Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount

1 Foundation Work
Site clearance including cutting and
removing bushes and roots etc. before and
1.1 after completion of work as directed by Sq.m 3,000.00 30.00 90,000.00 3,000.00 30.00 90,000.00 3,000.00 90,000.00 0.00 0.00
engineer.

Earthwork in excavation for foundationof


structure in all types of soil/rock including
shoring, struting, bracing, dewatering and
1.2 disposal with necessary haulage and lift, all Cu.m 2,235.20 500.00 1,117,600.00 2,790.70 500.00 1,395,350.00 2,790.70 1,395,350.00 0.00 0.00
complete as per drawing, specification and
instruction of Engineer. (SS/SP-900).

Boring, Providing and Installing 800mm dia


bored cast-in-situ RCC pileof specified
diameter including Bentonite and excluding
1.3 reinforcement and concrete as per Rm 3,520.00 5,000.00 17,600,000.00 3,520.00 5,000.00 17,600,000.00 3,520.00 17,600,000.00 0.00 0.00
specification and drawing etc. all complete.
(1600)

Providing and laying boulder soling in


1.4 foundation for abutment, pier and wing wall Cu.m 151.81 2,500.00 379,527.61 135.28 2,500.00 338,208.00 151.36 378,400.00 -16.08 -40,192.00
all complete (2400)

Providing and placing machine mixed


cement concrete M15/40 for the foundation
and footing etc. including compaction,
1.5 curing, testing etc. all complete as per Cu.m 189.34 8,000.00 1,514,688.00 101.46 8,000.00 811,699.20 113.52 908,160.00 -12.06 -96,460.80
specification and drawing. (SS/SP-2000)

Providing and placing machine mixed


cement concrete M20/20 for the abutment
pile cap, abutment piles etc. including
1.6 compaction, curing, testing etc. all complete Cu.m 3,089.68 10,000.00 30,896,809.83 3,130.69 10,000.00 31,306,900.00 3,130.69 31,306,900.00 0.00 0.00
as per specification and drawing. (SS/SP-
2000)

Providing and laying reinforcement


Fe415/500 including cutting, bending,
binding, fixing in position etc. all complete as
1.7 Mt 379.95 85,000.00 32,295,822.25 403.63 85,000.00 34,308,550.00 403.63 34,308,550.00 0.00 0.00
per specification and drawing. (SS/SP-2000)

Providing,preparing and Installing formwork


for concrete works for foundation and
substructure including necessary supports
1.8 and removing after completion for sub Sq.m 602.16 600.00 361,296.00 611.52 600.00 366,912.00 611.52 366,912.00 0.00 0.00
structure (Class F1 finish)(SS/SP-1800).
2of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Backfilling in layers in foundation pits,
trenches etc including compaction and
1.9 watering etc. all complete as per Cu.m 894.08 100.00 89,408.00 #REF! 100.00 #REF! 892.00 89199.60 #REF! #REF!
specification.(SP 900)

Sub Total 1 84,345,151.69 #REF! 86,443,471.60 #REF!


2 Sub-Structural Work
Providing and placing machine mixed
cement concrete M20/20 for the abutment
2.1 stem, pier stem, stopper etc. including Cu.m 394.11 10,000.00 3,941,137.96 235.40 10,000.00 2,354,000.00 235.40 2,354,000.00 0.00 0.00
compaction curing, testing and lead 30m etc.
all complete (SS/SP-2000)

Providing and placing machine mixed


cement concrete M25/20 for the abutment
stem cap, Concrete pedestral etc. including
2.2 compaction, curing, testing etc. all complete Cu.m 370.35 12,000.00 4,444,176.00 294.68 12,000.00 3,536,166.00 289.04 3,468,480.00 5.64 67,686.00
as per specification and drawing. (SS/SP-
2000)

Providing and laying reinforcement


Fe415/500 including cutting, bending,
2.3 binding, fixing in position etc. all complete as Mt 119.47 85,000.00 10,155,086.68 84.07 85,000.00 7,145,624.09 83.89 7,130,650.00 0.18 14,974.09
per specification and drawing. (SS/SP-2000)

Providing, preparing and installing formworks


for abutment stem, back wall, return wall,
stopper etc. including necessary supports
2.4 and removing after comletion etc. all Sq.m 904.67 700.00 633,265.52 621.47 700.00 435,028.30 615.71 430,997.00 5.76 4,031.30
complete as per specification with F2 finish.
(SS/SP-1800)

Providing and Backfilling with graded filter


materials in layer with necessary watering
and compaction etc. all complete as per
2.5 Cu.m 44.02 600.00 26,413.20 0.00 600.00 0.00 0.00 0.00 0.00 0.00
specification and drawing. (SS/SP-2400,
3100)

Providing, laying and fixing Geotextile (filter


fabrics) all complete as per specification.
2.6 Sq.m 73.14 150.00 10,971.00 0.00 150.00 0.00 0.00 0.00 0.00 0.00
(SS/SP-2404,3110)

Providing and laying Random Rubble


masonry works in cement sand mortar in 1:4
including scaffolding, curing, preparing
2.7 cement mortar for construction of left and Cu.m 286.19 5,500.00 1,574,041.70 0.00 5,500.00 0.00 0.00 0.00 0.00 0.00
right wing walls all complete manual mixing
mortar 35 % (SS/SP-2600)
3of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount

Sub Total 2 20,785,092.06 13,470,818.39 13,384,127.00 86,691.39


3 Super Structure Work
Providing and Installing M35/20 in precast
RC footpath slabs , parapet posts and their
3.1 bases and road kerbs etc. all complete. Cu.m 210.00 13,500.00 2,835,000.00 0.00 13,500.00 0.00 0.00 0.00 0.00 0.00
(2000)

Providing and placing machine mixed


cement concrete M45/20 for the
superstructure, deck slab, girder etc.
3.2 including compaction, curing, testing and Cu.m 1,603.00 15,000.00 24,045,000.00 217.38 15,000.00 3,260,632.50 0.00 0.00 217.38 3,260,632.50
necessary drainage spout etc. and all
relavent lead all complete (SS/SP-2000)

Providing , Preparing and Installing Steel


Forms for Cast-In-Situ prestressing girder
3.3 Sq.m 248.15 700.00 173,705.00 52.86 700.00 37,002.00 0.00 0.00 52.86 37,002.00
and removing after completion. (SS-1800)

Providing , Preparing and Installing


Formwork for Slab and X-beam structures
and removing after completion (falsework
3.4 included) including necessary supports and Sq.m 6,959.52 700.00 4,871,666.94 898.65 700.00 629,053.74 0.00 0.00 898.65 629,053.74
removing after completion for
Superstructure. (SS-1800)

Providing and laying Untensioned


reinforcement bars, HYSD, TMT, minimum
0.2% proof stress 500Mpa (Fe 500)
3.5 including cutting, bending, binding, fixing in Mt 251.50 85,000.00 21,377,552.19 33.20 85,000.00 2822097.26 0.00 0.00 33.20 2,822,097.26
position etc. all complete as per specification
and drawing.(SS/PP-2000)

Providing Prestressing multistranded cables


each comprising 19 mono strands, each
mono strands of 12.7mm dia. 7- ply low
relaxation Class II HTS (breaking load per
mono strand =183.71KN);Total length of 19
3.6 multistranded cables (weighing @14.73 Mt 48.30 135,000.00 6,520,500.00 6.90 135,000.00 931500.00 0.00 0.00 6.90 931,500.00
kg/m)=616.6 m(total length of 12.7mm dia.
mono strand weighing @0.77526
Kg/m=11716m)

Providing and Installing Sheathing (ducting


for housing 19 multi stranded cables ),
corrugated HDPE type , 90mm internal dia.
3.7 Rm 3,563.00 300.00 1,068,900.00 508.80 300.00 152640.00 0.00 0.00 508.80 152,640.00
(wall thickness 2.3±0.3 mm as maufactured
and 1.5 mm after loss of compression).
4of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8 position etc. all complete as per specification set 196.00 5,000.00 980,000.00 28.00 5,000.00 140000.00 0.00 0.00 28.00 140,000.00
and drawing.(SS-2100)

Providing and fixing in position Reinforced


3.9 POT bearings as per drawing and Nos. 28.00 75,000.00 2,100,000.00 4.00 75,000.00 300000.00 0.00 0.00 4.00 300,000.00
specification (1902)

Providing and Installing expansion joint(Slab


seal Type) sealing etc. all complete as per
3.10 specification and drawing. (1900) Rm 88.00 25,000.00 2,200,000.00 0.00 25,000.00 0.00 0.00 0.00 0.00 0.00

Providing, laying, spreading, levelling and


compaction of Wearing Coat M25/20 all
3.11 complete as per specification and drawing. Cu.m 189.27 12,500.00 2,365,875.00 0.00 12,500.00 0.00 0.00 0.00 0.00 0.00
(2000)

Providing and installing 50 mm dia GI


3.12 (parapet railling) all complete as per Rm 1,892.70 1,100.00 2,081,970.00 0.00 1,100.00 0.00 0.00 0.00 0.00 0.00
specification.

Providing and supplying of Enamel Paint


application in two coats in addition to one
3.13 Sq.m 488.95 300.00 146,684.25 0.00 300.00 0.00 0.00 0.00 0.00 0.00
base coat.

Sub Total 3 70,766,853.38 8,272,925.50 0.00 8,272,925.50


5of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount

4 Appoach Road Work


Formation of embankment through all types
of soil including compaction in layers and
4.1 watering, all complete as per specification Cu.m 5,250.00 150.00 787,500.00 0.00 150.00 0.00 0.00 0.00 0.00 0.00
and drawing.(SS/SP - 900)

Backfilling in layers in Foundation pits,


trenches etc including compaction and
4.2 watering complete as per specification.[sp Sq.m 100.00 100.00 10,000.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00
900]

Preparation of sub-grade for rehabilitation or


other similar works (filling or cutting depth of
4.3 Cu.m 1,500.00 30.00 45,000.00 0.00 30.00 0.00 0.00 0.00 0.00 0.00
10 to 20 cm) in common soil.

Providing, laying, spreading, watering,


levelling and compaction of natural sand
4.4 gravel sub-base grading as per table 12.1 of Nos. 375.00 1,100.00 412,500.00 0.00 1,100.00 0.00 0.00 0.00 0.00 0.00
standard specification (1201)

Supplying and fixing in place M20/20 RCC


delineator and guard post (size
1500mmx150mmx150mm) including
4.5 excavation, backfilling, painting and erection Nos. 80.00 2,000.00 160,000.00 0.00 2,000.00 0.00 0.00 0.00 0.00 0.00
etc. all complete (SS/SP-1500)

Providing & Installation of Bridge Sign


Board of size 1.5mX0.75m with steel stands
4.6 and including all reinforcement works & Nos. 2.00 15,000.00 30,000.00 0.00 15,000.00 0.00 0.00 0.00 0.00 0.00
formwork complete.(SS-1500)

Sub Total 4 1,445,000.00 0.00 0.00 0.00


5 River Training and Protection Work
Earthwork in excavation for river training
works in all types of soil/rock including
shoring, struting, bracing, dewatering and
5.1 disposal with necessary haulage and lift, all Cu.m 2,000.00 100.00 200,000.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900)
6of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Backfilling in layers in gabion wall, trenches
etc including compaction and watering
5.2 complete as per specification.[sp 900] Cu.m 600.00 100.00 60,000.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00

Formation of embankment through all types


of soil including compaction in layers and
5.3 watering, all complete as per specification Cu.m 2,500.00 150.00 375,000.00 0.00 150.00 0.00 0.00 0.00 0.00 0.00
and drawing.(SS/SP - 900)

Supply and Making heavy Zinc coated


gabion boxes including cutting wire & netting
etc. Hexagonal mesh size 100 mm x 120
mm, mesh wire-10 SWG, selvedge wire-8
SWG; Gabion construction works including
placing in position, tying gabion by tightening
5.4 wire closing from the top, tying wire-12 Cu.m 3,500.00 3,000.00 10,500,000.00 0.00 3,000.00 0.00 0.00 0.00 0.00 0.00
SWG; and filling stones in gabion box,
including supply of materials , foundation
excavation and disposal all complete
(SS/SP-2400)

Supply and placing grass turfing on guide


5.5 banks etc. all complete as per specification. Sq.m 3,500.00 25.00 87,500.00 0.00 25.00 0.00 0.00 0.00 0.00 0.00

Sub Total 5 11,222,500.00 0.00 0.00 0.00


6 Miscellaneous Work
Provide insurance of works, materials,
construction equipment and against
accidents to work person including third
6.1 party insturance as per General Conditions LS 1.00 2,000,000.00 2,000,000.00 #REF! 2,000,000.00 #REF! 1.00 2,000,000.00 #REF! #REF!
of Contract clause 13 and Contract Data.

Engineer's Facilities: Establishment and


maintenance of facilities for Enginner
including the cost of minor repair, telephone,
6.2 PS 1.00 500,000.00 500,000.00 1.00 500,000.00 500,000.00 1.00 500,000.00 0.00 0.00
electricity, securities guards etc and
providing furniture and other facilities.

Construction of diversion works and


maintanance of diversion during bridge
6.3 LS 1.00 200,000.00 200,000.00 0.90 200,000.00 180,000.00 0.90 180,000.00 0.00 0.00
construction as directed by Engineer

Providing and installation of bridge status of


size 1.5mx0.75m etc. all complete as
6.4 LS 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 1.00 20,000.00 0.00 0.00
directed by engineers.
7of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Provision of Demonstration of prestressing
6.5 process to Project Personnels. PS 1.00 100,000.00 100,000.00 0.00 100,000.00 0.00 0.00 0.00 0.00 0.00
8of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 07
Bill S.N. :- IPC 07 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/09/19 (Proposed)
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2076/11/20
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Load test of piles including installation of
6.6 platform, loading arrangements etc. and Nos. 8.00 132,000.00 1,056,000.00 8.00 132,000.00 1,056,000.00 8.00 1,056,000.00 0.00 0.00
necessary measurements & plotting

Sub Total 6 2,820,000.00 #REF! 3,756,000.00 #REF!


Amount 191,384,597.13 #REF! 103,583,598.60 #REF!

Amount without PS 190,784,597.13 #REF! 103,083,598.60 #REF!

Discount 0.00 % 0.00 #REF! 0.00 #REF!


Net Amount without PS 190,784,597.13 #REF! 103,083,598.60 #REF!
Net Amount with PS 191,384,597.13 #REF! 103,583,598.60 #REF!

Recommended By : Singature of Contractor:-………………………………………………

Total Bill Amount, Nrs. :


Payment till Previous Bill, NRs. : Checked By:
To be paid in this Bill, NRs.:
Amount to be deducted:
A) Advance Payment, Nrs. :
B) Material Cost, NRs. :
C) Toos and Equiptment Cost, NRs. :
D) Contract Tax, NRs. :
E) Retention Amount, NRs. :
F) Others, NRs. :

Net Payable Amount


Approved By :
Prepared and Submitted By: Post: Division Chief
Post : Name:- D. Prasad
Signature : Signature :- ……………………………….

Decleration by Contractor : I/We get the payment as per above. Signature:- ………………………………………
Checklist

Name of Project: Lalbakaiya River Bridge, Rautahat

Contract No: DROCNP/337157-4/073/74-36

Name of Contractor: Sapana Nirman Sewa P. Ltd, Hetauda-2

Bill S.N. IPC 09 (Running)

Application for Bill: Yes

Bill in Format Yes

Measurement Sheet attached Yes

Required Lab Test attached Yes

Site Photos attached Yes

Any Quantity overun

Variation required

Intended date of Completion 2077.09.19 (Proposed)

Date of Expiry of APG

Date of expiry of Insurance 09.07.2017 To 16.11.2019

Sign and Seal of contractor Yes

Note: OK for the Payment


Government of Nepal
Ministry Of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahapur
Rautahat
Revised Estimate/Variation No.1

###
Financed by: GON Date of Work Order : -2073/12/21
###
Name of Contractor: Sapana Nirman Sewa Pvt. Ltd. Hetauda-2 Completion Date after this Variation : 2077
Original Cost Estimate in NRs: (without VAT) 123,052,205.26 Increase or Decrease in Estimate wrt Original Cost, in NRs. -1.99%
Revised Cost Estimate (Till Date) in NRs.: (without VAT) 120,599,253.96 Percentage Increase of Decrease in Estimate:
Original Contract Amount in NRs.: (without VAT) 108,367,254.60 % age Increase or Decrease wrt Oringinal Contract Amount: -0.12%
Revised Contract Amount after this Variation in NRs.(without VAT) 108,236,469.43 Budgetary Provision for Increase works (GON): Yes/No
Location:Along Laxminiya-Karuniya-Matiyarba Sadak,Rauthat

Percentage Percentage
change in change in
Original Contract Amount in New Contract Amount after Amount wrt
S.N. DESCRIPTION UNIT Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. Quantity wrt Remarks
Nrs. Variation original
original Contract
quantity amount
1 Foundation Work Quantity Rate Amount Quantity Rate Amount Rate Amount Rate Amount
Site clearance including cutting and
removing bushes and roots etc. before
1.1 m3 1158.06 144.92 167825.33 2459.73 144.92 356464.07 112.40% 176.00 203817.68 176.00 432912.48 0.21%
and after completion of work as
directed by engineer.

Earthwork in excavation for


foundationof structure in all types of
soil/rock including shoring, struting,
1.2 bracing, dewatering and disposal with m3 124.36 1554.23 193284.04 142.88 1554.23 222068.38 14.89% 1760.00 218873.60 1760.00 251468.80 0.03%
necessary haulage and lift, all complete
as per drawing, specification and
instruction of Engineer. (SS/SP-900).

Boring, Providing and Installing 800mm


dia bored cast-in-situ RCC pileof
specified diameter including Bentonite
1.3 m3 127.56 9030.13 1151919.50 124.83 9030.13 1127231.13 -2.14% 6600.00 841922.40 6600.00 823878.00 -0.02%
and excluding reinforcement and
concrete as per specification and
drawing etc. all complete. (1600)

Providing and laying boulder soling in


1.4 foundation for abutment, pier and wing m3 375.20 10069.17 3777952.58 620.00 10069.17 6242885.40 65.25% 8800.00 3301760.00 8800.00 5456000.00 1.99%
wall all complete (2400)
Providing and placing machine mixed
cement concrete M15/40 for the
foundation and footing etc. including
1.5 220.70 10069.17 2222265.82 58.82% 8800.00 1942160.00 1.79%
compaction, curing, testing etc. all
complete as per specification and
drawing. (SS/SP-2000)

Providing and placing machine mixed


cement concrete M20/20 for the
abutment pile cap, abutment piles etc.
1.6 840.70
including compaction, curing, testing
etc. all complete as per specification
and drawing. (SS/SP-2000)

Providing and laying reinforcement


Fe415/500 including cutting, bending,
1.7 binding, fixing in position etc. all mt 82.97 126431.00 10490359.36 69.49 126431.00 8785690.19 -16.25% 109120.00 9054013.76 109120.00 7582748.80 -1.36%
complete as per specification and
drawing. (SS/SP-2000)

prepared by: checked by: approved by:


10 of 133
Providing,preparing and Installing
formwork for concrete works for
foundation and substructure including
1.8 m2 428.80 408.97 175366.34 417.12 408.97 170589.57 -2.72% 440.00 188672.00 440.00 183532.80 0.00%
necessary supports and removing after
completion for sub structure (Class F1
finish)(SS/SP-1800).

prepared by: checked by: approved by:


11 of 133
Backfilling in layers in foundation pits,
trenches etc including compaction and
1.9 m3 463.22 125.86 58301.12 1223.46 125.86 153984.68 164.12% 308.00 142672.38 308.00 376825.68 0.22%
watering etc. all complete as per
specification.(SP 900)

Sub Total 1 16015008.27 19281179.23 13951731.82 17049526.56


2 Sub-Structural Work
Providing and placing machine mixed
cement concrete M20/20 for the
abutment stem, pier stem, stopper etc.
2.1 m3 360.42 10069.17 3629127.73 340.84 10069.17 3431975.90 -5.43% 8800.00 3171693.80 8800.00 2999392.00 -0.16%
including compaction curing, testing
and lead 30m etc. all complete (SS/SP-
2000)
Providing and placing machine mixed
cement concrete M25/20 for the
abutment stem cap, Concrete pedestral
2.2 etc. including compaction, curing, m3 164.68 10811.20 1780410.04 125.06 10811.20 1352048.67 -24.06% 9680.00 1594121.76 9680.00 1210580.80 -0.35%
testing etc. all complete as per
specification and drawing. (SS/SP-
2000)
Providing and laying reinforcement
Fe415/500 including cutting, bending,
2.3 binding, fixing in position etc. all mt 72.78 126431.00 9202252.52 63.92 126431.00 8081469.52 -12.17% 109120.00 7942275.19 109120.00 6974950.40 -0.89%
complete as per specification and
drawing. (SS/SP-2000)
Providing, preparing and installing
formworks for abutment stem, back
wall, return wall, stopper etc. including
2.4 necessary supports and removing after m2 927.21 593.92 550686.57 924.26 593.92 548936.50 -0.32% 704.00 652753.57 704.00 650679.04 0.00%
comletion etc. all complete as per
specification with F2 finish. (SS/SP-
1800)
Providing and Backfilling with graded
filter materials in layer with necessary
2.5 watering and compaction etc. all m3 30.69 1466.25 44999.21 30.69 1466.25 44999.21 0.00% 1760.00 54014.40 1760.00 54014.40 0.00%
complete as per specification and
drawing. (SS/SP-2400, 3100)

Providing, laying and fixing Geotextile


2.6 (filter fabrics) all complete as per m2 81.15 242.62 19688.61 1076.15 242.62 261095.51 1226.12% 105.00 8520.75 105.00 112995.75 0.10%
specification. (SS/SP-2404,3110)

prepared by: checked by: approved by:


12 of 133
Providing and laying Random Rubble
masonry works in cement sand mortar
in 1:4 including scaffolding, curing,
2.7 preparing cement mortar for m3 220.80 7096.73 1566957.98 455.00 7096.73 3229012.15 106.07% 5280.00 1165824.00 5280.00 2402400.00 1.14%
construction of left and right wing walls
all complete manual mixing mortar 35
% (SS/SP-2600)
subtotal 2 16794122.66 16949537.47 14589203.47 14405012.39
3 Super Structural Work
Providing and Installing M35/20 in
precast RC footpath slabs , parapet
3.1 m3 171.50 13565.70 2326517.55 137.20 13565.70 1861214.04 -20.00% 11440.00 1961960.00 11440.00 1569568.00 -0.36%
posts and their bases and road kerbs
etc. all complete.(2000)
Providing and placing machine mixed
cement concrete M45/20 for the
superstructure, deck slab, girder etc.
3.2 including compaction, curing, testing m3 1338.65 13716.46 18361539.18 1070.92 13716.46 14689231.34 -20.00% 11880.00 15903162.00 11880.00 12722529.60 -2.94%
and necessary drainage spout etc. and
all relavent lead all complete (SS/SP-
2000)
Providing , Preparing and Installing
Steel Forms for Cast-In-Situ
3.3 m2 6688.33 593.92 3972331.77 5350.68 593.92 3177875.87 -20.00% 440.00 2942864.32 440.00 2354299.20 -0.54%
prestressing girder and removing after
completion. (SS-1800)
Providing , Preparing and Installing
Formwork for Slab and X-beam
structures and removing after
3.4 completion (falsework included) m2 2200.00 1896.59 4172498.00 1760.00 1896.59 3337998.40 -20.00% 440.00 968000.00 440.00 774400.00 -0.18%
including necessary supports and
removing after completion for
Superstructure. (SS-1800)

Providing and laying Untensioned


reinforcement bars, HYSD, TMT,
minimum 0.2% proof stress 500Mpa
3.5 (Fe 500) including cutting, bending, Mt 195.76 126431.00 24750226.12 167.32 126431.00 21154434.92 -14.53% 109120.00 21361411.95 109120.00 18257958.40 -2.86%
binding, fixing in position etc. all
complete as per specification and
drawing.(SS/PP-2000)

prepared by: checked by: approved by:


13 of 133
Providing Prestressing multistranded
cables each comprising 19 mono
strands, each mono strands of 12.7mm
dia. 7- ply low relaxation Class II HTS
(breaking load per mono strand
3.6 mt 45.50 178537.50 8123456.25 36.40 178537.50 6498765.00 -20.00% 149600.00 6806800.00 149600.00 5445440.00 -1.26%
=183.71KN);Total length of 19
multistranded cables (weighing @14.73
kg/m)=616.6 m(total length of 12.7mm
dia. mono strand weighing @0.77526
Kg/m=11716m)

Providing and Installing Sheathing


(ducting for housing 19 multi stranded
cables ), corrugated HDPE type ,
3.7 rm 3375.00 335.16 1131165.00 2700.00 335.16 904932.00 -20.00% 352.00 1188000.00 352.00 950400.00 -0.22%
90mm internal dia. (wall thickness
2.3±0.3 mm as maufactured and 1.5
mm after loss of compression).

