Professional Documents
Culture Documents
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-
BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
1 Foundation Work
Site clearance including cutting and
removing bushes and roots etc. before and
1.1 after completion of work as directed by Sq.m 3,000.00 30.00 90,000.00 3,000.00 30.00 90,000.00 3,000.00 90,000.00 0.00 0.00
engineer.
BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Backfilling in layers in foundation pits,
trenches etc including compaction and
1.9 watering etc. all complete as per Cu.m 894.08 100.00 89,408.00 #REF! 100.00 #REF! 892.00 89199.60 #REF! #REF!
specification.(SP 900)
BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8 position etc. all complete as per specification set 196.00 5,000.00 980,000.00 28.00 5,000.00 140000.00 0.00 0.00 28.00 140,000.00
and drawing.(SS-2100)
BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Backfilling in layers in gabion wall, trenches
etc including compaction and watering
5.2 complete as per specification.[sp 900] Cu.m 600.00 100.00 60,000.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00
BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Provision of Demonstration of prestressing
6.5 process to Project Personnels. PS 1.00 100,000.00 100,000.00 0.00 100,000.00 0.00 0.00 0.00 0.00 0.00
8of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-
BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Load test of piles including installation of
6.6 platform, loading arrangements etc. and Nos. 8.00 132,000.00 1,056,000.00 8.00 132,000.00 1,056,000.00 8.00 1,056,000.00 0.00 0.00
necessary measurements & plotting
Decleration by Contractor : I/We get the payment as per above. Signature:- ………………………………………
Checklist
Variation required
###
Financed by: GON Date of Work Order : -2073/12/21
###
Name of Contractor: Sapana Nirman Sewa Pvt. Ltd. Hetauda-2 Completion Date after this Variation : 2077
Original Cost Estimate in NRs: (without VAT) 123,052,205.26 Increase or Decrease in Estimate wrt Original Cost, in NRs. -1.99%
Revised Cost Estimate (Till Date) in NRs.: (without VAT) 120,599,253.96 Percentage Increase of Decrease in Estimate:
Original Contract Amount in NRs.: (without VAT) 108,367,254.60 % age Increase or Decrease wrt Oringinal Contract Amount: -0.12%
Revised Contract Amount after this Variation in NRs.(without VAT) 108,236,469.43 Budgetary Provision for Increase works (GON): Yes/No
Location:Along Laxminiya-Karuniya-Matiyarba Sadak,Rauthat
Percentage Percentage
change in change in
Original Contract Amount in New Contract Amount after Amount wrt
S.N. DESCRIPTION UNIT Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. Quantity wrt Remarks
Nrs. Variation original
original Contract
quantity amount
1 Foundation Work Quantity Rate Amount Quantity Rate Amount Rate Amount Rate Amount
Site clearance including cutting and
removing bushes and roots etc. before
1.1 m3 1158.06 144.92 167825.33 2459.73 144.92 356464.07 112.40% 176.00 203817.68 176.00 432912.48 0.21%
and after completion of work as
directed by engineer.
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
1 Foundation works
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
For Right Abutment Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (6) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (5) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (4) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (2) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Left Abutment Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (3) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (1) Piles Cap 1.00 11.00 8.60 0.20 18.92
Deduction for piles area
For Right Abutment Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (6) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (5) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (4) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (2) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Left Abutment Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (3) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (1) Piles Cap 1.00 11.00 8.60 0.15 14.19
Deduction for piles area
Area= (3.14 x 0.80
For Left & Right Abutment -40.00 x0.80/4)=0.5024
0.15 -3.01
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
