Phase-6 Progress:
Shortage of Manpower: - Reference to BL Rev 02, Planned manpower is 5100 but as per the current
status contractor is having only 1200, which is affecting the progress of Phase 6 .
Shortage of Materials: - Limited availability of shuttering/formwork is obstructing the contractor to
progress in line with schedule.
Delay in approval: - Delay in approval of External block work, consequently affecting all remaining
works like plaster, painting and all other required finishes.
MEP Subcontractor: - Non-deployment of Dedicated MEP subcontractors are delaying all related
MEP works, finally it will delay Testing & Commissioning and handing over.
Procurement (Long Lead items): - None of the Long lead items are on the site (Only Hollow block is
available), this delay will be agreed handing over dates of priority buildings.
Most of the critical/long lead items material are not yet approve.
581 Shop drawings under review with DAR as of 23-Jan-2022
1145 Shop Drawings Rejected which requires resubmittal as of 23-Jan-2022
Dar Al Riyadh Consultants - C.R. 111 – C.C 6263 – P.O. Box 250170, Riyadh 11391 - Saudi Arabia –www.daralriyadh.com
دار الرياض لﻺستشارات الهندسية –المملكة العربية السعودية11391 – الرياض250170 ب. – ص6263 رقم العضوية-– 111 ت.س
CLIENT SUPPORT CONSTRUCTION MANAGEMENT ENGINEERING & GEOMATICS SERVICES & MASDAR SYSTEMS &
SERVICES SERVICES ARCHITECTURE SOLUTIONS SOLUTIONS
Variance
BL Project BL Project Plan % Performance
WBS
Start Finish Complete % Complete
Pages 1/1
Meeting at RSAF
Critical & Long Lead Items for Phase 6 21-Nov-2020
(Revised 18-Jan-22)
121 Irrigation Work, 1. Initial Saudi Arabia Co. Ltd. KSA 1. PreQ., approved. 2 06/Feb/22 13/Feb/22 6 27/Mar/22 30 23/Oct/22 3 13/Nov/22 2 27/Nov/22 8.17 Action by NASJV
2. (MS) approved 2. MS.
P0033.07
19-Dec-21 NAS-SB-0-GE00-DC-3256-03
122 Chain Link Fence & Gates, Ph. 6 1. 1. BRC Industrial Saudi Co. KSA 1. PreQ., approved. - - 30/Jan/22 4 27/Feb/22 4 27/Mar/22 4 24/Apr/22 2 08/May/22 2.33 Action by NASJV
P0036.01
123 Landscaping Work, Ph.6 1. Initial Saudi Arabia Co. Ltd. KSA 1. PreQ., approved. 3 13/Feb/22 20/Feb/22 7 10/Apr/22 15 24/Jul/22 13 23/Oct/22 3 13/Nov/22 7.23 Action by NASJV
P0040.01
124 Precast- Slabs, Phase 06, 1. Ideal Precast Company 1. PreQ., approved. - - SUB-843-2021 24/Jul/21 15 06/Nov/21 10 15/Jan/22 8 12/Mar/22 2 26/Mar/22 4.67 Action by NASJV
RA14, Primary School, Boys. 2. (MS) Approved Production starts 20 days after receiving
RA16, Secondary School, Boys 11-Jul-21 the final approval for drawings and
P0049.03
125 GFRC for Mosque, Ph.6 1. Ideal Precast Company, KSA 1. PreQ., is approved 3 13/Feb/22 Schedule is to be 20/Feb/22 3 06/Mar/22 7 24/Apr/22 5 29/May/22 1 05/Jun/22 3.03 Action by NASJV
P0050.02
2. (MS) Pending Awaiting Approval of Mosque
updated Shop Drawings
126 Hourdi Block Masonry, 1. Manal Alamal for Concrete Products 1. PreQ., is approved 2 06/Feb/22 13/Feb/22 1 13/Feb/22 4 13/Mar/22 6 26/Feb/22 1 05/Mar/22 0.67 Action by NASJV
Factory, KSA 2. (MS) approved
P0052.08
28-Dec-21.