Providing and instlling Anchorages for


19 - stranded multistranded cables
3.8 Assemble in position etc. all complete set 160.00 3358.58 537372.80 128.00 3358.58 429898.24 -20.00% 880.00 140800.00 880.00 112640.00 -0.03%
as per specification and drawing.(SS-
2100)
Providing and fixing in position
3.9 Reinforced POT bearings as per No 10.00 94875.00 948750.00 8.00 94875.00 759000.00 -20.00% 44000.00 440000.00 44000.00 352000.00 -0.08%
drawing and specification (1902)
Providing and Installing expansion
joint(Slab seal Type) sealing etc. all
3.1 No 10.00 75900.00 759000.00 8.00 75900.00 607200.00 -20.00% 44000.00 440000.00 44000.00 352000.00 -0.08%
complete as per specification and
drawing. (1900)
Providing, laying, spreading, levelling
and compaction of Wearing Coat
3.11 rm 66.00 13915.00 918390.00 55.00 13915.00 765325.00 -16.67% 35000.00 2310000.00 35000.00 1925000.00 -0.36%
M25/20 all complete as per
specification and drawing. (2000)
Providing and installing 50 mm dia GI
3.12 (parapet railling) all complete as per m3 98.44 9153.20 901018.13 94.50 9153.20 864977.40 -4.00% 10560.00 1039500.00 10560.00 997920.00 -0.04%
specification.
Providing and supplying of Enamel
3.13 Paint application in two coats in rm 1265.00 1200.00 1518000.00 1054.00 1200.00 1264800.00 -16.68% 1056.00 1335840.00 1056.00 1113024.00 -0.21%
addition to one base coat.
Sub Total 3 68420264.80 56315652.21 56838338.27 46927179.20
4 Approach Road Work
Formation of embankment through all
types of soil including compaction in
4.1 layers and watering, all complete as m3 11744.22 147.07 1727222.44 25485.54 147.07 3748158.37 117.00% 132.00 1550237.04 132.00 3364091.28 1.67%
per specification and drawing.(SS/SP -
900)
Backfilling in layers in Foundation pits,
trenches etc including compaction and
4.2 m2 1785.00 12.81 22865.85 5830.00 12.81 74682.30 226.61% 44.00 78540.00 44.00 256520.00 0.16%
watering complete as per specification.
[sp 900]
Preparation of sub-grade for
rehabilitation or other similar works
4.3 m3 357.00 1835.75 655362.75 1166.00 1835.75 2140484.50 226.61% 2200.00 785400.00 2200.00 2565200.00 1.64%
(filling or cutting depth of 10 to 20 cm)
in common soil.
Providing, laying, spreading, watering,
levelling and compaction of natural
4.4 sand gravel sub-base grading as per Nos 70.00 1113.34 77933.80 70.00 1113.34 77933.80 0.00% 880.00 61600.00 880.00 61600.00 0.00%
table 12.1 of standard specification
(1201)
Supplying and fixing in place M20/20
RCC delineator and guard post (size
1500mmx150mmx150mm) including
4.5 Nos. 2.00 10000.00 20000.00 2.00 10000.00 20000.00 0.00% 8800.00 17600.00 8800.00 17600.00 0.00%
excavation, backfilling, painting and
erection etc. all complete (SS/SP-
1500)

prepared by: checked by: approved by:


14 of 133
Providing & Installation of Bridge Sign
Board of size 1.5mX0.75m with steel
4.6 2503384.84 6061258.97 2493377.04 6265011.28
stands and including all reinforcement
works & formwork complete.(SS-1500)

5 River Training and Protection Work

prepared by: checked by: approved by:


15 of 133
Earthwork in excavation for river
training works in all types of soil/rock
including shoring, struting, bracing,
dewatering and disposal with
5.1 m3 2555.00 144.92 370270.60 5805.00 144.92 841260.60 127.20% 220.00 562100.00 220.00 1277100.00 0.66%
necessary haulage and lift, all
complete, as per drawing, specification
and instruction of Engineer.(SS/SP-
900)
Backfilling in layers in gabion wall,
trenches etc including compaction and
5.2 m3 766.50 125.86 96471.69 2130.00 125.86 268081.80 177.89% 176.00 134904.00 176.00 374880.00 0.22%
watering complete as per specification.
[sp 900]
Formation of embankment through all
types of soil including compaction in
5.3 layers and watering, all complete as m3 5390.00 3338.16 17992682.40 5998.00 3338.16 20022283.68 11.28% 3520.00 18972800.00 3520.00 21112960.00 1.97%
per specification and drawing.(SS/SP -
900)

Supply and Making heavy Zinc coated


gabion boxes including cutting wire &
netting etc. Hexagonal mesh size 100
mm x 120 mm, mesh wire-10 SWG,
selvedge wire-8 SWG; Gabion
construction works including placing in
position, tying gabion by tightening wire
closing from the top, tying wire-12
SWG; and filling stones in gabion box,
including supply of materials ,
foundation excavation and disposal all
complete (SS/SP-2400)

Supply and placing grass turfing on


guide banks etc. all complete as per
specification.
Sub-Total 5 18459424.69 21131626.08 19669804.00 22764940.00
6 Miscellaneous Work

Provide insurance of works, materials,


construction equipment and against
accidents to work person including third
6.1 LS 1.00 550000.00 550000.00 1.00 550000.00 550000.00 0.00% 352000.00 352000.00 352000.00 352000.00 0.00%
party insturance as per General
Conditions of Contract clause 13 and
Contract Data.

Engineer's Facilities: Establishment


and maintenance of facilities for
Enginner including the cost of minor
6.2 PS 1.00 200000.00 200000.00 1.00 200000.00 200000.00 0.00% 200000.00 200000.00 200000.00 200000.00 0.00%
repair, telephone, electricity, securities
guards etc and providing furniture and
other facilities.

prepared by: checked by: approved by:


16 of 133
Construction of diversion works and
6.3 maintanance of diversion during bridge LS 1.00 100000.00 100000.00 1.00 100000.00 100000.00 0.00% 264000.00 264000.00 264000.00 264000.00 0.00%
construction as directed by Engineer

Providing and installation of bridge


6.4 status of size 1.5mx0.75m etc. all LS 1.00 10000.00 10000.00 1.00 10000.00 10000.00 0.00% 8800.00 8800.00 8800.00 8800.00 0.00%
complete as directed by engineers.
Provision of Demonstration of
6.5 prestressing process to Project
Personnels.
Load test of piles including installation
of platform, loading arrangements etc.
6.6
and necessary measurements &
plotting
Sub-Total 6 860000.00 860000.00 824800.00 824800.00
Total Amount 108,367,254.60 108,236,469.43
Total Amount without PS 108,167,254.60 108,036,469.43
Discount % 0.00% 0.00%
Final Amount witout PS 108,167,254.60 108,036,469.43
VAT 13% 14,061,743.10 14,044,741.03
Total Amount with VAT 122,228,997.70 122,081,210.46
Provisional Sum 200,000.00 200,000.00
Contract Amount With VAT & PS 122,428,997.70 122,281,210.46

Sub Total 123,052,205.26 120,599,253.96


VAT 13% 15,996,786.68 15,677,903.01
Contingency 5% 6,152,610.26 6,029,962.70
price escalation 10% 12,305,220.53 12,059,925.40
Physical contingency 10% 12,305,220.53 12,059,925.40
Total 169,812,043.26 166,426,970.46

prepared by: checked by: approved by:


17 of 133
18of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

1 Foundation works

Site clearance including cutting and removing


bushes and roots etc. before and after
1.1 completion of work as directed by engineer. Sq.m

For Left abutment 1.00 20.00 15.00 300.00


For Pier no 1 1.00 20.00 20.00 400.00
For Pier no 2 1.00 20.00 20.00 400.00
For Pier no 3 1.00 20.00 20.00 400.00
For Pier no 4 1.00 20.00 20.00 400.00
For Pier no 5 1.00 20.00 20.00 400.00
For Pier no 6 1.00 20.00 20.00 400.00
For Right abutment 1.00 20.00 15.00 300.00
Uptodate Quantity 3,000.00
Previous Quantity 3,000.00
In this Bill 0.00
Earthwork in excavation for foundation of
structure in all types of soil/rock including
shoring, struting, bracing, dewatering and
1.2 disposal with necessary haulage and lift, all Cu.m
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900)

For Left Abutment Piles 1.00 11.00 8.60 2.20 208.12


For Pier (1) Piless 1.00 11.00 8.60 3.35 316.91
For Pier (2) Piles 1.00 11.00 8.60 4.35 411.51
For Pier (3) Piles 1.00 11.00 8.60 4.35 411.51
For Pier (4) Piles 1.00 11.00 8.60 4.35 411.51
For Pier (5) Piles 1.00 11.00 8.60 4.35 411.51
For Pier (6) Piles 1.00 11.00 8.60 4.35 411.51
For Right Abutment Piles 1.00 11.00 8.60 2.20 208.12
Uptodate Quantity 2,790.70
Previous Quantity 2,790.70
In this Bill 0.00
Boring , providing and Installing 800mm dia
bored cast-in-situ RCC pile of specfied
diameter including Bentonite and excluding
1.3 reinforcement and concrete as per Rm
specification and drawing etc. all complete.
(1600)

For Left Abutment Piles 20.00 22.00 440.00


For Pier (1) Piless 20.00 22.00 440.00
For Pier (2) Piles 20.00 22.00 440.00

Prepared by:- Checked by:- Approved by:-


19of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

For Pier (3) Piless 20.00 22.00 440.00


For Pier (4) Piles 20.00 22.00 440.00

Prepared by:- Checked by:- Approved by:-


20of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

For Pier (5) Piless 20.00 22.00 440.00


For Pier (6) Piles 20.00 22.00 440.00
For Right Abutment Piles 20.00 22.00 440.00
Uptodate Quantity 3,520.00
Previous Quantity 3,520.00
In this Bill 0.00
Providing and laying boulder soling in
1.4 foundation for abutment, pier and wing wall Cu.m
all complete (2400)

For Right Abutment Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (6) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (5) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (4) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (2) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Left Abutment Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (3) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (1) Piles Cap 1.00 11.00 8.60 0.20 18.92
Deduction for piles area

Area= (3.14 x 0.80


For Left & Right Abutment -40.00 x0.80/4)=0.5024
0.20 -4.02

Area= (3.14 x 0.80


For piers -120.00 x0.80/4)=0.5024
0.20 -12.06

Uptodate Quantity 135.28


Previous Quantity 151.36
In this Bill -16.08
Providing and placing machine mixed cement
concrete M15/40 for the foundation and
footing etc. including compaction, curing,
1.5 Cu.m
testing etc. all complete as per specification
and drawing. (SS/SP-2000)

For Right Abutment Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (6) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (5) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (4) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (2) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Left Abutment Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (3) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (1) Piles Cap 1.00 11.00 8.60 0.15 14.19
Deduction for piles area
Area= (3.14 x 0.80
For Left & Right Abutment -40.00 x0.80/4)=0.5024
0.15 -3.01

Area= (3.14 x 0.80


For piers -120.00 x0.80/4)=0.5024
0.15 -9.04

Uptodate Quantity 101.46


Previous Quantity 113.52
In this Bill -12.06

Prepared by:- Checked by:- Approved by:-


21of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

Providing and placing machine mixed cement


concrete M20/20 for the abutment pile cap,
abutment piles etc. including compaction,
1.6 curing, testing etc. all complete as per Cu.m
specification and drawing. (SS/SP-2000)

Area= (3.14 x 0.80


For Left Abutment Piles 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (1) Piless 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (2) Piles 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (3) Piless 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (4) Piles 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (5) Piless 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (6) Piles 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Right Abutment Piles 20.00 22.00 x0.80/4)=0.5024
221.06

For Right Abutment Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (6) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (5) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (4) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (2) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Left Abutment Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (3) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (1) Piles Cap 1.00 11.00 8.60 1.80 170.28

Uptodate Quantity 3,130.69


Previous Quantity 3,130.69
In this Bill 0.00

Prepared by:- Checked by:- Approved by:-


22of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

Providing and laying reinforcement


Fe415/500 including cutting, bending,
1.7 binding, fixing in position etc. all complete as Mt
per specification and drawing.(SS/SP-2000)

For Left Abutment Piles


PL1-25 mm Dia 16.00 22.75 wt. =3.858kg/mtr 1404.31
PL2-12 mm Dia 153.00 2.80 wt. =0.889 kg/mtr 380.85
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1812.34
For 20 Nos of Piles 20.00 36246.71
36.25
For Pier (1) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1919.87
For 20 Nos of Piles 20.00 38397.32
For Pier (2) Piles 38.40
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32
38.40
For Pier (3) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32
38.40
For Pier (4) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32
38.40
For Pier (5) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32

Prepared by:- Checked by:- Approved by:-


23of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

38.40
For Pier (6) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85

Prepared by:- Checked by:- Approved by:-


24of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84


Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32
38.40
For Right Abutment Piles
PL1-25 mm Dia 16.00 22.75 wt. =3.858kg/mtr 1,404.31
PL2-12 mm Dia 153.00 2.80 wt. =0.889 kg/mtr 380.85
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,812.34
For 20 Nos of Piles 20.00 36,246.71
36.25
For Right Abutment Piles Cap
AA1-25 mm Dia 89.00 9.87 878.43 3.858 3,388.98
AA2-20 mm Dia 93.00 9.87 917.91 2.469 2,266.32
AA3-20 mm Dia 115.00 12.27 1411.05 2.469 3,483.88
AA4-16 mm Dia 8.00 10.87 86.96 1.580 137.40
AA4-16 mm Dia 8.00 8.97 71.76 1.580 113.38
AA5-12 mm Dia 369.00 1.87 690.03 0.889 613.44
10,003.40
10.00
For Pier no 6 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48
13.46
For Pier no 5 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48
13.46

Prepared by:- Checked by:- Approved by:-


25of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

For Pier no 4 Pile Cap


P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48
13.46
For Pier no 2 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48
13.46
For Left Abutment Piles Cap
AA1-25 mm Dia 89.00 9.87 878.43 3.858 3,388.98
AA2-20 mm Dia 93.00 9.87 917.91 2.469 2,266.32
AA3-20 mm Dia 115.00 12.27 1411.05 2.469 3,483.88
AA4-16 mm Dia 8.00 10.87 86.96 1.580 137.40
AA4-16 mm Dia 8.00 8.97 71.76 1.580 113.38
AA5-12 mm Dia 369.00 1.87 690.03 0.889 613.44
10,003.40
10.00
For Pier no 3 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48

Prepared by:- Checked by:- Approved by:-


26of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

13.46
For Pier no 1 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48
13.46
Uptodate Quantity 403.63

Previous Quantity 403.63

In this Bill 0.00


Providing,preparing and Installing formwork
for concrete works for foundation and
substructure including necessary supports
1.8 and removing after completion for sub Sq.m
structure (Class F1 finish)(SS/SP-1800).

For Right Abutment


PCC 1.00 39.20 0.15 5.88
Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 6
PCC 1.00 39.20 0.15 5.88
Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 5

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 4

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 2

PCC 1.00 39.20 0.15 5.88

Prepared by:- Checked by:- Approved by:-


27of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

Raft 1.00 39.20 1.80 70.56


Sub-Total 76.44
For Left Abutment

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 3

Prepared by:- Checked by:- Approved by:-


28of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 1

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
Uptodate Quantity 611.52
Previous Quantity 611.52
In this Bill 0.00
Backfilling in layers in foundation pits,
trenches etc including compaction and
1.9 watering etc. all complete as per Cu.m
specification.(SP 900)

For Left Abutment Piles 1.00 39.20 1.35 2.05 108.49


For Pier (1) Piless 1.00 39.20 1.40 2.05 112.50
For Pier (2) Piles 1.00 39.20 1.40 2.05 112.50
For Pier (3) Piles 1.00 39.20 1.40 2.05 112.50
For Pier (4) Piles 1.00 39.20 1.40 2.05 112.50
For Pier (5) Piles 1.00 39.20 1.40 2.05 112.50
For Pier (6) Piles 1.00 39.20 1.40 2.05 112.50
For Right Abutment Piles 1.00 39.20 1.35 2.05 108.49
Uptodate Quantity 892.00
Previous Quantity 892.00
In this Bill 0.00

2 Sub-Structural Work

Providing and placing machine mixed cement


concrete M20/20 for the abutment stem, pier
stem, stopper etc. including compaction
curing, testing and lead 30m etc. all complete Cu.m
2.1
(SS/SP-2000)

For Right Abutment Stem 1.00 10.70 1.50 3.24 52.00

For Pier No 06 Stem 1.00 area = 4.91 4.46 21.90

For Pier No. 05 Stem 1.00 area = 4.91 4.46 21.90

For Pier No. 04 Stem 1.00 area = 4.91 4.46 21.90

For Pier No. 03 Stem 1.00 area = 4.91 4.46 21.90

Prepared by:- Checked by:- Approved by:-


29of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

For Pier No. 02 Stem 1.00 area = 4.91 4.46 21.90

For Pier No. 01 Stem 1.00 area = 4.91 4.46 21.90

For Left Abutment Stem 1.00 10.70 1.50 3.24 52.00

Uptodate Quantity 235.40


Previous Quantity 235.40
In this Bill 0.00
Providing and placing machine mixed cement
concrete M25/20 for the abutment stem cap,
Concrete pedestral etc. including compaction,
2.2 curing, testing etc. all complete as per Cu.m
specification and drawing. (SS/SP-2000)

For Right Abutment Cap 1.00 10.70 2.00 0.70 14.98

Haunch portion 1.00 10.70 0.08 0.86

For Left Abutment Cap 1.00 10.70 2.00 0.70 14.98


Haunch portion 1.00 10.70 0.08 0.86
For Pier No 06 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom
Top area
area
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63
5=32.40
5=6.25
For Pier No. 05 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom
Top area
area
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63
5=32.40
5=6.25
For Pier No. 04 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom
Top area
area
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63
5=32.40
5=6.25
For Pier No. 03 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom
Top area
area
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63
5=32.40
5=6.25
For Pier No. 02 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92

Prepared by:- Checked by:- Approved by:-


30of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

Bottom
Top area
area
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63
5=32.40
5=6.25
For Pier No. 01 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom
Top area
area
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63
5=32.40
5=6.25
Bearing Pedestal 4.00 1.20 1.20 0.30 1.73
Uptodate Quantity 294.68
Previous Quantity 289.04
In this Bill 5.64
Providing and laying reinforcement
Fe415/500 including cutting, bending,
2.3 binding, fixing in position etc. all complete as Mt No. L TL Wt./mtr. Quantity
per specification and drawing. (SS/SP-2000)

For Right Abutment & Cap

A1-25 mm Dia 79.00 6.99 552.21 3.858 2,130.43


A2-20 mm Dia 74.00 6.99 517.26 2.469 1,277.11
A3-16 mm Dia 35.00 11.47 401.45 1.580 634.29
A4-16 mm Dia 33.00 11.47 378.51 1.580 598.05
A5-12 mm Dia 161.00 1.57 252.77 0.889 224.71
A6-25 mm Dia 16.00 5.90 94.40 3.858 364.20
A7-16mm Dia 102.00 11.47 1169.94 1.580 1,848.51
A8-25mm Dia 27.00 6.10 164.70 3.858 635.41
A9-12 mm Dia 74.00 4.08 301.92 0.889 268.41
A14-16 mm Dia 32.00 11.47 367.04 1.580 579.92
A31-12 mm Dia 42.00 9.73 408.66 0.889 363.30
A32-16 mm Dia 12.00 8.55 102.60 1.580 162.11
9,086.44
9.09
For Pier No. 6
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59
For Pier No. 6 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16

Prepared by:- Checked by:- Approved by:-


31of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13


P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75
6.36
For Pier No. 5
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59
For Pier No. 5 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75
6.36
For Pier No. 4
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59
For Pier No. 4 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75
6.36
For Pier No. 3
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44

Prepared by:- Checked by:- Approved by:-


32of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38


P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59
For Pier No. 3 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75
6.36
For Pier No. 2
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59
For Pier No. 2 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75
6.36
For Pier No. 1
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59
For Pier No. 1 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13

Prepared by:- Checked by:- Approved by:-


33of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05


P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75
6.36
For Left Abutment & Cap
A1-25 mm Dia 79.00 6.99 552.21 3.858 2,130.43
A2-20 mm Dia 74.00 6.99 517.26 2.469 1,277.11
A3-16 mm Dia 35.00 11.47 401.45 1.580 634.29
A4-16 mm Dia 33.00 11.47 378.51 1.580 598.05
A5-12 mm Dia 161.00 1.57 252.77 0.889 224.71
A6-25 mm Dia 16.00 5.90 94.40 3.858 364.20
A7-16mm Dia 102.00 11.47 1169.94 1.58 1,848.51
A8-25mm Dia 27.00 6.10 164.70 3.86 635.41
A9-12 mm Dia 74.00 4.08 301.92 0.889 268.41
A14-16 mm Dia 32.00 11.47 367.04 1.580 579.92
A31-12 mm Dia 42.00 9.73 408.66 0.889 363.30
A32-16 mm Dia 12.00 8.55 102.60 1.580 162.11
9,086.44
9.09
Bearing Pedestal
A25-12 mm Dia 18.00 1.75 31.50 0.889 28.00
A26-8 mm Dia 36.00 1.20 43.20 0.395 17.06
For 1 Bearing pedestal 45.07
For 4 bearing pedestal 4.00 180.27
0.18
Uptodate Quantity 84.07
Previous Quantity 83.89
In this Bill 0.18
Providing, preparing and installing formworks
for abutment stem, back wall, return wall,
stopper etc. including necessary supports
2.4 and removing after comletion etc. all Sq.m
complete as per specification with F2 finish.
(SS/SP-1800)

For Right Abutment Stem 1.00 24.40 3.24 79.06


For Pier No. 06 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 06 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72

Prepared by:- Checked by:- Approved by:-


34of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

Slope portion 2.00 area= 4.85 9.70


Slope portion 2.00 area= 3.50 7.00
For Pier No. 05 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 05 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Pier No. 04 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 04 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Pier No. 03 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 03 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Pier No.02 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 02 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Pier No.01 Stem 2.00 P= 7.85 4.46 70.02
For Pier No. 01 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Left Abutment Stem 1.00 24.40 3.24 79.06
For Bearing Pedestal 4.00 4.80 0.30 5.76
Uptodate Quantity 621.47
Previous Quantity 615.71
In this Bill 5.76

Prepared by:- Checked by:- Approved by:-


35of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

Providing and Backfilling with graded filter


materials in layer with necessary watering
and compaction etc. all complete as per
2.5 specification and drawing. (SS/SP-2400, Cu.m 0.00
3100)

Providing, laying and fixing Geotextile (filter


fabrics) all complete as per specification.
2.6 Sq.m 0.00
(SS/SP-2404,3110)

Providing and laying Random Rubble


masonry works in cement sand mortar in 1:4
including scaffolding, curing, preparing
2.7 cement mortar for construction of left and Cu.m 0.00
right wing walls all complete manual mixing
mortar 35 % (SS/SP-2600)

3 Super Structure Work


Providing and Installing M35/20 in precast RC
footpath slabs , parapet posts and their bases
3.1 and road kerbs etc. all complete.(2000) Cu.m 0.00

Providing and placing machine mixed cement


concrete M45/20 for the superstructure, deck
slab, girder etc. including compaction, curing,
3.2 testing and necessary drainage spout etc. Cu.m
and all relavent lead all complete (SS/SP-
2000)

Girder
Main Girder
End Block portion 2.00 2.10 0.75 2.50 7.88
End tappered portion

Bottom rectangular portion 2.00 0.90 0.60 2.50 2.70

area=(0.50 x
Haunch portion 4.00 0.90 0.2 x 0.05
0.15)=0.015)

End straight portion


Bottom rectangular portion 2.00 6.35 0.75 0.30 2.86
area=(2 x 0.5
Sloped portion 2.00 6.35 x 0.15 x 0.38
0.2)= 0.03
vertical portion 2.00 6.35 0.45 2.05 11.72
area=(0.50 x
0.15 x
Haunch portion 4.00 6.35 0.29
0.15)=0.0112
5)
Intermediate main girder

Bottom rectangular portion 2.00 8.75 0.75 0.30 3.94

area=(2 x 0.5
Sloped portion 2.00 8.75 x 0.225 x 1.18
0.3)= 0.0675

Prepared by:- Checked by:- Approved by:-


36of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

vertical portion 2.00 8.75 0.30 2.05 10.76


area=(0.5 x
Haunch portion 2.00 8.75 0.3 x0.15)= 0.39
0.0225
42.14
Sub-Total (for 2 nos. main girder) 2.00 84.29
Cross Girder
Between main girder (End portion) 2.00 4.25 0.40 2.20 7.48
Between main girder (Intermediate portion) 3.00 4.25 0.30 2.20 8.42

area= 0.5 x
Outside the main girder (End portion) 4.00 (2.625+0.3) x 0.40 5.26
2.25 = 3.29

area= 0.5 x
Outside the main girder (Intermediate portion) 6.00 2.775 x 2.25 0.30 5.62
= 3.12
Sub-Total (cross girder) 26.78
Deck slab
Carriageway portion 1.00 35.00 5.75 0.30 60.38

Footpath portion 2.00 35.00 2.625 0.25 45.94

Sub-Total (deck slab) 106.31


Uptodate Quantity 217.38
Till Previous Quantity 0.00
In this Bill 217.38
Providing , Preparing and Installing Steel
3.3 Forms for Cast-In-Situ prestressing girder Sq.m
and removing after completion. (SS-1800)
Girder
Main Girder
End Block portion
Bottom portion 2.00 2.10 0.75 3.15
End tappered portion
Bottom portion 2.00 0.90 0.75 1.35
End straight portion
Bottom portion 2.00 6.35 0.75 9.53
Intermediate main girder
Bottom portion 2.00 8.87 0.75 13.31
Deduction for bearing portion -2.00 0.60 0.75 -0.90
26.43
Sub-Total (for 2 nos. main girder) 2.00 52.86
Uptodate Quantity 52.86
Previous Bill 0.00
In this Bill 52.86
Providing , Preparing and Installing Formwork
for Slab and X-beam structures and removing
after completion (falsework included)
3.4 including necessary supports and removing Sq.m
after completion for Superstructure. (SS-
1800)