For Right Abutment Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (6) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (5) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (4) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (2) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Left Abutment Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (3) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (1) Piles Cap 1.00 11.00 8.60 1.80 170.28
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
38.40
For Pier (6) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
13.46
For Pier no 1 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48
13.46
Uptodate Quantity 403.63
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
2 Sub-Structural Work
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Bottom
Top area
area
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63
5=32.40
5=6.25
For Pier No. 01 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom
Top area
area
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63
5=32.40
5=6.25
Bearing Pedestal 4.00 1.20 1.20 0.30 1.73
Uptodate Quantity 294.68
Previous Quantity 289.04
In this Bill 5.64
Providing and laying reinforcement
Fe415/500 including cutting, bending,
2.3 binding, fixing in position etc. all complete as Mt No. L TL Wt./mtr. Quantity
per specification and drawing. (SS/SP-2000)
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Girder
Main Girder
End Block portion 2.00 2.10 0.75 2.50 7.88
End tappered portion
area=(0.50 x
Haunch portion 4.00 0.90 0.2 x 0.05
0.15)=0.015)
area=(2 x 0.5
Sloped portion 2.00 8.75 x 0.225 x 1.18
0.3)= 0.0675
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
area= 0.5 x
Outside the main girder (End portion) 4.00 (2.625+0.3) x 0.40 5.26
2.25 = 3.29
area= 0.5 x
Outside the main girder (Intermediate portion) 6.00 2.775 x 2.25 0.30 5.62
= 3.12
Sub-Total (cross girder) 26.78
Deck slab
Carriageway portion 1.00 35.00 5.75 0.30 60.38
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Girder
Main Girder
Vertical portion 4.00 2.10 2.50 21.00
End tappered portion
Tappered portion 4.00 0.90 2.35 8.46
Haunch portion 4.00 0.90 0.21 0.76
End straight portion
Sloped portion 4.00 6.35 0.25 6.35
vertical portion 4.00 6.35 0.30 7.62
4.00 6.35 1.85 46.99
Haunch portion 4.00 6.35 0.21 5.33
Intermediate main girder
Sloped portion 4.00 8.87 0.38 13.48
vertical portion 4.00 8.87 0.30 10.64
4.00 8.87 1.75 62.09
Haunch portion 4.00 8.87 0.34 12.06
Deduction for intersection of cross girder portion -2.00 0.40 0.75 -0.60
-3.00 0.30 0.75 -0.68
194.19
Sub-Total (for 2 nos. main girder) 2.00 388.38
Cross Girder
Between main girder (End portion)
Bottom portion 2.00 4.25 0.40 3.40
Vertical portion 4.00 4.25 2.20 37.40
Between main girder (Intermediate portion)
Bottom portion 3.00 4.25 0.30 3.83
Vertical portion 6.00 4.25 2.20 56.10
Outside the main girder (End portion)
area= 0.5 x
Face portion 8.00 (2.625+0.3) x 26.32
2.25 = 3.29
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20
6 Miscellaneous Work
Provide insurance of works, materials,
construction equipment and against accidents
6.1 to work person including third party LS 1.00 1.00
insturance as per General Conditions of
Contract clause 13 and Contract Data.
Engineer's Facilities: Establishment and
maintenance of facilities for Enginner Providing 2 nos. of Laptop (Dell i7) as per
6.2 including the cost of minor repair, telephone, PS the request of Road Division 1.00
electricity, securities guards etc and providing Chandranigahpur, Rautahat.
furniture and other facilities.
Construction of diversion works and
6.3 maintanance of diversion during bridge LS 0.90
construction as directed by Engineer
Providing and installation of bridge status of
6.4 size 1.5mx0.75m etc. all complete as directed LS 1.00 0.00
by engineers.
Load test of piles including installation of
6.6 platform, loading arrangements etc. and Nos. 8.00 8.00
necessary measurements & plotting
Remarks
Remarks
Remarks
Remarks
Remarks
Kg.
MT
Kg.
MT
Kg.
MT
Kg.
MT
Kg.
MT
Kg.
Remarks
MT
Remarks
Kg.
MT
Kg.
MT
Kg.
MT
Kg.
MT
Kg.
MT
Remarks
Kg.
MT
Kg.
MT
Kg.
MT
Kg.
Remarks
MT
Kg.
MT
Mt
Remarks
Remarks
Remarks
A=1/2*.4
*.4
A=1/2*.4
*.4
Qty.=
[A1+A2+S
qt(A1*A2)]
H/3
Qty.=
[A1+A2+S
qt(A1*A2)]
H/3
Qty.=
[A1+A2+S
qt(A1*A2)]
H/3
Qty.=
[A1+A2+S
qt(A1*A2)]
H/3
Remarks
Qty.=
[A1+A2+S
qt(A1*A2)]
H/3
Qty.=
[A1+A2+S
qt(A1*A2)]
H/3
Kg.
Mt.
Kg.
Mt.
Remarks
Kg.
Mt.
MT
Kg.
Mt.
MT
Kg.
Mt.
Remarks
Mt.
Kg.
Mt.
MT
Kg.
Mt.
MT
Remarks
Kg.
Mt.
Kg.
Mt.
Kg.
Mt.
MT
Remarks
Remarks
t=
(0.75+45)/2
Remarks
t=
(0.30+0.20)/
2
Remarks
Remarks
Remarks
Kg.
Mt.
Mt.
Mt.