127 Space Frame Structure, 1. Space Structures Co. KSA 1. PreQ., is approved 3 13/Feb/22 Schedule is to be 20/Feb/22 7 03/Apr/22 13 03/Jul/22 7 21/Aug/22 2 04/Sep/22 5.13 Action by NASJV
2. (MS) disapproved 2. MS
P0056.01
Action BY NASJV
VD & Calculation submittal
128 Stainless Steel Handrails 1. Al Sultan Construction Co. KSA 1. PreQ., submitted 4 20/Feb/22 Schedule is to be 27/Feb/22 4 20/Mar/22 7 08/May/22 4 05/Jun/22 2 19/Jun/22 3.03 Action by NASJV
P0060.01
18-Oct-21 Pending material Submittal
2. (MS) Pending updated & VD Submittal
129 Kitchen Cabinets 1. Nesma Al Sahara, KSA 1. PreQ., approved 4 20/Feb/22 Schedule is to be 27/Feb/22 7 10/Apr/22 8 05/Jun/22 7 22/Jul/22 2 05/Aug/22 3.92 Action by DAR
P0064.01
2. (MS) Submitted for MS approval
updated NAS-SB-0-GE00-DC-4201-00 Released Code C 19-Jan-2022
04-Nov-21
Target Date: 13-Jan-22
130 Aluminum Glazed Skylights 1. Cube Metal Industries Co. KSA 1. PreQ., approved 3 13/Feb/22 Schedule is to be 20/Feb/22 7 03/Apr/22 10 12/Jun/22 4 10/Jul/22 2 24/Jul/22 3.73 Action by NASJV
P0086.01
2. (MS) disapproved to re-submit MS
28-Nov-21 updated NAS-SB-0-GE00-DC-3818-02
131 Hollow Metal Steel Doors 1. Al Kuhaimi Metal Industries Ltd., KSA 1. PreQ., approved 2 06/Feb/22 PO-692-2021 04/Apr/21 2 20/Feb/22 13 22/May/22 6 03/Jul/22 2 17/Jul/22 4.90 Action by DAR/ NASJV
2. (MS) approved. Pending approval of Shop
P0079.01
132 Aluminum Doors 1. Cube Metal Industries Co. KSA 1. PreQ., approved 2 06/Feb/22 SUB-807-2021 11/Jul/21 1 13/Feb/22 12 08/May/22 6 19/Jun/22 1.5 29/Jun/22 4.55 Action by NASJV
2. (MS) approved
P0080.01
30-Dec-21
134 Aluminum Windows 1. Cube Metal Industries Co. KSA 1. PreQ., approved 2 06/Feb/22 SUB-807-2021 11/Jul/21 1 13/Feb/22 12 08/May/22 6 19/Jun/22 1.5 29/Jun/22 4.55 Action by NASJV
2. (MS) approved
P0083.01
30-Dec-21
135 Door Hardware 1. Al Kuhaimi Metal Industries Ltd., KSA 1. PreQ., approved 2 06/Feb/22 PO-693-2021 04/Apr/21 4 06/Mar/22 13 05/Jun/22 2 19/Jun/22 2 03/Jul/22 3.97 Action by NASJV
2. (MS) disapprved 2. MS
P0084.01
20-Dec-21 NAS-SB-0-GE00-DC-2497-03
3. VD disapproved
Submitted for almost all
Buildings
136 Curtain Walls 1. Cube Metal Industries Co. KSA 1. PreQ., approved 2 06/Feb/22 SUB-807-2021 11/Jul/21 1 13/Feb/22 12 08/May/22 6 19/Jun/22 1.5 29/Jun/22 4.55 Action by DAR
2. (MS) Submitted 2. MS. NAS was advised to double check
P0085.01
137 Exposed Aggregate Marble Chips Rendering, 1. Al-Qasabi. KSA & Others 1. PreQ., Pending 7 13/Mar/22 Schedule is to be 16/Mar/22 1.3 22/Mar/22 7 10/May/22 6 21/Jun/22 2 05/Jul/22 3.50 Action by NASJV
2. (MS) Pending Pending material PreQ &
P0087.05
updated submittal.
