ERECTION MANUAL OF
ROTARY KILN
CONSULTATION
FOR REFERENCE
SIGNA
TURE
DATE
JOB No
Delivery
Note
PROJECT ENGINEERING CENTER
CONSTRUCTION DEPT.
Rev. No. R0 APPROVED
REVIEWED
CHECKED
PREPARED
CONTENTS
No Item Page
Ⅰ. INSTALLATION PROCEDURE 1
1. Kiln foundation 1
7. Confirmation of Rollers 6
I. INSTALLATION PROCEDURE
1. Kiln foundation
1) Confirmation of Kiln foundation
The foundation supplied by the Customer shall be
checked and if the dimensions are not conformed to
the drawing, inform to the customer to be rectified.
Pinion Motor
No.5 Roller bed center
Gear reducer
No.1Roller bed center
No.4 Roller bed center No.2 Roller bed center
1
Installation Manual for Rotary Kiln
h4 h3 h2 h1
B-B by Constructor
A
Base frame
Base plate
50
B
A-A A
Position of
Basic pad
M16 Bolt
FB32~38 M16 Nut
B B
2
Installation Manual for Rotary Kiln
L7 L5 L3 L1
S7 S8 S5 S6 S3 S4 S1 S2
L8 L6 L4 L2
h4
h3 h2
h1
H4 H3 H2 H1
3
No.5 No.4 No.3 No.2 No.1 Installation Manual for Rotary Kiln
50
straight edge
5. Final centering of Base frame
After tightened the anchor bolts, the same positions
with pre-centering shall be measured.
(1) Check the displacement between the center marks Span: L=±2mm
of the foundation and the Roller bed. Diagonal:
(2) Measure the dimensions of span and diagonal line |L1-L2|, |L3-L4|,
of the Roller bed. |L5-L6|, |L7-L8|≦2mm
|S1-S2|, |S3-S4|,
|S5-S6|, |S7-S8|≦2mm
(3) Measure the height of the Roller bed using a Y-level, H = (Planned) ± 3mm
taper gauge(s) and a scale. h = (Planned) ± 1mm
4
Installation Manual for Rotary Kiln
A A
Roller bed
Base frame
Gap
5
Installation Manual for Rotary Kiln
0 3mm
C-C
C
Theodolite
b19 b17 b15 b13 b11 b9 b7 b5 b3 b1
b20 b18 b16 b14 b12 b10 b8 b6 b4 b2
B
C
b1 b2
B
No.5 No.4 No.3 No.2 No.1
6
Installation Manual for Rotary Kiln
View B-B
Roller bed
Coincidence mark
7
Installation Manual for Rotary Kiln
Roller bed
Taper liner
Tack welding
⑦ ⑧ ⑫ ⑬ ⑮ Lower part of
⑤ ④ ③ ② ① ⑥ ⑨ ⑩ ⑪ ⑭ outlet hood
8
Installation Manual for Rotary Kiln
Reinforcing plate
Temporary support
Push bolt
Aligning piece
Connecting piece Pulling bolt
Inside
Inside x≦2mm
Outside
Outside
t≦2mm
9
Installation Manual for Rotary Kiln
Light
Tin plate
□100
10
Installation Manual for Rotary Kiln
11
into 8 sections and welded from one position to the
11
13
±1
2±1
50
2±1
30
30
35
2
opposite position in turn.
17
20
17
6R (Inside) 6R (Inside) 6R (Inside)
(3) The second and later seams shall be welded by flat Gousing
0+2
60゜±5゜ Gousing
0+2
60゜±5゜ Gousing
0+2
60゜±5゜
0 0 0
position (F) with rotating the shell.
(4) After completed inside welding, remove off harmfull CWL-4 (t35-t50) CWL-5 (t50-t50)
60゜±5゜
matters on the inside welding seams by arc-air 60゜±5゜
(Outside)
gouging. Start outside welding after inspecting and 1
4 (Outside)
13
19
grinding the gouged surface.
±1
±1
35
50
2
50
2
20
3) Inspection of welded seams
29
6R 0+2 (Inside)
60゜±5゜ 0+2 (Inside)
(1) Allowable height of beads are as follows. Gousing 0 6R
Gousing 0
60゜±5゜
Inside e 8 4
Inside : e≦0.5mm Symmetrical welding 2 6
method
Outside : e≦3mm 5 1
3 7
Outside e
11
Installation Manual for Rotary Kiln
Spring plate
12
Installation Manual for Rotary Kiln
9
3 A(B)
B A
8 4
7 C5 C
6
3) Installing Pinion
(1) Adjust the pinion confirming the pitch circle, back- Backlash (t1+t2):
lash, top clearance and the diference of center planned -0~+2mm
positions. Top clearance: h
to be measured for reference
Girth gear
t1 t2
Pinion
h
Heat expansion
13
Installation Manual for Rotary Kiln
1 1
4 2 2
4
3 3
C
14
Installation Manual for Rotary Kiln
1 1
Torsion Shaft 2 4 2
4
3 3
Distance I:
Planned ±0.5mm
H
G 4 2 4 2
Gear
3
3
15
Installation Manual for Rotary Kiln
2) Piping
(1) The lubrication piping shall be fabricated at shop and
assembled at the site.
(2) All the lubrication and oil pipings shall be pickled
at the site.
(3) After completed the piping work, perform flushing
using flushing oil until all the foreign matters are
removed.
16
Installation Manual for Rotary Kiln
Rail for burner hanger and Burner, etc. should bring into
burner floor before upper roof is closed.
17
Installation Manual for Rotary Kiln
Direction of
insirt
18
Installation Manual for Rotary Kiln
19
Installation Manual for Rotary Kiln
20