You are on page 1of 9

PAGE:

METHOD STATEMENT FOR MECHANICAL WORK


REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)

REVISED (3) ITEM DRAWING LIST

APPROVED DATE

METHOD OF STEAM PIPING

00 - DRAWING LIST

01 - PROCESS FOR WELDING PIPING / QUI TRÌNH HÀN ỐNG

02 - INSTALLATION BRANCH PIPING METHOD / LẮP ĐẶT ỐNG NHÁNH

03 - PIPE HANGER AND SUPPORT METHOD / HỆ GIÁ ĐỠ ỐNG

04 - EXPANSION JOIN INSTALLATION METHOD / LẮP ĐẶT KHỚP GIÃN NỞ

05 - PRESSURE IN PIPE TEST METHOD / BIỆN PHÁP THỬ ÁP LỰC ỐNG

06 - FLUSHING PIPE METHOD AND STEAM TRAP INSTALLATION / XÚC XẢ ỐNG VÀ LẮP NGĂN HƠI

07 - ECCENTRIC REDUCER & BRANCH OF STEAM PIPE / GIẢM LỆCH TÂM VÀ ỐNG NHÁNH

08 - STEAM OFF-TAKE OF STEAM PIPE / LẤY HƠI TỪ PHÍA TRÊN ỐNG


PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)

REVISED (3) ITEM PROCESS FOR WELDING PIPING

APPROVED DATE

BUTT WELDING GROOVE SPEC.

Pipe Size Groove Type Layer Welding Rod Welding Rod Type

<=65A 1 Layer Ø3.2

80A > 1 Layer Ø3.2


=

AWS, E-6013
100A > 1 Layer Ø3.2
=

125A > 1 Layer Ø4.0


=

> 150A > 2 Layer Ø4.0


=

Butt Welding Type


PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)

REVISED (3) ITEM INSTALLATION BRANCH PIPING METHOD

APPROVED DATE

1. DO
CONNECT TO
BRANCH PIPE

D3 GO UP
L ≥150mm L ≥2D1

D1
D2 BOTTOM OF PIPE

2. DON'T

D1
D2 BOTTOM OF PIPE

D3
GO DOWN

CONNECT TO
BRANCH PIPE
PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)

REVISED (3) ITEM PIPE HANGER AND SUPPORT METHOD

APPROVED DATE

HANGER ROD STEAM SUPPLY PIPE

ROLLER

ANGLE STEEL DOUBLE BOLT AND NUTS


PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)

REVISED (3) ITEM EXPANSION JOIN INSTALLATION METHOD

APPROVED DATE

FIX POINT

L L

L1 ≤ 4D A
L1 ≤ 4D

FIX POINT ROLLER ROLLER EXPANSION JOIN ROLLER ROLLER FIX POINT
WELDING PIPE TO SUPPORT

EXPANSION JOIN
STEAM PIPING

ROLLER

BOLT&NUT

JACKET

BEAM
U-STELL

SECTION A-A

NOTE:

L (DISTANCE) : DEPEND ON VAPOUR TEMPERATURE, MATERIAL.


PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)

REVISED (3) ITEM PRESSURE IN PIPE TEST METHOD

APPROVED DATE

END FLANGE

VALVE 1

DESCRIPTION KIND OF PIPE SUBTANCE USED PRESSURE TEST HOLDING TIME

2 TIMES WORKING
STEAM SEAMLESS PIPE NITROGEN PRESSURE 24 HOUR
MINIMUM : 1.6Mpa

N2
CYLINDER
1. FILL COMPRESSED AIR INTO PIPING ABOUT 8KG/CM2 AND KEEP 05MIN
2. CONTINUED ADD NITOGEND INTO PIPING UNTIL PRESSURE
GAUGE INDICATE AT PRESSURE TEST (2 WORKING PRESSURE)
3. CHECK PIPELINE DURING TESTING, IF PRESSURE DOWN, SHOULD BE TAKE OUT NITROGEN IN PIPELINE AND
PREPARATION IT. AFTER FINISH, WE CONTINUE TESTING FOLLOW ABOVE PROCESS
PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)
FLUSHING PIPE METHOD AND
REVISED (3) ITEM STEAM TRAP INSTALLATION

APPROVED DATE

BOILER
PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)

REVISED (3) ITEM ECCENTRIC REDUCER & BRANCH OF STEAM PIPE

APPROVED DATE
PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION

REVISED (2)

REVISED (3) ITEM STEAM OFF-TAKE OF STEAM PIPE

APPROVED DATE

You might also like