Work (PROJECT):
RISK ANALYSIS
Contractor (COMPANY):
Transaction details
Location:Area 6
Start date: 23/03/2022 Duration: 6 months Workforce: 20
Permit Knowledge
Permit Permit of consignment underground
Inspection Permit Fire permit
Permit of deposit to penetrate / deconsignment networks
Carried out? search required? required?
lifting? required? required? required? Controlled?
Prepared by:(Executing Entity) Verified by: (Responsible Technical/Direction Approved by: (Safety Coordinator) OSH tkIS
Work)
Data: ____/____/____ Date: ____/____/____ Name and Visa :
Data: ____/____/____
This document is associated with METHOD STATEMENT No. 4G1. TD01/B REVISION N°0
pagina 1 of 6
Risk Assessment
Work (PROJECT):
RISK ANALYSIS
Contractor (COMPANY):
pagina 2 of 6
Risk Assessment
Work (PROJECT):
RISK ANALYSIS
Contractor (COMPANY):
of Secil;
All equipment is checked according to DL 50/2005;
Drivers must strictly comply with internal traffic rules in Secil;
Stabilise the multifunction/telescopic stacker/crane taking into account the route to
be carried out during the handling of loads, and ensure that the support structure
has the necessary resistance;
Never start a lifting operation without checking that you have the stabilizer arms
open and properly levelled;
Ensure the positioning of the equipment in relation to the execution of the task, in a
safe way, preventing the collision with existing structures or workers;
Use of signaller for execution of maneuvers, and use of radio in the coordination
pagina 3 of 6
Risk Assessment
Work (PROJECT):
RISK ANALYSIS
Contractor (COMPANY):
The entire area corresponding to the radius of action where the load will pass must
be sealed/flagged. In this impossibility, to place a person with signaller functions to
swipe and prevent the passage of people.
Hooks have to have safety tabs;
It is forbidden to remain or pass under the suspended loads and the signaling
tape;
Check the safety tabs of the chains to be used and ensure that the load is packed
and secured before lifting;
In the unloading operation, only two employees will be allowed on top of the truck
pagina 4 of 6
Risk Assessment
Work (PROJECT):
RISK ANALYSIS
Contractor (COMPANY):
pagina 5 of 6
Risk Assessment
Work (PROJECT):
RISK ANALYSIS
Contractor (COMPANY):
pagina 6 of 6