138 Gypsum Board Work 1. Mada Gypsum Co. KSA 1. PreQ., approved - - 30/Jan/22 1.0 06/Feb/22 3 27/Feb/22 6 10/Apr/22 2 24/Apr/22 2.57 Action by NASJV
P0088.01
1.1. The Int'l Co. For Building Materials Ltd. 2. (MS) approved to place an order
"BINEX", KSA
139 Ceramic Tiles 1. RAK Ceramics PJSC., UAE 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 2.0 20/Feb/22 4 20/Mar/22 6 01/May/22 2 15/May/22 2.80 Action by NASJV
For Non-Residential & Schools 1.1. Nesma United Industries Co. Ltd. KSA 06-Jan-22 2. MS
P0089.01
140 Porcelain Tiles 1. Forsan Ceramics, KSA 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 2.0 20/Feb/22 4 20/Mar/22 6 01/May/22 2 15/May/22 2.80 Action by NASJV
P0093.01
141 Terrazzo Tiles 1. Arabian Tile Co. Ltd. KSA 1. PreQ., approved 2 06/Feb/22 09/Feb/22 1.0 13/Feb/22 4 13/Mar/22 6 24/Apr/22 2 08/May/22 2.80 Action by DAR
2. (MS) Submitted. 2. MS
P0094.01
142 Acoustical Ceiling 1. USG Boral Middle East Ltd. Co. KSA 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 3.0 27/Feb/22 6 10/Apr/22 6 22/May/22 2 05/Jun/22 3.27 Action by DAR
For Non-Residential & Schools 2. (MS) Submitted
MS
P0095.01
For Non-Residential & Schools 2. (MS) Submitted 2. MS
P0096.01
144 Acoustical Metal Ceiling 1. USG Boral Middle East Ltd. Co. KSA 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 3.0 27/Feb/22 6 10/Apr/22 6 22/May/22 2 05/Jun/22 3.27 Action by DAR
For Non-Residential & Schools 2. (MS) Submitted
MS.
P0097.01
145 Wood Flooring 1. Robbins Air Channel Classic, 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 3.0 27/Feb/22 10 08/May/22 6 19/Jun/22 2 03/Jul/22 4.20 Action by NASJV
1.1. Taameer Specialized Systems Co. "TASCO" 2. (MS) pending 2. MS
P0098.01
updated NAS-0-GE00-AR050-0023-00
146 Marble Flooring 1. Free Design Trading, KSA. 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 3.0 27/Feb/22 10 08/May/22 6 19/Jun/22 2 03/Jul/22 4.20 Action by DAR
For Non-Residential & Schools 1.1. Nesma United Industries Co. Ltd. KSA 2. (MS). Submitted 2. MS
P0099.01
147 Granite Flooring 1. Free Design Trading, KSA. 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 2.0 20/Feb/22 8 17/Apr/22 6 29/May/22 2 12/Jun/22 3.73 Action by NASJV
1.1. Nesma United Industries Co. Ltd. KSA 2. (MS) Pending 2. MS
P0100.01
updated NAS-SB-GE00-DC-3282-00
148 Resilient & Vinyl Tiles Flooring 1. Gerflor 1. PreQ., Pending 2 06/Feb/22 Schedule is to be 09/Feb/22 2.0 20/Feb/22 10 01/May/22 6 12/Jun/22 2 26/Jun/22 4.20 Action by NASJV
2. (MS) Pending. to check if we can procced with
P0101.01
149 Rubber Flooring 1. Kraiburg Rubber Mats & Tails, Germany. 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 2.0 20/Feb/22 10 01/May/22 6 12/Jun/22 2 26/Jun/22 4.20 Action by NASJV