Prepared by:- Checked by:- Approved by:-


37of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

Girder
Main Girder
Vertical portion 4.00 2.10 2.50 21.00
End tappered portion
Tappered portion 4.00 0.90 2.35 8.46
Haunch portion 4.00 0.90 0.21 0.76
End straight portion
Sloped portion 4.00 6.35 0.25 6.35
vertical portion 4.00 6.35 0.30 7.62
4.00 6.35 1.85 46.99
Haunch portion 4.00 6.35 0.21 5.33
Intermediate main girder
Sloped portion 4.00 8.87 0.38 13.48
vertical portion 4.00 8.87 0.30 10.64
4.00 8.87 1.75 62.09
Haunch portion 4.00 8.87 0.34 12.06
Deduction for intersection of cross girder portion -2.00 0.40 0.75 -0.60
-3.00 0.30 0.75 -0.68
194.19
Sub-Total (for 2 nos. main girder) 2.00 388.38

Cross Girder
Between main girder (End portion)
Bottom portion 2.00 4.25 0.40 3.40
Vertical portion 4.00 4.25 2.20 37.40
Between main girder (Intermediate portion)
Bottom portion 3.00 4.25 0.30 3.83
Vertical portion 6.00 4.25 2.20 56.10
Outside the main girder (End portion)

area= 0.5 x
Face portion 8.00 (2.625+0.3) x 26.32
2.25 = 3.29

Sloped portion 4.00 3.860 0.40 6.18


Outside the main girder (Intermediate portion)
area= 0.5 x
Face portion 12.00 2.775 x 2.25 37.44
= 3.12
Sloped portion 6.00 3.560 0.30 6.41
Sub-Total (cross girder) 177.07
Deck slab
Between main girder (end portion) 2.00 8.40 4.25 71.40
Between main girder (intermediate portion) 2.00 8.40 4.25 71.40
Outside main girder (end portion) 4.00 8.40 2.625 88.20
Outside main girder (intermediate portion) 4.00 8.40 2.625 88.20
Side face 2.00 35.00 0.20 14.00
Sub-Total (Deck slab) 333.20
Uptodate Quantity 898.65
Previous Bill 0.00
In this Bill 898.65

Prepared by:- Checked by:- Approved by:-


38of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

Providing and laying Untensioned


reinforcement bars, HYSD, TMT, minimum
0.2% proof stress 500Mpa (Fe 500) including
3.5 cutting, bending, binding, fixing in position Mt
etc. all complete as per specification and
drawing.(SS/PP-2000)
Bar Mark No. L TL Wt/m.(Kg.) Quantity
1601-16 mm dia. 143.00 11.100 1587.30 1.580 2507.93
2002-20 mm dia. 284.00 4.350 1235.40 2.469 3050.20
1603- 16 mm dia. 142.00 7.080 1005.36 1.580 1588.47
1004-10 mm dia. 74.00 36.120 2672.88 0.617 1649.17
1005-10 mm dai. 40.00 10.460 418.40 0.617 258.15
1006-10 mm dia. 69.00 36.120 2492.28 0.617 1537.74
1607-16 mm dia. 143.00 6.180 883.74 1.580 1396.31
2008-20 mm dia. 142.00 6.224 883.74 2.469 2181.95
1209-12 mm dia. 286.00 3.660 1046.76 0.889 930.57
2010-20 mm dia. 74.00 3.000 222.00 2.469 548.12
1611-16 mm dia. 74.00 2.140 158.36 1.580 250.21
1212-12 mm dia. 17.00 10.920 185.64 0.889 165.03
1613-16 mm dia. 88.00 2.245 197.56 1.580 312.14
1614-16 mm dia. 88.00 2.245 197.56 1.580 312.14
0615-6 mm dia. 352.00 0.410 144.32 0.222 32.04
1016-10 mm dia. 12.00 36.970 443.64 0.617 273.73
1017-10 mm dia. 494.00 1.420 701.48 0.617 432.81
1018-10 mm dia. 0.00 1.300 0.00 0.617 0.00
1019-10 mm dia. 0.00 1.300 0.00 0.617 0.00
0820-8 mm dia. 0.00 1.300 0.00 0.395 0.00
0621-6 mm dia. 0.00 4.020 0.00 0.222 0.00
0622-6 mm dia. 0.00 4.020 0.00 0.222 0.00
0623-6 mm dia. 0.00 1.310 0.00 0.222 0.00
1024-10 mm dia. 494.00 1.605 792.87 0.617 489.20
1025-10 mm dia. 12.00 31.970 383.64 0.617 236.71
1026-10 mm dia. 12.00 36.120 433.44 0.617 267.43
1227-12 mm dia. 104.00 3.764 391.46 0.889 348.00
1228-12 mm dia. 104.00 6.650 691.60 0.889 614.83
1029-10 mm dia. 112.00 21.800 2441.60 0.617 1506.47
2030-20 mm dia. 72.00 4.300 309.60 2.469 764.40
2031-20 mm dia. 28.00 4.044 113.23 2.469 279.56
2032-20 mm dia. 204.00 3.670 748.68 2.469 1848.49
1633-16 mm dia. 160.00 3.645 583.20 1.580 921.46
2034-20 mm dia. 8.00 6.350 50.80 2.469 125.43
2035-20 mm dia. 8.00 6.350 50.80 2.469 125.43
2036-20 mm dia. 16.00 4.870 77.92 2.469 192.38
2037-20 mm dia. 16.00 4.870 77.92 2.469 192.38
2038-20 mm dia. 8.00 10.900 87.20 2.469 215.30
2039-20 mm dia. 8.00 10.900 87.20 2.469 215.30
1040-10 mm dia. 48.00 8.637 414.57 0.617 255.79
1641-16 mm dia. 70.00 5.400 378.00 1.580 597.24
1642-16 mm dia. 60.00 3.380 202.80 1.580 320.42
2043-20 mm dia. 9.00 5.750 51.75 2.469 127.77
2044-20 mm dia. 9.00 5.750 51.75 2.469 127.77
2045-20 mm dia. 18.00 4.825 86.85 2.469 214.43

Prepared by:- Checked by:- Approved by:-


39of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

2046-20 mm dia. 18.00 4.750 85.50 2.469 211.10


2047-20 mm dia. 9.00 10.920 98.28 2.469 242.65
2048-20 mm dia. 9.00 10.920 98.28 2.469 242.65
1049-10 mm dia. 72.00 8.208 590.97 0.617 364.63
1650-16 mm dia. 75.00 5.200 390.00 1.580 616.20
1651-16 mm dia. 84.00 2.822 237.04 1.580 374.52
2052-20 mm dia. 72.00 3.350 241.20 2.469 595.52
2053-20 mm dia. 28.00 3.270 91.56 2.469 226.06
2054-20 mm dia. 204.00 3.223 657.49 2.469 1623.35
1655-16 mm dia. 160.00 2.973 475.68 1.580 751.57
MESH TYPE 1A-12 mm dia. 4.00 20.627 82.51 0.889 73.35
MESH TYPE 1B-12 mm dia. 4.00 6.059 24.24 0.889 21.55
MESH TYPE 2A-12 mm dia. 4.00 21.246 84.98 0.889 75.55
MESH TYPE 2B-12 mm dia. 4.00 7.431 29.72 0.889 26.42
MESH TYPE C-10 mm dia. 4.00 11.749 47.00 0.617 29.00
Spiral Reinforcement (9 TURNS EACH)-16 mm
28.00 7.100 198.80 1.580 314.10
dia.
33,201.14
Uptodate Quantity 33.20
Till Previous Quantity 0.00
In this Bill 33.20

Providing Prestressing multistranded cables


each comprising 19 mono strands, each
mono strands of 12.7mm dia. 7- ply low
relaxation Class II HTS (breaking load per
From standard superstructure drawings of 35 m
mono strand =183.71KN);Total length of 19
3.6 Mt span simply supported, cast in situ, 2-webbed 6.90
multistranded cables (weighing @14.73 prestressed concrete deck slab.
kg/m)=616.6 m(total length of 12.7mm dia.
mono strand weighing @0.77526
Kg/m=11716m)

Providing and Installing Sheathing (ducting


for housing 19 multi stranded cables ),
3.7 corrugated HDPE type , 90mm internal dia. Rm
(wall thickness 2.3±0.3 mm as maufactured
and 1.5 mm after loss of compression).
1 2.00 37.00 74.00
D 2.00 36.50 73.00
2 2.00 36.30 72.60

Prepared by:- Checked by:- Approved by:-


40of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

3 2.00 36.30 72.60


4 2.00 36.20 72.40
5 2.00 36.10 72.20
6 2.00 36.00 72.00
For 1 span 508.80
Uptodate Quantity 508.80
Previous Bill 0.00
In this Bill 508.80
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8 position etc. all complete as per specification set 28.00
and drawing.(SS-2100)
Providing and fixing in position Reinforced
3.9 POT bearings as per drawing and Nos. 4.00
specification (1902)
Providing and Installing expansion joint(Slab
seal Type) sealing etc. all complete as per
3.10 specification and drawing. (1900) Rm 0.00

Providing, laying, spreading, levelling and


compaction of Wearing Coat M25/20 all
3.11 complete as per specification and drawing. Cu.m 0.00
(2000)
Providing and installing 50 mm dia GI
3.12 (parapet railling) all complete as per Rm 0.00
specification.
Providing and supplying of Enamel Paint
3.13 application in two coats in addition to one Sq.m 0.00
base coat.
4 Appoach Road Work
Formation of embankment through all types
of soil including compaction in layers and
4.1 watering, all complete as per specification Cu.m 0.00
and drawing.(SS/SP - 900)
Backfilling in layers in Foundation pits,
trenches etc including compaction and
4.2 watering complete as per specification.[sp Sq.m 0.00
900]
Preparation of sub-grade for rehabilitation or
4.3 other similar works (filling or cutting depth of Cu.m 0.00
10 to 20 cm) in common soil.
Providing, laying, spreading, watering,
levelling and compaction of natural sand
4.4 gravel sub-base grading as per table 12.1 of Nos. 0.00
standard specification (1201)
Supplying and fixing in place M20/20 RCC
delineator and guard post (size
4.5 1500mmx150mmx150mm) including Nos. 0.00
excavation, backfilling, painting and erection
etc. all complete (SS/SP-1500)
Providing & Installation of Bridge Sign Board
of size 1.5mX0.75m with steel stands and
4.6 including all reinforcement works & formwork Nos. 0.00
complete.(SS-1500)

Prepared by:- Checked by:- Approved by:-


41of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 07 (Running)
#REF!
#REF!
#REF!
#REF!
#REF!
Date of Measurement:- 2076/11/20

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity

5 River Training and Protection Work


Earthwork in excavation for river training
works in all types of soil/rock including
shoring, struting, bracing, dewatering and
5.1 disposal with necessary haulage and lift, all Cu.m 0.00
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900)
Backfilling in layers in gabion wall, trenches
5.2 etc including compaction and watering Cu.m 0.00
complete as per specification.[sp 900]
Formation of embankment through all types
of soil including compaction in layers and
5.3 watering, all complete as per specification Cu.m 0.00
and drawing.(SS/SP - 900)
Supply and Making heavy Zinc coated gabion
boxes including cutting wire & netting etc.
Hexagonal mesh size 100 mm x 120 mm,
mesh wire-10 SWG, selvedge wire-8 SWG;
Gabion construction works including placing
in position, tying gabion by tightening wire
5.4
closing from the top, tying wire-12 SWG; and Cu.m 0.00
filling stones in gabion box, including supply
of materials , foundation excavation and
disposal all complete (SS/SP-2400)

Supply and placing grass turfing on guide


5.5 banks etc. all complete as per specification. Sq.m 0.00

6 Miscellaneous Work
Provide insurance of works, materials,
construction equipment and against accidents
6.1 to work person including third party LS 1.00 1.00
insturance as per General Conditions of
Contract clause 13 and Contract Data.
Engineer's Facilities: Establishment and
maintenance of facilities for Enginner Providing 2 nos. of Laptop (Dell i7) as per
6.2 including the cost of minor repair, telephone, PS the request of Road Division 1.00
electricity, securities guards etc and providing Chandranigahpur, Rautahat.
furniture and other facilities.
Construction of diversion works and
6.3 maintanance of diversion during bridge LS 0.90
construction as directed by Engineer
Providing and installation of bridge status of
6.4 size 1.5mx0.75m etc. all complete as directed LS 1.00 0.00
by engineers.
Load test of piles including installation of
6.6 platform, loading arrangements etc. and Nos. 8.00 8.00
necessary measurements & plotting

Prepared by:- Checked by:- Approved by:-


42of 133

Remarks

Prepared by:- Checked by:- Approved by:-


43of 133

Remarks

Prepared by:- Checked by:- Approved by:-


44of 133

Remarks

Prepared by:- Checked by:- Approved by:-


45of 133

Remarks

Prepared by:- Checked by:- Approved by:-


46of 133

Remarks

Kg.
MT

Kg.
MT

Kg.
MT

Kg.
MT

Kg.
MT

Kg.

Prepared by:- Checked by:- Approved by:-


47of 133

Remarks

MT

Prepared by:- Checked by:- Approved by:-


48of 133

Remarks

Kg.
MT

Kg.
MT

Kg.
MT

Kg.
MT

Kg.
MT

Prepared by:- Checked by:- Approved by:-


49of 133

Remarks

Kg.
MT

Kg.
MT

Kg.
MT

Kg.

Prepared by:- Checked by:- Approved by:-


50of 133

Remarks

MT

Kg.
MT
Mt

Prepared by:- Checked by:- Approved by:-


51of 133

Remarks

Prepared by:- Checked by:- Approved by:-


52of 133

Remarks

Prepared by:- Checked by:- Approved by:-


53of 133

Remarks

A=1/2*.4
*.4

A=1/2*.4
*.4

Qty.=
[A1+A2+S
qt(A1*A2)]
H/3

Qty.=
[A1+A2+S
qt(A1*A2)]
H/3

Qty.=
[A1+A2+S
qt(A1*A2)]
H/3

Qty.=
[A1+A2+S
qt(A1*A2)]
H/3

Prepared by:- Checked by:- Approved by:-


54of 133

Remarks

Qty.=
[A1+A2+S
qt(A1*A2)]
H/3

Qty.=
[A1+A2+S
qt(A1*A2)]
H/3

Kg.
Mt.

Kg.
Mt.

Prepared by:- Checked by:- Approved by:-


55of 133

Remarks

Kg.
Mt.

MT

Kg.
Mt.

MT

Kg.
Mt.

Prepared by:- Checked by:- Approved by:-


56of 133

Remarks

Mt.

Kg.
Mt.

MT

Kg.
Mt.

MT

Prepared by:- Checked by:- Approved by:-


57of 133

Remarks

Kg.
Mt.

Kg.
Mt.

Kg.
Mt.
MT

Prepared by:- Checked by:- Approved by:-


58of 133

Remarks

Prepared by:- Checked by:- Approved by:-


59of 133

Remarks

t=
(0.75+45)/2

Prepared by:- Checked by:- Approved by:-


60of 133

Remarks

t=
(0.30+0.20)/
2

Prepared by:- Checked by:- Approved by:-


61of 133

Remarks

Prepared by:- Checked by:- Approved by:-


62of 133

Remarks

Prepared by:- Checked by:- Approved by:-


63of 133

Remarks

Kg.
Mt.
Mt.
Mt.

Prepared by:- Checked by:- Approved by:-


64of 133

Remarks

Prepared by:- Checked by:- Approved by:-


65of 133

Remarks

Prepared by:- Checked by:- Approved by:-


GOVERNMENT OF NEPAL
MINISTRY OF PHYSICAL INFRASRUCTURE & TRANSPORT
CENTRAL REGIONAL ROAD DIRECTORATE
DEPARTMENT OF ROADS
DIVISION ROAD OFFICE, CHANDRANIGAHPUR

Name of Project : Lalbakaiya River Bridge,Rautahat


Name of work: Construction of Prestressed RCC T beam
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED QUANTITY ESTIMATE
Span=7 Length=35m
SN Description Unit No L(m) B(m) H(m) Quantity
1 Foundation Works

Site Clearance including cutting and removing


1.1 bushes and roots etc.before and after
completion of work as directed by Engineer.
m2 2.00 150.00 10.00 3000.00
Earthwork in excavation for foundation of
structure in all types of soil/rock including
shoring, struting, bracing, dewatering and
1.2
disposal with necessary haulage and lift, all
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900)
Left Abutment m3 1.00 11.00 8.60 2.20 208.12
Right Abutment m3 1.00 11.00 8.60 2.20 208.12
Piers m3 6.00 11.00 8.60 4.35 2469.06
Wingwall m3 4.00 9.20 4.15 3.00 458.16
Total = 3343.46

Boring , providing and Installing 800mm dia


bored cast-in-situ RCC pile of specfied
diameter including Bentonite and excluding
1.3
reinforcement and concrete as per
specification and drawing etc. all complete.
(1600) rm
In piers 120.00 22.00 2640.00
in abutment 40.00 22.00 880.00
Total = 3520.00
Providing and laying boulder soling in
1.4 foundation for abutment,piers and wing wall all
complete(2000) m3
in abutment 2.00 11.00 8.60 0.20 37.84
In piers 6.00 11.00 8.60 0.20 113.52
in wing wall base 4.00 9.20 4.15 0.20 30.54
deduction of pile area -120.00 0.50 0.20 -12.00
Area =
deduction of abutment pile area -40.00 0.50 0.20 -4.00
Total = 165.90
Providing and placing machine mixed M15/40
cement concrete for the foundation and footing
1.5 etc. including compaction, curing, testing etc.
all complete as per specification and drawing.
(SS/SP-2000) m3
L/B abutment 1.00 11.00 8.60 0.15 14.19
R/B abutment 1.00 11.00 8.60 0.15 14.19
Pier 6.00 11.00 8.60 0.15 85.14
Wing walls 4.00 9.20 4.15 0.45 68.72
Total = 182.24
Providing and placing machine mixed M20/20
cement concrete for the foundation and footing
1.6 etc. including compaction, curing, testing etc.
all complete as per specification and drawing.
(SS/Sp-2000) m3
L/B abutment pile cap 1.00 11.00 8.60 1.80 170.28

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Name of work: Construction of Prestressed RCC T beam
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED QUANTITY ESTIMATE
Span=7 Length=35m
SN Description Unit No L(m) B(m) H(m) Quantity
R/B abutment pile cap 1.00 11.00 8.60 1.80 170.28
pier cap 6.00 11.00 8.60 1.80 1021.68
Abutment piles 40.00 22.00 0.50 442.11
Area=
pier piles 120.00 22.00 0.50 1326.34
Total = 3130.69
Providing and laying reinforcement Fe415/500
including cutting, bending, binding, fixing in
1.7
position etc. all complete as per specification
and drawing.(SS/SP-2000) Mt
Abutment pile 2.00 36346.71 72693.42
Abutment pile cap 2.00 10003.40 20006.80
Pier pile 6.00 38397.32 230383.92
Pier pile cap 6.00 13457.48 80744.87
403829.01
Total = 403.83

Providing , Preparing and Installing form work


1.8 including necessary supports and removing
after completion for foundation and footings.
m2
Left Abutment & Right Abutment pile caps 2.00 39.20 1.95 152.88
Pier pile cap 6.00 39.20 1.95 458.64
Total = 611.52
Providing and Backfilling in layers in
foundation pits,trenches etc including
1.9
compaction and watering etc all complete as
per specification. (SP 900) m3
For abutment piles 2.00 39.20 1.35 2.05 216.97
For pier piles 6.00 39.20 1.40 2.05 675.02
for wing walls 4.00 9.20 1.00 1.50 55.20
Total = 947.20
B Sub-structural Work
Providing and placing machine mixed M20/20
cement concrete for the abutment stem,pier
2.1 stem Stopper etc including compaction, curing,
testing all complete as per specification and
drawing. m3
Left & Right Abutment stem 2.00 10.70 1.50 3.24 104.00
For piers stem 6.00 Area= 4.91 4.47 131.57
Backwall 2.00 11.00 0.50 3.30 36.30
For Left & Right Abutment Fillet 2.00 11.00 area= 0.125 2.75

For Left & Right Abutment Back wall 2.00 11.00 0.40 2.5 22
Haunch portion 2.00 11.00 0.25 0.25 1.375
2.00 11.00 area= 0.031 0.682
RCC Return wall bottom 4.00 3.00 2.50 0.40 12.00
Return wall triangle 4.00 Area= 3.75 0.40 6.00
Total = 316.68
Providing and placing machine mixed M25/20
cement concrete for the abutment stem
2.2 capconcrete pedestral etc including
compaction, curing, testing all complete as per
specification and drawing.(SS/Sp-2000) m3
For Abutment Cap 2.00 10.70 2.00 0.70 29.96
Haunch portion 2.00 10.70 0.08 1.71
For Piers Stem cap
Rectangular portion 6.00 7.20 4.50 0.80 155.52

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Name of work: Construction of Prestressed RCC T beam
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED QUANTITY ESTIMATE
Span=7 Length=35m
SN Description Unit No L(m) B(m) H(m) Quantity

Top area Bottom area


Tappered portion (A1)=7.2x4. (A2)=2.5x2.5=6.2 1.00
5=32.40 5
6.00 Volume of 1 Section = 17.63 105.76
Bearing Pedestal 28.00 1.20 1.20 0.30 12.10
stopper
For Left & Right Abutment Wing walls 4.00 3.50 0.40 1.70 9.52

4.00 area= 2.63 0.40 4.20


Stopper Block 28.00 0.60 0.80 1.20 16.13
support for approach slab 2.00 9.95 0.25 0.40 1.99
approach slab 2.00 7.50 3.50 0.30 15.75
concrete pedestral 28.00 0.80 0.10 0.30 0.67
railing post 308.00 0.15 0.15 1.00 6.93
Total = 360.24

Supply and install HYSD bars (Fe 415) with


2.3 cutting, bending, fixing and other
miscellaneous works for R.C.C. work.
Abutment stem 2.00 10173.04 20346.08
Pier 6.00 15472.46 92834.76
Wing wall 4.00 980.00 3920.00
Bearing Stopper 28.00 175.00 4900.00
Bearing Pedestral 28.00 65.00 1820.00
123820.84
Total= 123.82
Providing , Preparing and Installing form work
2.4 including necessary supports and removing
after completion for substructure
Abutment
For Pier Stem 2.00 P= 7.85 4.46 70.02

For Pier Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72

Slope portion 2.00 area= 4.85 9.70

Slope portion 2.00 area= 3.50 7.00

105.44

For 6 Nos 6.00 632.65

For Abutment Stem 2.00 24.40 3.24 158.11

For Bearing Pedestal 28.00 4.80 0.30 40.32

BackWall 4.00 11.00 3.30 145.20

Back Wall Side 4.00 3.30 0.40 5.28

Backwall Trapezoidal side 4.00 Area = 0.14 0.55


Stopper Block 4.00 2.80 1.20 13.44
Return Wing walls
Straight portion 8.00 3.50 2.50 70.00
Slope portion 8.00 area= 3.50 28.00
Side portion 4.00 5.50 0.40 8.80
Total = 1102.36

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Name of work: Construction of Prestressed RCC T beam
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED QUANTITY ESTIMATE
Span=7 Length=35m
SN Description Unit No L(m) B(m) H(m) Quantity

Providing and Backfilling with graded filter


materials in layer with necessary watering and
2.5
compaction etc. all complete as per
specification and drawing. (SS/SP-2400, 3100)
m3
Behind Abutment 2.00 11.00 0.30 6.67 44.02
Providing, laying and fixing Geotextile (filter
2.6 fabrics) all complete as per specification.
(SS/SP-2404,3110) m2
for abutment 2.00 11.00 3.24 71.28
for wingwall 4.00 10.00 3.75 150.00
At Gabion U/S 2.00 140.00 3.00 840.00
At Gabion D/S 2.00 100.00 3.00 600.00
Total = 1661.28
Providing and laying Random Rubble masonry
works in cement sand mortar in 1:4 including
scaffolding, curing, preparing cement mortar
2.7
for construction of left and right wing walls all
complete manual mixing mortar 35 % (SS/SP-
2600) m3 4.00 10.07 Area = 7.11 286.39
3 Super Structure Work

Providing and Installing M35/20 in precast RC


3.1 footpath slabs , parapet posts and their bases
and road kerbs etc. all complete.(2000)
m3
precast RCC footpath slab,parapet posts and
road kerb 7.00 30.00 210.00
Total = 210.00

Providing and placing machine mixed cement


concrete M45/20 for the superstructure, deck
3.2 slab, girder etc. including compaction, curing,
testing and necessary drainage spout etc. and
all relavent lead all complete (SS/SP-2000)
m3
PSC Deck 7.00 229.00 1603.00
Total = 1603.00
Providing , Preparing and Installing Steel
3.3 Forms for Cast-In-Situ prestressing girder and
removing after completion. (SS-1800)
Girder
Main Girder
End Block portion
Bottom portion 2.00 2.10 0.75 3.15
End tappered portion
Bottom portion 2.00 0.90 0.75 1.35
End straight portion
Bottom portion 2.00 6.35 0.75 9.53
Intermediate main girder
Bottom portion 2.00 8.87 0.75 13.31
Deduction for bearing portion -2.00 0.60 0.75 -0.90
26.43
Sub-Total (for 7 nos. main girder) 14.00 370.02

Providing , Preparing and Installing Formwork


for Slab and X-beam structures and removing
3.4 after completion (falsework included) including
necessary supports and removing after
completion for Superstructure. (SS-1800)

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Name of work: Construction of Prestressed RCC T beam
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED QUANTITY ESTIMATE
Span=7 Length=35m
SN Description Unit No L(m) B(m) H(m) Quantity

