* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Microsemi Page: 4
12.6.0H
Location: LISP Cabuyao Laguna Date: 04-09-2017
Contract: SN:
Engineer: Kath Divina Revision: Base
Study Case: LF
Filename: Microsemi Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable1 1.310 0.870 -1.310 -0.870 0.0 0.0 100.0 100.0 0.00
Cable2 1.310 0.870 -1.310 -0.870 0.0 0.0 100.0 100.0 0.00
Cable3 1.299 0.800 -1.296 -0.795 2.7 4.5 97.0 96.7 0.30
Cable8 -0.113 -0.075 0.113 0.075 0.1 0.1 95.5 95.6 0.10
Cable9 0.112 0.070 -0.112 -0.069 0.2 0.4 92.8 92.5 0.27
Cable10 -0.014 -0.008 0.014 0.008 0.0 0.0 92.4 92.5 0.14
Cable11 -0.036 -0.023 0.037 0.023 0.1 0.0 92.4 92.5 0.15
Cable12 -0.011 -0.007 0.011 0.007 0.0 0.0 92.4 92.5 0.09
Cable13 -0.051 -0.032 0.051 0.032 0.1 0.1 92.3 92.5 0.23
Cable20 -0.020 -0.011 0.021 0.011 0.2 0.0 95.0 95.6 0.59
Cable15 -0.047 -0.030 0.047 0.030 0.0 0.0 95.5 95.6 0.08
Cable16 0.046 0.028 -0.046 -0.028 0.1 0.1 92.8 92.6 0.22
Cable17 -0.027 -0.017 0.027 0.017 0.0 0.0 92.4 92.6 0.16
Cable18 -0.018 -0.011 0.018 0.011 0.1 0.0 92.4 92.6 0.24
Cable19 -0.029 -0.018 0.029 0.018 0.0 0.0 95.5 95.6 0.05
Cable14 -0.002 -0.001 0.002 0.001 0.0 0.0 95.5 95.6 0.03
T12 0.002 0.001 -0.002 -0.001 0.0 0.1 95.5 93.0 2.54
Cable21 -0.034 -0.021 0.034 0.021 0.0 0.0 96.0 96.0 0.04
Cable22 0.033 0.020 -0.033 -0.020 0.1 0.0 94.1 93.9 0.18
Cable23 -0.010 -0.006 0.010 0.006 0.0 0.0 93.8 93.9 0.15
Cable24 -0.020 -0.012 0.020 0.012 0.1 0.0 93.6 93.9 0.31
Cable29 0.002 0.001 -0.002 -0.001 0.0 0.0 93.0 92.5 0.49
Cable33 -0.077 -0.048 0.077 0.048 0.1 0.0 95.5 95.6 0.08
Cable25 -0.004 -0.002 0.004 0.002 0.0 0.0 93.7 93.9 0.20
Cable30 -0.004 -0.003 0.004 0.003 0.0 0.0 95.9 96.0 0.14
Cable28 -0.007 -0.004 0.007 0.004 0.0 0.0 95.9 96.0 0.05
Cable31 -0.004 -0.003 0.004 0.003 0.0 0.0 95.9 96.0 0.08
Cable36 -0.069 -0.045 0.069 0.045 0.1 0.0 95.5 95.6 0.07
T13 0.069 0.045 -0.068 -0.042 0.5 2.6 95.5 93.3 2.14
Cable34 -0.048 -0.022 0.048 0.022 0.1 0.0 95.9 96.0 0.12
Cable35 -0.097 -0.060 0.098 0.060 0.1 0.1 95.9 96.0 0.12
ETAP
Project: Microsemi Page: 8
12.6.0H
Location: LISP Cabuyao Laguna Date: 04-09-2017
Contract: SN:
Engineer: Kath Divina Revision: Base
Study Case: LF
Filename: Microsemi Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable39 0.068 0.042 -0.068 -0.042 0.2 0.1 93.3 93.1 0.24
Cable37 -0.011 -0.007 0.011 0.007 0.0 0.0 96.0 96.0 0.06
T16 0.011 0.007 -0.011 -0.007 0.1 0.2 96.0 94.7 1.28
Cable38 -0.011 -0.007 0.011 0.007 0.0 0.0 94.6 94.7 0.14
Cable52 0.054 0.033 -0.054 -0.033 0.1 0.1 93.9 93.7 0.21
Cable42 -0.036 -0.018 0.037 0.018 0.1 0.0 95.8 96.0 0.20
Cable40 -0.015 -0.009 0.015 0.009 0.0 0.0 96.1 96.1 0.03
T10 0.015 0.009 -0.015 -0.009 0.0 0.1 96.1 95.9 0.23
Cable44 -0.013 -0.008 0.013 0.008 0.0 0.0 95.5 95.6 0.11
T14 0.013 0.008 -0.013 -0.008 0.1 0.3 95.5 94.0 1.48
Cable45 -0.036 -0.018 0.036 0.018 0.0 0.0 95.9 96.0 0.09
Cable47 -0.036 -0.018 0.036 0.018 0.1 0.0 95.8 96.0 0.16
