i) All types of soil Cum 144,760.00 101.00 14,620,760.00 7,159.35 104.63 7,263.98 723,095.00 10,567.00 733,662.00
Construction of embankment complete as per Technical
Specification Clause 305 with approved material from borrow
2.02 areas. i.e. Stripping, storing and reapplication of top soil Cum 142,612.00 224.00 31,945,088.00 39,046.27 - 39,046.27 8,746,365.00 - 8,746,365.00
complete as per Technical Specification Clause 301,305,
borrow excavation with all leads and lifts
Providing and laying and jointing NP4 (as per IS:458) Hume
5.04 pipes for culverts, complete as per Technical Specification - - -
Section 2900 and IRC Special Publication No.13 - 1998
Providing & Laying 1st Class bedding below hume pipes with
5.05 graded sand or other granular material passing throuh 5.6mm Cum 398.00 444.00 176,712.00 - - -
sieve as per clause 2904 and design Drawing
Back filling behind head walls, wing walls/retaining and
return walls and earth cushion around pipes or at any other
location complete as per drawing and Technical Specification
5.06 16,535.00 - - -
Clause 305 and Section 2900.
a. With selected granular materials (sand) Cum 16,535.00 444.00 7,341,540.00 36,343.58 2,021.53 38,365.11 16,136,552.00 897,557.00 17,034,109.00
b. With Selected material Cum 368.00 - - - -
Structural Plain Cement Concrete M 15 for Encasing and
Curtain wall etc. including formwork, excluding
5.07 reinforcement complete as per drawing, Technical Cum 2,651.00 5,765.00 15,283,015.00 427.18 - 427.18 2,462,699.00 - 2,462,699.00
Specification Sections 1500, 1700, 2100 & 2200
7.03 Providing Plain Cement Concrete M20 wearing course 25mm Cum - 6,416.00 - - - -
thick in Brick masonry drain
7.23 RCC M40 Friction Slab on RE Wall approaches including steel Cum 476.00 14,276.00 6,795,376.00 213.93 2.88 216.81 3,054,065.00 41,115.00 3,095,180.00
Total Carried to Summary 57,152,056.00 22,984,074.00 256,356.00 23,240,431.00
BILL No 8 NEW BRIDGES
Earth work in excavation for foundation of structures
including cut off walls as per drawings and Technical
8.01 Specifications Clause 304, including setting out, construction
of shoring and bracing, removal of stumps and other
deleterious matter, dressing of
i) All types of soil, including backfilling up to ground level with Cum 38,281.00 104.00 3,981,224.00 281,790.81 1,742.78 283,533.59 29,306,244.00 181,249.00 29,487,493.00
approved material as directed by Engineer-in-Charge
Quantity Amount
Item Description Unit Quantity Rate Amount Remark
Upto Previous This Month Total Upto Previous This Month
Amount for Extra usage of cement instead of fly ash as per our
VO-01 - -
dated
VO-02 Disposal of dismanteled PQC beyond 1 Km lead. Cum 372.00 39,737.10 40,268.64 14,782,202.00 -
5.03,5.07 ,
7.02 & 8.02, M-15 PCC Cum. 308.78 275 84.914 593.00 183.106 641.00 197.928 0.425 810.00 250.111
8.02ii
8.03i,8.03ii,7 M-20 PCC cum. 941.00 275 258.776 593.00 558.014 641.00 603.182 1.294 810.00 762.212
.11i,7.11ii
5.09ii,
5.10ii ,
M-25 RCC cum. 334.15 320 106.926 580 193.804 627.00 209.509 1.213 792 264.643
5.11i , 8.04ii
& 8.05ii
8.2 M-30 RCC Cum. 177.05 400 70.820 552 97.731 596.00 105.521 0.740 753 133.318
8.04iv ,
8.05iv & M-35 RCC Cum. 426.61 400 170.643 552 235.487 596.00 254.258 1.783 753 321.235
8.06ii
8.27 M-35 RCC Pile Cum. - 405 - 543 - 587.00 - 742 -
8.22,8.06IV M-40 RCC cum. 82.83 430 35.617 542 44.894 586.00 48.539 - 740 61.295
ABSTRACT
Month: Apr-22
Total 24,236,584.00
Page No:
E= Qc x (Pp - Pb)
E= Escalation for the month
Qc= Quantity consumed for the month
Pp= Average Price of each item during the month of consumption.
Pb= Base Price (Rs.5500/-per Mt)
E= Qc x (Pp - Pb)
E= Escalation for the month
Qc= Quantity consumed for the month
Pp= Average Price of each item during the month of consumption.
Pb= Base Price (Rs.52100/-per Mt)
Work done
Bill No R Pli Plo V Remarks
Period
Total 64,858,175
Page no:
Bill No Work done Cement Fly Ash 20% Amount per Total Amount Remarks
Period Mt
Road DEC13/HW/787 25-Dec-13 17+960 18+320 Cleaning & Gurbing LHS 1 360 18.2 0.655 RAB 12
Road DEC13/HW/786 25-Dec-13 17+680 17+820 Cleaning & Gurbing LHS 1 140 18.2 0.255 RAB 12
Road FEB14/HW/1424 21-Feb-14 17+480 18+440 Cleaning & Gurbing RHS 1 960 18.2 1.747 RAB 14
Road FEB15/HW/517 11-Feb-15 24+502 24+564 A2 SIDE Kerb Dismantling LHS 1 62 0.1245 1 7.719 RAB 26
Road FEB15/HW/518 11-Feb-15 24+502 24+564 Median Chute Dismantling LHS 12 2.7 0.1575 1 5.103 RAB 26
BC JAN15/STR/649 25-Jan-15 02+865 02+865 Box Culvert Raft LHS 1 7.750 13.491 0.420 43.913 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 Box Culvert Raft LHS 1 7.750 0.750 0.780 4.534 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 A1 A2 Wall LHS 2 13.491 0.350 3.000 28.331 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 A1 & A2 wall L-portion LHS 2 0.400 3.400 0.350 0.952 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 Mid wall LHS 1 13.491 0.250 3.000 10.118 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 A1,A2 & Mid Haunch LHS 8 0.500 0.023 13.491 1.241 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 Deck Slab LHS 1 13.491 6.950 0.400 37.505 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 A1 Retaing wall LHS 1 6.450 1.313 4.200 35.569 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 A2 Retaing wall LHS 1 6.225 1.313 4.200 34.328 RAB 25
BC JAN15/STR/649 25-Jan-15 02+865 02+865 Floor Apron LHS 20 0.750 0.250 0.250 0.938 RAB 25
BC AUG14/STR/08 1-Aug-14 03+350 03+350 Box Culvert Raft LHS 1 7.550 19.770 0.420 62.691 RAB 20
BC AUG14/STR/08 1-Aug-14 03+350 03+350 Box Culvert Raft LHS 1 7.550 0.690 0.780 4.063 RAB 20
BC AUG14/STR/08 1-Aug-14 03+350 03+350 A1 A2 Wall LHS 2 19.770 3.000 0.350 41.517 RAB 20
BC AUG14/STR/08 1-Aug-14 03+350 03+350 A1 A2 Wall L Portion LHS 2 0.300 3.400 0.350 0.714 RAB 20
BC AUG14/STR/08 1-Aug-14 03+350 03+350 Mid Wall LHS 1 19.770 3.000 0.250 14.828 RAB 20
BC AUG14/STR/08 1-Aug-14 03+350 03+350 A1,A2 & Mid Haunch LHS 8 19.770 0.500 0.023 1.779 RAB 20
BC AUG14/STR/08 1-Aug-14 03+350 03+350 Deck Slab LHS 1 6.950 19.770 0.400 54.961 RAB 20
BC AUG14/STR/08 1-Aug-14 03+350 03+350 RCC guard Post LHS 20 0.750 0.250 0.250 0.938 RAB 20
BC AUG14/STR/08 1-Aug-14 03+350 03+350 Parapet Wall LHS 1 0.300 0.300 6.950 0.626 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 Box Culvert Raft LHS 1 7.550 20.670 0.420 65.545 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 Box Culvert Raft LHS 1 7.550 0.690 0.780 4.063 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 A1 A2 Wall LHS 2 20.670 3.000 0.350 43.407 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 A1 A2 Wall L Portion LHS 2 0.300 3.400 0.350 0.714 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 Mid Wall LHS 1 20.670 3.000 0.250 15.503 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 A1,A2 & Mid Haunch LHS 8 20.670 0.500 0.023 1.860 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 Deck Slab LHS 1 6.950 20.670 0.400 57.463 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 RCC guard Post LHS 20 0.750 0.250 0.250 0.938 RAB 20
BC JUL14/STR/1282 30-Jul-14 03+400 03+400 Parapet Wall LHS 1 0.300 0.300 6.950 0.626 RAB 20
BC MAY14/STR/76 03-May-14 14+500 14+500 Box Culvert Raft LHS 1 5.350 17.930 0.300 28.778 RAB 17
BC MAY14/STR/76 03-May-14 14+500 14+500 Box Culvert Raft LHS 1 5.350 0.750 0.900 3.611 RAB 17
BC MAY14/STR/76 03-May-14 14+500 14+500 A1 A2 Wall LHS 2 17.930 2.000 0.250 17.930 RAB 17
BC MAY14/STR/76 03-May-14 14+500 14+500 Deck L Portion LHS 2 0.300 2.270 0.250 0.341 RAB 17
BC MAY14/STR/76 03-May-14 14+500 14+500 Mid Wall LHS 1 17.930 2.000 0.250 8.965 RAB 17
BC MAY14/STR/76 03-May-14 14+500 14+500 Deck Haunch LHS 8 17.930 0.500 0.023 1.650 RAB 17
BC MAY14/STR/76 03-May-14 14+500 14+500 Deck Slab LHS 1 4.750 17.930 0.270 22.995 RAB 17
BC MAY14/STR/76 03-May-14 14+500 14+500 RCC guard Post LHS 13 0.750 0.250 0.250 0.609 RAB 17
BC MAY14/STR/703 15-May-14 14+655 14+655 Box Culvert Raft LHS 1 17.396 7.450 0.420 54.432 RAB 17
BC MAY14/STR/703 15-May-14 14+655 14+655 Box Culvert Raft LHS 1 7.450 0.690 0.780 4.010 RAB 17
BC MAY14/STR/703 15-May-14 14+655 14+655 A1 A2 Wall LHS 2 17.396 1.714 0.300 17.890 RAB 17
BC MAY14/STR/703 15-May-14 14+655 14+655 A1 A2 Wall L Portion LHS 2 0.300 2.014 0.300 0.363 RAB 17
BC MAY14/STR/703 15-May-14 14+655 14+655 Mid Wall LHS 1 17.396 1.714 0.250 7.454 RAB 17
BC MAY14/STR/703 15-May-14 14+655 14+655 A1,A2 & Mid Haunch LHS 8 17.396 0.500 0.023 1.600 RAB 17
BC MAY14/STR/703 15-May-14 14+655 14+655 Deck Slab LHS 1 17.396 6.850 0.400 47.665 RAB 17
BC MAY14/STR/703 15-May-14 14+655 14+655 RCC guard Post LHS 20 0.750 0.250 0.250 0.938 RAB 17
BC MAY14/STR/701 15-May-14 14+950 14+950 Box Culvert Raft LHS 1 17.550 7.550 0.420 55.651 RAB 17
BC MAY14/STR/701 15-May-14 14+950 14+950 Box Culvert Raft LHS 1 7.550 0.690 0.780 4.063 RAB 17
BC MAY14/STR/701 15-May-14 14+950 14+950 A1 A2 Wall LHS 2 17.550 3.000 0.350 36.855 RAB 17
BC MAY14/STR/701 15-May-14 14+950 14+950 A1 A2 Wall L Portion LHS 2 0.300 3.400 0.350 0.714 RAB 17
BC MAY14/STR/701 15-May-14 14+950 14+950 Mid Wall LHS 1 17.550 3.000 0.250 13.163 RAB 17
BC MAY14/STR/701 15-May-14 14+950 14+950 A1,A2 & Mid Haunch LHS 8 17.550 0.500 0.023 1.615 RAB 17
BC MAY14/STR/701 15-May-14 14+950 14+950 Deck Slab LHS 1 17.550 6.950 0.400 48.789 RAB 17
BC MAY14/STR/701 15-May-14 14+950 14+950 RCC guard Post LHS 20 0.750 0.250 0.250 0.938 RAB 17
BC MAY14/STR/877 18-May-14 14+950 14+950 Box Culvert Raft LHS 1 17.542 10.800 0.400 75.781 RAB 17
BC MAY14/STR/877 18-May-14 14+950 14+950 Box Culvert Raft LHS 1 10.800 0.700 0.800 6.048 RAB 17
BC MAY14/STR/877 18-May-14 14+950 14+950 A1 A2 Wall LHS 2 17.542 3.000 0.350 36.838 RAB 17
BC MAY14/STR/877 18-May-14 14+950 14+950 A1 A2 Wall L Portion LHS 2 0.300 3.350 0.350 0.704 RAB 17
BC MAY14/STR/877 18-May-14 14+950 14+950 Mid Wall LHS 2 17.542 3.000 0.250 26.313 RAB 17
BC MAY14/STR/877 18-May-14 14+950 14+950 A1,A2 & Mid Haunch LHS 12 17.542 0.500 0.023 2.421 RAB 17
BC MAY14/STR/877 18-May-14 14+950 14+950 Deck Slab LHS 1 17.542 10.200 0.350 62.625 RAB 17
BC MAY14/STR/877 18-May-14 14+950 14+950 RCC guard Post LHS 22 0.750 0.250 0.250 1.031 RAB 17
BC JAN15/STR/366 16-Jan-15 16+300 16+300 A1,A2 Approach slab LHS 2 13.250 3.600 0.300 28.620 RAB 25
BC FEB14/STR/893 16-Feb-14 18+196 18+189 Box Culvert Raft LHS 1 7.550 18.392 0.420 58.321 RAB 14
BC FEB14/STR/893 16-Feb-14 18+196 18+189 Box Culvert Raft LHS 1 7.550 0.690 0.780 4.063 RAB 14
BC FEB14/STR/893 16-Feb-14 18+196 18+189 A1 A2 Wall LHS 2 18.392 3.000 0.350 38.623 RAB 14
BC FEB14/STR/893 16-Feb-14 18+196 18+189 A1 A2 Wall L Portion LHS 2 0.300 3.400 0.350 0.714 RAB 14
BC FEB14/STR/893 16-Feb-14 18+196 18+189 Mid wall LHS 1 18.392 3.000 0.250 13.794 RAB 14
BC FEB14/STR/893 16-Feb-14 18+196 18+189 A1,A2 & Mid Haunch LHS 8 18.392 0.500 0.023 1.692 RAB 14
BC FEB14/STR/893 16-Feb-14 18+196 18+189 Deck Slab LHS 1 6.950 18.392 0.400 51.130 RAB 14
BC FEB14/STR/893 16-Feb-14 18+196 18+189 RCC guard Post LHS 15 0.750 0.250 0.250 0.703 RAB 14
BC JAN15/STR/368 16-Jan-15 22+725 22+725 A1,A2 Approach slab LHS 2 12.500 3.600 0.300 27.000 RAB 25
BC FEB14/STR/220 5-Feb-14 02+865 02+866 Box Culvert Raft RHS 1 7.750 13.491 0.420 43.913 RAB 14
Road FEB14/HW/257 41+675 17+680 17+810 Stone Pitching Removing LHS 1 130 11.00 0.30 429.00 RAB 14
HW Aug13/HW/02 1-Aug-13 43+570 43+620 GSB Removing RHS 1 50.000 11.500 0.072 41.400 RAB 08
HW FEB14/HW/1190 15-Feb-14 42+122 42+155 GSB Removing RHS 1 33.000 13.000 0.150 64.350 RAB 14
HW FEB14/HW/1191 15-Feb-14 04+990 05+090 GSB Removing RHS 1 100.000 13.000 0.150 195.000 RAB 14
HW FEB14/HW/1192 15-Feb-14 30+200 30+300 GSB Removing RHS 1 100.000 13.000 0.150 195.000 RAB 14
HW FEB14/HW/1193 15-Feb-14 30+450 30+520 GSB Removing RHS 1 70.000 13.000 0.150 136.500 RAB 14
Road FEB15/HW/681 15-Feb-15 07+400 07+400 A1 PQC Dismantling LHS 1 12.75 12.5 0.3 47.813 RAB 26
Road FEB15/HW/681 15-Feb-15 07+400 07+400 A2 PQC Dismantling LHS 1 41.15 12.9 0.3 159.251 RAB 26
Road FEB15/HW/1286 25-Feb-15 21+462 21+467 PQC Dismantling LHS 1 4.10 8.5 0.3 10.455 RAB 26
Road FEB15/HW/1288 25-Feb-15 04+750 04+790 PQC Dismantling RHS 1 40 8.5 0.3 102 RAB 26
Road FEB15/HW/652 14-Feb-15 17+630 17+700 PQC Dismantling RHS 1 70 8.5 0.3 178.5 RAB 26
MNB Feb15/Str/487 20-Feb-15 20+500 20+500 PQC Dismantling RHS 1 13.143 8.500 0.300 33.52 RAB 26
MNB Feb15/Str/488 20-Feb-15 20+500 20+500 DLC Dismantling RHS 1 13.143 8.900 0.150 17.55 RAB 26
Road FEB15/HW/682 15-Feb-15 07+400 07+400 A1 DLC Dismantling LHS 1 12.75 12.5 0.15 23.906 RAB 26
Road FEB15/HW/682 15-Feb-15 07+400 07+400 A2 DLC Dismantling LHS 1 41.15 12.9 0.15 79.625 RAB 26
Road FEB15/HW/1289 25-Feb-15 04+750 04+790 DLC Dismantling RHS 1 40 8.9 0.15 53.4 RAB 26
Road FEB15/HW/653 14-Feb-15 17+630 17+740 DLC Dismantling RHS 1 110 8.9 0.15 146.85 RAB 26
Road FEB15/HW/654 14-Feb-15 17+740 17+800 DLC Dismantling RHS 1 60 4.9 0.15 44.1 RAB 26
Road FEB15/HW/522 11-Feb-15 18+110 18+170 Embankment I Layer Laying and FDD CheckinLHS 1 60 9.703 0.2 116.436 RAB 26
