of
S/No Location Type of structure Back filling Weep hole Flush pointing Centering/Shuttering Earth filling Qty per Qty per unit Weight of steel Hard Core White wash
(m) unit Soil SMB SR HR 1:4:8 1:3:6 1:05:10 M25 1:6 1:4 Qty Upto 12mm above 12mm
Qty per Qty per unit
Qty per unit Qty per unit Qty per unit Qty per unit Qty per unit
unit unit Qty per
(Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) (Cum) Qty per unit (Mtr) Qty per unit (Sqm) Qty per unit (Sqm) Qty per unit (Cum) ( Kg) (Kg) (KG) Qty per unit (Cum) Qty per unit (Sqm)
unit
177 110.200 R/wall 32X3 32 4 SMB 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
178 110.200 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
179 110.200 T/wall 8 X1 mtr 8 1 SMB 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
180 110.250 T/wall 24X2 24 3 SMB 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
181 110.250 R/wall 24X3 24 3 SMB 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
182 110.425 R/wall 24X4 0 0 HR 49.49 0.00 9.09 0.00 18.50 0.00 20.58 0.00 13.43 0.00 35.36 0.00 25.31 0.00
182 110.500 R/wall 8X3 8 1 SMB 31.64 31.64 5.60 5.60 13.76 13.76 10.95 10.95 10.13 10.13 25.35 25.35 21.62 21.62
183 110.525 T/wall 48X2 48 6 SMB 15.82 94.92 2.88 17.29 14.17 85.01 6.83 40.95 13.60 81.60
184 110.525 R/wall 48X3 48 6 SMB 31.64 189.81 5.60 33.59 13.76 82.57 10.95 65.70 10.13 60.75 25.35 152.10 21.62 129.74
185 110.625 T/wall 24X2 24 3 HR 15.82 47.46 2.88 8.65 14.17 42.50 6.83 20.48 13.60 40.80
186 110.625 R/wall 24X3 24 3 HR 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
187 110.625 RCC culvert 2 Mtr span 1 1 HR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
188 110.625 T/wall 8 X1 mtr 8 1 HR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
189 110.675 T/wall 16X2 16 2 HR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
190 110.675 R/wall 16X3 16 2 HR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
191 110.700 T/wall 8X2 8 1 HR 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
192 110.700 R/wall 8X3 8 1 HR 31.64 31.64 5.60 5.60 13.76 13.76 10.95 10.95 10.13 10.13 25.35 25.35 21.62 21.62
193 110.825 T/wall 24X1.5 24 3 HR 11.17 33.51 1.98 5.94 9.95 29.85 5.23 15.70
194 110.825 R/wall 24X3 24 3 HR 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
195 110.825 RCC culvert 2 Mtr span 1 1 HR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
196 110.825 T/wall 8 X1 mtr 8 1 HR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
197 110.875 R/wall 88X2 88 11 SMB 17.22 189.42 2.85 31.37 9.65 106.11 4.17 45.82 6.83 75.08 18.70 205.70 17.98 197.73
198 110.875 R/wall 88X3 88 11 SMB 31.64 347.99 5.60 61.57 13.76 151.38 10.95 120.45 10.13 111.38 25.35 278.85
199 110.925 R/wall 32X2 32 4 SMB 17.22 68.88 2.85 11.41 9.65 38.59 4.17 16.66 6.83 27.30 18.70 74.80 17.98 71.90
200 110.925 R/wall 32X3 32 4 SMB 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
201 110.975 T/wall 24X1 24 3 SMB 7.62 22.87 1.27 3.80 6.23 18.69 3.64 10.91
202 110.975 R/wall 24X3 24 3 SMB 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
203 110.975 RCC culvert 2 Mtr span 1 1 SMB 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
204 110.975 T/wall 8 X1 mtr 0 SMB 7.62 0.00 1.27 0.00 6.23 0.00 3.64 0.00
205 111.000 R/wall 16X3 16 2 SMB 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
206 111.150 R/wall 8X3 8 1 SMB 31.64 31.64 5.60 5.60 13.76 13.76 10.95 10.95 10.13 10.13 25.35 25.35 21.62 21.62
207 111.250 T/wall 32X2 32 4 HR 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
208 111.250 R/wall 32X4 32 4 HR 49.49 197.98 9.09 36.36 18.50 73.99 20.58 82.32 13.43 53.70 35.36 141.44 25.31 101.25
209 111.300 T/wall 16X2 16 2 HR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
210 111.300 R/wall 56X2 56 7 HR 17.22 120.54 2.85 19.96 9.65 67.53 4.17 29.16 6.83 47.78 18.70 130.90 17.98 125.83
211 111.300 B/wall 16X2 16 2 HR 27.07 54.13 4.06 8.11 16.71 33.43 6.58 13.15 8.01 16.02 22.00 44.00 23.18 46.36
212 111.375 R/wall 8X3 8 1 HR 31.64 31.64 5.60 5.60 13.76 13.76 10.95 10.95 10.13 10.13 25.35 25.35 21.62 21.62
213 111.450 T/wall 24X1 24 3 HR 7.62 22.87 1.27 3.80 6.23 18.69 3.64 10.91
214 111.450 R/wall 24X3 24 3 HR 31.64 94.91 5.60 16.79 13.76 41.29 10.95 32.85 10.13 30.38 25.35 76.05 21.62 64.87
215 111.450 RCC culvert 2 Mtr span 1 1 HR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
216 111.450 T/wall 8 X1 mtr 0 HR 7.62 0.00 1.27 0.00 6.23 0.00 3.64 0.00
217 111.552 R/wall 8X2 8 1 HR 17.22 17.22 2.85 2.85 9.65 9.65 4.17 4.17 6.83 6.83 18.70 18.70 17.98 17.98
218 111.575 T/wall 32X2 32 4 HR 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
219 111.575 R/wall 32X3 32 4 HR 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
220 111.575 RCC culvert 2 Mtr span 1 1 HR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
221 111.575 T/wall 8 X1 mtr 8 1 HR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
222 111.725 T/wall 16X2 16 2 HR 15.82 31.64 2.88 5.76 14.17 28.34 6.83 13.65 13.60 27.20
223 111.725 R/wall 16X3 16 2 HR 31.64 63.27 5.60 11.20 13.76 27.52 10.95 21.90 10.13 20.25 25.35 50.70 21.62 43.25
224 111.875 T/wall 8X2 8 1 SMB 15.82 15.82 2.88 2.88 14.17 14.17 6.83 6.83 13.60 13.60
225 111.875 R/wall 32X3 32 4 SMB 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
226 111.900 T/wall 32X2 32 4 HR 15.82 63.28 2.88 11.53 14.17 56.67 6.83 27.30 13.60 54.40
227 111.900 R/wall 32X3 32 4 HR 31.64 126.54 5.60 22.39 13.76 55.05 10.95 43.80 10.13 40.50 25.35 101.40 21.62 86.49
228 111.900 RCC culvert 2 Mtr span 1 1 HR 134.22 134.22 22.34 22.34 88.84 88.84 7.14 7.14 40.55 40.55 0.00 224.35 224.35 4.46 4.46 635.65 635.65 - - 635.65 1.57 1.57
229 111.900 T/wall 8 X1 mtr 8 1 HR 7.62 7.62 1.27 1.27 6.23 6.23 3.64 3.64
230 112.000 R/wall 32X3 0 0 HR 31.64 0.00 5.60 0.00 13.76 0.00 10.95 0.00 10.13 0.00 25.35 0.00 21.62 0.00
On R/Wall 1074 1074 0.35 375.90 0.00 0.00
230 Parapet wall
and Culvert
km 105.700 to Lined Drain(Kerb Channel) 2611.60 2612 SMB 0.290 757.36 0.13 347.34 0.094 245.49 0.03 78.35 0.78 2037.05
231
112.000 Per mtr
km 105.700 to Lined Drain(Kerb Channel) 1837.20 1837 SR 0.290 532.788 0.13 244.35 0.094 172.70 0.03 55.12 0.78 1433.02
232
112.000 Per mtr
km 105.700 to Lined Drain(Kerb Channel) 1815.40 1815 HR 0.290 526.466 0.13 241.45 0.094 170.65 0.03 54.46 0.78 1416.01
233
112.000 Per mtr
473 59.13 SMB 15.820 935.36 2.88 170.41 14.17 837.67 6.83 403.53 13.60 804.10
T/Wall at Km 110.175 for
234 110.175 muck stablisation in 473.00
m (2 m ht)

473 59.13 SMB 49.49 2926.33 9.09 537.42 39.08 2310.54 0.00 13.43 793.75 40.96 2421.76 25.31 1496.63
R/Wall at Km 110.175for
235 110.175 muck stablisation in 473.00
m (4 m ht)

180.80 22.60 SMB 15.820 357.53 2.88 65.14 14.17 320.19 6.83 154.25 13.60 307.36
T/Wall at Km 112.15 for
236 112.150 muck stablisation in 180.8 m
(2 m ht)

180.80 22.60 SMB 49.49 1118.56 9.09 205.42 39.08 883.18 0.00 13.43 303.41 40.96 925.70 25.31 572.07
R/Wall at Km 112.15 for
237 112.150 muck stablisation in 180.8 m
(4 m ht)

TOTAL 13094.20 5655.02 3241.53 3546.89 2521.07 0.28 588.83 135.66 135.66 2228.34 11481.83 0.00 3301.31 6743.56 14101.29 0.00 9148.67 84.74 12077.29 - 12077.29 29.83 7394.26
Total Quantity 16719.39 9372.23 3983.89 4760.67 3711.16 927.65 192.78 15005.14 0.00 4864.21 9158.07 18313.91 - 13754.88 120.42 17162.47 - 17162.47 42.39 9828.78

0.00
0.00
0.00
0.00

Page 189 of PMT Wks Qty


ABSTRACT OF QTY FOR PMT WORKS

S/No. Items A/U Alt 2101-2400 m Total Qty for Alt 2401-2700 Total qty for
Cost Cal Pmt m Material
Qty for Wks wks Qty for Wks calculations
1 Excvn in trenches in SMB Cum 3,627.59 3,627.59 13,094.20 13094.20
2 Excvn in trenches in SR Cum 3,717.21 3,717.21 5,655.02 5655.02
3 Excvn in trenches in HR Cum 742.36 742.36 3,241.53 3241.53
4 PCC 1:4:8 Cum 1,216.59 1,216.59 3,546.89 3546.89
5 PCC 1:3:6 Cum 1,190.09 1,190.09 2,521.07 2521.07
6 PCC 1:2:4 Cum - - - 0.00
7 RCC 1:2:4 Cum 2.80 2.80 - 0.00
8 M-25 Cum 57.12 57.12 135.66 135.66
9 PCC 1:5:10 Cum 338.81 338.81 588.83 588.83
10 RRM 1:6 Cum 3,523.31 3,523.31 11,481.83 11481.83
11 RRM Dry Cum 1,562.91 1,562.91 3,301.31 3301.31
12 Back filling Cum 2,414.52 2,414.52 6,743.56 6743.56
13 Weep hole MTR 4,212.62 4,212.62 14,101.29 14101.29
14 White washing (Two coats) 10 Sqm 243.45 243.45 739.43 739.43
Centering/Shuttering
15 ( Considering 10 times to be used) 10 Sqm 460.62 460.62 914.87 914.87
16 Hard core Cum 12.56 12.56 29.83 29.83
17 Earth filling Cum 35.68 35.68 84.74 84.74
18 Laying of Steel upto 12 mm Kg 5,747.88 5,747.88 12,077.29 12077.29
19 Laying of Steel above 12 mm Kg - - - 0.00
20 Cost of steel Kg 5,747.88 5,747.88 12,077.29 12077.29
21 Road sign post ( Warning/Mandatory) Nos 112.00 112.00 126.00 126.00
22 Road sign post ( Informatory) Nos 4.00 4.00 5.00 5.00
23 Over head Gantry Nos 1.00 1.00 - -
24 Ordinary Km stones Nos 4.00 4.00 6.00 6.00
25 Sub Km stones Nos 12.00 12.00 28.00 28.00
26 5th Km stone Nos - - 1.00 1.00
27 Crash Barrier Mtr 550.00 550.00 1,204.00 1204.00
28 Cat eyes Nos 241.00 241.00 417.00 417.00
29 Delinietors Nos 121.00 121.00 209.00 209.00

Page 190 of 251


Quantity Calculation For Fixing Over Head Gantry
Sl No Item A/U Nos L (m) B (m) H (m) Quantity
1. Earth work Excavation
For Foundation Cum 2.00 1.00 1.00 1.20 2.40
Total 2.40
2. PCC 1:4:8
For Base slab Cum 2.00 1.00 1.00 1.40 2.80
Total 2.80
3. RCC 1:2:4
Bottom slab Cum 2.00 1.00 1.00 0.40 0.8
Footing Cum 2.00 1.00 1.00 1.00 2.00
Total 2.80

4. Cutting, Bending and Laying of Steel upto 12 mm 662.70


Parapet wall on R/wall
Total length of R/wall 8 mtr
Length of PP wall reqd 8.00 x2/3 5.33 mtr
Nos of PP wall reqd 3.55 4 Nos
1 RRM 1:6 1 1.50 0.45 0.450 0.15 0.150 0.10 Cum
1 1.50 (0.45+0.3)/2 0.375 0.45 0.450 0.25 Cum
Total 0.35 Cum
2 Centering/shutering
Front 1 0.00 0.62 0.620 0.00 Sqm
Back 1 0.00 0.6 0.600 0.00 Sqm
Side 0 0.45 0.450 0.15 0.150 0.00 Sqm
0 (0.45+0.3)/2 0.375 0.45 0.450 0.00 Sqm
Total 0.00 Sqm
EXTRA COST OF TRANSPORTATION FOR WMM/DBM/BC MIX FROM WET/HOT MIX FROM PLANT TO WORK SITE

Plant location at Km 92.250 on B-B-B road.

Brief Discription Area Thickness Qty in Cum Wt of Bituminous/Wet Mix


(Mt)
Alt 2101- Alt 2401-2700 (in mtr) Alt 2101- Alt 2401- Alt 2101- Alt 2401-
2400 m m 2400 m 2700 m 2400 m 2700 m

Area of DBM 50 cm thick 26342.60 44952.80 0.05 1317.13 2247.64 3029.40 5169.57 MT
Area of AC/BC 3.00 Cm Thick 26342.60 44952.80 0.03 790.28 1348.58 1865.06 3182.66 MT
Area of WMM 25.00 Cm Thick 51021.90 70505.96 0.25 12755.48 17626.49 28444.71 39307.07
Total 33339.16 47659.30 MT
Average lead involved 6.59 11.59
C-101 Considering SSR 2016 Zone 'J'& 'J' 11.05 11.75
Extra TPT Charges for 4852647 12975427
conveyance of DBM/AC
G/Total= 4852647 12975427
Carriage of Constructional store (MT/km)

SSR Resource Res A/U Resources Suggested Resources Rate as Amount Rate as per Amount
Code s code elementin norms with element per SSR SSR 2016 for
SSR 2016 ref considered in 2016 for zone 'J'(Alt
SSR 2016 zone 'J' 2100-2400)

4 CPL
C101 PNR/CPL CP01 Day 0.007143 day/(100 km 0.007143 639.04 4.56 639.04 4.56
lead X 5.6 MT
load)
C101 Mate CP02 Day 0.004 1 mate/20 lab 0.004 666.90 2.67 666.90 2.67
7.23 7.23
Rate per MT/km item C101(with labour), Zone wise 18.28 18.98
Rate per MT/km item C101(excluding labour), Zone wise 11.05 11.75
Extra Lead
Alt 2101-3000 m Sector bet km 102.00 to 112.00.00

A For Sand
Quarry location 7.00 km away from Puldoda Junction towareds Aghat road
From Ghat to Puldoda Junction Km 0.00 Km 7 For km 112 to
105.675 (2101 to
From Puldoda to Bhedarwah km 28.63 2400)
From Bhaderwah to mid of sector (Km 112 to 105.675) km 60.18
Total lead km 95.805
Deduct Initial lead km 90.81
Total lead for 2401 to 2700 km 97.64
Deduct Initial lead km 92.64
Net lead 102.00 to 105.675 km 97.64
Net lead 105.675 to 112.000 km 90.81

B For Stone
Qty recd fm Fmn cutting Km 102 to 112
mid sector km 5
Distance from mid sector to crusher point (Crusher at Km 9.75
92.250 on BBB Rd) for stone km
Total Lead from Quarry to Mid Sector 14.75
(112.00-105.675)/2+(112.00-112.000)+76.85 km
Deduct Initial lead km 5
Net lead km 9.75

B For S/Metal
Qty recd fm Fmn cutting Km 102 to 112
mid sector km 5
Distance from crusher point to mid sector (Crusher at Km 9.75
92.250 on BBB Rd) for stone km
Total Lead from Quarry to Mid Sector 14.75
(112.00-105.675)/2+(112.00-112.000)+76.85 km
Deduct Initial lead km 5
Net lead km 9.75
CONVEYANCE OF DBM & BC MIX FROM HMP TO WORK SITE
1. Attitude 2101-2400 Mtr (Km 102.00-105.675 to Km )
From To Distance
HMP Plant (i.e Km 92.250 on BBB rd Road) End point of BBB rd (Starting point of Sectore 9.75
i.e Km 102.00)
End point of BBB rd (Starting point of Sectore i.e Km Mid Sector (102-105.675)/2 1.84
102.00)
Total 11.59
Deduct Intial Lead 5
Grand Total 6.588