1.1. Khalid A. Al Shathry., KSA 2. (MS) Pending. 2. MS
P0102.01
updated
150 Epoxy Screed & Epoxy Coating 1. Fosam Company Limited (Saudi Fosroc), KSA 1. PreQ., approved 23/Jan/22 26/Jan/22 2.0 06/Feb/22 2 20/Feb/22 5 27/Mar/22 2 10/Apr/22 2.10 Action by NASJV
1. Epoxy Flooring, Nitoflor FC130, RAL 7040 2. (MS) approved 2. MS
P0103.01
151 Carpet Tiles 1.Belgotex, South Africa. 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 2.0 20/Feb/22 10 01/May/22 6 12/Jun/22 2 26/Jun/22 4.20 Action by NASJV
P0104.01
1.1. Riyadh House Co. "Jeraisy". KSA 2. (MS) Pending. Will NAS-0-GE00-AR050-0053-00
Not be Reviewed updated
by DAR. 10-Oct-21
152 Carpet Roll 1. Al Sorayai Group: Naseej Int'l Co.. KSA 1. PreQ., approved 2 06/Feb/22 Schedule is to be 09/Feb/22 2.0 20/Feb/22 8 17/Apr/22 6 29/May/22 2 12/Jun/22 3.73 Action by NASJV
2. (MS) disapproved to check if we can procced with
P0105.01
(1 of 2)
(2 of 2) 2. (MS) approved
15-Dec-21
154 Raised Flooring, 1. Avayo Middle East Co. Ltd., KSA 1. PreQ., approved 3 13/Feb/22 Schedule is to be 16/Feb/22 3.0 06/Mar/22 10 15/May/22 5 19/Jun/22 2 03/Jul/22 3.97 Action by NASJV
P0113.01
2. (MS) approved 2. MS. .
13-Jan-22 updated NAS-SB-0-GE00-DC-4200-01
155 Internal Signs, 1. Nour Massa Co. KSA 1. PreQ., approved 4 20/Feb/22 Schedule is to be 23/Feb/22 10.0 01/May/22 14 07/Aug/22 3 28/Aug/22 2 11/Sep/22 4.43 Action by NASJV
P0114.01
2. (MS) pending Awaiting MS. Submittal Docs.
updated
156 Bathroom Accessories 1. Nofer S.L. Spain. 1. PreQ., approved 4 20/Feb/22 Schedule is to be 23/Feb/22 10.0 01/May/22 10 10/Jul/22 4 07/Aug/22 2 21/Aug/22 3.73 Action by NASJV
1.1. Nesma United Industries Co. Ltd. KSA 2. (MS) to re-Submit
2. MS.
P0117.01
157 Corian Counter Tops 1. Pont Contracting Est. KSA. 1. PreQ., approved 4 20/Feb/22 Schedule is to be 23/Feb/22 10.0 01/May/22 10 10/Jul/22 4 07/Aug/22 2 21/Aug/22 3.73 Action by NASJV
1.1. Nesma United Industries Co. Ltd. KSA 2. (MS) Pending
NAS-SB-0-GE00-DC-3418-01
P0118.01
updated
158 Laundry Equipment 1. PreQ., pending 8 20/Mar/22 Schedule is to be 23/Mar/22 4.0 17/Apr/22 4 15/May/22 2 29/May/22 2 12/Jun/22 1.87 Action by NASJV
P0119.00
2. (MS) pending
updated
159 Garbage Chutes, 1. 1. Kaisab Company Limited, KSA 1. PreQ., approved 4 20/Feb/22 23/Feb/22 8.0 17/Apr/22 7 05/Jun/22 3 26/Jun/22 1 03/Jul/22 2.57 Action by DAR
2. (MS) Submitted for MS approval (John)
P0120.00
160 Kitchen Equipment, 1. Elba, China, Falcon, Egypt & Brema, Italy 1. PreQ., Submitted 4 20/Feb/22 23/Feb/22 6.0 03/Apr/22 16 24/Jul/22 3 14/Aug/22 2 28/Aug/22 4.90 Action by DAR
(Domestic) 1.1. Italian Appliances Trading Co. KSA 02-Jan-22 1. PQ.
