DEPARTMENT OF CIVIL ENGINEERING

CONSTRUCTION OF ADMINISTRATIVE BUILIDING


AND CAR PARKING FOR ADM. BUILDING FOR ARMY
UNIT (237DIV. ENGR REGT.) JAMMU

Biweekly Report

Submitted by

ABHIJEET PATHANIA
180904568

Under the guidance of

Dr. AMAR MOHAN SHINDE

DEPARTMENT OF CIVIL ENGINEERING, MANIPAL MIT


ABSTRACT
I worked on the estimation and costing of ADM building and Car parking for Army unit.

I also worked on literature review and also perform various of tests on site and laboratory.

I also worked on construction.


OBJECTIVES

 To find out estimation and costing of building.


 To find out quantity analysis and rate analysis.
 To find out quantity of steel in building.
Project Details
Student Details
Student Name Abhijeet Pathania
Register Number  180904568 Section / Roll  59
No
Email Address  Abhijeetpathania03@gmail.comPhone No (M)  9906206903

Project Details

CONSTRUCTION OF ADMINISTRATIVE BUILIDING AND CAR


PARKING FOR ADM. BUILDING FOR ARMY UNIT (237DIV.
Project Title
ENGR REGT.) JAMMU

Project Duration  4 months Start Date 24-01-2022

Organization Details
Organization  KAPAHI CONTRACTS PRIVATE LIMITED
Name
Full postal  KAPAHI CONTRACTS PRIVATE LIMITED
address with pin NEAR TAWI FOURTH BRIDGE LOWER BELI CHARANA JAMMU
code 180003

Website address  KAPAHI CONTRACTS PVT.LTD. JAMMU


Supervisor Details
Supervisor Name  Er. Yograj
Designation  Project Manager
Full contact  Jammu 18003.
address with pin
code
Email address  Yograj710@gmail.com Phone No (M)  9622204309

Internal Guide Details


Faculty Name  DR. Amar mohan shinde
Full contact  CIVIL ENGINEERING DEPARTMENT,MIT MANIPAL,
address with pin KARNATAKA, PIN CODE 576104
code
Email address  Amar.shinde@manipal.edu
Week No. 1
Sl.
Details of work carried out Comments
No. Date
01 25-01- • Visiting the Whole site.( Army unit)
2022-31-
01-2022 • Learning about buildings their work and needs and
how much buildings over there.
Week 1
• Working on drawing( Learn how to read drawing
and all important details)

• Construction work.

02 01-02-22- • Testing on Materials on site


07-02-
2022
• (Compression Test of concrete)
Week 2

• Steel tests on laboratory.


• (Mechanical Tests)
• (Chemical Tests)

• Layout and Marking of FDR STORE
• Finding level( using Suitable Formulas)
• cutting and filling and
Level the whole ground

03 08-02- • Getting First Task from Manager and regarding my


2022-14- topic
02-2022 • Working on Literature Review
• Working on Estimation and Costing learn and
getting
Week 3 Knowledge and tips from Manager and my team.
• Start Work on Estimation of Car garage
• Construction Work
• (Brickwork on Barrack Building)
04 15-02- • Working on estimation of garage
2022-21- (With the use of drawings and formulas)
02-2022 • Working on literature review

Week 4 • Construction work


(Column and beam casting) using Conc. Grade
M20
Of Barrack building.(Size 500x500)MM
05 22-02- • Working on Literature review
2022-28- • Working on estimation of garage
02-2022 (Foundation part is complete)
• Start with plinth beams.
Week 5
• Construction work
(Slab casting on Night Picket 04 there structure in
unit) Grade M25
06 01-03- • Estimation work of garage using Drawings
2022-07- (start from column to Plinth beam and RCC chajja)
03-2022 • Start quantity of Steel analysis.

Week 7 • Construction Work


(Column casting and Casting of Chajjas Using grade
M20)

07 08-03- • Estimation work only (including centering and


2022-14- shuttering part.
03-2022 • Steel quantity work.

Week 8 • Construction work (Brickwork double and single


brick wall accordingly design on drawing.

08 15-03- • Working on literature review


2022-21- • Estimation and steel quantity of garage is complete.
03-2022 • Starting with cost analysis.

Week 9 • Construction work


(Layout of plan of another building).

09 22-03- • Starting with Estimation of ADM building


2022-29-
03-2022
• Construction work.
Week 10

10 30-03- • Continue with Estimation and costing work


2022-06- • Construction work.
04-2022
Summary of the work done in the week:

 Week 1:- Worked on Drawings. Worked on Literature review and construction work.
 Week 2:- Worked on various Tests on site and laboratory tests and construction work.
 Week 3:- Start worked on estimation and costing and literature work and construction.
 Week 4:- Cont. work on Estimation and literature review and construction.
 Week 5:- Conti. With Estimation Foundation part is complete.
 Week 6:- Conti work of estimation and started work on Steel quantity.
 Week 7:- Cont. work with estimation and steel quantity
 Week 8:-Estimation of car garage is complete also steel quantity and starting with cost
analysis.
 (CONSTRUCTION WORK IS CONTI. IN WHOLE WEEK)

Challenges faced during the work:


During estimation work it actually very hard work to read and understand each details of
drawings of MES. These drawings are very complicated like not much easier like PWD
drawings.
For finding length and height of single structure we should consult at least 3 or 4 drawings.
And Its Army work so lot of restrictions over there during work.
References:
• MES Standard Schedule of rates 2009 Part 1 -Specifications.
• MES Standard Schedule of rates 2010 Part 2 – Rates.
• MES Drawings.

Remarks:
nil