Road FEB15/HW/523 11-Feb-15 18+110 18+170 Embankment II Layer Laying and FDD CheckiLHS 1 60 9.703 0.2 116.436 RAB 26
Road FEB15/HW/524 11-Feb-15 18+110 18+170 Embankment III Layer Laying and FDD CheckLHS 1 60 9.703 0.2 116.436 RAB 26
Road FEB15/HW/614 13-Feb-15 18+110 18+170 Embankment IV Layer Laying and FDD CheckLHS 1 60 9.703 0.2 116.436 RAB 26
Road FEB15/HW/615 13-Feb-15 18+110 18+170 Embankment V Layer Laying and FDD Checki LHS 1 60 9.703 0.2 116.436 RAB 26
Road FEB15/HW/616 13-Feb-15 18+110 18+170 Embankment VI Layer Laying and FDD CheckLHS 1 60 9.703 0.2 116.436 RAB 26
Road FEB15/HW/690 15-Feb-15 18+110 18+170 Embankment VII Layer Laying and FDD CheckLHS 1 60 9.703 0.2 116.436 RAB 26
Road FEB15/HW/525 11-Feb-15 18+200 18237.5 Embankment I Layer Laying and FDD CheckinLHS 1 37.5 10.77 0.2 80.775 RAB 26
Road FEB15/HW/526 11-Feb-15 18+200 18237.5 Embankment II Layer Laying and FDD CheckiLHS 1 37.5 10.77 0.15 60.581 RAB 26
Road FEB15/HW/519 11-Feb-15 24+502 24+564 A2 Excavation For Tapering LHS 1 62 2.5 0.675 104.625 RAB 26
Road DEC14/HW/1363 12/20/2014 03+050 03+100 1st LHS 1 50.000 18.900 0.150 141.750 RA Bill 24
Road DEC14/HW/1364 12/20/2014 03+050 03+100 2nd LHS 1 50.000 18.600 0.150 139.500 RA Bill 24
Road DEC14/HW/1365 12/20/2014 03+050 03+100 Top LHS 1 50.000 18.200 0.200 182.000 RA Bill 24
Road SEP14/HW/236 9/10/2014 03+830 03+900 Top LHS 1 70.000 12.200 0.200 170.800 RAB 21
Road SEP14/HW/281 9/11/2014 03+940 04+010 2nd LHS 1 70.000 13.000 0.200 182.000 RAB 21
Road JUNE14/HW/55 6/6/2014 05+000 05+020 1st LHS 1 20.000 18.500 0.150 55.500 RAB 18
Road JUNE14/HW/67 6/7/2014 05+000 05+020 Top LHS 1 20.000 18.200 0.150 54.600 RAB 18
Road JUNE14/HW/53 6/6/2014 05+000 05+050 1st LHS WP 1 50.000 2.000 0.200 20.000 RAB 18
Road JUNE14/HW/54 6/6/2014 05+000 05+050 2nd LHS WP 1 50.000 2.000 0.200 20.000 RAB 18
Road APR14/HW/494 4/13/2014 14+370 14+430 1st LHS 1 60.000 18.000 0.200 216.000 RAB 16
Road MAY14/HWY/252 08-May-14 14+420 14+475 Top LHS 1 55.000 18.200 0.200 200.200 RAB 17
Road APR14/HW/495 4/13/2014 14+430 14+580 1st LHS 1 150.000 18.000 0.200 540.000 RAB 16
Road APR14/HW/540 4/14/2014 14+430 14+580 2nd LHS 1 150.000 17.600 0.200 528.000 RAB 16
Road MAY14/HWY/105 04-May-14 14+430 14+475 3rd LHS 1 45.000 18.800 0.200 169.200 RAB 17
Road MAY14/HWY/179 16-May-14 14+430 14+475 4th LHS 1 45.000 18.600 0.200 167.400 RAB 17
Road APR14/HW/1147 4/30/2014 14+430 14+490 5th LHS WP 1 60.000 3.900 0.200 46.800 RAB 17
Road APR14/HW/1148 4/30/2014 14+430 14+490 6th LHS WP 1 60.000 3.600 0.200 43.200 RAB 17
Road APR14/HW/788 4/19/2014 14+440 14+495 1st LHS WP 1 55.000 5.000 0.200 55.000 RAB 16
Road APR14/HW/788/A 4/19/2014 14+440 14+495 2nd LHS WP 1 55.000 4.800 0.200 52.800 RAB 16
Road APR14/HW/834 4/19/2014 14+440 14+495 3rd LHS WP 1 55.000 4.500 0.200 49.500 RAB 16
Road APR14/HW/835 4/19/2014 14+440 14+495 4th LHS WP 1 55.000 4.200 0.200 46.200 RAB 16
Road MAY14/HWY/368 11-May-14 14+500 14+580 6th LHS 1 80.000 18.000 0.200 288.000 RAB 17
Road MAY14/HWY/369 11-May-14 14+500 14+580 Top LHS 1 80.000 17.800 0.200 284.800 RAB 17
Road APR14/HW/789 4/19/2014 14+505 14+580 1st LHS WP 1 75.000 5.000 0.200 75.000 RAB 16
Road APR14/HW/789/A 4/19/2014 14+505 14+580 2nd LHS WP 1 75.000 4.800 0.200 72.000 RAB 16
Road APR14/HW/836 4/19/2014 14+505 14+580 3rd LHS WP 1 75.000 4.800 0.200 72.000 RAB 16
Road APR14/HW/837 4/19/2014 14+505 14+580 4th LHS WP 1 75.000 4.500 0.200 67.500 RAB 16
Road MAY14/HWY/107 04-May-14 14+510 14+580 5th LHS 1 70.000 18.800 0.200 263.200 RAB 17
Road APR14/HW/1149 4/30/2014 14+510 14+580 5th LHS WP 1 70.000 4.200 0.200 58.800 RAB 17
Road APR14/HW/1150 4/30/2014 14+510 14+580 6th LHS WP 1 70.000 3.900 0.200 54.600 RAB 17
Road APR14/HW/459 4/12/2014 14+660 14+780 1st LHS 1 120.000 18.200 0.200 436.800 RAB 16
Road APR14/HW/460 4/12/2014 14+660 14+780 2nd LHS 1 120.000 18.000 0.200 432.000 RAB 16
Road APR14/HW/496 4/13/2014 14+660 14+770 3rd LHS 1 110.000 17.000 0.200 374.000 RAB 16
Road APR14/HW/539 4/14/2014 14+660 14+770 4th LHS 1 110.000 17.000 0.200 374.000 RAB 16
Road APR14/HW/861 4/21/2014 14+820 14+910 1st LHS 1 90.000 18.400 0.200 331.200 RAB 16
Road APR14/HW/899 4/22/2014 14+820 14+910 2nd LHS 1 90.000 18.400 0.200 331.200 RAB 16
Road APR14/HW/970 4/24/2014 14+820 14+910 3rd LHS 1 90.000 18.000 0.200 324.000 RAB 16
Road APR14/HW/1016 4/26/2014 14+820 14+910 4th LHS 1 90.000 18.000 0.200 324.000 RAB 17
Road APR14/HW/1045 4/27/2014 14+820 14+910 5th LHS 1 90.000 18.800 0.200 338.400 RAB 17
Road APR14/HW/1109 4/29/2014 14+820 14+910 6th LHS 1 90.000 18.800 0.200 338.400 RAB 17
Road APR14/HW/1110 4/29/2014 14+820 14+910 7th LHS 1 90.000 18.400 0.200 331.200 RAB 17
Road APR14/HW/1140 4/30/2014 14+820 14+910 Top LHS 1 90.000 18.000 0.200 324.000 RAB 17
Road APR14/HW/541 4/14/2014 14+820 14+950 1st LHS WP 1 130.000 5.000 0.200 130.000 RAB 16
Road APR14/HW/729 4/18/2014 14+820 14+920 1st LHS WP 1 100.000 4.500 0.200 90.000 RAB 16
Road APR14/HW/542 4/14/2014 14+820 14+950 2nd LHS WP 1 130.000 4.600 0.200 119.600 RAB 16
Road APR14/HW/730 4/18/2014 14+820 14+920 2nd LHS WP 1 100.000 4.500 0.200 90.000 RAB 16
Road APR14/HW/790 4/19/2014 14+820 14+920 3rd LHS WP 1 100.000 4.800 0.200 96.000 RAB 16
Road APR14/HW/791 4/19/2014 14+820 14+920 4th LHS WP 1 100.000 4.500 0.200 90.000 RAB 16
Road APR14/HW/838 4/20/2014 14+820 14+910 5th LHS WP 1 90.000 4.200 0.200 75.600 RAB 16
Road APR14/HW/839 4/20/2014 14+820 14+910 6th LHS WP 1 90.000 4.000 0.200 72.000 RAB 16
Road APR14/HW/840 4/20/2014 14+820 14+910 7th LHS WP 1 90.000 3.800 0.200 68.400 RAB 16
Road APR14/HW/868 4/21/2014 14+820 14+910 8th LHS WP 1 90.000 3.800 0.200 68.400 RAB 16
Road APR14/HW/869 4/21/2014 14+820 14+910 9th LHS WP 1 90.000 3.500 0.200 63.000 RAB 16
Road APR14/HW/904 4/22/2014 14+820 14+910 10th LHS WP 1 90.000 3.200 0.200 57.600 RAB 16
Road APR14/HW/905 4/22/2014 14+820 14+910 11th LHS WP 1 90.000 3.000 0.200 54.000 RAB 16
Road APR14/HW/942 4/23/2014 14+820 14+910 12th LHS WP 1 90.000 3.000 0.200 54.000 RAB 16
Road APR14/HW/1021 4/26/2014 14+935 14+975 5th LHS WP 1 40.000 4.000 0.200 32.000 RAB 17
Road APR14/HW/1022 4/26/2014 14+935 14+975 6th LHS WP 1 40.000 3.800 0.200 30.400 RAB 17
Road APR14/HW/1050 4/27/2014 14+935 14+975 7th LHS WP 1 40.000 3.600 0.200 28.800 RAB 17
Road APR14/HW/1051 4/27/2014 14+935 14+975 8th LHS WP 1 40.000 3.400 0.200 27.200 RAB 17
Road APR14/HW/644 4/16/2014 14+940 15+010 1st LHS 1 70.000 18.200 0.200 254.800 RAB 16
Road APR14/HW/1018 4/26/2014 14+940 15+010 2nd LHS 1 70.000 18.400 0.200 257.600 RAB 17
Road APR14/HW/1113 4/29/2014 14+940 14+980 3rd LHS 1 40.000 18.400 0.200 147.200 RAB 17
Road APR14/HW/1114 4/29/2014 14+940 14+980 Top LHS 1 40.000 18.000 0.200 144.000 RAB 17
Road APR14/HW/832 4/20/2014 14+940 14+980 1st LHS WP 1 40.000 5.000 0.200 40.000 RAB 16
Road APR14/HW/833 4/20/2014 14+940 14+980 2nd LHS WP 1 40.000 4.800 0.200 38.400 RAB 16
Road APR14/HW/862 4/21/2014 14+940 14+980 3rd LHS WP 1 40.000 4.500 0.200 36.000 RAB 16
Road APR14/HW/863 4/21/2014 14+940 14+980 4th LHS WP 1 40.000 4.200 0.200 33.600 RAB 16
Road MAR14/HW/298 3/7/2014 15+280 15+430 1st LHS 1 150.000 14.000 0.200 420.000 RAB 15
Road MAR14/HW/299 3/7/2014 15+280 15+430 2nd LHS 1 150.000 14.000 0.200 420.000 RAB 15
Road MAR14/HW/371 3/9/2014 15+280 15+430 Top LHS 1 150.000 14.000 0.200 420.000 RAB 15
Road NOV14/HW/544 14-Nov-14 15+517 15+530 Top LHS 1 13.500 18.200 0.200 49.140 RAB 23
Road OCT14/HW/22 01-Oct-14 17+670 17+700 Top LHS 1 30 20 0.2 120 RAB 22
Road NOV14/HW/299 7-Nov-14 18+180 18+200 Top LHS 1 20.000 10.050 0.200 40.200 RAB 23
Road APR14/HW/617 4/16/2014 18+200 18+440 Top SR LHS SR 1 240.000 14.000 0.200 672.000 RAB 16
Road APR14/HW/203 4/5/2014 18+310 18+440 9th SR LHS SR 1 130.000 11.000 0.200 286.000 RAB 16
Road APR14/HW/342 4/9/2014 18+310 18+440 11th SR LHS SR 1 130.000 11.000 0.200 286.000 RAB 16
Road APR14/HW/408 4/11/2014 18+310 18+440 12th SR LHS SR 1 130.000 11.000 0.200 286.000 RAB 16
Road APR14/HW/499 4/13/2014 18+310 18+440 13th SR LHS SR 1 130.000 9.000 0.200 234.000 RAB 16
Road APR14/HW/500 4/13/2014 18+310 18+440 Top SR LHS SR 1 130.000 11.000 0.200 286.000 RAB 16
Road APR14/HW/04 4/1/2014 31+250 31+280 1st LHS 1 30.000 12.000 0.200 72.000 RAB 16
Road APR14/HW/05 4/1/2014 31+250 31+280 2nd LHS 1 30.000 12.000 0.200 72.000 RAB 16
Road APR14/HW/06 4/1/2014 31+250 31+280 Top LHS 1 30.000 12.000 0.200 72.000 RAB 16
Road APR14/HW/108 4/3/2014 31+320 31+400 1st LHS 1 80.000 12.000 0.200 192.000 RAB 16
Road APR14/HW/110 4/3/2014 31+320 31+400 Top LHS 1 80.000 12.000 0.200 192.000 RAB 16
Road Aug14/HW/655 8/29/2014 35+805 35+810 1st LHS 1 5.000 13.400 0.200 13.400 RAB 21
Road Aug14/HW/656 8/29/2014 35+805 35+810 2nd LHS 1 5.000 18.600 0.200 18.600 RAB 21
Road Aug14/HW/657 8/29/2014 35+805 35+810 Top LHS 1 10.000 18.200 0.200 36.400 RAB 21
Road JULY14/HW/945 7/30/2014 35+950 35+957 1st LHS 1 6.600 7.000 0.200 9.240 RAB 20
Road JULY14/HW/945 7/30/2014 35+950 35+957 2nd LHS 1 6.600 7.000 0.200 9.240 RAB 20
Road JULY14/HW/970 7/31/2014 35+950 35+957 3rd LHS 1 6.600 7.000 0.200 9.240 RAB 20
Road FEB15/HW/1072 22-Feb-15 14+667 14+757 1st LHS 1 90.000 4 0.2 72 RAB 26
Road FEB15/HW/1073 22-Feb-15 14+667 14+757 2nd LHS 1 90.000 3.6 0.2 64.8 RAB 26
Road FEB15/HW/1074 22-Feb-15 14+667 14+757 3rd LHS 1 90.000 3.2 0.2 57.6 RAB 26
Road FEB15/HW/1075 22-Feb-15 14+667 14+757 4th LHS 1 90.000 2.8 0.2 50.4 RAB 26
Road FEB15/HW/1136 23-Feb-15 14+667 14+757 5th LHS 1 90.000 19.4 0.2 349.2 RAB 26
Road FEB15/HW/1137 23-Feb-15 14+667 14+757 6th LHS 1 90.000 19 0.2 342 RAB 26
Road FEB15/HW/1209 24-Feb-15 14+667 14+757 7th LHS 1 90.000 18.6 0.2 334.8 RAB 26
Road FEB15/HW/1210 24-Feb-15 14+667 14+757 Top layer LHS 1 90.000 18.2 0.2 327.6 RAB 26
Road FEB15/HW/726 16-Feb-15 3650.00 3670.00 Median Filling LHS 1 20 1.775 0.15 5.325 RAB 26
Road FEB15/HW/726 16-Feb-15 3650.00 3670.00 Median Filling LHS 1 20 1.425 0.15 4.275 RAB 26
Road FEB15/HW/728 16-Feb-15 3778.50 3825.00 Median Filling LHS 1 46.5 2.025 0.15 14.124 RAB 26
Road FEB15/HW/728 16-Feb-15 3778.50 3825.00 Median Filling LHS 1 46.5 1.675 0.15 11.683 RAB 26
Road FEB15/HW/728 16-Feb-15 3825.00 3834.50 Median Filling LHS 1 9.5 3.55 0.15 5.059 RAB 26
Road FEB15/HW/728 16-Feb-15 3825.00 3834.50 Median Filling LHS 1 9.5 2.85 0.15 4.061 RAB 26
Road FEB15/HW/728 16-Feb-15 3834.50 3904.50 Median Filling LHS 1 70 1.775 0.15 18.638 RAB 26
Road FEB15/HW/728 16-Feb-15 3834.50 3904.50 Median Filling LHS 1 70 1.425 0.15 14.963 RAB 26
Road FEB15/HW/724 16-Feb-15 3949.60 4019.60 Median Filling LHS 1 70 1.775 0.15 18.638 RAB 26
Road FEB15/HW/724 16-Feb-15 3949.60 4019.60 Median Filling LHS 1 70 1.425 0.15 14.963 RAB 26
Road FEB15/HW/724 16-Feb-15 4019.60 4090.00 Median Filling LHS 1 70.4 3.55 0.15 37.488 RAB 26
Road FEB15/HW/724 16-Feb-15 4019.60 4090.00 Median Filling LHS 1 70.4 2.85 0.15 30.096 RAB 26
Road FEB15/HW/730 16-Feb-15 4700.00 4731.50 Median Filling LHS 1 31.5 3.55 0.15 16.774 RAB 26
Road FEB15/HW/730 16-Feb-15 4700.00 4731.50 Median Filling LHS 1 31.5 2.85 0.15 13.466 RAB 26
Road FEB15/HW/730 16-Feb-15 4731.50 4801.50 Median Filling LHS 1 70 1.775 0.15 18.638 RAB 26
Road FEB15/HW/730 16-Feb-15 4731.50 4801.50 Median Filling LHS 1 70 1.425 0.15 14.963 RAB 26
Road FEB15/HW/732 16-Feb-15 4988.50 5058.50 Median Filling LHS 1 70 1.775 0.15 18.638 RAB 26
Road FEB15/HW/732 16-Feb-15 4988.50 5058.50 Median Filling LHS 1 70 1.425 0.15 14.963 RAB 26
Road FEB15/HW/732 16-Feb-15 5058.50 5093.00 Median Filling LHS 1 34.5 3.55 0.15 18.371 RAB 26
Road FEB15/HW/732 16-Feb-15 5058.50 5093.00 Median Filling LHS 1 34.5 2.85 0.15 14.749 RAB 26
Road FEB15/HW/894 19-Feb-15 07+316 07+333 GSB A1 SIDE LHS 1 12.75 12.5 0.15 23.906 RAB 26
Road FEB15/HW/894 19-Feb-15 07+316 07+333 GSB A2 SIDE LHS 1 41.15 12.9 0.15 79.625 RAB 26
Road FEB15/HW/893 19-Feb-15 07+317 07+338 GSB A1 SIDE LHS 1 16.25 12.5 0.15 30.469 RAB 26
Road FEB15/HW/893 19-Feb-15 07+512 07+562 GSB A2 SIDE LHS 1 44.35 12.9 0.15 85.817 RAB 26
Item of Work :Service Road Prime Coat Laying Executing Agency: NAPC Limited.,
RFI No Chainages Length Breadth Quantity Remarks
Item Date Description Side No
NAPC/BKEL/ From To (M) (M) (Hac)
VUP NOV14/HW/987 15-Dec-14 17480 17600.0 Prime Coat SR LHS 1 120 3.5 420.000 RAB 24
VUP NOV14/HW/987 15-Dec-14 17600 17750.0 Prime Coat SR LHS 1 150 7 1,050.000 RAB 24
VUP DEC14/HW/879 13-Dec-14 17750 17900.0 Prime Coat SR LHS 1 150 7 1,050.000 RAB 24
VUP DEC14/HW/1293 19-Dec-14 17900 18020.0 Prime Coat SR LHS 1 120 7 840.000 RAB 24
VUP DEC14/HW/1293 19-Dec-14 18020 18220.0 Prime Coat SR LHS 1 200 6.25 1,250.000 RAB 24
VUP DEC14/HW/192 03-Dec-14 18030 18200.0 Prime Coat SR LHS 1 170 6 1,020.000 RAB 24
VUP DEC14/HW/1293 19-Dec-14 18220 18320.0 Prime Coat SR LHS 1 100 7 700.000 RAB 24
VUP DEC14/HW/1293 19-Dec-14 18320 18440.0 Prime Coat SR LHS 1 120 3.5 420.000 RAB 24
VUP DEC14/HW/331 05-Dec-14 17480 17580.0 Prime Coat SR RHS 1 100 2.917 291.700 RAB 24
