This document contains 31 questions and answers related to safety procedures and regulations. It addresses topics such as permit requirements, tool box meetings, crane operations, excavation slopes, scaffolding specifications, fire safety, electrical safety, hot work procedures, fire extinguisher usage, confined space entry, access to excavations, generator placement, site facilities, and noise levels. The questions provide definitions and numerical values for safety limits and standards.
This document contains 31 questions and answers related to safety procedures and regulations. It addresses topics such as permit requirements, tool box meetings, crane operations, excavation slopes, scaffolding specifications, fire safety, electrical safety, hot work procedures, fire extinguisher usage, confined space entry, access to excavations, generator placement, site facilities, and noise levels. The questions provide definitions and numerical values for safety limits and standards.
This document contains 31 questions and answers related to safety procedures and regulations. It addresses topics such as permit requirements, tool box meetings, crane operations, excavation slopes, scaffolding specifications, fire safety, electrical safety, hot work procedures, fire extinguisher usage, confined space entry, access to excavations, generator placement, site facilities, and noise levels. The questions provide definitions and numerical values for safety limits and standards.
1 Permit to work G.I. G.I. 2.100 2 Tool Box Meeting when should be held Every new activity 3 Crane out rigger pad should be 150% 4 Wire rope load capacity 1” 8 Ton Formula: 1” * 8ton = 8 ton 5 Excavation slope should be in 45 degree 6 Excavation slope formula 1.5 e.g. if deep 3 meter and wide 4 meter: should be 4.5 meter should slop distance 7 Hard barricading / top rail of scaffold 200 pounds capacity should be 8 Between Camp building and fence distance 15 feet 9 Can Diesel / oil store in a heavy plastic gallon False Should be metal 10 Scaffolding planks size 2” * 9” / 2” * 12” 11 Gas Testing Procedure according to G.I.2.709 12 Crane Lifts Procedures according to G.I.7.028 13 Crane should stay away from trench or 1.8 meter excavation edge. 14 Wind speed max. for crane lifting 20mph 15 Every platform max. distance 9 meter (30 feet) E.g. a tower scaffold means then ladder should not go direct, after 9 meter shall be a platform. 16 Scaffolding procedure should be according G.I.8.001 17 Fire for combustible materials A type Fire extinguisher 18 Electrical max volte can use should be 125v 19 After hot work fire watch shall stay till 30 minute 20 From a fire extinguisher how much time 8 to 15 second Depend on kg. fight 21 If deep excavation more than 1.2m Call confined space meter 22 If an excavation more than 75 feet length, Every 25 feet should be Then how many ladder should use as access a ladder as access. 23 Soil type C Muddy, soft etc.. 24 Diesel generator should away from 20 meter (50 feet) combustible material / gas cylinder. 25 Site toilet how many for workers 1 toilet for 15 worker 26 Between laydown to site distance min. 50 meter 27 Spoil pills from edge of excavation or 2 feet trench 28 Scaffolding bracing zigzag should be 32 degree to 53 degree between 29 Noise levels 85 dB For 8 hours 30 Man basket should not use more than wind 25kmph. 31