PUBLIC TECHNICAL-VOCATIONAL
HIGH SCHOOLS
Writer
Antonina D. Santos
Teacher III
Assemblywoman Felicita G. Bernardino Memorial Trade School
Lias Marilao, Bulacan, Region III
Editor
Leticia S. Angelito
Master Teacher 1, English
Zamboanga Del Sur School of Arts and Trades
Kawit, Pagadian City, Region IX
Facilitator:
Virgilio A. Santos
Education Program Specialist
Curriculum Development Division
Bureau of Secondary Education
Encoder
Maria Eliza R. Rivera
Department of Education
Meralco Ave., Pasig
Page
After completing this module, ask your teacher to assess your level of
competency. The result of your assessment will be recorded in your
competency profile. All the learning activities provided in this Module are
designed for you to complete at your own pace with minimum supervision or
help from your teacher.
i
Program/Course PLUMBING NC-II
INTRODUCTION:
ASSESSMENT CRITERIA:
LO1
1. Materials and tools are listed as per job requirements
2. Materials and tools are identified according to the job requirements
3. Materials and tools are selected according to the job requirements
LO2
1. Materials and tools needed are requested according to the list
prepared.
2. Request is done as per standard operating procedure (SOP).
3. Materials and tools requested are substituted without compromising
the cost and quality of work.
LO3
1. Materials and tools issued are received as per quantity and
specifications.
2. Materials and tools are inspected / checked against the requested
ones.
ii
DEFINITION OF TERMS
Requisition form is a form requesting materials and supplies needed for making a
project.
iii
iv
Program/Course PLUMBING NC-II
Unit of Competency PREPARE PLUMBING MATERIALS AND TOOLS
Module PREPARING PLUMBING MATERIALS AND TOOLS
Assessment Criteria:
1. Materials and tools are identified and listed based on the job
requirements.
2. Materials and tools are selected according to the job requirements.
LEARNING EXPERIENCES/ACTIVITIES
1
INFORMATION SHEET # 1.1
I. PLUMBING MATERIALS
PIPES
Plastic or Synthetic Pipes
Rigid Types:
Polyvinyl Chloride (PVC)
Chlorinated Polyvinyl Chloride (CPVC)
Unplasticized Polyvinyl Chloride (UPVC)
Acrylonitrile Butadiene Styrene (ABS)
Polypropylene (PP)
Styrene Rubber plastic (SR)
Flexible Types:
Polyethylene (PE)
Polybutylene (PB)
METALLIC PIPES
Stainless Steel Pipe
Lead Pipes
Galvanized Wrought Iron Pipe
Brass Pipe
Copper Pipe
ASBESTOS PIPE
BITUMINOUS FIBER SEWER PIPE
VITRIFIED CLAY PIPE
FITTINGS – are any pipe part used to join two sections of pipes.
Elbows
Tee
Socket
Cap
Plug
Union
Nipple
Couplings
Bushings
Bends
Wyes
FIXTURES – are devices that provide a supply of water and its disposal.
Sink
Faucet
Tubs
Lavatory
Urinal
Toilet Bowl
Floor drain
Shower diverter
2
Telephone shower
Water Closet
Bath Tub
3
Polyethylene (PE) and Spigot Fitting
4
5
II. PLUMBING TOOLS
MEASURING TOOLS
Push – Pull Rule
Try Square
L – Square / Steel Square
Inside and Outside Calipers
CUTTING TOOLS
Hack Saw
Cross-Cut Saw
Pipe Cutter
Pipe Thread
Pipe Reamer
BORING TOOLS
Auger Brace with Bits
Portable Electrical Drill
Hammer Drill
TESTING TOOLS
Try Square
Spirit Level
Hose Level
Plumb Bob
DRIVING TOOLS
Claw Hammer
Crow Bar
Sledge Hammer
Drill Press
Screw Driver
HOLDING TOOLS
Clamps (C and B)
Bench Vise
Adjustable Wrench
Pipe Wrench
Pipe Vise
6
7
SELF-CHECK # 1.1
A. Directions: Look at the Table below, from the list the appropriate plumbing
materials and tools for each of the following activities.
