You are on page 1of 8

Project: ESJ PHASE 2 ETAP Page: 1

Location: SIERRA JUAREZ 20.5.0C Date: 04-06-2021

Contract: SN: SENER

Engineer: Job Garcia Revision: Base


Study Case: LF
Filename: ESJ_II_WIND_FARM_Rev_1 Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 230.000 100.000 0.0 -250.714 43.203 0.000 0.000 Bus2 -250.714 43.203 638.6 -98.5

Bus2 230.000 102.231 0.7 0.000 0.000 0.000 0.000 Bus4 -103.090 23.858 259.8 -97.4

Bus1 256.818 -42.847 639.3 -98.6

Bus 2 -153.728 18.989 380.3 -99.2

Bus 2 34.500 102.299 7.8 155.000 0.100 0.000 0.000 Bus2 155.000 0.100 2535.6 100.0

Bus3 230.000 102.230 0.7 0.000 0.000 0.000 0.000 Bus11 -103.090 23.862 259.8 -97.4

Bus4 103.090 -23.862 259.8 -97.4

Bus4 230.000 102.230 0.7 0.000 0.000 0.000 0.000 Bus2 103.090 -23.860 259.8 -97.4

Bus3 -103.090 23.860 259.8 -97.4

Bus5 34.500 100.898 6.0 0.000 0.000 0.000 0.000 Bus38 23.590 -5.135 400.4 -97.7

Bus36 -23.590 5.135 400.4 -97.7

Bus6 0.720 104.532 12.5 4.200 -0.200 0.000 0.000 Bus7 4.200 -0.200 3225.5 -99.9

Bus7 34.500 102.235 8.4 0.000 0.000 0.000 0.000 Bus8 4.083 -0.488 67.3 -99.3

Bus6 -4.083 0.488 67.3 -99.3

Bus8 34.500 102.228 8.4 0.000 0.000 0.000 0.000 Bus7 -4.083 0.481 67.3 -99.3

Bus36 4.083 -0.481 67.3 -99.3

Bus9 34.500 102.000 7.5 0.000 0.000 0.000 0.000 Bus131 -3.894 0.352 64.1 -99.6

Bus132 3.894 -0.352 64.1 -99.6

Bus10 34.500 100.869 5.9 0.000 0.000 0.000 0.000 Bus12 -103.430 14.254 1732.2 -99.1

Bus11 103.430 -14.254 1732.2 -99.1

Bus11 230.000 102.230 0.7 0.000 0.000 0.000 0.000 Bus3 103.090 -23.863 259.8 -97.4

Bus10 -103.090 23.863 259.8 -97.4

Bus12 34.500 100.867 5.9 0.000 0.000 0.000 0.000 Bus10 103.432 -14.219 1732.2 -99.1

COLLECTOR BUS -103.432 14.219 1732.2 -99.1

Bus15 0.720 104.792 13.6 4.200 -0.400 0.000 0.000 Bus16 4.200 -0.400 3228.4 -99.5

Bus16 34.500 102.848 9.5 0.000 0.000 0.000 0.000 Bus17 4.083 -0.689 67.4 -98.6

Bus15 -4.083 0.689 67.4 -98.6

Bus17 34.500 102.841 9.5 0.000 0.000 0.000 0.000 Bus16 -4.083 0.681 67.4 -98.6

Bus35 4.083 -0.681 67.4 -98.6

Bus18 0.720 104.838 13.7 4.200 -0.400 0.000 0.000 Bus19 4.200 -0.400 3227.0 -99.5

Bus19 34.500 102.895 9.6 0.000 0.000 0.000 0.000 Bus20 4.083 -0.689 67.3 -98.6
Project: ESJ PHASE 2 ETAP Page: 2

Location: SIERRA JUAREZ 20.5.0C Date: 04-06-2021

Contract: SN: SENER

Engineer: Job Garcia Revision: Base


Study Case: LF
Filename: ESJ_II_WIND_FARM_Rev_1 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus18 -4.083 0.689 67.3 -98.6

Bus20 34.500 102.889 9.6 0.000 0.000 0.000 0.000 Bus19 -4.083 0.681 67.3 -98.6

Bus34 4.083 -0.681 67.3 -98.6

Bus21 0.720 104.774 13.6 4.000 -0.400 0.000 0.000 Bus22 4.000 -0.400 3076.6 -99.5

