2*(0.470+0.154+0.08)*2= 2.816
STIRRUPS 8 3.784 17 3 0.395 76.22868
(0.22+0.184+0.08)*2=0.968
2*(0.420+0.154+0.08)*2= 2.616
STIRRUPS 8 3.536 17 1 0.395 23.74424
(0.22+0.160+0.08)*2=0.92
3 B-63 A (250X450)
TOP ALTH 16 6.48 2 1.58 20.4768 6480=(5580+450+450)
TOP ALTH 12 6.48 1 0.89 5.7672 6480=(5580+450+450)
BOTTOM ALTH 20 6.48 3 2.469 47.99736 6480=(5580+450+450)
1.36=(0.2+0.4)*2+0.08+0.08
G 8 1.36 44 0.39 23.3376 6456/150=43+1=44
STIRRUPS
TOTAL= 97.57896
4 B-112 (250X450)
TOP ALTH 25 5.215 1 3.858 20.11947 5.215=(4415+400+400)
16 5.215 2 1.58 16.4794 5.215=(4415+400+400)
EXTRA TOP C-11 25 1.8 1 3.858 6.9444 1800=(1400+400)
EXTRA TOP C-12 25 1.8 1 3.858 6.9444 1800=(1400+400)
BOTTOM ALTH 25 5.215 3 3.858 60.35841 5.215=(4415+400+400)
16 5.215 2 1.58 16.4794 5.215=(4415+400+400)
EXTRA BOTTOM 25 2.93 1 3.858 11.30394 2.93
1.46=(0.2+0.45)*2+0.08+0.08
E 8 1.46 29 0.39 16.5126
STIRRUPS 3915/140=28+1=29
TOTAL= 155.14202
5 B-73 (200X300)
TOP ALTH 12 2.35 2 0.89 4.183 2350=(1850+250+250)
BOTTOM ALTH 12 2.35 2 0.89 4.183 2350=(1850+250+250)
0.96=(0.15+0.25)*2+0.08+0.08
C 8 0.96 15 0.39 5.616
STIRRUPS 1400/100=14+1=15
TOTAL= 13.982
6 B-42-52 (300X550)
TOP ALTH 20 8.3 3 2.469 61.4781 8.3=(7.3+0.5+0.5)
EXTRA C5 20 2.3 1 3.858 8.8734 (1.3+1.0)=2.3
EXTRA C6 20 5.29 2 2.469 26.12202 5.290=(1.1+3.69+0.5)
BOTTOM ALTH 20 8.3 3 2.469 61.4781 8.3=(7.3+0.5+0.5)
EXTRA C-6 16 5.29 1 2.469 13.06101 5.290=(1.1+3.69+0.5)
1.66=(0.25+0.5)*2+0.08+0.08
J STIRRUPS 8 1.66 37 0.39 23.9538
6540/180=36.33+1=37
TOTAL= 194.96643
7 B-12-22 (250X450)
TOP ALTH 16 8.09 2 1.58 25.5644 8090=(7290+400+400)
EXTRA TOP C-1 16 1.6 2 1.58 5.056 1600=(1200+400)
EXTRA TOP C-2 16 2.2 2 1.58 6.952 2200=(1100+1100)
EXTRA TOP C-3 20 1.6 2 2.469 7.9008 1600=(1200+400)
BOTTOM ALTH 16 8.09 2 1.58 25.5644 8090=(7290+400+400)
EXTRA BOTTOM SPAN UNDER C1-12 16 2.435 1 1.58 3.8473 2435
EXTRA BOTTOM SPAN UNDER C2-C3 16 2.535 2 1.58 8.0106 2535
1.36=(0.2+0.4)*2+0.08+0.08
J STIRRUPS 8 1.36 48 0.39 25.4592
6590/140=47+1=48
TOTAL= 108.3547
8 B-102 (250X450)
TOP ALTH 25 3.925 3 3.858 45.42795 3925=(3125+400+400)
EXTRA TOP C-11 25 1.7 1 3.858 6.5586 1700=(1300+400)
EXTRA TOP C-12 25 1.7 1 3.858 6.5586 1700=(1300+400)
BOTTOM ALTH 20 3.925 3 2.469 29.072475 3925=(3125+400+400)
E EXTRA BOTTOM SPAN 20 2.05 3 2.469 15.18435 2050
1.36=(0.2+0.4)*2+0.08+0.08
8 1.36 23 0.39
STIRRUPS 12.1992 2625/120=22+1=23
TOTAL= 115.001175
9 B-74 (200X300)
TOP ALTH 12 2.35 2 0.89 4.183 2.35=(2.100+0.25)
BOTTOM (SUPPORT & SPAN) 12 2.35 2 0.89 4.183 2.35=(2.100+0.25)
EXTRA BOTTOM 20 0.85 2 2.469 4.1973 0.85
0.61=(0.2+0.25)*2+0.08+0.08
8 0.61 13 0.39 1175/100=12+1=13
STIRRUPS 3.0927
TOTAL= 15.656
10 B-84 (250X250)