Girder
Main Girder
Vertical portion 4.00 2.10 2.50 21.00
End tappered portion
Tappered portion 4.00 0.90 2.35 8.46
Haunch portion 4.00 0.90 0.21 0.76
End straight portion
Sloped portion 4.00 6.35 0.25 6.35
vertical portion 4.00 6.35 0.30 7.62
4.00 6.35 1.85 46.99
Haunch portion 4.00 6.35 0.21 5.33
Intermediate main girder
Sloped portion 4.00 8.87 0.38 13.48
vertical portion 4.00 8.87 0.30 10.64
4.00 8.87 1.75 62.09
Haunch portion 4.00 8.87 0.34 12.06
Deduction for intersection of cross girder
portion
-2.00 0.40 0.75 -0.60
-3.00 0.30 0.75 -0.68
194.19
Sub-Total (for 2 nos. main girder) 2.00 388.38

Cross Girder
Between main girder (End portion)
Bottom portion 2.00 4.25 0.40 3.40
Vertical portion 4.00 4.25 2.20 37.40
Between main girder (Intermediate portion)
Bottom portion 3.00 4.25 0.30 3.83
Vertical portion 6.00 4.25 2.20 56.10
Outside the main girder (End portion)
area= 0.5 x
Face portion 8.00 (2.625+0.3) x 26.32
2.25 = 3.29
Sloped portion 4.00 3.860 0.40 6.18
Outside the main girder (Intermediate portion)
area= 0.5 x
Face portion 12.00 2.775 x 2.25 = 37.44
3.12
Sloped portion 6.00 3.560 0.30 6.41
Sub-Total (cross girder) 177.07
Deck slab
Between main girder (end portion) 2.00 8.40 4.25 71.40
Between main girder (intermediate portion) 2.00 8.40 4.25 71.40
Outside main girder (end portion) 4.00 8.40 2.625 88.20
Outside main girder (intermediate portion) 4.00 8.40 2.625 88.20
Side face 2.00 35.00 0.20 14.00
Sub-Total (Deck slab) 333.20
Cantilever Slab Portion at Pier
Bottom portion 2.00 11.00 1.25 27.50
Side face 4.00 1.25 0.50 2.50
Sub-Total (At pier) 30.00
Railing Post
End Railing Post 4.00 0.80 1.00 3.20
Intermediate Railing Post 308.00 0.80 1.00 246.40
Sub-Total (Railing post) 249.60

Total for 1 Slab 1178.25


For 7 Nos 7.00 8247.74

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Name of work: Construction of Prestressed RCC T beam
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED QUANTITY ESTIMATE
Span=7 Length=35m
SN Description Unit No L(m) B(m) H(m) Quantity
Total = 8247.74
Providing and laying Untensioned
reinforcement bars, HYSD, TMT, minimum
0.2% proof stress 500Mpa (Fe 500) including
3.5
cutting, bending, binding, fixing in position etc.
all complete as per specification and drawing.
(SS/PP-2000) Mt
For SuperStructure 7.00 35000.00 245000.00
Approach Slab 2.00 965.83 1931.66
Railing Post 2.00 214.00 428.00
Railing Post for end span 2.00 36.11 72.21
247431.87
Total = 247.43

Providing Prestressing multistranded cables


each comprising 19 mono strands, each mono
strands of 12.7mm dia. 7- ply low relaxation
Class II HTS (breaking load per mono strand
3.6
=183.71KN);Total length of 19 multistranded
cables (weighing @14.73 kg/m)=616.6 m(total
length of 12.7mm dia. mono strand weighing
@0.77526 Kg/m=11716m)
mt 7.00 6.90 48.30
Providing and Installing Sheathing (ducting for
housing 19 multi stranded cables ), corrugated
3.7 HDPE type , 90mm internal dia. (wall thickness
2.3±0.3 mm as maufactured and 1.5 mm after
loss of compression). Rm 7.00 509.00 3563.00
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8
position etc. all complete as per specification
and drawing.(SS-2100) Set 7.00 28.00 196.00
Providing and fixing in position Reinforced
3.9 POT bearings as per drawing and specification
(1902) Nos 7.00 4.00 28.00
Providing and Installing expansion joint(Slab
3.10 seal Type) sealing etc. all complete as per
specification and drawing. (1900) Rm 8.00 11.00 88.00
Providing, laying, spreading, levelling and
compaction of Wearing Coat M25/20 all
3.11
complete as per specification and drawing.
(2000) m3 1.00 315.45 7.50 0.08 189.27

Providing and installing 50 mm dia GI (parapet


3.12
railling) all complete as per specification.
Rm 6.00 315.45 1892.70
Providing and supplying of Enamel Paint
3.13 application in two coats in addition to one base
coat. m2
For Bridge Kerb paints 2.00 315.45 0.78 492.10
For Railing Posts
Side Face 16.00 0.80 1.00 12.80
Side Face 308.00 0.80 1.00 246.40
Top Face 16.00 0.20 0.20 0.64
Top Face 308.00 0.20 0.20 12.32
Total = 764.26
4.0 Appoach Road Work
Formation of embankment through all types of
soil including compaction in layers and
4.1
watering, all complete as per specification and
drawing.(SS/SP - 900) m3

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Name of work: Construction of Prestressed RCC T beam
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED QUANTITY ESTIMATE
Span=7 Length=35m
SN Description Unit No L(m) B(m) H(m) Quantity
East Side 6085.00
Refer Earthwork Calculation Sheet
West Side 19875.00
Total = 25960.00
Backfilling in layers in Foundation pits,
trenches etc including compaction and
4.2
watering complete as per specification.[sp
900] m3 1.00 100.00
Preparation of sub-grade for rehabilitation or
4.3 other similar works (filling or cutting depth of
10 to 20 cm) in common soil. m2
East Side 1.00 100.00 7.50 750.00
West Side 1.00 100.00 7.50 750.00
Total = 1500.00
Providing, laying, spreading, watering,
levelling and compaction of natural sand
4.4
gravel sub-base grading as per table 12.1 of
standard specification (1201) m3
East Side 1.00 140.00 7.00 0.20 196.00
West Side 1.00 150.00 7.00 0.20 210.00
Total = 406.00
Supplying and fixing in place M20/20 RCC
delineator and guard post (size
4.5 1500mmx150mmx150mm) including
excavation, backfilling, painting and erection
etc. all complete (SS/SP-1500) Nos 80.00 80.00
Providing & Installation of Bridge Sign Board
of size 1.5mX0.75m with steel stands and
4.6
including all reinforcement works & formwork
complete.(SS-1500) Nos 2.00 2.00
5.0 River Training and Protection Work
Earthwork in excavation for river training works
in all types of soil/rock including shoring,
struting, bracing, dewatering and disposal with
5.1
necessary haulage and lift, all complete, as
per drawing, specification and instruction of
Engineer.(SS/SP-900) m3
U/S Bank Protection 2.00 140.00 3.00 840.00
D/S Bank Protection 2.00 110.00 3.00 660.00
Total = 1500.00
Backfilling in layers in gabion wall, trenches
5.2 etc including compaction and watering
complete as per specification.[sp 900] m3
For Gabion excavation 30% of Earthwork Excavation 450.00
Formation of embankment through all types of
soil including compaction in layers and
5.3
watering, all complete as per specification and
drawing.(SS/SP - 900)
Bank Protection 2.00 100.00 7.00 3.00 4200.00
Total = 4200.00

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Name of work: Construction of Prestressed RCC T beam
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED QUANTITY ESTIMATE
Span=7 Length=35m
SN Description Unit No L(m) B(m) H(m) Quantity

Supply and Making heavy Zinc coated gabion


boxes including cutting wire & netting etc.
Hexagonal mesh size 100 mm x 120 mm,
mesh wire-10 SWG, selvedge wire-8 SWG;
Gabion construction works including placing in
5.4
position, tying gabion by tightening wire
closing from the top, tying wire-12 SWG; and
filling stones in gabion box, including supply of
materials , foundation excavation and disposal
all complete (SS/SP-2400)

U/S Bank Protection


2.00 140.00 6.50 1820.00

D/S Bank Protection


2.00 125.00 4.50 1125.00
Total = 2945.00
Supply and placing grass turfing on guide
5.5
banks etc. all complete as per specification.
U/S Bank Protection 2.00 100.00 4.00 800.00
D/S Bank Protection 2.00 100.00 4.00 800.00
Total = 1600.00
6.0 Miscellaneous Work
Provide insurance of works, materials,
construction equipment and against accidents
6.1 to work person including third party insturance
as per General Conditions of Contract clause
13 and Contract Data. LS 1.00 1.00
Engineer's Facilities: Establishment and
maintenance of facilities for Enginner including
6.2 the cost of minor repair, telephone, electricity,
securities guards etc and providing furniture
and other facilities. PS 1.00 1.00
Construction of diversion works and
6.3 maintanance of diversion during bridge
construction as directed by Engineer LS 1.00 1.00
Providing and installation of bridge status of
6.4 size 1.5mx0.75m etc. all complete as directed
by engineers. LS 1.00 1.00
Provision of Demonstration of prestressing
6.5
process to Project Personnels. PS 1.00 1.00
7.0 New Item
Load test of piles including installation of
7.1 platform, loading arrangements etc. and
necessary measurements & plotting Nos 8.00 8.00
Pile Integrity test of piles including of
7.2 installation of platform etc and necessary
measurements Nos 100.00 100.00
Supply and fixing 100mm G.I. Pipe, medium
class for Drainage Spout necessary
7.3 nos 112.0 112.0
accessory complete as per drawing and
specification.

Prepared by Checked by Approved by


GOVERNMENT OF NEPAL
OF PHYSICAL INFRASRUCTURE & TRANSPORT
NTRAL REGIONAL ROAD DIRECTORATE
DEPARTMENT OF ROADS
SION ROAD OFFICE, CHANDRANIGAHPUR

autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE

Remarks

m3

m3

w=(6.4+1.9)/2
m3

Prepared by Checked by Approved by


autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE

Remarks

m3

kg
MTON

m2

m3

m3

A=1/2*.4*.4

Prepared by Checked by Approved by


autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE

Remarks
Qty.=
[A1+A2+Sq
t(A1*A2)]H/
3

m3

kg
Mton

m2

Prepared by Checked by Approved by


autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE

Remarks

Prepared by Checked by Approved by


autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE

Remarks

Prepared by Checked by Approved by


autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE

Remarks

Mt

Mt

Rm

Set

Prepared by Checked by Approved by


autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE

Remarks

Prepared by Checked by Approved by


autahat
RCC T beam
utahat
REVISED QUANTITY ESTIMATE

Remarks

(3*1*0.5+3
*1*1+2*1*
1)
(3*1*0.5+2
*1*1+1*1*
1)

Prepared by Checked by Approved by


GOVERNMENT OF NEPAL
MINISTRY OF PHYSICAL INFRASRUCTURE & TRANSPORT
CENTRAL REGIONAL ROAD DIRECTORATE
DEPARTMENT OF ROADS
DIVISION ROAD OFFICE, CHANDRANIGAHPUR

Name of Project : Lalbakaiya River Bridge,Rautahat


Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED ABSTRACT OF COST

S.N. Description of Items Unit Quantity Rate, NRs. Amount, NRs. Remark
1 Foundation
Site clearance including cutting and removing
1.1 bushes
Earthworkandinroots etc. before
excavation and after completion
for foundationof structure Sq.m
of
in work as directed
all types by engineer.
of soil/rock including shoring, struting, 3000.00 11.17 33,510.00
bracing, dewatering and disposal with necessary
1.2 Cu.m
haulage and lift, all complete as per drawing, 3343.46 122.39 409,206.07
specification and instruction of Engineer. (SS/SP-
Boring,
900). Providing and Installing 800mm dia bored
cast-in-situ RCC pileof specified diameter
1.3 including Bentonite and excluding reinforcement Rm
and concrete as per specification and drawing etc.
all complete. (1600) 3520.00 7514.47 26,450,934.40
Providing and laying boulder soling in foundation
1.4 for abutment, pier and wing wall all complete Cu.m
(2400) 165.90 3065.10 508,512.35
Providing and placing machine mixed cement
concrete M15/40 for the foundation and footing
1.5 etc. including compaction, curing, testing etc. all Cu.m
complete as per specification and drawing.
(SS/SP-2000) 182.24 10360.82 1,888,197.28
Providing and placing machine mixed cement
concrete M20/20 for the abutment pile cap,
1.6 abutment piles etc. including compaction, curing, Cu.m
testing etc. all complete as per specification and
drawing. (SS/SP-2000) 3130.69 11810.43 36,974,771.48
Providing and laying reinforcement Fe415/500
including cutting, bending, binding, fixing in
1.7 Mt
position etc. all complete as per specification and
drawing. (SS/SP-2000) 403.83 125080.01 50,510,936.84
Providing,preparing and Installing formwork for
concrete works for foundation and substructure
1.8 including necessary supports and removing after Sq.m
completion for sub structure (Class F1 finish)
(SS/SP-1800). 611.52 823.83 503,788.52
Backfilling in layers in foundation pits, trenches
1.9 etc including compaction and watering etc. all Cu.m
complete as per specification.(SP 900) 947.20 553.63 524,396.12
Sub Total 1 117,804,253.06
2 Sub-Structural Work
Providing and placing machine mixed cement
concrete M20/20 for the abutment stem, pier
2.1 stem, stopper etc. including compaction curing, Cu.m
testing and lead 30m etc. all complete (SS/SP-
2000) 316.68 11810.43 3,740,119.41
Providing and placing machine mixed cement
concrete M25/20 for the abutment stem cap,
2.2 Concrete pedestral etc. including compaction, Cu.m
curing, testing etc. all complete as per
specification and drawing. (SS/SP-2000) 360.24 12601.44 4,539,523.83

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED ABSTRACT OF COST

S.N. Description of Items Unit Quantity Rate, NRs. Amount, NRs. Remark
Providing and laying reinforcement Fe415/500
including cutting, bending, binding, fixing in
2.3 Mt
position etc. all complete as per specification and
drawing. (SS/SP-2000) 123.82 125080.01 15,487,511.91
Providing, preparing and installing formworks for
abutment stem, back wall, return wall, stopper etc.
2.4 including necessary supports and removing after Sq.m
comletion etc. all complete as per specification
with F2 finish. (SS/SP-1800) 1102.36 823.83 908,153.94
Providing and Backfilling with graded filter
materials in layer with necessary watering and
2.5 Cu.m
compaction etc. all complete as per specification
and drawing. (SS/SP-2400, 3100) 44.02 1214.09 53,446.67
Providing, laying and fixing Geotextile (filter
2.6 fabrics) all complete as per specification. (SS/SP- Sq.m
2404,3110) 1661.28 242.62 403,059.75
Providing and laying Random Rubble masonry
works in cement sand mortar in 1:4 including
scaffolding, curing, preparing cement mortar for
2.7 Cu.m
construction of left and right wing walls all
complete manual mixing mortar 35 % (SS/SP-
2600)
286.39 8977.87 2,571,179.37
Sub Total 2 27,702,994.89
3 Super Structure Work
Providing and Installing M35/20 in precast RC
3.1 footpath slabs , parapet posts and their bases and Cu.m
road kerbs etc. all complete.(2000) 210.00 15345.24 3,222,500.40
Providing and placing machine mixed cement
concrete M45/20 for the superstructure, deck slab,
3.2 girder etc. including compaction, curing, testing Cu.m
and necessary drainage spout etc. and all
relavent lead all complete (SS/SP-2000) 1603.00 15622.51 25,042,883.53
Providing , Preparing and Installing Steel Forms
3.3 for Cast-In-Situ prestressing girder and removing Sq.m
after completion. (SS-1800) 370.02 342.61 126,772.55
Providing , Preparing and Installing Formwork for
Slab and X-beam structures and removing after
3.4 completion (falsework included) including Sq.m
necessary supports and removing after
completion for Superstructure. (SS-1800) 8247.74 823.83 6,794,733.50
Providing and laying Untensioned reinforcement
bars, HYSD, TMT, minimum 0.2% proof stress
3.5 500Mpa (Fe 500) including cutting, bending, Mt
binding, fixing in position etc. all complete as per
specification and drawing.(SS/PP-2000) 247.43 125080.01 30,948,780.77

Providing Prestressing multistranded cables each


comprising 19 mono strands, each mono strands
of 12.7mm dia. 7- ply low relaxation Class II HTS
(breaking load per mono strand =183.71KN);Total
3.6 Mt
length of 19 multistranded cables (weighing
@14.73 kg/m)=616.6 m(total length of 12.7mm
dia. mono strand weighing @0.77526
Kg/m=11716m)
48.30 160290.45 7,742,028.74
Providing and Installing Sheathing (ducting for
housing 19 multi stranded cables ), corrugated
3.7 HDPE type , 90mm internal dia. (wall thickness Rm
2.3±0.3 mm as maufactured and 1.5 mm after
loss of compression). 3563.00 426.81 1,520,724.03

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED ABSTRACT OF COST

S.N. Description of Items Unit Quantity Rate, NRs. Amount, NRs. Remark
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8 set
position etc. all complete as per specification and
drawing.(SS-2100) 196.00 5071.50 994,014.00

Providing and fixing in position Reinforced POT


3.9 Nos.
bearings as per drawing and specification (1902)
28.00 31625.00 885,500.00
Providing and Installing expansion joint(Slab seal
3.10 Type) sealing etc. all complete as per Rm
specification and drawing. (1900) 88.00 13915.00 1,224,520.00

Providing, laying, spreading, levelling and


3.11 compaction of Wearing Coat M25/20 all complete Cu.m
as per specification and drawing. (2000)
189.27 14334.51 2,713,092.71
Providing and installing 50 mm dia GI (parapet
3.12 Rm
railling) all complete as per specification. 1892.70 791.76 1,498,564.15
Providing and supplying of Enamel Paint
3.13 application in two coats in addition to one base Sq.m
coat. 764.26 192.22 146,906.44
Sub Total 3 82,861,020.82
4 Appoach Road Work
Formation of embankment through all types of soil
including compaction in layers and watering, all
4.1 Cu.m
complete as per specification and drawing.(SS/SP
- 900) 25960.00 379.36 9,848,185.60
Backfilling in layers in Foundation pits, trenches
4.2 etc including compaction and watering complete Cu.m
as per specification.[sp 900] 100.00 553.63 55,363.00
Preparation of sub-grade for rehabilitation or other
4.3 similar works (filling or cutting depth of 10 to 20 Sq.m
cm) in common soil. 1500.00 12.81 19,215.00
Providing, laying, spreading, watering, levelling
and compaction of natural sand gravel sub-base
4.4 Cu.m
grading as per table 12.1 of standard specification
(1201) 406.00 2055.04 834,346.24
Supplying and fixing in place M20/20 RCC
delineator and guard post (size
4.5 1500mmx150mmx150mm) including excavation, Nos.
backfilling, painting and erection etc. all complete
(SS/SP-1500) 80.00 1134.57 90,765.60
Providing & Installation of Bridge Sign Board of
size 1.5mX0.75m with steel stands and including
4.6 Nos.
all reinforcement works & formwork complete.(SS-
1500) 2.00 10000.00 20,000.00
Sub Total 4 10,867,875.44
5 River Training and Protection Work
Earthwork in excavation for river training works in
all types of soil/rock including shoring, struting,
bracing, dewatering and disposal with necessary
5.1 Cu.m 1500.00 122.39 183,585.00
haulage and lift, all complete, as per drawing,
specification and instruction of Engineer.(SS/SP-
900)

Backfilling in layers in gabion wall, trenches etc


5.2 including compaction and watering complete as Cu.m 450.00 553.63 249,133.50
per specification.[sp 900]

Prepared by Checked by Approved by


Name of Project : Lalbakaiya River Bridge,Rautahat
Location: Matiyarba-Laxminiya-Karuniya, Rautahat
REVISED ABSTRACT OF COST

S.N. Description of Items Unit Quantity Rate, NRs. Amount, NRs. Remark
Formation of embankment through all types of soil
including compaction in layers and watering, all
5.3 Cu.m 4200.00 379.36 1,593,312.00
complete as per specification and drawing.(SS/SP
- 900)

Supply and Making heavy Zinc coated gabion


boxes including cutting wire & netting etc.
Hexagonal mesh size 100 mm x 120 mm, mesh
wire-10 SWG, selvedge wire-8 SWG; Gabion
construction works including placing in position,
5.4 Cu.m 2945.00 4785.18 14,092,355.10
tying gabion by tightening wire closing from the
top, tying wire-12 SWG; and filling stones in
gabion box, including supply of materials ,
foundation excavation and disposal all complete
(SS/SP-2400)

Supply and placing grass turfing on guide banks


5.5 Sq.m 1600.00 51.46 82,336.00
etc. all complete as per specification.
Sub Total 5 16,200,721.60
6 Miscellaneous Work
Provide insurance of works, materials,
construction equipment and against accidents to
6.1 work person including third party insturance as LS 1.00 1000000.00 1,000,000.00
per General Conditions of Contract clause 13 and
Contract Data.

Engineer's Facilities: Establishment and


maintenance of facilities for Enginner including the
6.2 cost of minor repair, telephone, electricity, PS 1.00 500000.00 500,000.00
securities guards etc and providing furniture and
other facilities.
Construction of diversion works and maintanance
6.3 of diversion during bridge construction as directed LS 1.00 100000.00 100,000.00
by Engineer
Providing and installation of bridge status of size
6.4 1.5mx0.75m etc. all complete as directed by LS 1.00 10000.00 10,000.00
engineers.
Provision of Demonstration of prestressing
6.5 PS 1.00 100000.00 100,000.00
process to Project Personnels.
Sub Total 6 1,710,000.00
7 New Item
Load test of piles including installation of platform,
7.1 loading arrangements etc. and necessary Nos. 8.00 175000.00 1,400,000.00
measurements & plotting

Pile Integrity test of piles including of installation of


7.2 set 100.00 6500.00 650,000.00
platform etc and necessary measurements

Supply and fixing 100mm G.I. Pipe, medium class for


7.3 Drainage Spout necessary accessory complete as per Nos. 112.00 1656.25 185,500.00
drawing and specification.
Sub Total 7 2,235,500.00
WITHOUT
Grand Total 259,382,365.81 VAT
Provision for Price escalation (10%) 25,938,236.58
Physical Contingencies(10%) 25,938,236.58
Contigencies @ 5 % of Grand Total = 12,969,118.29
VAT @ 13% of Total = 33,719,707.56
Grand Total including VAT and contigencies = 357,947,664.82

Prepared by Checked by Approved by


Approach Road
EAST SIDE APPROACH ROAD FROM ch.0+000 to ch.0+140
chainage length(m) Top width Bottom wiAverage width height avg height volume(m3) Remarks
0+000 0 7.5 21.50 14.50 7.00 0.00
0+030 30 7.5 19.50 13.50 6.00 6.50 2632.50
0+060 30 7.5 15.50 11.50 4.00 5.00 1725.00
0+090 30 7.5 12.50 10.00 2.50 3.25 975.00
0+120 30 7.5 10.50 9.00 1.50 2.00 540.00
0+140 20 7.5 9.50 8.50 1.00 1.25 212.50

6085.00 cu.m
WEST SIDE APPROACH ROAD FROM ch.0+000 to ch.0+900
\
chainage length(m) Top width Bottom wiAverage width height avg height volume(m3) Remarks
0+000 0 7.5 21.50 14.50 7.00 0.00
0+030 30 7.5 19.50 13.50 6.00 6.50 2632.50
0+060 30 7.5 17.50 12.50 5.00 5.50 2062.50
0+090 30 7.5 16.50 12.00 4.50 4.75 1710.00
0+120 30 7.5 14.50 11.00 3.50 4.00 1320.00
0+150 30 7.5 12.50 10.00 2.50 3.00 900.00
0+180 30 7.5 12.50 10.00 2.50 2.50 750.00
0+210 30 7.5 12.50 10.00 2.50 2.50 750.00
0+240 30 7.5 12.50 10.00 2.50 2.50 750.00
0+270 30 7.5 12.50 10.00 2.50 2.50 750.00
0+300 30 7.5 12.50 10.00 2.50 2.50 750.00
0+330 30 7.5 12.50 10.00 2.50 2.50 750.00
0+360 30 7.5 12.50 10.00 2.50 2.50 750.00
0+390 30 7.5 12.50 10.00 2.50 2.50 750.00
0+420 30 7.5 12.50 10.00 2.50 2.50 750.00
0+450 30 7.5 12.50 10.00 2.50 2.50 750.00
0+480 30 7.5 12.50 10.00 2.50 2.50 750.00
0+510 30 7.5 12.50 10.00 2.50 2.50 750.00
0+540 30 7.5 12.50 10.00 2.50 2.50 750.00
0+570 30 7.5 12.50 10.00 2.50 2.50 750.00
0+600 30 7.5 12.50 10.00 2.50 2.50 750.00
19875.00
Total 25960.00 cu.m
Approach Road
EASTSIDE APPROACH ROAD FROM ch.0+000 to ch.0+140
chainage length(m) Top widthheight volume(m3Remarks
0+000 0 7 0.20 0.00
0+030 30 7 0.20 42.00
0+060 30 7 0.20 42.00
0+090 30 7 0.20 42.00
0+120 30 7 0.20 42.00
0+140 20 7 0.20 28.00

196.00 cu.m
WEST SIDE APPROACH ROAD FROM ch.0+000 to ch.0+150

chainage length(m) Top widthheight volume(m3Remarks


0+000 0 7 0.20 0.00
0+030 30 7 0.20 42.00
0+060 30 7 0.20 42.00
0+090 30 7 0.20 42.00
0+120 30 7 0.20 42.00
0+150 30 7 0.20 42.00