Bus22 34.500 102.943 9.6 0.000 0.000 0.000 0.000 Bus23 3.894 -0.662 64.2 -98.6

Bus21 -3.894 0.662 64.2 -98.6

Bus23 34.500 102.937 9.6 0.000 0.000 0.000 0.000 Bus22 -3.894 0.654 64.2 -98.6

Bus33 3.894 -0.654 64.2 -98.6

Bus24 0.720 104.905 13.8 4.200 -0.400 0.000 0.000 Bus25 4.200 -0.400 3224.9 -99.5

Bus25 34.500 102.963 9.7 0.000 0.000 0.000 0.000 Bus26 4.083 -0.688 67.3 -98.6

Bus24 -4.083 0.688 67.3 -98.6

Bus26 34.500 102.956 9.7 0.000 0.000 0.000 0.000 Bus25 -4.083 0.680 67.3 -98.6

Bus32 4.083 -0.680 67.3 -98.6

Bus27 0.720 104.911 13.8 4.200 -0.400 0.000 0.000 Bus28 4.200 -0.400 3224.7 -99.5

Bus28 34.500 102.969 9.7 0.000 0.000 0.000 0.000 Bus31 4.083 -0.688 67.3 -98.6

Bus27 -4.083 0.688 67.3 -98.6

Bus31 34.500 102.960 9.7 0.000 0.000 0.000 0.000 Bus28 -4.083 0.676 67.3 -98.7

Bus32 4.083 -0.676 67.3 -98.7

Bus32 34.500 102.955 9.7 0.000 0.000 0.000 0.000 Bus26 -4.083 0.680 67.3 -98.6

Bus31 -4.083 0.676 67.3 -98.7

Bus33 8.166 -1.356 134.5 -98.6

Bus33 34.500 102.937 9.6 0.000 0.000 0.000 0.000 Bus23 -3.893 0.654 64.2 -98.6

Bus32 -8.163 1.359 134.5 -98.6

Bus34 12.057 -2.013 198.7 -98.6

Bus34 34.500 102.885 9.6 0.000 0.000 0.000 0.000 Bus20 -4.083 0.681 67.3 -98.6

Bus33 -12.048 2.028 198.7 -98.6

Bus35 16.130 -2.709 266.0 -98.6

Bus35 34.500 102.831 9.5 0.000 0.000 0.000 0.000 Bus17 -4.082 0.680 67.3 -98.6

Bus34 -16.118 2.731 266.0 -98.6

Bus36 20.200 -3.411 333.4 -98.6

Bus36 34.500 102.195 8.4 0.000 0.000 0.000 0.000 Bus8 -4.081 0.480 67.3 -99.3

Bus35 -20.007 3.754 333.3 -98.3

Bus5 24.089 -4.234 400.5 -98.5


Project: ESJ PHASE 2 ETAP Page: 3

Location: SIERRA JUAREZ 20.5.0C Date: 04-06-2021

Contract: SN: SENER

Engineer: Job Garcia Revision: Base


Study Case: LF
Filename: ESJ_II_WIND_FARM_Rev_1 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus38 34.500 100.887 6.0 0.000 0.000 0.000 0.000 Bus5 -23.583 5.099 400.2 -97.7

Circuit_1 23.583 -5.099 400.2 -97.7

Bus53 0.720 104.109 11.1 4.000 -0.100 0.000 0.000 Bus54 4.000 -0.100 3081.9 -100.0

Bus54 34.500 101.744 7.2 0.000 0.000 0.000 0.000 Bus55 3.893 -0.363 64.3 -99.6

Bus53 -3.893 0.363 64.3 -99.6

Bus55 34.500 101.736 7.2 0.000 0.000 0.000 0.000 Bus54 -3.893 0.354 64.3 -99.6

Bus76 3.893 -0.354 64.3 -99.6

Bus56 34.500 100.922 6.0 0.000 0.000 0.000 0.000 Bus77 27.954 -3.600 467.4 -99.2

Bus76 -27.954 3.600 467.4 -99.2

Bus57 0.720 104.257 11.3 4.200 -0.100 0.000 0.000 Bus58 4.200 -0.100 3231.3 -100.0