VUP NOV14/HW/712 18-Nov-14 17+580 17+600 Prime Coat SR RHS 1 20.000 6.417 128.340 RAB 23
VUP NOV14/HW/712 18-Nov-14 17+600 17+940 Prime Coat SR RHS 1 340.000 7.000 2,380.000 RAB 23
VUP DEC14/HW/332 05-Dec-14 18200 18235.0 Prime Coat SR RHS 1 35 6 210.000 RAB 24
VUP DEC14/HW/332 05-Dec-14 18235 18320.0 Prime Coat SR RHS 1 85 7 595.000 RAB 24
VUP DEC14/HW/655 10-Dec-14 18320 18440.0 Prime Coat SR RHS 1 120 3.5 420.000 RAB 24
VUP JAN15/HW/529 13-Jan-15 17940 18030.0 Prime Coat SR RHS 1 90 6 540.000 RAB 25
Road FEB15/HW/512 11-Feb-15 23+750 23+750 Tack Coat Laying LHS 1 120 4.3 516 RAB 26
Road FEB15/HW/512 11-Feb-15 23+750 23+750 Tack Coat Laying LHS 1 50 2.84 142 RAB 26
Road FEB15/HW/971 20-Feb-15 23+750 23+750 Tack Coat Laying for Junction LHS 1 120 4.3 516.000 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 Tack Coat Laying LHS 1 20 1.75 35 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 Tack Coat Laying LHS 1 80 5.4 432 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 Tack Coat Laying LHS 1 36 7.3 262.8 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 Tack Coat Laying LHS 1 6 9.15 54.9 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 Tack Coat Laying LHS 1 17 4 68 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 Tack Coat Laying LHS 1 23 11.1 255.3 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 Tack Coat Laying LHS 1 13.6 6.8 92.48 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 Tack Coat Laying LHS 1 6 6 36 RAB 26
Road FEB15/HW/512 11-Feb-15 23+750 23+750 DBM Laying for Slip Ro LHS 1 120 4.3 0.05 25.8 RAB 26
NOV14/HW/757 19-Nov-14 44+120 44+120 BC Laying LHS 1 29.00 12.750 0.04 14.790 RAB 23
Road FEB15/HW/512 11-Feb-15 23+750 23+750 SDBC Laying LHS 1 50 2.84 0.025 3.55 RAB 26
Road FEB15/HW/972 20-Feb-15 23+750 23+750 SDBC Laying LHS 1 120 4.3 0.025 12.900 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 SDBC Laying LHS 1 20 1.75 0.025 0.875 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 SDBC Laying LHS 1 80 5.4 0.025 10.8 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 SDBC Laying LHS 1 36 7.3 0.025 6.57 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 SDBC Laying LHS 1 6 9.15 0.025 1.3725 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 SDBC Laying LHS 1 17 4 0.025 1.7 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 SDBC Laying LHS 1 23 11.1 0.025 6.3825 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 SDBC Laying LHS 1 13.6 6.8 0.025 2.312 RAB 26
Road FEB15/HW/513 11-Feb-15 24+670 24+670 SDBC Laying LHS 1 6 6 0.025 0.9 RAB 26
ROAD FEB15/HW/894 19-Feb-15 07+516 07+563 A2 side DLC LHS 1 41.15 12.90 0.15 RFI Req. RAB 26
ROAD FEB15/HW/896 19-Feb-15 21+473 21+478 A1 Side DLC LHS 1 5.50 4.50 0.15 3.71 RAB 26
ROAD FEB15/HW/896 19-Feb-15 21+542 21+549 A2 side DLC LHS 1 7.00 12.88 0.15 13.52 RAB 26
ROAD FEB15/HW/1004 21-Feb-15 24+443 24+448 A1 Side DLC LHS 1 4.55 4.10 0.15 2.80 RAB 26
ROAD FEB15/HW/676 15-Feb-15 24+502 24+507 A2 side DLC LHS 1 4.75 4.45 0.15 3.17 RAB 26
ROAD FEB15/HW/676 15-Feb-15 24+502 24+564 A2 side DLC LHS 1 62.00 2.30 0.15 21.39 RAB 26
ROAD FEB15/HW/675 15-Feb-15 18+250 18+300 DLC RHS 1 50.00 8.90 0.15 66.75 RAB 26
ROAD FEB15/HW/1070 22-Feb-15 35+825 35+825 A1 Side DLC RHS 1 7.40 12.70 0.15 14.10 RAB 26
ROAD FEB15/HW/1070 22-Feb-15 35+825 35+825 A2 side DLC RHS 1 7.00 12.70 0.15 13.34 RAB 26
ROAD FEB15/HW/1070 22-Feb-15 35+825 35+825 A2 side DLC RHS -1 2.00 12.70 0.15 (3.81) RAB 26
Road FEB15/HW/503 11-Feb-15 3151.50 3168.75 PQC Lane II LHS 1 17.250 3.500 0.300 18.113 RAB 26
Road FEB15/HW/503 11-Feb-15 3151.50 3168.75 PQC TP LHS 1 17.250 3.075 0.300 15.913 RAB 26
Road FEB15/HW/503 11-Feb-15 3217.25 3237.40 PQC Lane II LHS 1 20.150 3.500 0.300 21.158 RAB 26
Road FEB15/HW/503 11-Feb-15 3217.25 3237.40 PQC TP LHS 1 20.150 3.000 0.300 18.135 RAB 26
Road FEB15/HW/543 12-Feb-15 3318.40 3349.50 PQC Lane I LHS 1 31.100 3.500 0.300 32.655 RAB 26
Road FEB15/HW/543 12-Feb-15 3318.40 3349.50 PQC Shoulder LHS 1 31.100 1.701 0.300 15.869 RAB 26
Road FEB15/HW/633 14-Feb-15 3318.4 3349.5 PQC Lane II LHS 1 31.100 3.500 0.300 32.655 RAB 26
Road FEB15/HW/633 14-Feb-15 3318.4 3349.5 PQC TP LHS 1 31.100 2.825 0.300 26.357 RAB 26
Road FEB15/HW/890 19-Feb-15 3536.50 3560.50 PQC TP LHS 1 24.000 2.850 0.300 20.520 RAB 26
Road FEB15/HW/890 19-Feb-15 3536.50 3560.50 PQC Lane II LHS 1 24.000 3.500 0.300 25.200 RAB 26
Road FEB15/HW/712 16-Feb-15 3536.50 3560.50 PQC Lane I LHS 1 24.000 3.500 0.300 25.200 RAB 26
Road FEB15/HW/712 16-Feb-15 3536.50 3560.50 PQC Shoulder LHS 1 24.000 1.746 0.300 12.571 RAB 26
Road FEB15/HW/1215 24-Feb-15 07+400 7400.00 PQC Lane I LHS 1 12.550 3.625 0.300 13.648 RAB 26
Road FEB15/HW/1215 24-Feb-15 07+400 7400.00 PQC Shoulder LHS 1 17.800 1.500 0.300 8.010 RAB 26
Road FEB15/HW/1214 24-Feb-15 07+400 7400.00 PQC TP LHS 1 46.750 3.000 0.300 42.075 RAB 26
Road FEB15/HW/1214 24-Feb-15 07+400 7400.00 PQC Lane II LHS 1 38.650 3.500 0.300 40.583 RAB 26
Road FEB15/HW/1165 23-Feb-15 07+400 07+400 PQC Lane I LHS 1 42.750 3.500 0.300 44.888 RAB 26
Road FEB15/HW/1165 23-Feb-15 07+400 07+400 PQC Shoulder LHS 1 35.550 1.500 0.300 15.998 RAB 26
Road FEB15/HW/891 19-Feb-15 15+768 15797.35 PQC Shoulder LHS 1 29.850 1.500 0.300 13.433 RAB 26
Road FEB15/HW/891 19-Feb-15 15+773 15797.35 PQC Lane I LHS 1 24.150 3.500 0.300 25.357 RAB 26
Road FEB15/HW/942 20-Feb-15 15+768 15797.35 PQC Lane II LHS 1 29.850 3.500 0.300 31.343 RAB 26
Road FEB15/HW/943 20-Feb-15 16+086 16117.20 PQC Shoulder LHS 1 31.700 1.550 0.300 14.741 RAB 26
Road FEB15/HW/943 20-Feb-15 16+086 16109.90 PQC Lane I LHS 1 24.400 3.500 0.300 25.620 RAB 26
Road FEB15/HW/999 21-Feb-15 16+086 16117.20 PQC Lane II LHS 1 31.700 3.500 0.300 33.285 RAB 26
Road FEB15/HW/997 21-Feb-15 16+092 16156.60 PQC TP LHS 1 64.200 1.600 0.300 30.816 RAB 26
Road FEB15/HW/998 21-Feb-15 16+990 17015.10 PQC Shoulder LHS 1 25.600 1.500 0.300 11.520 RAB 26
Road FEB15/HW/998 21-Feb-15 16+994 17013.20 PQC Lane I LHS 1 19.400 3.500 0.300 20.370 RAB 26
Road FEB15/HW/1069 22-Feb-15 16+990 17015.10 PQC Lane II LHS 1 25.600 3.500 0.300 26.880 RAB 26
Road FEB15/HW/507 11-Feb-15 17+680 17684.00 PQC TP LHS 1 4.500 3.500 0.300 4.725 RAB 26
Road FEB15/HW/1304 25-Feb-15 21+462 21466.50 PQC Full Width LHS 1 4.100 8.500 0.300 10.455 RAB 26
Road FEB15/HW/1306 25-Feb-15 21+472 21478.45 PQC Lane II LHS 1 6.150 3.500 0.300 6.458 RAB 26
Road FEB15/HW/1306 25-Feb-15 21+472 21478.45 PQC Lane I LHS 1 6.150 1.797 0.300 3.315 RAB 26
Road FEB15/HW/1216 24-Feb-15 21+472 21478.45 PQC Shoulder LHS 1 6.150 1.670 0.300 3.081 RAB 26
Road FEB15/HW/1216 24-Feb-15 21+542 21550.25 PQC Lane I LHS 1 8.500 3.500 0.300 8.925 RAB 26
Road FEB15/HW/1216 24-Feb-15 21+542 21550.25 PQC Shoulder LHS 1 8.500 2.052 0.300 5.233 RAB 26
Road FEB15/HW/1305 25-Feb-15 21+542 21550.25 PQC Lane II LHS 1 8.500 3.500 0.300 8.925 RAB 26
Road FEB15/HW/1305 25-Feb-15 21+542 21549.35 PQC TP LHS 1 7.600 2.900 0.300 6.612 RAB 26
Road FEB15/HW/941 20-Feb-15 23+750 23750.00 PQC Lane I LHS 1 13.200 3.500 0.300 13.860 RAB 26
Road FEB15/HW/941 20-Feb-15 23+750 23+750 PQC Shoulder LHS 1 12.600 1.604 0.300 6.063 RAB 26
Road FEB15/HW/996 21-Feb-15 23+750 23750.00 PQC Lane II LHS 1 13.200 3.500 0.300 13.860 RAB 26
Road FEB15/HW/996 21-Feb-15 23+750 23+750 PQC TP LHS 1 13.400 3.925 0.300 15.779 RAB 26
Road FEB15/HW/1164 23-Feb-15 23+750 23+750 PQC TP LHS 1 13.500 3.625 0.300 14.681 RAB 26
Road FEB15/HW/1164 23-Feb-15 23+750 23+750 PQC Lane II LHS 1 14.000 3.500 0.300 14.700 RAB 26
Road FEB15/HW/1068 22-Feb-15 23+750 23+750 PQC Lane I LHS 1 13.600 3.500 0.300 14.280 RAB 26
Road FEB15/HW/1068 22-Feb-15 23+750 23+750 PQC Shoulder LHS 1 14.300 1.500 0.300 6.435 RAB 26
Road FEB15/HW/578 13-Feb-15 24+036 24+043 PQC Lane II LHS 1 7.450 3.500 0.300 7.823 RAB 26
Road FEB15/HW/674 15-Feb-15 24+135 24+157 PQC TP LHS 1 21.600 0.625 0.300 4.050 RAB 26
Road FEB15/HW/753 17-Feb-15 24+136 24+139 PQC Lane II LHS 1 2.800 2.850 0.300 2.394 RAB 26
Road FEB15/HW/753 17-Feb-15 24+139 24+156 PQC Lane II LHS 1 17.600 3.500 0.300 18.480 RAB 26
Road FEB15/HW/753 17-Feb-15 24+156 24+162 PQC Lane II LHS 1 5.100 2.850 0.300 4.360 RAB 26
Road FEB15/HW/673 15-Feb-15 24+136 24+162 PQC Shoulder LHS 1 25.500 1.500 0.300 11.475 RAB 26
Road FEB15/HW/673 15-Feb-15 24+139 24+156 PQC Lane I LHS 1 17.600 3.500 0.300 18.480 RAB 26
Road DEC14/HW/1232 18-Dec-14 38+212 38+356 PQC TP LHS 1 144.100 0.300 0.110 RFI REQ. RAB 26
Road DEC14/HW/799 13-Dec-14 33+108 33+115 PQC Lane II RHS 1 6.400 3.500 0.300 6.720 RAB 26
Road DEC14/HW/799 13-Dec-14 33+108 33+115 PQC Lane II RHS 1 6.400 3.500 0.300 6.720 RAB 26
Road FEB15/HW/634 14-Feb-15 43+700 43+700 PQC Full Width RHS 1 4.150 12.700 0.300 15.812 RAB 26
Road FEB15/HW/635 14-Feb-15 43+700 43+700 PQC Full Width RHS 1 3.400 12.650 0.300 12.903 RAB 26
Road JUL13/HW/204 27-Jul-13 14+264 14+301 PQC RHS 1 36.500 3.550 0.300 38.873 RAB 07
Road JUL13/HW/72 12-Jul-13 16+913 16+958 PQC LHS 1 45.000 3.550 0.300 47.925 RAB 07
Road JUL13/HW/77 13-Jul-13 16+913 16+958 PQC LHS 1 45.000 5.000 0.300 67.500 RAB 07
Road JUL13/HW/90 12-Jul-13 17+012 17+089 PQC LHS 1 76.500 3.550 0.300 81.473 RAB 07
Road JUL13/HW/107 17-Jul-13 17+012 17+089 PQC LHS 1 76.500 5.000 0.300 114.750 RAB 07
Road DEC13/HW/916 28-Dec-13 31+229 31+299 PQC LHS 1 70.000 1.875 0.300 39.375 RAB 13
Road FEB14/HW/850 12-Feb-14 31+620 31+630 PQC LHS 1 9.500 1.875 0.300 5.344 RAB 14
Road FEB14/HW/851 12-Feb-14 31+636 31+649 PQC LHS 1 13.000 1.875 0.300 7.313 RAB 14
Road JUL13/HW/61 11-Jul-13 32+401 32+455 PQC LHS 1 54.000 5.000 0.300 81.000 RAB 07
Road NOV13/HW/527 30-Nov-13 32+401 32+491 PQC LHS 1 90.000 3.550 0.300 95.850 RAB 11
Road JUL13/HW/71 12-Jul-13 32+455 32+491 PQC LHS 1 36.000 5.000 0.300 54.000 RAB 07
Road JUL13/HW/42 8-Jul-13 32+491 32+536 PQC LHS 1 45.000 3.550 0.300 47.925 RAB 07
Road JUL13/HW/48 9-Jul-13 32+491 32+536 PQC LHS 1 45.000 5.000 0.300 67.500 RAB 07
Road FEB14/HW/1518 23-Feb-14 33+094 33+104 PQC LHS 1 10.100 3.500 0.300 10.605 RAB 14
Road FEB14/HW/1519 23-Feb-14 33+094 33+104 PQC LHS 1 10.100 1.500 0.300 4.545 RAB 14
Road FEB14/HW/1659 25-Feb-14 33+094 33+104 PQC LHS 1 10.100 3.550 0.300 10.757 RAB 14
Road FEB14/HW/1520 23-Feb-14 33+111 33+120 PQC LHS 1 9.000 3.500 0.300 9.450 RAB 14
Road FEB14/HW/1521 23-Feb-14 33+111 33+120 PQC LHS 1 9.000 1.500 0.300 4.050 RAB 14
Road FEB14/HW/1660 25-Feb-14 33+111 33+120 PQC LHS 1 10.000 3.550 0.300 10.650 RAB 14
Road JAN14/HW/397 9-Jan-14 33+350 33+356 PQC LHS 1 6.000 8.500 0.300 15.300 RAB 13
Road JAN14/HW/360 8-Jan-14 33+356 33+361 PQC LHS 1 5.000 8.550 0.300 12.825 RAB 13
Road JUL13/HW/38 7-Jul-13 33+361 33+389 PQC LHS 1 27.500 3.550 0.300 29.288 RAB 07
Road JUL13/HW/33 12-Jul-13 33+361 33+389 PQC LHS 1 27.500 5.000 0.300 41.250 RAB 07
Road JAN14/HW/1274 21-Jan-14 33+389 33+395 PQC LHS 1 6.000 8.500 0.300 15.300 RAB 13
Road JAN14/HW/1275 21-Jan-14 33+403 33+415 PQC LHS 1 12.500 3.500 0.300 13.125 RAB 13
Road JAN14/HW/1189 20-Jan-14 33+403 33+415 PQC LHS 1 12.000 3.500 0.300 12.600 RAB 13
Road JUL13/HW/24 4-Jul-13 33+415 33+488 PQC LHS 1 72.500 3.550 0.300 77.213 RAB 07
Road JUL13/HW/30 5-Jul-13 33+415 33+488 PQC LHS 1 72.500 5.000 0.300 108.750 RAB 07
Road JUL13/HW/07 2-Jul-13 33+488 33+581 PQC LHS 1 93.500 8.550 0.300 239.828 RAB 07
Road JAN14/HW/359 8-Jan-14 33+581 33+595 PQC LHS 1 14.000 1.500 0.300 6.300 RAB 13
Road JAN14/HW/398 9-Jan-14 33+581 33+595 PQC LHS 1 14.000 3.500 0.300 14.700 RAB 13
Road JAN14/HW/574 11-Jan-14 33+811 33+817 PQC RHS 1 6.000 5.000 0.300 9.000 RAB 13
Road JAN14/HW/483 10-Jan-14 33+817 33+822 PQC LHS 1 4.500 8.500 0.300 11.475 RAB 13
Road JUN13/HW/17 5-Jun-13 33+822 33+888 PQC LHS 1 66.000 3.550 0.300 70.290 RAB 06
Road JUN13/HW/35 24-Jun-13 33+822 33+888 PQC LHS 1 66.000 5.000 0.300 99.000 RAB 06
Road JUN13/HW/24 6-Jun-13 33+888 33+900 PQC LHS 1 12.500 3.550 0.300 13.313 RAB 06
Road JUN13/HW/37 11-Jun-13 33+888 33+961 PQC LHS 1 73.500 5.000 0.300 110.250 RAB 06
Road JUN13/HW/26 7-Jun-13 33+900 33+970 PQC LHS 1 70.000 3.550 0.300 74.550 RAB 06
Road JUN13/HW/55 18-Jun-13 33+961 33+970 PQC LHS 1 9.000 5.000 0.300 13.500 RAB 06
Road JAN14/HW/754 13-Jan-14 33+970 33+990 PQC LHS 1 19.500 5.000 0.300 29.250 RAB 13
Road JAN14/HW/817 15-Jan-14 33+970 33+990 PQC LHS 1 19.500 3.500 0.300 20.475 RAB 13
Road JAN14/HW/1183 19-Jan-14 33+998 34+007 PQC RHS 1 9.000 3.500 0.300 9.450 RAB 13
Road JAN14/HW/1184 19-Jan-14 34+015 34+025 PQC RHS 1 10.000 3.500 0.300 10.500 RAB 13
Road JUN13/HW/71 24-Jun-13 34+523 34+528 PQC LHS 1 4.500 8.550 0.300 11.543 RAB 06
Road JUN13/HW/71 24-Jun-13 34+528 34+609 PQC LHS 1 81.000 8.550 0.300 207.765 RAB 06
Road JUN13/HW/76 27-Jun-13 34+609 34+640 PQC LHS 1 31.500 8.550 0.300 80.798 RAB 06
Road JUL13/HW/12 3-Jul-13 34+640 34+675 PQC LHS 1 35.000 8.550 0.300 89.775 RAB 07
Road JAN14/HW/479 10-Jan-14 42+010 42+062 PQC RHS 1 52.000 3.500 0.300 54.600 RAB 13
PQC
PQC
Road JAN14/HW/1009 17-Jan-14 13+125 13+137 PQC RHS 1 12.000 3.500 0.300 12.600 RAB 13
Road JAN14/HW/1053 18-Jan-14 13+125 13+137 PQC RHS 1 12.000 3.500 0.300 12.600 RAB 13
