Work Package Work Activity Weightage %

HCIS - Security
Consultancy
HCIS - Fire Fighting
(Special Service)
Local Consultancy Work
TSF Works
Fence Installation
Earthwork
Road Works
Duct Bank

IDT Station Installation

IDT Civil works


Civil
O&M Building

Other Buildings (Ware House, Gate House, Visitor


Center,Security Control Centre)

Cable trenching

LA, IDT Light & WMS Foundations

Tracker Foundation-Ramming

Tracker Installation

Module Installation
Mechanical

HVAC

HCIS - Fire Fighting


HCIS
HCIS - Security / Protection
DC Cabling Works
Inverter Installation
Electrical LV Cabling
Electrical
MV Cabling
Equipment & Other works
T&C Testing & Commissioning
Planned Drawing Actual Drawing Plan date for PC Actual date for Plan date for PC
Approval Date Approval Date submission PC submission Approval

29-Sep-21

29-Sep-21

26-Aug-21

5-Oct-21

24-Aug-21

22-Aug-21
Actual Date for Planned Start Planned Finish Actual Finish
Actual Start Date
PC Approval Date date Date

21-Jun-21 21-Jun-21 23-Aug-21


12-Aug-21 17-Jan-22
17-Jul-21 26-Dec-21
26-Jul-21 14-Jul-22
26-Jul-21 4-Jan-22

15-Mar-22 26-Jun-22

26-Sep-21 26-Apr-22

6-Oct-21 12-Jun-22

12-Oct-21 24-May-22

5-Dec-21 17-Jul-22

27-Dec-21 28-Aug-22

13-Nov-21 9-May-22

25-Dec-21 28-May-22

11-May-22 24-Aug-22

3-Feb-22 12-Jun-22

8-Jun-22 29-Aug-22
10-Jan-22 20-Jun-22
14-Dec-21 16-Jul-22
14-Dec-21 16-Jul-22

16-Feb-22 8-Sep-22
Plan Duration Actual Duration Productivity
Total Qty UOM
(Days) (Days) (Per day)

52
134 13,687 RM 102
135 170,000 Cum 1,259
296 25,402 RM 86
138

86 40 Set 0.5

181 40 Set 0.2

210

180

187

204

149 63,500 Nos 426

130 12,600 Nos 97

87 726,120 Nos 8,346

75

67 387 MWp 6
136
178 410 Km 2
178 145 Km 1

169
Subcontractor Identified No. of Subcontractors planned for the activity

AlMasar
Armara
AlAsthool
1.ALAsthool
2.Armara AlAsthool
3.Aldawalliah
AlAsthool
4.FMC
5.AlBadr Contracting
Subcontractor 1 Subcontractor 2
6.AMAZCO
7.MANARAH
8.Shama-Al-Shamal Subcontractor 1 Subcontractor 2
9.RMCO
10.Raqwani
Subcontractor 1
11.Green Experts
12. MIGCO
13. Al-Judr Subcontractor 1
14. MMEST
15. MAC
16.AlMasar Subcontractor 1
17.Alalam Alkhas
Subcontractor 1

Subcontractor 1 Subcontractor 2

1. Allied Vision Subcontractor 1 Subcontractor 2


2. VOLTAS
3. Green Experts
4. Alalam Alkhas Subcontractor 1 Subcontractor 2

Subcontractor 1 Subcontractor 2
1. Allied Vision
2. VOLTAS Subcontractor 1 Subcontractor 2
3. Alalam Alkhas
1. Allied Vision
2. VOLTAS
3. Alalam Alkhas Subcontractor 1
Plan Manpower Plan equipment &
he activity S/C Head Office
requirement plant requirements

Subcontractor 2

Subcontractor 2

Subcontractor 3

Subcontractor 2

Subcontractor 2

Subcontractor 2

Subcontractor 2