You are on page 1of 5

Project: ETAP Page: 1

Location: 18.0.0C Date: 22-06-2020

Contract: SN: INTERFACE

Engineer: Revision: Base


Study Case: LF
Filename: cetp_12062020 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID V Rated Amp kW kvar kW kvar kW kvar kW kvar kVA % PF Amp Loading

Bus2 415.00 13.704 87.3 18.3


Bus6 415.00 74.546 91.3 103.7
Bus8 415.00 132.594 91.6 184.5
Bus10 415.00 723.132 92.3 1006.0
Bus11 415.00 350.255 92.0 487.3
Bus12 415.00 53.576 90.8 74.5
Bus14 415.00 31.785 89.5 44.2
APFCR1 415.00 -
APFCR2 415.00 -
APFCR3 415.00 -
APFCR4 415.00
Bus HTP1 33000.00 2154.049 99.1 37.7
Bus1 33000.00 2153.249 99.1 37.7
Bus4 33000.00 34.440 99.8 0.6
Bus5 33000.00 983.557 99.5 17.2
HTP2 33000.00 34.440 99.8 0.6
MLDB1 415.00 60.117 60.117 100.0 85.3
MPDB1 415.00 12.000 2.653 14.653 100.0 20.8
MPDB2 415.00 12.000 2.653 14.653 100.0 20.8
MPDB3 415.00 12.000 2.719 14.719 100.0 20.6
MPDB4 415.00
PCC1 415.00 1124.432 99.1 1594.0
PCC2 415.00 8.000 1.784 975.579 99.8 1377.2
PMCC1 415.00 23.555 6.493 24.434 96.4 34.6
PMCC2 415.00 989.651 137.354 999.137 99.1 1434.0
PMCC3 415.00 8.000 1.813 24.535 100.0 34.4
PMCC4 415.00 8.000 1.814 9.814 100.0 13.7
PMCC5 415.00 149.831 58.802 160.956 93.1 227.7
PMCC6 415.00 390.253 390.253 100.0 553.3
PMCC7 415.00 347.853 71.977 419.830 100.0 595.4
T1_HV 33000.00 1138.500 98.5 19.9
T2_HV 33000.00 24.539 100.0 0.4
T3_HV 33000.00 9.814 100.0 0.2
T4_HV 33000.00 983.674 99.5 17.2

* Indicates operating load of a bus exceeds the bus critical limit ( 110.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (100.0% of the Continuous Ampere rating).
Project: ETAP Page: 2

Location: 18.0.0C Date: 22-06-2020

Contract: SN: INTERFACE

Engineer: Revision: Base


Study Case: LF
Filename: cetp_12062020 Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (kVA) kVA % kVA %

T1 Transformer 2000.0 1138.5 56.9 1124.4 56.2

T2 Transformer 1600.0 24.5 1.5 24.5 1.5

T3 Transformer 1600.0 9.8 0.6 9.8 0.6

T4 Transformer 2000.0 983.7 49.2 975.6 48.8

* Indicates a branch with operating load exceeding the branch capability.


Project: ETAP Page: 3

Location: 18.0.0C Date: 22-06-2020

Contract: SN: INTERFACE

Engineer: Revision: Base


Study Case: LF
Filename: cetp_12062020 Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID kW kvar kW kvar kW kvar From To in Vmag

C:PCC1_OG1 0.0 0.0 0.0 0.0 0.0 0.0 98.1 98.1 0.00

C:PMCC3_OG1 0.0 0.0 0.0 0.0 0.0 0.0 99.4 99.4 0.00

C:PMCC4_OG1 0.0 0.0 0.0 0.0 0.0 0.0 99.4 99.4 0.00

C:PCC2_OG1 0.0 0.0 0.0 0.0 0.0 0.0 98.6 98.6 0.00

C:Grid -2134.8 -283.4 2134.8 281.5 0.0 -1.8 100.0 100.0 0.00

C:HTP1_OG2 34.4 -4.3 -34.4 2.4 0.0 -1.8 100.0 100.0 0.00

C:HTP1_OG3 979.1 91.8 -979.1 -93.6 0.0 -1.8 100.0 100.0 0.00

C:T1_HV 1121.3 195.9 -1121.3 -197.1 0.0 -1.2 100.0 100.0 0.00

C:T4_HV 979.1 93.6 -979.1 -94.9 0.0 -1.2 100.0 100.0 0.00

C:T2_HV 24.5 -1.2 -24.5 0.0 0.0 -1.2 100.0 100.0 0.00

C:T3_HV 9.8 -1.2 -9.8 0.0 0.0 -1.2 100.0 100.0 0.00

C:PCC1_OG4 -60.1 0.0 60.2 0.0 0.0 0.0 98.1 98.1 0.07

C:PCC1_OG2 -14.7 0.0 14.7 0.0 0.0 0.0 98.1 98.1 0.02

C:PCC1_OG3 -14.7 0.0 14.7 0.0 0.0 0.0 98.1 98.1 0.02

C:PMCC3_OG2 -14.7 0.0 14.7 0.0 0.0 0.0 99.3 99.4 0.02

C:PCC2_OG2 0.0 0.0 0.0 0.0 0.0 0.0 98.6 98.6 0.00

C:PCC1_OG6 23.6 6.5 -23.6 -6.5 0.0 0.0 98.1 98.1 0.03

C:PCC1_OG8 1000.9 146.5 -989.7 -137.4 11.3 9.2 98.1 96.9 1.21

T1 -1114.0 -153.0 1121.3 197.1 7.3 44.1 98.1 100.0 5.94

C:PCC2_OG3 150.1 59.0 -149.8 -58.8 0.3 0.2 98.6 98.3 0.21

C:PCC2_OG5 391.9 1.4 -390.3 0.0 1.7 1.4 98.6 98.1 0.42

C:PCC2_OG6 421.8 1.6 -419.8 0.0 1.9 1.6 98.6 98.1 0.46

T4 -973.6 -62.0 979.1 94.9 5.5 32.9 98.6 100.0 5.55

T2 -24.5 0.0 24.5 0.0 0.0 0.0 99.4 100.0 4.78

T3 -9.8 0.0 9.8 0.0 0.0 0.0 99.4 100.0 4.77

28.1 78.9
Project: ETAP Page: 4

Location: 18.0.0C Date: 22-06-2020

Contract: SN: INTERFACE

Engineer: Revision: Base


Study Case: LF
Filename: cetp_12062020 Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 110.0 100.0

Cable / Busway 110.0 100.0

Reactor 110.0 100.0

Line 110.0 100.0

Transformer 110.0 100.0

Panel 110.0 100.0

Protective Device 110.0 100.0

Generator 100.0 95.0

Inverter/Charger 110.0 100.0

Bus Voltage
OverVoltage 110.0 105.0

UnderVoltage 90.0 95.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0


Project: ETAP Page: 5

Location: 18.0.0C Date: 22-06-2020

Contract: SN: INTERFACE

Engineer: Revision: Base


Study Case: LF
Filename: cetp_12062020 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

kW kvar kVA % PF

Source (Swing Buses): 2134.8 281.5 2153.2 99.14 Lagging

Source (Non-Swing Buses): 0.0 0.0 0.0

Total Demand: 2134.8 281.5 2153.2 99.14 Lagging

Total Motor Load: 1961.1 686.5 2077.8 94.38 Lagging

Total Static Load: 145.5 0.0 145.5 100.00 Lagging

Total Constant I Load: 0.0 0.0 0.0

Total Generic Load: 0.0 0.0 0.0

Apparent Losses: 28.1 -405.0

System Mismatch: 0.0 0.0

Number of Iterations: 1