Remarks
Remarks
For Left & Right Abutment Back wall 2.00 11.00 0.40 2.5 22
Haunch portion 2.00 11.00 0.25 0.25 1.375
2.00 11.00 area= 0.031 0.682
RCC Return wall bottom 4.00 3.00 2.50 0.40 12.00
Return wall triangle 4.00 Area= 3.75 0.40 6.00
Total = 316.68
Providing and placing machine mixed M25/20
cement concrete for the abutment stem
2.2 capconcrete pedestral etc including
compaction, curing, testing all complete as per
specification and drawing.(SS/Sp-2000) m3
For Abutment Cap 2.00 10.70 2.00 0.70 29.96
Haunch portion 2.00 10.70 0.08 1.71
For Piers Stem cap
Rectangular portion 6.00 7.20 4.50 0.80 155.52
105.44
Girder
Main Girder
Vertical portion 4.00 2.10 2.50 21.00
End tappered portion
Tappered portion 4.00 0.90 2.35 8.46
Haunch portion 4.00 0.90 0.21 0.76
End straight portion
Sloped portion 4.00 6.35 0.25 6.35
vertical portion 4.00 6.35 0.30 7.62
4.00 6.35 1.85 46.99
Haunch portion 4.00 6.35 0.21 5.33
Intermediate main girder
Sloped portion 4.00 8.87 0.38 13.48
vertical portion 4.00 8.87 0.30 10.64
4.00 8.87 1.75 62.09
Haunch portion 4.00 8.87 0.34 12.06
Deduction for intersection of cross girder
portion
-2.00 0.40 0.75 -0.60
-3.00 0.30 0.75 -0.68
194.19
Sub-Total (for 2 nos. main girder) 2.00 388.38
Cross Girder
Between main girder (End portion)
Bottom portion 2.00 4.25 0.40 3.40
Vertical portion 4.00 4.25 2.20 37.40
Between main girder (Intermediate portion)
Bottom portion 3.00 4.25 0.30 3.83
Vertical portion 6.00 4.25 2.20 56.10
Outside the main girder (End portion)
area= 0.5 x
Face portion 8.00 (2.625+0.3) x 26.32
2.25 = 3.29
Sloped portion 4.00 3.860 0.40 6.18
Outside the main girder (Intermediate portion)
area= 0.5 x
Face portion 12.00 2.775 x 2.25 = 37.44
3.12
Sloped portion 6.00 3.560 0.30 6.41
Sub-Total (cross girder) 177.07
Deck slab
Between main girder (end portion) 2.00 8.40 4.25 71.40
Between main girder (intermediate portion) 2.00 8.40 4.25 71.40
Outside main girder (end portion) 4.00 8.40 2.625 88.20
Outside main girder (intermediate portion) 4.00 8.40 2.625 88.20
Side face 2.00 35.00 0.20 14.00
Sub-Total (Deck slab) 333.20
Cantilever Slab Portion at Pier
Bottom portion 2.00 11.00 1.25 27.50
Side face 4.00 1.25 0.50 2.50
Sub-Total (At pier) 30.00
Railing Post
End Railing Post 4.00 0.80 1.00 3.20
Intermediate Railing Post 308.00 0.80 1.00 246.40
Sub-Total (Railing post) 249.60
autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE
Remarks
m3
m3
w=(6.4+1.9)/2
m3
Remarks
m3
kg
MTON
m2
m3
m3
A=1/2*.4*.4
Remarks
Qty.=
[A1+A2+Sq
t(A1*A2)]H/
3
m3
kg
Mton
m2
Remarks
Remarks
Remarks
Mt
Mt
Rm
Set
Remarks
Remarks
(3*1*0.5+3
*1*1+2*1*
1)
(3*1*0.5+2
*1*1+1*1*
1)
S.N. Description of Items Unit Quantity Rate, NRs. Amount, NRs. Remark
1 Foundation
Site clearance including cutting and removing
1.1 bushes
Earthworkandinroots etc. before
excavation and after completion
for foundationof structure Sq.m
of
in work as directed
all types by engineer.
of soil/rock including shoring, struting, 3000.00 11.17 33,510.00
bracing, dewatering and disposal with necessary
1.2 Cu.m
haulage and lift, all complete as per drawing, 3343.46 122.39 409,206.07
specification and instruction of Engineer. (SS/SP-
Boring,
900). Providing and Installing 800mm dia bored
cast-in-situ RCC pileof specified diameter
1.3 including Bentonite and excluding reinforcement Rm
and concrete as per specification and drawing etc.
all complete. (1600) 3520.00 7514.47 26,450,934.40
Providing and laying boulder soling in foundation
1.4 for abutment, pier and wing wall all complete Cu.m
(2400) 165.90 3065.10 508,512.35
Providing and placing machine mixed cement
concrete M15/40 for the foundation and footing
1.5 etc. including compaction, curing, testing etc. all Cu.m
complete as per specification and drawing.