P0124.01
161 Playing Equipment, 1. Pro Landscape Structures, Malaysia 1. PreQ., Submitted 8 20/Mar/22 23/Mar/22 4.0 17/Apr/22 12 10/Jul/22 3 31/Jul/22 1 07/Aug/22 3.73 Action by DAR
P0125.01
1.1. Saeed A. Bahmdah Contracting Co. Ltd. 12-Dec-21 1. PQ. NAS-0-GE00-CP069-0254 R00
(S.B.E), KSA 2. (MS) pending NAS-SB-0-GE00-DC-xxxx-00 Released as Code C on 2-Jan-2022
162 Exercise Equipment, 1. Sports World, 1. PreQ., Submitted 10 03/Apr/22 06/Apr/22 4.0 01/May/22 12 24/Jul/22 2 07/Aug/22 2 21/Aug/22 3.73 Action by DAR
1.1. Khalid A. Al Shathry., KSA 16-Jan-22 1. PQ.
P0126.01
163 Clinic Medical Equipment, 1. Al Asasyah, 2. Mediserv, 3. Ebrahim Al Mana Bros, 1. PreQ., Approved. 3 13/Feb/22 Schedule is to be 06/Feb/22 4.0 13/Mar/22 16 03/Jul/22 5 07/Aug/22 2 21/Aug/22 5.37 Action By DAR
- 10 of 10 4. Al Olaibi Medical Services (OMS), 11-Aug-21 Note: Submitted all in one
5. Salehiya Trading Company, 6. Shams Al Riyadh, 2. (MS) 19-Sep-21 updated submittal as per RSAF request.
P0128.01
NAS-DAR-LE-211215-01, 7. Azeer Trading Est., 8. Siemens Healthiness, Reviewed by DAR & Sent to End waiting end user response
15-Dec-21 9. Veolia, 10. Gulf Medical, 11. Sesneber User on 19-Sep-21
164 Steam & Sauna Equipment, | VOP 1. Aquarius Water Treatment Co. KSA 1. PreQ., approved. 6.3 08/Mar/22 Schedule is to be 18/Mar/22 1.0 15/Mar/22 17.2 13/Jul/22 4.3 12/Aug/22 1 19/Aug/22 5.25 Action by NASJV
P0209.01
2. (MS) approved. 2. MS
09-Jan-22 updated NAS-SB-0-GE00-DC-4682-01
165 Elevator, Phase 6 1. Schindler Olayan Elevator Co. Ltd. KSA 1. PreQ., approved LOA. # 24/Mar/21 14.2 01/Jul/21 26.6 03/Jan/22 8 28/Feb/22 3 21/Mar/22 12.09 Partial Delivery
on 18-Feb-21 KFAA/NAS/SCH/001 RA42: 27-Dec-21 [3no.]
