1 Design Criteria 2
3 Load Calculation 9
4 Model Sketches 10
(0.000) m (Level)
Road (FGL)
Wall Thk.
1.400 m Soil -(1.400) m (Level)
Clear Depth
4.00 m 2.15 m
-(4.600) m (Level)
LIVE LOAD :
C) Load due to HS-20 vehicle :
Load due to one Axle ( 32000 lbs ) = 142.34 kN
Load due to one wheel (16000 lbs ) = 71.17 kN
Ay+2(Hfill+d)
Bx = 450 mm
Ay = 380 mm
Ay
H fill = 1400 mm
Bx+2(d+Hfill) = 3250 mm Bx
Ay+2(d+Hfill) = 3180 mm
Dispersion area = 10.34 m²
Bx+2(Hfill+d)
Uniform Load on Top Slab = 71.17/10.34
= 6.89 kN/m²
UL on Top Slab due to overlap = 13.78 kN/m²
450 1380 450
690
1400
13.78
6.89 6.89
Inlet Pipe
2.150
P2
P1
SURCHARGE DUE TO WHEEL LOAD
AT 5.28 ft DISTANCE
m = X/H = 0.35
n = Z/H
s1 = for m < 0.40 = 0.28*V*n2/[H2*(0.16+n2)3]
ft.
p/
0.000 0.033 0.067 0.100 0.134 0.167 0.201 0.234 0.268 0.301
ki
0.00 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.10 1.509 0.040 0.040 0.040 0.040 0.040 0.039 0.039 0.038 0.037 0.037 0.036
0.20 3.018 0.098 0.098 0.098 0.098 0.097 0.096 0.095 0.094 0.092 0.090 0.088
0.30 4.528 0.113 0.113 0.113 0.113 0.112 0.111 0.110 0.108 0.106 0.104 0.101
0.40 6.037 0.096 0.096 0.096 0.096 0.095 0.094 0.093 0.091 0.090 0.088 0.086
0.50 7.546 0.071 0.071 0.071 0.071 0.070 0.070 0.069 0.068 0.067 0.065 0.064
0.60 9.055 0.050 0.050 0.050 0.050 0.050 0.049 0.049 0.048 0.047 0.046 0.045
0.70 10.564 0.035 0.035 0.035 0.035 0.035 0.034 0.034 0.033 0.033 0.032 0.031
0.80 12.073 0.025 0.025 0.025 0.024 0.024 0.024 0.024 0.023 0.023 0.023 0.022
0.90 13.583 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.016 0.016 0.016
1.00 15.092 0.013 0.013 0.013 0.013 0.012 0.012 0.012 0.012 0.012 0.012 0.011
2.00
4.00
DEPTH OF WALL (feet)
6.00
8.00
10.00
12.00
14.00
16.00
SURCHARGE PRESSURE
0.0820
0.0840
0.0860
0.0880
0.0900
0.0920
0.0940
0.0960
0.0980
SURCHARGE DUE TO WHEEL LOAD
AT 12 ft DISTANCE
m = X/H = 0.80
n = Z/H
s1 = for m < 0.40 = 0.28*V*n2/[H2*(0.16+n2)3]
ft.
p/
0.000 0.015 0.030 0.045 0.060 0.075 0.091 0.106 0.121 0.136
ki
0.00 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.10 1.509 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.20 3.018 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.30 4.528 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.018 0.018
0.40 6.037 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.50 7.546 0.029 0.029 0.029 0.029 0.029 0.028 0.028 0.028 0.028 0.028 0.028
0.60 9.055 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.028 0.028
0.70 10.564 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
0.80 12.073 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
0.90 13.583 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021
1.00 15.092 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
2.00
4.00
DEPTH OF WALL (feet)
6.00
8.00
10.00
12.00
14.00
16.00
SURCHARGE PRESSURE
0.0282
0.0284
0.0286
0.0288
0.0290
0.0292