Bus58 34.500 101.780 7.2 0.000 0.000 0.000 0.000 Bus59 4.083 -0.389 67.4 -99.5

Bus57 -4.083 0.389 67.4 -99.5

Bus59 34.500 101.773 7.2 0.000 0.000 0.000 0.000 Bus58 -4.083 0.381 67.4 -99.6

Bus75 4.083 -0.381 67.4 -99.6

Bus60 0.720 104.369 11.5 4.200 -0.100 0.000 0.000 Bus61 4.200 -0.100 3227.8 -100.0

Bus61 34.500 101.894 7.4 0.000 0.000 0.000 0.000 Bus62 4.083 -0.389 67.4 -99.5

Bus60 -4.083 0.389 67.4 -99.5

Bus62 34.500 101.887 7.4 0.000 0.000 0.000 0.000 Bus61 -4.083 0.381 67.4 -99.6

Bus79 4.083 -0.381 67.4 -99.6

Bus63 0.720 104.595 11.8 4.200 -0.100 0.000 0.000 Bus64 4.200 -0.100 3220.8 -100.0

Bus64 34.500 102.124 7.7 0.000 0.000 0.000 0.000 Bus65 4.084 -0.387 67.2 -99.6

Bus63 -4.084 0.387 67.2 -99.6

Bus65 34.500 102.117 7.7 0.000 0.000 0.000 0.000 Bus64 -4.083 0.380 67.2 -99.6

Bus73 4.083 -0.380 67.2 -99.6

Bus66 0.720 104.944 12.3 4.200 -0.100 0.000 0.000 Bus67 4.200 -0.100 3210.1 -100.0

Bus67 34.500 102.480 8.2 0.000 0.000 0.000 0.000 Bus68 4.084 -0.386 67.0 -99.6

Bus66 -4.084 0.386 67.0 -99.6

Bus68 34.500 102.472 8.2 0.000 0.000 0.000 0.000 Bus67 -4.084 0.377 67.0 -99.6

Bus72 4.084 -0.377 67.0 -99.6

Bus69 0.720 104.800 12.3 4.200 -0.200 0.000 0.000 Bus70 4.200 -0.200 3217.3 -99.9

Bus70 34.500 102.507 8.3 0.000 0.000 0.000 0.000 Bus71 4.084 -0.487 67.1 -99.3

Bus69 -4.084 0.487 67.1 -99.3

Bus71 34.500 102.500 8.3 0.000 0.000 0.000 0.000 Bus70 -4.084 0.479 67.1 -99.3
Project: ESJ PHASE 2 ETAP Page: 4

Location: SIERRA JUAREZ 20.5.0C Date: 04-06-2021

Contract: SN: SENER

Engineer: Job Garcia Revision: Base


Study Case: LF
Filename: ESJ_II_WIND_FARM_Rev_1 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus83 -4.083 0.475 67.1 -99.3

Bus72 8.166 -0.953 134.2 -99.3

Bus72 34.500 102.470 8.2 0.000 0.000 0.000 0.000 Bus68 -4.084 0.377 67.0 -99.6

Bus71 -8.163 0.957 134.2 -99.3

Bus73 12.247 -1.334 201.2 -99.4

Bus73 34.500 102.116 7.7 0.000 0.000 0.000 0.000 Bus65 -4.083 0.380 67.2 -99.6

Bus72 -12.193 1.423 201.2 -99.3

Bus79 16.276 -1.803 268.4 -99.4

Bus75 34.500 101.737 7.2 0.000 0.000 0.000 0.000 Bus59 -4.081 0.381 67.4 -99.6

Bus79 -20.274 2.334 335.7 -99.3

Bus76 24.355 -2.715 403.1 -99.4

Bus76 34.500 101.694 7.1 0.000 0.000 0.000 0.000 Bus55 -3.891 0.353 64.3 -99.6

Bus75 -24.342 2.738 403.1 -99.4

Bus56 28.233 -3.092 467.4 -99.4

Bus77 34.500 100.900 6.0 0.000 0.000 0.000 0.000 Bus56 -27.944 3.571 467.2 -99.2

Circuit_2 27.944 -3.571 467.2 -99.2

Bus79 34.500 101.887 7.4 0.000 0.000 0.000 0.000 Bus62 -4.083 0.381 67.4 -99.6

Bus73 -16.229 1.885 268.4 -99.3

Bus75 20.312 -2.266 335.7 -99.4

Bus81 0.720 104.813 12.4 4.200 -0.200 0.000 0.000 Bus82 4.200 -0.200 3216.9 -99.9