(SS/SP-2000) 182.24 10360.82 1,888,197.28
Providing and placing machine mixed cement
concrete M20/20 for the abutment pile cap,
1.6 abutment piles etc. including compaction, curing, Cu.m
testing etc. all complete as per specification and
drawing. (SS/SP-2000) 3130.69 11810.43 36,974,771.48
Providing and laying reinforcement Fe415/500
including cutting, bending, binding, fixing in
1.7 Mt
position etc. all complete as per specification and
drawing. (SS/SP-2000) 403.83 125080.01 50,510,936.84
Providing,preparing and Installing formwork for
concrete works for foundation and substructure
1.8 including necessary supports and removing after Sq.m
completion for sub structure (Class F1 finish)
(SS/SP-1800). 611.52 823.83 503,788.52
Backfilling in layers in foundation pits, trenches
1.9 etc including compaction and watering etc. all Cu.m
complete as per specification.(SP 900) 947.20 553.63 524,396.12
Sub Total 1 117,804,253.06
2 Sub-Structural Work
Providing and placing machine mixed cement
concrete M20/20 for the abutment stem, pier
2.1 stem, stopper etc. including compaction curing, Cu.m
testing and lead 30m etc. all complete (SS/SP-
2000) 316.68 11810.43 3,740,119.41
Providing and placing machine mixed cement
concrete M25/20 for the abutment stem cap,
2.2 Concrete pedestral etc. including compaction, Cu.m
curing, testing etc. all complete as per
specification and drawing. (SS/SP-2000) 360.24 12601.44 4,539,523.83
S.N. Description of Items Unit Quantity Rate, NRs. Amount, NRs. Remark
Providing and laying reinforcement Fe415/500
including cutting, bending, binding, fixing in
2.3 Mt
position etc. all complete as per specification and
drawing. (SS/SP-2000) 123.82 125080.01 15,487,511.91
Providing, preparing and installing formworks for
abutment stem, back wall, return wall, stopper etc.
2.4 including necessary supports and removing after Sq.m
comletion etc. all complete as per specification
with F2 finish. (SS/SP-1800) 1102.36 823.83 908,153.94
Providing and Backfilling with graded filter
materials in layer with necessary watering and
2.5 Cu.m
compaction etc. all complete as per specification
and drawing. (SS/SP-2400, 3100) 44.02 1214.09 53,446.67
Providing, laying and fixing Geotextile (filter
2.6 fabrics) all complete as per specification. (SS/SP- Sq.m
2404,3110) 1661.28 242.62 403,059.75
Providing and laying Random Rubble masonry
works in cement sand mortar in 1:4 including
scaffolding, curing, preparing cement mortar for
2.7 Cu.m
construction of left and right wing walls all
complete manual mixing mortar 35 % (SS/SP-
2600)
286.39 8977.87 2,571,179.37
Sub Total 2 27,702,994.89
3 Super Structure Work
Providing and Installing M35/20 in precast RC
3.1 footpath slabs , parapet posts and their bases and Cu.m
road kerbs etc. all complete.(2000) 210.00 15345.24 3,222,500.40
Providing and placing machine mixed cement
concrete M45/20 for the superstructure, deck slab,
3.2 girder etc. including compaction, curing, testing Cu.m
and necessary drainage spout etc. and all
relavent lead all complete (SS/SP-2000) 1603.00 15622.51 25,042,883.53
Providing , Preparing and Installing Steel Forms
3.3 for Cast-In-Situ prestressing girder and removing Sq.m
after completion. (SS-1800) 370.02 342.61 126,772.55
Providing , Preparing and Installing Formwork for
Slab and X-beam structures and removing after
3.4 completion (falsework included) including Sq.m
necessary supports and removing after
completion for Superstructure. (SS-1800) 8247.74 823.83 6,794,733.50
Providing and laying Untensioned reinforcement
bars, HYSD, TMT, minimum 0.2% proof stress
3.5 500Mpa (Fe 500) including cutting, bending, Mt
binding, fixing in position etc. all complete as per
specification and drawing.(SS/PP-2000) 247.43 125080.01 30,948,780.77
S.N. Description of Items Unit Quantity Rate, NRs. Amount, NRs. Remark
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8 set
position etc. all complete as per specification and
drawing.(SS-2100) 196.00 5071.50 994,014.00
S.N. Description of Items Unit Quantity Rate, NRs. Amount, NRs. Remark
Formation of embankment through all types of soil
including compaction in layers and watering, all
5.3 Cu.m 4200.00 379.36 1,593,312.00
complete as per specification and drawing.(SS/SP
- 900)
6085.00 cu.m