210.00
Total 406.00 cu.m
2 100 7 3 4200
2 100 7 3 4200
8400
(3*1*.5+2*
1*1+1*1*1
)
0
5.5 Supply and placing grass turfing on guide banks etc. all complete as per specification.
4 0
4 0
0
6 Miscellaneous Work
6.1 Provide insLS
6.2 Engineer's PS
6.3 ConstructioLS
6.4 Providing aLS
6.5 Provision oPS
7.1 Load test of piles including installation of platform, loading arrangements etc. and necessary measurements & plottin
7.2 Pile Integrity test of piles including of installation of platform etc and necessary measurements
essary measurements & plotting
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office, Itahari
Road Division Chandranigahpur
SUMMARY

Name of Project:- Lalbakaiya River Bridge, Rautahat


Name of Work:- Construction of Prestressed R.C.C. T beam Due Date of Work to be completed : 2077/07/28
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Work Completion :- Running
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Date of Measurement:- 2077/07/15
Contract No.:- DROCNP/337157-4/073/74-36
Date of Work Order : 2074/01/20 Voucher No. of Payment:- -
Date of Work to be completed : 2076/09/28 M.B. Nos.:- -
Previous Bill No.: - -

S.No. Description Contract Amount Previous Bill Current Bill Upto Date Bill Remarks
Amount Amount Amount
A Total Value of Works with PS 198,246,313.12 129,185,540.00 8,529,040.88 137,714,580.88
B Total Value of Works without PS 197,646,313.12 128,685,540.00 8,529,040.88 137,214,580.88
C VAT @13% 25,694,020.71 16,729,120.20 1,108,775.31 17,837,895.51
D Grand Total With VAT & PS 223,940,333.83 145,914,660.20 9,637,816.20 155,552,476.39
Deduction
E Retention Money @ 5% of B 6,434,277.00 426,452.04 6,860,729.04
F Mobilization Advance - - -
G TDS @1.5% of B 1,930,283.10 127,935.61 2,058,218.71
H VAT @6.5% of B 8,364,560.10 554,387.66 8,918,947.76
I CAN Tax @ 0.1% of B 128,685.54 8,529.04 137,214.58
J Total Deduction 16,857,805.74 1,117,304.36 17,975,110.10
K Net Payble Amount 129,056,854.46 8,520,511.84 137,577,366.30

Submitted By Checked By Approved By


DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09

Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office, Itahari
Road Division Chandranigahpur
Interim Payment Certificate No 09
Bill S.N. :- IPC 09 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Date of Work to be completed : 2076/09/28
Name of Work:- Construction of Prestressed R.C.C. T beam Due Date of Work to be completed : 2077/07/28
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Work Completion :- Running
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Date of Measurement:- 2077/07/15
Contract No.:- DROCNP/337157-4/073/74-36
As per BOQ Uptodate bill Previous Bill In this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
1 Foundation Work
1.1 Site clearance including cutting and removing bushes
and roots etc. before and after completion of work as
directed by engineer. Sq.m 3,000.00 30.00 90,000.00 3,000.00 30.00 90,000.00 3,000.00 90,000.00 - -
1.2 Earthwork in excavation for foundationof structure
in all types of soil/rock including shoring, struting,
bracing, dewatering and disposal with necessary
haulage and lift, all complete as per drawing,
specification and instruction of Engineer. (SS/SP-
900). Cu.m 3,343.46 500.00 1,671,730.00 2,790.70 500.00 1,395,350.00 2,790.70 1,395,350.00 - -
1.3 Boring, Providing and Installing 800mm dia bored
cast-in-situ RCC pileof specified diameter including
Bentonite and excluding reinforcement and concrete
as per specification and drawing etc. all complete.
(1600) Rm 3,520.00 5,000.00 17,600,000.00 3,520.00 5,000.00 17,600,000.00 3,520.00 17,600,000.00 - -
1.4 Providing and laying boulder soling in foundation

for abutment, pier and wing wall all complete (2400) Cu.m 165.90 2,500.00 414,760.00 135.28 2,500.00 338,208.00 135.28 338,208.00 - -
1.5 Providing and placing machine mixed cement
concrete M15/40 for the foundation and footing etc.
including compaction, curing, testing etc. all
complete as per specification and drawing. (SS/SP-
2000) Cu.m 182.24 8,000.00 1,457,952.00 101.46 8,000.00 811,699.20 101.46 811,699.20 - -
1.6 Providing and placing machine mixed cement
concrete M20/20 for the abutment pile cap, abutment
piles etc. including compaction, curing, testing etc.
all complete as per specification and drawing.
(SS/SP-2000) Cu.m 3,130.69 10,000.00 31,306,880.00 3,130.69 10,000.00 31,306,900.00 3,130.69 31,306,900.00 - -
1.7 Providing and laying reinforcement Fe415/500
including cutting, bending, binding, fixing in
position etc. all complete as per specification and
drawing. (SS/SP-2000) Mt 403.83 85,000.00 34,325,466.01 403.63 85,000.00 34,308,550.00 403.63 34,308,550.00 - -
1.8 Providing,preparing and Installing formwork for
concrete works for foundation and substructure
including necessary supports and removing after
completion for sub structure (Class F1 finish)
(SS/SP-1800). Sq.m 611.52 600.00 366,912.00 611.52 600.00 366,912.00 611.52 366,912.00 - -
1.9 Backfilling in layers in foundation pits, trenches etc
including compaction and watering etc. all complete
as per specification.(SP 900) Cu.m 947.20 100.00 94,719.60 892.00 100.00 89,199.60 892.00 89,199.60 - -

91 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09

As per BOQ Uptodate bill Previous Bill In this Bill


S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Sub Total 1 87,328,419.61 86,306,818.80 86,306,818.80 -
2 Sub-Structural Work
2.1 Providing and placing machine mixed cement
concrete M20/20 for the abutment stem, pier stem,
stopper etc. including compaction curing, testing and
lead 30m etc. all complete (SS/SP-2000) Cu.m 316.68 10,000.00 3,166,793.60 235.40 10,000.00 2,354,000.00 235.40 2,354,000.00 - -
2.2 Providing and placing machine mixed cement
concrete M25/20 for the abutment stem cap,
Concrete pedestral etc. including compaction, curing,
testing etc. all complete as per specification and
drawing. (SS/SP-2000) Cu.m 360.24 12,000.00 4,322,861.99 298.14 12,000.00 3,577,637.99 296.41 3,556,901.99 1.73 20,736.00
2.3 Providing and laying reinforcement Fe415/500
including cutting, bending, binding, fixing in
position etc. all complete as per specification and
drawing. (SS/SP-2000) Mt 123.82 85,000.00 10,524,771.40 84.43 85,000.00 7,176,269.99 84.25 7,160,947.04 0.18 15,322.95
2.4 Providing, preparing and installing formworks for
abutment stem, back wall, return wall, stopper etc.
including necessary supports and removing after
comletion etc. all complete as per specification with
F2 finish. (SS/SP-1800) Sq.m 1,102.36 700.00 771,649.20 632.99 700.00 443,092.30 627.23 439,060.30 5.76 4,032.00
2.5 Providing and Backfilling with graded filter
materials in layer with necessary watering and
compaction etc. all complete as per specification and
drawing. (SS/SP-2400, 3100) Cu.m 44.02 600.00 26,413.20 - 600.00 - - - - -
2.6 Providing, laying and fixing Geotextile (filter
fabrics) all complete as per specification. (SS/SP-
2404,3110) Sq.m 1,661.28 150.00 249,192.00 - 150.00 - - - - -
2.7 Providing and laying Random Rubble masonry
works in cement sand mortar in 1:4 including
scaffolding, curing, preparing cement mortar for
construction of left and right wing walls all complete
manual mixing mortar 35 % (SS/SP-2600) Cu.m 286.39 5,500.00 1,575,149.40 - 5,500.00 - - - - -
Sub Total 2 20,636,830.79 13,551,000.28 13,510,909.33 40,090.95
3 Super Structure Work
3.1 Providing and Installing M35/20 in precast RC
footpath slabs , parapet posts and their bases and
road kerbs etc. all complete.(2000) Cu.m 210.00 13,500.00 2,835,000.00 - 13,500.00 - - - - -
3.2 Providing and placing machine mixed cement
concrete M45/20 for the superstructure, deck slab,
girder etc. including compaction, curing, testing and
necessary drainage spout etc. and all relavent lead all
complete (SS/SP-2000) Cu.m 1,603.00 15,000.00 24,045,000.00 669.24 15,000.00 10,038,543.75 434.75 6,521,265.00 234.49 3,517,278.75
3.3 Providing , Preparing and Installing Steel Forms for
Cast-In-Situ prestressing girder and removing after
completion. (SS-1800) Sq.m 370.02 700.00 259,014.00 157.50 700.00 110,250.00 105.72 74,004.00 51.78 36,246.00
3.4 Providing , Preparing and Installing Formwork for
Slab and X-beam structures and removing after
completion (falsework included) including necessary
supports and removing after completion for
Superstructure. (SS-1800) Sq.m 8,247.74 700.00 5,773,416.18 2,710.70 700.00 1,897,489.02 1,797.30 1,258,107.48 913.40 639,381.54

92 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09

As per BOQ Uptodate bill Previous Bill In this Bill


S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
3.5 Providing and laying Untensioned reinforcement
bars, HYSD, TMT, minimum 0.2% proof stress
500Mpa (Fe 500) including cutting, bending,
binding, fixing in position etc. all complete as per
specification and drawing.(SS/PP-2000) Mt 247.43 85,000.00 21,031,708.95 99.01 85,000.00 8,416,038.15 66.40 5,644,194.51 32.61 2,771,843.64
3.6 Providing Prestressing multistranded cables each
comprising 19 mono strands, each mono strands of
12.7mm dia. 7- ply low relaxation Class II HTS
(breaking load per mono strand =183.71KN);Total
length of 19 multistranded cables (weighing @14.73
kg/m)=616.6 m(total length of 12.7mm dia. mono
strand weighing @0.77526 Kg/m=11716m) Mt 48.30 135,000.00 6,520,500.00 20.70 135,000.00 2,794,500.00 13.80 1,863,000.00 6.90 931,500.00
3.7 Providing and Installing Sheathing (ducting for
housing 19 multi stranded cables ), corrugated
HDPE type , 90mm internal dia. (wall thickness
2.3±0.3 mm as maufactured and 1.5 mm after loss of
compression). Rm 3,563.00 300.00 1,068,900.00 1,527.00 300.00 458,100.00 1,018.00 305,400.00 509.00 152,700.00
3.8 Providing and instlling Anchorages for 19 - stranded
multistranded cables Assemble in position etc. all
complete as per specification and drawing.(SS-2100) set 196.00 5,000.00 980,000.00 84.00 5,000.00 420,000.00 56.00 280,000.00 28.00 140,000.00
3.9 Providing and fixing in position Reinforced POT
bearings as per drawing and specification (1902) Nos. 28.00 75,000.00 2,100,000.00 12.00 75,000.00 900,000.00 8.00 600,000.00 4.00 300,000.00
3.10 Providing and Installing expansion joint(Slab seal
Type) sealing etc. all complete as per specification
and drawing. (1900) Rm 88.00 25,000.00 2,200,000.00 - 25,000.00 - - - - -
3.11 Providing, laying, spreading, levelling and
compaction of Wearing Coat M25/20 all complete
as per specification and drawing. (2000) Cu.m 189.27 12,500.00 2,365,875.00 - 12,500.00 - - - - -
3.12 Providing and installing 50 mm dia GI (parapet
railling) all complete as per specification. Rm 1,892.70 1,100.00 2,081,970.00 - 1,100.00 - - - - -
3.13 Providing and supplying of Enamel Paint

application in two coats in addition to one base coat. Sq.m 764.26 300.00 229,278.60 - 300.00 - - - - -
Sub Total 3 71,490,662.73 25,034,920.92 16,545,970.99 8,488,949.93

93 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09

As per BOQ Uptodate bill Previous Bill In this Bill


S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
4 Appoach Road Work
4.1 Formation of embankment through all types of soil
including compaction in layers and watering, all
complete as per specification and drawing.(SS/SP -
900) Cu.m 25,960.00 150.00 3,894,000.00 - 150.00 - - - - -
4.2 Backfilling in layers in Foundation pits, trenches etc
including compaction and watering complete as per
specification.[sp 900] Sq.m 100.00 100.00 10,000.00 - 100.00 - - - - -
4.3 Preparation of sub-grade for rehabilitation or other
similar works (filling or cutting depth of 10 to 20
cm) in common soil. Cu.m 1,500.00 30.00 45,000.00 - 30.00 - - - - -
4.4 Providing, laying, spreading, watering, levelling and
compaction of natural sand gravel sub-base grading
as per table 12.1 of standard specification (1201) Nos. 406.00 1,100.00 446,600.00 - 1,100.00 - - - - -
4.5 Supplying and fixing in place M20/20 RCC
delineator and guard post (size
1500mmx150mmx150mm) including excavation,
backfilling, painting and erection etc. all complete
(SS/SP-1500) Nos. 80.00 2,000.00 160,000.00 - 2,000.00 - - - - -
4.6 Providing & Installation of Bridge Sign Board of
size 1.5mX0.75m with steel stands and including all
reinforcement works & formwork complete.(SS-
1500) Nos. 2.00 15,000.00 30,000.00 - 15,000.00 - - - - -
Sub Total 4 4,585,600.00 - - -
5 River Training and Protection Work
5.1 Earthwork in excavation for river training works in
all types of soil/rock including shoring, struting,
bracing, dewatering and disposal with necessary
haulage and lift, all complete, as per drawing,
specification and instruction of Engineer.(SS/SP-
900) Cu.m 1,500.00 100.00 150,000.00 - 100.00 - - - - -

94 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09

As per BOQ Uptodate bill Previous Bill In this Bill


S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
5.2 Backfilling in layers in gabion wall, trenches etc
including compaction and watering complete as per
specification.[sp 900] Cu.m 450.00 100.00 45,000.00 - 100.00 - - - - -
5.3 Formation of embankment through all types of soil
including compaction in layers and watering, all
complete as per specification and drawing.(SS/SP -
900) Cu.m 4,200.00 150.00 630,000.00 - 150.00 - - - - -
5.4 Supply and Making heavy Zinc coated gabion boxes
including cutting wire & netting etc. Hexagonal
mesh size 100 mm x 120 mm, mesh wire-10 SWG,
selvedge wire-8 SWG; Gabion construction works
including placing in position, tying gabion by
tightening wire closing from the top, tying wire-12
SWG; and filling stones in gabion box, including
supply of materials , foundation excavation and
disposal all complete (SS/SP-2400) Cu.m 2,945.00 3,000.00 8,835,000.00 - 3,000.00 - - - - -
5.5 Supply and placing grass turfing on guide banks etc.
all complete as per specification. Sq.m 1,600.00 25.00 40,000.00 - 25.00 - - - - -
Sub Total 5 9,700,000.00 - - -
6 Miscellaneous Work
6.1 Provide insurance of works, materials, construction
equipment and against accidents to work person
including third party insturance as per General
Conditions of Contract clause 13 and Contract Data. LS 1.00 2,000,000.00 2,000,000.00 1.00 2,000,000.00 2,000,000.00 1.00 2,000,000.00 - -
6.2 Engineer's Facilities: Establishment and maintenance
of facilities for Enginner including the cost of minor
repair, telephone, electricity, securities guards etc
and providing furniture and other facilities. PS 1.00 500,000.00 500,000.00 1.00 500,000.00 500,000.00 1.00 500,000.00 - -
6.3 Construction of diversion works and maintanance of
diversion during bridge construction as directed by
Engineer LS 1.00 200,000.00 200,000.00 0.90 200,000.00 180,000.00 0.90 180,000.00 - -
6.4 Providing and installation of bridge status of size
1.5mx0.75m etc. all complete as directed by
engineers. LS 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 1.00 20,000.00 - -
6.5 Provision of Demonstration of prestressing process
to Project Personnels. PS 1.00 100,000.00 100,000.00 - 100,000.00 - - - - -
Sub Total 6 2,820,000.00 2,700,000.00 2,700,000.00 -
7 New Item
7.1 Load test of piles including installation of platform,
loading arrangements etc. and necessary
measurements & plotting Nos. 8.00 132,000.00 1,056,000.00 8.00 132,000.00 1,056,000.00 8.00 1,056,000.00 - -
7.2 Pile Integrity test of piles including of installation of
platform etc and necessary measurements Nos. 100.00 5,000.00 500,000.00 100.00 5,000.00 500,000.00 100.00 500,000.00 - -
7.3 Providing Drainage spouts each 450mm
long,100mm Dia GI Pipe Nos. 112.00 1,150.00 128,800.00 32.00 1,150.00 36,800.00 32.00 36,800.00 - -
Sub Total 7 1,684,800.00 1,592,800.00 - 1,592,800.00 -

95 of 133
DROCNP/337157-4/073/74-36 INTERIM PAYMENT CERTIFICATE 09

As per BOQ Uptodate bill Previous Bill In this Bill


S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount

Total Amount 198,246,313.12 129,185,540.00 120,656,499.12 8,529,040.88


Amount without PS 197,646,313.12 128,685,540.00 120,156,499.12 8,529,040.88
Debate @ 0% - - - -
Net Amount without PS 197,646,313.12 128,685,540.00 120,156,499.12 8,529,040.88
Net Amount with PS without VAT 198,246,313.12 129,185,540.00 120,656,499.12 8,529,040.88

Checked By : Approved By :
Post: Engineer Post: Division Chief
Signature of Contractor:-……………………………. Sub Engineer:-……………… Signature :- ………………………………. Signature :- ……………………………….

96 of 133
DROCNP/337157-4/073/74-36 MEASUREMENT SHEET FOR IPC 09 97of 133

Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office, Itahari
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 09 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Date of Measurement:- 2077/07/15
S.N. Description of Works Unit No. Length Breadth Height Quantity Remarks
1
Foundation works
1.1 Site clearance including cutting and removing
bushes and roots etc. before and after
completion of work as directed by engineer. Sq.m
Uptodate Quantity 3,000.00
Previous Quantity 3,000.00
In this Bill -
1.2 Earthwork in excavation for foundation of
structure in all types of soil/rock including
shoring, struting, bracing, dewatering and
disposal with necessary haulage and lift, all
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900) Cu.m
Uptodate Quantity 2,790.70
Previous Quantity 2,790.70
In this Bill -
1.3 Boring , providing and Installing 800mm dia
bored cast-in-situ RCC pile of specfied
diameter including Bentonite and excluding
reinforcement and concrete as per
specification and drawing etc. all complete.
(1600) Rm
Uptodate Quantity 3,520.00
Previous Quantity 3,520.00
In this Bill -
1.4 Providing and laying boulder soling in
foundation for abutment, pier and wing wall
all complete (2400) Cu.m
Uptodate Quantity 135.28
Previous Quantity 135.28
In this Bill -
1.5 Providing and placing machine mixed cement
concrete M15/40 for the foundation and
footing etc. including compaction, curing,
testing etc. all complete as per specification
and drawing. (SS/SP-2000) Cu.m
Uptodate Quantity 101.46
Previous Quantity 101.46
In this Bill 0.00
1.6 Providing and placing machine mixed cement
concrete M20/20 for the abutment pile cap,
abutment piles etc. including compaction,
curing, testing etc. all complete as per
specification and drawing. (SS/SP-2000) Cu.m
Uptodate Quantity 3,130.69
Previous Quantity 3,130.69
In this Bill -
1.7 Providing and laying reinforcement
Fe415/500 including cutting, bending,
binding, fixing in position etc. all complete as
Prepared by:- Checked by:- Approved by:-
per specification and drawing.(SS/SP-2000) Mt
13.46 MT
98of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 08
Bill S.N. :- IPC 08 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/07/28
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2077/03/14
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount

1 Foundation Work
Site clearance including cutting and
removing bushes and roots etc. before and
1.1 after completion of work as directed by Sq.m 3,000.00 30.00 90,000.00 3,000.00 30.00 90,000.00 3,000.00 90,000.00 0.00 0.00
engineer.

Earthwork in excavation for foundationof


structure in all types of soil/rock including
shoring, struting, bracing, dewatering and
1.2 disposal with necessary haulage and lift, all Cu.m 3,343.46 500.00 1,671,730.00 2,790.70 500.00 1,395,350.00 2,790.70 1,395,350.00 0.00 0.00
complete as per drawing, specification and
instruction of Engineer. (SS/SP-900).

Boring, Providing and Installing 800mm dia


bored cast-in-situ RCC pileof specified
diameter including Bentonite and excluding
1.3 reinforcement and concrete as per Rm 3,520.00 5,000.00 17,600,000.00 3,520.00 5,000.00 17,600,000.00 3,520.00 17,600,000.00 0.00 0.00
specification and drawing etc. all complete.
(1600)

Providing and laying boulder soling in


1.4 foundation for abutment, pier and wing wall Cu.m 165.90 2,500.00 414,760.00 135.28 2,500.00 338,208.00 135.28 338,208.00 0.00 0.00
all complete (2400)

Providing and placing machine mixed


cement concrete M15/40 for the foundation
and footing etc. including compaction,
1.5 curing, testing etc. all complete as per Cu.m 182.24 8,000.00 1,457,952.00 101.46 8,000.00 811,699.20 101.46 811,699.20 0.00 0.00
specification and drawing. (SS/SP-2000)

Providing and placing machine mixed


cement concrete M20/20 for the abutment
pile cap, abutment piles etc. including
1.6 compaction, curing, testing etc. all complete Cu.m 3,130.69 10,000.00 31,306,880.00 3,130.69 10,000.00 31,306,900.00 3,130.69 31,306,900.00 0.00 0.00
as per specification and drawing. (SS/SP-
2000)

Providing and laying reinforcement


Fe415/500 including cutting, bending,
binding, fixing in position etc. all complete as
1.7 Mt 403.83 85,000.00 34,325,466.01 403.63 85,000.00 34,308,550.00 403.63 34,308,550.00 0.00 0.00
per specification and drawing. (SS/SP-2000)

Providing,preparing and Installing formwork


for concrete works for foundation and
substructure including necessary supports
1.8 and removing after completion for sub Sq.m 611.52 600.00 366,912.00 611.52 600.00 366,912.00 611.52 366,912.00 0.00 0.00
structure (Class F1 finish)(SS/SP-1800).
99of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 08
Bill S.N. :- IPC 08 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/07/28
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2077/03/14
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Backfilling in layers in foundation pits,
trenches etc including compaction and
1.9 watering etc. all complete as per Cu.m 947.20 100.00 94,719.60 892.00 100.00 89,199.60 892.00 89199.60 0.00 0.00
specification.(SP 900)

Sub Total 1 87,328,419.61 86,306,818.80 86,306,818.80 0.00


2 Sub-Structural Work
Providing and placing machine mixed
cement concrete M20/20 for the abutment
2.1 stem, pier stem, stopper etc. including Cu.m 316.68 10,000.00 3,166,793.60 235.40 10,000.00 2,354,000.00 235.40 2,354,000.00 0.00 0.00
compaction curing, testing and lead 30m etc.
all complete (SS/SP-2000)

Providing and placing machine mixed


cement concrete M25/20 for the abutment
stem cap, Concrete pedestral etc. including
2.2 compaction, curing, testing etc. all complete Cu.m 360.24 12,000.00 4,322,861.99 296.41 12,000.00 3,556,901.99 294.68 3,536,166.00 1.73 20,735.99
as per specification and drawing. (SS/SP-
2000)

Providing and laying reinforcement


Fe415/500 including cutting, bending,
2.3 binding, fixing in position etc. all complete as Mt 123.82 85,000.00 10,524,771.40 84.25 85,000.00 7,160,947.04 84.07 7,145,624.09 0.18 15,322.95
per specification and drawing. (SS/SP-2000)

Providing, preparing and installing formworks


for abutment stem, back wall, return wall,
stopper etc. including necessary supports
2.4 and removing after comletion etc. all Sq.m 1,102.36 700.00 771,649.20 627.23 700.00 439,060.30 621.47 435,028.30 5.76 4,032.00
complete as per specification with F2 finish.
(SS/SP-1800)

Providing and Backfilling with graded filter


materials in layer with necessary watering
and compaction etc. all complete as per
2.5 Cu.m 44.02 600.00 26,413.20 0.00 600.00 0.00 0.00 0.00 0.00 0.00
specification and drawing. (SS/SP-2400,
3100)

Providing, laying and fixing Geotextile (filter


fabrics) all complete as per specification.
2.6 Sq.m 1,661.28 150.00 249,192.00 0.00 150.00 0.00 0.00 0.00 0.00 0.00
(SS/SP-2404,3110)

Providing and laying Random Rubble


masonry works in cement sand mortar in 1:4
including scaffolding, curing, preparing
2.7 cement mortar for construction of left and Cu.m 286.39 5,500.00 1,575,149.40 0.00 5,500.00 0.00 0.00 0.00 0.00 0.00
right wing walls all complete manual mixing
mortar 35 % (SS/SP-2600)

Sub Total 2 20,636,830.79 13,510,909.33 13,470,818.39 40,090.94


100of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 08
Bill S.N. :- IPC 08 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/07/28
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2077/03/14
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount

3 Super Structure Work


Providing and Installing M35/20 in precast
RC footpath slabs , parapet posts and their
3.1 bases and road kerbs etc. all complete. Cu.m 210.00 13,500.00 2,835,000.00 0.00 13,500.00 0.00 0.00 0.00 0.00 0.00
(2000)

Providing and placing machine mixed


cement concrete M45/20 for the
superstructure, deck slab, girder etc.
3.2 including compaction, curing, testing and Cu.m 1,603.00 15,000.00 24,045,000.00 434.75 15,000.00 6,521,265.00 217.35 3260227.50 217.40 3,261,037.50
necessary drainage spout etc. and all
relavent lead all complete (SS/SP-2000)

Providing , Preparing and Installing Steel


Forms for Cast-In-Situ prestressing girder
3.3 Sq.m 370.02 700.00 259,014.00 105.72 700.00 74,004.00 52.86 37002.00 52.86 37,002.00
and removing after completion. (SS-1800)

Providing , Preparing and Installing


Formwork for Slab and X-beam structures
and removing after completion (falsework
3.4 included) including necessary supports and Sq.m 8,247.74 700.00 5,773,416.18 1,797.30 700.00 1,258,107.48 898.65 629053.74 898.65 629,053.74
removing after completion for
Superstructure. (SS-1800)

Providing and laying Untensioned


reinforcement bars, HYSD, TMT, minimum
0.2% proof stress 500Mpa (Fe 500)
3.5 including cutting, bending, binding, fixing in Mt 247.43 85,000.00 21,031,708.95 66.40 85,000.00 5644194.51 33.20 2822097.26 33.20 2,822,097.26
position etc. all complete as per specification
and drawing.(SS/PP-2000)

Providing Prestressing multistranded cables


each comprising 19 mono strands, each
mono strands of 12.7mm dia. 7- ply low
relaxation Class II HTS (breaking load per
mono strand =183.71KN);Total length of 19
3.6 multistranded cables (weighing @14.73 Mt 48.30 135,000.00 6,520,500.00 13.80 135,000.00 1863000.00 6.90 931500.00 6.90 931,500.00
kg/m)=616.6 m(total length of 12.7mm dia.
mono strand weighing @0.77526
Kg/m=11716m)

Providing and Installing Sheathing (ducting


for housing 19 multi stranded cables ),
corrugated HDPE type , 90mm internal dia.
3.7 Rm 3,563.00 300.00 1,068,900.00 1018.00 300.00 305400.00 508.80 152640.00 509.20 152,760.00
(wall thickness 2.3±0.3 mm as maufactured
and 1.5 mm after loss of compression).
101of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 08
Bill S.N. :- IPC 08 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/07/28
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2077/03/14
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8 position etc. all complete as per specification set 196.00 5,000.00 980,000.00 56.00 5,000.00 280000.00 28.00 140000.00 28.00 140,000.00
and drawing.(SS-2100)

Providing and fixing in position Reinforced


3.9 POT bearings as per drawing and Nos. 28.00 75,000.00 2,100,000.00 8.00 75,000.00 600000.00 4.00 300000.00 4.00 300,000.00
specification (1902)

Providing and Installing expansion joint(Slab


seal Type) sealing etc. all complete as per
3.10 specification and drawing. (1900) Rm 88.00 25,000.00 2,200,000.00 0.00 25,000.00 0.00 0.00 0.00 0.00 0.00

Providing, laying, spreading, levelling and


compaction of Wearing Coat M25/20 all
3.11 complete as per specification and drawing. Cu.m 189.27 12,500.00 2,365,875.00 0.00 12,500.00 0.00 0.00 0.00 0.00 0.00
(2000)

Providing and installing 50 mm dia GI


3.12 (parapet railling) all complete as per Rm 1,892.70 1,100.00 2,081,970.00 0.00 1,100.00 0.00 0.00 0.00 0.00 0.00
specification.