Bus82 34.500 102.521 8.3 0.000 0.000 0.000 0.000 Bus83 4.084 -0.487 67.1 -99.3

Bus81 -4.084 0.487 67.1 -99.3

Bus83 34.500 102.510 8.3 0.000 0.000 0.000 0.000 Bus82 -4.083 0.475 67.1 -99.3

Bus71 4.083 -0.475 67.1 -99.3

Bus112 0.720 103.768 10.6 4.000 -0.100 0.000 0.000 Bus113 4.000 -0.100 3092.0 -100.0

Bus113 34.500 101.396 6.7 0.000 0.000 0.000 0.000 Bus114 3.893 -0.365 64.5 -99.6

Bus112 -3.893 0.365 64.5 -99.6

Bus114 34.500 101.389 6.7 0.000 0.000 0.000 0.000 Bus113 -3.892 0.357 64.5 -99.6

Bus138 3.892 -0.357 64.5 -99.6

Bus115 34.500 100.924 6.0 0.000 0.000 0.000 0.000 Bus139 27.548 -3.041 459.6 -99.4

Bus138 -27.548 3.041 459.6 -99.4

Bus116 0.720 103.930 10.8 4.200 -0.100 0.000 0.000 Bus117 4.200 -0.100 3241.5 -100.0

Bus117 34.500 101.447 6.7 0.000 0.000 0.000 0.000 Bus118 4.082 -0.391 67.6 -99.5
Project: ESJ PHASE 2 ETAP Page: 5

Location: SIERRA JUAREZ 20.5.0C Date: 04-06-2021

Contract: SN: SENER

Engineer: Job Garcia Revision: Base


Study Case: LF
Filename: ESJ_II_WIND_FARM_Rev_1 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus116 -4.082 0.391 67.6 -99.5

Bus118 34.500 101.439 6.7 0.000 0.000 0.000 0.000 Bus117 -4.082 0.383 67.6 -99.6

Bus137 4.082 -0.383 67.6 -99.6

Bus119 0.720 103.988 10.9 4.000 -0.100 0.000 0.000 Bus120 4.000 -0.100 3085.4 -100.0

Bus120 34.500 101.621 7.0 0.000 0.000 0.000 0.000 Bus136 3.893 -0.364 64.4 -99.6

Bus119 -3.893 0.364 64.4 -99.6

Bus122 0.720 104.028 10.9 4.000 -0.100 0.000 0.000 Bus123 4.000 -0.100 3084.3 -100.0

Bus123 34.500 101.661 7.0 0.000 0.000 0.000 0.000 Bus124 3.893 -0.364 64.4 -99.6

Bus122 -3.893 0.364 64.4 -99.6

Bus124 34.500 101.654 7.0 0.000 0.000 0.000 0.000 Bus123 -3.893 0.356 64.4 -99.6

Bus135 3.893 -0.356 64.4 -99.6

Bus125 0.720 104.440 11.5 4.200 -0.100 0.000 0.000 Bus126 4.200 -0.100 3225.6 -100.0

Bus126 34.500 101.966 7.4 0.000 0.000 0.000 0.000 Bus127 4.083 -0.388 67.3 -99.6

Bus125 -4.083 0.388 67.3 -99.6

Bus127 34.500 101.958 7.4 0.000 0.000 0.000 0.000 Bus126 -4.083 0.379 67.3 -99.6

Bus134 4.083 -0.379 67.3 -99.6

Bus128 0.720 104.484 11.6 4.200 -0.100 0.000 0.000 Bus129 4.200 -0.100 3224.3 -100.0

Bus129 34.500 102.011 7.5 0.000 0.000 0.000 0.000 Bus140 4.083 -0.388 67.3 -99.6

Bus128 -4.083 0.388 67.3 -99.6

Bus130 0.720 104.369 11.4 4.000 -0.100 0.000 0.000 Bus131 4.000 -0.100 3074.2 -100.0

