You are on page 1of 5

ETAP

Project: Page: 1
12.6.0H
Location: Date: 03-31-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Bismillah Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 20.000 0 0 0 0 0 0 0 0 1.278 98.3 36.9

Bus3 20.000 0 0 0 0 0 0 0 0 1.777 79.9 51.3

Bus6 5.500 0 0 0 0 0 0 0 0 1.770 93.1 185.4

Bus7 5.500 0.145 0.063 0 0 0 0 0 0 0.493 98.7 52.0

Bus8 5.500 0 0 0 0 0 0 0 0 0.341 99.9 36.1

Bus10 0.380 0 0 0.338 0 0 0 0 0 0.338 100.0 522.7

Bus11 5.500 0 0 0 0 0 0 0 0 1.737 81.4 181.8

Bus12 5.500 0.505 0.216 0 0 0 0 0 0 1.175 97.4 125.2

Bus13 5.500 0 0 0 0 0 0 0 0 0.638 99.7 68.3

Bus14 0.380 0 0 0.324 0 0 0 0 0 0.626 100.0 989.3

Bus15 5.500 0.505 0.216 0 0 0 0 0 0 0.572 92.0 60.5

Bus16 5.500 0 0 0 0 0 0 0 0 0.023 93.6 2.5

Bus17 0.380 0 0 0.324 0 0 0 0 0 0.324 100.0 511.6

Bus18 5.500 0.145 0.063 0 0 0 0 0 0 0.252 96.7 26.5

Bus21 5.500 0 0 0 0 0 0 0 0 0.099 100.0 10.5

Bus22 0.380 0 0 0.099 0 0 0 0 0 0.099 100.0 151.3

Bus23 5.500 0.145 0.063 0 0 0 0 0 0 0.252 96.7 26.5

Bus24 5.500 0 0 0 0 0 0 0 0 0.099 100.0 10.5

Bus25 0.380 0 0 0.099 0 0 0 0 0 0.099 100.0 151.3

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 2
12.6.0H
Location: Date: 03-31-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Bismillah Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

T1 Transformer 5.000 1.281 25.6 1.278 25.6

T2 Transformer 5.000 1.777 35.5 1.737 34.7

T3 Transformer 0.400 0.341 85.3 0.338 84.5

* T4 Transformer 0.400 0.638 159.6 0.626 156.6

T5 Transformer 0.400 0.023 5.9 0.022 5.5

T6 Transformer 0.400 0.099 24.8 0.099 24.8

T7 Transformer 0.400 0.099 24.8 0.099 24.8

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 3
12.6.0H
Location: Date: 03-31-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Bismillah Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T1 1.256 -0.234 -1.253 0.266 3.3 32.5 100.0 100.2 0.25

T2 1.419 1.069 -1.414 -1.009 6.0 59.7 100.0 100.2 0.25

Cable1 0.489 0.085 -0.487 -0.080 2.4 4.9 100.2 99.6 0.65

Cable3 1.158 0.296 -1.144 -0.268 14.1 28.2 100.2 98.5 1.71

Cable2 0.342 0.017 -0.341 -0.015 1.2 2.3 99.6 99.2 0.37

T3 0.341 0.015 -0.338 0.000 2.9 14.5 99.2 98.3 0.93

Cable5 0.530 0.231 -0.527 -0.224 3.3 6.6 100.2 99.3 0.98

Cable7 0.245 0.065 -0.244 -0.064 0.6 1.3 100.2 99.9 0.37

Cable12 0.245 0.065 -0.244 -0.064 0.6 1.3 100.2 99.9 0.37

Cable4 0.639 0.052 -0.637 -0.046 2.8 5.6 98.5 98.0 0.50

T4 0.637 0.046 -0.626 0.006 10.4 52.0 98.0 96.2 1.85

Cable6 0.022 0.008 -0.022 -0.008 0.0 0.0 99.3 99.2 0.04

T5 0.022 0.008 -0.021 -0.006 0.5 2.6 99.2 96.2 3.04

Cable11 0.099 0.001 -0.099 0.000 0.1 0.2 99.9 99.8 0.10

T6 0.099 0.000 -0.099 0.000 0.2 0.4 99.8 99.6 0.22

Cable13 0.099 0.001 -0.099 0.000 0.1 0.2 99.9 99.8 0.10

T7 0.099 0.000 -0.099 0.000 0.2 0.4 99.8 99.6 0.22

48.8 212.7
ETAP
Project: Page: 4
12.6.0H
Location: Date: 03-31-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Bismillah Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

T4 Transformer Overload 0.400 MVA 0.626 156.6 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus14 Bus Under Voltage 0.380 kV 0.366 96.2 3-Phase

Bus17 Bus Under Voltage 0.380 kV 0.366 96.2 3-Phase


ETAP
Project: Page: 5
12.6.0H
Location: Date: 03-31-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: Bismillah Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 2.676 0.835 2.803 95.46 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 2.676 0.835 2.803 95.46 Lagging

Total Motor Load: 1.443 0.622 1.571 91.84 Lagging

Total Static Load: 1.184 0.000 1.184 100.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.049 0.213

System Mismatch: 0.000 0.000

Number of Iterations: 3