TOP ALTH 12 5.012 3 0.89 13.38204 5015=(4415+300+300)
BOTTOM ALTH 16 5.012 4 1.58 31.67584 5015=(4415+300+300)
0.96=(0.2+0.2)*2+0.08+0.08
8 0.96 15 0.39
STIRRUPS 5.616 1649/120=13.74+1=15
TOTAL= 50.67388
12 B-11-41-71 (250X500)
TOP ALTH 20 18.806 2 2.469 92.864028 8090=(17956-50+450+450)
EXTRA TOP C-1 25 2.425 2 3.858 18.7113 2.425=(1975+405)
EXTRA TOP C-4 25 3.5 2 3.858 27.006 3500=(1800+1700)
EXTRA TOP C-7 25 3.7 2 3.858 28.5492 3700=(2000+1700)
EXTRA TOP C-10 25 2.65 2 3.858 20.4474 2650=(2200+450)
BOTTOM ALTH 16 18.806 2 1.58 59.42696 8090=(17956-50+450+450)
EXTRA BOTTOM APAN C-1 C-4 16 3.95 2 1.58 12.482 3950
EXTRA BOTTOM APAN C-4 C-7 20 3.8 2 2.469 18.7644 3800
EXTRA BOTTOM APAN C-4 C-7 12 3.8 1 0.89 3.382 3801
EXTRA BOTTOM APAN C-7 C-8 20 4.495 1 2.469 11.098155 4495
1.46=(0.2+0.45)*2+0.08+0.08 17956-
STIRRUPS 8 0.86 108 0.39 36.2232
(450-500-500-500)/100=107+1=108
TOTAL= 328.954643
13 B-81 (300X600) B-63 (250X500)
TOP 16 14.634 2 1.58 46.24344 (2.78+10.154+0.8+0.45+0.45)=14.634
20 15.031 1 3.858 57.989598 (9.231+3.9+1.0+0.45+0.45)=15.031
14 B-24 (250X300)
TOP ALTH 12 4.34 2 0.89 7.7252 4.340=(3.840+0.25+0.25)
BOTTOM ALTH 12 4.34 2 0.89 7.7252 4.340=(3.840+0.25+0.25)
EXTRA BOTTOM 12 2.53 2 0.89 4.5034 2.53
1.06=(0.2+0.25)*2+0.08+0.08
8 0.61 34 0.39
STIRRUPS 8.0886 3340/100=33+1=34
TOTAL= 28.0424
15 B-14 (250X350)
TOP ALTH 12 4.2 2 0.89 7.476 4200=(3700+250+250)
BOTTOM ALTH 12 2.79 2 0.89 4.9662 4200=(3700+250+250)
EXTRA BOTTOM SPAN 20 2.435 2 2.469 12.02403 2435
1.16=(0.2+0.3)*2+0.08+0.08
8 0.96 33 0.39 12.3552
STIRRUPS 3200/100=32+1=33
TOTAL= 36.82143
16 B-23 (250X200)
TOP ALTH 12 2.01 2 0.89 3.5778 2010=(1710+150+150)
BOTTOM ALTH 12 2.01 2 0.89 3.5778 2010=(1710+150+150)
0.86=(0.2+0.15)*2+0.08+0.08
8 0.86 13 0.39 4.3602
STIRRUPS 1213/100=12+1=13
TOTAL= 11.5158
17 B-31-61-91 (250X500)
TOP ALTH 20 18.806 2 2.469 92.864028 8090=(17956-50+450+450)
EXTRA TOP C-3 25 2.425 2 3.858 18.7113 2.425=(1975+450)
EXTRA TOP C-6 25 3.5 2 3.858 27.006 3500=(1800+1700)
EXTRA TOP C-9 25 3.7 2 3.858 28.5492 3700=(2000+1700)
EXTRA TOP C-12 25 2.65 2 3.858 20.4474 2650=(2200+450)
EXTRA TOP C-12 16 2.65 1 1.58 4.187 2650=(2200+450)
BOTTOM ALTH 16 18.806 1 1.58 29.71348 8090=(17956-50+450+450)
BOTTOM ALTH 20 18.806 2 2.469 92.864028 8090=(17956-50+450+450)
EXTRA BOTTOM APAN C-3 C-6 16 3.95 1 1.58 6.241 3950
EXTRA BOTTOM APAN C-9 C-12 16 4.495 1 2.469 11.098155 4495
1.46=(0.2+0.45)*2+0.08+0.08 17956-
STIRRUPS 8 0.86 109 0.39 36.5586
(450-450-500-300)/100=108+1=109
TOTAL= 368.240191
G.TOTAL= 2376.17771
THIRED FLOOR ROOF SLAB
SL. NO. Description of item Dia. Of bar Shape of bar Total length No. of wt. (kg-m) Total in(Kg) Remarks
(mm) (IN M) bar.