Road JAN14/HW/955 16-Jan-14 13+125 13+137 PQC RHS 1 12.000 1.500 0.300 5.400 RAB 13
Road FEB14/HW/529 8-Feb-14 13+140 13+140 PQC RHS 1 6.700 9.500 0.290 18.459 RAB 14
Road JAN14/HW/1010 17-Jan-14 13+144 13+158 PQC RHS 1 14.000 3.500 0.300 14.700 RAB 13
Road JAN14/HW/1054 18-Jan-14 13+144 13+158 PQC RHS 1 14.500 3.500 0.300 15.225 RAB 13
Road JAN14/HW/956 16-Jan-14 13+144 13+158 PQC RHS 1 14.000 1.500 0.300 6.300 RAB 13
Road JAN14/HW/957 16-Jan-14 13+231 13+243 PQC RHS 1 12.000 1.500 0.300 5.400 RAB 13
Road JAN14/HW/1007 17-Jan-14 13+231 13+243 PQC RHS 1 11.900 3.500 0.300 12.495 RAB 13
Road JAN14/HW/1051 18-Jan-14 13+231 13+243 PQC RHS 1 11.900 3.500 0.300 12.495 RAB 13
Road FEB14/HW/531 8-Feb-14 13+240 13+240 PQC RHS 1 6.700 9.500 0.290 18.459 RAB 14
Road JAN14/HW/1008 17-Jan-14 13+250 13+262 PQC RHS 1 12.000 3.500 0.300 12.600 RAB 13
Road JAN14/HW/1052 18-Jan-14 13+250 13+262 PQC RHS 1 12.000 3.500 0.300 12.600 RAB 13
Road JAN14/HW/805 13-Jan-14 13+250 13+262 PQC RHS 1 12.000 1.500 0.300 5.400 RAB 13
Road JAN14/HW/1133 19-Jan-14 13+345 13+357 PQC RHS 1 11.600 1.500 0.300 5.220 RAB 13
Road JAN14/HW/1222 20-Jan-14 13+345 13+357 PQC RHS 1 11.500 3.500 0.300 12.075 RAB 13
Road JAN14/HW/1288 21-Jan-14 13+345 13+357 PQC RHS 1 12.000 3.500 0.300 12.600 RAB 13
Road JAN14/HW/1134 19-Jan-14 13+363 13+375 PQC RHS 1 11.600 1.500 0.300 5.220 RAB 13
Road JAN14/HW/1223 20-Jan-14 13+363 13+375 PQC RHS 1 11.600 3.500 0.300 12.180 RAB 13
Road JAN14/HW/1561 24-Jan-14 13+363 13+375 PQC RHS 1 11.600 3.550 0.300 12.354 RAB 13
Road JUL13/HW/203 27-Jul-13 14+211 14+251 PQC RHS 1 40.500 3.550 0.300 43.133 RAB 07
Road July13/HW/243 31-Jul-13 14+211 14+251 PQC RHS 1 40.500 5.000 0.300 60.750 RAB 08
Road July13/HW/244 31-Jul-13 14+264 14+301 PQC RHS 1 36.500 5.000 0.300 54.750 RAB 08
Road Aug13/HW/09 1-Aug-13 14+301 14+341 PQC RHS 1 40.500 3.550 0.300 43.133 RAB 08
Road Aug13/HW/10 2-Aug-13 14+301 14+341 PQC RHS 1 40.500 5.000 0.300 60.750 RAB 08
Road DEC13/HW/399 16-Dec-13 14+341 14+426 PQC RHS 1 85.500 3.550 0.300 91.058 RAB 12
Road DEC13/HW/426 17-Dec-13 14+341 14+426 PQC RHS 1 85.500 5.000 0.300 128.250 RAB 12
Road FEB14/HW/120 2-Feb-14 14+426 14+494 PQC RHS 1 68.000 1.500 0.300 30.600 RAB 14
Road FEB14/HW/214 4-Feb-14 14+426 14+494 PQC RHS 1 67.500 3.500 0.300 70.875 RAB 14
Road FEB14/HW/295 5-Feb-14 14+426 14+489 PQC RHS 1 63.000 3.550 0.300 67.095 RAB 14
Road FEB14/HW/459 7-Feb-14 14+489 14+557 PQC RHS 1 67.500 1.500 0.300 30.375 RAB 14
Road FEB14/HW/460 7-Feb-14 14+489 14+557 PQC RHS 1 67.500 3.500 0.300 70.875 RAB 14
Road FEB14/HW/557 8-Feb-14 14+489 14+557 PQC RHS 1 67.500 3.550 0.300 71.888 RAB 14
Road FEB14/HW/1591 24-Feb-14 14+557 14+582 PQC RHS 1 25.000 1.500 0.300 11.250 RAB 14
Road FEB14/HW/1401 20-Feb-14 14+631 14+697 PQC RHS 1 66.000 1.875 0.300 37.125 RAB 14
Road FEB14/HW/1434 21-Feb-14 14+631 14+697 PQC RHS 1 66.000 1.500 0.300 29.700 RAB 14
Road FEB14/HW/1473 22-Feb-14 14+631 14+697 PQC RHS 1 66.000 3.500 0.300 69.300 RAB 14
Road FEB14/HW/1516 23-Feb-14 14+631 14+697 PQC RHS 1 66.000 3.550 0.300 70.290 RAB 14
Road FEB14/HW/1662 25-Feb-14 14+657 14+685 PQC RHS 1 28.500 3.500 0.300 29.925 RAB 14
Road FEB14/HW/971 14-Feb-14 14+690 14+764 PQC RHS 1 73.500 1.500 0.300 33.075 RAB 14
Road FEB14/HW/1256 17-Feb-14 14+697 14+764 PQC RHS 1 67.500 3.500 0.300 70.875 RAB 14
Road FEB14/HW/1286 18-Feb-14 14+697 14+764 PQC RHS 1 67.500 3.500 0.300 70.875 RAB 14
Road FEB14/HW/1212 16-Feb-14 14+697 14+764 PQC RHS 1 67.000 1.650 0.300 33.170 RAB 14
Road FEB14/HW/461 7-Feb-14 14+810 14+860 PQC RHS 1 49.500 1.500 0.300 22.275 RAB 14
Road FEB14/HW/559 8-Feb-14 14+810 14+860 PQC RHS 1 49.350 1.500 0.300 22.280 RAB 14
Road FEB14/HW/691 10-Feb-14 14+810 14+909 PQC RHS 1 99.000 3.550 0.300 105.435 RAB 14
Road FEB14/HW/620 9-Feb-14 14+860 14+909 PQC RHS 1 49.500 1.500 0.300 22.275 RAB 14
Road FEB14/HW/621 9-Feb-14 14+860 14+909 PQC RHS 1 49.500 5.000 0.300 74.250 RAB 14
Road FEB14/HW/771 11-Feb-14 14+909 14+972 PQC RHS 1 63.000 1.500 0.300 28.350 RAB 14
Road FEB14/HW/852 12-Feb-14 14+909 14+972 PQC RHS 1 63.000 3.500 0.300 66.150 RAB 14
Road JAN14/HW/1641 25-Jan-14 14+970 15+094 PQC RHS 1 123.500 1.500 0.300 55.575 RAB 13
Road FEB14/HW/215 4-Feb-14 14+972 15+062 PQC RHS 1 90.000 3.550 0.300 95.850 RAB 14
Road JAN14/HW/1840 27-Jan-14 15+062 15+094 PQC RHS 1 31.500 1.500 0.300 14.175 RAB 14
Road FEB14/HW/213 4-Feb-14 15+062 15+094 PQC RHS 1 31.500 1.500 0.300 14.175 RAB 14
Road FEB14/HW/386 6-Feb-14 15+062 15+094 PQC RHS 1 31.500 3.500 0.300 33.075 RAB 14
Road FEB14/HW/462 7-Feb-14 15+062 15+094 PQC RHS 1 31.500 3.550 0.300 33.548 RAB 14
Road FEB14/HW/387 6-Feb-14 15+136 15+155 PQC RHS 1 19.000 5.000 0.300 28.500 RAB 14
Road FEB14/HW/463 7-Feb-14 15+136 15+155 PQC RHS 1 19.000 3.550 0.300 20.235 RAB 14
Road May13/HW/67 25-May-13 15+155 15+164 PQC RHS 1 9.000 5.000 0.300 13.500 RAB 05
Road JUN13/HW/7 2-Jun-13 15+155 15+164 PQC RHS 1 9.000 3.550 0.300 9.585 RAB 06
Road May13/HW/68 27-May-13 15+164 15+218 PQC RHS 1 54.000 3.550 0.300 57.510 RAB 05
Road JUN13/HW/16 4-Jun-13 15+164 15+218 PQC RHS 1 54.000 3.500 0.300 56.700 RAB 06
Road JUN13/HW/19 5-Jun-13 15+164 15+218 PQC RHS 1 54.000 1.500 0.300 24.300 RAB 06
Road May13/HW/68 27-May-13 15+218 15+227 PQC RHS 1 9.000 8.500 0.300 22.950 RAB 06
Road May13/HW/74 31-May-13 15+227 15+331 PQC RHS 1 104.000 3.500 0.300 109.200 RAB 05
Road JUN13/HW/6 2-Jun-13 15+227 15+331 PQC RHS 1 104.000 1.500 0.300 46.800 RAB 06
Road JUN13/HW/25 6-Jun-13 15+227 15+331 PQC RHS 1 104.000 3.550 0.300 110.760 RAB 06
Road JAN14/HW/2352 31-Jan-14 15+330 15+440 PQC RHS 1 110.000 3.500 0.300 115.500 RAB 14
Road JAN14/HW/2255 30-Jan-14 15+335 15+440 PQC RHS 1 105.000 3.500 0.300 110.250 RAB 14
Road JAN14/HW/1710 25-Jan-14 15+340 15+440 PQC RHS 1 100.000 1.500 0.300 45.000 RAB 13
Road FEB14/HW/55 1-Feb-14 15+370 15+440 PQC RHS 1 70.000 1.875 0.300 39.375 RAB 14
Road FEB14/HW/53 1-Feb-14 15+503 15+540 PQC RHS 1 37.000 3.550 0.300 39.405 RAB 14
Road JAN14/HW/2168 29-Jan-14 15+507 15+601 PQC RHS 1 93.500 1.500 0.300 42.075 RAB 14
Road JAN14/HW/2256 30-Jan-14 15+507 15+601 PQC RHS 1 93.500 3.500 0.300 98.175 RAB 14
Road FEB14/HW/119 2-Feb-14 15+507 15+577 PQC RHS 1 70.000 1.800 0.300 37.800 RAB 14
Road JAN14/HW/2351 31-Jan-14 15+540 15+600 PQC RHS 1 60.000 3.500 0.300 63.000 RAB 14
Road JAN14/HW/571 11-Jan-14 15+601 15+673 PQC RHS 1 72.000 1.500 0.300 32.400 RAB 13
Road JAN14/HW/733 12-Jan-14 15+601 15+673 PQC RHS 1 72.000 3.500 0.300 75.600 RAB 13
Road JAN14/HW/807 13-Jan-14 15+601 15+673 PQC RHS 1 72.000 3.500 0.300 75.600 RAB 13
Road FEB14/HW/118 2-Feb-14 15+673 15+678 PQC RHS 1 5.000 8.500 0.300 12.750 RAB 14
Road FEB14/HW/1720 26-Feb-14 14+515 14+585 PQC RHS 1 70.000 1.875 0.300 39.375 RAB 15
Road FEB14/HW/1721 26-Feb-14 30+253 30+320 PQC RHS 1 67.500 3.500 0.300 70.875 RAB 15
Road FEB14/HW/1876 28-Feb-14 14+557 14+585 PQC RHS 1 28.500 3.500 0.300 29.925 RAB 15
Road FEB14/HW/1877 28-Feb-14 14+817 14+877 PQC RHS 1 60.000 1.875 0.300 33.750 RAB 15
Road MAR14/HW/19 1-Mar-14 16+084 16+114 PQC LHS 1 30.000 1.500 0.300 13.500 RAB 15
Road MAR14/HW/20 1-Mar-14 16+084 16+114 PQC LHS 1 30.000 3.500 0.300 31.500 RAB 15
Road MAR14/HW/103 2-Mar-14 30+253 30+320 PQC RHS 1 67.500 1.875 0.300 37.969 RAB 15
Road MAR14/HW/125 3-Mar-14 16+084 16+114 PQC RHS 1 30.000 3.500 0.300 31.500 RAB 15
Road MAR14/HW/136 3-Mar-14 43+570 43+642 PQC LHS 1 72.000 1.500 0.300 32.400 RAB 15
Road MAR14/HW/153 4-Mar-14 43+570 43+615 PQC LHS 1 45.000 3.500 0.300 47.250 RAB 15
Road MAR14/HW/154 4-Mar-14 43+642 43+678 PQC LHS 1 36.000 1.500 0.300 16.200 RAB 15
Road MAR14/HW/202 5-Mar-14 32+900 32+900 PQC LHS 1 8.500 6.700 0.278 15.832 RAB 15
Road MAR14/HW/204 5-Mar-14 33+105 33+105 PQC LHS 1 8.500 6.700 0.250 14.238 RAB 15
Road MAR14/HW/205 5-Mar-14 20+945 20+968 PQC RHS 1 23.000 1.750 0.300 12.075 RAB 15
Road MAR14/HW/206 5-Mar-14 20+864 20+905 PQC RHS 1 40.500 1.750 0.300 21.263 RAB 15
Road MAR14/HW/207 5-Mar-14 43+570 43+610 PQC LHS 1 40.000 3.500 0.300 42.000 RAB 15
Road MAR14/HW/208 5-Mar-14 43+642 43+678 PQC LHS 1 36.000 3.500 0.300 37.800 RAB 15
Road MAR14/HW/251 6-Mar-14 43+615 43+642 PQC LHS 1 27.000 3.500 0.300 28.350 RAB 15
Road MAR14/HW/256 6-Mar-14 20+864 20+905 PQC RHS 1 40.500 3.500 0.300 42.525 RAB 15
Road MAR14/HW/257 6-Mar-14 20+944 20+968 PQC RHS 1 23.500 3.500 0.300 24.675 RAB 15
Road MAR14/HW/300 7-Mar-14 20+835 20+905 PQC RHS 1 70.000 1.875 0.300 39.375 RAB 15
Road MAR14/HW/301 7-Mar-14 20+945 21+015 PQC RHS 1 70.000 1.875 0.300 39.375 RAB 15
Road MAR14/HW/302 7-Mar-14 05+000 05+090 PQC RHS 1 90.000 3.500 0.300 94.500 RAB 15
Road MAR14/HW/303 7-Mar-14 05+000 05+090 PQC RHS 1 90.000 1.500 0.300 40.500 RAB 15
Road MAR14/HW/304 7-Mar-14 30+090 30+109 PQC RHS 1 19.000 3.500 0.300 19.950 RAB 15
Road MAR14/HW/305 7-Mar-14 30+090 30+109 PQC RHS 1 19.000 1.500 0.300 8.550 RAB 15
Road MAR14/HW/340 8-Mar-14 05+000 05+090 PQC RHS 1 90.000 3.500 0.300 94.500 RAB 15
Road MAR14/HW/341 8-Mar-14 05+000 05+060 PQC RHS 1 60.000 1.875 0.300 33.750 RAB 15
Road MAR14/HW/373 9-Mar-14 20+945 20+968 PQC RHS 1 23.000 3.500 0.300 24.150 RAB 15
Road MAR14/HW/374 9-Mar-14 20+864 20+905 PQC RHS 1 40.500 3.500 0.300 42.525 RAB 15
Road MAR14/HW/375 9-Mar-14 30+090 30+109 PQC RHS 1 19.000 3.500 0.300 19.950 RAB 15
Road MAR14/HW/377 9-Mar-14 20+768 20+773 PQC RHS 1 5.000 8.500 0.300 12.750 RAB 15
Road MAR14/HW/417 10-Mar-14 21+080 21+085 PQC RHS 1 5.000 17.600 0.200 17.600 RAB 15
Road MAR14/HW/418 10-Mar-14 44+770 44+840 PQC LHS 1 70.000 1.500 0.300 31.500 RAB 15
Road MAR14/HW/460 11-Mar-14 44+770 44+843 PQC LHS 1 72.500 3.500 0.300 76.125 RAB 15
Road MAR14/HW/461 11-Mar-14 30+090 30+110 PQC RHS 1 20.000 1.875 0.300 11.250 RAB 15
Road MAR14/HW/499 12-Mar-14 44+770 44+842 PQC LHS 1 72.000 3.500 0.300 75.600 RAB 15
Road MAR14/HW/500 12-Mar-14 43+767 43+870 PQC RHS 1 103.500 1.500 0.300 46.575 RAB 15
Road MAR14/HW/501 12-Mar-14 27+785 27+793 PQC RHS 1 8.000 1.500 0.300 3.600 RAB 15
Road MAR14/HW/502 12-Mar-14 27+785 27+793 PQC RHS 1 8.000 3.500 0.300 8.400 RAB 15
Road MAR14/HW/503 12-Mar-14 27+803 27+811 PQC RHS 1 8.000 1.500 0.300 3.600 RAB 15
Road MAR14/HW/504 12-Mar-14 27+803 27+811 PQC RHS 1 8.000 3.500 0.300 8.400 RAB 15
Road MAR14/HW/522 13-Mar-14 43+767 43+870 PQC RHS 1 103.500 3.500 0.300 108.675 RAB 15
Road MAR14/HW/523 13-Mar-14 27+785 27+797 PQC RHS 1 11.150 3.500 0.300 11.708 RAB 15
Road MAR14/HW/524 13-Mar-14 27+803 27+814 PQC RHS 1 11.000 3.500 0.300 11.550 RAB 15
Road MAR14/HW/526 13-Mar-14 44+990 45+040 PQC RHS 1 50.000 1.500 0.300 22.500 RAB 15
Road MAR14/HW/575 14-Mar-14 43+790 43+870 PQC LHS 1 80.000 1.875 0.300 45.000 RAB 15
Road MAR14/HW/577 14-Mar-14 44+991 45+040 PQC RHS 1 49.500 3.500 0.300 51.975 RAB 15
Road MAR14/HW/618 15-Mar-14 44+991 45+040 PQC RHS 1 49.500 3.500 0.300 51.975 RAB 15
Road MAR14/HW/663 16-Mar-14 14+251 14+259 PQC RHS 1 7.650 3.550 0.300 8.147 RAB 15
Road MAR14/HW/664 16-Mar-14 14+251 14+259 PQC RHS 1 7.650 1.500 0.300 3.443 RAB 15
Road MAR14/HW/665 16-Mar-14 14+201 14+206 PQC RHS 1 5.500 8.550 0.300 14.108 RAB 15
Road MAR14/HW/666 16-Mar-14 14+266 14+274 PQC RHS 1 8.000 3.550 0.300 8.520 RAB 15
Road MAR14/HW/667 16-Mar-14 14+266 14+274 PQC RHS 1 8.000 1.500 0.300 3.600 RAB 15
Road MAR14/HW/697 18-Mar-14 14+251 14+259 PQC RHS 1 7.650 1.500 0.300 3.443 RAB 15
Road MAR14/HW/698 18-Mar-14 14+266 14+274 PQC RHS 1 8.000 3.500 0.300 8.400 RAB 15
Road MAR14/HW/731 19-Mar-14 27+589 27+611 PQC RHS 1 22.000 1.500 0.300 9.900 RAB 15
Road MAR14/HW/732 19-Mar-14 27+589 27+611 PQC RHS 1 22.000 3.500 0.300 23.100 RAB 15
Road MAR14/HW/734 19-Mar-14 43+678 43+687 PQC LHS 1 9.000 8.500 0.300 22.950 RAB 15
Road MAR14/HW/737 19-Mar-14 43+766 43+870 PQC LHS 1 104.000 3.500 0.300 109.200 RAB 15
Road MAR14/HW/774 20-Mar-14 43+730 43+767 PQC LHS 1 36.500 1.500 0.300 16.425 RAB 15
Road MAR14/HW/775 20-Mar-14 15+290 15+390 PQC LHS 1 100.000 1.500 0.300 45.000 RAB 15
Road MAR14/HW/813 21-Mar-14 43+730 43+767 PQC LHS 1 36.500 3.500 0.300 38.325 RAB 15
Road MAR14/HW/816 21-Mar-14 13+994 14+000 PQC RHS 1 6.500 3.500 0.300 6.825 RAB 15
Road MAR14/HW/817 21-Mar-14 13+994 14+000 PQC RHS 1 6.500 1.500 0.300 2.925 RAB 15
Road MAR14/HW/818 21-Mar-14 13+973 13+987 PQC RHS 1 13.800 3.500 0.300 14.490 RAB 15
Road MAR14/HW/819 21-Mar-14 13+973 13+987 PQC RHS 1 13.800 1.500 0.300 6.210 RAB 15
Road MAR14/HW/837 21-Mar-14 14+260 14+260 PQC RHS 1 8.500 6.700 0.257 14.636 RAB 15
Road MAR14/HW/851 22-Mar-14 13+994 14+000 PQC RHS 1 6.500 3.500 0.300 6.825 RAB 15
Road MAR14/HW/852 22-Mar-14 13+979 13+986 PQC RHS 1 6.500 3.500 0.300 6.825 RAB 15
Road MAR14/HW/896 23-Mar-14 15+300 15+407 PQC LHS 1 107.000 3.500 0.300 112.350 RAB 15
Road MAR14/HW/899 23-Mar-14 13+980 13+980 PQC RHS 1 8.500 6.700 0.278 15.832 RAB 15
Road MAR14/HW/930 24-Mar-14 15+300 15+407 PQC RHS 1 107.000 3.500 0.300 112.350 RAB 15
Road MAR14/HW/931 24-Mar-14 15+580 15+680 PQC LHS 1 100.000 1.500 0.300 45.000 RAB 15