WEST SIDE APPROACH ROAD FROM ch.0+000 to ch.0+900
\
chainage length(m) Top width Bottom wiAverage width height avg height volume(m3) Remarks
0+000 0 7.5 21.50 14.50 7.00 0.00
0+030 30 7.5 19.50 13.50 6.00 6.50 2632.50
0+060 30 7.5 17.50 12.50 5.00 5.50 2062.50
0+090 30 7.5 16.50 12.00 4.50 4.75 1710.00
0+120 30 7.5 14.50 11.00 3.50 4.00 1320.00
0+150 30 7.5 12.50 10.00 2.50 3.00 900.00
0+180 30 7.5 12.50 10.00 2.50 2.50 750.00
0+210 30 7.5 12.50 10.00 2.50 2.50 750.00
0+240 30 7.5 12.50 10.00 2.50 2.50 750.00
0+270 30 7.5 12.50 10.00 2.50 2.50 750.00
0+300 30 7.5 12.50 10.00 2.50 2.50 750.00
0+330 30 7.5 12.50 10.00 2.50 2.50 750.00
0+360 30 7.5 12.50 10.00 2.50 2.50 750.00
0+390 30 7.5 12.50 10.00 2.50 2.50 750.00
0+420 30 7.5 12.50 10.00 2.50 2.50 750.00
0+450 30 7.5 12.50 10.00 2.50 2.50 750.00
0+480 30 7.5 12.50 10.00 2.50 2.50 750.00
0+510 30 7.5 12.50 10.00 2.50 2.50 750.00
0+540 30 7.5 12.50 10.00 2.50 2.50 750.00
0+570 30 7.5 12.50 10.00 2.50 2.50 750.00
0+600 30 7.5 12.50 10.00 2.50 2.50 750.00
19875.00
Total 25960.00 cu.m
Approach Road
EASTSIDE APPROACH ROAD FROM ch.0+000 to ch.0+140
chainage length(m) Top widthheight volume(m3Remarks
0+000 0 7 0.20 0.00
0+030 30 7 0.20 42.00
0+060 30 7 0.20 42.00
0+090 30 7 0.20 42.00
0+120 30 7 0.20 42.00
0+140 20 7 0.20 28.00
196.00 cu.m
WEST SIDE APPROACH ROAD FROM ch.0+000 to ch.0+150
210.00
Total 406.00 cu.m
2 100 7 3 4200
2 100 7 3 4200
8400
(3*1*.5+2*
1*1+1*1*1
)
0
5.5 Supply and placing grass turfing on guide banks etc. all complete as per specification.
4 0
4 0
0
6 Miscellaneous Work
6.1 Provide insLS
6.2 Engineer's PS
6.3 ConstructioLS
6.4 Providing aLS
6.5 Provision oPS
7.1 Load test of piles including installation of platform, loading arrangements etc. and necessary measurements & plottin
7.2 Pile Integrity test of piles including of installation of platform etc and necessary measurements
essary measurements & plotting
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office, Itahari
Road Division Chandranigahpur
SUMMARY
S.No. Description Contract Amount Previous Bill Current Bill Upto Date Bill Remarks
Amount Amount Amount
A Total Value of Works with PS 198,246,313.12 129,185,540.00 8,529,040.88 137,714,580.88
B Total Value of Works without PS 197,646,313.12 128,685,540.00 8,529,040.88 137,214,580.88
C VAT @13% 25,694,020.71 16,729,120.20 1,108,775.31 17,837,895.51
D Grand Total With VAT & PS 223,940,333.83 145,914,660.20 9,637,816.20 155,552,476.39
Deduction
E Retention Money @ 5% of B 6,434,277.00 426,452.04 6,860,729.04
F Mobilization Advance - - -
G TDS @1.5% of B 1,930,283.10 127,935.61 2,058,218.71
H VAT @6.5% of B 8,364,560.10 554,387.66 8,918,947.76
I CAN Tax @ 0.1% of B 128,685.54 8,529.04 137,214.58
J Total Deduction 16,857,805.74 1,117,304.36 17,975,110.10
K Net Payble Amount 129,056,854.46 8,520,511.84 137,577,366.30
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office, Itahari
Road Division Chandranigahpur
Interim Payment Certificate No 09
Bill S.N. :- IPC 09 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Date of Work to be completed : 2076/09/28
Name of Work:- Construction of Prestressed R.C.C. T beam Due Date of Work to be completed : 2077/07/28
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Work Completion :- Running
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Date of Measurement:- 2077/07/15
Contract No.:- DROCNP/337157-4/073/74-36
As per BOQ Uptodate bill Previous Bill In this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
1 Foundation Work
1.1 Site clearance including cutting and removing bushes
and roots etc. before and after completion of work as
directed by engineer. Sq.m 3,000.00 30.00 90,000.00 3,000.00 30.00 90,000.00 3,000.00 90,000.00 - -
1.2 Earthwork in excavation for foundationof structure
in all types of soil/rock including shoring, struting,
bracing, dewatering and disposal with necessary
haulage and lift, all complete as per drawing,
specification and instruction of Engineer. (SS/SP-
900). Cu.m 3,343.46 500.00 1,671,730.00 2,790.70 500.00 1,395,350.00 2,790.70 1,395,350.00 - -
1.3 Boring, Providing and Installing 800mm dia bored
cast-in-situ RCC pileof specified diameter including
Bentonite and excluding reinforcement and concrete
as per specification and drawing etc. all complete.