2 Attitude 2401-2700 Mtr (Km 105.675 -112.00)

From To Distance
HMP Plant (i.e Km 92.250 on BBB rd Road) End point of BBB rd (Starting point of Sectore 13.43
i.e Km 105.675)
End point of BBB rd (Starting point of Sectore i.e Km Mid Sector (112.00-105.675)/2 3.163
105.675)

Total 16.59
Deduct Intial Lead 5
Grand Total 11.588

CONVEYANCE OF WMM MIX FROM WMP TO WORK SITE

1. Attitude 2101-2400 Mtr (Km 102.00-105.675 to Km )


From To Distance
WMP Plant (i.e Km 92.250 on BBB rd Road) End point of BBB rd (Starting point of Sectore 9.75
i.e Km 102.00)
End point of BBB rd (Starting point of Sectore i.e Km Mid Sector (102-105.675)/2 1.84
102.00)
Total 11.59
Deduct Intial Lead -
Grand Total 11.588
2 Attitude 2401-2700 Mtr (Km 105.675 -112.00)

From To Distance
WMP Plant (i.e Km 92.250 on BBB rd Road) End point of BBB rd (Starting point of Sectore 13.43
i.e Km 105.675)
End point of BBB rd (Starting point of Sectore i.e Km Mid Sector (112.00-105.675)/2 3.163
105.675)

Total 16.59
Deduct Intial Lead -
Grand Total 16.588

Page 196 of 251


KERB AND CHANNEL TYPE ROAD SIDE DRAIN FOR HILL ROAD

50
HILL FACE 50 150 400 200

100
154 ROAD LEVEL

80
200
400

PCC 1:3:6

100
HPS FILLING

100
10 cm THICK LEAN CONCRETE
LEVELLING COARSE 1:5:10
75

QTY CALCULATION

LINED DRAIN
S/ Item of work A/U Nos Length Breadth Height Qty
No

1 Excavation in trenches (rect) Cum 1 1.00 0.354 0.40 0.14


- do - (champer) " 1 1.00 0.64 0.40 + 0.08 0.15
2
Total 0.290
2 Levelling coarse 1:5:10 (rect) " 1 1.00 0.279 0.10 0.03
- do - (champer) " 1 1.00 0.60 0.10 0.06
- do - (triangle) " 1/2 1.00 0.10 0.04 0.004
Total 0.094
3 PCC 1:3:6 (bottom rect) " 1 1.00 0.279 0.10 0.03
- do - (bottom triangle) " 1 1.00 0.025 0.10 0.003
- do - (champer) " 1 1.00 0.40 0.10 0.040
- do - (triangle) " 1 1.00 0.20 0.10 0.020
- do - (hill face rect) " 1 1.00 0.154 0.20 0.030
- do - (hill face top champer) " 0.5 1.00 0.15 + 0.05 0.10 0.010
2
Total 0.133
4 HPS filling (rect) " 1 1.00 0.075 0.10 0.010
- do - (triangle) " 1/2 1.00 0.075 0.30 0.020
Total 0.030
5 Centering/Shuttering (hill face champer) Sqm 1 1.00 0.413 0.41
- do - (road side champer) 1 1.00 0.206 0.21
- do - (top) " 1 1.00 0.163 0.16
Total 0.780

Page 197 of 251


TYPICAL L & X-SECTION OF TOE WALL 1.00 MTR HEIGHT

8.0 m
0.6 0.6

RRM

RRM IN CM 1:6
1.212 RRM 1.04 1.00
1.362

0.850
0.212 0.10 0.10

1.22
A T/WALL 1.00 M
1 Excvn 1 8 1.22 (1.362+0.20)/2 7.62 Cum
2 PCC 1:4:8
For foundation 1 8 1.22 0.1 0.98 Cum
Form bond stone 17 0.76 0.15 0.15 0.29 Cum
Total 1.27 Cum
3 RRM in CM 1:6
For bottom bond 1 8 (0.85+0.60)/2 1.0 5.80 Cum
Triangular portion 1 8 (0.85+.00)/2 0.212 0.72 Cum
Total 6.52 Cum
Deduct for bond stone 17 0.76 0.15 0.15 0.29 Cum
Net quantity 6.23 Cum
5 Back filling 1 8 (0.15+0.60)/2 1.212 3.64 Cum
TYPICAL L & X-SECTION OF TOE WALL 1.50 MTR HEIGHT

8.0 m
0.6 0.6

RRM

RRM IN CM 1:6
1.744 RRM 1.55 1.50
1.89

0.975
0.24 0.15 0.15

1.275
A T/WALL 1.50 M
1 Excvn 1 8 1.275 (1.89+0.30)/2 11.17 Cum
2 PCC 1:4:8
For foundation 1 8 1.275 0.15 1.53 Cum
Form bond stone 25 0.8 0.15 0.15 0.45 Cum
Total 1.98 Cum
3 RRM in CM 1:6
For bottom bond 1 8 (0.975+0.60)/2 1.5 9.45 Cum
Triangular portion 1 8 (0.975+.00)/2 0.244 0.95 Cum
Total 10.40 Cum
Deduct for bond stone 25 0.8 0.15 0.15 0.45 Cum
Net quantity 9.95 Cum
5 Back filling 1 8 (0.15+0.60)/2 1.744 5.23 Cum
TYPICAL L & X-SECTION OF TOE WALL 2.00 MTR HEIGHT

8.0 m
0.6 0.6

RRM

RRM IN CM 1:6
2.275 RRM 2.061 2.00
2.475

1.10
0.275 0.20 0.20

1.40
A T/WALL 2.00 M
1 Excvn 1 8 1.4 (2.425+0.4)/2 15.82 Cum
2 PCC 1:4:8
For foundation 1 8 1.4 0.2 2.24 Cum
Form bond stone 33 0.865 0.15 0.15 0.64 Cum
Total 2.88 Cum
3 RRM in CM 1:6
For bottom bond 1 8 (1.10+.60)/2 2.0 13.60 Cum
Triangular portion 1 8 (1.10+.00)/2 0.275 1.21 Cum
Total 14.81 Cum
Deduct for bond stone 33 0.865 0.15 0.15 0.64 Cum
Net quantity 14.17 Cum
4 Back filling 1 8 (0.15+0.60)/2 2.275 6.83 Cum
5 Weep hole 16 8 (0.6+1.1)/2 0.85 13.60 mtr
TYPICAL L & X-SECTION OF TOE WALL 3.00 MTR HEIGHT
8.0 m
0.6 0.6

3.090 RRM IN CM 1:6


3.375 RRM 3.00
3.595

1.30
0.325 0.30
0.3
1.85

B T/WALL 3.00 M
1 Excvn 1 8 1.85 (3.595+0.50)/2 30.30 Cum
2 PCC 1:4:8
For foundation 1 8 1.85 0.3 4.44 Cum
Form bond stone 49 1.075 0.15 0.15 1.19 Cum
Total 5.63 Cum
3 RRM in CM 1:6
For bottom bond 1 8 (1.50+0.60)/2 3.00 25.20 Cum
Triangular portion 1 8 (1.50+0.0)/2 0.375 2.25 Cum
Total 27.45 Cum
Deduct for bond stone 49 1.075 0.15 0.15 1.19 Cum
Net quantity 26.26 Cum
5 Back filling 1 8 (0.15+0.60)/2 3.375 10.13 Cum
6 Weep hole 24 8 (1.3+0.6)/2 0.95 22.80 Mtr
TYPICAL L & X-SECTION OF RETAINING WALL 2.00 MTR HEIGHT

8.0 m
0.6 0.6

RRM 0.618 0.6


0.77

0.825
2.275 DRY 0.80
2.425

0.95
0.618 0.6
1.10
0.20 0.20
0.61 3.21 0.61 3.21 0.61
1.40
B R/WALL 2.00 M
1 Excvn 1 8 1.4 (2.475+0.6)/2 17.22 Cum
2 PCC 1:4:8
For foundation 1 8 1.4 0.2 2.24 Cum
For bond stone 32 (1.1+0.6)/2 0.15 0.15 0.61 Cum
0.85 Total 2.85 Cum
3 RRM in CM 1:6
For bottom bond 1 8 (1.1+.95)/2
0.618 5.07 Cum
Top bond 1 8 (0.75+0.62)/2
0.618 3.39 Cum
Triangular portion 1 8 (0.60+0.0)/2
0.15 0.36 Cum
Vertical bond 3 0.6 (0.95+.75)/2
0.825 1.26 Cum
Total 10.08 Cum
Deduct for bond stone 23 0.42273 0.15 0.15 0.43 Cum
Net quantity 9.65 Cum
4 RRM Dry 2 3.1 (0.95+.75)/2 0.825 4.35 Cum
Deduct for bond stone 10 0.88 0.15 0.15 0.18 Cum
Net quantity 4.17 Cum
5 Back filling 1 8 (0.15+0.60)/2 2.275 6.825 Cum

6 Weep Hole 1 8 1.1 8.8 Mtr


1 8 0.6 4.8 Mtr
3 2 (1.1+0.6)/2 0.85 5.1 Mtr
Net quantity 18.70 Mtr
7 White Washing
1 8 1.055 8.44 Area Sqm
1 8 0.695 5.56 Area Sqm
1 8 0.3 2.4 Area Sqm
3 0.6 0.875 1.575 Area Sqm
Total Area 17.975 Area Sqm
TYPICAL L & X-SECTION OF RETAINING WALL 3.00 MTR HEIGHT
8.0 m
0.6 0.6

RRM 0.618 0.6


0.77

1.854
3.375 DRY 1.85
3.675

1.30
0.618 0.6
1.50
0.30 0.30
0.61 3.21 0.61 3.21 0.61
1.85

D R/WALL 3.00 M
1 Excvn 1 8 1.85 (3.675+0.6)/2 31.635 Cum
2 PCC 1:4:8
For foundation 1 8 1.85 0.3 4.44 Cum
Form bond stone 49 1.05 0.15 0.15 1.16 Cum
Total 5.60 Cum
3 RRM in CM 1:6
For bottom bond 1 8 (1.55+1.4)/2 0.618 7.29 Cum
Top bond 1 8 (0.75+0.62)/2 0.618 3.39 Cum
Triangular portion 1 8 (0.60+0.0)/2 0.15 0.36 Cum
Vertical bond 3 0.6 (1.25+0.75)/2 1.854 3.34 Cum
Total 14.38 Cum
Deduct for bond stone 26 1.05 0.15 0.15 0.61 Cum
Net quantity 13.76 Cum
4 RRM Dry 2 3.1 (1.85+0.75)/2 1.426 11.49 Cum
Deduct for bond stone 23 1.05 0.15 0.15 0.54 Cum
Net quantity 10.95 Cum
5 Back filling 1 8 (0.15+0.60)/2 3.375 10.13 Cum

6 Weep Hole 1 8 1.5 12 Mtr


1 8 0.6 4.8 Mtr
3 3 (1.3+0.6)/2 0.95 8.55 Mtr
Net quantity 25.35
7 White Washing
1 8 1.475 11.8 Area Sqm
1 8 0.695 5.56 Area Sqm
1 8 0.3 2.4 Area Sqm
3 0.6 1.035 1.863 Area Sqm
Total Area 21.623 Area Sqm
TYPICAL L & X-SECTION OF RETAINING WALL 4.00 MTR HEIGHT
8.0 m
0.6 0.6

RRM 0.618 0.6


0.77
0.92

1.443
DRY

1.13
1.28
4.475 DRY 2.800
4.875 1.443

1.64
1.81 0.618 0.6
1.96
0.40 0.40
0.6 3.1 0.6 3.1 0.6
2.26
F R/WALL 4.00 M
1 Excvn 1 8 2.26 (0.6+4.875)/2 49.49 Cum
2 PCC 1:4:8
For foundation 1 8 2.26 0.4 7.23 Cum
Form bond stone 64 1.29 0.15 0.15 1.86 Cum
Total 9.09 Cum
3 RRM in CM 1:6
For bottom bond 1 8 (1.96+1.81)/2 0.618 9.32 Cum
Top bond 1 8 (0.77+0.62)/2 0.618 3.44 Cum
Triangular portion 1 8 (0.60+0.0)/2 0.15 0.36 Cum
Vertical bond 3 0.6 (1.64+1.28)/2 1.443 3.79 Cum
3 0.6 (1.13+0.77)/2 1.443 2.47 Cum
Total 19.38 Cum
Deduct for bond stone 30 1.3 0.15 0.15 0.88 Cum
Net quantity 18.50 Cum
4 2 3.1 (1.64+1.28)/2 1.443 13.06 Cum
2 3.1 (1.13+0.77)/2 1.443 8.50
Deduct for bond stone 36 1.28 0.15 0.15 0.98 Cum
Net quantity Total 20.58 Cum
5 Back filling 1 8 (0.15+0.60)/2 4.475 13.43 Cum
6 Weep Hole 1 8 1.9 15.2 Mtr
1 8 0.6 4.8 Mtr
3 4 (1.96+0.6)/2 1.28 15.36 Mtr
7 White Washing Net quantity 35.36

1 8 1.88 15.04 Area Sqm


1 8 0.695 5.56 Area Sqm
1 8 0.3 2.4 Area Sqm
3 0.6 1.285 2.313 Area Sqm
3
Total Area 25.313
TYPICAL L & X-SECTION OF RETAINING WALL 4.00 MTR HEIGHT
8.0 m
0.6 0.6

RRM 0.618 0.6


0.77
0.92

1.443
RRM IN CM 1:6

1.13
1.28
4.475 2.800
4.875 1.443

1.64
1.81 0.618 0.6
1.96
0.40 0.40
0.6 3.1 0.6 3.1 0.6
2.26
F R/WALL 4.00 M
1 Excvn 1 8 2.26 (0.6+4.875)/2 49.49 Cum
2 PCC 1:4:8
For foundation 1 8 2.26 0.4 7.23 Cum
For bond stone 64 1.29 0.15 0.15 1.86 Cum
Total 9.09 Cum
3 RRM in CM 1:6
1 8 (1.96+1.81)/2 0.618 9.32 Cum
1 8 (0.77+0.62)/2 0.618 3.44 Cum
1 8 (0.60+0.0)/2 0.15 0.36 Cum
3 0.6 (1.64+1.28)/2 1.443 3.79 Cum
3 0.6 (1.13+0.77)/2 1.443 2.47 Cum
Total 19.38 Cum
Deduct for bond stone 30 1.3 0.15 0.15 0.88 Cum
Net quantity 18.50 Cum
4 2 3.1 (1.64+1.28)/2 1.443 13.06 Cum
2 3.1 (1.13+0.77)/2 1.443 8.50
Deduct for bond stone 36 1.28 0.15 0.15 0.98 Cum
Net quantiTotal 20.58 Cum
Total RRM 1:6 39.08 Cum
5 Back filling 1 8 (0.15+0.60)/2 4.475 13.43 Cum
6 Weep Hole 4 8 (1.96+0.6)/ 1.28 40.96 Mtr

Net quantity 40.96


7 White Washing

1 8 1.88 15.04 Area Sqm


1 8 0.695 5.56 Area Sqm
1 8 0.3 2.4 Area Sqm
3 0.6 1.285 2.313 Area Sqm
3
Total Area 25.313
TYPICAL L & X-SECTION OF B/ WALL 3.00 MTR HEIGHT

0.60 0.90
0.45
8.00

0.95

0.60

2.11 2.00
DRY
2.67
2.00 0.80 0.60 0.60 3.10
3.10 0.60 2.20

1.57 0.20
0.60
0.15 0.60
PCC 1:4:8 1.65
0.20 1.95
0.15
ELEVATION
B/WALL 2.00 Mtr HEIGHT (BM)

B/WALL 2 M
1 Excvn 1 8 1.95 1.735 27.07 Cum
PCC 1:4:8 Foundation
2 1 8 1.95 0.2 3.12 Cum

Form bond stone 32 1.3 0.15 0.15 0.94 Cum


Total 4.06 Cum
3 RMM 1:6 1 8 1.545 0.630 7.79 Cum
1 8 1.055 0.630 5.32 Cum
3 0.6 1.3 0.850 1.99 Cum
1 8 0.45 0.450 1.62 Cum
Total 16.71 Cum
Deduct for Bond Stone 0.66 (-) 0.66 Cum
Net RRM in CM 1:6 16.05 Cum
4 RRM DRY 2 3.1 1.3 0.850 6.85 Cum
Deduct for Bond Stone 0.28 0.28 Cum
6.58 Cum
5 Back Filling 1 8 0.375 2.67 8.01 Cum

6 Weep Hole 1 8 1.1 8.8 Mtr


1 8 0.9 7.2 Mtr
3 2 (1.1+0.9)/2 1 6 Mtr
Net quantity 22.00 Mtr

7 White wash 2 8 0.6 9.6 Sqm


3 0.8 0.6 1.44 Sqm
2 (1.57+0.9) 2 4.94
1 8 0.9 7.2
Net quantity 23.18 Sqm
BREAST WALL IN BM
Size 8.00 x 2.50 m