Road MAR14/HW/962 25-Mar-14 15+370 15+407 PQC LHS 1 37.000 1.875 0.300 20.813 RAB 15
Road MAR14/HW/964 25-Mar-14 15+578 15+680 PQC LHS 1 102.500 3.500 0.300 107.625 RAB 15
Road MAR14/HW/965 25-Mar-14 05+316 05+346 PQC RHS 1 29.500 1.500 0.300 13.275 RAB 15
Road MAR14/HW/966 25-Mar-14 05+316 05+346 PQC RHS 1 29.500 3.500 0.300 30.975 RAB 15
Road MAR14/HW/967 25-Mar-14 15+170 15+300 PQC LHS 1 130.000 1.500 0.300 58.500 RAB 15
Road MAR14/HW/968 25-Mar-14 15+170 15+300 PQC LHS 1 130.000 3.500 0.300 136.500 RAB 15
Road MAR14/HW/969 25-Mar-14 41+850 41+970 PQC LHS 1 120.000 1.500 0.300 54.000 RAB 15
Road MAR14/HW/970 25-Mar-14 41+850 41+970 PQC LHS 1 120.000 3.500 0.300 126.000 RAB 15
Road MAR14/HW/971 25-Mar-14 05+316 05+345 PQC RHS 1 29.000 3.500 0.300 30.450 RAB 15
BC Feb15/Str/522 21-Feb-15 40+045 40+045 Curtain wall LHS 1 10.427 1.850 1.150 22.18 RAB 26
Road FEB15/HW/798 17-Feb-15 17+686 17+695 Excavation RHS 1 9.500 4.460 2.459 104.19 RAB 26
Road FEB15/HW/609 13-Feb-15 17+695 17+730 Excavation for RE Wall RHS 1 35.000 4.460 2.459 383.85 RAB 26
Road FEB15/HW/610 13-Feb-15 17+730 17+800 Excavation for RE Wall RHS 1 70.000 5.638 3.286 1,296.74 RAB 26
BC Feb15/Str/489 20-Feb-15 20+500 20+500 Structure RHS 1 11.375 21.334 6.256 1,518.17 RAB 26
BC Feb15/Str/489 20-Feb-15 20+500 20+500 A1 A2 Ret wall RHS 1 7.765 4.700 6.731 245.65 RAB 26
BC Feb15/Str/489 20-Feb-15 20+500 20+500 Deduction for PQC and DLC RHS -1 11.375 8.500 0.450 (43.51) RAB 26
BC Feb15/str/514 21-Feb-15 20+500 20+500 Sand Filling LHS 1 25.650 9.375 0.900 216.422 RAB 26
MNB Feb15/str/310 13-Feb-15 2865 2865 Sand Filling LHS 1 18.800 8.275 0.900 140.013 RAB 26
Road FEB15/HW/799 17-Feb-15 17+686 17+695 Stone Dust filling for RHS 1 9.500 4.460 0.200 8.474 RAB 26
Road FEB15/HW/800 17-Feb-15 17+686 17+695 Stone Dust filling for RHS 1 9.500 4.460 0.200 8.474 RAB 26
Road FEB15/HW/801 17-Feb-15 17+686 17+695 Stone Dust filling for RHS 1 9.500 4.460 0.200 8.474 RAB 26
Road FEB15/HW/863 18-Feb-15 17+686 17+695 Stone Dust filling for RHS 1 9.500 4.460 0.200 8.474 RAB 26
Road FEB15/HW/864 18-Feb-15 17+686 17+695 Stone Dust filling for RHS 1 9.500 4.460 0.200 8.474 RAB 26
Road FEB15/HW/865 18-Feb-15 17+686 17+695 Stone Dust filling for RHS 1 9.500 4.460 0.200 8.474 RAB 26
Road FEB15/HW/611 13-Feb-15 17+695 17+730 Stone Dust filling for RHS 1 35.000 4.460 0.200 31.220 RAB 26
Road FEB15/HW/612 13-Feb-15 17+695 17+730 Stone Dust filling for RHS 1 35.000 4.460 0.200 31.220 RAB 26
Road FEB15/HW/613 13-Feb-15 17+695 17+730 Stone Dust filling for RHS 1 35.000 4.460 0.200 31.220 RAB 26
Road FEB15/HW/658 14-Feb-15 17+695 17+730 Stone Dust filling for RHS 1 35.000 4.460 0.200 31.220 RAB 26
Road FEB15/HW/659 14-Feb-15 17+695 17+730 Stone Dust filling for RHS 1 35.000 4.460 0.200 31.220 RAB 26
Road FEB15/HW/660 14-Feb-15 17+695 17+730 Stone Dust filling for RHS 1 35.000 4.460 0.200 31.220 RAB 26
Road FEB15/HW/733 16-Feb-15 17+730 17+800 Stone Dust filling for RHS 1 70.000 5.638 0.200 78.925 RAB 26
Road FEB15/HW/734 16-Feb-15 17+730 17+800 Stone Dust filling for RHS 1 70.000 5.638 0.200 78.925 RAB 26
Road FEB15/HW/735 16-Feb-15 17+730 17+800 Stone Dust filling for RHS 1 70.000 5.638 0.200 78.925 RAB 26
Road FEB15/HW/806 17-Feb-15 17+730 17+800 Stone Dust filling for RHS 1 70.000 5.638 0.200 78.925 RAB 26
Road FEB15/HW/807 17-Feb-15 17+730 17+800 Stone Dust filling for RHS 1 70.000 5.638 0.200 78.925 RAB 26
Road FEB15/HW/808 17-Feb-15 17+730 17+800 Stone Dust filling for RHS 1 70.000 5.638 0.200 78.925 RAB 26
BC Feb15/Str/311 13-Feb-15 2+865 2+865 Structure LHS 1 18.800 8.275 0.150 23.34 RAB 26
BC Feb15/Str/515 21-Feb-15 20500 20500 Structure LHS 1 25.650 9.375 0.150 36.07 RAB 26
BC Feb15/Str/523 21-Feb-15 40+045 40+045 Curtain wall LHS 1 10.427 1.850 0.150 2.89 RAB 26
Road FEB15/HW/736 16-Feb-15 17+695 17+730 Levelling Pad PCC RHS 1 35.00 0.35 0.15 1.84 RAB 26
Road FEB15/HW/866 18-Feb-15 17+686 17+695 Leveling Pad PCC RHS 1 9.50 0.35 0.15 0.50 RAB 26
Road FEB15/HW/909 19-Feb-15 17+730 17+800 Leveling Pad PCC RHS 1 70.00 0.35 0.15 3.68 RAB 26
PC FEB15/STR/380 15-Feb-15 17+995 17+995 In MCW Pipe Laying RHS 3 10.00 30.000 RAB 26
PC FEB15/STR/381 15-Feb-15 18+185 18+185 In MCW Pipe Laying RHS 4 14.20 56.800 RAB 26
BC Nov14/Str/1119 30-Nov-14 16+100 16+100 Curtain wall IV lift LHS 1 9.600 0.200 0.450 0.864 RAB 24
BC Jan15/Str/137 7-Jan-15 16770 16770 CW III Lift LHS 1 31.820 0.450 0.200 2.864 RAB 25
BC JAN14/Str/35 03-Jan-15 16+775 16+775 CW I Lift LHS 1 31.820 1.300 0.800 33.093 RAB 25
BC Jan15/Str/80 5-Jan-15 16775 16775 CW II Lift LHS 1 31.820 0.750 0.450 10.739 RAB 25
BC Dec14/Str/775 27-Dec-14 30100 30100 CW I Lift LHS 1 8.011 1.300 0.800 8.331 RAB 25
BC Dec14/Str/823 29-Dec-14 30100 30100 CW II Lift LHS 1 8.011 0.750 0.450 2.704 RAB 25
BC Jan15/Str/95 5-Jan-15 41680 41680 CW III Lift LHS 1 10.171 0.750 0.450 3.433 RAB 25
BC Dec14/Str/781 27-Dec-14 41680 41680 CW I Lift LHS 1 7.812 1.300 0.800 8.124 RAB 25
BC Dec14/Str/871 30-Dec-14 41680 41680 CW I Lift LHS 1 10.171 1.650 0.550 9.230 RAB 25
BC Dec14/Str/906 31-Dec-14 41680 41680 CW II Lift LHS 1 7.812 0.750 0.450 2.637 RAB 25
BC JUN14/STR/13 01-Jun-14 13+980 13+950 CW III Lift RHS 1 12.21 0.45 0.75 4.120 RAB 18
BC JUN14/STR/14 01-Jun-14 13+980 13+950 CW FinaL Lift RHS 1 12.21 0.45 0.20 1.099 RAB 18
BC MAY14/STR/1144 23-May-14 13+980 13+950 CW I Lift RHS 1 12.20 1.65 0.55 11.075 RAB 17
BC MAY14/STR/1190 24-May-14 13+980 13+950 CW II Lift RHS 1 12.21 0.75 0.75 6.866 RAB 17
BC JUN14/STR/180 05-Jun-14 14+260 14+260 CW I Lift RHS 1 12.60 1.66 0.55 11.472 RAB 18
BC JUN14/STR/251 07-Jun-14 14+260 14+260 CW II Lift RHS 1 12.60 0.75 0.75 7.089 RAB 18
BC JUN14/STR/483 12-Jun-14 14+260 14+260 CW II Lift RHS 1 12.60 0.75 0.75 7.089 RAB 18
BC JUN14/STR/484 12-Jun-14 14+260 14+260 CW III Lift RHS 1 12.60 0.75 0.45 4.254 RAB 18
BC JUN14/STR/540 13-Jun-14 14+260 14+260 CW IV Lift RHS 1 12.60 0.45 0.20 1.134 RAB 18
BC MAY14/STR/108 04-May-14 14+655 14+655 CW I Lift RHS 1 10.90 1.30 0.80 11.335 RAB 17
BC JUN14/STR/485 12-Jun-14 14+655 14+655 CW II Lift RHS 1 10.90 0.75 0.45 3.679 RAB 18
BC JUN14/STR/486 12-Jun-14 14+655 14+655 CW III Lift RHS 1 10.90 0.45 0.20 0.981 RAB 18
BC Nov14/Str/778 20-Nov-14 16+100 16+100 CW I Lift RHS 1 9.600 1.300 0.800 9.984 RAB 23
BC Nov14/Str/866 22-Nov-14 16+100 16+100 CW II Lift RHS 1 9.600 0.750 0.450 3.240 RAB 23
BC Nov14/Str/911 23-Nov-14 16+100 16+100 CW III Lift RHS 1 9.600 0.450 0.200 0.864 RAB 23
BC Nov14/Str/372 06-Nov-14 16+770 16+770 CW I Lift RHS 1 34.58 1.65 0.55 31.378 RAB 23
BC Nov14/Str/429 11-Nov-14 16+770 16+770 CW II Lift RHS 1 34.78 0.75 0.75 19.562 RAB 23
BC Nov14/Str/479 12-Nov-14 16+770 16+770 CW III Lift RHS 1 34.78 0.75 0.45 11.737 RAB 23
BC Nov14/Str/588 14-Nov-14 16+770 16+770 CW IV Lift RHS 1 34.78 0.45 0.20 3.130 RAB 23
BC Nov14/Str/874 22-Nov-14 17+002 17+002 CW I Lift RHS 1 10.400 1.650 0.550 9.438 RAB 23
BC Nov14/Str/916 23-Nov-14 17+002 17+002 CW II Lift RHS 1 10.400 0.750 0.750 5.850 RAB 23
` DEC14/Str/659 24-Dec-14 30+100 30+100 Curtain wall RHS 1 8.011 1.500 0.150 1.802 RAB 24
BC JAN14/Str/22 02-Jan-15 30+100 30+100 CW III Lift RHS 1 8.011 0.450 0.200 0.721 RAB 25
BC MAY14/STR/218 06-May-14 39+020 39+020 CW I Lift RHS 1 9.45 1.65 0.55 8.580 RAB 17
BC JUN14/STR/514 12-Jun-14 39+020 39+020 CW II Lift RHS 1 8.08 0.75 0.45 2.728 RAB 18
BC JUN14/STR/517 12-Jun-14 40+045 40+045 CW II Lift RHS 1 7.69 0.45 0.75 2.595 RAB 18
BC JUNE14/STR/985 22-Jun-14 40+045 40+045 CW III lift RHS 1 7.69 0.45 0.20 0.692 RAB 18
BC JUN14/STR/392 10-Jun-14 40+340 40+340 CW I Lift RHS 1 13.97 1.65 0.55 12.678 RAB 18
BC JUN14/STR/518 12-Jun-14 40+340 40+340 CW III Lift RHS 1 13.70 0.75 0.45 4.624 RAB 18
BC JUN14/STR/959 21-Jun-14 40+340 40+340 CW III Lift RHS 1 13.77 0.45 0.75 4.647 RAB 18
BC JAN14/Str/55 03-Jan-15 41+680 41+680 CW II Lift RHS 1 10.171 0.750 0.750 5.721 RAB 25
NAPC/BKELSEP'13/106 30-Sep-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELSEP'13/107 30-Sep-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELSEP'13/108 30-Sep-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELOCT'13/21 07-Oct-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELOCT'13/28 08-Oct-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELOCT'13/31 09-Oct-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELOCT'13/41 10-Oct-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/24 02-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/37 04-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/57 04-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/250 19-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/320 22-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/335 23-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/463 29-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/529 30-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/530 30-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELNOV'13/531 30-Nov-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELDEC'13/187 10-Dec-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELDEC'13/203 11-Dec-13 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
NAPC/BKELJAN'14/947 16-Jan-14 13+000 13+000 Jersey barrier casting @ 0.675 Cum RHS 10 0.675 6.750 RAB 26A
PC Feb15/Str/382 15-Feb-15 17+995 17+995 Head Wall I lift RHS 1 11.400 1.044 0.650 7.736 RAB 26
PC Feb15/Str/383 15-Feb-15 18+185 18+185 Head Wall I lift RHS 1 13.440 1.044 0.650 9.120 RAB 26
BC FEB15/STR/410 17-Feb-15 2865 2866 Structure LHS 1 18.700 8.075 0.325 49.076 RAB 26
BC FEB15/STR/446 19-Feb-15 2865 2865 A1 A2 Mid wall bottom haunch LHS 2 18.700 0.400 0.150 2.244 RAB 26
BC FEB15/STR/446 19-Feb-15 2865 2865 A1 A2 Mid wall bottom haunch LHS 2 18.700 0.325 0.100 1.216 RAB 26
BC FEB15/STR/502 21-Feb-15 2865 2865 Mid wall Haunch LHS 1 18.700 0.375 0.150 1.052 RAB 26
BC FEB15/STR/502 21-Feb-15 2865 2865 Mid wall Haunch LHS 1 18.700 0.225 0.100 0.421 RAB 26
BC FEB15/STR/525 22-Feb-15 2865 2865 A1 A2 Wall I lift LHS 2 18.700 0.325 1.200 14.586 RAB 26
BC FEB15/STR/555 24-Feb-15 2865 2865 Mid wall I lift LHS 1 18.700 0.225 1.200 5.049 RAB 26
BC FEB15/STR/483 19-Feb-15 13603 13603 A1 A2 wall final lift LHS 2 16.000 0.250 1.400 11.200 RAB 26
BC FEB15/STR/483 19-Feb-15 13603 13603 A1 A2 Wall ( L - Portion ) LHS 2 0.700 0.250 2.050 0.718 RAB 26
BC FEB15/STR/483 19-Feb-15 13603 13603 Mid wall Final LHS 1 16.000 0.200 1.400 4.480 RAB 26
BC FEB15/STR/483 19-Feb-15 13603 13603 A1 A2 Top Haunch LHS 2 16.000 0.325 0.150 1.560 RAB 26
BC FEB15/STR/483 19-Feb-15 13603 13603 Mid wall Haunch LHS 1 16.000 0.350 0.150 0.840 RAB 26
BC FEB15/STR/548 23-Feb-15 14655 14655 A1 RT wall IV lift LHS 1 8.905 0.425 1.200 4.542 RAB 26
BC FEB15/STR/578 25-Feb-15 14655 14655 A2 RT wall final lift LHS 1 8.905 0.334 1.170 3.480 RAB 26
BC FEB15/STR/578 25-Feb-15 14655 14655 A2 RT wall final lift LHS 1 9.505 0.500 0.300 1.426 RAB 26
BC FEB15/STR/578 25-Feb-15 14655 14655 A2 RT wall final lift LHS 1 9.505 0.394 0.200 0.749 RAB 26
BC FEB15/STR/320 13-Feb-15 20220 20220 A2 wall final lift LHS 2 16.000 0.275 2.300 20.240 RAB 26
BC FEB15/STR/320 13-Feb-15 20220 20220 A1 A2 Wall ( L - Portion ) LHS 2 1.200 0.275 2.825 1.865 RAB 26
BC FEB15/STR/320 13-Feb-15 20220 20220 Mid wall Final LHS 1 16.000 0.225 2.300 8.280 RAB 26
BC FEB15/STR/320 13-Feb-15 20220 20220 A1 A2 Top Haunch LHS 4 16.000 0.500 0.023 0.736 RAB 26
BC FEB15/STR/349 14-Feb-15 22795 22795 A2 wall final lift LHS 1 8.017 0.318 0.610 1.555 RAB 26
BC FEB15/STR/349 14-Feb-15 22795 22795 A2 wall final lift LHS 1 9.217 0.300 0.500 1.383 RAB 26
BC FEB15/STR/349 14-Feb-15 22795 22795 A2 wall final lift LHS 1 9.217 0.396 0.200 0.730 RAB 26
BC FEB15/STR/518 21-Feb-15 22795 22795 A1 A2 RT wall final lift LHS 1 8.017 0.343 1.210 3.327 RAB 26
BC FEB15/STR/518 21-Feb-15 22795 22795 A1 A2 RT wall final lift LHS 1 9.217 0.500 0.300 1.383 RAB 26
BC FEB15/STR/518 21-Feb-15 22795 22795 A1 A2 RT wall final lift LHS 1 9.217 0.396 0.200 0.730 RAB 26
BC FEB15/STR/354 14-Feb-15 32380 32380 A1 wall final lift LHS 1 16.000 0.250 0.813 3.252 RAB 26
BC FEB15/STR/354 14-Feb-15 32380 32380 A1 Wall L Portion LHS 1 0.700 0.250 1.313 0.230 RAB 26
BC FEB15/STR/354 14-Feb-15 32380 32380 A2 Wall Final Lift LHS 1 16.000 0.250 2.238 8.952 RAB 26
BC FEB15/STR/354 14-Feb-15 32380 32380 A2 Wall L Portion LHS 1 0.700 0.250 2.513 0.440 RAB 26
BC FEB15/STR/354 14-Feb-15 32380 32380 Mid wall Final Lift LHS 1 16.000 0.200 0.813 2.602 RAB 26
BC FEB15/STR/354 14-Feb-15 32380 32380 Top Haunch LHS 4 16.000 0.500 0.023 0.720 RAB 26
BC FEB15/STR/322 13-Feb-15 20+220 20+220 Deck Slab LHS 1 16.000 6.775 0.275 29.810 RAB 26
BC FEB15/STR/485 20-Feb-15 13603 13603 Deck Slab RHS 1 16.000 6.700 0.250 26.800 RAB 26
BC FEB15/STR/356 14-Feb-15 32380 32380 Deck Slab RHS 1 16.000 6.700 0.250 26.800 RAB 26
Item RFI No Date Actual Side Description No Total Wt. (Kg) Remarks
NAPC/BKEL/ Chainage
RFI No Actual
Item NAPC/BKEL/ Date Chainage Side Description No Total Wt. (Kg) Remarks