1150-25*2+50*2=1200
1 RCC SLAB BOTTOM MAIN (S1) 8 110 C/C 1.2 30 0.395 14.22
3225/110=29.31+1=30
3725-25*2+50*2=3775
RCC SLAB BOTTOM BINDER (S1) 8 225 C/C 3.775 4 0.395 5.9645
650/225=2.8+1=4
2 RCC SLAB BOTTOM MAIN (S2) 10 110 C/C 3.915 38 0.617 91.79109 3865-25*2+50*2=3915
4112/110=37.38+1=38
RCC SLAB BOTTOM BINDER (S2) 10 140 C/C 4.662 25 0.617 71.91135 4612-25*2+50*2=4662
3340/140=24+1=25
3725-25*2+50*2=3775
2 RCC SLAB BOTTOM MAIN (S3) 10 110 C/C 1.775 44 0.617 48.1877
4675/110=42.5+1=44
5225-25*2+50*2=5275
RCC SLAB BOTTOM BINDER (S3) 10 125 C/C 4.675 24 0.617 69.2274
3225/140=23+1=24
1763-25*2+50*2=1.813
4 RCC SLAB BOTTOM MAIN (S4,S5) 8 120 C/C 1.763 29 0.395 20.195165
3340/120=28+1=29
3890-25*2+50*2=3.94
RCC SLAB BOTTOM BINDER (S4,S5) 8 225 C/C 3.94 9 0.395 14.0067
1213/150=88+1=9
3150-25*2+50*2=3200
5 RCC SLAB BOTTOM MAIN (S6) 10 110 C/C 3.2 47 0.617 92.7968
5031/110=46+1=47
5631-25*2+50*2=5681
RCC SLAB BOTTOM BINDER (S6) 10 140 C/C 5.681 20 0.617 70.10354
2650/140=19+1=20
3150-25*2+50*2=3200
6 RCC SLAB BOTTOM MAIN (S7) 10 110 C/C 3.2 47 0.617 92.7968
5031/110=46+1=47
5631-25*2+50*2=5681
RCC SLAB BOTTOM BINDER (S7) 10 140 C/C 5.681 20 0.617 70.10354
2650/140=19+1=20
1550-25*2+50*2=1600
7 RCC SLAB BOTTOM MAIN (S8) 8 110 C/C 1.6 47 0.617 46.3984
5031/110=46+1=47
5631-25*2+50*2=5681
RCC SLAB BOTTOM BINDER (S8) 8 225 C/C 5.681 6 0.395 13.46397
1050/225=5+1=6
1900-25*2+50*2=1950
8 RCC SLAB BOTTOM MAIN (S9) 8 110 C/C 1.95 11 0.617 13.23465
1125/110=10+1=11
1675-25*2+50*2=1725
RCC SLAB BOTTOM BINDER (S9) 8 110 C/C 1.725 13 0.617 13.836225
1350/110=12+1=13
1800-25*2+50*2=1850
9 RCC SLAB BOTTOM MAIN (S10) 8 110 C/C 1.85 37 0.395 27.03775
3915/110=36+1=37
4465-25*2+50*2=4515
RCC SLAB BOTTOM MAIN (S10) 8 225 C/C 4.515 7 0.395 12.483975
1250/225=6+1=7
4465-25*2+50*2=4515
10 RCC SLAB BOTTOM MAIN (S11) 10 110 C/C 4.515 44 0.617 122.57322
4750/110=43+1=44
5250-25*2+50*2=5300
RCC SLAB BOTTOM MAIN (S11) 10 125 C/C 5.3 32 0.617 104.6432
3915/125=31+1=32
(1618+2896)=4514/200=23+1=24 NOS
B BINDER AT BOTTOM BAR 8 200MM C/C 1.32 24 0.395 12.5136
2316=(1766+500)+50
