30th April, 2021

Project Manager
Olam Group Company
Kaduna
Kaduna Stare
Dear Sir,

REPAIR OF YOUR DOC BOILER REFRACTORY

The inspection carried out and our discussion on above subject refers. We are pleased to persent here
below our quotation

S/N Discription Qty Unit Price Amount

1 Boiler Inspection
Flight Ticket including airport taxi in Lagos and One night
1 158,000 158,000
accomodation
Engineer's Inspection fee 1 25,000 25,000

2 Quotation For the Repair Work


a Provision of M85LCC refractory cement 80 30,000 2,400,000
b Provision of 10mm steel plate for base 1 175,000 175,000
c Provision for rod/flat bar for hook 12,000
d Consumables: electrodes, cutting disc, grinding disc etc Lots 80,000
e Transportation of materials to site 1 350,000 350,000
f Transport of 4 staff to & fro Kaduna through Abuja Airport 4 138 552
h Accommodation of 4 staff for 4 nights 96,000
i Professional Service Charge 650,000
Total 3,946,552
7.5% VAT 295,991
Total Price inclusive of 7.5% VAT 4,242,543

TERMS
1
Olam to be responsible for the security of Aybod staff throghout the duration of the repair
work. Transportation with Escort is to be provided for safe movement of Aybod staff
between Abuja Airport and Kaduna and between hotel and factory
2 Job Duration: 3-4 days
3 Payment Terms: 1. 80% mobilization with LPO 2. 20% Upon job completion
4 Guarantee Period of Job done - 6months
We trust that above quotation meets your requirements. We look forward to offering you and your
plant a highly professional service which we are known for.

Yours faithfully
For: AYBOD LIMITED

Engr I. O. Taiwo
Director, Engineering Services