Bus131 34.500 102.009 7.5 0.000 0.000 0.000 0.000 Bus9 3.894 -0.362 64.2 -99.6

Bus130 -3.894 0.362 64.2 -99.6

Bus132 34.500 102.000 7.5 0.000 0.000 0.000 0.000 Bus9 -3.894 0.352 64.1 -99.6

Bus133 3.894 -0.352 64.1 -99.6

Bus133 34.500 101.978 7.5 0.000 0.000 0.000 0.000 Bus140 -4.082 0.380 67.3 -99.6

Bus132 -3.893 0.352 64.1 -99.6

Bus134 7.974 -0.732 131.4 -99.6

Bus134 34.500 101.957 7.4 0.000 0.000 0.000 0.000 Bus127 -4.083 0.379 67.3 -99.6

Bus133 -7.972 0.735 131.4 -99.6

Bus135 12.055 -1.114 198.7 -99.6

Bus135 34.500 101.653 7.0 0.000 0.000 0.000 0.000 Bus124 -3.893 0.355 64.4 -99.6

Bus134 -12.011 1.186 198.7 -99.5

Bus136 15.904 -1.542 263.1 -99.5


Project: ESJ PHASE 2 ETAP Page: 6

Location: SIERRA JUAREZ 20.5.0C Date: 04-06-2021

Contract: SN: SENER

Engineer: Job Garcia Revision: Base


Study Case: LF
Filename: ESJ_II_WIND_FARM_Rev_1 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus136 34.500 101.614 7.0 0.000 0.000 0.000 0.000 Bus120 -3.893 0.356 64.4 -99.6

Bus135 -15.897 1.555 263.0 -99.5

Bus137 19.789 -1.911 327.4 -99.5

Bus137 34.500 101.435 6.7 0.000 0.000 0.000 0.000 Bus118 -4.082 0.383 67.6 -99.6

Bus136 -19.746 1.987 327.4 -99.5

Bus138 23.828 -2.370 395.1 -99.5

Bus138 34.500 101.388 6.7 0.000 0.000 0.000 0.000 Bus114 -3.892 0.357 64.5 -99.6

Bus137 -23.814 2.395 395.1 -99.5

Bus115 27.707 -2.752 459.6 -99.5

Bus139 34.500 100.901 6.0 0.000 0.000 0.000 0.000 Bus115 -27.538 3.011 459.5 -99.4

Circuit_3 27.538 -3.011 459.5 -99.4

Bus140 34.500 102.004 7.5 0.000 0.000 0.000 0.000 Bus129 -4.083 0.380 67.3 -99.6

Bus133 4.083 -0.380 67.3 -99.6

Bus169 0.720 103.686 10.5 4.200 -0.100 0.000 0.000 Bus170 4.200 -0.100 3249.1 -100.0

Bus170 34.500 101.199 6.4 0.000 0.000 0.000 0.000 Bus188 4.082 -0.393 67.8 -99.5

Bus169 -4.082 0.393 67.8 -99.5

Bus172 0.720 103.632 10.4 4.200 -0.100 0.000 0.000 Bus173 4.200 -0.100 3250.8 -100.0

Bus173 34.500 101.143 6.3 0.000 0.000 0.000 0.000 Bus174 4.081 -0.393 67.8 -99.5

Bus172 -4.081 0.393 67.8 -99.5

Bus174 34.500 101.135 6.3 0.000 0.000 0.000 0.000 Bus173 -4.081 0.384 67.8 -99.6

Bus187 4.081 -0.384 67.8 -99.6

Bus178 0.720 103.466 10.2 4.200 -0.100 0.000 0.000 Bus179 4.200 -0.100 3256.0 -100.0

Bus179 34.500 100.974 6.0 0.000 0.000 0.000 0.000 Bus180 4.081 -0.394 68.0 -99.5

Bus178 -4.081 0.394 68.0 -99.5

Bus180 34.500 100.967 6.0 0.000 0.000 0.000 0.000 Bus179 -4.081 0.386 67.9 -99.6

Bus182 4.081 -0.386 67.9 -99.6

Bus182 34.500 100.965 6.0 0.000 0.000 0.000 0.000 Bus180 -4.081 0.386 67.9 -99.6

Bus186 -20.356 2.007 339.0 -99.5

Circuit_4 24.437 -2.393 407.0 -99.5

Bus184 0.720 103.574 10.3 4.200 -0.100 0.000 0.000 Bus185 4.200 -0.100 3252.6 -100.0