Providing and supplying of Enamel Paint


application in two coats in addition to one
3.13 Sq.m 764.26 300.00 229,278.60 0.00 300.00 0.00 0.00 0.00 0.00 0.00
base coat.

Sub Total 3 71,490,662.73 16,545,970.99 8272520.50 8,273,450.50


102of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 08
Bill S.N. :- IPC 08 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/07/28
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2077/03/14
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount

4 Appoach Road Work


Formation of embankment through all types
of soil including compaction in layers and
4.1 watering, all complete as per specification Cu.m 25,960.00 150.00 3,894,000.00 0.00 150.00 0.00 0.00 0.00 0.00 0.00
and drawing.(SS/SP - 900)

Backfilling in layers in Foundation pits,


trenches etc including compaction and
4.2 watering complete as per specification.[sp Sq.m 100.00 100.00 10,000.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00
900]

Preparation of sub-grade for rehabilitation or


other similar works (filling or cutting depth of
4.3 Cu.m 1,500.00 30.00 45,000.00 0.00 30.00 0.00 0.00 0.00 0.00 0.00
10 to 20 cm) in common soil.

Providing, laying, spreading, watering,


levelling and compaction of natural sand
4.4 gravel sub-base grading as per table 12.1 of Nos. 406.00 1,100.00 446,600.00 0.00 1,100.00 0.00 0.00 0.00 0.00 0.00
standard specification (1201)

Supplying and fixing in place M20/20 RCC


delineator and guard post (size
1500mmx150mmx150mm) including
4.5 excavation, backfilling, painting and erection Nos. 80.00 2,000.00 160,000.00 0.00 2,000.00 0.00 0.00 0.00 0.00 0.00
etc. all complete (SS/SP-1500)

Providing & Installation of Bridge Sign


Board of size 1.5mX0.75m with steel stands
4.6 and including all reinforcement works & Nos. 2.00 15,000.00 30,000.00 0.00 15,000.00 0.00 0.00 0.00 0.00 0.00
formwork complete.(SS-1500)

Sub Total 4 4,585,600.00 0.00 0.00 0.00


5 River Training and Protection Work
Earthwork in excavation for river training
works in all types of soil/rock including
shoring, struting, bracing, dewatering and
5.1 disposal with necessary haulage and lift, all Cu.m 1,500.00 100.00 150,000.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900)
103of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 08
Bill S.N. :- IPC 08 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/07/28
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2077/03/14
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Backfilling in layers in gabion wall, trenches
etc including compaction and watering
5.2 complete as per specification.[sp 900] Cu.m 450.00 100.00 45,000.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00

Formation of embankment through all types


of soil including compaction in layers and
5.3 watering, all complete as per specification Cu.m 4,200.00 150.00 630,000.00 0.00 150.00 0.00 0.00 0.00 0.00 0.00
and drawing.(SS/SP - 900)

Supply and Making heavy Zinc coated


gabion boxes including cutting wire & netting
etc. Hexagonal mesh size 100 mm x 120
mm, mesh wire-10 SWG, selvedge wire-8
SWG; Gabion construction works including
placing in position, tying gabion by tightening
5.4 wire closing from the top, tying wire-12 Cu.m 2,945.00 3,000.00 8,835,000.00 0.00 3,000.00 0.00 0.00 0.00 0.00 0.00
SWG; and filling stones in gabion box,
including supply of materials , foundation
excavation and disposal all complete
(SS/SP-2400)

Supply and placing grass turfing on guide


5.5 banks etc. all complete as per specification. Sq.m 1,600.00 25.00 40,000.00 0.00 25.00 0.00 0.00 0.00 0.00 0.00

Sub Total 5 9,700,000.00 0.00 0.00 0.00


6 Miscellaneous Work
Provide insurance of works, materials,
construction equipment and against
accidents to work person including third
6.1 party insturance as per General Conditions LS 1.00 2,000,000.00 2,000,000.00 1.00 2,000,000.00 2,000,000.00 1.00 2,000,000.00 0.00 0.00
of Contract clause 13 and Contract Data.

Engineer's Facilities: Establishment and


maintenance of facilities for Enginner
including the cost of minor repair, telephone,
6.2 PS 1.00 500,000.00 500,000.00 1.00 500,000.00 500,000.00 1.00 500,000.00 0.00 0.00
electricity, securities guards etc and
providing furniture and other facilities.

Construction of diversion works and


maintanance of diversion during bridge
6.3 LS 1.00 200,000.00 200,000.00 0.90 200,000.00 180,000.00 0.90 180,000.00 0.00 0.00
construction as directed by Engineer

Providing and installation of bridge status of


size 1.5mx0.75m etc. all complete as
6.4 LS 1.00 20,000.00 20,000.00 1.00 20,000.00 20000.00 1.00 20,000.00 0.00 0.00
directed by engineers.

Provision of Demonstration of prestressing


6.5 process to Project Personnels. PS 1.00 100,000.00 100,000.00 0.00 100,000.00 0.00 0.00 0.00 0.00 0.00
104of 133
Government of Nepal
Ministry of Physical Infrastructre and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Interim Payment Certificate No 08
Bill S.N. :- IPC 08 (Running) Date of Work Order : 2074/01/20
Name of Project:- Lalbakaiya River Bridge, Rautahat Due Date of Work to be completed : 2077/07/28
Name of Work:- Construction of Prestressed R.C.C. T beam Date of Work Completion :- Running
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat Date of Measurement:- 2077/03/14
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Payment Voucher No.:-
Contract No.:- DROCNP/337157-4/073/74-36 Date of Payment
Previous Bill S.N. :None M.B.No:-
Previous Bill's Voucher No. : M.B.Page No:-

BOQ (AS PER VO) Work done uptodate bill Work done till Previous Bill Work done in this Bill
S.N Description of Works Unit Remarks
Quantity Rate, NRs. Amount, NRs. Quantity Rate Amount Quantity Amount Quantity Amount
Sub Total 6 2,820,000.00 2,700,000.00 2,700,000.00 0.00
7 New Item
Load test of piles including installation of
7.1 platform, loading arrangements etc. and Nos. 8.00 132,000.00 1,056,000.00 8.00 132,000.00 1056000.00 8.00 1056000.00 0.00 0.00
necessary measurements & plotting
Pile Integrity test of piles including of
7.2 installation of platform etc and necessary Nos. 100.00 5,000.00 500,000.00 100.00 5,000.00 500000.00 0.00 0.00 100.00 500000.00
measurements
Providing Drainage spouts each 450mm
7.3 long,100mm Dia GI Pipe Nos. 112.00 1,150.00 128,800.00 32.00 1,150.00 36800.00 0.00 0.00 32.00 36800.00
Sub Total 7 1,684,800.00 1,592,800.00 1,056,000.00 536800.00
Amount 198,246,313.12 120,656,499.12 111,806,157.68 8,850,341.43

Amount without PS 197,646,313.12 120,156,499.12 111,306,157.68 8,850,341.43

Discount 0.00 % 0.00 0.00 0.00 0.00


Net Amount without PS 197,646,313.12 120,156,499.12 111,306,157.68 8,850,341.43
Net Amount with PS 198,246,313.12 120,656,499.12 111,806,157.68 8,850,341.43

Recommended By : Singature of Contractor:-………………………………………………

Total Bill Amount, Nrs. :


Payment till Previous Bill, NRs. : Checked By:
To be paid in this Bill, NRs.:
Amount to be deducted:
A) Advance Payment, Nrs. :
B) Material Cost, NRs. :
C) Toos and Equiptment Cost, NRs. :
D) Contract Tax, NRs. :
E) Retention Amount, NRs. :
F) Others, NRs. :

Net Payable Amount


Approved By :
Prepared and Submitted By: Post: Division Chief
Post : Name:- D. Prasad
Signature : Signature :- ……………………………….

Decleration by Contractor : I/We get the payment as per above. Signature:- ………………………………………
105of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

1 Foundation works

Site clearance including cutting and removing


bushes and roots etc. before and after
1.1 completion of work as directed by engineer. Sq.m

For Left abutment 1.00 20.00 15.00 300.00


For Pier no 1 1.00 20.00 20.00 400.00
For Pier no 2 1.00 20.00 20.00 400.00
For Pier no 3 1.00 20.00 20.00 400.00
For Pier no 4 1.00 20.00 20.00 400.00
For Pier no 5 1.00 20.00 20.00 400.00
For Pier no 6 1.00 20.00 20.00 400.00
For Right abutment 1.00 20.00 15.00 300.00
Uptodate Quantity 3,000.00
Previous Quantity 3,000.00
In this Bill 0.00
Earthwork in excavation for foundation of
structure in all types of soil/rock including
shoring, struting, bracing, dewatering and
1.2 disposal with necessary haulage and lift, all Cu.m
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900)

For Left Abutment Piles 1.00 11.00 8.60 2.20 208.12


For Pier (1) Piless 1.00 11.00 8.60 3.35 316.91
For Pier (2) Piles 1.00 11.00 8.60 4.35 411.51
For Pier (3) Piles 1.00 11.00 8.60 4.35 411.51
For Pier (4) Piles 1.00 11.00 8.60 4.35 411.51
For Pier (5) Piles 1.00 11.00 8.60 4.35 411.51
For Pier (6) Piles 1.00 11.00 8.60 4.35 411.51
For Right Abutment Piles 1.00 11.00 8.60 2.20 208.12
Uptodate Quantity 2,790.70
Previous Quantity 2,790.70
In this Bill 0.00
Boring , providing and Installing 800mm dia
bored cast-in-situ RCC pile of specfied
diameter including Bentonite and excluding
1.3 reinforcement and concrete as per Rm
specification and drawing etc. all complete.
(1600)

For Left Abutment Piles 20.00 22.00 440.00


For Pier (1) Piless 20.00 22.00 440.00
For Pier (2) Piles 20.00 22.00 440.00

Prepared by:- Checked by:- Approved by:-


106of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

For Pier (3) Piless 20.00 22.00 440.00


For Pier (4) Piles 20.00 22.00 440.00
For Pier (5) Piless 20.00 22.00 440.00
For Pier (6) Piles 20.00 22.00 440.00
For Right Abutment Piles 20.00 22.00 440.00
Uptodate Quantity 3,520.00
Previous Quantity 3,520.00
In this Bill 0.00
Providing and laying boulder soling in
1.4 foundation for abutment, pier and wing wall Cu.m
all complete (2400)

For Right Abutment Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (6) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (5) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (4) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (2) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Left Abutment Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (3) Piles Cap 1.00 11.00 8.60 0.20 18.92
For Pier (1) Piles Cap 1.00 11.00 8.60 0.20 18.92
Deduction for piles area

Area= (3.14 x 0.80


For Left & Right Abutment -40.00 x0.80/4)=0.5024
0.20 -4.02

Area= (3.14 x 0.80


For piers -120.00 x0.80/4)=0.5024
0.20 -12.06

Uptodate Quantity 135.28


Previous Quantity 135.28
In this Bill 0.00
Providing and placing machine mixed cement
concrete M15/40 for the foundation and
footing etc. including compaction, curing,
1.5 Cu.m
testing etc. all complete as per specification
and drawing. (SS/SP-2000)

For Right Abutment Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (6) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (5) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (4) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (2) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Left Abutment Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (3) Piles Cap 1.00 11.00 8.60 0.15 14.19
For Pier (1) Piles Cap 1.00 11.00 8.60 0.15 14.19
Deduction for piles area
Area= (3.14 x 0.80
For Left & Right Abutment -40.00 x0.80/4)=0.5024
0.15 -3.01

Area= (3.14 x 0.80


For piers -120.00 x0.80/4)=0.5024
0.15 -9.04

Uptodate Quantity 101.46


Previous Quantity 101.46
In this Bill 0.00

Prepared by:- Checked by:- Approved by:-


107of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

Providing and placing machine mixed cement


concrete M20/20 for the abutment pile cap,
abutment piles etc. including compaction,
1.6 curing, testing etc. all complete as per Cu.m
specification and drawing. (SS/SP-2000)

Area= (3.14 x 0.80


For Left Abutment Piles 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (1) Piless 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (2) Piles 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (3) Piless 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (4) Piles 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (5) Piless 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Pier (6) Piles 20.00 22.00 x0.80/4)=0.5024
221.06

Area= (3.14 x 0.80


For Right Abutment Piles 20.00 22.00 x0.80/4)=0.5024
221.06

For Right Abutment Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (6) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (5) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (4) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (2) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Left Abutment Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (3) Piles Cap 1.00 11.00 8.60 1.80 170.28

For Pier (1) Piles Cap 1.00 11.00 8.60 1.80 170.28

Uptodate Quantity 3,130.69


Previous Quantity 3,130.69
In this Bill 0.00

Prepared by:- Checked by:- Approved by:-


108of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

Providing and laying reinforcement


Fe415/500 including cutting, bending,
1.7 binding, fixing in position etc. all complete as Mt
per specification and drawing.(SS/SP-2000)

For Left Abutment Piles


PL1-25 mm Dia 16.00 22.75 wt. =3.858kg/mtr 1404.31
PL2-12 mm Dia 153.00 2.80 wt. =0.889 kg/mtr 380.85
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1812.34
For 20 Nos of Piles 20.00 36246.71 Kg.
36.25 MT
For Pier (1) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1919.87
For 20 Nos of Piles 20.00 38397.32 Kg.
For Pier (2) Piles 38.40 MT
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32 Kg.
38.40 MT
For Pier (3) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32 Kg.
38.40 MT
For Pier (4) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32 Kg.
38.40 MT
For Pier (5) Piles
PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85
PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32 Kg.
38.40 MT
For Pier (6) Piles

Prepared by:- Checked by:- Approved by:-


109of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

PL1-25 mm Dia 18.00 22.75 wt. =3.858kg/mtr 1,579.85


PL2-12 mm Dia 153.00 2.30 wt. =0.889 kg/mtr 312.84
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,919.87
For 20 Nos of Piles 20.00 38,397.32 Kg.
38.40 MT
For Right Abutment Piles
PL1-25 mm Dia 16.00 22.75 wt. =3.858kg/mtr 1,404.31
PL2-12 mm Dia 153.00 2.80 wt. =0.889 kg/mtr 380.85
Stifferner ring (ring) 16 mm Dia 8.00 2.15 wt. =1.580 kg/mtr 27.18
1,812.34
For 20 Nos of Piles 20.00 36,246.71 Kg.
36.25 MT
For Right Abutment Piles Cap
AA1-25 mm Dia 89.00 9.87 878.43 3.858 3,388.98
AA2-20 mm Dia 93.00 9.87 917.91 2.469 2,266.32
AA3-20 mm Dia 115.00 12.27 1411.05 2.469 3,483.88
AA4-16 mm Dia 8.00 10.87 86.96 1.580 137.40
AA4-16 mm Dia 8.00 8.97 71.76 1.580 113.38
AA5-12 mm Dia 369.00 1.87 690.03 0.889 613.44
10,003.40 Kg.
10.00 MT
For Pier no 6 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48 Kg.
13.46 MT
For Pier no 5 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48 Kg.
13.46 MT
For Pier no 4 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58

Prepared by:- Checked by:- Approved by:-


110of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75


P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48 Kg.
13.46 MT
For Pier no 2 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48 Kg.
13.46 MT
For Left Abutment Piles Cap
AA1-25 mm Dia 89.00 9.87 878.43 3.858 3,388.98
AA2-20 mm Dia 93.00 9.87 917.91 2.469 2,266.32
AA3-20 mm Dia 115.00 12.27 1411.05 2.469 3,483.88
AA4-16 mm Dia 8.00 10.87 86.96 1.580 137.40
AA4-16 mm Dia 8.00 8.97 71.76 1.580 113.38
AA5-12 mm Dia 369.00 1.87 690.03 0.889 613.44
10,003.40 Kg.
10.00 MT
For Pier no 3 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65
P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58
P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48 Kg.
13.46 MT
For Pier no 1 Pile Cap
P1-25mm Dia. 73.00 12.27 895.71 3.858 3,455.65

Prepared by:- Checked by:- Approved by:-


111of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

P2-25mm Dia. 58.00 12.27 711.66 3.858 2,745.58


P3-12mm Dia. 374.00 1.87 699.38 0.889 621.75
P4-16mm Dia. 10.00 10.87 108.70 1.580 171.75
P4-16mm Dia. 10.00 8.97 89.70 1.580 141.73
P18-25mm Dia. 92.00 9.87 908.04 3.858 3,503.22
P19-25mm Dia. Bar 74.00 9.87 730.38 3.858 2,817.81
13,457.48 Kg.
13.46 MT
Uptodate Quantity 403.63 Mt

Previous Quantity 403.63

In this Bill 0.00


Providing,preparing and Installing formwork
for concrete works for foundation and
substructure including necessary supports
1.8 and removing after completion for sub Sq.m
structure (Class F1 finish)(SS/SP-1800).

For Right Abutment


PCC 1.00 39.20 0.15 5.88
Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 6
PCC 1.00 39.20 0.15 5.88
Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 5

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 4

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 2

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Left Abutment

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44

Prepared by:- Checked by:- Approved by:-


112of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

For Pier No. 3

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
For Pier No. 1

PCC 1.00 39.20 0.15 5.88


Raft 1.00 39.20 1.80 70.56
Sub-Total 76.44
Uptodate Quantity 611.52
Previous Quantity 611.52
In this Bill 0.00
Backfilling in layers in foundation pits,
trenches etc including compaction and
1.9 watering etc. all complete as per Cu.m
specification.(SP 900)

For Left Abutment Piles 1.00 39.20 1.35 2.05 108.49


For Pier (1) Piless 1.00 39.20 1.40 2.05 112.50
For Pier (2) Piles 1.00 39.20 1.40 2.05 112.50
For Pier (3) Piles 1.00 39.20 1.40 2.05 112.50
For Pier (4) Piles 1.00 39.20 1.40 2.05 112.50
For Pier (5) Piles 1.00 39.20 1.40 2.05 112.50
For Pier (6) Piles 1.00 39.20 1.40 2.05 112.50
For Right Abutment Piles 1.00 39.20 1.35 2.05 108.49
Uptodate Quantity 892.00
Previous Quantity 892.00
In this Bill 0.00

2 Sub-Structural Work

Providing and placing machine mixed cement


concrete M20/20 for the abutment stem, pier
stem, stopper etc. including compaction
curing, testing and lead 30m etc. all complete Cu.m
2.1
(SS/SP-2000)

For Right Abutment Stem 1.00 10.70 1.50 3.24 52.00

For Pier No 06 Stem 1.00 area = 4.91 4.46 21.90

For Pier No. 05 Stem 1.00 area = 4.91 4.46 21.90

For Pier No. 04 Stem 1.00 area = 4.91 4.46 21.90

For Pier No. 03 Stem 1.00 area = 4.91 4.46 21.90

For Pier No. 02 Stem 1.00 area = 4.91 4.46 21.90

Prepared by:- Checked by:- Approved by:-


113of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

For Pier No. 01 Stem 1.00 area = 4.91 4.46 21.90

For Left Abutment Stem 1.00 10.70 1.50 3.24 52.00

Uptodate Quantity 235.40


Previous Quantity 235.40
In this Bill 0.00
Providing and placing machine mixed cement
concrete M25/20 for the abutment stem cap,
Concrete pedestral etc. including compaction,
2.2 curing, testing etc. all complete as per Cu.m
specification and drawing. (SS/SP-2000)

For Right Abutment Cap 1.00 10.70 2.00 0.70 14.98

A=1/2*.4
Haunch portion 1.00 10.70 0.08 0.86
*.4

For Left Abutment Cap 1.00 10.70 2.00 0.70 14.98


A=1/2*.4
Haunch portion 1.00 10.70 0.08 0.86
*.4
For Pier No 06 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom Qty.=
Top area
area [A1+A2+S
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63 qt(A1*A2)]
5=32.40 H/3
5=6.25
For Pier No. 05 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom Qty.=
Top area
area [A1+A2+S
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63 qt(A1*A2)]
5=32.40 H/3
5=6.25
For Pier No. 04 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom Qty.=
Top area
area [A1+A2+S
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63 qt(A1*A2)]
5=32.40 H/3
5=6.25
For Pier No. 03 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom Qty.=
Top area
area [A1+A2+S
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63 qt(A1*A2)]
5=32.40 H/3
5=6.25
For Pier No. 02 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92
Bottom Qty.=
Top area
area [A1+A2+S
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63 qt(A1*A2)]
5=32.40 H/3
5=6.25
For Pier No. 01 Stem cap
Rectangular portion 1.00 7.20 4.50 0.80 25.92

Prepared by:- Checked by:- Approved by:-


114of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

Bottom Qty.=
Top area
area [A1+A2+S
Tappered portion 1.00 (A1)=7.2x4. (A2)=2.5x2. 1.00 17.63 qt(A1*A2)]
5=32.40 H/3
5=6.25
Bearing Pedestal 8.00 1.20 1.20 0.30 3.46
Uptodate Quantity 296.41
Previous Quantity 294.68
In this Bill 1.73
Providing and laying reinforcement
Fe415/500 including cutting, bending,
2.3 binding, fixing in position etc. all complete as Mt No. L TL Wt./mtr. Quantity
per specification and drawing. (SS/SP-2000)

For Right Abutment & Cap

A1-25 mm Dia 79.00 6.99 552.21 3.858 2,130.43


A2-20 mm Dia 74.00 6.99 517.26 2.469 1,277.11
A3-16 mm Dia 35.00 11.47 401.45 1.580 634.29
A4-16 mm Dia 33.00 11.47 378.51 1.580 598.05
A5-12 mm Dia 161.00 1.57 252.77 0.889 224.71
A6-25 mm Dia 16.00 5.90 94.40 3.858 364.20
A7-16mm Dia 102.00 11.47 1169.94 1.580 1,848.51
A8-25mm Dia 27.00 6.10 164.70 3.858 635.41
A9-12 mm Dia 74.00 4.08 301.92 0.889 268.41
A14-16 mm Dia 32.00 11.47 367.04 1.580 579.92
A31-12 mm Dia 42.00 9.73 408.66 0.889 363.30
A32-16 mm Dia 12.00 8.55 102.60 1.580 162.11
9,086.44 Kg.
9.09 Mt.
For Pier No. 6
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42 Kg.
4.59 Mt.
For Pier No. 6 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75 Kg.
6.36 Mt.
For Pier No. 5
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44

Prepared by:- Checked by:- Approved by:-


115of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

P6-12mm Dia. 46.00 8.25 379.50 0.889 337.38


P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59 MT
For Pier No. 5 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75 Kg.
6.36 Mt.
For Pier No. 4
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59 MT
For Pier No. 4 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75 Kg.
6.36 Mt.
For Pier No. 3
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59 Mt.
For Pier No. 3 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75 Kg.

