No.: PRT-2022-0177

Tender No. : CMIT-PRT-10.30-210028


Project Title : Microwave and Smart Prefab Communication Room and
Energy Site
Subject : Technical Clarifications / Bid Closing date extension

Dear Bidders,
With respect to the tender of Microwave and Smart Prefab Communication Room and
Energy Site (Tender No.: CMIT-PRT-10.30-210028), Company hereby is submitting
technical clarifications. Kindly refer to attachment No. 1.

It should be noted that the Bid closing date is extended by one (01) week, so the bid
Proposal shall be delivered and submitted no later than 16:00, on or before
03-May-2022 (Baghdad Time) (“New Closing Date”).

The ITT and all the Bulletins/Clarifications during the bid period will be published on
below web-link which is the same address of ITT uploaded. Bidders shall pay attention
to the web link and download the Bulletins/Clarifications during the bid period.
https://www.cnoociraq.com/share/page/site/BiddingDoc/documentlibrary#filter=path%7
C%2F210028-Microwave%2520and%2520Smart%2520Prefab%2520Communication%
2520Room%2520and%2520Energy%2520Site&page=1
User name: contractor
Password: contractor

Best Regards

Mr. Yang Tingsheng


Manager of Contracts & Procurement Department
CNOOC Iraq Limited

Attachment No.1

1
Room 3100, 7WB, Dubai Airport Free Zone
CNOOC IRAQ LIMITED Dubai, UAE

Attachment No.1
Item Article/Clause No.
Bidder's Clarifications Company Answer
No. Current Text (as it appears in ITT)
The Bid Closing Date is extended by One
TENDER DATA SHEET (TDS) One week extension for the submission (1) week from April 26, 2022, so the bid
deadline as the project involves several Proposal shall be delivered and submitted
1 Bid Closing Date: no later than 16:00 disciplines and this requires more time to no later than 16:00, on or before May 3rd,
(Baghdad Time), on or before 26 compile. 2022 (Baghdad Time) (“New Closing
April 2022. Date”).

Maximum cooling will be around 4kw as the


heat dissipation is 1.5kw for MW and 1.5kw for
SECTION 3 - TECHNICAL AC load. Will 12.5kw be sufficient as the
2
PACKAGE cooling capacity? Instead of the 19kw required The proposal is acceptable.
in the RFP.

6.3 Cooling System


• The total cooling capacity is at least Please clarify D.G. and grid availability and D.G and Grid are available in site of work
19kw capacity for each site base and the other sites only Grid
3
available. Capacity is sufficient and can be
changed as needed.

CMIT-PRT-10.30-210028 (Microwave and Smart Prefab Communication Room and Energy Site) Bulletin # 1
2
Room 3100, 7WB, Dubai Airport Free Zone
CNOOC IRAQ LIMITED Dubai, UAE

Can vendor propose UPS system instead of


inverter for AC devices to ensure 0 downtime?
4 A full UPS solution with centralized monitoring The proposal is acceptable.
and bypass for maintenance is recommended by
vendor.
To ensure 8 hours of backup time, can the
vendor propose Li Battery 32 set (150AH) + 5
set (100AHM) instead of the required 18 sets?
5 The battery sets will be installed in rectifier The proposal is acceptable.
cabinet

11. Material Requirements List


Li Battery Set 18 Vendor recommends additional 27 UPS+54
Battery cabinet set 18 battery+18 racks + communication card to
6 provide 1 hour backup for air conditioner The proposal is acceptable.

Are the telecom towers erected and ready for


7 MW installation? All towers are ready.