Professional Documents
Culture Documents
REVISED (2)
APPROVED DATE
00 - DRAWING LIST
06 - FLUSHING PIPE METHOD AND STEAM TRAP INSTALLATION / XÚC XẢ ỐNG VÀ LẮP NGĂN HƠI
07 - ECCENTRIC REDUCER & BRANCH OF STEAM PIPE / GIẢM LỆCH TÂM VÀ ỐNG NHÁNH
REVISED (2)
APPROVED DATE
Pipe Size Groove Type Layer Welding Rod Welding Rod Type
AWS, E-6013
100A > 1 Layer Ø3.2
=
REVISED (2)
APPROVED DATE
1. DO
CONNECT TO
BRANCH PIPE
D3 GO UP
L ≥150mm L ≥2D1
D1
D2 BOTTOM OF PIPE
2. DON'T
D1
D2 BOTTOM OF PIPE
D3
GO DOWN
CONNECT TO
BRANCH PIPE
PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION
REVISED (2)
APPROVED DATE
ROLLER
REVISED (2)
APPROVED DATE
FIX POINT
L L
L1 ≤ 4D A
L1 ≤ 4D
FIX POINT ROLLER ROLLER EXPANSION JOIN ROLLER ROLLER FIX POINT
WELDING PIPE TO SUPPORT
EXPANSION JOIN
STEAM PIPING
ROLLER
BOLT&NUT
JACKET
BEAM
U-STELL
SECTION A-A
NOTE:
REVISED (2)
APPROVED DATE
END FLANGE
VALVE 1
2 TIMES WORKING
STEAM SEAMLESS PIPE NITROGEN PRESSURE 24 HOUR
MINIMUM : 1.6Mpa
N2
CYLINDER
1. FILL COMPRESSED AIR INTO PIPING ABOUT 8KG/CM2 AND KEEP 05MIN
2. CONTINUED ADD NITOGEND INTO PIPING UNTIL PRESSURE
GAUGE INDICATE AT PRESSURE TEST (2 WORKING PRESSURE)
3. CHECK PIPELINE DURING TESTING, IF PRESSURE DOWN, SHOULD BE TAKE OUT NITROGEN IN PIPELINE AND
PREPARATION IT. AFTER FINISH, WE CONTINUE TESTING FOLLOW ABOVE PROCESS
PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION
REVISED (2)
FLUSHING PIPE METHOD AND
REVISED (3) ITEM STEAM TRAP INSTALLATION
APPROVED DATE
BOILER
PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION
REVISED (2)
APPROVED DATE
PAGE:
METHOD STATEMENT FOR MECHANICAL WORK
REVISED (1) CLAUSE METHOD OF STEAM PIPING APPLICATION
REVISED (2)
APPROVED DATE