Sl No Brief Nos Length Breadth Height Qty


A Excavation in Trenches
1 For Foudation 1 8.00 2.12 3.48 + 0.60 34.60
2
2 PCC 1:4:8
For Foudation 1 8.00 2.12 0.25 4.24
For Bond stone 40 0.15 1.82 + 0.95 0.15 1.25
2
Total 5.49
3 RRM 1:6
Bottom Layer 1 8.00 1.82 + 1.60 0.63 8.62
2
Top Layer 1 8.00 0.95 + 1.16 0.63 5.32
2
Triangle Portion 1 8.00 0.95 + 0.00 0.45 1.71
2
Middle Bond 3 0.60 1.16 + 1.60 1.37 3.4
2
Total 19.05
Deduct for Bond Stone 1.25 x 19.05 0.77
30.77
Total 18.28
4 RRM Dry
Middle Bond 2 3.10 1.16 + 1.60 1.370 11.72
2
Deduct for Bond Stone 1.25 (-) 0.77 0.48
Total 11.24

5 Back Filling
Back Filling 1 8.00 0.15 + 0.60 3.230 9.69
2
Total 9.69
6 Weep hole
Weep hole 1 8.00 1.82 14.56
1 8 0.9 7.20
3 3 1.25 11.25
Total 33.01

5 White wash
White wash 2 8.00 0.6 9.60
3 1.3 0.6 2.34
2 2 (1.82+0.95)/2 1.385 5.54
1 8 0.9 7.20
Total 24.68

###
###
###
###
0.600 0.900

0.150 0.150
0.300 0.632 RRM 1:6
HPS 0.949 0.600
FILLING

1.160
DRY DRY
1.370
2.500 1.300
3.375
3.612

1.616 0.632
0.600
1.733
0.250 0.250 PCC 1:4:8
0.578 1.827 0.600
0.600 0.600 0.600
2.127 3.100 3.100
X-SECTION
ELEVATION

B/ WALL 2.50m HT (BM)


0.600
B/Wall 8.00 X 3.00 mtr
0.60 8.0 M
0.90

0.95 0.63
RRM 1:6

1.16
RRM DRY RRM DRY
1.90 0.6
3.78
4.08 RRM DRY 3.0 0.6 3.10 m 0.6 3.10 m 0.6

0.63
1.79
RRM 1:6
2.0 0.30 0.30 PCC 1:4:8

2.30
B/WALL 3 M
PCC 1:4:8 1 Excvn 1 8 2.3 2.34 43.06 Cum
2 PCC 1:4:8 Foundation 1 8 2.3 0.3 5.52 Cum
Form bond stone 48 1.475 0.15 0.15 1.59 Cum
Total 7.11 Cum
3 RRM 1:6 1 8 1.895 0.630 9.55 Cum
1 8 1.055 0.630 5.32 Cum
1 8 0.45 0.450 1.62 Cum
3 0.6 1.475 1.900 5.04 Cum
Cum
21.53 Cum
Deduct for Bond Stone 0.88 (-) 0.88 Cum
Net RRM in CM 1:6 20.65 Cum
4 RRM DRY 2 3.1 1.475 1.900 17.38 Cum
Deduct for Bond Stone 0.71 0.71 Cum
Total 16.66
5 Back Filling 1 8 0.375 3.78 11.34 Cum

6 Weep Hole 1 8 2.2 17.6 Mtr


1 8 0.9 7.2 Mtr
3 3 (2.2+0.9)/2 1.55 13.95 Mtr
Net quantity 38.75 Mtr

7 White wash 2 8 0.6 9.6 Sqm


3 1.8 0.6 3.24 Sqm
2 (2+0.9)/2 2 5.8
1 8 0.9 7.2
Net quantity 25.84 Sqm
T/Wall 8.00 x 2 mtr (PCC 1:3:6)
S/No Name of work A/U Nos length (m) width (m) height (m) Qty
1 Excavation Cum 1 x 8 x 1.950 x ( 2.77 + 0.600 ) / 2 = 26.29
2 PCC 1:4:8 for fdn Cum 1 x 8 x 1.950 x 0.20 = 3.120
Total PCC 1:4:8 = 3.120
3 Centering/Shuttering
Front side Sqm 1 X 8 X 2.11 = 16.880
Back side Sqm 1 X 8 X 2.52 = 20.160
Both side Sqm 1 X 2 X ( 1.65 + 0.9 ) / 2 X 2 = 5.100
Total = 42.140
Total = 42.140
4 PCC 1:3:6 Cum 1 x 8.00 x ( 1.566 + 0.90 ) / 2 x 2.11 = 20.810
Cum 1 x 8.00 x 1.566 x ( 0.52 ) / 2= 3.26
Total = 24.070
5 Back filling Cum 1 x 8 x ( 0.150 + 0.600 ) / 2 x 2.52 = 7.560
Total = 7.560
6 Pvc pipe Mtr 1 x 16 x ( 0.950 + 1.260 ) / 2 = 17.680
Total = 17.680

SUMMARY OF QUANTITIES FOR T/Wall size Per mtr qty


8 x 2 mtr

1 Excavation Cum 26.29 3.286


2 PCC 1:4:8 Cum 3.12 0.390
3 Centering/Shuttering Sqm 42.14 5.268
4 PCC 1:3:6 Cum 24.07 3.009
5 Back Filling Cum 7.56 0.945
6 Pvc pipe Mtr 17.68 2.210

T/Wall 8.00 x 1mtr (PCC 1:3:6)


S/No Name of work A/U Nos length (m) width (m) height (m) Qty
1 Excavation Cum 1 x 8 x 1.600 x ( 1.51 + 0.600 ) / 2 = 13.5
2 PCC 1:4:8 for fdn Cum 1 x 8 x 1.600 x 0.10 = 1.280
Total PCC 1:4:8 = 1.280
3 Centering/Shuttering
Front side Sqm 1 X 8 X 1.05 = 8.400
Back side Sqm 1 X 8 X 1.41 = 11.280
Both side Sqm 2 X ( 1.6 + 0.95 ) / 2 X 1 = 2.550
Total = 22.230
Total = 22.230
4 PCC 1:3:6 Cum 1 x 8.00 x ( 1.300 + 0.95 ) / 2 x 1.05 = 9.450
Cum 1 x 8.00 x ( 0.900 ) / 2 x 0.3 = 1.08
Total = 10.530
5 Back filling Cum 1 x 8 x ( 0.150 + 0.600 ) / 2 x 1.411 = 4.230
Total = 4.230
6 Pvc pipe Mtr 8 x ( 1.300 + 0.950 ) / 2 = 9.000
Total = 9.000

SUMMARY OF QUANTITIES FOR T/Wall size Per mtr qty


1 8 x 1 mtr ( CM))
Excavation Cum 13.50 1.688
2 PCC 1:4:8 Cum 1.28 0.160
3 Centering/Shuttering Sqm 22.23 2.779
4 PCC 1:3:6 Cum 10.53 1.316
5 Back Filling Cum 4.23 0.529

Page 211 of Cal R/W,B/W 13:01:24/W


6 Pvc pipe Mtr 9.00 1.125

Page 212 of Cal R/W,B/W 13:01:24/W


T/Wall 8.00 x 1.5mtr (PCC 1:3:6)
S/No Name of work A/U Nos length (m) width (m) height (m) Qty
1 Excavation Cum 1 x 8 x 1.305 x ( 1.93 + 0.300 ) / 2 = 11.62
2 PCC 1:4:8 for fdn Cum 1 x 8 x 1.305 x 0.15 = 1.570
Total PCC 1:4:8 = 1.570
3 Centering/Shuttering
Both side Sqm 2 X x ( 0.7875 + 0.6 ) / 2 x ( 1.3 + 0.75 ) / 2 = 1.420
Back side Sqm 1 X 8 X 1.776 = 14.210
Front side Sqm 1 x 8 X 1.546 = 12.370
Total = 28.000
Total = 28.000
4 PCC 1:3:6 Cum 1 x 8.00 x ( 1.105 + 0.62 ) / 2 x 1.546 = 10.660
Cum 1 x 8.00 x ( 0.600 ) / 2 x 0.15 = 0.36
Total = 11.020
5 Back filling Cum 1 x 8 x ( 0.150 + 0.600 ) / 2 x 1.771 = 5.310
Total = 5.310

SUMMARY OF QUANTITIES FOR T/Wall size Per mtr qty


1 8 x 1.5 mtr ( CM))
Excavation Cum 11.62 1.4525
2 PCC 1:4:8 Cum 1.57 0.1963
3 Centering/Shuttering Sqm 28.00 3.5000
4 PCC 1:3:6 Cum 11.02 1.3775
5 Back Filling Cum 5.31 0.6638

T/Wall 8.00 x 3mtr (PCC 1:3:6)


S/No Name of work A/U Nos length (m) width (m) height (m) Qty
1 Excavation Cum 1 x 8 x 2.000 x ( 3.720 + 0.500 ) / 2 = 33.76
2 PCC 1:4:8 for fdn Cum 1 x 8 x 2.000 x 0.30 = 4.800
Total PCC 1:4:8 = 4.800
3 Centering/Shuttering
Front and back face Sqm 2 X 8 x ( 0.3 + 0.3 ) /
2= 4.800
End face Sqm 2 x ( 2+ 2) / 2 x ( 0.3 + 0.3 ) /
2= 1.200
Rear side of wall Sqm 1 x 8 x ( 3.72 + 3.72 ) /
2= 29.760
Front side of wall Sqm 1 x 8 x ( 3.09 + 3.09 ) /
2= 24.720
Total = 60.480
Total = 60.480
4 PCC 1:3:6 Cum 1 x 8.00 x ( 1.700 + 0.93 ) / 2 x 3.09 = 32.510
Cum 1 x 8.00 x ( 0.900 + 0.900 ) / 2 x ( 0.225 + 0.225 ) / 2 = 1.620
Total = 34.130
5 Back filling Cum 1 x 8 x ( 0.150 + 0.600 ) / 2 x 3.375 = 10.130
Total = 10.130

SUMMARY OF QUANTITIES FOR T/Wall size Per mtr qty


1 8 x 3 mtr ( CM))
Excavation Cum 33.76 4.220
2 PCC 1:4:8 Cum 4.80 0.600
3 Centering/Shuttering Sqm 60.48 7.560
4 PCC 1:3:6 Cum 34.13 4.266
5 Back Filling Cum 10.13 1.266

Page 213 of Cal R/W,B/W 13:01:24/W


DETAIL QTY CULCULATIONS FOR V-SHAPE LINE DRAIN
S/No Name of work A/U Nos length (m) width (m) height (m) Qty
LINED DRAIN FOR 1.00 M LENGTH ( As Per Det GBR LETTER No. 80695/DGBR/POL/60/D&S dt20.10.2010)
1 Excavation Cum 1 X 1.00 X ( 1.000 + 0.38 ) / 2 X 0.5 = 0.340

2 PCC 1:4:8 for fdn Cum 1 X 0.98 X 0.10 = 0.100

3 PCC 1:3:6 Cum 1 X 1 X ( 0.670 + 0.450 ) / 2 X 0.10 = 0.060


1 X 1 X ( 0.15 + 0.300 ) / 2 X 0.1 = 0.020
1 X 1 X ( 0.21 + 0.310 ) / 2 X 0.15 = 0.040
1 X 1 X ( 0.05 + 0.150 ) / 2 X 0.1 = 0.010
TOTAL = 0.130

4 Centering/Shuttering Sqm 1 X 1X 0.21 = 0.210


1 X 1X 0.45 = 0.450
TOTAL = 0.660

5 Back Filling Cum 1X 1 X ( 0.075 + 0.000 ) / 2X 0.30 = 0.010


1X 1 X 0.075 X 0.10 = 0.010
TOTAL = 0.020

(Dhirendra Tiwari)
AE (Civ)
SO (Estg & DPR)
For Commander

Page 214 of Cal R/W,B/W 13:01:24/W


RCC CULVERT 3 M SPAN AND 10 M LENGTH
SL DESCRIPTION A/U NOS LENGTH WIDTH HEIGHT / DEPTH QTY
NO.

1 Excvn in trenches Cum 1 10.30 6.40 3.5 + 1.2 154.91


2
Total= 154.91
2
PCC 1:4:8
For foundation Cum 2 10.30 2.70 0.20 11.12
For foundation Cum 2 10.30 2.30 0.20 9.48
For curtain wall Cum 2 1.40 0.75 0.20 0.42
Total= 21.02
3 Hard core Cum 1 9.10 2 + 2.3 0.15 2.93
2
Total= 2.93
4 PCC 1:3:6 in water way Cum 1 10.00 2 + 2.6 0.15 3.68
2
Total= 3.68
5 PCC 1:2:4 for abutment
1st step Cum 2 10.00 1.90 0.40 15.20
2nd step Cum 2 10.00 2 + 1.5 0.40 13.60
2
3rd step Cum 2 10.00 2 + 0.6 2.30 48.30
2
R/Wall Cum 4 0.4 + 1.1 1 + 1.18 2.30 6.14
2 2
R/Wall Cum 4 0.4 + 0.2 1 + 1.43 1.00 1.57
2 2
Parapet wall Cum 2 4.20 0 + 0.3 0.60 1.89
2
For curtain wall Cum 2 1.80 0.45 0.40 0.65
For curtain wall Cum 2 1.8 + 2.3 0.45 0.25 0.46
2
Wearing coat Cum 1 9.10 4.20 0.08 2.87
Deduction for slab &bed block Cum -2 10.00 0.30 0.45 -2.70
Total= 87.98
6 M-25 RCC
For deck slab Cum 1 10.00 3.60 0.30 10.80
For bed block Cum 2 10.00 0.30 0.15 0.90
Total= 11.70
7 Centering & Shuttering
For foundation Sqm 4 2.70 0.20 2.16
For foundation Sqm 4 2.30 0.20 1.84
For foundation Sqm 4 10.30 0.40 16.48
For abutment 1st step Sqm 4 10.00 0.40 16.00
For abutment 1st step Sqm 4 1.90 0.40 3.04
For abutment IInd step Sqm 2 10.00 0.40 8.00
For abutment IInd step Sqm 2 10.00 0.57 11.30
For abutment IInd step Sqm 4 1.9 + 1.5 0.40 2.72
2
For abutment IIIrd step Sqm 2 10.00 2.41 48.20
For abutment IIIrd step Sqm 2 10.00 1.86 37.20
For abutment IIIrd step Sqm 4 1.5 + 0.6 2.30 9.66
2
For water way Sqm 2 2.3 + 2.6 0.15 0.74
2
For water way Sqm 4 1.00 + 1.8 0.60 3.36
2
For water way Sqm 4 1.8 + 2.3 0.25 2.05
2
For bed block Sqm 2 10.00 0.15 3.00
For bed block Sqm 4 0.30 0.15 0.18
For slab Sqm 1 10.00 3.00 30.00
For slab Sqm 2 3.60 0.30 2.16
Wearing coat Sqm 2 9.10 0.08 1.37
For R / Wall Sqm 4 1.43 + 0.6 3.30 13.40
2
For R / Wall Sqm 4 1.1 + 0.4 2.37 7.11
2
For R / Wall Sqm 4 0.4 + 0.2 1.03 1.24
2
For R / Wall Sqm 4 1.1 + 0.4 2.30 6.90
2
For R / Wall Sqm 4 0.4 + 0.2 1.00 1.20
2
For parapet Sqm 2 4.20 0.62 5.21
For parapet Sqm 2 4.20 0.60 5.04
For parapet Sqm 4 0.45 + 0.3 0.60 0.90
2
Deduction For bed block & slab Sqm -4 0.30 0.45 -0.54
Total= 239.91
8 Earth filling cum 1 10.30 1.00 0.20 2.06
cum 1 9.10 1.80 0.40 6.55
cum 1 9.10 2 + 2 0.10 1.73
2
cum 1 9.10 1.40 0.20 2.55
Total= 12.89
9
Back filling cum 2 9.68 + 10.8 1 + 0.4 2.30 35.33
2 2
cum 2 9.68 0 + 0.2 1.00 5.81
2
Total= 41.14
10 Steel required
a) qty of steel above 12mm dia Kg 373.74
Total qty of steel including 5% Kg Total 392.43
b) qty of steel up to 12mm dia Kg
Total qty of steel including 5% Kg 627.32
Total 1019.76
Net qty of steel in terms of MT MT 1.020
PVC pipe 10 cm dia for weep hole Mtr 60.00 1.05 63.00
11
PVC pipe 10 cm dia for weep hole Mtr Total 63.00
SUMMARY
Sl No Item of work A/U Qty
1 Earth work in Excavation Cum 154.91
2 PCC 1:4:8 Cum 21.02
3 Hard core Cum 2.93
4 PCC 1:3:6 in water way Cum 3.68
5 PCC 1:2:4 for abutment Cum 87.98
6 M-25 RCC Cum 11.70
7 Centering & Shuttering Sqm 239.91
8 Earth filling Cum 12.89
9 Back filling Cum 41.14
10 Steel required above 12 mm Kgs 392.43 (Dhirendra Tiwari)
11 Steel required upto 12 mm Kgs 627.32 AE (Civ)
12 PVC Pipe 10 Cm dia for weep hole Mtr 63.00 SO (Estg & DPR)
For Commander
Reinforcement details for 3.0 mts span RCC Culvert