1. Traffic analysis report 2. (MS) approved 15-Mar-21 RA43: 27-Dec-21 [3 nos.]
P0137.02, 03 & 04
166 Hoist & Crane, 1. GH Cranes and Components, Spain. 1. PreQ., approved 2 06/Feb/22 09/Feb/22 4.0 06/Mar/22 24 21/Aug/22 10.5 02/Nov/22 2 16/Nov/22 8.52 Action by NASJV
Bldgs. IR06, & WW25 1.1. Etihad Cranes Company, KSA 2. (MS) approved to close open comments
P0138.04
27-Nov-21 NAS-SB-0-GE00-DC-3261-02
167 Novec System 1. Saudi Factory for Fire Equipment, 1. PreQ., approved 30/Jan/22 4.0 27/Feb/22 16 19/Jun/22 4 17/Jul/22 1 24/Jul/22 4.90 Action by NASJV
"SFFECO", KSA 2. (MS) approved to place an order
P0143.04
168 Sanitary Fixtures 1. Saudi Ceramics, Grohe, Arco, Flexitub, Rodi, 1. PreQ., approved 3 13/Feb/22 Schedule is to be 16/Feb/22 4.0 13/Mar/22 18 19/Jul/22 4 16/Aug/22 2 30/Aug/22 5.69 Action by NASJV
& Geberit 2. (MS) disapproved to Resubmit
P0146.01
See Letter DAR-NAS-LE-211216-03, 1.1. Nesma United Industries Co. Ltd. KSA 04-Jan-22. updated NAS-SB-0-GE00-DC-3421-03
19-Dec-21 for Changing fron E. to W.WC
169 Residential Electric Water Heater, 1. Saudi Ceramics Co. KSA 1. PreQ., approved 2 06/Feb/22 13/Feb/22 4.0 13/Mar/22 5.5 20/Apr/22 4.0 18/May/22 1 25/May/22 3.38 Action by NASJV
Ph. 6 2. (MS) disapproved 2. MS.
P0147.01
04-Jan-22 NAS-SB-0-GE00-DC-0927-03
170 Residential Electric Water Heater 1. Rheem, UAE 1. PreQ., approved 2 06/Feb/22 09/Feb/22 4.0 06/Mar/22 24 21/Aug/22 3.2 12/Sep/22 2 26/Sep/22 6.81 Action by NASJV
Ph. 6 1.1 Lamah Co. Ltd. Trading & Contracting, KSA 2. (MS) disapprove MS. approval.
P0147.02
15-Nov-21 NAS-SB-0-GE00-DC-3237-03
171 Irrigation Booster Pumps 1. Grundfos. 1. PreQ., approved 3 13/Feb/22 16/Feb/22 6.0 27/Mar/22 24 11/Sep/22 3.0 02/Oct/22 1 09/Oct/22 6.53 Action by NASJV
1.1. Lamah Co. Ltd. Trading & Contracting, KSA 2. (MS) approved for for MS. Resubmittal
P0148.08
172 Fountain Equipment 1. OASE, Grundfos, Astral, Poolmiser, .. 1. PreQ., approved. 2 06/Feb/22 Schedule is to be 09/Feb/22 4.0 06/Mar/22 22 07/Aug/22 2 21/Aug/22 2 04/Sep/22 6.07 Action by NASJV
1.1. Aquarius Water Treatment Co. KSA 2. (MS) disapproved to resubmit MS
P0149.01
173 Swimming Pool Equipment 1. Aquarius Water Treatment Co. KSA 1. PreQ., approved. 2 06/Feb/22 Schedule is to be 09/Feb/22 4.0 06/Mar/22 23 14/Aug/22 2 28/Aug/22 2 11/Sep/22 6.30 Action by NASJV
2. (MS) approved to close open comments on MS
P0151.01
174 Hot Water Circulation Pump, 1. Grundfos. 1. PreQ., approved. 2 06/Feb/22 Schedule is to be 09/Feb/22 4.0 06/Mar/22 23 14/Aug/22 2 28/Aug/22 2 11/Sep/22 6.30 Action by NASJV
RA25, 1.1. Lamah Co. Ltd. Trading & Contracting, KSA 2. (MS) approved to resubmit MS
P0147.03
175 Daikin Air Conditioning Saudi Arabic LLC. 1. PreQ. approved 6 06/Mar/22 PO-1069-2021 31/Dec/21 3 21/Jan/22 14 29/Apr/22 4 27/May/22 2 10/Jun/22 5.37 Action by DAR