Bus185 34.500 101.084 6.2 0.000 0.000 0.000 0.000 Bus186 4.081 -0.393 67.9 -99.5

Bus184 -4.081 0.393 67.9 -99.5

Bus186 34.500 101.076 6.2 0.000 0.000 0.000 0.000 Bus185 -4.081 0.384 67.9 -99.6
Project: ESJ PHASE 2 ETAP Page: 7

Location: SIERRA JUAREZ 20.5.0C Date: 04-06-2021

Contract: SN: SENER

Engineer: Job Garcia Revision: Base


Study Case: LF
Filename: ESJ_II_WIND_FARM_Rev_1 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus187 -16.302 1.574 271.2 -99.5

Bus182 20.383 -1.958 339.0 -99.5

Bus187 34.500 101.134 6.3 0.000 0.000 0.000 0.000 Bus174 -4.081 0.384 67.8 -99.6

Bus188 -12.233 1.170 203.3 -99.5

Bus186 16.314 -1.554 271.2 -99.5

Bus188 34.500 101.192 6.3 0.000 0.000 0.000 0.000 Bus170 -4.081 0.385 67.8 -99.6

Bus192 -8.160 0.771 135.6 -99.6

Bus187 12.241 -1.155 203.3 -99.6

Bus189 0.720 103.703 10.5 4.200 -0.100 0.000 0.000 Bus190 4.200 -0.100 3248.5 -100.0

Bus190 34.500 101.216 6.4 0.000 0.000 0.000 0.000 Bus191 4.082 -0.392 67.8 -99.5

Bus189 -4.082 0.392 67.8 -99.5

Bus191 34.500 101.209 6.4 0.000 0.000 0.000 0.000 Bus190 -4.081 0.384 67.8 -99.6

Bus192 4.081 -0.384 67.8 -99.6

Bus192 34.500 101.205 6.4 0.000 0.000 0.000 0.000 Bus195 -4.080 0.384 67.8 -99.6

Bus191 -4.081 0.384 67.8 -99.6

Bus188 8.162 -0.769 135.6 -99.6

Bus193 0.720 103.717 10.5 4.200 -0.100 0.000 0.000 Bus194 4.200 -0.100 3248.1 -100.0

Bus194 34.500 101.230 6.4 0.000 0.000 0.000 0.000 Bus195 4.082 -0.392 67.8 -99.5

Bus193 -4.082 0.392 67.8 -99.5

Bus195 34.500 101.223 6.4 0.000 0.000 0.000 0.000 Bus194 -4.081 0.384 67.8 -99.6

Bus192 4.081 -0.384 67.8 -99.6

Circuit_1 34.500 100.864 5.9 0.000 0.000 0.000 0.000 Bus38 -23.573 5.113 400.2 -97.7

COLLECTOR BUS 23.573 -5.113 400.2 -97.7

Circuit_2 34.500 100.865 5.9 0.000 0.000 0.000 0.000 Bus77 -27.931 3.591 467.2 -99.2

COLLECTOR BUS 27.931 -3.591 467.2 -99.2

Circuit_3 34.500 100.865 5.9 0.000 0.000 0.000 0.000 Bus139 -27.526 3.031 459.4 -99.4

COLLECTOR BUS 27.526 -3.031 459.4 -99.4

Circuit_4 34.500 100.865 5.9 0.000 0.000 0.000 0.000 COLLECTOR BUS 24.407 -2.438 407.0 -99.5

Bus182 -24.407 2.438 407.0 -99.5

COLLECTOR BUS 34.500 100.865 5.9 0.000 0.000 0.000 0.000 Bus12 103.435 -14.183 1732.2 -99.1

Circuit_4 -24.406 2.440 407.0 -99.5

Circuit_1 -23.573 5.114 400.2 -97.7

Circuit_2 -27.931 3.595 467.2 -99.2


Project: ESJ PHASE 2 ETAP Page: 8

Location: SIERRA JUAREZ 20.5.0C Date: 04-06-2021

Contract: SN: SENER

Engineer: Job Garcia Revision: Base


Study Case: LF
Filename: ESJ_II_WIND_FARM_Rev_1 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Circuit_3 -27.525 3.034 459.4 -99.4


* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)