S.No Length (m) Span(m) Type 'a' Bar Type 'b' Bar Type 'c' Bar Type 'd' Bar Type 'e' Bar Remark Wt including
10 mm dia for 16 mm dia for 10 mm dia for 12 mm dia for 10 mm dia for 5% for
Slab Slab Slab Slab Slab wastage
1 10 3 Dia (mm) 10 16 10 12 10
Spacing (mm) 150 150 300 100 300
Nos 67 67 33 36 12
x(m) 0.443
y(m) 0.353
z(m) 2.143
2(x+y)+z+hooks 3.735
L(m) 3.53
r(m) 9.95
j(m) 9.95
M(m) 3.53
m(m) 0.217
M+2m 3.964
Total length 3.735 3.53 3.964 9.95 9.95
G/Total length 250.25 236.51 130.81 358.20 119.40
wt per mtr 0.617 1.580 0.617 0.889 0.617
Total Wt(kg) 154.47 373.74 80.75 318.40 73.70 1001.07 1051.12

(Dhirendra Tiwari)
AE (Civ)
SO (Estg & DPR)
For Commander
RCC CULVERT 6.0 M SPAN AND 10 M LENGTH
Length in Breadth in Hight in
S.No. Item of work A/U Nos Quantity
Mtr Mtr Mtr

1 Excvn in trenches
For abutment Cum 2 10 3.2 (3.55+1.5)/2 161.60
161.60
2 PCC 1:4:8
For foundation Cum 2 10 3.2 0.2 12.80
Cum 2 10 2.8 0.2 11.20
Cum 2 3.7 0.75 0.2 1.11
Total 24.00
3 Hard core Cum 1 9.1 5.10 0.15 6.96

4 PCC 1:3:6 in water way Cum 1 10 5.30 0.15 7.95

5 PCC 1:2:4 for Abutment


1st step Cum 2 10 2.4 0.4 19.20
2nd step Cum 2 10 (2.4+1.8)/2 0.4 16.80
3rd step Cum 2 10 (1.8+0.7)/2 2.34 58.50
R/Wall Cum 4 (0.40+1.35)/2 (1.39+0.6)/2 3.02 10.52
For curtain wall Cum 2 4.1 0.45 0.2 0.74
Cum 2 4.5 0.45 0.5 2.03
Wearing coat Cum 1 10 6.80 0.075 5.10
107.78
For slab and bed block Cum 2 10 0.3 0.67 -4.02
Total 103.76
6 M-25 RCC
for deck slab Cum 1 10 6.8 0.445 30.26
for bed block Cum 2 10 0.40 0.15 1.20
Curve Cum 2 7 0.22 0.22 0.68
Vartical railling Cum 10 0.15 0.15 0.78 0.18
Horizontal post Cum 24 1.602 0.08 0.15 0.43
Total 32.75
7 Centering & Shuttering
For foundation Sqm 4 3.2 0.2 2.56
Sqm 4 2.8 0.2 2.24
1st step Sqm 2 12 0.8 19.20
Sqm 4 (2.4+2.0)/2 0.4 3.52
For water way Sqm 2 12 0.4 9.60
Sqm 2 12 0.56 13.44
For Curtain wall Sqm 4 4.1 0.2 3.28
Sqm 4 4.5 0.5 9.00
For Abutment Sqm 4 (1.8+0.7)/2 3.02 15.10
Inner side Sqm 2 10 2.51 50.20
Outer side Sqm 2 10 3.14 62.80
For bed block Sqm 2 10 0.15 3.00
Sqm 4 0.3 0.15 0.18
For Slab Sqm 1 10 6 60.00
Sqm 2 6 0.52 6.24
For R/Wall Sqm 8 (0.40+1.25)/2 3.82 25.21
Sqm 4 (1.39+0.6)/2 3.82 15.20
for Kerv Sqm 4 7 0.22 6.16
End Sqm 8 0.22 0.22 0.39
Vartical railling post Sqm 40 0.78 0.15 4.68
Deduction
For bed block & slab Sqm 4 0.30 0.67 -0.80
Total 311.20
8 Earth filling Cum 1 9.10 0.2 0.2 0.36
Cum 1 9.10 0.4 0.5 1.82
Total 2.18
9 Back filling Cum 2 10.00 (1.35+0.4)/2 3.15 55.13

10 Steel required as per IRC Special


publication 13 2002 , Plate No. 06 @
140.98 Kg/Cum for

a) Qty of steel above 12mm dia kg 1101.12


Total qty of steel incl 5% Kg 1156.17

Page 218 of Qty Cal 06m Span


b) Qty of steel uo to 12mm dia kg 1115.82
Total qty of steel incl 5% Kg 1171.61
Total 2327.78
Net qty of steel in terms of MT MT 2.328
11 PVC pipe 10 cm dia for weep hole Mtr 120 (1.8+0.75)/2 153.00

SUMMARY
Sl No Item of work A/U Qty
1 Earth work in Excavation Cum 161.60
2 PCC 1:4:8 Cum 24.00
3 Hard core Cum 6.96
4 PCC 1:3:6 in water way Cum 7.95
5 PCC 1:2:4 for abutment Cum 103.76
6 M-25 RCC Cum 32.75
7 Centering & Shuttering Sqm 311.20
8 Earth filling Cum 2.18
9 Back filling Cum 55.13 (Dhirendra Tiwari)
10 Steel required above 12 mm Kgs 1156.17 AE (Civ)
11 Steel required upto 12 mm Kgs 1171.61 SO (Estg & DPR)
12 PVC Pipe 10 Cm dia for weep hole Mtr 153.00 For Commander

Page 219 of Qty Cal 06m Span


Reinforcement details for 6.0 mts span RCC Culvert

Type 'a' Type 'b' Type 'c' Type 'd' Type 'e'
Wt
Bar Bar Bar Bar Bar
Length includin
S.No Span(m) 10 mm 20 mm 10 mm 12 mm 10 mm Remark
(m) g 5% for
dia for dia for dia for dia for dia for
wastage
Slab Slab Slab Slab Slab

1 10 6 Dia (mm) 12 20 10 12 10
Spacing (mm) 150 150 300 150 300
Nos 67 67 33 45 23
x(m) 0.772
y(m) 0.63
z(m) 4.286
2(x+y)+z+hooks 7.102
L(m) 6.656
r(m) 9.95
j(m) 9.95
M(m) 6.73
m(m) 0.405
M+2m 7.54
Total length 7.102 6.656 7.54 9.95 9.95
G/Total length 475.83 445.95 248.82 447.75 228.85
wt per mtr 0.889 2.469 0.617 0.889 0.617
Total Wt(kg) 422.96 1101.12 153.59 398.00 141.27 2216.94 2327.78

(Dhirendra Tiwari)
AE (Civ)
SO (Estg & DPR)
For Commander
RCC CULVERT 2 M SPAN AND 10 M LENGTH

Sl No Item of work A/U Nos Length in Mtr Breadth in Mtr Hight in Mtr Quantity

1
Excvn in trenches

For abutment Cum 1 10.30 5.40 3.44 + 1.20 129.04

For catch pit Cum 1 1.75 3.20 1.55 + 0.30 5.18

Total= 134.22
2
PCC 1:4:8

For foundation Cum 1 10.30 5.40 0.2 11.12

For foundation Cum 1 10.30 5.00 0.2 10.30

For catch pit Cum 1 1.90 3.20 0.15 0.91

Total= 22.34
3
Hard core Cum 1 9.10 1.00 + 1.3 0.15 1.57

Total= 1.57
4
PCC 1:3:6 in water way Cum 1 10.00 1.30 + 1.6 0.15 2.18

Total= 2.18
5
PCC 1:3:6 for abutment (M-15)

1st step Cum 2 10.00 1.90 0.40 15.20

2nd step Cum 2 10.00 1.90 + 1.5 0.40 13.60

3rd step Cum 2 10.00 1.50 + 0.6 2.24 46.94

R/Wall Cum 4 0.4 + 1.10 0.60 + 0.99 2.24 5.34

2 2

R/Wall Cum 4 0.4 + 0.20 0.99 + 1.16 1.00 1.29

2 2

Parapet wall Cum 2 3.20 0.45 + 0.3 0.60 1.44

For curtain wall Cum 2 0.80 0.45 0.40 0.29

For curtain wall Cum 2 0.8 + 1.30 0.45 0.25 0.24

Catch pit Cum 1 2.90 0.38 + 0.3 1.40 1.37

Catch pit Cum 2 1.38 0.38 + 0.3 1.40 1.30

Wearing coat Cum 1 9.10 3.20 0.08 2.18

Deduction for Drain Cum -2 0.30 0.60 + 0.45 0.60 -0.19

Deduction for slab &bed block Cum -2 10.00 0.30 0.39 -2.34

Total 86.66
6
M-25 RCC

For deck slab Cum 1 10.00 2.60 0.24 6.24

For bed block Cum 2 10.00 0.30 0.15 0.90

Total 7.14
7
Centering & Shuttering
Qty Cal 2 m Cul Page 221
Sl7No Item of work A/U Nos Length in Mtr Breadth in Mtr Hight in Mtr Quantity

For foundation Sqm 2 5.40 0.20 2.16

For foundation Sqm 2 5.00 0.20 2.00

For foundation Sqm 2 10.30 0.40 8.24

For abutment 1st step Sqm 4 10.00 0.40 16.00

For abutment 1st step Sqm 4 1.90 0.40 3.04

For abutment IInd step Sqm 2 10.00 0.40 8.00

For abutment IInd step Sqm 2 10.00 0.57 11.30

For abutment IInd step Sqm 4 1.9 + 1.50 0.40 2.72

For abutment IIIrd step Sqm 2 10.00 2.35 47.00

For abutment IIIrd step Sqm 2 10.00 1.86 37.20

For abutment IIIrd step Sqm 4 1.5 + 0.60 2.24 9.41

For water way Sqm 2 1.3 + 1.60 0.15 0.44

For water way Sqm 4 0.80 0.40 1.28

For water way Sqm 4 0.8 + 1.30 0.25 1.05

For bed block Sqm 2 10.00 0.15 3.00

For bed block Sqm 4 0.30 0.15 0.18

For slab Sqm 1 10.00 2.00 20.00

For slab Sqm 2 2.60 0.24 1.25

Wearing coat Sqm 2 9.10 0.08 1.37

For R / Wall Sqm 4 1.16 + 0.60 3.24 11.40

For R / Wall Sqm 4 1.1 + 0.40 2.27 6.81

For R / Wall Sqm 4 0.4 + 0.20 1.02 1.22

For R / Wall Sqm 4 1.1 + 0.40 2.24 6.72

For R / Wall Sqm 4 0.4 + 0.20 1.00 1.20

For parapet Sqm 2 3.20 0.62 3.97

For parapet Sqm 2 3.20 0.60 3.84

For parapet Sqm 4 0.45 + 0.30 0.60 0.90

For catch pit Sqm 2 1.90 0.15 0.57

For catch pit Sqm 1 3.20 0.15 0.48

For catch pit Sqm 1 2.90 0.70 2.03

For catch pit Sqm 1 2.75 0.70 1.93

For catch pit Sqm 2 1.75 0.70 2.45

For catch pit Sqm 2 1.68 0.70 2.35

For catch pit Sqm 2 1.38 1.40 3.86

For drain Sqm 4 0.30 0.60 0.72

Deduction For bed block & slab Sqm -4 0.30 0.39 -0.47

Deduction For drain Sqm -4 0.6 + 0.45 0.60 -1.26

Qty Cal 2 m Cul Page 222


Sl No Item of work A/U Nos Length in Mtr Breadth in Mtr Hight in Mtr Quantity

Total 224.35
8
Earth filling cum 1 9.10 0.40 3.64

cum 1 9.10 0.80 + 1 0.10 0.82

2.00

Total 4.46
9
Back filling cum 2 9.68 + 10.80 1.10 + 0.4 2.24 34.41

2 2

2 9.68 + 10.80 0.40 + 0.2 1.00 6.14

2 2 Total 40.55
10 Steel required as per IRC Special publication 13 1998 , Plate No. 06 (0.1895m length has been deducted for hook)

a) qty of steel above 12mm dia kg 0


Kg
Total qty of steel including 5% Total 0.00

b) qty of steel up to 12mm dia kg 605.38

Total qty of steel including 5% 635.65


Total 635.65
Net qty of steel in terms of MT MT 0.636
11
PVC pipe 10 cm dia for weep hole Mtr 40.00 1.05 42.00
Mtr Total 42.00
SUMMARY
Sl No Item of work A/U Qty
1 Earth work in Excavation Cum 134.22
2 PCC 1:4:8 Cum 22.34
3 Hard core Cum 1.57
4 PCC 1:3:6 in water way Cum 2.18
5 PCC 1:3:6 for abutment Cum 86.66
6 M-25 RCC (RCC 1:2:4) Cum 7.14
7 Centering & Shuttering Sqm 224.35
8 Earth filling Cum 4.46
9 Back filling Cum 40.55
10 Steel required above 12 mm Kgs 0.00
11 Steel required upto 12 mm Kgs 635.65
12 PVC Pipe 10 Cm dia for weep
hole Mtr 42.00

Qty Cal 2 m Cul Page 223


Reinforcement details for 2.0 mts span RCC Culvert

Type 'a' Bar Type 'b' Bar Type 'c' Bar Type 'd' Bar Type 'e' Bar Wt including
S.No Length (m) Span(m) 10 mm dia for 12 mm dia for 10 mm dia for 12 mm dia for 10 mm dia for Remark 5% for
Slab Slab Slab Slab Slab wastage
1 10 2 Dia (mm) 10 12 10 12 10
Spacing (mm) 150 150 300 100 300
Nos 67 67 33 26 9
x(m) 0.361
y(m) 0.269
z(m) 1.428
2(x+y)+z+hooks 2.686
L(m) 2.53
r(m) 9.95
j(m) 9.95
M(m) 2.53
m(m) 0.168
M+2m 2.866
Total length 2.686 2.53 2.866 9.95 9.95
G/Total length 179.96 169.51 94.58 258.70 89.55
wt per mtr 0.617 0.889 0.617 0.889 0.617
Total Wt(kg) 111.09 150.68 58.38 229.96 55.28 605.38 635.65
RAIN FALL DATA (MM)

S/No. Month Year


2020 2021
01 January 240.00 46.00

02 February 22.80 35.50

03 March 242.00 30.00

04 April 78.00

05 May 111.29

06 June 37.00

07 July 17.00

08 August 65.00

09 September 18.00

10 October -

11 November 28.10

12 December 5.00

Total 864.19 111.50


Avg Rainfall Data 72.02 mm
SNOWFALL DATA (CM)

S No. Month Year


2020 2021
01 January 60.00 50.00

02 February - -

03 March 50.00 -

04 April -

05 May -

06 June -

07 July -

08 August -

09 September -

10 October -

11 November 30.00

12 December 60.00

Total 200.00 50.00


Avg Snowfall in mm 16.67 mm
MINIMUM AND MAXIMUM TEMPERATURE (DEGREE CELSIUS)

S No. Month 2020 2021


Max Temp Min Temp Max Temp Min Temp
01 January 7.0 (-) 5.0 10.0 (-) 2.0

02 February 16.0 (-) 4.0 14.00 (-) 2.0

03 March 14.0 (-) 2.0 17.00 2.00

04 April 22.0 1.0

05 May 26.0 3.0

06 June 28.0 12.0

07 July 30.0 11.0

08 August 25.0 13.0

09 September 23.0 10.0

10 October 20.0 8.0

11 November 17.0 1.0

12 December 13.0 (-) 9.0

Total 241.00 59.00 41.00 (-) 6.0


ALTITUDE CHART
(BASOLI-BANI-BHADEWAH Rd Km 102.000 to km 112.00)

S/No Location in Kms Length in Mtrs


From To
(A) Altd between 2010-2400 mtr
1 102.000 105.675 3675.000
(B) Altd between 2401-2700 mtr
1 105.675 112.000 6325.000
G/Total (Length) 10000.000

Alt chart Page 228


INDEX MAP
TO ANANTNAG SINTHAN PASS
TO
SRINAGAR 83

CHANDRABHAGA
340 SPL RIVER

45 CHINGAM 118 RCC


314 SPL 42 170 FCP
DUL
GUL 16 / 0
52 0 RAMBAN GULABGARH
151
GALHAR 32
DHARMKUND BATOTE 123 / 0 17 / 0 TIARI
NBP KISHTWAR 51
21
126 110 / 0 55.18
ROA 368 RMP
37
59.10
BBP
10 45/0 KPRA 50
51.35 114 RCC
52 RCC PREM NAGAR 64 THATRI
80 KILAR
371 RMP PATNI TOP 160 FCP
110 HAMBAL
15 6 MASRATA BALOT CHINTA
90 395 RMP 10.45 / 0 JAIGHATI
MAND 372 RMP
ASCON BHARGRAN 9.80 / 0
3.31 48.435 MORE CAMP GOHA BHALRA
75 20 7.97 NASKA WATER PT GUNDU
PHALATA UDHAMPUR 27 KAPRA 2.85
KATRA 66 DRUDU 8/0 30
55 18.97 / 0 ATALGARH
0
UBP BHADARWAH
DOMEL
30 NALTHI 165.850 / 28.625
NAGROTA 156 CHHATARGALI
128.90
13

RAMNAGAR PALACE SARTHAL


4.49 KM 89 114.50
239 PWP
KM 0 JAMMU TO PATHANKOT BANI
86

TO BASOLI
DESIGN AND CONSTRUCTION OF 90 M (45 M + 45 M) MAJOR PERMANENT SARTHAL BRIDGE
WITH PSC BOX GIRDER TYPE SUPERSTRUCTURE ON OPEN FOUNDATION OVER KANDILLU
NALLAH AT KM 114.250 ON BASOLI-BANI-BHADERWAH ROAD UNDER 114 RCC/35 BRTF OF
PROJECT BEACON IN J & k STATE .( FEASIBILITY CERTIFICATES OF BRIDGE HAS BEEN
APPROVED VIDE HQ DGBR LETTER NO. 40796/SARTHAL/BCN/CSM/05/B & T Dte DATED 14 SEP
2018.