(1600) Rm 3,520.00 5,000.00 17,600,000.00 3,520.00 5,000.00 17,600,000.00 3,520.00 17,600,000.00 - -
1.4 Providing and laying boulder soling in foundation
for abutment, pier and wing wall all complete (2400) Cu.m 165.90 2,500.00 414,760.00 135.28 2,500.00 338,208.00 135.28 338,208.00 - -
1.5 Providing and placing machine mixed cement
concrete M15/40 for the foundation and footing etc.
including compaction, curing, testing etc. all
complete as per specification and drawing. (SS/SP-
2000) Cu.m 182.24 8,000.00 1,457,952.00 101.46 8,000.00 811,699.20 101.46 811,699.20 - -
1.6 Providing and placing machine mixed cement
concrete M20/20 for the abutment pile cap, abutment
piles etc. including compaction, curing, testing etc.
all complete as per specification and drawing.
(SS/SP-2000) Cu.m 3,130.69 10,000.00 31,306,880.00 3,130.69 10,000.00 31,306,900.00 3,130.69 31,306,900.00 - -
1.7 Providing and laying reinforcement Fe415/500
including cutting, bending, binding, fixing in
position etc. all complete as per specification and
drawing. (SS/SP-2000) Mt 403.83 85,000.00 34,325,466.01 403.63 85,000.00 34,308,550.00 403.63 34,308,550.00 - -
1.8 Providing,preparing and Installing formwork for
concrete works for foundation and substructure
including necessary supports and removing after
completion for sub structure (Class F1 finish)
(SS/SP-1800). Sq.m 611.52 600.00 366,912.00 611.52 600.00 366,912.00 611.52 366,912.00 - -
1.9 Backfilling in layers in foundation pits, trenches etc
including compaction and watering etc. all complete
as per specification.(SP 900) Cu.m 947.20 100.00 94,719.60 892.00 100.00 89,199.60 892.00 89,199.60 - -
91 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09
92 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09
application in two coats in addition to one base coat. Sq.m 764.26 300.00 229,278.60 - 300.00 - - - - -
Sub Total 3 71,490,662.73 25,034,920.92 16,545,970.99 8,488,949.93
93 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09
94 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09
95 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09
Checked By : Approved By :
Post: Engineer Post: Division Chief
Signature of Contractor:-……………………………. Sub Engineer:-……………… Signature :- ………………………………. Signature :- ……………………………….
96 of 133
DROCNP/337157-4/073/74-36 MEASUREMENT SHEET FOR IPC 09 97of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office, Itahari
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 09 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Date of Measurement:- 2077/07/15
S.N. Description of Works Unit No. Length Breadth Height Quantity Remarks
1
Foundation works
1.1 Site clearance including cutting and removing
bushes and roots etc. before and after
completion of work as directed by engineer. Sq.m
Uptodate Quantity 3,000.00
Previous Quantity 3,000.00
In this Bill -
1.2 Earthwork in excavation for foundation of
structure in all types of soil/rock including
shoring, struting, bracing, dewatering and
disposal with necessary haulage and lift, all
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900) Cu.m
Uptodate Quantity 2,790.70
Previous Quantity 2,790.70
In this Bill -
1.3 Boring , providing and Installing 800mm dia
bored cast-in-situ RCC pile of specfied
diameter including Bentonite and excluding
reinforcement and concrete as per
specification and drawing etc. all complete.