1. 2. 3.
8
4. 5.
Directions: Call your instructor and request him to check if you have executed
the task based upon his observation.
1. While inside the workplace, your teacher will give you a job order or a
particular work to do.
2. Based on the job order, identify all the materials and tools needed.
3. Classify the materials and tools according to their uses.
4. Let the teacher examine the list of the Tools and Materials if they conform to
the job requirement.
9
Self- Check # 1.1
Directions: List down the materials and tools required by the following task.
Write your answer on a separate answer sheet.
10
Program/Course PLUMBING NC-II
Unit of Competency PREPARE PLUMBING MATERIALS AND TOOLS
Module PREPARING PLUMBING MATERIALS AND TOOLS
Assessment Criteria:
1. Materials and tools needed are requested according to the list prepared.
2. Request is done according to the standard operating procedure (SOP).
3. Materials and tools requested are substituted without compromising the
cost and quality of work.
LEARNING EXPERIENCES/ACTIVITIES
11
INFORMATION SHEET # 2.1
When making a request of materials and tools, the following forms should
be accomplished:
A. Requisition Slip
Plumbing Shop
Requisition Slip
Requested by:
_____________________ Approved:
Student’s Name
_____________________ ______________________
Foreman Shop Teacher
12
B. The following are the terms found in a requisition form:
1. Name of Project indicates the task in which the materials will be used.
Example: Repair of School Lavatory
2. Balance On Hand indicates the quantity and unit of materials still
available in the stockroom
3. Requisition Quantity
and Unit is a number and units of materials requested
4. Unit write the unit of measuring quantity
5. Material/ Description write the name of material and description or
Specification (e.g. PVC Pipe 12mm X 3m)
6. Unit Price is a price of material per piece or per unit
7. Total is a unit price X Quantity (ex. 3 pc x P30 = P90.00)
8. Barrower is a name and signature of the person requesting tools
and materials.
9. Tool Keeper is the one who is responsible to take care the of the
tool room
10. Job Order is workings sheet that server as a complete guide of
the student to a certain task to be done.
11. Safety Officer is the person in-charge to monitor the safety
conditioning of the workplace.
12. Material Officer is a person responsible in the release and retrieve of
excess materials.
13. Lead man is a person that leads the group in the specific task.
14. Foreman is a person responsible in the overall operation of the
worker in the workplace.
13
B. Borrower’s Slip
Plumbing Shop
Barrower’s Slip
Date: _____________
3
4
10
Approved by:
__________________________________ _______________________________
Tool Keeper Barrower
__________________________________
Foreman
__________________________________
Shop Teacher
14
Organizational Chart
in
PLUMBING
Letty R. Sovel Remy M.Caponpon EsterB. Pablo Vic C. Clemen Richard B. Paulino
Lead woman Lead woman Lead Woman Lead man Lead man
15
SELF-CHECK #2.1
Directions: Fill in the blanks with appropriate term in filling out a requisition
form. Write your answer on a separate answer sheet.
2. The task in which the materials and tools will be used is_____.
16
INFORMATION SHEET # 2.2
REQUISITION PROCEDURE
In making a request for materials and tools needed, the following Standard
Operating Procedure (SOP) should be followed:
1. List down the materials and tools needed as per job requirement.
2. Check for the availability of the needed materials and tools in the stockroom.
3. Accomplish a requisition form
4. Let the shop teacher check the requisition form.
5. Submit the requisition form to the material officer
6. Unavailable requested materials and tools should be substituted without
sacrificing the cost and quality of work
7. The material officer will prepare the requested material for issuance to the
student.