BC Raft bottom main rod 1 12 200 81 8.962 725.922 0.888 644.619 IPC-15
BC Outer wall main rod 2 12 200 162 5.842 946.404 0.888 840.407 IPC-15
BC Extra raft rod 3 12 200 160 2.105 336.800 0.888 299.078 IPC-15
BC Raft top Rod 4 12 200 81 7.342 594.702 0.888 528.095 IPC-15
BC Outer Wall inner rod 5 12 200 162 4.388 710.856 0.888 631.240 IPC-15
BC Bottom Hunch 9 10 200 162 1.130 183.060 0.617 112.948 IPC-15
MAR14/STR/62 2-Mar-2014 13+140 LHS
BC Bottom Hunch 10 10 200 162 1.060 171.720 0.617 105.951 IPC-15
BC Raft distribution 12 10 175 68 16.110 1,095.480 0.617 675.911 IPC-15
BC Raft Extra distribution 14 10 12 16.190 194.280 0.617 119.871 IPC-15
BC Mid wall 22 12 165 192 4.032 774.144 0.888 687.440 IPC-15
BC Extra raft rod 25 20 200 80 2.000 160.000 2.466 394.560 IPC-15
BC L rod 26 12 175 12 4.822 57.864 0.888 51.38 IPC-15
BC Slab Bottom bar 6 12 200 81 7.238 586.278 0.888 520.615 IPC-15
BC Extra Slab Bottom 7 16 200 160 2.100 336.000 1.578 530.208 IPC-15
BC Slab top main bar 8 12 200 81 8.938 723.978 0.888 642.892 IPC-15
BC Top haunch 9 10 200 162 1.102 178.524 0.617 110.149 IPC-15
BC Top haunch 10 10 200 162 1.031 167.022 0.617 103.053 IPC-15
MAR14/STR/1120 21-Mar-2014 13+140 LHS
BC Slab distribution 11 10 170 68 16.190 1,100.920 0.617 679.268 IPC-15
BC Wall distribution 13 10 170 72 16.130 1,161.360 0.617 716.559 IPC-15
BC Mid Wall distribution 15 10 170 36 16.058 578.088 0.617 356.680 IPC-15
BC Extra slab rod 24 25 200 80 2.000 160.000 3.853 616.480 IPC-15
BC L wall dist bar 27 12 175 84 4.443 373.212 0.888 331.41 IPC-15
BC 1 16 200 28 5.294 148.232 1.578 233.910 RAB 14
BC 2 12 200 29 7.013 203.377 0.888 180.599
BC 3 10 200 28 3.161 88.508 0.617 54.609
BC 4 12 200 29 3.837 111.273 0.888 98.810
BC 5 10 150 13 6.004 78.052 0.617 48.158
BC 5 10 150 9 6.108 54.972 0.617 33.918
BC 6 12 200 29 3.776 109.504 0.888 97.240
BC A1 Retaining wall 6a 10 200 28 2.555 71.540 0.617 44.140
BC 7 10 150 13 6.004 78.052 0.617 48.158
BC 7 10 150 3 6.370 19.110 0.617 11.791
BC 7 10 150 9 6.108 54.972 0.617 33.918
BC 8 10 150 39 5.810 226.590 0.617 139.806
BC 9 10 150 33 6.328 208.824 0.617 128.844
BC 10 10 150 33 6.005 198.165 0.617 122.268
BC 10 4 5.710 22.840 0.617 14.092
FEB14/STR/1292 23-Feb-2014 13+140 LHS
BC 1 16 200 28 5.294 148.232 1.578 233.910 RAB 14
BC 2 12 200 29 7.013 203.377 0.888 180.599
BC 3 10 200 28 3.161 88.508 0.617 54.609
BC 4 12 200 29 3.837 111.273 0.888 98.810
BC 5 10 150 13 6.004 78.052 0.617 48.158
BC 5 10 150 9 6.108 54.972 0.617 33.918
BC 6 12 200 29 3.776 109.504 0.888 97.240
BC A2 Retaining wall 6a 10 200 28 2.555 71.540 0.617 44.140
BC 7 10 150 13 6.004 78.052 0.617 48.158
BC 7 10 150 3 6.370 19.110 0.617 11.791
BC 7 10 150 9 6.108 54.972 0.617 33.918
BC 8 10 150 39 5.810 226.590 0.617 139.806
BC 9 10 150 33 6.328 208.824 0.617 128.844
BC 10 10 150 33 6.005 198.165 0.617 122.268
BC 10 4 5.710 22.840 0.617 14.09
BC APR14/HW/927 22/Apr/14 13+140 Cushion reinforcement 1 10 0.617 355.000 IPC-16
BC Raft bottom main rod 1 12 200 81 8.962 725.922 0.888 644.619 IPC-15
BC Outer wall main rod 2 12 200 162 5.842 946.404 0.888 840.407 IPC-15
BC Extra raft rod 3 12 200 160 2.100 336.000 0.888 298.368 IPC-15
BC Raft top Rod 4 12 200 81 7.342 594.702 0.888 528.095 IPC-15
BC Outer Wall inner rod 5 12 200 162 4.388 710.856 0.888 631.240 IPC-15
BC Bottom Hunch 9 10 200 162 1.130 183.060 0.617 112.948 IPC-15
MAR14/STR/915 18-Mar-2014 13+240 LHS
BC Bottom Hunch 10 10 200 162 1.060 171.720 0.617 105.951 IPC-15
BC Raft distribution 12 10 175 68 16.110 1,095.480 0.617 675.911 IPC-15
BC Raft Extra distribution 14 10 12 16.190 194.280 0.617 119.871 IPC-15
BC Mid wall 22 12 165 192 4.032 774.144 0.888 687.440 IPC-15
BC Extra raft rod 25 20 200 80 2.000 160.000 2.466 394.560 IPC-15
BC L rod 26 12 175 12 4.822 57.864 0.888 51.38 IPC-15
BC Slab Bottom bar 6 12 200 81 7.238 586.278 0.888 520.615 IPC-15
BC Extra Slab Bottom 7 16 200 160 2.100 336.000 1.578 530.208 IPC-15
BC Slab top main bar 8 12 200 81 8.938 723.978 0.888 642.892 IPC-15
BC Top haunch 9 10 200 162 1.102 178.524 0.617 110.149 IPC-15
BC Top haunch 10 10 200 162 1.031 167.022 0.617 103.053 IPC-15
MAR14/STR/1304 24-Mar-2014 13+240 LHS
BC Slab distribution 11 10 170 68 16.190 1,100.920 0.617 679.268 IPC-15
BC Wall distribution 13 10 170 72 16.190 1,165.680 0.617 719.225 IPC-15
BC Mid Wall distribution 15 10 170 36 16.058 578.088 0.617 356.680 IPC-15
BC Extra slab rod 24 25 200 80 2.000 160.000 3.853 616.480 IPC-15
BC L wall dist bar 27 12 175 84 4.443 373.212 0.888 331.41 IPC-15
BC 1 16 200 28 5.283 147.924 1.578 233.424 IPC-15
BC 2 12 200 29 6.991 202.739 0.888 180.032 IPC-15
BC 3 10 200 28 3.161 88.508 0.617 54.609 IPC-15
BC 4 12 200 29 3.837 111.273 0.888 98.810 IPC-15
BC 5 10 150 13 5.971 77.623 0.617 47.893 IPC-15
BC 5 10 150 9 6.075 54.675 0.617 33.734 IPC-15
BC 6 12 200 29 3.776 109.504 0.888 97.240 IPC-15
BC MAR14/STR/708 13-Mar-2014 13+240 LHS A1 side Ret Raft 6a 10 200 28 2.555 71.540 0.617 44.140 IPC-15
BC 7 10 150 13 5.971 77.623 0.617 47.893 IPC-15
BC 7 10 150 3 6.337 19.011 0.617 11.730 IPC-15
BC 7 10 150 9 6.075 54.675 0.617 33.734 IPC-15
BC 8 10 150 38 5.788 219.944 0.617 135.705 IPC-15
CheckedBC JUN14/STR/159
By,QS, ILFS 4-Jun-14 39+020 LHS AcceptedIPC-18
By,QS,NAPC
RFI No Actual Bar Bar No. of Cutting Total Cutting Wt/M
Item NAPC/BKEL/ Date Chainage Side Description No. Dia Spacing bars Length (m) Length (M) (Kg) Total Wt. (Kg) Remarks
BC DEC13/STR/2317 29-Dec-2013 14+655 RHS Slab distribution 11 10 170 68 15.350 1,043.800 0.617 644.025
BC Wall distribution 13 10 170 104 15.350 1,596.400 0.617 984.979
BC Slab extra distribution 14 10 12 15.350 184.200 0.617 113.651
BC mid Wall distribution 15 10 170 52 15.250 793.000 0.617 489.281
BC L rod 27 12 175 116 1.893 219.588 0.888 194.994
BC 1 20 50 7.417 370.850 2.466 914.516
BC 2 16 50 9.645 482.250 1.578 760.991
BC 3 12 50 4.358 217.900 0.888 193.495
BC 4 12 50 6.066 303.300 0.888 269.330
BC 5 10 19 9.381 178.239 0.617 109.973
BC 5 10 18 9.694 174.492 0.617 107.662
BC 6 16 50 6.066 303.300 1.578 478.607
A1 Retaining wall
BC 6a 20 50 4.674 233.700 2.466 576.304
BC 7 10 19 9.381 178.239 0.617 109.973
BC 7 10 10 9.965 99.650 0.617 61.484
BC 7 10 18 9.694 174.492 0.617 107.662
BC 8 10 60 7.846 470.760 0.617 290.459
BC 9 10 50 9.865 493.250 0.617 304.335
BC 10 10 50 9.334 466.700 0.617 287.954
DEC13/Str/250 6-Dec-2013 14+655 RHS
BC 1 20 50 7.417 370.850 2.466 914.516
BC 2 16 50 9.645 482.250 1.578 760.991
BC 3 12 50 4.358 217.900 0.888 193.495
BC 4 12 50 6.066 303.300 0.888 269.330
BC 5 10 19 9.381 178.239 0.617 109.973
BC 5 10 18 9.694 174.492 0.617 107.662
BC 6 16 50 6.066 303.300 1.578 478.607
A2 Retaining wall
BC 6a 20 50 4.674 233.700 2.466 576.304
BC 7 10 19 9.381 178.239 0.617 109.973
BC 7 10 10 9.965 99.650 0.617 61.484
BC 7 10 18 9.694 174.492 0.617 107.662
BC 8 10 60 7.846 470.760 0.617 290.459
BC 9 10 50 9.865 493.250 0.617 304.335
BC 10 10 50 9.334 466.700 0.617 287.954
BC FEB14/STR/21 1-Feb-2014 14+655 RHS A2 Bracket 10 4 8.815 35.260 0.617 21.755 RAB 14
BC FEB14/STR/174 4-Feb-2014 14+655 RHS A1 Bracket 10 4 8.815 35.260 0.617 21.755 RAB 14
BC Raft bottom main rod 1 16 89 7.364 655.396 1.578 1,034.215 IPC-13
BC Outer wall main rod 2 12 178 5.967 1,062.126 0.888 943.168
BC Raft top Rod 4 10 89 6.310 561.590 0.617 346.501
BC Outer Wall inner rod 5 16 90 5.678 511.020 1.578 806.390
BC Bottom Hunch 9 12 88 5.678 499.664 0.888 443.702
BC Bottom Hunch 10 10 152 1.090 165.680 0.617 102.225
DEC13/str/1830 24-Dec-2013 14+925 RHS
BC Raft distribution 12 10 152 1.062 161.424 0.617 99.599
BC Raft Extra distribution 14 10 40 15.120 604.800 0.617 373.162
BC Raft Extra distribution 15 10 12 15.070 180.840 0.617 111.578
BC Mid wall 22 10 20 16.120 322.400 0.617 198.921
BC Extra raft rod 25 10 178 4.765 848.170 0.617 523.321
BC L rod 26 12 20 5.547 110.940 0.888 98.515
BC Slab bottom rod 6 10 170 89 5.320 473.480 0.617 292.137 IPC-13
BC Slab top main rod 8 12 170 89 7.422 660.558 0.888 586.576
BC Top Hunch 9 10 200 152 1.020 155.040 0.617 95.660
BC Top Hunch 10 10 200 152 0.991 150.632 0.617 92.940
BC DEC13/STR/2315 29-Dec-2013 14+925 RHS Slab distribution 11 10 170 44 15.350 675.400 0.617 416.722
BC Wall distribution 13 10 170 92 15.350 1,412.200 0.617 871.327
BC Slab extra distribution 14 10 12 15.350 184.200 0.617 113.651
BC mid Wall distribution 15 10 170 46 15.250 701.500 0.617 432.826
BC L rod 27 12 170 104 1.967 204.568 0.888 181.656
BC 1 16 46 6.569 302.174 1.578 476.831
BC 2 16 47 9.014 423.658 1.578 668.532
BC 3 12 46 4.063 186.898 0.888 165.965
BC 4 12 47 5.408 254.176 0.888 225.708
BC 5 10 17 8.825 150.025 0.617 92.565
BC 5 10 13 9.039 117.507 0.617 72.502
BC 6 16 47 5.264 247.408 1.578 390.410
BC DEC13/Str/889 14-Dec-2013 14+925 RHS A1 Retaining wall 6a 16 46 3.817 175.582 1.578 277.068
BC 7 10 17 8.825 150.025 0.617 92.565
BC 7 10 5 9.311 46.555 0.617 28.724
BC 7 10 13 9.039 117.507 0.617 72.502
BC 8 10 56 7.577 424.312 0.617 261.801
BC 9 10 42 9.383 394.086 0.617 243.151
BC 9 10 42 8.815 370.230 0.617 228.432
BC 10 10 4 8.361 33.444 0.617 20.635
BC 1 16 46 6.569 302.174 1.578 476.831
BC 2 16 47 8.994 422.718 1.578 667.049
BC 3 12 46 4.063 186.898 0.888 165.965
BC 4 12 47 5.408 254.176 0.888 225.708
BC 5 10 17 8.825 150.025 0.617 92.565
BC 5 10 13 9.039 117.507 0.617 72.502
BC 6 16 47 5.264 247.408 1.578 390.410
BC DEC13/Str/801 13-Dec-2013 14+925 RHS A2 Retaining wall 6a 16 46 3.817 175.582 1.578 277.068
BC 7 10 17 8.825 150.025 0.617 92.565
BC 7 10 5 9.311 46.555 0.617 28.724
BC 7 10 13 9.039 117.507 0.617 72.502
BC 8 10 56 7.577 424.312 0.617 261.801
BC 9 10 42 9.383 394.086 0.617 243.151
BC 9 10 42 8.815 370.230 0.617 228.432
BC 10 10 4 8.361 33.444 0.617 20.635
BC Raft bottom main rod 1 10 190 85 6.220 528.700 0.617 326.21 RAB 14
BC Outer wall main rod 2 10 190 170 3.975 675.750 0.617 416.94
BC Raft top Rod 4 10 190 85 6.300 535.500 0.617 330.40
BC Outer Wall inner rod 5 10 190 170 3.540 601.800 0.617 371.31
BC Bottom Hunch 9 10 200 163 0.991 160.540 0.617 99.05
BC FEB14/STR/1081 20-Feb-2014 15+100 RHS Bottom Hunch 9 10 200 163 1.062 173.106 0.617 106.81
BC Raft distribution 12 10 190 40 16.410 656.400 0.617 405.00
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.06
BC Raft Extra distribution 15 10 190 16 16.250 260.000 0.617 160.42
BC Mid wall 22 10 190 170 2.765 470.050 0.617 290.02
May13/str/266
Checked By,QS, ILFS 11.06.13 15+780 RHS Accepted By,QS,NAPC
RFI No Actual Bar Bar No. of Cutting Total Cutting Wt/M
Item NAPC/BKEL/ Date Chainage Side Description No. Dia Spacing bars Length (m) Length (M) (Kg) Total Wt. (Kg) Remarks
BC DEC13/STR/2462 31-Dec-2013 16+100 RHS A2 Retaining wall R/s 6a 10 175 33 2.933 96.789 0.617 59.719
BC 7 10 150 15 6.260 93.900 0.617 57.936
BC 7 10 150 4 6.655 26.620 0.617 16.425
BC 7 10 150 11 6.470 71.170 0.617 43.912
BC 8 10 150 40 6.600 264.000 0.617 162.888
BC 9 10 150 36 6.690 240.840 0.617 148.598
BC 10 10 150 36 6.360 228.960 0.617 141.268
BC 10 4 5.905 23.620 0.617 14.574
BC Raft bottom main rod 1 10 175 92 8.820 811.440 0.617 500.66 RAB 14
BC Outer wall main rod 2 10 175 184 5.600 1,030.400 0.617 635.76
BC Extra raft rod 3 10 175 184 2.100 386.400 0.617 238.41
BC Raft top Rod 4 10 175 92 8.210 755.320 0.617 466.03
BC Outer Wall inner rod 5 10 175 184 4.525 832.600 0.617 513.71
BC Bottom Hunch 9 10 200 162 1.090 160.540 0.617 99.05
BC FEB14/STR/1035 19-Feb-2014 16+757 RHS Bottom Hunch 10 10 200 162 1.062 172.044 0.617 106.15
BC Raft distribution 12 10 175 64 16.410 1,050.240 0.617 648.00
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.06
BC Raft Extra distribution 15 10 175 16 16.250 260.000 0.617 160.42
BC Mid wall 22 10 175 184 3.790 697.360 0.617 430.27
BC Extra raft rod 25 12 175 92 2.000 184.000 0.888 163.39
BC L rod 26 12 175 20 4.572 91.440 0.888 81.20
BC Slab Bottom bar 6 10 175 92 7.270 668.840 0.617 412.67 IPC-15
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.41 IPC-15
BC Slab top main bar 8 10 175 92 8.780 807.760 0.617 498.39 IPC-15
BC Top haunch 9 10 200 162 1.020 165.240 0.617 101.95 IPC-15
BC Top haunch 10 10 200 162 0.991 160.542 0.617 99.05 IPC-15
BC MAR14/STR/581 11-Mar-2014 16+757 RHS Slab distribution 11 10 175 64 16.350 1,046.400 0.617 645.63 IPC-15
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 645.63 IPC-15
BC Slab extra distribution 14 10 12 16.350 196.200 0.617 121.06 IPC-15
BC Mid Wall distribution 15 10 175 32 16.250 520.000 0.617 320.84 IPC-15
BC Extra slab rod 24 12 175 92 2.000 184.000 0.888 163.39 IPC-15
BC L wall dist bar 27 12 175 76 1.893 143.868 0.888 127.75 IPC-15
BC Raft bottom main rod 1 10 175 92 8.820 811.440 0.617 500.66 RAB 14
BC Outer wall main rod 2 10 175 184 5.600 1,030.400 0.617 635.76
BC Extra raft rod 3 10 175 184 2.100 386.400 0.617 238.41
BC Raft top Rod 4 10 175 92 8.210 755.320 0.617 466.03
BC Outer Wall inner rod 5 10 175 184 4.525 832.600 0.617 513.71
BC Bottom Hunch 9 10 200 162 1.090 160.540 0.617 99.05
BC FEB14/STR/750 14-Feb-2014 16+767 RHS Bottom Hunch 10 10 200 162 1.062 172.044 0.617 106.15