(1600) Rm
Uptodate Quantity 3,520.00
Previous Quantity 3,520.00
In this Bill -
1.4 Providing and laying boulder soling in
foundation for abutment, pier and wing wall
all complete (2400) Cu.m
Uptodate Quantity 135.28
Previous Quantity 135.28
In this Bill -
1.5 Providing and placing machine mixed cement
concrete M15/40 for the foundation and
footing etc. including compaction, curing,
testing etc. all complete as per specification
and drawing. (SS/SP-2000) Cu.m
Uptodate Quantity 101.46
Previous Quantity 101.46
In this Bill 0.00
1.6 Providing and placing machine mixed cement
concrete M20/20 for the abutment pile cap,
abutment piles etc. including compaction,
curing, testing etc. all complete as per
specification and drawing. (SS/SP-2000) Cu.m
Uptodate Quantity 3,130.69
Previous Quantity 3,130.69
In this Bill -
1.7 Providing and laying reinforcement
Fe415/500 including cutting, bending,
binding, fixing in position etc. all complete as
Prepared by:- Checked by:- Approved by:-
per specification and drawing.(SS/SP-2000) Mt
13.46 MT
98of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 08
Bill S.N. :- IPC 08 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/07/28
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2077/03/14
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-
BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
1 Foundation Work
Site clearance including cutting and
removing bushes and roots etc. before and
1.1 after completion of work as directed by Sq.m 3,000.00 30.00 90,000.00 3,000.00 30.00 90,000.00 3,000.00 90,000.00 0.00 0.00
engineer.
BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Backfilling in layers in foundation pits,
trenches etc including compaction and
1.9 watering etc. all complete as per Cu.m 947.20 100.00 94,719.60 892.00 100.00 89,199.60 892.00 89199.60 0.00 0.00
specification.(SP 900)
BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8 position etc. all complete as per specification set 196.00 5,000.00 980,000.00 56.00 5,000.00 280000.00 28.00 140000.00 28.00 140,000.00
and drawing.(SS-2100)
BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Backfilling in layers in gabion wall, trenches
etc including compaction and watering
5.2 complete as per specification.[sp 900] Cu.m 450.00 100.00 45,000.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00
BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Sub Total 6 2,820,000.00 2,700,000.00 2,700,000.00 0.00
7 New Item
Load test of piles including installation of
7.1 platform, loading arrangements etc. and Nos. 8.00 132,000.00 1,056,000.00 8.00 132,000.00 1056000.00 8.00 1056000.00 0.00 0.00
necessary measurements & plotting
Pile Integrity test of piles including of
7.2 installation of platform etc and necessary Nos. 100.00 5,000.00 500,000.00 100.00 5,000.00 500000.00 0.00 0.00 100.00 500000.00
measurements
Providing Drainage spouts each 450mm
7.3 long,100mm Dia GI Pipe Nos. 112.00 1,150.00 128,800.00 32.00 1,150.00 36800.00 0.00 0.00 32.00 36800.00
Sub Total 7 1,684,800.00 1,592,800.00 1,056,000.00 536800.00
Amount 198,246,313.12 120,656,499.12 111,806,157.68 8,850,341.43
Decleration by Contractor : I/We get the payment as per above. Signature:- ………………………………………
105of 133
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
1 Foundation works
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
For Right Abutment Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (6) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (5) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (4) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (2) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Left Abutment Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (3) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (1) Piles Cap 1.00 11.00 8.60 0.20 18.92
Deduction for piles area
For Right Abutment Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (6) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (5) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (4) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (2) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Left Abutment Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (3) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (1) Piles Cap 1.00 11.00 8.60 0.15 14.19
Deduction for piles area
Area= (3.14 x 0.80
For Left & Right Abutment -40.00 x0.80/4)=0.5024
0.15 -3.01
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
For Right Abutment Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (6) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (5) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (4) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (2) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Left Abutment Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (3) Piles Cap 1.00 11.00 8.60 1.80 170.28
For Pier (1) Piles Cap 1.00 11.00 8.60 1.80 170.28
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
2 Sub-Structural Work
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
A=1/2*.4
Haunch portion 1.00 10.70 0.08 0.86
*.4
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Bottom Qty.=
Top area
area [A1+A2+S
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63 qt(A1*A2)]
5=32.40 H/3
5=6.25
Bearing Pedestal 8.00 1.20 1.20 0.30 3.46
Uptodate Quantity 296.41
Previous Quantity 294.68
In this Bill 1.73
Providing and laying reinforcement
Fe415/500 including cutting, bending,
2.3 binding, fixing in position etc. all complete as Mt No. L TL Wt./mtr. Quantity
per specification and drawing. (SS/SP-2000)
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
6.36 Mt.
For Pier No. 2
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59 MT
For Pier No. 2 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75 Kg.
6.36 Mt.
For Pier No. 1
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59 MT
For Pier No. 1 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75 Kg.