1 Name of Bridge : SARTHAL Bridge


2 Location of Bridge : At Km 114.250 on Basoli-Bani-
Bhaderwah Road
3 Span of Bridge (45m + 45 m) : 90 m
4 Type of Foundation : Open foundation
5 Depth of Superstructure :
6 Total Height of Abutment :
Deck Level (RL) : 2443.00 m
7 Foundation Level :
(i) Bhaderwah Side Abutment (A1) RL (Open foundation/ Scour : 2427.000 m
Criteria)
(ii) Bani Side Abutment (A2) RL (Open foundation/ Scour : 2427.000 m
Criteria)
(iii) Intermediate pier (well foundation/Scour Criteria) : 2418.000 m
8 Height of Abutment
Bhaderwah Side Abutment (A1) : 16.00 m
Bani Side Abutment (A2) : 16.00 m
For Project Beacon rate (BR SSR 2019 circulated vide HQ Dte GBR Letter No.
33733/DGBR/BRSSR-2019/92/D&S dated 19 Jul 2019)
9 Super Structure (Table-2) :
Longer span i.e 90 m span per m rate considered = 0.00 lakh
10 Sub Structure (Table-1) :
For sub structure of 90 m span upto 10 m height substructure = 0.00 lakh
per m rate
11 The Height of Abutment of Bridge :
Both side (i.e. Atalgarh and Kapra) : 16.000 m
12 ABUTMENT :
Per m rate for 16.00 m height of both side Abutment = 0.00 lakh/m
Therefore, per m cost of Bridge for Project Beacon
13 Rate for Superstructure 11 m width = 0.00 lakh/m
Cost for 12m width superstructure (6.18/11x12) = 0.00 lakh/m
Therefore, per m cost of Bridge for Project Beacon
14 Work done through Execution Contract
Substructure
Cost of Work as per SSR - 2019 (X) : 0.00 lakh/m
Over head charges (Y) @ 10% of X as the work is within 50 : 0 lakh/m
Crs
Contractor's Profit : 0.00 lakh/m
(Z = 10% of (X+Y))
Total cost of Substructure (C=X+Y+Z) 0.00 lakh/m
For intermediate pier add 50% extra on Cost of Sub 0.00 lakh/m
Structure

Superstructure
Cost of Work as per SSR - 2019 (X) : 0.00 lakh/m
Over head charges (Y) @ 10% of X as the work is within 50 : 0 lakh/m
Crs
Contractor's Profit : 0.00 lakh/m
(Z = 10% of (X+Y))
Total cost of Superstructure (C=X+Y+Z) 0.00 lakh/m
Appx 'J'
GRADIENT CHART