BC Raft distribution 12 10 175 64 16.410 1,050.240 0.617 648.00
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.06
BC Raft Extra distribution 15 10 175 16 16.250 260.000 0.617 160.42
BC Mid wall 22 10 175 184 3.790 697.360 0.617 430.27
BC Extra raft rod 25 12 175 92 2.000 184.000 0.888 163.39
BC L rod 26 12 175 20 4.572 91.440 0.888 81.20
BC Slab Bottom bar 6 10 175 92 7.270 668.840 0.617 412.67 IPC-15
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.41 IPC-15
BC Slab top main bar 8 10 175 92 8.780 807.760 0.617 498.39 IPC-15
BC Top haunch 9 10 200 162 1.020 165.240 0.617 101.95 IPC-15
BC Top haunch 10 10 200 162 0.991 160.542 0.617 99.05 IPC-15
BC MAR14/STR/306 5-Mar-2014 16+767 RHS Slab distribution 11 10 175 64 16.350 1,046.400 0.617 645.63 IPC-15
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 645.63 IPC-15
BC Slab extra distribution 14 10 12 16.350 196.200 0.617 121.06 IPC-15
BC Mid Wall distribution 15 10 175 32 16.250 520.000 0.617 320.84 IPC-15
BC Extra slab rod 24 12 175 92 2.000 184.000 0.888 163.39 IPC-15
BC L wall dist bar 27 12 175 76 1.893 143.868 0.888 127.75 IPC-15
BC Raft bottom main rod 1 10 175 92 8.820 811.440 0.617 500.66 RAB 14
BC Outer wall main rod 2 10 175 184 5.600 1,030.400 0.617 635.76
BC Extra raft rod 3 10 175 184 2.100 386.400 0.617 238.41
BC Raft top Rod 4 10 175 92 8.210 755.320 0.617 466.03
BC Outer Wall inner rod 5 10 175 184 4.525 832.600 0.617 513.71
BC Bottom Hunch 9 10 200 162 1.090 160.540 0.617 99.05
BC FEB14/STR/637 12-Feb-2014 16+774 RHS Bottom Hunch 10 10 200 162 1.062 172.044 0.617 106.15
BC Raft distribution 12 10 175 64 16.410 1,050.240 0.617 648.00
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.06
BC Raft Extra distribution 15 10 175 16 16.250 260.000 0.617 160.42
BC Mid wall 22 10 175 184 3.790 697.360 0.617 430.27
BC Extra raft rod 25 12 175 92 2.000 184.000 0.888 163.39
BC L rod 26 12 175 20 4.572 91.440 0.888 81.20
BC Slab Bottom bar 6 10 175 92 7.270 668.840 0.617 412.67 IPC-15
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.41 IPC-15
BC Slab top main bar 8 10 175 92 8.780 807.760 0.617 498.39 IPC-15
BC Top haunch 9 10 200 162 1.020 165.240 0.617 101.95 IPC-15
BC Top haunch 10 10 200 162 0.991 160.542 0.617 99.05 IPC-15
BC FEB14/STR/1550 27-Feb-2014 16+774 RHS Slab distribution 11 10 175 64 16.350 1,046.400 0.617 645.63 IPC-15
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 645.63 IPC-15
BC Slab extra distribution 14 10 12 16.350 196.200 0.617 121.06 IPC-15
BC Mid Wall distribution 15 10 175 32 16.250 520.000 0.617 320.84 IPC-15
BC Extra slab rod 24 12 175 92 2.000 184.000 0.888 163.39 IPC-15
BC L wall rod 27 12 175 76 1.893 143.868 0.888 127.75 IPC-15
BC Slab Bottom bar 6 10 175 92 7.270 668.840 0.617 412.67 IPC-15
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.41 IPC-15
BC Slab top main bar 8 10 175 92 8.780 807.760 0.617 498.39 IPC-15
BC Top haunch 9 10 200 162 1.020 165.240 0.617 101.95 IPC-15
BC Top haunch 10 10 200 162 0.991 160.542 0.617 99.05 IPC-15
BC MAR14/STR/860 15-Mar-2014 16+782 RHS Slab distribution 11 10 175 64 16.350 1,046.400 0.617 645.63 IPC-15
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 645.63 IPC-15
BC Slab extra distribution 14 10 12 16.350 196.200 0.617 121.06 IPC-15
BC Mid Wall distribution 15 10 175 32 16.250 520.000 0.617 320.84 IPC-15
BC Extra slab rod 24 12 175 92 2.000 184.000 0.888 163.39 IPC-15
BC L wall dist bar 27 12 175 76 1.893 143.868 0.888 127.75 IPC-15
BC Raft bottom main rod 1 10 175 92 8.820 811.440 0.617 500.66 IPC-15
BC Outer wall main rod 2 10 175 184 5.600 1,030.400 0.617 635.76 IPC-15
BC Extra raft rod 3 10 175 184 2.100 386.400 0.617 238.41 IPC-15
BC Raft top Rod 4 10 175 92 8.210 755.320 0.617 466.03 IPC-15
BC Outer Wall inner rod 5 10 175 184 4.525 832.600 0.617 513.71 IPC-15
BC JAN14/STR/597 11-Jan-2014 39+020 RHS A1 Bracket R/s 10 4 5.208 20.832 0.617 12.853 IPC-13
BC JAN14/STR/698 13-Jan-2014 39+020 RHS A2 Bracket R/s 10 4 5.208 20.832 0.617 12.853 IPC-13
BC FEB/HW/680 10-Feb-2014 39+020 RHS Cushion rods - 354.000 RAB 14
-
BC Raft bottom main rod 1 10 175 92 8.820 811.440 0.617 500.66 IPC-13
BC Outer wall main rod 2 10 175 184 5.600 1,030.400 0.617 635.76
BC Extra raft rod 3 10 175 184 2.100 386.400 0.617 238.41
BC Raft top Rod 4 10 175 92 8.210 755.320 0.617 466.03
BC Outer Wall inner rod 5 10 175 184 4.525 832.600 0.617 513.71
BC Bottom Hunch 9 10 200 162 1.090 176.580 0.617 108.95
BC JAN14/STR/1333 25-Jan-2014 40+045 RHS Bottom Hunch 10 10 200 162 1.062 172.044 0.617 106.15
BC Raft distribution 12 10 175 64 16.410 1,050.240 0.617 648.00
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.06
BC Raft Extra distribution 15 10 175 16 16.250 260.000 0.617 160.42
BC Mid wall 22 10 175 184 3.790 697.360 0.617 430.27
BC Extra raft rod 25 12 175 92 2.000 184.000 0.888 163.39
BC L rod 26 12 175 20 4.572 91.440 0.888 81.20
BC Slab bottom rod 6 10 175 92 7.270 668.840 0.617 412.674 RAB 14
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.409
BC Slab top main rod 8 10 175 92 8.783 808.036 0.617 498.558
BC Top Hunch 9 10 200 162 1.020 165.240 0.617 101.953
BC Top Hunch 10 10 200 162 0.991 160.542 0.617 99.054
BC FEB14/STR/1132 20-Feb-2014 40+045 RHS Slab distribution 11 10 170 64 16.350 1,046.400 0.617 645.629
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 645.629
BC Slab extra distribution 14 10 12 16.350 196.200 0.617 121.055
BC mid Wall distribution 15 10 170 32 16.250 520.000 0.617 320.840
BC Extra Slab rod 24 12 170 92 2.000 184.000 0.888 163.392
BC L rod 27 12 200 76 1.893 143.868 0.888 127.755
BC 1 12 175 36 5.187 186.732 0.888 165.818 IPC-13
BC 2 16 175 37 7.276 269.212 1.578 424.817
BC 3 10 175 36 3.663 131.868 0.617 81.363
BC 4 12 175 37 4.640 171.680 0.888 152.452
BC 5 10 150 15 6.730 100.950 0.617 62.286
BC 5 10 150 11 6.940 76.340 0.617 47.102
BC 6 12 175 37 4.525 167.425 0.888 148.673
BC JAN14/STR/1182 23-Jan-2014 40+045 RHS A1 Retaining wall raft 6a 10 175 36 2.933 105.588 0.617 65.148
BC 7 10 150 15 6.730 100.950 0.617 62.286
BC 7 10 150 4 7.125 28.500 0.617 17.585
BC 7 10 150 11 6.940 76.340 0.617 47.102
BC 8 10 150 43 6.253 268.879 0.617 165.898
BC 9 10 150 32 7.160 229.120 0.617 141.367
BC 10 10 150 32 6.830 218.560 0.617 134.852
BC 10 4 6.375 25.500 0.617 15.734
BC 1 16 200 29 5.384 156.136 1.578 246.383 RAB 14
BC 2 12 200 30 7.160 214.800 0.888 190.742
BC 3 10 200 29 3.177 92.133 0.617 56.846
BC 4 12 200 30 3.847 115.410 0.888 102.484
BC 5 10 150 13 6.241 81.133 0.617 50.059
BC 5 10 150 9 6.339 57.051 0.617 35.200
BC 6 12 200 30 3.802 114.060 0.888 101.285
BC JAN14/STR/1402 27-Jan-2014 40+045 RHS A2 Retaining wall 6a 10 200 29 2.595 75.255 0.617 46.432
BC 7 10 150 13 6.325 82.225 0.617 50.733
BC 7 10 150 3 6.591 19.773 0.617 12.200
BC 7 10 150 9 6.329 56.961 0.617 35.145
BC 8 10 150 40 5.957 238.280 0.617 147.019
BC 9 10 150 32 6.549 209.568 0.617 129.303
BC 10 10 150 32 6.226 199.232 0.617 122.926
BC 10 4 5.931 23.724 0.617 14.638
BC Raft bottom main rod 1 10 92 8.741 804.172 0.617 496.174 IPC-08
BC Outer wall main rod 2 10 184 5.468 1,006.112 0.617 620.771
BC Extra raft top 3 10 184 2.100 386.400 0.617 238.409
BC Raft top Rod 4 10 92 8.210 755.320 0.617 466.032
BC Outer Wall inner rod 5 10 184 4.393 808.312 0.617 498.729
BC Bottom Hunch 9 10 162 1.090 176.580 0.617 108.950
BC Aug13/str/303 11-Aug-2013 40+340 RHS Bottom Hunch 10 10 162 1.062 172.044 0.617 106.151
BC Raft distribution 12 10 68 16.350 1,111.800 0.617 685.981
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.055
BC Raft Extra distribution 15 10 16 16.250 260.000 0.617 160.420
BC Mid wall 22 10 184 3.658 673.072 0.617 415.285
BC Extra raft rod 25 12 92 2.000 184.000 0.888 163.392
BC L rod 26 12 20 4.440 88.800 0.888 78.854
BC Slab bottom rod 6 10 175 92 7.270 668.840 0.617 412.674 IPC-09
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.409
BC Slab top main rod 8 10 175 92 8.656 796.352 0.617 491.349
BC Top Hunch 9 10 200 162 1.020 165.240 0.617 101.953
BC Top Hunch 10 10 200 162 0.991 160.542 0.617 99.054
BC Sep13/str/316 7-Sep-2013 40+340 RHS Slab distribution 11 10 170 64 16.350 1,046.400 0.617 645.629
BC Wall distribution 10 175 60 16.350 981.000 0.617 605.277
BC Slab extra distribution 11 10 12 16.350 196.200 0.617 121.055
BC mid Wall distribution 13 10 170 30 16.250 487.500 0.617 300.788
BC Extra Slab rod 15 12 170 92 2.000 184.000 0.888 163.392
BC L rod 24 12 200 76 1.893 143.868 0.888 127.755
BC 1 16 200 26 5.141 133.666 1.578 210.925 IPC-15
BC 2 12 200 27 6.675 180.225 0.888 160.040 IPC-15
BC 3 10 200 26 3.161 82.186 0.617 50.709 IPC-15
BC 4 12 200 27 3.837 103.599 0.888 91.996 IPC-15
BC 5 10 150 13 5.449 70.837 0.617 43.706 IPC-15
BC 5 10 150 9 5.553 49.977 0.617 30.836 IPC-15
BC 6 12 200 27 3.776 101.952 0.888 90.533 IPC-15
BC MAR14/STR/112 2-Mar-2014 40+340 RHS A1 side Ret Raft 6a 10 200 26 2.555 66.430 0.617 40.987 IPC-15
BC 7 10 150 13 5.449 70.837 0.617 43.706 IPC-15
BC 7 10 150 3 5.815 17.445 0.617 10.764 IPC-15
BC 7 10 150 9 5.553 49.977 0.617 30.836 IPC-15
BC 8 10 150 35 5.472 191.520 0.617 118.168 IPC-15
BC 9 10 150 29 5.773 167.417 0.617 103.296 IPC-15
BC 10 10 150 29 5.450 158.050 0.617 97.517 IPC-15
BC
Sep14/Str/328 13-Sep-2014 34+015 RHS
BC 10 10 0.328 IPC 21
BC Extra raft rod 3 10 175 182 2.100 382.200 0.617 235.817 IPC 22
BC Raft top Rod 4 10 175 92 8.210 755.320 0.617 466.032 IPC 22
BC Outer Wall inner rod 5 10 175 184 4.525 832.600 0.617 513.714 IPC 22
BC Bottom Hunch 9 10 200 162 0.991 160.542 0.617 99.054 IPC 22
BC Sep14/Str/979 29-Sep-2014 24+145 LHS Bottom Hunch 10 10 200 162 1.062 172.044 0.617 106.151 IPC 22
BC Raft distribution 12 10 175 64 16.410 1,050.240 0.617 647.998 IPC 22
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.055 IPC 22
BC Raft Extra distribution 15 10 175 16 16.250 260.000 0.617 160.420 IPC 22
BC Mid wall 22 10 175 184 3.790 697.360 0.617 430.271 IPC 22
BC Extra raft rod 25 12 175 91 2.000 182.000 0.888 161.616 IPC 22
BC L rod 26 12 175 20 4.572 91.440 0.888 81.199 IPC 22
BC 1 10 21 3.682 77.322 0.617 47.708 IPC 22
BC 2 10 22 5.174 113.828 0.617 70.232 IPC 22
BC 3 10 21 2.495 52.395 0.617 32.328 IPC 22
BC 4 10 22 2.963 65.186 0.617 40.220 IPC 22
BC 5 10 10 3.354 33.540 0.617 20.694 IPC 22
BC 5 10 7 3.463 24.241 0.617 14.957 IPC 22
BC 6 10 22 2.925 64.350 0.617 39.704 IPC 22
BC Oct14/Str/199 8-Oct-2014 38+350 LHS A1 Retaining wall 6a 10 21 2.125 44.625 0.617 27.534 IPC 22
BC 7 10 10 3.354 33.540 0.617 20.694 IPC 22
BC 7 10 3 3.596 10.788 0.617 6.656 IPC 22
BC 7 10 7 3.463 24.241 0.617 14.957 IPC 22
BC 8 10 22 4.459 98.098 0.617 60.526 IPC 22
BC 9 10 22 3.724 81.928 0.617 50.550 IPC 22
BC 9 10 22 3.512 77.264 0.617 47.672 IPC 22
BC 10 10 4 3.246 12.984 0.617 8.01 IPC 22
BC 1 10 21 3.682 77.322 0.617 47.708 IPC 22
BC 2 10 22 5.174 113.828 0.617 70.232 IPC 22
BC 3 10 21 2.495 52.395 0.617 32.328 IPC 22
BC 4 10 22 2.963 65.186 0.617 40.220 IPC 22
BC 5 10 10 3.354 33.540 0.617 20.694 IPC 22
BC 5 10 7 3.463 24.241 0.617 14.957 IPC 22
BC 6 10 22 2.925 64.350 0.617 39.704 IPC 22
BC Oct14/Str/227 9-Oct-2014 38+350 LHS A2 Retaining wall 6a 10 21 2.125 44.625 0.617 27.534 IPC 22
BC 7 10 10 3.354 33.540 0.617 20.694 IPC 22
BC 7 10 3 3.596 10.788 0.617 6.656 IPC 22
BC 7 10 7 3.463 24.241 0.617 14.957 IPC 22
BC 8 10 22 4.459 98.098 0.617 60.526 IPC 22
BC 9 10 22 3.724 81.928 0.617 50.550 IPC 22
BC 9 10 22 3.512 77.264 0.617 47.672 IPC 22
BC 10 10 4 3.246 12.984 0.617 8.01 IPC 22
BC Slab bottom rod 6 12 175 98 7.520 736.960 0.888 654.420 IPC 22
BC Slab top main rod 8 12 175 98 10.072 987.056 0.888 876.506 IPC 22
BC Top Hunch 9 10 200 172 1.062 182.664 0.617 112.704 IPC 22
BC Top Hunch 10 10 200 172 0.991 170.452 0.617 105.169 IPC 22
BC Oct14/Str/217 9-Oct-2014 14+655 LHS Slab distribution 11 10 170 68 17.350 1,179.800 0.617 727.937 IPC 22
BC Wall distribution 13 10 170 104 17.350 1,804.400 0.617 1,113.315 IPC 22
BC Slab extra distribution 14 10 12 17.350 208.200 0.617 128.459 IPC 22
BC mid Wall distribution 15 10 170 52 17.250 897.000 0.617 553.449 IPC 22
BC L rod 27 12 175 116 1.893 219.588 0.888 194.994 IPC 22
BC 1 12 175 29 5.119 148.451 0.888 131.824 IPC 22
BC 2 16 175 30 7.140 214.200 1.578 338.008 IPC 22
BC 3 10 175 29 3.663 106.227 0.617 65.542 IPC 22
BC 4 12 175 30 4.640 139.200 0.888 123.610 IPC 22
BC 5 10 150 15 5.443 81.645 0.617 50.375 IPC 22
BC 5 10 150 11 5.653 62.183 0.617 38.367 IPC 22
BC 6 12 175 30 4.525 135.750 0.888 120.546 IPC 22
BC Oct14/Str/213 9-Oct-2014 05+330 LHS A2 Retaining wall 6a 10 175 29 2.933 85.057 0.617 52.480 IPC 22
BC 7 10 150 15 5.443 81.645 0.617 50.375 IPC 22
BC 7 10 150 4 5.838 23.352 0.617 14.408 IPC 22
BC 7 10 150 11 5.653 62.183 0.617 38.367 IPC 22
BC 8 10 150 35 6.117 214.095 0.617 132.097 IPC 22
BC 9 10 150 32 5.873 187.936 0.617 115.957 IPC 22
BC 10 10 150 32 5.543 177.376 0.617 109.441 IPC 22
BC 10 4 5.088 20.352 0.617 12.557 IPC 22
BC 1 12 175 29 5.119 148.451 0.888 131.824 IPC 22