Prepared by:- Checked by:- Approved by:-


116of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

6.36 Mt.
For Pier No. 2
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59 MT
For Pier No. 2 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75 Kg.
6.36 Mt.
For Pier No. 1
P5-32mm Dia. 70.00 9.57 669.90 6.321 4,234.44
P6-12mm Dia. Bar 46.00 8.25 379.50 0.889 337.38
P11-12 mm Dia. (Link bar) 9.00 2.70 24.30 0.889 21.60
4,593.42
4.59 MT
For Pier No. 1 Cap
P7-25 mm Dia.Bar 35.00 8.40 294.00 3.858 1,134.25
P8-25 mm Dia.Bar 49.00 6.10 298.90 3.858 1,153.16
P9-12 mm Dia.Bar 235.00 0.80 188.00 0.889 167.13
P10-12 mm Dia.Bar 432.00 1.00 432.00 0.889 384.05
P13-20mm Dia.Bar 49.00 5.40 264.60 6.321 1,672.54
P14 32mm Dia.Bar 37.00 7.90 292.30 6.321 1,847.63
6,358.75 Kg.
6.36 Mt.
For Left Abutment & Cap
A1-25 mm Dia 79.00 6.99 552.21 3.858 2,130.43
A2-20 mm Dia 74.00 6.99 517.26 2.469 1,277.11
A3-16 mm Dia 35.00 11.47 401.45 1.580 634.29
A4-16 mm Dia 33.00 11.47 378.51 1.580 598.05
A5-12 mm Dia 161.00 1.57 252.77 0.889 224.71
A6-25 mm Dia 16.00 5.90 94.40 3.858 364.20
A7-16mm Dia 102.00 11.47 1169.94 1.58 1,848.51
A8-25mm Dia 27.00 6.10 164.70 3.86 635.41
A9-12 mm Dia 74.00 4.08 301.92 0.889 268.41
A14-16 mm Dia 32.00 11.47 367.04 1.580 579.92

Prepared by:- Checked by:- Approved by:-


117of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

A31-12 mm Dia 42.00 9.73 408.66 0.889 363.30


A32-16 mm Dia 12.00 8.55 102.60 1.580 162.11
9,086.44 Kg.
9.09 Mt.
Bearing Pedestal
A25-12 mm Dia 18.00 1.75 31.50 0.889 28.00
A26-8 mm Dia 36.00 1.20 43.20 0.395 17.06
For 1 Bearing pedestal 45.07
For 4 bearing pedestal 8.00 360.54 Kg.
0.36 Mt.
Uptodate Quantity 84.25 MT
Previous Quantity 84.07
In this Bill 0.18
Providing, preparing and installing formworks
for abutment stem, back wall, return wall,
stopper etc. including necessary supports
2.4 and removing after comletion etc. all Sq.m
complete as per specification with F2 finish.
(SS/SP-1800)

For Right Abutment Stem 1.00 24.40 3.24 79.06


For Pier No. 06 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 06 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Pier No. 05 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 05 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Pier No. 04 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 04 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Pier No. 03 Stem 1.00 P= 7.85 4.46 35.01
For Pier No. 03 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00

Prepared by:- Checked by:- Approved by:-


118of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

For Pier No.02 Stem 1.00 P= 7.85 4.46 35.01


For Pier No. 02 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Pier No.01 Stem 2.00 P= 7.85 4.46 70.02
For Pier No. 01 Stem Cap

Rectangular portion 1.00 23.40 0.80 18.72


Slope portion 2.00 area= 4.85 9.70
Slope portion 2.00 area= 3.50 7.00
For Left Abutment Stem 1.00 24.40 3.24 79.06
For Bearing Pedestal 8.00 4.80 0.30 11.52
Uptodate Quantity 627.23
Previous Quantity 621.47
In this Bill 5.76
Providing and Backfilling with graded filter
materials in layer with necessary watering
and compaction etc. all complete as per
2.5 specification and drawing. (SS/SP-2400, Cu.m 0.00
3100)

Providing, laying and fixing Geotextile (filter


fabrics) all complete as per specification.
2.6 Sq.m 0.00
(SS/SP-2404,3110)

Providing and laying Random Rubble


masonry works in cement sand mortar in 1:4
including scaffolding, curing, preparing
2.7 cement mortar for construction of left and Cu.m 0.00
right wing walls all complete manual mixing
mortar 35 % (SS/SP-2600)

3 Super Structure Work


Providing and Installing M35/20 in precast RC
footpath slabs , parapet posts and their bases
3.1 and road kerbs etc. all complete.(2000) Cu.m 0.00

Providing and placing machine mixed cement


concrete M45/20 for the superstructure, deck
slab, girder etc. including compaction, curing,
3.2 testing and necessary drainage spout etc. Cu.m
and all relavent lead all complete (SS/SP-
2000)

Girder
Main Girder
End Block portion 2.00 2.10 0.75 2.50 7.88
End tappered portion
t=
Bottom rectangular portion 2.00 0.90 0.60 2.50 2.70 (0.75+45)/2

Prepared by:- Checked by:- Approved by:-


119of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

area=(0.50 x
Haunch portion 4.00 0.90 0.2 x 0.05
0.15)=0.015)

End straight portion


Bottom rectangular portion 2.00 6.35 0.75 0.30 2.86
area=(2 x 0.5
Sloped portion 2.00 6.35 x 0.15 x 0.38
0.2)= 0.03
vertical portion 2.00 6.35 0.45 2.05 11.72
area=(0.50 x
0.15 x
Haunch portion 4.00 6.35 0.29
0.15)=0.0112
5)
Intermediate main girder

Bottom rectangular portion 2.00 8.75 0.75 0.30 3.94

area=(2 x 0.5
Sloped portion 2.00 8.75 x 0.225 x 1.18
0.3)= 0.0675

vertical portion 2.00 8.75 0.30 2.05 10.76


area=(0.5 x
Haunch portion 2.00 8.75 0.3 x0.15)= 0.39
0.0225
42.14
Sub-Total (for 2 nos. main girder) 2.00 84.29
Cross Girder
Between main girder (End portion) 2.00 4.25 0.40 2.20 7.48
Between main girder (Intermediate portion) 3.00 4.25 0.30 2.20 8.42
area= 0.5 x
Outside the main girder (End portion) 4.00 (2.625+0.3) x 0.40 5.26
area=
2.25 = 0.5 x
3.29
Outside the main girder (Intermediate portion) 6.00 2.775 x 2.25 0.30 5.62
= 3.12
Sub-Total (cross girder) 26.78
111.06
For 2 nos Slab 2.00 222.13
For Between Abutment and Pier
Deck slab
Carriageway portion 1.00 35.00 5.75 0.30 60.38
t=
Footpath portion 2.00 35.00 2.625 0.25 45.94 (0.30+0.20)/
2
Sub-Total (deck slab) 106.31
For 2 nos Slab 2.00 212.63
Uptodate Quantity 434.75
Till Previous Quantity 217.38
In this Bill 217.37
Providing , Preparing and Installing Steel
3.3 Forms for Cast-In-Situ prestressing girder Sq.m
and removing after completion. (SS-1800)
Girder
Main Girder
End Block portion
Bottom portion 2.00 2.10 0.75 3.15
End tappered portion
Bottom portion 2.00 0.90 0.75 1.35
End straight portion
Bottom portion 2.00 6.35 0.75 9.53

Prepared by:- Checked by:- Approved by:-


120of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

Intermediate main girder


Bottom portion 2.00 8.87 0.75 13.31
Deduction for bearing portion -2.00 0.60 0.75 -0.90
26.43
Sub-Total (for 4 nos. main girder) 4.00 105.72
Uptodate Quantity 105.72
Previous Bill 52.86
In this Bill 52.86
Providing , Preparing and Installing Formwork
for Slab and X-beam structures and removing
after completion (falsework included)
3.4 including necessary supports and removing Sq.m
after completion for Superstructure. (SS-
1800)
Girder
Main Girder
Vertical portion 4.00 2.10 2.50 21.00
End tappered portion
Tappered portion 4.00 0.90 2.35 8.46
Haunch portion 4.00 0.90 0.21 0.76
End straight portion
Sloped portion 4.00 6.35 0.25 6.35
vertical portion 4.00 6.35 0.30 7.62
4.00 6.35 1.85 46.99
Haunch portion 4.00 6.35 0.21 5.33
Intermediate main girder
Sloped portion 4.00 8.87 0.38 13.48
vertical portion 4.00 8.87 0.30 10.64
4.00 8.87 1.75 62.09
Haunch portion 4.00 8.87 0.34 12.06
Deduction for intersection of cross girder portion -2.00 0.40 0.75 -0.60
-3.00 0.30 0.75 -0.68
194.19
Sub-Total (for 2 nos. main girder) 2.00 388.38

Cross Girder
Between main girder (End portion)
Bottom portion 2.00 4.25 0.40 3.40
Vertical portion 4.00 4.25 2.20 37.40
Between main girder (Intermediate portion)
Bottom portion 3.00 4.25 0.30 3.83
Vertical portion 6.00 4.25 2.20 56.10
Outside the main girder (End portion)

area= 0.5 x
Face portion 8.00 (2.625+0.3) x 26.32
2.25 = 3.29

Sloped portion 4.00 3.860 0.40 6.18


Outside the main girder (Intermediate portion)
area= 0.5 x
Face portion 12.00 2.775 x 2.25 37.44
= 3.12
Sloped portion 6.00 3.560 0.30 6.41
Sub-Total (cross girder) 177.07
Deck slab
Between main girder (end portion) 2.00 8.40 4.25 71.40
Between main girder (intermediate portion) 2.00 8.40 4.25 71.40

Prepared by:- Checked by:- Approved by:-


121of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

Outside main girder (end portion) 4.00 8.40 2.625 88.20


Outside main girder (intermediate portion) 4.00 8.40 2.625 88.20
Side face 2.00 35.00 0.20 14.00
Sub-Total (Deck slab) 333.20
Total 898.65
For 2 nos 2.00 1797.30
Uptodate Quantity 1797.30
Previous Bill 898.65
In this Bill 898.65
Providing and laying Untensioned
reinforcement bars, HYSD, TMT, minimum
0.2% proof stress 500Mpa (Fe 500) including
3.5 cutting, bending, binding, fixing in position Mt
etc. all complete as per specification and
drawing.(SS/PP-2000)
Bar Mark No. L TL Wt/m.(Kg.) Quantity
For Girder and Slab
1601-16 mm dia. 143.00 11.100 1587.30 1.580 2507.93
2002-20 mm dia. 284.00 4.350 1235.40 2.469 3050.20
1603- 16 mm dia. 142.00 7.080 1005.36 1.580 1588.47
1004-10 mm dia. 74.00 36.120 2672.88 0.617 1649.17
1005-10 mm dai. 40.00 10.460 418.40 0.617 258.15
1006-10 mm dia. 69.00 36.120 2492.28 0.617 1537.74
1607-16 mm dia. 143.00 6.180 883.74 1.580 1396.31
2008-20 mm dia. 142.00 6.224 883.74 2.469 2181.95
1209-12 mm dia. 286.00 3.660 1046.76 0.889 930.57
2010-20 mm dia. 74.00 3.000 222.00 2.469 548.12
1611-16 mm dia. 74.00 2.140 158.36 1.580 250.21
1212-12 mm dia. 17.00 10.920 185.64 0.889 165.03
1613-16 mm dia. 88.00 2.245 197.56 1.580 312.14
1614-16 mm dia. 88.00 2.245 197.56 1.580 312.14
0615-6 mm dia. 352.00 0.410 144.32 0.222 32.04
1016-10 mm dia. 12.00 36.970 443.64 0.617 273.73
1017-10 mm dia. 494.00 1.420 701.48 0.617 432.81
1018-10 mm dia. 0.00 1.300 0.00 0.617 0.00
1019-10 mm dia. 0.00 1.300 0.00 0.617 0.00
0820-8 mm dia. 0.00 1.300 0.00 0.395 0.00
0621-6 mm dia. 0.00 4.020 0.00 0.222 0.00
0622-6 mm dia. 0.00 4.020 0.00 0.222 0.00
0623-6 mm dia. 0.00 1.310 0.00 0.222 0.00
1024-10 mm dia. 494.00 1.605 792.87 0.617 489.20
1025-10 mm dia. 12.00 31.970 383.64 0.617 236.71
1026-10 mm dia. 12.00 36.120 433.44 0.617 267.43
1227-12 mm dia. 104.00 3.764 391.46 0.889 348.00
1228-12 mm dia. 104.00 6.650 691.60 0.889 614.83
1029-10 mm dia. 112.00 21.800 2441.60 0.617 1506.47
2030-20 mm dia. 72.00 4.300 309.60 2.469 764.40
2031-20 mm dia. 28.00 4.044 113.23 2.469 279.56
2032-20 mm dia. 204.00 3.670 748.68 2.469 1848.49
1633-16 mm dia. 160.00 3.645 583.20 1.580 921.46
2034-20 mm dia. 8.00 6.350 50.80 2.469 125.43
2035-20 mm dia. 8.00 6.350 50.80 2.469 125.43
2036-20 mm dia. 16.00 4.870 77.92 2.469 192.38
2037-20 mm dia. 16.00 4.870 77.92 2.469 192.38
2038-20 mm dia. 8.00 10.900 87.20 2.469 215.30
2039-20 mm dia. 8.00 10.900 87.20 2.469 215.30
1040-10 mm dia. 48.00 8.637 414.57 0.617 255.79

Prepared by:- Checked by:- Approved by:-


122of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

1641-16 mm dia. 70.00 5.400 378.00 1.580 597.24


1642-16 mm dia. 60.00 3.380 202.80 1.580 320.42
2043-20 mm dia. 9.00 5.750 51.75 2.469 127.77
2044-20 mm dia. 9.00 5.750 51.75 2.469 127.77
2045-20 mm dia. 18.00 4.825 86.85 2.469 214.43
2046-20 mm dia. 18.00 4.750 85.50 2.469 211.10
2047-20 mm dia. 9.00 10.920 98.28 2.469 242.65
2048-20 mm dia. 9.00 10.920 98.28 2.469 242.65
1049-10 mm dia. 72.00 8.208 590.97 0.617 364.63
1650-16 mm dia. 75.00 5.200 390.00 1.580 616.20
1651-16 mm dia. 84.00 2.822 237.04 1.580 374.52
2052-20 mm dia. 72.00 3.350 241.20 2.469 595.52
2053-20 mm dia. 28.00 3.270 91.56 2.469 226.06
2054-20 mm dia. 204.00 3.223 657.49 2.469 1623.35
1655-16 mm dia. 160.00 2.973 475.68 1.580 751.57
MESH TYPE 1A-12 mm dia. 4.00 20.627 82.51 0.889 73.35
MESH TYPE 1B-12 mm dia. 4.00 6.059 24.24 0.889 21.55
MESH TYPE 2A-12 mm dia. 4.00 21.246 84.98 0.889 75.55
MESH TYPE 2B-12 mm dia. 4.00 7.431 29.72 0.889 26.42
MESH TYPE C-10 mm dia. 4.00 11.749 47.00 0.617 29.00
Spiral Reinforcement (9 TURNS EACH)-16 mm
28.00 7.100 198.80 1.580 314.10
dia.
33,201.14 Kg.
For 2 Nos Slab 2.00 66,402.29
Uptodate Quantity 66.40 Mt.
Till Previous Quantity 33.20 Mt.
In this Bill 33.20 Mt.

Providing Prestressing multistranded cables


each comprising 19 mono strands, each
mono strands of 12.7mm dia. 7- ply low
relaxation Class II HTS (breaking load per
From standard superstructure drawings of 35 m
mono strand =183.71KN);Total length of 19
3.6 Mt span simply supported, cast in situ, 2-webbed 6.90
multistranded cables (weighing @14.73 prestressed concrete deck slab.
kg/m)=616.6 m(total length of 12.7mm dia.
mono strand weighing @0.77526
Kg/m=11716m)

For 2 Nos Slab 2.00 13.80


Uptodate Quantity 13.80
Till Previous Quantity 6.90
In this Bill 6.90
Providing and Installing Sheathing (ducting
for housing 19 multi stranded cables ),
3.7 corrugated HDPE type , 90mm internal dia. Rm
(wall thickness 2.3±0.3 mm as maufactured
and 1.5 mm after loss of compression).
1 2.00 37.00 74.00
D 2.00 36.50 73.00
2 2.00 36.30 72.60

Prepared by:- Checked by:- Approved by:-


123of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

3 2.00 36.30 72.60


4 2.00 36.20 72.40
5 2.00 36.20 72.40
6 2.00 36.00 72.00
509.00
For 2 span 2.00 1018.00
Uptodate Quantity 1018.00
Previous Bill 508.80
In this Bill 509.20
Providing and instlling Anchorages for 19 -
stranded multistranded cables Assemble in
3.8 position etc. all complete as per specification set 28.00
and drawing.(SS-2100)
For 2 span 2.00 56.00
Uptodate Quantity 56.00
Previous Bill 28.00
In this Bill 28.00
Providing and fixing in position Reinforced
3.9 POT bearings as per drawing and Nos. 4.00
specification (1902)
For 2 span 2.00 8.00
Uptodate Quantity 8.00
Previous Bill 4.00
In this Bill 4.00
Providing and Installing expansion joint(Slab
seal Type) sealing etc. all complete as per
3.10 specification and drawing. (1900) Rm 0.00

Providing, laying, spreading, levelling and


compaction of Wearing Coat M25/20 all
3.11 complete as per specification and drawing. Cu.m 0.00
(2000)
Providing and installing 50 mm dia GI
3.12 (parapet railling) all complete as per Rm 0.00
specification.
Providing and supplying of Enamel Paint
3.13 application in two coats in addition to one Sq.m 0.00
base coat.
4 Appoach Road Work
Formation of embankment through all types
of soil including compaction in layers and
4.1 watering, all complete as per specification Cu.m 0.00
and drawing.(SS/SP - 900)
Backfilling in layers in Foundation pits,
trenches etc including compaction and
4.2 watering complete as per specification.[sp Sq.m 0.00
900]
Preparation of sub-grade for rehabilitation or
4.3 other similar works (filling or cutting depth of Cu.m 0.00
10 to 20 cm) in common soil.
Providing, laying, spreading, watering,
levelling and compaction of natural sand
4.4 gravel sub-base grading as per table 12.1 of Nos. 0.00
standard specification (1201)
Supplying and fixing in place M20/20 RCC
delineator and guard post (size
4.5 1500mmx150mmx150mm) including Nos. 0.00
excavation, backfilling, painting and erection
etc. all complete (SS/SP-1500)

Prepared by:- Checked by:- Approved by:-


124of 133

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Measurement Sheet
Bill S.N. :- IPC 08 (Running)
Name of Project:- Lalbakaiya River Bridge, Rautahat
Name of Work:- Construction of Prestressed R.C.C. T beam
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2
Contract No.:- DROCNP/337157-4/073/74-36
Date of Measurement:- 2077/03/14

S.N. Descriptiton of Works Unit No. Length Breadth Height Quantity Remarks

Providing & Installation of Bridge Sign Board


of size 1.5mX0.75m with steel stands and
4.6 including all reinforcement works & formwork Nos. 0.00
complete.(SS-1500)
5 River Training and Protection Work
Earthwork in excavation for river training
works in all types of soil/rock including
shoring, struting, bracing, dewatering and
5.1 disposal with necessary haulage and lift, all Cu.m 0.00
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900)
Backfilling in layers in gabion wall, trenches
etc including compaction and watering
5.2 complete as per specification.[sp 900] Cu.m 0.00

Formation of embankment through all types


of soil including compaction in layers and
5.3 watering, all complete as per specification Cu.m 0.00
and drawing.(SS/SP - 900)
Supply and Making heavy Zinc coated gabion
boxes including cutting wire & netting etc.
Hexagonal mesh size 100 mm x 120 mm,
mesh wire-10 SWG, selvedge wire-8 SWG;
Gabion construction works including placing
in position, tying gabion by tightening wire
5.4
closing from the top, tying wire-12 SWG; and Cu.m 0.00
filling stones in gabion box, including supply
of materials , foundation excavation and
disposal all complete (SS/SP-2400)

Supply and placing grass turfing on guide


5.5 banks etc. all complete as per specification. Sq.m 0.00

6 Miscellaneous Work
Provide insurance of works, materials,
construction equipment and against accidents
6.1 to work person including third party LS 1.00 1.00
insturance as per General Conditions of
Contract clause 13 and Contract Data.
Engineer's Facilities: Establishment and
maintenance of facilities for Enginner Providing 2 nos. of Laptop (Dell i7) as per
6.2 including the cost of minor repair, telephone, PS the request of Road Division 1.00
electricity, securities guards etc and providing Chandranigahpur, Rautahat.
furniture and other facilities.
Construction of diversion works and
6.3 maintanance of diversion during bridge LS 0.90
construction as directed by Engineer
Providing and installation of bridge status of
6.4 size 1.5mx0.75m etc. all complete as directed LS 1.00 0.00
by engineers.
Provision of Demonstration of prestressing
6.5
process to Project Personnels.
PS 1.00 0.00
7 New Item
Load test of piles including installation of
7.1 platform, loading arrangements etc. and Nos. 8.00 8.00
necessary measurements & plotting

Pile Integrity test of piles including of installation


7.2
of platform etc and necessary measurements
Nos 100.00 100.00

Providing Drainage spouts each 450mm


7.3
long,100mm Dia GI Pipe
nos 32.00 32.00

Prepared by:- Checked by:- Approved by:-


Government of Nepal
Ministry Of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Division Road office
Chandranigahapur, Rautahat
Revised Estimate/Variation No.1
Revised Estimate/Variation No.1
Name of Project:- Lalbakaiya River Bridge, Rautahat
Financed by: GON Date of Work Order:- 1/20/2074
Contract No.: DROCNP/337157-4/073/74-36 Due date of Work Completion:- 9/19/2076
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Revised Completion date:- 7/28/2077
Name of Consultant Engineer : None Original Contract Amount in NRs. (without VAT) 191,384,597.13
Original Cost Estimate in NRs: (without VAT) 247,166,939.04 Revised Contract Amount after this Variation in NRs. (without VAT) 198,246,313.12
Revised Cost Estimate (Till Date) in NRs.: (without VAT) 259,382,365.81 % age Increase or Decrease wrt Oringinal Contract Amount: 3.59%
Increase or Decrease in Estimate wrt Original Cost, in NRs. 12,215,426.77 Budgetary Provision for Increase works (GON): Yes/No Yes
Percentage Increase or Decrease in Estimate 4.94%
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat

Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount

1 Foundation Work
Site clearance including cutting and
removing bushes and roots etc. before and
1.1 after completion of work as directed by Sq.m 3,000.00 11.17 33,510.00 3,000.00 11.17 33,510.00 0.00% 30.00 90,000.00 30.00 90,000.00 0.00% 0.00%
engineer.

Earthwork in excavation for foundationof


structure in all types of soil/rock including
shoring, struting, bracing, dewatering and
1.2 disposal with necessary haulage and lift, all Cu.m 2,235.20 122.39 273,566.13 3,343.46 122.39 409,206.07 49.58% 500.00 1,117,600.00 500.00 1,671,730.00 49.58% 0.29%
complete as per drawing, specification and
instruction of Engineer. (SS/SP-900).

Boring, Providing and Installing 800mm dia


bored cast-in-situ RCC pileof specified
diameter including Bentonite and excluding
1.3 reinforcement and concrete as per Rm 3,520.00 7,514.47 26,450,934.40 3,520.00 7,514.47 26,450,934.40 0.00% 5,000.00 17,600,000.00 5,000.00 17,600,000.00 0.00% 0.00%
specification and drawing etc. all complete.
(1600)

Providing and laying boulder soling in


1.4 foundation for abutment, pier and wing wall Cu.m 151.81 3,065.10 465,316.03 165.90 3,065.10 508,512.35 9.28% 2,500.00 379,527.61 2,500.00 414,760.00 9.28% 0.02%
all complete (2400)
Providing and placing machine mixed
cement concrete M15/40 for the foundation
and footing etc. including compaction,
1.5 curing, testing etc. all complete as per Cu.m 189.34 10,360.82 1,961,676.22 182.24 10,360.82 1,888,197.28 -3.75% 8,000.00 1,514,688.00 8,000.00 1,457,952.00 -3.75% -0.03%
specification and drawing. (SS/SP-2000)

Providing and placing machine mixed


cement concrete M20/20 for the abutment
pile cap, abutment piles etc. including
1.6 compaction, curing, testing etc. all complete Cu.m 3,089.68 11,810.43 36,490,460.97 3,130.69 11,810.43 36,974,771.48 1.33% 10,000.00 30,896,809.83 10,000.00 31,306,880.00 1.33% 0.21%
as per specification and drawing. (SS/SP-
2000)

Providing and laying reinforcement


Fe415/500 including cutting, bending,
binding, fixing in position etc. all complete as
1.7 per specification and drawing. (SS/SP-2000) Mt 379.95 125,080.01 47,524,256.12 403.83 125,080.01 50,510,936.84 6.28% 85,000.00 32,295,822.25 85,000.00 34,325,466.01 6.28% 1.06%

Providing,preparing and Installing formwork


for concrete works for foundation and
substructure including necessary supports
and removing after completion for sub
1.8 Sq.m 602.16 823.83 496,077.47 611.52 823.83 503,788.52 1.55% 600.00 361,296.00 600.00 366,912.00 1.55% 0.00%
structure (Class F1 finish)(SS/SP-1800).

