You are on page 1of 24

N

ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


N
ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


SIDE PITCHING WITH ONE LAYER OF
BOULDER SIZE 300MM TO 500 MM.
0.4
5.0
SIDE PITCHING WITH ONE LAYER OF
0.5 BOULDER SIZE 300MM TO 500 MM.
WEIR AXIS 5.0
5.3

2.2

4.0
5.0 2.3 2.0 13.2 18.0 6.2
GABION PROTECTION

1.0
1505.2 1502.1

D/S GLACIES (1V:3H)


A D/S CONCRETE FLOOR A

U/S CONCRETE FLOOR

D/S PROTECTION WORK


ROSHI KHOLA 16.7

1496.9
1501.3
1499.0

1499.0

1496.9
U/S GLACIES (1V:1H)
1499.0

1496.9
1499.0

ROSHI KHOLA

18.0
13.2 5.3

0.6 GABION PROTECTION WORKS

DIVIDEWALL
2.5

UNDERSLUICE
C 2.5
D 0.6
B B
3.

6.1 12.4 12.5 6.2


5

F
2.2 0.6 E ESCAPE
1.
0

C ESCAPE FLUSHING CHANNEL


1.
5

D
INTAKE GATE AXIS
E PRE-HEADRACE CANAL (42 m )
5.0
0.3 GRAVEL TRAP F

ALL DIMENSIONS ARE IN M.

TRIBHUWAN UNIVERSITY
PROJECT NAME: TITLE : ARRANGEMENT OF HEADWORK COMPONENTS
CHECKED BY:

INSTITUTE OF ENGINEERING 6
A PREFEASIBILITY STUDY OF ROSHI KHOLA HYDROPOWER
PULCHOWK CAMPUS PROJECT SCALE : 1:200
HFL

NWL

ESCAPE SPILLWAY

1499.7

RCC

BOULDER PACKING

EXISTING GROUND

1H:2V

RCC

BOULDER PACKING
ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


G
L IN
N E SH
AN LU
CH LT F
B C

SI
16.2 32.5

0.3

3.6
A INLET TRANSITION
A
2.1

2.5
FLOW
1499.2
1498.5

0.3

3.6
SLOPE
0.3

1:5

7.5

B C

PLAN
0.5

FREEBOARD
1500.7
1.1

1499.2

1.2
SLOPE 1:2
SLOPE 1:50
0.3

SEDIMENT FLUSHING

0.4
M20 PCC
CHANNEL

SECTION AT A-A

ALL DIMENSIONS ARE IN METER

TRIBHUWAN UNIVERSITY
PROJECT NAME: TITLE : SETTLING BASIN (PLAN & SECTION) DATE : OCTOBER-2016 CHECKED BY: SHEET NO. :
INSTITUTE OF ENGINEERING 9/A
A PREFEASIBILITY STUDY OF ROSHI KHOLA HYDROPOWER
PULCHOWK CAMPUS PROJECT
ROLL NO. : 069/BCE/(049/059/066/088/175/186) SCALE : 1 : 200
GL 1502.6m

0.3 0.3 0.3


1500.7 0.3
0.3
FSL 1500.7

GL1500.7 FSL

2.8
3.600 3.600

0.3
3.9 3.9

0.3
M20 RCC WALL
SECTION AT B-B M20 PCC

SECTION AT C-C

ALL DIMENSIONS ARE IN METER

TRIBHUWAN UNIVERSITY
PROJECT NAME: TITLE : SETTLING BASIN CROSS SECTION DATE : OCTOBER-2016 CHECKED BY: SHEET NO. :
INSTITUTE OF ENGINEERING 9/B
A PREFEASIBILITY STUDY OF ROSHI KHOLA HYDROPOWER
PULCHOWK CAMPUS PROJECT
ROLL NO. : 069/BCE/(049/059/066/088/175/186) SCALE : 1 : 100
ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


C

SPILL CANAL

C
3.
00
0

0.300
B 0.300
10.000 GL 1496.1

WHEEL
VALVE

0.600
SPILL TANK

1.500
12.000

SPILLWAY 0.250 0.400 0.300 Ø SILT 3.000


CREST FLUSHING PIPE
3.000 1.1Ø PENSTOCK
PIPE

A 0.250
1.000
A
1.250

2.500
0.200

7.000

3.500

1.800
FLOW

0.250 0.900

2.000
0.150 Ø AIR
1493.888 VENT
SECTION AT C-C
WHEEL
VALVE
0.150
(SCALE : 1:50)
12.500 0.250

PLAN (SCALE 1:200)