C TOP BAR AT S.F 10 100MM C/C 2.316 14 0.617 20.0056 (1350-30)=1330/100=11+1=12 NOS
1766/200=9+1=10 NOS
D BINDER AT TOP BAR AT S.F 8 200MM C/C 1.32 10 0.395 5.214
1406=(906+500)
E EXTRA TOP AT S.F 10 100MM C/C 1.406 14 0.617 12.145 (1350-30)=1330/100=11+1=12 NOS
906/200=5+1=6 NOS
F BINDER AT TOP BAR AT S.F 8 200MM C/C 1.32 6 0.395 3.1284
2228=(1272+906)+50
G TOP BAR AT 1 ST LANDING 10 100MM C/C 2.228 14 0.617 19.2455
(1272+906)=2178/200=11+1=12 NOS
H BINDER AT BOTTOM BAR 8 200MM C/C 1.32 12 0.395 6.2568
1970=(1420+500)+50
I BOTTOM BAR AT 1ST LANDING 10 100MM C/C 1.97 14 0.617 17.0169
1420/200=7+1=8 NOS
J BINDER AT BOTTOM BAR 8 200MM C/C 1.32 8 0.395 4.1712
5014=(1568+2896+0.5)+50
A MAIN BOTTOM BAR 1ST LANDING TO 3RD FLOOR 10 100MM C/C 5.014 14 0.617 43.3109 (1350-30)=1320/100=13+1=12 NOS
(1568+2896)=4464/200=22+1=23 NOS
B BINDER AT BOTTOM BAR 8 200MM C/C 1.32 23 0.395 11.9922
C TOP BAR AT 1ST LANDING 10 100MM C/C 2.265 14 0.617 19.5651 2265=(1715+500)+50
1715/200=9+1=10 NOS
D BINDER AT TOP BAR AT 1ST LANDING 8 200MM C/C 1.32 10 0.395 5.214
1406=(906+500)
E EXTRA TOP AT 1ST LANDING 10 100MM C/C 1.406 14 0.617 12.145 (1350-30)=1320/100=11+1=12 NOS
F BINDER AT TOP BAR AT 3RD.F 8 200MM C/C 1.32 6 0.395 3.1284 906/200=5+1=6 NOS
G TOP BAR AT 3RD FLOOR 10 100MM C/C 2.278 14 0.617 19.6774 2278=(1322+906)+50
(1322+906)=2228/200=11+1=12 NOS
H BINDER AT BOTTOM BAR 8 200MM C/C 1.32 12 0.395 6.2568
I BOTTOM BAR AT 3RD FLOOR 10 100MM C/C 1.872 14 0.617 16.1703 1872=(1322+500)+50
J BINDER AT BOTTOM BAR 8 200MM C/C 1.32 8 0.395 4.1712 1322/200=7+1=8 NOS
TOTAL= 285.071
THIRED FLOOR
8 10 12 16
10 8 COLUMN 281.6 4 14
SLAB
STAIR 191.16 62 BEAM 750 1700 9 13
LIFT 165 173.8 STAIR 68.2 210.276
TOTAL= 356.16 235.8 LIFT 191.18 181.5
SCRAP 391.776 259.38
1290.98 2091.776 13 27
2351.776
OR
20 25 NO CUTTING 16 12
4 C1,3 2 4 6
3 4 4 2
33 9 C2,10,12
C4,C6 2 4 4 4
C7C9C11 3 4 4
C5 1 4 8
37 9 C8 1 4 4
12 10.68 4 42.72
16 18.96 14 265.44 12 10.68 9 96.12
20 29.628 4 118.512 16 18.96 13 246.48
25 46.296 0 0 20 29.628 33 977.724
426.672 25 46.296 9 416.664
1736.988
12 10.68
16 18.96
20 29.628
25 46.296
20 16 12 20
3 0 0
3 1.5 0
2 2 0
4 3 0 3
2 0 0
4 1 0 1
14 3.5 4