ALTITUDE : 2100-2400m

S/No Location(Km) Altitude(Mtr) Total Rise/Fall(Mtr) Distance Proposed Remarks


(Mtr) Gradient
From To Starting Ending Rise Fall
1 102.000 102.025 2112.27 2111.70 0.000 0.570 25.000 43.86
2 102.025 102.050 2111.70 2111.19 0.000 0.510 25.000 49.02
3 102.050 102.075 2111.19 2110.69 0.000 0.500 25.000 50.00
4 102.075 102.100 2110.69 2110.19 0.000 0.500 25.000 50.00
5 102.100 102.125 2110.190 2109.68 0.000 0.510 25.000 49.02
6 102.125 102.150 2109.680 2109.18 0.000 0.500 25.000 50.00
7 102.150 102.175 2109.180 2108.67 0.000 0.510 25.000 49.02
8 102.175 102.200 2108.670 2108.17 0.000 0.500 25.000 50.00
9 102.200 102.225 2108.170 2109.39 1.220 0.000 25.000 20.49
10 102.225 102.250 2109.390 2110.610 1.220 0.000 25.000 20.49
11 102.250 102.275 2110.610 2111.830 1.220 0.000 25.000 20.49
12 102.275 102.300 2111.830 2113.050 1.220 0.000 25.000 20.49
13 102.300 102.325 2113.050 2114.270 1.220 0.000 25.000 20.49
14 102.325 102.350 2114.270 2115.490 1.220 0.000 25.000 20.49
15 102.350 102.375 2115.490 2116.710 1.220 0.000 25.000 20.49
16 102.375 102.400 2116.710 2117.930 1.220 0.000 25.000 20.49
17 102.400 102.425 2117.930 2119.150 1.220 0.000 25.000 20.49
18 102.425 102.450 2119.150 2120.370 1.220 0.000 25.000 20.49
19 102.450 102.475 2120.370 2121.590 1.220 0.000 25.000 20.49
20 102.475 102.500 2121.590 2122.810 1.220 0.000 25.000 20.49
21 102.500 102.525 2122.810 2124.030 1.220 0.000 25.000 20.49
22 102.525 102.550 2124.030 2125.250 1.220 0.000 25.000 20.49
23 102.550 102.575 2125.250 2126.470 1.220 0.000 25.000 20.49
24 102.575 102.600 2126.470 2127.690 1.220 0.000 25.000 20.49
25 102.600 102.625 2127.690 2128.910 1.220 0.000 25.000 20.49
26 102.625 102.650 2128.910 2130.120 1.210 0.000 25.000 20.66
27 102.650 102.675 2130.120 2131.340 1.220 0.000 25.000 20.49
29 102.675 102.700 2131.340 2132.560 1.220 0.000 25.000 20.49
30 102.700 102.725 2132.560 2133.780 1.220 0.000 25.000 20.49
31 102.725 102.750 2133.780 2135.000 1.220 0.000 25.000 20.49
32 102.750 102.775 2135.000 2136.220 1.220 0.000 25.000 20.49
33 102.775 102.800 2136.220 2137.440 1.220 0.000 25.000 20.49
34 102.800 102.825 2137.440 2138.660 1.220 0.000 25.000 20.50
35 102.825 102.850 2138.660 2139.880 1.220 0.000 25.000 20.49
36 102.850 102.875 2139.880 2141.100 1.220 0.000 25.000 20.49
37 102.875 102.900 2141.100 2142.320 1.220 0.000 25.000 20.49
38 102.900 102.925 2142.320 2143.540 1.220 0.000 25.000 20.50
39 102.925 102.950 2143.540 2144.760 1.220 0.000 25.000 20.50
40 102.950 102.975 2144.760 2145.980 1.220 0.000 25.000 20.50
41 102.975 103.000 2145.980 2147.200 1.220 0.000 25.000 20.49
42 103.000 103.025 2147.200 2148.500 1.300 0.000 25.000 19.23
43 103.025 103.050 2148.500 2149.800 1.300 0.000 25.000 19.23
44 103.050 103.075 2149.800 2151.100 1.300 0.000 25.000 19.23
45 103.075 103.100 2151.100 2152.400 1.300 0.000 25.000 19.23
46 103.100 103.125 2152.400 2153.700 1.300 0.000 25.000 19.23
47 103.125 103.150 2153.700 2155.000 1.300 0.000 25.000 19.23
48 103.150 103.175 2155.000 2156.300 1.300 0.000 25.000 19.23
49 103.175 103.200 2156.300 2157.600 1.300 0.000 25.000 19.23
50 103.200 103.225 2157.600 2158.900 1.300 0.000 25.000 19.23
51 103.225 103.250 2158.900 2160.200 1.300 0.000 25.000 19.23
52 103.250 103.275 2160.200 2161.500 1.300 0.000 25.000 19.23
53 103.275 103.300 2161.500 2162.800 1.300 0.000 25.000 19.23
54 103.300 103.325 2162.800 2164.100 1.300 0.000 25.000 19.23
55 103.325 103.350 2164.100 2165.400 1.300 0.000 25.000 19.23
56 103.350 103.375 2165.400 2166.700 1.300 0.000 25.000 19.23
57 103.375 103.400 2166.700 2168.000 1.300 0.000 25.000 19.23
58 103.400 103.425 2168.000 2169.300 1.300 0.000 25.000 19.23
59 103.425 103.450 2169.300 2170.600 1.300 0.000 25.000 19.23
60 103.450 103.475 2170.600 2171.900 1.300 0.000 25.000 19.23
61 103.475 103.500 2171.900 2173.200 1.300 0.000 25.000 19.23
62 103.500 103.525 2173.200 2174.500 1.300 0.000 25.000 19.20
63 103.525 103.550 2174.500 2175.800 1.300 0.000 25.000 19.20
64 103.550 103.575 2175.800 2177.100 1.300 0.000 25.000 19.20
65 103.575 103.600 2177.100 2178.400 1.300 0.000 25.000 19.20
66 103.600 103.625 2178.400 2179.700 1.300 0.000 25.000 19.20
67 103.625 103.650 2179.700 2181.000 1.300 0.000 25.000 19.20
68 103.650 103.675 2181.000 2182.300 1.300 0.000 25.000 19.23
69 103.675 103.700 2182.300 2183.600 1.300 0.000 25.000 19.23
70 103.700 103.725 2183.600 2184.900 1.300 0.000 25.000 19.23
71 103.725 103.750 2184.900 2186.200 1.300 0.000 25.000 19.23
72 103.750 103.775 2186.200 2187.500 1.300 0.000 25.000 19.23
73 103.775 103.800 2187.500 2188.800 1.300 0.000 25.000 19.23
74 103.800 103.825 2188.800 2190.100 1.300 0.000 25.000 19.23
75 103.825 103.850 2190.100 2191.400 1.300 0.000 25.000 19.23
76 103.850 103.875 2191.400 2192.700 1.300 0.000 25.000 19.23
77 103.875 103.900 2192.700 2194.000 1.300 0.000 25.000 19.20
Page 231
S/No Location(Km) Altitude(Mtr) Total Rise/Fall(Mtr) Distance Proposed Remarks
(Mtr) Gradient
From To Starting Ending Rise Fall
78 103.900 103.925 2194.000 2195.300 1.300 0.000 25.000 19.23
79 103.925 103.950 2195.300 2196.600 1.300 0.000 25.000 19.23
80 103.950 103.975 2196.600 2197.900 1.300 0.000 25.000 19.23
81 103.975 104.000 2197.900 2199.200 1.300 0.000 25.000 19.23
82 104.000 104.025 2199.200 2200.450 1.250 0.000 25.000 20.00
83 104.025 104.050 2200.450 2201.700 1.250 0.000 25.000 20.00
84 104.050 104.075 2201.700 2202.950 1.250 0.000 25.000 20.00
85 104.075 104.100 2202.950 2204.200 1.250 0.000 25.000 20.00
86 104.100 104.125 2204.200 2205.450 1.250 0.000 25.000 20.00
87 104.125 104.150 2205.450 2206.700 1.250 0.000 25.000 20.00
88 104.150 104.175 2206.700 2207.950 1.250 0.000 25.000 20.00
89 104.175 104.200 2207.950 2209.200 1.250 0.000 25.000 20.00
90 104.200 104.225 2209.200 2210.450 1.250 0.000 25.000 20.00
91 104.225 104.250 2210.450 2211.700 1.250 0.000 25.000 20.00
92 104.250 104.275 2211.700 2212.950 1.250 0.000 25.000 20.00
93 104.275 104.300 2212.950 2214.200 1.250 0.000 25.000 20.00
94 104.300 104.325 2214.200 2215.450 1.250 0.000 25.000 20.00
95 104.325 104.350 2215.450 2216.700 1.250 0.000 25.000 20.00
96 104.350 104.375 2216.700 2217.950 1.250 0.000 25.000 20.00
97 104.375 104.400 2217.950 2219.200 1.250 0.000 25.000 20.00
98 104.400 104.425 2219.200 2220.450 1.250 0.000 25.000 20.00
99 104.425 104.450 2220.450 2221.700 1.250 0.000 25.000 20.00
100 104.450 104.475 2221.700 2222.950 1.250 0.000 25.000 20.00
101 104.475 104.500 2222.950 2224.200 1.250 0.000 25.000 20.00
102 104.500 104.525 2224.200 2225.450 1.250 0.000 25.000 20.00
103 104.525 104.550 2225.450 2226.700 1.250 0.000 25.000 20.00
104 104.550 104.575 2226.700 2227.950 1.250 0.000 25.000 20.00
105 104.575 104.600 2227.950 2229.200 1.250 0.000 25.000 20.00
106 104.600 104.625 2229.200 2230.450 1.250 0.000 25.000 20.00
107 104.625 104.650 2230.450 2231.700 1.250 0.000 25.000 20.00
108 104.650 104.675 2231.700 2232.950 1.250 0.000 25.000 20.00
109 104.675 104.700 2232.950 2234.200 1.250 0.000 25.000 20.00
110 104.700 104.725 2234.200 2235.450 1.250 0.000 25.000 20.00
111 104.725 104.750 2235.450 2236.700 1.250 0.000 25.000 20.00
112 104.750 104.775 2236.700 2237.950 1.250 0.000 25.000 20.00
113 104.775 104.800 2237.950 2239.200 1.250 0.000 25.000 20.00
114 104.800 104.825 2239.200 2240.450 1.250 0.000 25.000 20.00
115 104.825 104.850 2240.450 2241.700 1.250 0.000 25.000 20.00
116 104.850 104.875 2241.700 2242.950 1.250 0.000 25.000 20.00
117 104.875 104.900 2242.950 2244.200 1.250 0.000 25.000 20.00
118 104.900 104.925 2244.200 2245.450 1.250 0.000 25.000 20.00
119 104.925 104.950 2245.450 2246.700 1.250 0.000 25.000 20.00
120 104.950 104.975 2246.700 2247.950 1.250 0.000 25.000 20.00
121 104.975 105.000 2247.950 2249.200 1.250 0.000 25.000 20.00
122 105.000 105.025 2249.200 2250.550 1.350 0.000 25.000 18.52
123 105.025 105.050 2250.550 2251.800 1.250 0.000 25.000 20.00
124 105.050 105.075 2251.800 2253.040 1.240 0.000 25.000 20.16
125 105.075 105.100 2253.040 2254.290 1.250 0.000 25.000 20.00
126 105.100 105.125 2254.290 2255.540 1.250 0.00 25.000 20.00
127 105.125 105.150 2255.540 2256.790 1.250 0.000 25.000 20.00
128 105.150 105.175 2256.790 2258.030 1.240 0.000 25.000 20.16
129 105.175 105.200 2258.030 2259.280 1.250 0.000 25.000 20.00
130 105.200 105.225 2259.280 2260.530 1.250 0.000 25.000 20.00
131 105.225 105.250 2260.530 2261.780 1.250 0.000 25.000 20.00
132 105.250 105.275 2261.780 2263.020 1.240 0.000 25.000 20.16
133 105.275 105.300 2263.020 2264.270 1.250 0.000 25.000 20.00
134 105.300 105.325 2264.270 2265.520 1.250 0.000 25.000 20.00
135 105.325 105.350 2265.520 2266.770 1.250 0.000 25.000 20.00
136 105.350 105.375 2266.770 2268.010 1.240 0.000 25.000 20.16
137 105.375 105.400 2268.010 2269.200 1.190 0.000 25.000 21.01
138 105.400 105.425 2269.200 2270.510 1.310 0.000 25.000 19.08
139 105.425 105.450 2270.510 2271.760 1.250 0.000 25.000 20.00
140 105.450 105.475 2271.760 2273.000 1.240 0.000 25.000 20.16
141 105.475 105.500 2273.000 2274.250 1.250 0.000 25.000 20.00
142 105.500 105.525 2274.250 2275.500 1.250 0.000 25.000 20.00
143 105.525 105.550 2275.500 2276.750 1.250 0.000 25.000 20.00
144 105.550 105.575 2276.750 2277.990 1.240 0.000 25.000 20.16
145 105.575 105.600 2277.990 2279.240 1.250 0.000 25.000 20.00
146 105.600 105.625 2279.240 2280.49 1.250 0.000 25.000 20.00
147 105.625 105.650 2280.490 2281.74 1.250 0.000 25.000 20.00
148 105.650 105.675 2281.740 2282.98 1.240 0.000 25.000 20.16
149 105.675 105.700 2282.980 2284.23 1.250 0.000 25.000 20.00
150 105.700 105.725 2284.230 2285.48 1.250 0.000 25.000 20.00
151 105.725 105.750 2285.480 2286.73 1.250 0.000 25.000 20.00
152 105.750 105.775 2286.730 2287.97 1.240 0.000 25.000 20.16
153 105.775 105.800 2287.970 2289.22 1.250 0.000 25.000 20.00
154 105.800 105.825 2289.220 2290.47 1.250 0.000 25.000 20.00
155 105.825 105.850 2290.470 2291.72 1.250 0.000 25.000 20.00
156 105.850 105.875 2291.720 2292.96 1.240 0.000 25.000 20.16
157 105.875 105.900 2292.960 2294.21 1.250 0.000 25.000 20.00
158 105.900 105.925 2294.210 2295.46 1.250 0.000 25.000 20.00
159 105.925 105.950 2295.460 2296.71 1.250 0.000 25.000 20.00
Page 232
S/No Location(Km) Altitude(Mtr) Total Rise/Fall(Mtr) Distance Proposed Remarks
(Mtr) Gradient
From To Starting Ending Rise Fall
160 105.950 105.975 2296.710 2297.95 1.240 0.000 25.000 20.16
161 105.975 106.000 2297.950 2299.20 1.250 0.000 25.000 20.00
162 106.000 106.025 2299.200 2300.45 1.250 0.000 25.000 20.00
163 106.025 106.050 2300.450 2301.70 1.250 0.000 25.000 20.00
164 106.050 106.075 2301.700 2302.95 1.250 0.000 25.000 20.00
165 106.075 106.100 2302.950 2304.20 1.250 0.000 25.000 20.00
166 106.100 106.125 2304.200 2305.45 1.250 0.000 25.000 20.00
167 106.125 106.150 2305.450 2306.70 1.250 0.000 25.000 20.00
168 106.150 106.175 2306.700 2307.95 1.250 0.000 25.000 20.00
169 106.175 106.200 2307.950 2309.20 1.250 0.000 25.000 20.00
170 106.200 106.225 2309.200 2310.45 1.250 0.000 25.000 20.00
171 106.225 106.250 2310.450 2311.700 1.250 0.000 25.000 20.00
172 106.250 106.275 2311.700 2312.950 1.250 0.000 25.000 20.00
173 106.275 106.300 2312.950 2314.200 1.250 0.000 25.000 20.00
174 106.300 106.325 2314.200 2315.450 1.250 0.000 25.000 20.00
175 106.325 106.350 2315.450 2316.700 1.250 0.000 25.000 20.00
176 106.350 106.375 2316.700 2317.950 1.250 0.000 25.000 20.00
177 106.375 106.400 2317.950 2319.200 1.250 0.000 25.000 20.00
178 106.400 106.425 2319.200 2320.450 1.250 0.000 25.000 20.00
179 106.425 106.450 2320.450 2321.690 1.240 0.000 25.000 20.16
180 106.450 106.475 2321.690 2322.940 1.250 0.000 25.000 20.00
181 106.475 106.500 2322.940 2324.190 1.250 0.000 25.000 20.00
182 106.500 106.525 2324.190 2325.440 1.250 0.000 25.000 20.00
183 106.525 106.550 2325.440 2326.690 1.250 0.000 25.000 20.00
184 106.550 106.575 2326.690 2327.940 1.250 0.000 25.000 20.00
185 106.575 106.600 2327.940 2329.190 1.250 0.000 25.000 20.00
186 106.600 106.625 2329.190 2330.440 1.250 0.000 25.000 20.00
187 106.625 106.650 2330.440 2331.760 1.320 0.000 25.000 18.94
188 106.650 106.675 2331.760 2332.940 1.180 0.000 25.000 21.19
189 106.675 106.700 2332.940 2334.190 1.250 0.000 25.000 20.00
190 106.700 106.725 2334.190 2335.440 1.250 0.000 25.000 20.00
191 106.725 106.750 2335.440 2336.690 1.250 0.000 25.000 20.00
192 106.750 106.775 2336.690 2337.940 1.250 0.000 25.000 20.00
193 106.775 106.800 2337.940 2339.190 1.250 0.000 25.000 20.00
194 106.800 106.825 2339.190 2340.440 1.250 0.000 25.000 20.00
195 106.825 106.850 2340.440 2341.690 1.250 0.000 25.000 20.00
196 106.850 106.875 2341.690 2342.940 1.250 0.000 25.000 20.00
197 106.875 106.900 2342.940 2344.190 1.250 0.000 25.000 20.00
198 106.900 106.925 2344.190 2345.440 1.250 0.000 25.000 20.00
199 106.925 106.950 2345.440 2346.690 1.250 0.000 25.000 20.00
200 106.950 106.975 2346.690 2347.940 1.250 0.000 25.000 20.00
201 106.975 107.000 2347.940 2349.190 1.250 0.000 25.000 20.00
202 107.000 107.025 2349.190 2350.440 1.250 0.000 25.000 20.00
203 107.025 107.050 2350.440 2351.690 1.250 0.000 25.000 20.00
204 107.050 107.075 2351.690 2352.940 1.250 0.000 25.000 20.00
205 107.075 107.100 2352.940 2354.190 1.250 0.000 25.000 20.00
206 107.100 107.125 2354.190 2355.440 1.250 0.000 25.000 20.00
207 107.125 107.150 2355.440 2356.690 1.250 0.000 25.000 20.00
208 107.150 107.175 2356.690 2357.940 1.250 0.000 25.000 20.00
209 107.175 107.200 2357.940 2359.190 1.250 0.000 25.000 20.00
210 107.200 107.225 2359.190 2360.440 1.250 0.000 25.000 20.00
211 107.225 107.250 2360.440 2361.690 1.250 0.000 25.000 20.00
212 107.250 107.275 2361.690 2362.940 1.250 0.000 25.000 20.00
213 107.275 107.300 2362.940 2364.190 1.250 0.000 25.000 20.00
214 107.300 107.325 2364.190 2365.440 1.250 0.000 25.000 20.00
215 107.325 107.350 2365.440 2366.690 1.250 0.000 25.000 20.00
216 107.350 107.375 2366.690 2367.940 1.250 0.000 25.000 20.00
217 107.375 107.400 2367.940 2369.190 1.250 0.000 25.000 20.00
218 107.400 107.425 2369.190 2370.440 1.250 0.000 25.000 20.00
219 107.425 107.450 2370.440 2371.690 1.250 0.000 25.000 20.00
220 107.450 107.475 2371.690 2372.940 1.250 0.000 25.000 20.00
221 107.475 107.500 2372.940 2374.190 1.250 0.000 25.000 20.00
222 107.500 107.525 2374.190 2375.440 1.250 0.000 25.000 20.00
223 107.525 107.550 2375.440 2376.690 1.250 0.000 25.000 20.00
224 107.550 107.575 2376.690 2377.940 1.250 0.000 25.000 20.00
225 107.575 107.600 2377.940 2379.190 1.250 0.000 25.000 20.00
226 107.600 107.625 2379.190 2380.440 1.250 0.000 25.000 20.00
227 107.625 107.650 2380.440 2381.690 1.250 0.000 25.000 20.00
228 107.650 107.675 2381.690 2382.940 1.250 0.000 25.000 20.00
229 107.675 107.700 2382.940 2384.190 1.250 0.000 25.000 20.00
230 107.700 107.725 2384.190 2385.440 1.250 0.000 25.000 20.00
231 107.725 107.750 2385.440 2386.690 1.250 0.000 25.000 20.00
232 107.750 107.775 2386.690 2387.940 1.250 0.000 25.000 20.00
233 107.775 107.800 2387.940 2389.190 1.250 0.000 25.000 20.00
234 107.800 107.825 2389.190 2390.440 1.250 0.000 25.000 20.00
235 107.825 107.850 2390.440 2391.690 1.250 0.000 25.000 20.00
236 107.850 107.875 2391.690 2392.940 1.250 0.000 25.000 20.00
237 107.875 107.900 2392.940 2394.190 1.250 0.000 25.000 20.00
238 107.900 107.925 2394.190 2395.440 1.250 0.000 25.000 20.00
239 107.925 107.950 2395.440 2396.690 1.250 0.000 25.000 20.00
240 107.950 107.975 2396.690 2397.940 1.250 0.000 25.000 20.00
241 107.975 108.000 2397.940 2399.300 1.360 0.000 25.000 18.38
Page 233
S/No Location(Km) Altitude(Mtr) Total Rise/Fall(Mtr) Distance Proposed Remarks
(Mtr) Gradient
From To Starting Ending Rise Fall
242 108.000 108.025 2399.300 2400.540 1.240 0.000 25.000 20.16
243 108.025 108.050 2400.540 2401.790 1.250 0.000 25.000 20.00
ALTITUDE : 2401-2700m
244 108.050 108.075 2401.790 2403.030 1.240 0.000 25.000 20.16
245 108.075 108.100 2403.030 2404.270 1.240 0.000 25.000 20.16
246 108.100 108.125 2404.270 2405.520 1.250 0.000 25.000 20.00
247 108.125 108.150 2405.520 2406.760 1.240 0.000 25.000 20.16
248 108.150 108.175 2406.760 2408.000 1.240 0.000 25.000 20.16
249 108.175 108.200 2408.000 2409.240 1.240 0.000 25.000 20.16
250 108.200 108.225 2409.240 2410.490 1.250 0.000 25.000 20.00
251 108.225 108.250 2410.490 2411.730 1.240 0.000 25.000 20.16
252 108.250 108.275 2411.730 2413.010 1.280 0.000 25.000 19.53
253 108.275 108.300 2413.010 2414.220 1.210 0.000 25.000 20.66
254 108.300 108.325 2414.220 2415.460 1.240 0.000 25.000 20.16
255 108.325 108.350 2415.460 2416.700 1.240 0.000 25.000 20.16
256 108.350 108.375 2416.700 2417.950 1.250 0.000 25.000 20.00
257 108.375 108.400 2417.950 2419.190 1.240 0.000 25.000 20.16
258 108.400 108.425 2419.190 2420.430 1.240 0.000 25.000 20.16
259 108.425 108.450 2420.430 2421.680 1.250 0.000 25.000 20.00
260 108.450 108.475 2421.680 2422.920 1.240 0.000 25.000 20.16
261 108.475 108.500 2422.920 2424.160 1.240 0.000 25.000 20.16
262 108.500 108.525 2424.160 2425.410 1.250 0.000 25.000 20.00
263 108.525 108.550 2425.410 2426.650 1.240 0.000 25.000 20.16
264 108.550 108.575 2426.650 2427.890 1.240 0.000 25.000 20.16
265 108.575 108.600 2427.890 2429.130 1.240 0.000 25.000 20.16
266 108.600 108.625 2429.130 2430.380 1.250 0.000 25.000 20.00
267 108.625 108.650 2430.380 2431.690 1.310 0.000 25.000 19.08
268 108.650 108.675 2431.690 2432.860 1.170 0.000 25.000 21.37
269 108.675 108.700 2432.860 2434.110 1.250 0.000 25.000 20.00
270 108.700 108.725 2434.110 2435.430 1.320 0.000 25.000 18.94
271 108.725 108.750 2435.430 2436.680 1.250 0.000 25.000 20.00
272 108.750 108.775 2436.680 2437.840 1.160 0.000 25.000 21.55
273 108.775 108.800 2437.840 2439.080 1.240 0.000 25.000 20.16
274 108.800 108.825 2439.080 2440.320 1.240 0.000 25.000 20.16
275 108.825 108.850 2440.320 2441.570 1.250 0.000 25.000 20.00
276 108.850 108.875 2441.570 2442.810 1.240 0.000 25.000 20.16
277 108.875 108.900 2442.810 2444.050 1.240 0.000 25.000 20.16
278 108.900 108.925 2444.050 2445.300 1.250 0.000 25.000 20.00
279 108.925 108.950 2445.300 2446.540 1.240 0.000 25.000 20.16
280 108.950 108.975 2446.540 2447.780 1.240 0.000 25.000 20.16
281 108.975 109.000 2447.780 2449.140 1.360 0.000 25.000 18.38
282 109.000 109.025 2449.140 2450.390 1.250 0.000 25.000 20.00
283 109.025 109.050 2450.390 2451.640 1.250 0.000 25.000 20.00
284 109.050 109.075 2451.640 2452.890 1.250 0.000 25.000 20.00
285 109.075 109.100 2452.890 2454.140 1.250 0.000 25.000 20.00
286 109.100 109.125 2454.140 2455.390 1.250 0.000 25.000 20.00
287 109.125 109.150 2455.390 2456.630 1.240 0.000 25.000 20.16
288 109.150 109.175 2456.630 2457.880 1.250 0.000 25.000 20.00
289 109.175 109.200 2457.880 2459.130 1.250 0.000 25.000 20.00
290 109.200 109.225 2459.130 2460.380 1.250 0.000 25.000 20.00
291 109.225 109.250 2460.380 2461.630 1.250 0.000 25.000 20.00
292 109.250 109.275 2461.630 2462.880 1.250 0.000 25.000 20.00
293 109.275 109.300 2462.880 2464.130 1.250 0.000 25.000 20.00
294 109.300 109.325 2464.130 2465.380 1.250 0.000 25.000 20.00
295 109.325 109.350 2465.380 2466.630 1.250 0.000 25.000 20.00
296 109.350 109.375 2466.630 2467.880 1.250 0.000 25.000 20.00
297 109.375 109.400 2467.880 2469.120 1.240 0.000 25.000 20.16
298 109.400 109.425 2469.120 2470.370 1.250 0.000 25.000 20.00
299 109.425 109.450 2470.370 2471.620 1.250 0.000 25.000 20.00
300 109.450 109.475 2471.620 2472.870 1.250 0.000 25.000 20.00
301 109.475 109.500 2472.870 2474.120 1.250 0.000 25.000 20.00
302 109.500 109.525 2474.120 2475.370 1.250 0.000 25.000 20.00
303 109.525 109.550 2475.370 2476.620 1.250 0.000 25.000 20.00
304 109.550 109.575 2476.620 2477.870 1.250 0.000 25.000 20.00
305 109.575 109.600 2477.870 2479.120 1.250 0.000 25.000 20.00
306 109.600 109.625 2479.120 2480.370 1.250 0.000 25.000 20.00
307 109.625 109.650 2480.370 2481.620 1.250 0.000 25.000 20.00
308 109.650 109.675 2481.620 2482.860 1.240 0.000 25.000 20.16
309 109.675 109.700 2482.860 2484.110 1.250 0.000 25.000 20.00
310 109.700 109.725 2484.110 2485.360 1.250 0.000 25.000 20.00
311 109.725 109.750 2485.360 2486.610 1.250 0.000 25.000 20.00
312 109.750 109.775 2486.610 2487.860 1.250 0.000 25.000 20.00
313 109.775 109.800 2487.860 2489.110 1.250 0.000 25.000 20.00
314 109.800 109.825 2489.110 2490.360 1.250 0.000 25.000 20.00
315 109.825 109.850 2490.360 2491.610 1.250 0.000 25.000 20.00
316 109.850 109.875 2491.610 2492.860 1.250 0.000 25.000 20.00
317 109.875 109.900 2492.860 2494.110 1.250 0.000 25.000 20.00
318 109.900 109.925 2494.110 2495.360 1.250 0.000 25.000 20.00
319 109.925 109.950 2495.360 2496.600 1.240 0.000 25.000 20.16
320 109.950 109.975 2496.600 2497.850 1.250 0.000 25.000 20.00
321 109.975 110.000 2497.850 2499.100 1.250 0.000 25.000 20.00
322 110.000 110.025 2499.100 2500.350 1.250 0.000 25.000 20.00
Page 234
S/No Location(Km) Altitude(Mtr) Total Rise/Fall(Mtr) Distance Proposed Remarks
(Mtr) Gradient
From To Starting Ending Rise Fall
323 110.025 110.050 2500.350 2501.600 1.250 0.000 25.000 20.00
324 110.050 110.075 2501.600 2502.850 1.250 0.000 25.000 20.00
325 110.075 110.100 2502.850 2504.100 1.250 0.000 25.000 20.00
326 110.100 110.125 2504.100 2505.350 1.250 0.000 25.000 20.00
327 110.125 110.150 2505.350 2506.600 1.250 0.000 25.000 20.00
328 110.150 110.175 2506.600 2507.850 1.250 0.000 25.000 20.00
329 110.175 110.200 2507.850 2509.100 1.250 0.000 25.000 20.00
330 110.200 110.225 2509.100 2510.350 1.250 0.000 25.000 20.00
331 110.225 110.250 2510.350 2511.600 1.250 0.000 25.000 20.00
332 110.250 110.275 2511.600 2512.850 1.250 0.000 25.000 20.00
333 110.275 110.300 2512.850 2514.100 1.250 0.000 25.000 20.00
334 110.300 110.325 2514.100 2515.350 1.250 0.000 25.000 20.00
335 110.325 110.350 2515.350 2516.600 1.250 0.000 25.000 20.00
336 110.350 110.375 2516.600 2517.850 1.250 0.000 25.000 20.00
337 110.375 110.400 2517.850 2519.100 1.250 0.000 25.000 20.00
338 110.400 110.425 2519.100 2520.360 1.260 0.000 25.000 19.84
339 110.425 110.450 2520.360 2521.600 1.240 0.000 25.000 20.16
340 110.450 110.475 2521.600 2522.850 1.250 0.000 25.000 20.00
341 110.475 110.500 2522.850 2524.100 1.250 0.000 25.000 20.00
342 110.500 110.525 2524.100 2525.350 1.250 0.000 25.000 20.00
343 110.525 110.550 2525.350 2526.600 1.250 0.000 25.000 20.00
344 110.550 110.575 2526.600 2527.850 1.250 0.000 25.000 20.00
345 110.575 110.600 2527.850 2529.100 1.250 0.000 25.000 20.00
346 110.600 110.625 2529.100 2530.350 1.250 0.000 25.000 20.00
347 110.625 110.650 2530.350 2531.600 1.250 0.000 25.000 20.00
348 110.650 110.675 2531.600 2532.850 1.250 0.000 25.000 20.00
349 110.675 110.700 2532.850 2534.100 1.250 0.000 25.000 20.00
350 110.700 110.725 2534.100 2535.350 1.250 0.000 25.000 20.00
351 110.725 110.750 2535.350 2536.600 1.250 0.000 25.000 20.00
352 110.750 110.775 2536.600 2537.850 1.250 0.000 25.000 20.00
353 110.775 110.800 2537.850 2539.100 1.250 0.000 25.000 20.00
354 110.800 110.825 2539.100 2540.350 1.250 0.000 25.000 20.00
355 110.825 110.850 2540.350 2541.600 1.250 0.000 25.000 20.00
356 110.850 110.875 2541.600 2542.850 1.250 0.000 25.000 20.00
357 110.875 110.900 2542.850 2544.100 1.250 0.000 25.000 20.00
358 110.900 110.925 2544.100 2545.350 1.250 0.000 25.000 20.00
359 110.925 110.950 2545.350 2546.600 1.250 0.000 25.000 20.00
360 110.950 110.975 2546.600 2547.850 1.250 0.000 25.000 20.00
361 110.975 111.000 2547.850 2549.100 1.250 0.000 25.000 20.00
362 111.000 111.025 2549.100 2550.210 1.110 0.000 25.000 22.52
363 111.025 111.050 2550.210 2551.330 1.120 0.000 25.000 22.32
364 111.050 111.075 2551.330 2552.440 1.110 0.000 25.000 22.52
365 111.075 111.100 2552.440 2553.550 1.110 0.000 25.000 22.52
366 111.100 111.125 2553.550 2554.670 1.120 0.000 25.000 22.32
367 111.125 111.150 2554.670 2555.780 1.110 0.000 25.000 22.52
368 111.150 111.175 2555.780 2556.890 1.110 0.000 25.000 22.52
369 111.175 111.200 2556.890 2558.000 1.110 0.000 25.000 22.52
370 111.200 111.225 2558.000 2559.120 1.120 0.000 25.000 22.32
371 111.225 111.250 2559.120 2560.230 1.110 0.000 25.000 22.52
372 111.250 111.275 2560.230 2561.340 1.110 0.000 25.000 22.52
373 111.275 111.300 2561.340 2562.460 1.120 0.000 25.000 22.32
374 111.300 111.325 2562.460 2563.570 1.110 0.000 25.000 22.52
375 111.325 111.350 2563.570 2564.680 1.110 0.000 25.000 22.52
376 111.350 111.375 2564.680 2565.800 1.120 0.000 25.000 22.32
377 111.375 111.400 2565.800 2566.910 1.110 0.000 25.000 22.52
378 111.400 111.425 2566.910 2568.020 1.110 0.000 25.000 22.52
379 111.425 111.450 2568.020 2569.130 1.110 0.000 25.000 22.52
380 111.450 111.475 2569.130 2570.250 1.120 0.000 25.000 22.32
381 111.475 111.500 2570.250 2571.360 1.110 0.000 25.000 22.52
382 111.500 111.525 2571.360 2572.470 1.110 0.000 25.000 22.52
383 111.525 111.550 2572.470 2573.590 1.120 0.000 25.000 22.32
384 111.550 111.575 2573.590 2574.700 1.110 0.000 25.000 22.52
385 111.575 111.600 2574.700 2575.810 1.110 0.000 25.000 22.52
386 111.600 111.625 2575.810 2576.930 1.120 0.000 25.000 22.32
387 111.625 111.650 2576.930 2578.040 1.110 0.000 25.000 22.52
388 111.650 111.675 2578.040 2579.150 1.110 0.000 25.000 22.52
389 111.675 111.700 2579.150 2580.260 1.110 0.000 25.000 22.52
390 111.700 111.725 2580.260 2581.380 1.120 0.000 25.000 22.32
391 111.725 111.750 2581.380 2582.490 1.110 0.000 25.000 22.52
392 111.750 111.775 2582.490 2583.600 1.110 0.000 25.000 22.52
393 111.775 111.800 2583.600 2584.720 1.120 0.000 25.000 22.32
394 111.800 111.825 2584.720 2585.830 1.110 0.000 25.000 22.52
395 111.825 111.850 2585.830 2586.940 1.110 0.000 25.000 22.52
396 111.850 111.875 2586.940 2588.060 1.120 0.000 25.000 22.32
397 111.875 111.900 2588.060 2589.170 1.110 0.000 25.000 22.52
398 111.900 111.925 2589.170 2590.280 1.110 0.000 25.000 22.52
399 111.925 111.950 2590.280 2591.390 1.110 0.000 25.000 22.52
400 111.950 111.975 2591.390 2592.510 1.120 0.000 25.000 22.32
401 111.975 112.000 2592.510 2593.620 1.110 0.000 25.000 22.52