Subject to VOP approval 16-Jan-22 * Quotations Submitted
2. (MS). Submitted NAS-DAR-LE-211214-04
P0157.05
2. MS.
11-Jan-22 NAS-SB-0-GE00-DC-4842-00
2. MS.
NAS-SB-0-GE00-DC-4842-00 - Under Review
176 Split Unit, DX Ducted Concealed Type, Carrier 1. PreQ. approved 30/Jan/22 3 20/Feb/22 16 12/Jun/22 5 17/Jul/22 2 31/Jul/22 6.07 Pending with NASJV for
P0157.01
2. (MS). To Resubmit to Submit Separtately for phase 6
P0158.04
178 Air Handling Units, AHU, Arabian Air-Conditioning Co. Ltd. (Carrier) 1. PreQ. Approved Schedule is to be 26/Jan/22 1 02/Feb/22 15.6 22/May/22 4.2 20/Jun/22 5.7 30/Jul/22 6.18 Action By NASJV
to close open comments
2. (MS). Approved.
P0160.01
updated NAS-SB-0-GE00-DC-2639-01
179 Air Curtain, 1. 2VV s.r.o. Chech Republic. 1. PreQ. approved Schedule is to be 26/Jan/22 4 23/Feb/22 15.0 08/Jun/22 1.5 18/Jun/22 0.6 22/Jun/22 4.92 Action By NASJV
MS.
1.1. Joint Gulf Business Corp (JGB), KSA 2. (MS). approved
P0164.01
180 Fire Alarm System, 1. Simplex, 1. PreQ. approved 3 13/Feb/22 20/Feb/22 3.4 15/Mar/22 12.0 07/Jun/22 4.3 07/Jul/22 2.0 21/Jul/22 5.06 Action by NASJV
P0167.01
181 Fire Alarm Cables 1. Asharqiyah Cables Company for Trading 1. PreQ., | approved. 23/Jan/22 26/Jan/22 2 09/Feb/22 4.0 09/Mar/22 4.0 06/Apr/22 1.0 13/Apr/22 2.57 Action by NASJV
& Industry, "Ash Cables", KSA 2. (MS) | approved
P0167.04
13-Dec-21
182 Transformer, Oil Immersed Type, [7 EA] 1. Alfanar Co. Ltd., KSA 1. PreQ. Approved PO-2021-09466 26/Sep/21 9 28/Nov/21 4.0 26/Dec/21 1.3 04/Jan/22 0.2 05/Jan/22 3.38 Ordered
P0167.01
RA14, RA16, RA17, RA19, RA25, RA33, 2. (MS). Approved Action by NASJV
& RA41 3. Calculation approved
16-Nov-21
183 Ring Main Units, RMU, 1. Alfanar Co. Ltd., KSA 1. PreQ. Approved PO-2021-09535 03/Oct/21 9 05/Dec/21 12.0 27/Feb/22 4.0 27/Mar/22 1.0 03/Apr/22 6.07 Ordered
(RA14, RA16, RA17, RA19, RA33, RA25, 2. (MS). Approved
P0177.03
RA41), 21-Dec-21
3. VD. Approved
184 Low Voltage Switchboard, 1. Schneider Electric, 1. PreQ. Approved Schedule is to be 26/Jan/22 16 18/May/22 4.0 15/Jun/22 0.8 20/Jun/22 0.5 24/Jun/22 4.97 Action by NASJV
P0180.02 P0180.01
185 Safety Switches, non-fusible type, 1. GE (ABB), Mexico. 1. PreQ. Approved 26/Jan/22 1 02/Feb/22 1.0 09/Feb/22 0.8 14/Feb/22 0.5 18/Feb/22 0.77 Action by NASJV
1.1. Saudi Electric Supply Co. (SESCO), KSA 2. (MS). Approved