Cable46 0.013 0.008 -0.013 -0.008 0.0 0.0 94.0 93.8 0.13
Cable48 -0.036 -0.018 0.036 0.018 0.1 0.0 95.9 96.0 0.12
Cable50 -0.007 -0.004 0.007 0.004 0.0 0.0 95.9 96.0 0.12
Cable51 -0.054 -0.035 0.054 0.035 0.0 0.0 95.7 95.7 0.06
Cable89 0.014 0.009 -0.014 -0.009 0.1 0.0 95.6 95.3 0.33
Cable90 0.014 0.009 -0.014 -0.009 0.0 0.0 95.6 95.4 0.20
Cable53 -0.017 -0.010 0.017 0.010 0.0 0.0 93.5 93.7 0.16
Cable54 -0.002 -0.001 0.002 0.001 0.0 0.0 95.5 95.6 0.03
T15 0.002 0.001 -0.002 -0.001 0.0 0.0 95.5 93.9 1.64
Cable55 -0.028 -0.018 0.028 0.018 0.1 0.0 93.5 93.7 0.18
Cable56 -0.008 -0.005 0.008 0.005 0.0 0.0 93.4 93.7 0.28
Cable57 -0.153 -0.095 0.153 0.095 0.1 0.2 95.6 95.7 0.11
Cable58 -0.014 -0.009 0.014 0.009 0.0 0.0 95.7 95.7 0.05
Cable59 0.002 0.001 -0.002 -0.001 0.0 0.0 93.9 93.8 0.05
Cable60 -0.007 -0.005 0.007 0.005 0.0 0.0 95.6 95.7 0.14
Cable61 -0.013 -0.008 0.013 0.008 0.0 0.0 95.5 95.7 0.24
Cable63 -0.018 -0.012 0.018 0.012 0.0 0.0 95.6 95.7 0.13
Cable65 0.018 0.011 -0.018 -0.011 0.0 0.0 93.5 93.3 0.21
Cable71 -0.120 -0.074 0.120 0.074 0.2 0.3 95.6 95.9 0.25
Cable73 -0.073 -0.048 0.073 0.048 0.1 0.1 95.7 95.9 0.16
Cable74 0.073 0.045 -0.072 -0.045 0.3 0.3 93.4 93.0 0.41
Cable79 0.027 0.017 -0.027 -0.017 0.1 0.0 93.4 93.0 0.31
ETAP
Project: Microsemi Page: 9
12.6.0H
Location: LISP Cabuyao Laguna Date: 04-09-2017
Contract: SN:
Engineer: Kath Divina Revision: Base
Study Case: LF
Filename: Microsemi Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable78 -0.027 -0.018 0.028 0.018 0.0 0.0 96.0 96.1 0.09
Cable80 -0.017 -0.010 0.017 0.010 0.0 0.0 92.9 93.0 0.16
Cable81 -0.017 -0.011 0.017 0.011 0.0 0.0 96.0 96.1 0.08
Cable82 0.016 0.010 -0.016 -0.010 0.0 0.0 94.1 94.0 0.16
Cable83 0.016 0.010 -0.016 -0.010 0.0 0.0 94.0 93.8 0.16
Cable84 -0.010 -0.006 0.010 0.006 0.0 0.0 92.8 93.0 0.29
Cable41 0.015 0.009 -0.015 -0.009 0.1 0.0 95.9 95.5 0.37
Cable86 -0.015 -0.009 0.015 0.009 0.0 0.0 95.2 95.5 0.26
Cable87 -0.029 -0.018 0.029 0.018 0.0 0.0 96.1 96.1 0.02
T11 0.029 0.018 -0.029 -0.018 0.0 0.2 96.1 95.7 0.43
Cable88 0.029 0.018 -0.029 -0.018 0.0 0.0 95.7 95.6 0.06
Cable91 -0.015 -0.009 0.015 0.009 0.0 0.0 96.0 96.1 0.17
Cable27 -0.216 -0.106 0.216 0.106 0.1 0.1 96.0 96.0 0.06
Cable6 -1.294 -0.792 1.296 0.795 1.9 3.2 96.5 96.7 0.21
Cable7 0.375 0.241 -0.373 -0.238 2.6 3.6 96.5 95.6 0.90
Cable32 0.360 0.196 -0.358 -0.195 1.1 1.6 96.5 96.0 0.41
Cable49 0.262 0.165 -0.261 -0.163 1.5 2.1 96.5 95.7 0.73
Cable75 0.194 0.124 -0.193 -0.123 0.9 1.2 96.5 95.9 0.58
Cable76 0.103 0.065 -0.103 -0.065 0.3 0.4 96.5 96.1 0.33
31.2 107.5
ETAP
Project: Microsemi Page: 10
12.6.0H
Location: LISP Cabuyao Laguna Date: 04-09-2017
Contract: SN:
Engineer: Kath Divina Revision: Base
Study Case: LF
Filename: Microsemi Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Critical Report
Critical Report
Marginal Report
Marginal Report
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 3