INSPECTION REPORT
WORK TYPE: Motor Operating Mechanism made out of 2 MM MS Sheet

PARTY NAME: Electrical and Allied Industries INVOICE NO & DATE: 0047 DT: 25/01/2022
PO NO: By mail PO QTY & DATE: 2 NOS 10/01/2022
DRAWING REF. NO: MOM/POP/21-22/001 TESTING QTY & DATE: 2 NOS Dt: 25/01/2022
ELECTRICAL INTERLOCK: YES INSTRUMENT 1: MULTIMETER
CASTLE KEY: YES INSTRUMENT 2: CLAMP METER
CUBICAL: MS SIZE: 2.0 MM INSTRUMENT 3: HV TESTER
AUXILIARY SWITCH: 10 NO + 10 NC INSTRUMENT 4: VERIAC
Visual Inspection Result
Item: Motor Operated Isolator Switch (Made of MS) Check & Found OK
Finishing: Powder Coating (IS631) Check & Found OK
Connection: As per Drawing Check & Found OK
Gear Mechanism: Play In Motion: OK | Greasing: OK Check & Found OK
Name Plate Detail: NA NA
Dimensional Inspection
Item Dimension: 565 W X 500 H X 325 D Check & Found OK
Actual Dimension: 566 W X 501 H X 326 D Check & Found OK
Flange Dimension: 160 DIA PCD 127 MM θ18 X 12 Check & Found OK
Mechanical Testing
Gear ratio verification & 700:1 Check & Found OK
Alignment
Handle insertions (30 31 MM Check & Found OK
mm Min.)
Operation Test: Result Annexure-I Check & Found OK
Electrical Testing
Operation: Result Annexure-I
Wire Gauge: 2.5 Sq.mm 1100V Flexible Cable Check & Found OK
Continuity Test: Result Annexure-I Check & Found OK
Auxiliary Check: Result Annexure-I Check & Found OK
Solenoid Check: Result Annexure-I Check & Found OK
Rating: As per Follows Check & Found OK
i) Control Voltage : 110 VDC
ii) Solenoid Coil : 110 VDC
2 kV Test: With Stood 2 kV Test Check & Found OK
Circuit Diagram: As per Drawing Check & Found OK
Earthling: As per Drawing Check & Found OK

TESTING RESULTS 10 NO + 10 NC
ANNEXURE-I

Sr.No. Manual Electrical Continuity Continuity Auxiliary Solenoid Condition


Operation Operation Test O/C Test MBB Check Check
1 PASS PASS PASS PASS OK 110 VDC WORKING
2 PASS PASS PASS PASS OK 110 VDC WORKING
REMARK: Visual, Dimensionally, Mechanically, Electrically & finishing wise material is checked & tested found OK.
MECHANICAL, VISUAL, DIMENSIONAL & PROCESS INSPECTED BY: Mr. DARSHAN
ELECTRICAL INSPECTED BY: Mr. DHRUV
.