186 Wiring Devices, Sockets & Switches, 1. Alfanar Co. Ltd., KSA 1. PreQ. approved 3 13/Feb/22 16/Feb/22 1.0 23/Feb/22 10 04/May/22 1.0 11/May/22 1.0 18/May/22 3.03 Action by NASJV
to close open comments on MS
P0172.02
187 Motor Control Center 1. Schneider Electric, 1. PreQ. Approved Schedule is to be 26/Jan/22 18 01/Jun/22 4.0 29/Jun/22 0.8 04/Jul/22 0.5 08/Jul/22 5.44 Action by NASJV
P0182.02
1.1. Saudi Manufacturing Operations 2. (MS). Approved to close open comments
MOTS", KSA updated NAS-SB-0-GE00-DC-2717-03
188 Panel Boards 1. Schneider Electric, 1. PreQ. Approved PO-2021-0928 14/Sep/21 14 21/Dec/21 12.0 15/Mar/22 4.3 14/Apr/22 1.0 21/Apr/22 7.30 Ordered
P0184.03, 04 & 05
RA09, RA30, RA33, RA37 … 1.1. Saudi Manufacturing Operations 2. (MS). Approved PO-2021-0929
MOTS", KSA PO-2021-0930 Awaiting approved shop drawings &
Panel Schedule
190 Lighting Fixtures, Interior 1. Al Nasser Group, KSA 1. PreQ. Approved 1 30/Jan/22 05/Feb/22 10 16/Apr/22 12.0 09/Jul/22 3.0 30/Jul/22 1.0 06/Aug/22 6.07 Action by NASJV
2. Huda Lighting LLC Co. KSA 2. (MS). Approved to close open comments on MS
P0186.18
191 Lighting Fixtures, Exterior 1. Al Nasser Group, KSA 1. PreQ. Approved 4 20/Feb/22 26/Feb/22 10 07/May/22 12.0 30/Jul/22 3.0 20/Aug/22 1.0 27/Aug/22 6.07 Action by NASJV
2. Huda Lighting LLC Co. KSA 2. (MS). pending
P0189.01
3. … etc.
192 Unit Substations & SEC Power Meter, 1. MEMF Electrical Industries Co. 1. PreQ. approved 3 13/Feb/22 20/Feb/22 7.6 14/Apr/22 20.0 01/Sep/22 4.3 01/Oct/22 2.0 15/Oct/22 7.91 Action by NASJV
P0187.13
193 Package Substation for Street & Area 1. Alfanar Co. Ltd., KSA 1. PreQ. approved 3 13/Feb/22 20/Feb/22 3.4 15/Mar/22 22.0 16/Aug/22 4.3 15/Sep/22 2.0 29/Sep/22 7.40 Action by NASJV
to close open comments on MS
P0187.05
194 UPS & Battery Cabinets for ICT Racks, 1. Eaton Industries .., France. 1. PreQ. approved 4 20/Feb/22 27/Feb/22 3.4 22/Mar/22 22.0 23/Aug/22 4.3 22/Sep/22 2.0 06/Oct/22 7.40 Action by DAR
P0190.07
1.1. Nesma Telecom & Technology Co. Ltd. KSA 2. (MS). approved
16-Dec-21 NAS-SB-0-GE00-DC-3708-02
197 IP-Intercom System, 1. Came S.p.A. Italy. 1. PreQ. approved 3 13/Feb/22 20/Feb/22 1.0 27/Feb/22 12 22/May/22 1.0 29/May/22 1.0 05/Jun/22 3.50 Action by DAR
1.1. Smart Direction Group. KSA 2. (MS). Submitted 2. MS
P0202.01
198 Building Management System, 1. PreQ. disapproved 4 20/Feb/22 27/Feb/22 1.0 06/Mar/22 10 15/May/22 3.0 05/Jun/22 2.0 19/Jun/22 3.73 Action by NASJV
P0208.01