Flow Chart : ขัน้ ตอนการนํา BIM มาใช้วิ เคราะห์แ ละตรวจสอบโครงสร้างอาคารด้ว ยระบบ CMMS

*START*
Stage 1: As-built Model Preparation and Data BIM Model a. IFC Extension for Output 1:
- Geometric Model
- Component Attributes LoD300 Maintenance Task - IFC Model
LoD400 b. Extract COBie Data - COBie Spreadsheet
Integration

Data Mapping Data Model for FMM

- Equipment Submit
Data Integration Output 2:
- O&M manuals
a. Integrate IFC and FM Data
BIM-based Automatic Facility Maintenance Work Order Scheduling Framework

- Specification, etc. CMMS/FMS - As-built Model


b. Import COBie Data Into FMS
- Historical Inspection Record

- Geometric Model
Stage 2: Identification of Failure
Components to be Maintained

Search Broken Components


- Component Attributes As-Built Model API
in As-built Model
LoD500
Output 3: Maintenance Work Order List
- Component ID
- Component Dimension
- Inspection Record - Component Location
CMMS/FMS - Component Emergency Level
- Maintenance Work Request
- Component Condition
optimal Maintenance Path Planning
Stage 3: The BIM-based Sub-

Find the Critical Components


Algorithm
in As-built Model

Output 4: Maintenance Scheduling Factors


- Component ID
Stage 4: BIM-based Automatic Facility
Maintenance Work Order Scheduling

- Problem Type Output 3: Maintenance Maintenance Scheduling Optional


- Emergency Level Work Order List
- Component Location
Output 5:
- Maintenance Scheduling in 3D

What-if Scenarios Compare and Decision Making

*END*