6.36 Mt.
For Left Abutment & Cap
A1-25 mm Dia 79.00 6.99 552.21 3.858 2,130.43
A2-20 mm Dia 74.00 6.99 517.26 2.469 1,277.11
A3-16 mm Dia 35.00 11.47 401.45 1.580 634.29
A4-16 mm Dia 33.00 11.47 378.51 1.580 598.05
A5-12 mm Dia 161.00 1.57 252.77 0.889 224.71
A6-25 mm Dia 16.00 5.90 94.40 3.858 364.20
A7-16mm Dia 102.00 11.47 1169.94 1.58 1,848.51
A8-25mm Dia 27.00 6.10 164.70 3.86 635.41
A9-12 mm Dia 74.00 4.08 301.92 0.889 268.41
A14-16 mm Dia 32.00 11.47 367.04 1.580 579.92
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Girder
Main Girder
End Block portion 2.00 2.10 0.75 2.50 7.88
End tappered portion
t=
Bottom rectangular portion 2.00 0.90 0.60 2.50 2.70 (0.75+45)/2
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
area=(0.50 x
Haunch portion 4.00 0.90 0.2 x 0.05
0.15)=0.015)
area=(2 x 0.5
Sloped portion 2.00 8.75 x 0.225 x 1.18
0.3)= 0.0675
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Cross Girder
Between main girder (End portion)
Bottom portion 2.00 4.25 0.40 3.40
Vertical portion 4.00 4.25 2.20 37.40
Between main girder (Intermediate portion)
Bottom portion 3.00 4.25 0.30 3.83
Vertical portion 6.00 4.25 2.20 56.10
Outside the main girder (End portion)
area= 0.5 x
Face portion 8.00 (2.625+0.3) x 26.32
2.25 = 3.29
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14
S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks
6 Miscellaneous Work
Provide insurance of works, materials,
construction equipment and against accidents
6.1 to work person including third party LS 1.00 1.00
insturance as per General Conditions of
Contract clause 13 and Contract Data.
Engineer's Facilities: Establishment and
maintenance of facilities for Enginner Providing 2 nos. of Laptop (Dell i7) as per
6.2 including the cost of minor repair, telephone, PS the request of Road Division 1.00
electricity, securities guards etc and providing Chandranigahpur, Rautahat.
furniture and other facilities.
Construction of diversion works and
6.3 maintanance of diversion during bridge LS 0.90
construction as directed by Engineer
Providing and installation of bridge status of
6.4 size 1.5mx0.75m etc. all complete as directed LS 1.00 0.00
by engineers.
Provision of Demonstration of prestressing
6.5
process to Project Personnels.
PS 1.00 0.00
7 New Item
Load test of piles including installation of
7.1 platform, loading arrangements etc. and Nos. 8.00 8.00
necessary measurements & plotting
Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount
1 Foundation Work
Site clearance including cutting and
removing bushes and roots etc. before and
1.1 after completion of work as directed by Sq.m 3,000.00 11.17 33,510.00 3,000.00 11.17 33,510.00 0.00% 30.00 90,000.00 30.00 90,000.00 0.00% 0.00%
engineer.
2 Sub-Structural Work
Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount
Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount
Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount
Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount
6 Miscellaneous Work
· उक्त सडक बनाउन मिति 2074/01/20 मा निर्माण व्यवासायी श्री Sapana Nirman Sewa pvt. Ltd, Hetauda -2, Makwanpur संग रु 190784597.13(मु.अ. बाहेक) मा
सम्झौता भएको ǀ
. स्वीकृ त ल.ई. तथा BOQ मा Approach Road मा quantity अपुग भएको र लम्वाई बढेको,Load Test of Piles ,Pile Integrity Test , Drainage spout नभएको र Sub
structure को काम गर्न अघि सो टेस्ट आवशयक भएको हुदा रहेको हुदा सोहि अनुसार VO गर्दा निम्न items 7.0 New Items Sub Heading भित्र थप भयको छ |
3.0 Providing Drainage spouts each 450mm long,100mm Dia GI Pipe Nos. 0.00 112.00 100.00%
निष्कर्ष :
· पेश भएको VO बाट उक्त सडक स्वीकृ त ल.ई (246566939.04 (मु.अ कर बाहेक) भन्दा Revised ल.ई (258782365.81 (मु.अ.कर बाहेक ) 4.98% ले बढ्दा उक्त स्वीकृ त ठेक्का रकम
(190784597.13 (मु.अ.कर बाहेक) भन्दा Revised ठेक्का रकम (197646313.12(मु.अ कर बाहेक) 3.59 % ले बढ्ने देखिन्छ ǀ
संग्लग्न कागजातहरु :
Sub - total (A) 0.00 Sub - total (B) 1325.00 Sub total (c) 0.00
Direct Cost (A+B+C) = NRs. 1325.00
Additional 10% for the cost of pipe for necessary labour,materials, equipment and other
132.50
consumables
Contractor's Overhead @ 15 % of (A+B+C) = NRs. 198.75
Total Item Rate = NRs. 1656.25
Say per nos 1656.25