Backfilling in layers in foundation pits,


trenches etc including compaction and
1.9 watering etc. all complete as per Cu.m 894.08 553.63 494,989.51 947.20 553.63 524,396.12 5.94% 100.00 89,408.00 100.00 94,719.60 5.94% 0.00%
specification.(SP 900)

Sub Total 1 114,190,786.85 117,804,253.06 84,345,151.69 87,328,419.61

2 Sub-Structural Work

Prepared By:- Checked By:- Approved By:-


Government of Nepal
Ministry Of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Division Road office
Chandranigahapur, Rautahat
Revised Estimate/Variation No.1
Revised Estimate/Variation No.1
Name of Project:- Lalbakaiya River Bridge, Rautahat
Financed by: GON Date of Work Order:- 1/20/2074
Contract No.: DROCNP/337157-4/073/74-36 Due date of Work Completion:- 9/19/2076
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Revised Completion date:- 7/28/2077
Name of Consultant Engineer : None Original Contract Amount in NRs. (without VAT) 191,384,597.13
Original Cost Estimate in NRs: (without VAT) 247,166,939.04 Revised Contract Amount after this Variation in NRs. (without VAT) 198,246,313.12
Revised Cost Estimate (Till Date) in NRs.: (without VAT) 259,382,365.81 % age Increase or Decrease wrt Oringinal Contract Amount: 3.59%
Increase or Decrease in Estimate wrt Original Cost, in NRs. 12,215,426.77 Budgetary Provision for Increase works (GON): Yes/No Yes
Percentage Increase or Decrease in Estimate 4.94%
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat

Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount

Providing and placing machine mixed


cement concrete M20/20 for the abutment
stem, pier stem, stopper etc. including
2.1 compaction curing, testing and lead 30m Cu.m 394.11 11,810.43 4,654,653.40 316.68 11,810.43 3,740,119.41 -19.65% 10,000.00 3,941,137.96 10,000.00 3,166,793.60 -19.65% -0.40%
etc. all complete (SS/SP-2000)

Providing and placing machine mixed


cement concrete M25/20 for the abutment
stem cap, Concrete pedestral etc. including
2.2 compaction, curing, testing etc. all complete Cu.m 370.35 12,601.44 4,666,918.10 360.24 12,601.44 4,539,523.83 -2.73% 12,000.00 4,444,176.00 12,000.00 4,322,861.99 -2.73% -0.06%
as per specification and drawing. (SS/SP-
2000)

Providing and laying reinforcement


Fe415/500 including cutting, bending,
binding, fixing in position etc. all complete as
2.3 Mt 119.47 125,080.01 14,943,509.92 123.82 125,080.01 15,487,511.91 3.64% 85,000.00 10,155,086.68 85,000.00 10,524,771.40 3.64% 0.19%
per specification and drawing. (SS/SP-2000)

Providing, preparing and installing


formworks for abutment stem, back wall,
return wall, stopper etc. including necessary
2.4 supports and removing after comletion etc. Sq.m 904.67 823.83 745,290.19 1,102.36 823.83 908,153.94 21.85% 700.00 633,265.52 700.00 771,649.20 21.85% 0.07%
all complete as per specification with F2
finish. (SS/SP-1800)

Providing and Backfilling with graded filter


materials in layer with necessary watering
and compaction etc. all complete as per
2.5 specification and drawing. (SS/SP-2400, Cu.m 44.02 1,214.09 53,446.67 44.02 1,214.09 53,446.67 0.00% 600.00 26,413.20 600.00 26,413.20 0.00% 0.00%
3100)

Providing, laying and fixing Geotextile (filter


2.6 fabrics) all complete as per specification. Sq.m 73.14 242.62 17,745.23 1,661.28 242.62 403,059.75 2171.37% 150.00 10,971.00 150.00 249,192.00 2171.37% 0.12%
(SS/SP-2404,3110)

Providing and laying Random Rubble


masonry works in cement sand mortar in 1:4
including scaffolding, curing, preparing
cement mortar for construction of left and
2.7 Cu.m 286.19 8,977.87 2,569,371.23 286.39 8,977.87 2,571,179.37 0.07% 5,500.00 1,574,041.70 5,500.00 1,575,149.40 0.07% 0.00%
right wing walls all complete manual mixing
mortar 35 % (SS/SP-2600)

Sub Total 2 27,650,934.74 27,702,994.89 20,785,092.06 20,636,830.79

3 Super Structure Work

Providing and Installing M35/20 in precast


RC footpath slabs , parapet posts and their
3.1 bases and road kerbs etc. all complete. Cu.m 210.00 15,345.24 3,222,500.40 210.00 15,345.24 3,222,500.40 0.00% 13,500.00 2,835,000.00 13,500.00 2,835,000.00 0.00% 0.00%
(2000)

Providing and placing machine mixed


cement concrete M45/20 for the
superstructure, deck slab, girder etc.
3.2 including compaction, curing, testing and Cu.m 1,603.00 15,622.51 25,042,883.53 1,603.00 15,622.51 25,042,883.53 0.00% 15,000.00 24,045,000.00 15,000.00 24,045,000.00 0.00% 0.00%
necessary drainage spout etc. and all
relavent lead all complete (SS/SP-2000)

Prepared By:- Checked By:- Approved By:-


Government of Nepal
Ministry Of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Division Road office
Chandranigahapur, Rautahat
Revised Estimate/Variation No.1
Revised Estimate/Variation No.1
Name of Project:- Lalbakaiya River Bridge, Rautahat
Financed by: GON Date of Work Order:- 1/20/2074
Contract No.: DROCNP/337157-4/073/74-36 Due date of Work Completion:- 9/19/2076
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Revised Completion date:- 7/28/2077
Name of Consultant Engineer : None Original Contract Amount in NRs. (without VAT) 191,384,597.13
Original Cost Estimate in NRs: (without VAT) 247,166,939.04 Revised Contract Amount after this Variation in NRs. (without VAT) 198,246,313.12
Revised Cost Estimate (Till Date) in NRs.: (without VAT) 259,382,365.81 % age Increase or Decrease wrt Oringinal Contract Amount: 3.59%
Increase or Decrease in Estimate wrt Original Cost, in NRs. 12,215,426.77 Budgetary Provision for Increase works (GON): Yes/No Yes
Percentage Increase or Decrease in Estimate 4.94%
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat

Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount

Providing , Preparing and Installing Steel


3.3 Forms for Cast-In-Situ prestressing girder Sq.m 248.15 342.61 85,018.67 370.02 342.61 126,772.55 49.11% 700.00 173,705.00 700.00 259,014.00 49.11% 0.04%
and removing after completion. (SS-1800)
Providing , Preparing and Installing
Formwork for Slab and X-beam structures
and removing after completion (falsework
3.4 included) including necessary supports and Sq.m 6,959.52 823.83 5,733,464.82 8,247.74 823.83 6,794,733.50 18.51% 700.00 4,871,666.94 700.00 5,773,416.18 18.51% 0.47%
removing after completion for
Superstructure. (SS-1800)

Providing and laying Untensioned


reinforcement bars, HYSD, TMT, minimum
0.2% proof stress 500Mpa (Fe 500)
3.5 including cutting, bending, binding, fixing in Mt 251.50 125,080.01 31,457,699.31 247.43 125,080.01 30,948,780.77 -1.62% 85,000.00 21,377,552.19 85,000.00 21,031,708.95 -1.62% -0.18%
position etc. all complete as per
specification and drawing.(SS/PP-2000)

Providing Prestressing multistranded cables


each comprising 19 mono strands, each
mono strands of 12.7mm dia. 7- ply low
relaxation Class II HTS (breaking load per
mono strand =183.71KN);Total length of 19
3.6 multistranded cables (weighing @14.73 Mt 48.30 160,290.45 7,742,028.74 48.30 160,290.45 7,742,028.74 0.00% 135,000.00 6,520,500.00 135,000.00 6,520,500.00 0.00% 0.00%
kg/m)=616.6 m(total length of 12.7mm dia.
mono strand weighing @0.77526
Kg/m=11716m)

Providing and Installing Sheathing (ducting


for housing 19 multi stranded cables ),
corrugated HDPE type , 90mm internal dia.
3.7 (wall thickness 2.3±0.3 mm as maufactured Rm 3,563.00 426.81 1,520,724.03 3,563.00 426.81 1,520,724.03 0.00% 300.00 1,068,900.00 300.00 1,068,900.00 0.00% 0.00%
and 1.5 mm after loss of compression).

Providing and instlling Anchorages for 19 -


stranded multistranded cables Assemble in
3.8 position etc. all complete as per set 196.00 5,071.50 994,014.00 196.00 5,071.50 994,014.00 0.00% 5,000.00 980,000.00 5,000.00 980,000.00 0.00% 0.00%
specification and drawing.(SS-2100)
Providing and fixing in position Reinforced
3.9 POT bearings as per drawing and Nos. 28.00 31,625.00 885,500.00 28.00 31,625.00 885,500.00 0.00% 75,000.00 2,100,000.00 75,000.00 2,100,000.00 0.00% 0.00%
specification (1902)
Providing and Installing expansion joint(Slab
seal Type) sealing etc. all complete as per
3.10 specification and drawing. (1900) Rm 88.00 13,915.00 1,224,520.00 88.00 13,915.00 1,224,520.00 0.00% 25,000.00 2,200,000.00 25,000.00 2,200,000.00 0.00% 0.00%

Providing, laying, spreading, levelling and


compaction of Wearing Coat M25/20 all
3.11 complete as per specification and drawing. Cu.m 189.27 14,334.51 2,713,092.71 189.27 14,334.51 2,713,092.71 0.00% 12,500.00 2,365,875.00 12,500.00 2,365,875.00 0.00% 0.00%
(2000)
Providing and installing 50 mm dia GI
3.12 (parapet railling) all complete as per Rm 1,892.70 791.76 1,498,564.15 1,892.70 791.76 1,498,564.15 0.00% 1,100.00 2,081,970.00 1,100.00 2,081,970.00 0.00% 0.00%
specification.
Providing and supplying of Enamel Paint
3.13 application in two coats in addition to one Sq.m 488.95 192.22 93,985.49 764.26 192.22 146,906.44 56.31% 300.00 146,684.25 300.00 229,278.60 56.31% 0.04%
base coat.

Sub Total 3 82,213,995.85 82,861,020.82 70,766,853.38 71,490,662.73


Appoach Road Work
4

Prepared By:- Checked By:- Approved By:-


Government of Nepal
Ministry Of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Division Road office
Chandranigahapur, Rautahat
Revised Estimate/Variation No.1
Revised Estimate/Variation No.1
Name of Project:- Lalbakaiya River Bridge, Rautahat
Financed by: GON Date of Work Order:- 1/20/2074
Contract No.: DROCNP/337157-4/073/74-36 Due date of Work Completion:- 9/19/2076
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Revised Completion date:- 7/28/2077
Name of Consultant Engineer : None Original Contract Amount in NRs. (without VAT) 191,384,597.13
Original Cost Estimate in NRs: (without VAT) 247,166,939.04 Revised Contract Amount after this Variation in NRs. (without VAT) 198,246,313.12
Revised Cost Estimate (Till Date) in NRs.: (without VAT) 259,382,365.81 % age Increase or Decrease wrt Oringinal Contract Amount: 3.59%
Increase or Decrease in Estimate wrt Original Cost, in NRs. 12,215,426.77 Budgetary Provision for Increase works (GON): Yes/No Yes
Percentage Increase or Decrease in Estimate 4.94%
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat

Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount

Formation of embankment through all types


of soil including compaction in layers and
4.1 watering, all complete as per specification Cu.m 5,250.00 379.36 1,991,640.00 25,960.00 379.36 9,848,185.60 394.48% 150.00 787,500.00 150.00 3,894,000.00 394.48% 1.62%
and drawing.(SS/SP - 900)

Backfilling in layers in Foundation pits,


trenches etc including compaction and
4.2 watering complete as per specification.[sp Cu.m 100.00 553.63 55,363.00 100.00 553.63 55,363.00 0.00% 100.00 10,000.00 100.00 10,000.00 0.00% 0.00%
900]

Preparation of sub-grade for rehabilitation or


4.3 other similar works (filling or cutting depth of Sq.m 1,500.00 12.81 19,215.00 1,500.00 12.81 19,215.00 0.00% 30.00 45,000.00 30.00 45,000.00 0.00% 0.00%
10 to 20 cm) in common soil.
Providing, laying, spreading, watering,
levelling and compaction of natural sand
4.4 gravel sub-base grading as per table 12.1 of Cu.m 375.00 2,055.04 770,640.00 406.00 2,055.04 834,346.24 8.27% 1,100.00 412,500.00 1,100.00 446,600.00 8.27% 0.02%
standard specification (1201)

Supplying and fixing in place M20/20 RCC


delineator and guard post (size
1500mmx150mmx150mm) including
4.5 excavation, backfilling, painting and erection Nos. 80.00 1,134.57 90,765.60 80.00 1,134.57 90,765.60 0.00% 2,000.00 160,000.00 2,000.00 160,000.00 0.00% 0.00%
etc. all complete (SS/SP-1500)

Providing & Installation of Bridge Sign


Board of size 1.5mX0.75m with steel stands
4.6 and including all reinforcement works & Nos. 2.00 10,000.00 20,000.00 2.00 10,000.00 20,000.00 0.00% 15,000.00 30,000.00 15,000.00 30,000.00 0.00% 0.00%
formwork complete.(SS-1500)

Sub Total 4 2,947,623.60 10,867,875.44 1,445,000.00 4,585,600.00

5 River Training and Protection Work


Earthwork in excavation for river training
works in all types of soil/rock including
shoring, struting, bracing, dewatering and
5.1 disposal with necessary haulage and lift, all Cu.m 2,000.00 122.39 244,780.00 1,500.00 122.39 183,585.00 -25.00% 100.00 200,000.00 100.00 150,000.00 -25.00% -0.03%
complete, as per drawing, specification and
instruction of Engineer.(SS/SP-900)

Backfilling in layers in gabion wall, trenches


etc including compaction and watering
5.2 complete as per specification.[sp 900] Cu.m 600.00 553.63 332,178.00 450.00 553.63 249,133.50 -25.00% 100.00 60,000.00 100.00 45,000.00 -25.00% -0.01%

Formation of embankment through all types


of soil including compaction in layers and
5.3 watering, all complete as per specification Cu.m 2,500.00 379.36 948,400.00 4,200.00 379.36 1,593,312.00 68.00% 150.00 375,000.00 150.00 630,000.00 68.00% 0.13%
and drawing.(SS/SP - 900)

Supply and Making heavy Zinc coated


gabion boxes including cutting wire & netting
etc. Hexagonal mesh size 100 mm x 120
5.4 mm, mesh wire-10 SWG, selvedge wire-8 Cu.m 3,500.00 4,785.18 16,748,130.00 2,945.00 4,785.18 14,092,355.10 -15.86% 3,000.00 10,500,000.00 3,000.00 8,835,000.00 -15.86% -0.87%
SWG; Gabion construction works including
placing in position, tying gabion by
tightening wire closing from the top, tying
wire-12 SWG;
Supply and and filling
placing grassstones
turfinginongabion
guide
box, including
banks supply of as
etc. all complete materials ,
per specification.
5.5 foundation excavation and disposal all Sq.m 3,500.00 51.46 180,110.00 1,600.00 51.46 82,336.00 -54.29% 25.00 87,500.00 25.00 40,000.00 -54.29% -0.02%
complete (SS/SP-2400)

Sub Total 5 18,453,598.00 16,200,721.60 11,222,500.00 9,700,000.00

Prepared By:- Checked By:- Approved By:-


Government of Nepal
Ministry Of Physical Infrastructure and Transport
Department of Roads
Federal Road Supervision and Monitoring Office
Division Road office
Chandranigahapur, Rautahat
Revised Estimate/Variation No.1
Revised Estimate/Variation No.1
Name of Project:- Lalbakaiya River Bridge, Rautahat
Financed by: GON Date of Work Order:- 1/20/2074
Contract No.: DROCNP/337157-4/073/74-36 Due date of Work Completion:- 9/19/2076
Name of Contractor:- Sapana Nirman Sewa P. Ltd, Hetauda-2 Revised Completion date:- 7/28/2077
Name of Consultant Engineer : None Original Contract Amount in NRs. (without VAT) 191,384,597.13
Original Cost Estimate in NRs: (without VAT) 247,166,939.04 Revised Contract Amount after this Variation in NRs. (without VAT) 198,246,313.12
Revised Cost Estimate (Till Date) in NRs.: (without VAT) 259,382,365.81 % age Increase or Decrease wrt Oringinal Contract Amount: 3.59%
Increase or Decrease in Estimate wrt Original Cost, in NRs. 12,215,426.77 Budgetary Provision for Increase works (GON): Yes/No Yes
Percentage Increase or Decrease in Estimate 4.94%
Location:- Matiyarwa-Laxminiya-Karuniya, Rautahat

Original Cost Estimate in Nrs. Revised Cost Estimate(Till date) in Nrs. %age Original Contract Amount in Nrs. %age change in
%age change in
change in New Contract Amount after Variation amount wrt
amount wrt
S.N. DESCRIPTION of Works UNIT Quantity wrt individual Remarks
original contract
original contract item
QUANTITY RATE AMOUNT QUANTITY RATE AMOUNT RATE AMOUNT RATE AMOUNT amount
quantity amount

6 Miscellaneous Work

Provide insurance of works, materials,


construction equipment and against
accidents to work person including third
6.1 party insturance as per General Conditions LS 1.00 1,000,000.00 1,000,000.00 1.00 1,000,000.00 1,000,000.00 0.00% 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 0.00% 0.00%
of Contract clause 13 and Contract Data.

Engineer's Facilities: Establishment and


maintenance of facilities for Enginner
including the cost of minor repair, telephone,
6.2 electricity, securities guards etc and PS 1.00 500,000.00 500,000.00 1.00 500,000.00 500,000.00 0.00% 500,000.00 500,000.00 500,000.00 500,000.00 0.00% 0.00%
providing furniture and other facilities.

Construction of diversion works and


maintanance of diversion during bridge
6.3 LS 1.00 100,000.00 100,000.00 1.00 100,000.00 100,000.00 0.00% 200,000.00 200,000.00 200,000.00 200,000.00 0.00% 0.00%
construction as directed by Engineer

Providing and installation of bridge status of


6.4 size 1.5mx0.75m etc. all complete as LS 1.00 10,000.00 10,000.00 1.00 10,000.00 10,000.00 0.00% 20,000.00 20,000.00 20,000.00 20,000.00 0.00% 0.00%
directed by engineers.
Provision of Demonstration of prestressing
6.5 process to Project Personnels. PS 1.00 100,000.00 100,000.00 1.00 100,000.00 100,000.00 0.00% 100,000.00 100,000.00 100,000.00 100,000.00 0.00% 0.00%

Sub Total 6 1,710,000.00 1,710,000.00 2,820,000.00 2,820,000.00


7 New Item
Load test of piles including installation of
7.1 platform, loading arrangements etc. and Nos. 0.00 0.00 0.00 8.00 175,000.00 1,400,000.00 New Item 0.00 0.00 132,000.00 1,056,000.00 New Item 0.55%
necessary measurements & plotting

Pile Integrity test of piles including of


7.2 installation of platform etc and necessary Nos. 0.00 0.00 0.00 100.00 6,500.00 650,000.00 New Item 0.00 0.00 5,000.00 500,000.00 New Item 0.26%
measurements

Supply and fixing 100mm G.I. Pipe,


medium class for Drainage Spout As per Standard
7.3 necessary accessory complete as per Nos. 0.00 0.00 0.00 112.00 1,656.25 185,500.00 New Item 0.00 0.00 1,150.00 128,800.00 New Item 0.07% Drawing
drawing and specification.
Sub Total 7 0.00 2,235,500.00 0.00 1,684,800.00
Sub Total (1+2+3+4+5+6+7) 247,166,939.04 259,382,365.81 191,384,597.13 198,246,313.12
Total Amoount without PS 246,566,939.04 258,782,365.81 190,784,597.13 197,646,313.12
Discount 0.00% 0.00 0.00
Final Amount without PS 246,566,939.04 258,782,365.81 190,784,597.13 197,646,313.12
VAT 13 % 32,053,702.07 33,641,707.56 24,801,997.63 25,694,020.71
Total Amount with VAT 278,620,641.11 292,424,073.37 215,586,594.76 223,340,333.83
Provisional Sum 600,000.00 600,000.00 600,000.00 600,000.00
Total 279,220,641.11 293,024,073.37 216,186,594.76 223,940,333.83

Prepared By:- Checked By:- Approved By:-


सार्वजनिक खरीद नियमावली २०६४ को नियम ११८ को उपनियम ५ तथा Agreement को clause 37.1 तथा 38 बमोजिम भेरिएसन स्वीकृत गर्नु
अगाडी विशेषज्ञबाट शिफारिश भइ प्रतिवेदन प्राप्त भए पश्चात ् भेरिएसन स्वीकृत गर्नु पर्ने भनि उल्लेख भए अनुसार यस डिभिजन सडक कार्यालय
रौतहटबाट ठे क्का नं Contract No: DROCNP/337157-4073/74-36 Name of the Project:- Construction Of Prestressed RCC T beam
Over Lalbakaiya River Bridge along Matiyarba-Laxminiya-Karuniya Sadak,Rautahat भेरिएसन कार्यको लागी तपसिलको विशेषज्ञ
समितिबाट अध्यन कार्य गरियो ǀ

ई. श्री रामेश्वरप्रसाद साह : सदस्य


ई. श्री मदन मोहन कुमार सिंह : सदस्य
ले. अ. श्री गोकर्ण राज सुयाल : सदस्य

·         ठे क्का फाइल/ कागजात


·         साइट अध्यन
अध्यन गरे को विधि :
·         प्राविधिक/इन्जिनियरिंग विधि
·         प्राप्त भएका फाइल एवं कागजात
·         प्रत्यक्ष साइट अध्यन

अध्यनबाट दे खिएका विषयहरु (Findings):

·         उक्त सडक बनाउन मिति 2074/01/20 मा निर्माण व्यवासायी श्री Sapana Nirman Sewa pvt. Ltd, Hetauda -2, Makwanpur संग रु 190784597.13(मु.अ. बाहेक) मा
सम्झौता भएको ǀ

. स्वीकृ त ल.ई. तथा BOQ मा Approach Road मा quantity अपुग भएको र लम्वाई बढेको,Load Test of Piles ,Pile Integrity Test , Drainage spout नभएको र Sub
structure को काम गर्न अघि सो टेस्ट आवशयक भएको हुदा रहेको हुदा सोहि अनुसार VO गर्दा निम्न items 7.0 New Items Sub Heading भित्र थप भयको छ |

BOQ अनुसार VO अनुसार प्रतिशत घट


SN BOQ item
Quantity Quantity ी/बढी
7.0 New Item
Load test of piles including installation of platform, loading arrangements etc.
1.0 and necessary measurements & plotting
Nos. 0.00 8.00 100.00%

Pile Integrity test of piles including of installation of platform etc and


2.0 necessary measurements
set 0.00 100.00 100.00%

3.0 Providing Drainage spouts each 450mm long,100mm Dia GI Pipe Nos. 0.00 112.00 100.00%
निष्कर्ष :

· पेश भएको VO बाट उक्त सडक स्वीकृ त ल.ई (246566939.04 (मु.अ कर बाहेक) भन्दा Revised ल.ई (258782365.81 (मु.अ.कर बाहेक ) 4.98% ले बढ्दा उक्त स्वीकृ त ठेक्का रकम
(190784597.13 (मु.अ.कर बाहेक) भन्दा Revised ठेक्का रकम (197646313.12(मु.अ कर बाहेक) 3.59 % ले बढ्ने देखिन्छ ǀ

संग्लग्न कागजातहरु :

·         स्वीकृत Abstract of Cost


·         स्वीकृत BOQ
·         Site photos
·         Revised Quantity estimate and Abstract of cost
·         VO sheet
Government of Nepal
Ministry of Infrastructure and Transport
Department of Road
Federal Road Supervision and Monitoring Office
Road Division Chandranigahpur
Rautahat

Rate Negotiation Sheet


cfh ldlt ========================== sf lbg pNn]lvt 7]Ssfsf] BOQ df pNn]lvt tklzn cg';f/sf Item x?df नया Item रहेकोले yk sfdsf] af/]
5nkmn x'Fbf lgDg b/ /]6df ug]{ ;xdlt eof] .
Name of the Project:- Construction of prestressed RCC T beam Bridge over Lalbakaiya River Bridge along Matiyarba-Laxminiya-Karuniya Sadak, Rautahat

Contract No: DROCNP/337157-4-073/74-36


Name of Contractor:- Sapana Nirman Sewa pvt. Ltd, Hetauda-2, Makwanpur
Departmental Contractor's
SN Description of Work Unit Quantity Final Rate after Negotiation Amount Remarks
Rate Rate
7.0 New Item
Load test of piles including installation of platform,
One lakh and thirty two
1.00 loading arrangements etc. and necessary Nos. 8.00 175000.00 175000.00 132000.00 1056000.00
thousands only.
measurements & plotting
Pile Integrity test of piles including of installation of Six Thousand and five
2.00 Nos. 100.00 6500.00 6500.00 5000.00 500000.00
platform etc and necessary measurements hundred only
Providing Drainage spouts each 450mm One thousand and nine
3.00 Nos. 112.00 1656.25 1200.00 1150.00 128800.00
long,100mm Dia GI Pipe hundred only
Description of item : Supply and fixing 100mm G.I. Pipe, medium class for Drainage Spout necessary accessory complete as per drawing and specification.
0.45 m long (Rate =market price*l) Unit: 1.00 nos
Resources
Norms Specification
Labour (A) Materials (B) Equipment (C)
activity Clause
Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount

Pipe no 1.00 1325.00 1325.00

Sub - total (A) 0.00 Sub - total (B) 1325.00 Sub total (c) 0.00
Direct Cost (A+B+C) = NRs. 1325.00
Additional 10% for the cost of pipe for necessary labour,materials, equipment and other
132.50
consumables
Contractor's Overhead @ 15 % of (A+B+C) = NRs. 198.75
Total Item Rate = NRs. 1656.25
Say per nos 1656.25