Page 235
Appx ' '
DRAWING SHOWING PROPOSED ROAD SIGNS (Warning/Mandatory)

52 Cm
60 Cm

R 45

60 Cm

Mild Steel angle irons (50x50x5 mm)

1.50 Mtr

0.30

0.15 PCC 1:4:8 0.30

GL GL
0.40 Mtr

PCC 1:4:8
0.45
Excvn 0.072
PCC 0.0855
1:4:8

0.40

0.40
R 10

210

280
35

75 140 160
LEFT HAND CURVE
RIGHT HAND CURVE
Note: Dimention are in Milimeters

R 130
195

525

220

110 U TURN LEFT

U TURN RIGHT
Note: Dimention are in Milimeters
Appendix ' AL '
TYPICAL CROSS SECTION SURFACING WORKS IN SR

PROPOSED FORMATION : 10.00 MTR

PROPOSED C/WAY : 7.00 MTR


BC 30 mm Thick
0.15m 0.15m DBM 50 mm Thick
WMM 75 mm Thick II layer
480 mm WMM 75 mm Thick I layer
WMM 100 mm Thick I layer
GSBC 150 mm Thick
8.80 m

TYPICAL CROSS SECTION SURFACING WORKS IN SMB

PROPOSED FORMATION : 10.00 MTR

PROPOSED C/WAY : 7.00 MTR


BC 30 mm Thick
0.15m 0.15m DBM 50 mm Thick
WMM 75 mm Thick II layer
WMM 75 mm Thick I layer
480 mm WMM 100 mm Thick I layer
GSBC 150 mm Thick
8.80 m
TYPICAL CROSS SECTION SURFACING WORKS IN SR

PROPOSED FORMATION : 10.00 MTR

PROPOSED C/WAY : 7.00 MTR


BC 30 mm Thick
0.15m 0.15m DBM 50 mm Thick
405 mm 0.15 m 0.15 m WMM 100 mm Thick I layer
Sand Blenketing 25 mm Thick
8.80 m
TYPICAL CROSS SECTION SURFACING WORKS IN HR

PROPOSED FORMATION : 10.00 MTR


Annexure-A-I
SITE PLAN OF MUCK DUMPING SITE ON BBB ROAD AT KM 110.175
Location- KM 110.175 ON BBB Road N
Propose- R/Wall (8x4 M) -473.00 Mtr
T/Wall (8x2 M)-473.00 Mtr v
v
v v v
v
v
Muck Dumping Site
v
v

v
v v
v
Muck filling
124 Mtr RRM IN
R/Wall (8x4) CM 1:6
3 Mtr
A A'
225 Mtr
x x' T/Wall (8x2)

2 Mtr v
v

124 Mtr Section on XX'

Proposed of Retaning
wall for Stabilization
of Muck Dumping
Site
PLAN

50 Mtr
7.45 Mtr

v
v v Slope 2:1
v
Formation width of road Muck
v Filling
v v 17 Mtr
v v vv v
v v v
v v
v vv
vv
v
Proposed R/Wall for v
stabilization of Muck

Section on A-A'
DETAIL PROJECT REPORT
PROJECT BEACON
CONSTRUCTION AND IMPROVEMENT OF BASOLI-BANI-
BHADEWAH ROAD FROM EXISTING CLASS - 9
SPECIFICATIONS TO NHDL SPECIFICATIONS ( 10 M
FORMATION WIDTH ) BETWEEN KM 102.000 TO KM 112.00
UNDER PROJECT BEACON IN THE UNION TERITORY OF
JAMMU AND KASHMIR (U & T)

Amount : Rs 5680.34 Lakh


TO ANANTNAG SINTHAN PASS
TO

SRINAGAR 83

CHANDRABHAGA
340 SPL RIVER

45 CHINGAM 118 RCC


314 SPL 42 170 FCP
DUL

GUL 16 / 0
52 0 RAMBAN GULABGARH
151
GALHAR 32
DHARMKUND BATOTE 123 / 0 17 / 0 TIARI
KISHTWAR
21 NBP 51
110 / 0 55.18
ROA 126 368 RMP
37
59.10
BBP
10 45/0 KPRA 50
51.35 114 RCC
52 RCC PREM NAGAR 64 THATRI
80 KILAR
371 RMP PATNI TOP 160 FCP
HAMBAL
110
15 6 MASRATA BALOT CHINTA
90 395 RMP 10.45 / 0 JAIGHATI
MAND 372 RMP
ASCON BHARGRAN 9.80 / 0
3.31 48.435 MORE CAMP BHALRA
75 20 GOHA 7.97 WATER PT GUNDU
NASKA
PHALATA 27
UDHAMPUR KAPRA 2.85
KATRA 66 DRUDU 30
8/0
55 18.97 / 0 ATALGARH
0
UBP BHADARWAH
DOMEL
30 NALTHI 165.850 / 28.625
NAGROTA 156 CHHATARGALI
128.90
13

RAMNAGAR PALACE SARTHAL


4.49
239 PWP
KM 89 114.50 Proposed Project
JAMMU BANI
KM 0 TO PATHANKOT 86

TO BASOLI

114 RCC 35 BRTF


(Check list as per DGBR letter No. 30204/DGBR/Bcn/14058/Estg-II dt 16 Apr 2010.)
CHECK LIST FOR OFFICERS AND SUPERVISORS FOR
CHECKING OF AE's
CONSTRUCTION AND IMPROVEMENT OF BASOLI-BANI-BHADEWAH ROAD FROM EXISTING CLASS - 9
SPECIFICATIONS TO NHDL SPECIFICATIONS ( 10 M FORMATION WIDTH ) BETWEEN KM 102.000 TO KM 112.00 UNDER
PROJECT BEACON IN THE UNION TERITORY OF JAMMU AND KASHMIR (U & T)
Prepared by : 114 RCC (GREF)
Checked at TF by JE (Civ) :
Checked at TF by AE/AEE/EE (Civ) :
S/No Points/Activity Included
1 The work is included in the Approved Annual Works Plan. YES,BE 2021-22
2 Serial number of job in AWP (RE/BE) has been mentioned in the PC file. S.No. 149

3 Data sheet has been filled correctly. Yes


4 Planning in Data- sheet has been filled correctly mentioning year wise and Yes
element wise planning of the job as per AWP.
5 The MO-IV Dte have approved the work and it's alignment and The proposal was approved by MOD vide
specifications. MO-4 letter No A-40077/MO-4 dated 14 Jan
1998 for widening this road (Basoli-Bani-
Bhaderwah) to NH (D/L) specifications

6 Funds have been allotted in the RE/BE. Yes


7 Proper head of account has been indicated in the DGL. MH 5054 OTNH
8 Forest clearance status is clearly indicated. FC has been obtained
9 Per km cost of construction has been compared with the similar work in the Enclosed
adjoining sector.
10 Rates of all the items of works are as per the SSR issued by the HQrs. SSR 2016, Zone 'J' 2101 to 2400 m &
DGBR. Zone 'J' Alt 2401-2700 m
11 Rate analysis in respect of those items, which are not given in DGBR SSR, Yes
has been correctly worked out.
12 The item wise amount of Part-II of the estimate has correctly been carried Yes,
over to Part-I of the estimate and correctly summed up.
13 Credit on account of retrievable materials has been included. Yes
14 Credit on account of stone available from hard rock excavation is given. Yes

15 Following charges have correctly been levied :-


(a) Royalty and Monopoly charges Yes
(b) Physical contingency charges @ 5% Yes
(c) Quality Control Cell Charges @ 1%/ 0.10% Yes
(d) Provision of 2% Road side accommodation. Yes
(e) Lab CESS @ 1% Yes
(f) Price escalation charges @ 15.44% per annum (Compounded annually) 15.44 % for year 2021-22, 2022-23 & 2023-
(Only for SSR items) 24
16 Compensation/ requisition of land etc, is supported with the authority. The existing road land is already under
posession
17 Bridge estimates are along with the estimates for approaches/ have been NA
concurred in by the Bridging Directorate of HQrs. DGBR.
18 Following documents are attached :-
(a) Handing / Taking over notes in case road taken over from other agency. NA being existing road with BRO

(b) Recce report. The recce survey for widening of this road
was already sanctioned under Job No.
247/BBB/C/SPK/03 vide HQ CE (P)
Sampark letter No. 21164/98/E2 Plg dated
15 Sep 2000 for Rs 136731.00. The survey
was completed in April 2002
INDEX

S/No Particulars Appendix


1 INDEX
2 STATEMENT OF CASE
3 DETAIL PROJECT REPORT
4 CHECK LIST AS PER INFORMATION ASKED BY DTE
5 AE PART-I
6 AE PART-II
7 PRO-RATE SSR 2016
8 ABSTRACT OF QUANTITY : FORMATION WORK
9 DETAILS OF EARTH WORK
DETAIL FOR DISPOSAL OF EXCAVATED EARTH INDICATING
10
DISPOSAL
11 DETAILS OF JUNGLE CLEARANCE
12 ROAD LIFT CHARGES (FORMATION)
13 CREDIT FOR CP TRADESMAN (FORMATION)
14 DETAILS OF PERMANENT WORKS PROPOSED
15 ABSTRACTS OF QUANTITIES : PERMANENT WORKS
16 DETAILED QUANTITY CALCULATION OF PERMANENT STRUCTURE
17 DETAILS OF WATER GAP
18 DETAILS OF LINED/UNLINED DRAIN
19 DETAILS OF ROAD FURNITURE
20 REQUIREMENT OF MATERIALS (PMT)
21 COST COMPARISON SHEET i.e. CONTRACT Vs DEPT (PMT)
22 ROAD LIFT CHARGES (PERMANENT WORK)
23 EXTRA TPT CHARGES (PMT)
24 CREDIT FOR CP TRADESMAN (PMT)
SURFACING QUANTITY CALCULATION & EXTRA DETAILS OF
25
SURFACING WORK
26 ROAD MARKING
27 ABSTRACT OF QUANTITY: SURFACING WORKS
28 REQUIREMENT OF MATERIALS
29 COST COMPARISON SHEET i.e. CONTRACT Vs DEPT (SURF)
30 ROAD LIFT CHARGES (SURF)
31 EXTRA TPT CHARGES (SURF)
32 CREDIT FOR CP TRADESMAN (SURF)
33 CREDIT FOR RETRIEVED STONE
34 LEAD CALCULATION FOR ROAD LIFT CHARGES
35 ROYALTY CHARGES FOR STONE AND SAND
RATE ANALYSIS IN RESPECT OF THOSE ITEMS, WHICH ARE NOT
36
GIVEN IN DGBR SSR, HAS BEEN CORRECTLY WORKED OUT
37 COST OF CARRIAGE OF MATERIAL FOR DBM AND BC
38 ROAD SIDE AMENITIES-OH GANTRY
X-SECTION OF COMPLETE FMN WIDTH SHOWING DETAILS FOR L-
39
DRAIN & BERM FILLING
40 TRAFFIC CENSUS
41 DESIGN TRAFFIC-MSA CALCULATION
42 CBR VALUE CALCULATING AS PER 80TH PERCENTILE METHOD
43 CBR VALUE TEST REPORT
44 DETAILS QTY CALCULATION FOR PMT STRUCTURE WITH DWG
45 HORIZONTAL CURVE DETAILS
46 RAIN FALL DATA
47 SNOW FALL DATA
48 MINIMUM & MAXIMUM TEMP DATA
49 COMPARATIVE STATEMENT
50 DETAILS OF SANCTIONED JOB
51 ALTITUDE CHART
52 DISTANCE CHART
53 INDEX MAP
DWG FOR L-SEC,X-SEC,ALIGNMENT PLAN & PMT STRUCTURE (01
54
FLODER)
55 CTC COPY:- CBR VALUE TEST REPORT
56 CTY COPY:- CA NO.35 BRTF/07/2019-20
57 CTY COPY:- CA NO. CE (P) BCN/17/2018-19
CTC COPY:- SHIFTING OF UTILITIES LETTER FOR PHE AND
58
ELECTRICAL DEPT

