MIK-HSE

Date – 28-05-2022
Observation Location - R-070- R-369

CORRECTIVE ACTION PLAN

PROBLEM:

not applied correctly lifting plan procedure, need applied minimum of 5 hoist ropes are required.

DESIRED OUTCOME:

1- emphasize to comply lifting plan as procedure


2- all cran operators should be familiar with safety requirements and understand lifting plan requirements
3- All crane operators have to conduct daily checklist prior to lifting operation
4- if any confusion regarding the lifting plan crane operator should ask the supervisor

Sponsor:
Mik.co - supervisor will be available in site for supervision and monitoring all activates and always share any safety instructions related lifting plan

Plan/Training/
Responsible ISSUE Date Percent Complete
Task Monitoring CLOSE Date Comments
All crane operators
should attending TBT
daily safety meeting "TBT "before lifting MIK- supervisor DONE 25-05-2022 28-05-2022 100 %
Refresh training and
operation or before any task.
safety instructions will be
share
All crane operators
daily crane check list
should be familiar with
DONE 25-05-2022 28-05-2022 100 %
Crane operator check list and keep it as
well
MIK-HSE
Date – 28-05-2022
Observation Location - R-070- R-369

All crane operators should have certified as


ROO requirements MIK-HSE –
Done 25-05-2022 28-05-2022 100% Tracking Matrix training
SUPERVISOR

All crane operators should have DDT.SF as MIK-HSE –


Done 25-05-2022 28-05-2022 100% Tracking Matrix training
ROO requirements SUPERVISOR