Professional Documents
Culture Documents
ZON 5. All steel work fabrication shall be done in accordance with Indian Codes.
E2 E5
ZON
6. All workshop fabrication shall be done using SAW (Submerged Arc Welding) process.
ZO
E1 NE
ZON 6
HANGER
OF BEARING
OF BEARING
ZONE 7 ZONE 8 ZONE 9 ZONE 10 ZONE 11 ZONE 12
SPLICING SECTION MAY VARY WITHIN THE ZONES MARKED IN THE ABOVE DRAWING.
DETAILS OF SPLICING IS GIVEN IN DRAWING NO. 10408/2 & 10408/5.
(SCALE 1:70)
OF SYMMETRY
OF BEARING
OF BEARING
DETAILS OF SPLICING IS GIVEN IN DRAWING NO. 10408/2 & 10408/5.
(SCALE 1:70)
R. D. S. O.
ROAD OVER BRIDGE
BOW STRING STEEL GIRDER
42m CLEAR SPAN
SPLICING LOCATIONS
PROVISIONAL
(PAPER SIZE A1) RDSO/B - 10408/8
DRAWN BY: M/S Abhinav Associates DESIGNED BY: SCRUTINIZED & CHECKED BY: APPROVED BY:
"THIS DRAWING IS THE PROPERTY OF RESEARCH DESIGN AND STANDARD ORGANIZATION ( MINISTRY
CALCULATION REGISTER NO. DD/2014/9 AutoCAD FILE NO.: B-10408 OF RAILWAY ), LUCKNOW-226011, INDIA, AND SHALL NOT BE USED, COPIED OR REPRODUCED IN PART
CHECKED BY: V.K.PANDEY (SSE) VIVEK KUMAR (ADEN/NCR/B&S/RDSO) SRIJAN TRIPATHI (DBS /SB-I) A. K. DADARYA (EDBS) OR WHOLE, WITHOUT PRIOR CONSENT IN WRITING."