17
Self-Check # 2.2
Directions: Arrange the following steps in proper order. Write the letter of the
correct sequence on a separate sheet of paper.
a. Check for the availability of materials and tools needed in the stockroom
b. Submit the accomplished requisition form to the supply officer
c. Accomplish a requisition form
d. Prepare a list of the materials and tools needed as per job requirements
e. Select substitute materials and tools if the requested ones are not available
f. Let the shop teacher check the requisition form.
g. List down the materials needed as per job requirement
18
ACTIVITY SHEET # 2.1
Procedure:
2. Let your shop teacher check and sign the requisition slip and
borrower’s slip whether these contain the requested tools and
materials as per job requirement.
3. Submit the requisition form to the storekeeper for the requested tools.
4. Then, submit the requisition form to the material officer for the
requested materials.
6. Wait for the issuance of the requested materials and tools from the
store keeper and the material officer.
19
SELF-CHECK # 2.1
Directions: Call your instructor and request him to check if you have executed
the task based upon his observation.
20
Program/Course PLUMBING NC-II
Unit of Competency PREPARE PLUMBING MATERIALS AND TOOLS
Module PREPARING PLUMBING MATERIALS AND TOOLS
Assessment Criteria:
1. Materials and tools issued are received as per quantity and specification.
2. Materials and tools are inspected/checked against the requested ones.
LEARNING EXPERIENCES/ACTIVITIES
21
INFORMATION SHEET # 3.1
After you have made a request, you are now ready to receive the needed
materials and tools. A standard operating procedure (SOP) must be followed. In
connection to this, the following are safety measures and proper handling of
materials and tools:
1. Check if the materials and tools are complete in terms of quantity or unit.
2. Check if the materials and tools are of correct specifications.
3. See to it that the materials and tools are of good working conditions.
4. Check the tools with accessories. See to it that nothing is missing.
5. Check the materials for damages or defects.
6. If any of the following is found, report/ return immediately to the material
officer.
Incomplete number of materials and tools
Materials and tools which are not in accordance with specifications
Tools with missing accessories ( e.g. faucet with out handle or gasket )
Materials and tools with damages or defects
7. Get replacements for those returned materials or tools.
8. Sign an issue receipt or borrower’s slip. It signifies that you have received
the
materials and tools issued in good conditions.
9. Take the issued materials and tools to the workplace.
22
SELF-CHECK # 3.1
Directions: Call your instructor and request him to check if you have executed
the task based upon his observation.
__________ 1. Materials and tools are issued only after proper requisition
process.
__________ 4. Sign an issue receipt to indicate that the materials and tools
received are of good working conditions.
23
ACTIVITY SHEET # 3.1
Procedure:
1. Secure a job order from your teacher.
2. Make a list of materials and tools needed based on the job order.
3. Check for the availability of materials and tools in the stockroom.
4. Accomplish and submit a requisition form to the supply officer.
5. Accomplish the barrower slip and submit to the tool keeper.
6. Wait till the supply officer has prepared the needed materials and tools.
7. Receive the materials and tools by following the procedure discussed in
Information Sheet #3.1
24
SELF-CHECK # 3.1
Directions: Call your instructor and request him to check if you have executed
the task based upon his observation.
25
ANSWER KEY
SELF-CHECK #1.1
A. 1. PIPE CUTTER
2. L-SQUARE
3. PIPE THREADER
4. HOSE LEVEL
5. FITTINGS
B. 1. CLAMP
2. HACKSAW
3. PIPE REAMER
4. POWER HACK SAW
5. LAVATORY
SELF-CHECK #2.1
1. MATERIAL/DESCRIPTION
2. NAME OF PROJECT
3. UNIT PRICE
4. BALANCE ON HAND
5. REQUISITIONER
SELF-CHECK #2.2
1. G
2. A
3. C
4. F
5. B
6. E
SELF-CHECK #3.1
1. CORRECT
2. CORRECT
3. CORRECT
4. CORRECT
5. NOT CORRECT
26