13.500 10.000 1.000 0.250 0.250


FOREBAY
1500.096
1.000

1499.096 CANAL
FREEBOARD
FREEBOARD 0.300

1497.896 0.150Ø
1499.096 SPILLWATER
SLOPE AIR VENT
0.400
1:5
3.000 1496.388
1496.096 SLOPE 1:50 TRASH CL OF

4.000
RACK PENSTOCK
1495.305 1497.596
1.664
2.200
2.000

12.000

1493.888

1.500
0.150

0.150 300Ø SILT 1.1Ø PENSTOCK


FLUSHING
PIPE 1.000
1.300
PIPE 1496.096
WHEEL
VALVE 0.100
0.400 7.000 1.500 0.400

SECTION AT A-A
(SCALE 1:200)
SECTION AT B-B
(SCALE 1:100)

ALL DIMENSIONS ARE IN METER

TRIBHUWAN UNIVERSITY
PROJECT NAME: TITLE : FOREBAY (PLAN AND SECTIONS) DATE : OCTOBER-2016 CHECKED BY: SHEET NO. :
INSTITUTE OF ENGINEERING 11
A PREFEASIBILITY STUDY OF ROSHI KHOLA HYDROPOWER
PULCHOWK CAMPUS PROJECT
ROLL NO. : 069/BCE/(049/059/066/088/175/186) SCALE : AS SPECIFIED
ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


B

4.0 1.1Ø PENSTOCK


PIPE

1.0
A A

1.0
2.0

PLAN

ANCHOR BLOCK AT
CH:-0 + 212.59 M

2.0 2.0
1.1Ø PENSTOCK
PIPE
0.7

44°

1.1Ø PENSTOCK
PIPE

6.0
4.2

CL OF
PENSTOCK PIPE

0.2
3.0
M20 PCC 0.2
SECTION AT A-A M10 LEAN CONCRETE

SECTION AT B-B

ALL DIMENSIONS ARE IN METER

TRIBHUWAN UNIVERSITY
PROJECT NAME: TITLE : ANCHOR BLOCK(PLAN AND SECTION) DATE : OCTOBER-2016 CHECKED BY: SHEET NO. :
INSTITUTE OF ENGINEERING 13/A
A PREFEASIBILITY STUDY OF ROSHI KHOLA HYDROPOWER
PULCHOWK CAMPUS PROJECT
ROLL NO. : 069/BCE/(049/059/066/088/175/186) SCALE : 1 : 100
1.1Ø PENSTOCK
1.5 1.5 CL OF PIPE
PENSTOCK PIPE

0.6
0.6
A A B B

0.6
0.6
3.0

PLAN
PLAN
ANCHOR BLOCK AT ANCHOR BLOCK AT
CH:- 0+263.68 M CH:- 0+ 070 M

1.5

1.1Ø PENSTOCK
0.6

1.1Ø PENSTOCK PIPE


PIPE

0.6
0.6

2.1
3.3
0.2
M20 PCC

3.0 M10 LEAN CONCRETE

0.2 0.2 SECTION AT B-B


(SCALE 1:100)

SECTION AT A-A

ALL DIMENSIONS ARE IN METER

TRIBHUWAN UNIVERSITY
PROJECT NAME: TITLE : ANCHOR BLOCK (PLAN AND SECTION) DATE : OCTOBER-2016 CHECKED BY: SHEET NO. :
INSTITUTE OF ENGINEERING 13/B
A PREFEASIBILITY STUDY OF ROSHI KHOLA HYDROPOWER
PULCHOWK CAMPUS PROJECT
ROLL NO. : 069/BCE/(049/059/066/088/175/186) SCALE : 1 : 100
1.1Ø PENSTOCK 1.1Ø PENSTOCK
1.1Ø PENSTOCK
PIPE
PIPE

B 0.3 B
A 0.3 A

0.3 2.0
2.0

SUPPORT PIER PLAN SUPPORT PIER PLAN


(FOR PENSTOCK INCLINATION (FOR PENSTOCK INCLINATION
0F 44 DEGREE) 0F 5 DEGREE)

E
CK PIP
ENSTO
1.1Ø P

LATE
EAR P
T HICK W
20MM
CK PIPE
ENSTO
1.1Ø P
PLATE
WEAR
THICK
20MM
2.8


44°

0.360
2.0
2.0
M20 PCC

M10 LEAN CONCRETE


SUPPORT PIER
SUPPORT PIER SECTION AT B-B
SECTION AT A-A

ALL DIMENSIONS ARE IN METER

TRIBHUWAN UNIVERSITY
PROJECT NAME: TITLE : SUPPORT PIER (PLAN AND SECTIONS) DATE : OCTOBER-2016 CHECKED BY: SHEET NO. :
INSTITUTE OF ENGINEERING 13/C
A PREFEASIBILITY STUDY OF ROSHI KHOLA HYDROPOWER
PULCHOWK CAMPUS PROJECT
ROLL NO. : 069/BCE/(049/059/066/088/175/186) SCALE : 1 : 100
ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)


ALL DIMENSIONS ARE IN METER

DATE : OCTOBER-2016

ROLL NO. : 069/BCE/(049/059/066/088/175/186)