59 CTC COPY :- FOREST CLEARANCE USE OF 34.02 HA OF FOREST


LAND ISSUED BY FOREST DEPT,J & K STATE
CTC COPY:- ROYALTY LETTER FOR SAND AND STONE FROM J&K
60
GOVT
CERTIFICATE REGARDING ADEQUATE PROVISION OF PMT & CROSS
61
DRAINAGE
62 CERTIFICATE REGARDING RUNNING JOB (BIYALU BRIDGE)
CERTIFICATE REGARDING X- SECTION OC-25% AND RECEE
63
OFFICER-100%
CERTIFICATE REGARDING ALIGNMENT CHECK OC-25% AND RECEE
64
OFFICER-100%
65 CERTIFICATE REGARDING NEAREST QUARRY
CERTIFICATE REGARDING CORRECTNESS OF ARITHMETICAL
66 CALCULATIONS, AUTHENTICATION OF APPENDICES/ANNEXURES,
NO LUMP SUM
CERTIFICATE REGARDING NO UNDER UTILISATION OF
67
DEPARTMENTAL RESOURCES
68 CERTIFICATE REGARDING MINIMUM LEAD
69 CERTIFICATE REGARDING EXISTING SURFACING LAYERS
APPX " "
DETAIL OF SANCTIONED JOB

Cost
Sl. No. Job No Name of Work
(In Lacs)
CONSTRUCTION / IMPROVEMENT OF
BASOLI-BANI-BHADERWAH ROAD
BETWEEN KM 128.000 AND KM 135.000
247/88 TO NHDL SPECIFICATIONS (12.00 MTR
1 3105.48
(RAE) FMN WIDTH) IN J&K STATE UNDER 35
BRTF (P) BEACON

Provision of Surfacing work on B-B-B road


between km 89.000 to km 102.000 (Net
Length 13.000 kms) To NHDL
247/91 Specifications under 114 RCC/35
2 3159.56
(RAE) BRTF/PRPOJECT BEACON IN J&K (UT)

###
###
###
###
E2 ESTG SECTION
2048/DPR/Phase-I/KM 102.00-112.00/BBB RD/ /E2 Dated : May 2021
: CONSTR/IMPVT OF BASOLI-BANI-BHADERWAH ROAD BETWEEN KM 102.00 TO KM 112.00 (NET
LENGTH 10.000 kms) TO NHDL SPECIFICATIONS (FOR 10.00 m FMN WIDTH)

1. Reference E2 Estg ION No. _____________________ under which PC file No. _____________________
containing pages 01 to ___ was received.
TECHNICAL APPROVAL
The Technical approval is hereby accorded for Construction/Impvt of Basoli-Bani-Bhaderwah Km 102.00-
112.00 (Net Length 10.00 Kms) to NHDL Specification (For 10.00 m FMN width) under Project Becon in J & K
State (UT) for an estimated cost of 5944.64 Lakh (Rupees Fifty nine crore forty four lakh and sixty four thousand
only) as per details given below:-

1. Name of Work : Construction/Impvt of Basoli-Bani-Bhaderwah Km 102.00-112.00 (Net Length 10.00


Kms) to NHDL Specification (For 10.00 m FMN width) under Project Becon in J & K (UT) State.

2. State : J&K (UT)


3. Name of road : BASOLI-BANI-BHADERWAH ROAD (Km 102.00-112.00)
4. Name of Project/TF/RCC : Becon/35 TF/114 RCC
5. Inclusion in LTROWP and BRDB programme : S/No. 4 in LTRoWP, 19 in BRDB Programme (BE)
2020-21
6. Estimated cost of the Project : Err:509 lakh
7. Funding agency : GS
8. Job No. : 247/17 (BCN)
9. SCOPE OF WORK
Item of work Scope Cost (Lakh) Remarks
A) CIVIL WORK
Formation 18.01 Err:509
Permanent 1978.72 Lakh Err:509
Surfacing Linear - 32.89 Eqvt Cl-9 Err:509
Layer composition
GSBC - 150 mm
WMM 75 MM (02 Lyrs)
WMM -100 mm
DBM - 50 mm
BC - 30 mm

Bridges Nil -
Bailey Bridges Nil -
TOTAL (A) Err:509
B) NON CIVIL WORK
Shifting of utility (PHE 19.11
& Electricity Dept) J &
K (UT)
Land acquisition -
FC/Wild life -
Any other -
TOTAL (B) 19.11
G/TOTAL (A+B) Err:509
Contd…..P/2
-2-

10. STATUS OF NON CIVIL WORK


a) Shifting of utility - (i) The existing road land is already under
b) Land acquisition - possession with the department.
Administrative approval for payment of
c) FC/Wild life - compensation for forest land of 34.024 Ha for
d) Any other - development of Basoli-Bani-Bhaderwah road
to NHDL specification between Km 102.00 to
Km 128.00 has been sanctioned vide HQ CE
(P) BCN letter No.750803/AA/CE’s
Power/61/Estg dated 08 Nov 2019 under Job
No.247/13 (BCN) for Rs. 410.70 Lakh and
same was paid to forest authorities vide 114
RCC letter no. 2022/BBB/F/236/E2 Dated 04
May 2020.
(ii) Detailed estimate for utility shifting of pipe
line falling under the alignment of BBB road
bet km 102.000 to 128.000 by way of providing
and laying of G.I pipes vide Govt of J&K
Executive Engineer PHE Division Kathua letter
No PHEK/C 14416-18 dated 04 Mar 2021 for
Rs.28.27 lacs (copy enclosed).
(iii) Detailed estimate for
utility shifting of Electric poles between Km
102.00 to 128.00 on Basholi-Bani-Bhaderwah
vide Govt of J&K Executive Engineer Electric
Division Kathua letter No KSO/152761-62
dated 13 Mar 2021 for Rs.17.78 lacs (copy
enclosed).

11. MODE OF EXECUTION


a) Formation -
b) Permanent - Departmental.
c) Surfacing -
d) Bailey Bridges (De-Launching) - Nil
e) Pmt Bridges - Nil
12. RATES
a)
DepartmentalSSR Work
-
2016, Zone - 'I' & 'J'
b)
and altitudeBasic
2101-of
rates
2700 mtr SupplyWork
of Contract
contract :- Ref
Execution
Contract
contract :-materials
NA
13. PHASING OF
calculation FUND
sheet
Phasing of fund of this work is as under :-
S/No Financial Year % of cost Amount of Funds
of work (Lakhs)
1 2021-22 Err:509 Err:509
2 2022-23 Err:509 Err:509
3 2023-24 Err:509 Err:509
TOTAL Err:509 Err:509
14. AUTHORITY : The above Technical Approval is accorded under the power delegated to Dir
(Plg/Wks/Estg) in the office of CE (P) as per Annex (i) to GOI, Mod (BR) letter No. F.04/696/2015/D&P
(BR-I) dated 11 Aug 2017.

(I K Jaggi)
Brigadier
Chief Engineer

Enclosed : PC File No. ___________________


E2 Estg
DATA SHEET
As per HQ DGBR letter No. 30204/DGBR/POL/11/WP Coord dated 24 Oct 2013
To be filled by WP Coord
File No :
Name of Project :
Date of receipt :
Estimated cost of project : Rs. 5680.34 Lakh
To be filled by the section
Name of Work CONSTRUCTION/IMPROVEMENT OF ROAD BASOLI-BANI-
BHADERWAH FROM CL-9 TO NHDL SPECIFICATIONS (FMN, PMT
SURF & BR WK) BETWEEN KM 102.00 TO KM 112.00 THROUGH
DEPARTMENTAL MODE.
Name of Agency (GS/Agency) : GS
Job No. : NYA
Ref of GO-Ahead :
Type of Work : Fmn , Pmt & Surf
Head of account :
Working season : May to Oct
Non working season : Nov to Apr
Total months requried to complete the work after sanction 36 months (working)
Scope of works Total scope Year wise planning
2021-22 2022-23 2023-24
Fmn Eqvt Cl-9 18.010 3.600 14.410 -
Fmn works (Rs in Lakh) Err:509 Err:509 Err:509 Err:509
Pmt works (Rs in Lakh) Err:509 Err:509 Err:509 Err:509
Surf Eqvt Cl-9 28.161 - 14.080 14.080
Surf works (Rs in Lakh) Err:509 Err:509 Err:509 Err:509
Major Brs Nil - - -
Shifting of utilities 19.110 19.110
Total (Rs.) Lakh Err:509 Err:509 Err:509 Err:509
PDC of work March 2024

Station : C/o 56 APO

Dated : _______ May 2021.

Page 248 of 251


Annexure-A-I
SITE PLAN OF MUCK DUMPING SITE ON BBB ROAD AT KM 112.15
Location- KM 112.15 ON BBB Road N
Propose- R/Wall (8x4 M) - 180.80 Mtr
T/Wall (8x2 M)- 180.80 Mtr v
v
v v v
v
v
Muck Dumping Site
v
v

v
v v
v
Muck filling
RRM IN
R/Wall (8x4) CM 1:6
50.40 Mtr 3 Mtr
A A'

x x' T/Wall (8x2)

80 Mtr 2 Mtr v
v

Section on XX'

Proposed of Retaning
50.4 Mtr
wall for Stabilization
of Muck Dumping
Site
PLAN

50 Mtr
7.45 Mtr

v
v v Slope 2:1
v
Formation width of road Muck
v Filling
v v 17 Mtr
v v vv v
v v v
v v
v vv
vv
v
Proposed R/Wall for v
stabilization of Muck

Section on A-A'

0.00
0.00
0.00
0.00
DRAWING OF 2 MTR SPAN CULVERT

0.075 TH WEARING COAT


0.075m TH WEARING COAT
PCC 1:2:4 BED BLOCK
RCC 1:2:4 SLAB RCC 1:2:4 SLAB
0.60 0.525 PARAPET 0.525 PCC 1:2:4 BED BLOCK PARATET
0.075 0.075
0.24 0.24
0.15 0.15
B/F
2.00 0.60
0.25
1.85 2.00 1.85
3.04 PCC 1:3:6 1.00
0.075m TH WEARING COAT STONE PITCHING
0.15 0.15 0.15
0.15 0.15
0.10 PCC 1:3:6 EARTH FILLING
0.40 0.50
0.20
0.40 0.20 PCC 1:3:6 0.40 PCC 1:3:6

0.075
0.075

0.075
0.15
0.375
0.45
0.30
0.30
0.20
0.20

0.20

0.20
0.20

0.20

0.30
0.30

0.30
0.30

0.80

0.40
0.40

0.70
0.70

0.45

0.45
0.15
1.80
1.90 0.80 1.90 9.10
5.40
10.00

0.15
X- SECTION
0.60 0.56 L-SECTION
(e) 16mm # @ 0.125m C/C
(d) 10mm # @ 0.30m C/C
(c) 10mm # @ 0.30m C/C 0.20
RCC 1:2:4 (b) 16mm # @ 0.15m C/C 0.20
(a) 16mm # @ 0.15m C/C
0.70
0.15
1.90 0.30 0.075
0.24
0.03 0.30 0.375
0.125 0.865 0.20
0.03 0.30
0.40
2.60
5.40 0.80 2.000 2.00
X- SECTION OF RCC SLAB 0.40
0.600 0.20
0.30 0.375
1.90 0.30 0.075
0.15
0.70
RRM 1:3
2.32 0.20
0.20

0.075
0.075

0.075
0.375
0.15
0.45
0.30

0.30
0.99

0.15
0.15
0.15
0.80

0.30
1.80

0.30
1.13
0.20 9.10
10.00

0.15
1.160

PLAN
X- SECTION OF R/WALL CULVERT 2.00 m SPAN

(Ashok Kumar Ram)


AE(Civ)
SO-3 (Estg & Br)
for Chief Engineer
APPROXIMATE ESTIMATE
PART-I
Name of State/Area Jammu & Kashmir Job No : 247/17 (BCN)
Name of Project/TF/Unit BEACON/35 TF/114 RCC
Name of Work CONSTR/IMPVT OF BASOLI-BANI-BHADERWAH ROAD FROM CL-9 TO NHDL SPECIFICATIONS (FMN, PMT, SURF & BR WK) BETWEEN KM 102.00 AND KM 112.00 THROUGH DEPARTENT
S/No Name of work MODE UNDER 114Fmn
RCC/35 BRTF (P) BEACON IN THE UNION TERRITORY
works OF JAMMU AND KASHMIR
Pmt Works Surf Works Shifting of G/Total (Rs)
( Rs) (Rs) (Rs) utilities (PHE &
Electricity)
Alt 2101-2400 Alt 2401-2700 Alt 2101-2400 Alt 2401-2700 Alt 2101-2400 Alt 2401-2700 PHE
A Work assessed as per SSR
1 Cost of Works 69232810.00 104627071.00 173859881.00 46445040.00 132738925.00 179183965.00 56644927.00 94177567.00 150822494.00 1911268.80 505777608.80
2 Road lift charges 997513.00 1510793.00 2508306.00 5877458.00 16699394.00 22576852.00 2466832.00 4189796.00 6656628.00 31741786.00
3 Extra tpt charges - - - - - - 1473938.00 2193966.00 3667904.00 3667904.00
4 Credit for retrieved Stone (-) - - - -6282495.00 -19184311.00 -25466806.00 -3046848.00 -3242968.00 -6289816.00 -31756622.00
5 Credit for GREF Tradesmen (-) -1392856.00 -2322669.00 -3715525.00 -2084064.00 -7073059.00 -9157123.00 -345977.00 -762916.00 -1108893.00 -13981541.00
6 Credit for GREF PNR (-) -2863532.00 -3893673.00 -6757205.00 -1366135.00 -4248681.00 -5614816.00 -540394.00 -1052752.00 -1593146.00 -13965167.00
7 Deduct cost of works based on SSR 2016
- - - -7450588.00 -19092576.00 -26543164.00 -17042893.00 -28227711.00 -45270604.00 -71813768.00
Total (A) 65973935.00 99921522.00 165895457.00 35139216.00 99839692.00 134978908.00 39609585.00 67274982.00 106884567.00 1911268.80 409670200.80
B Add escalation charges
1 For the year 2021-22 @15.44% for 20% 2037275.00 3085577.00 542549.00 1541525.00 - -
5122852.00 2084074.00 - 7206926.00
Fmn and 10% Pmt works
2 For the year 2022-23 @ 15.44% for 80% 8149100.00 12342306.00 2170198.00 6166099.00 3057860.00 5193629.00
20491406.00 8336297.00 8251489.00 37079192.00
Fmn, 40% Pmt and 50% surf works
3 For the year 2023-24 @ 15.44% for 50% - - 2712747.00 7707624.00 3057860.00 5193629.00
- 10420371.00 8251489.00 18671860.00
Pmt and 50% works
Total ( B) 10186375.00 15427883.00 25614258.00 5425494.00 15415248.00 20840742.00 6115720.00 10387258.00 16502978.00 62957978.00
G/Total (A+B ) 76160310.00 115349405.00 191509715.00 40564710.00 115254940.00 155819650.00 45725305.00 77662240.00 123387545.00 1911268.80 472628178.80
C Add following charges on (A+B)
a) Physical Contingencies @ 5% 3808016.00 5767470.00 9575486.00 2028236.00 5762747.00 7790983.00 2286265.00 3883112.00 6169377.00 23535846.00
b) Quality control charges @ 1% 761603.00 1153494.00 1915097.00 405647.00 1152549.00 1558196.00 457253.00 776622.00 1233875.00 4707168.00
c) Lab Cess @ 1% 761603.00 1153494.00 1915097.00 405647.00 1152549.00 1558196.00 457253.00 776622.00 1233875.00 4707168.00
d) Road side accomodation @ 2% 1523206.00 2306988.00 3830194.00 811294.00 2305099.00 3116393.00 - 6946587.00
Total ( C ) 6854428.00 10381446.00 17235874.00 3650824.00 10372944.00 14023768.00 3200771.00 5436356.00 8637127.00 - 39896769.00
D Cost of contract Works (Through supply
contract)
a) Cost of Contract works - - - 5583870.00 13493797.00 19077667.00 12985787.00 20369365.00 33355152.00 52432819.00
b) OH Gantry - - - 599000.00 - 599000.00 - 599000.00
c) Add Supervision charges @ 2.00% - - - - - - - - -
d) Quality control charges @ 1.00% - - - 55839.00 134938.00 190777.00 129858.00 203694.00 333552.00 524329.00
Total (D) - - - 6238709.00 13628735.00 19867444.00 13115645.00 20573059.00 33688704.00 53556148.00
G/Total (A+B+C+D) 83014738.00 125730851.00 208745589.00 50454243.00 139256619.00 189710862.00 62041721.00 103671655.00 165713376.00 1911268.80 566081095.80
E Royalty charges (E) - - - 369636.00 1060836.00 1430472.00 244745.00 277400.00 522145.00 - 1952617.00
G/Total (A to E) 83014738.00 125730851.00 208745589.00 50823879.00 140317455.00 191141334.00 62286466.00 103949055.00 166235521.00 1911268.80 568033712.80
Say Rs (Lacs) 830.15 1257.31 2087.46 508.24 1403.17 1911.41 622.86 1039.49 1662.36 19.11 5680.340

Station : Chandigarh (G S Narula)


Col
Dir (Estg & Br)
Dated : _______ Sep 2021. For ADGBR (NW)