BC 2 16 175 30 7.140 214.200 1.578 338.008 IPC 22
BC 3 10 175 29 3.663 106.227 0.617 65.542 IPC 22
BC 4 12 175 30 4.640 139.200 0.888 123.610 IPC 22
BC 5 10 150 15 5.443 81.645 0.617 50.375 IPC 22
BC 5 10 150 11 5.653 62.183 0.617 38.367 IPC 22
BC 6 12 175 30 4.525 135.750 0.888 120.546 IPC 22
BC Oct14/Str/240 10-Oct-2014 05+330 LHS A2 Retaining wall 6a 10 175 29 2.933 85.057 0.617 52.480 IPC 22
BC 7 10 150 15 5.443 81.645 0.617 50.375 IPC 22
BC 7 10 150 4 5.838 23.352 0.617 14.408 IPC 22
BC 7 10 150 11 5.653 62.183 0.617 38.367 IPC 22
BC 8 10 150 35 6.117 214.095 0.617 132.097 IPC 22
BC 9 10 150 32 5.873 187.936 0.617 115.957 IPC 22
BC 10 10 150 32 5.543 177.376 0.617 109.441 IPC 22
BC 10 4 5.088 20.352 0.617 12.557 IPC 22
BC Raft bottom main rod 1 16 100 7.364 736.400 1.578 1,162.039 IPC-22
BC Outer wall main rod 2 12 200 5.967 1,193.400 0.888 1,059.739 IPC 22
BC Raft top Rod 4 10 100 6.310 631.000 0.617 389.327 IPC 22
BC Outer Wall inner rod 5 16 102 5.678 579.156 1.578 913.908 IPC 22
BC Bottom Hunch 9 12 102 5.678 579.156 0.888 514.291 IPC 22
BC Bottom Hunch 10 10 172 1.090 187.480 0.617 115.675 IPC 22
Oct4/Str/382 16-Oct-2014 14+925 RHS
BC Raft distribution 12 10 172 1.062 182.664 0.617 112.704 IPC 22
BC Raft Extra distribution 14 10 44 17.060 750.640 0.617 463.145 IPC 22
BC Raft Extra distribution 15 10 12 17.130 205.560 0.617 126.831 IPC 22
BC Mid wall 22 10 20 17.060 341.200 0.617 210.520 IPC 22
BC Extra raft rod 25 10 200 4.765 953.000 0.617 588.001 IPC 22
BC L rod 26 12 20 5.547 110.940 0.888 98.515 IPC 22
BC Raft bottom main rod 1 10 92 4.870 448.040 0.617 276.441 IPC 22
BC Outer wall main rod 2 10 184 4.350 800.400 0.617 493.847 IPC 22
BC Raft top Rod 3 10 91 2.100 191.100 0.617 117.909 IPC 22
BC Raft top Rod 4 10 92 4.210 387.320 0.617 238.976 IPC 22
BC Outer Wall inner rod 5 10 184 2.875 529.000 0.617 326.393 IPC 22
BC Bottom Hunch 9 10 162 1.030 166.860 0.617 102.953 IPC 22
Oct14/Str/399 16-Oct-2014 38+350 LHS
BC Raft distribution 12 10 32 16.350 523.200 0.617 322.814 IPC 22
BC Raft Extra distribution 14 10 8 16.290 130.320 0.617 80.407 IPC 22
BC Raft Extra distribution 15 10 8 16.190 129.520 0.617 79.914 IPC 22
BC L rod 16 10 8 3.330 26.640 0.617 16.437 IPC 22
BC Shear key Main rod 20 10 27 4.100 110.700 0.617 68.302 IPC 22
BC Shear key Distrod 21 10 10 4.210 42.100 0.617 25.976 IPC 22
BC Slab bottom rod 6 10 175 92 7.270 668.840 0.617 412.674 IPC 22
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.409 IPC 22
BC Slab top main rod 8 10 175 92 8.780 807.760 0.617 498.388 IPC 22
BC Top Hunch 9 10 200 162 1.020 165.240 0.617 101.953 IPC 22
BC Top Hunch 10 10 175 162 0.991 160.542 0.617 99.054 IPC 22
BC Oct14/Str/64 7-Oct-2014 42+400 LHS Slab distribution 11 10 170 64 16.350 1,046.400 0.617 645.629 IPC 22
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 645.629 IPC 22
BC Slab extra distribution 14 10 175 12 16.350 196.200 0.617 121.055 IPC 22
BC Mid wall distribution 15 10 175 32 16.250 520.000 0.617 320.840 IPC 22
BC Extra Slab rod 24 12 175 92 2.000 184.000 0.888 163.392 IPC 22
BC L wall dist bar 27 12 175 76 1.928 146.528 0.888 130.117 IPC 22
BC 1 16 45 6.503 292.613 1.578 461.743 IPC 22
BC 2 16 46 8.882 408.572 1.578 644.727 IPC 22
BC 3 12 45 4.038 181.710 0.888 161.358 IPC 22
BC 4 12 46 5.414 249.044 0.888 221.151 IPC 22
BC 5 10 17 8.623 146.583 0.617 90.441 IPC 22
BC 5 10 13 8.831 114.797 0.617 70.829 IPC 22
BC 6 16 46 5.264 242.144 1.578 382.103 IPC 22
BC Oct14/Str/415 17-Oct-2014 14+500 LHS A1 Retaining wall 6a 16 45 3.847 173.115 1.578 273.175 IPC 22
BC 7 10 17 8.623 146.583 0.617 90.441 IPC 22
BC 7 10 5 9.113 45.565 0.617 28.114 IPC 22
BC 7 10 13 8.831 114.797 0.617 70.829 IPC 22
BC 8 10 55 7.445 409.475 0.617 252.646 IPC 22
BC 9 10 40 9.067 362.660 0.617 223.761 IPC 22
BC 9 10 40 8.636 345.420 0.617 213.124 IPC 22
BC 10 10 4 8.163 32.652 0.617 20.15 IPC 22
BC 1 12 175 34 5.078 172.635 0.888 153.300 IPC 22
BC 2 16 175 35 7.058 247.030 1.578 389.813 IPC 22
BC 3 10 175 34 3.663 124.542 0.617 76.842 IPC 22
BC 4 12 175 35 4.640 162.400 0.888 144.211 IPC 22
BC 5 10 150 15 6.343 95.145 0.617 58.704 IPC 22
BC 5 10 150 11 6.553 72.083 0.617 44.475 IPC 22
BC 6 12 175 35 4.525 158.375 0.888 140.637 IPC 22
BC A1 Retaining wall 6a 10 175 34 2.933 99.722 0.617 61.528 IPC 22
BC 7 10 150 15 6.343 95.145 0.617 58.704 IPC 22
BC 7 10 150 4 6.738 26.952 0.617 16.629 IPC 22
BC 7 10 150 11 6.553 72.083 0.617 44.475 IPC 22
BC 8 10 150 41 6.035 247.435 0.617 152.667 IPC 22
BC 9 10 150 32 6.773 216.736 0.617 133.726 IPC 22
BC 10 10 150 32 6.443 206.176 0.617 127.211 IPC 22
BC 10 4 5.988 23.952 0.617 14.778 IPC 22
Oct14/Str/411 17-Oct-2014 13615 LHS
BC 1 12 175 34 5.078 172.635 0.888 153.300 IPC 22
BC 2 16 175 35 7.058 247.030 1.578 389.813 IPC 22
BC 3 10 175 34 3.663 124.542 0.617 76.842 IPC 22
BC 4 12 175 35 4.640 162.400 0.888 144.211 IPC 22
BC 5 10 150 15 6.343 95.145 0.617 58.704 IPC 22
BC 5 10 150 11 6.553 72.083 0.617 44.475 IPC 22
BC 6 12 175 35 4.525 158.375 0.888 140.637 IPC 22
BC A2 Retaining wall 6a 10 175 34 2.933 99.722 0.617 61.528 IPC 22
BC 7 10 150 15 6.343 95.145 0.617 58.704 IPC 22
BC 7 10 150 4 6.738 26.952 0.617 16.629 IPC 22
BC 7 10 150 11 6.553 72.083 0.617 44.475 IPC 22
BC 8 10 150 41 6.035 247.435 0.617 152.667 IPC 22
BC 9 10 150 32 6.773 216.736 0.617 133.726 IPC 22
BC 10 10 150 32 6.443 206.176 0.617 127.211 IPC 22
BC 10 4 5.988 23.952 0.617 14.778 IPC 22
Jan14/Str/1154 23-Jan-2014 18+900 LHS A1 Ret Wal lBracket 10 4 6.004 24.016 0.617 14.818
BC Raft bottom main rod 1 10 92 8.820 811.440 0.617 500.658 IPC-22
BC Outer wall main rod 2 10 184 5.600 1,030.400 0.617 635.757 IPC 22
Extra raft rod 3 10 184 2.100 386.400 0.617 238.409 IPC 22
BC Raft top Rod 4 10 92 8.210 755.320 0.617 466.032 IPC 22
BC Outer Wall inner rod 5 10 184 4.525 832.600 0.617 513.714 IPC 22
BC Bottom Hunch 9 10 162 0.991 160.542 0.617 99.054 IPC 22
BC Oct4/Str/529 21-Oct-2014 13+615 RHS Bottom Hunch 10 10 162 1.062 172.044 0.617 106.151 IPC 22
BC Raft distribution 12 10 64 16.410 1,050.240 0.617 647.998 IPC 22
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.055 IPC 22
BC Raft Extra distribution 15 10 16 16.250 260.000 0.617 160.420 IPC 22
BC Mid wall 22 10 184 3.790 697.360 0.617 430.271 IPC 22
BC Extra raft rod 25 12 92 2.000 184.000 0.888 163.392 IPC 22
BC L rod 26 12 20 4.572 91.440 0.888 81.199 IPC 22
BC 1 12 37 5.285 195.545 0.888 173.644 IPC 22
BC 2 16 38 7.441 282.758 1.578 446.192 IPC 22
BC 3 10 37 3.663 135.531 0.617 83.623 IPC 22
BC 4 12 38 4.640 176.320 0.888 156.572 IPC 22
BC 5 10 15 7.025 105.375 0.617 65.016 IPC 22
BC 5 10 11 7.235 79.585 0.617 49.104 IPC 22
BC 6 12 38 4.525 171.950 0.888 152.692 IPC 22
BC Oct14/Str/535 21-Oct-2014 15+780 LHS A1 Retaining wall 6a 10 37 2.933 108.521 0.617 66.957 IPC 22
BC 7 10 15 7.025 105.375 0.617 65.016 IPC 22
BC 7 10 4 7.420 29.680 0.617 18.313 IPC 22
BC 7 10 11 7.235 79.585 0.617 49.104 IPC 22
BC 8 10 44 6.450 283.800 0.617 175.105 IPC 22
BC 9 10 34 7.455 253.470 0.617 156.391 IPC 22
BC 9 10 34 7.125 242.250 0.617 149.468 IPC 22
BC 10 10 8 6.600 52.800 0.617 32.58 IPC 22
BC 1 12 175 34 5.113 173.842 0.888 154.372 IPC 22
BC 2 16 175 35 7.097 248.395 1.578 391.967 IPC 22
BC 3 10 175 34 3.663 124.542 0.617 76.842 IPC 22
A1 Retaining wall
RFI No Actual Bar Bar No. of Cutting Total Cutting Wt/M
Item NAPC/BKEL/ Date Chainage Side Description No. Dia Spacing bars Length (m) Length (M) (Kg) Total Wt. (Kg) Remarks
BC Slab bottom rod 6 10 170 100 5.320 532.000 0.617 328.244 IPC 23
BC Slab top main rod 8 12 170 100 7.422 742.200 0.888 659.074 IPC 23
BC Top Hunch 9 10 200 172 1.020 175.440 0.617 108.246 IPC 23
BC Top Hunch 10 10 200 172 0.991 170.452 0.617 105.169 IPC 23
BC Nov14/STR/334 7-Nov-2014 14+925 LHS Slab distribution 11 10 170 44 17.350 763.400 0.617 471.018 IPC 23
BC Wall distribution 13 10 170 92 17.350 1,596.200 0.617 984.855 IPC 23
BC Slab extra distribution 14 10 12 17.350 208.200 0.617 128.459 IPC 23
BC mid Wall distribution 15 10 170 46 17.250 793.500 0.617 489.590 IPC 23
BC L rod 27 12 170 104 1.967 204.568 0.888 181.656 IPC 23
BC Slab Bottom bar 6 10 175 92 7.270 668.840 0.617 412.67 IPC 23
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.41 IPC 23
BC Slab top main bar 8 10 175 92 8.780 807.760 0.617 498.39 IPC 23
BC Top haunch 9 10 200 162 1.020 165.240 0.617 101.95 IPC 23
BC Top haunch 10 10 200 162 0.991 160.542 0.617 99.05 IPC 23
BC Nov14/Str/344 8-Nov-2014 16+767 LHS Slab distribution 11 10 175 64 16.350 1,046.400 0.617 645.63 IPC 23
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 645.63 IPC 23
BC Slab extra distribution 14 10 12 16.350 196.200 0.617 121.06 IPC 23
BC Mid Wall distribution 15 10 175 32 16.250 520.000 0.617 320.84 IPC 23
BC Extra slab rod 24 12 175 92 2.000 184.000 0.888 163.39 IPC 23
BC L wall dist bar 27 12 175 76 1.893 143.868 0.888 127.75 IPC 23
BC Raft bottom main rod 1 10 92 8.820 811.440 0.617 500.658 IPC 23
BC Outer wall main rod 2 10 184 5.600 1,030.400 0.617 635.757 IPC 23
BC Extra raft top 3 10 184 2.100 386.400 0.617 238.409 IPC 23
BC Raft top Rod 4 10 92 8.210 755.320 0.617 466.032 IPC 23
BC Outer Wall inner rod 5 10 184 4.525 832.600 0.617 513.714 IPC 23
BC Bottom Hunch 9 10 162 1.090 176.580 0.617 108.950 IPC 23
BC Nov14/str/352 8-Nov-2014 26+975 LHS Bottom Hunch 10 10 162 1.062 172.044 0.617 106.151 IPC 23
BC Raft distribution 12 10 68 16.350 1,111.800 0.617 685.981 IPC 23
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.055 IPC 23
BC Raft Extra distribution 15 10 16 16.250 260.000 0.617 160.420 IPC 23
BC Mid wall 22 10 184 3.790 697.360 0.617 430.271 IPC 23
BC Extra raft rod 25 12 92 2.000 184.000 0.888 163.392 IPC 23
BC L rod 26 12 10 4.572 45.720 0.888 40.599 IPC 23
BC Raft bottom main rod 1 12 112 9.387 1,051.344 0.888 933.593 IPC 23
BC Outer wall main rod 2 12 224 6.442 1,443.008 0.888 1,281.391 IPC 23
BC Extra raft rod 3 10 222 2.100 466.200 0.617 287.645 IPC 23
BC Raft top Rod 4 10 112 9.335 1,045.520 0.617 645.086 IPC 23
BC Outer Wall inner rod 5 12 224 5.863 1,313.312 0.888 1,166.221 IPC 23
BC Bottom Hunch 9 10 196 1.090 213.640 0.617 131.816 IPC 23
BC Nov14/Str/382 10-Nov-2014 13+980 LHS Bottom Hunch 10 10 196 1.062 208.152 0.617 128.430 IPC 23
BC Raft distribution 12 10 64 19.660 1,258.240 0.617 776.334 IPC 23
BC Raft Extra distribution 14 10 12 19.680 236.160 0.617 145.711 IPC 23
BC Raft Extra distribution 15 10 28 19.580 548.240 0.617 338.264 IPC 23
BC Mid wall 22 10 224 4.590 1,028.160 0.617 634.375 IPC 23
BC Extra raft rod 25 10 111 2.025 224.775 0.617 138.686 IPC 23
BC L rod 26 12 32 5.372 171.904 0.888 152.651 IPC 23
BC Slab Bottom bar 6 10 175 92 7.270 668.840 0.617 412.67 IPC 23
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.41 IPC 23
BC Slab top main bar 8 10 175 92 8.780 807.760 0.617 498.39 IPC 23
BC Top haunch 9 10 200 162 1.020 165.240 0.617 101.95 IPC 23
BC Top haunch 10 10 200 162 0.991 160.542 0.617 99.05 IPC 23
BC Nov14/Str/464 12-Nov-2014 16+774 LHS Slab distribution 11 10 175 64 16.350 1,046.400 0.617 645.63 IPC 23
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 645.63 IPC 23
BC Slab extra distribution 14 10 12 16.350 196.200 0.617 121.06 IPC 23
BC Mid Wall distribution 15 10 175 32 16.250 520.000 0.617 320.84 IPC 23
BC Extra slab rod 24 12 175 92 2.000 184.000 0.888 163.39 IPC 23
BC L wall dist bar 27 12 175 76 1.893 143.868 0.888 127.75 IPC 23
BC Slab bottom rod 6 10 175 95 5.320 505.400 0.617 311.832 IPC 23
BC Slab top main rod 8 12 175 95 7.422 705.090 0.888 626.120 IPC 23
BC Top Hunch 9 10 200 162 1.020 165.240 0.617 101.953 IPC 23
BC Top Hunch 10 10 200 162 0.991 160.542 0.617 99.054 IPC 23
BC Nov14/Str/517 13-Nov-2014 14+500 RHS Slab distribution 11 10 170 44 16.350 719.400 0.617 443.870 IPC 23
BC Wall distribution 10 175 92 16.350 1,504.200 0.617 928.091 IPC 23
BC Slab extra distribution 11 10 12 16.350 196.200 0.617 121.055 IPC 23
BC mid Wall distribution 13 10 170 46 16.250 747.500 0.617 461.208 IPC 23
BC L rod 24 12 170 104 1.967 204.568 0.888 181.66 IPC 23
BC Slab Bottom bar 6 10 175 92 7.270 668.840 0.617 IPC 23
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 IPC 23
BC Slab top main bar 8 10 175 92 8.780 807.760 0.617 IPC 23
BC Top haunch 9 10 200 162 1.020 165.240 0.617 IPC 23
BC Top haunch 10 10 200 162 0.991 160.542 0.617 IPC 23
BC Nov14/Str/464 16+774 LHS Slab distribution 11 10 175 64 16.350 1,046.400 0.617 IPC 23
BC Wall distribution 13 10 175 64 16.350 1,046.400 0.617 IPC 23
BC Slab extra distribution 14 10 12 16.350 196.200 0.617 IPC 23
BC Mid Wall distribution 15 10 175 32 16.250 520.000 0.617 IPC 23
BC Extra slab rod 24 12 175 92 2.000 184.000 0.888 IPC 23
BC L wall dist bar 27 12 175 76 1.893 143.868 0.888 IPC 23
BC 1 12 175 39 5.390 210.210 0.888 186.666 IPC 23
BC 2 16 175 40 7.683 307.320 1.578 484.951 IPC 23
BC 3 10 175 39 3.663 142.857 0.617 88.143 IPC 23
BC 4 12 175 40 4.640 185.600 0.888 164.813 IPC 23
BC 5 10 150 15 7.292 109.380 0.617 67.487 IPC 23
BC 5 10 150 11 7.502 82.522 0.617 50.916 IPC 23
BC 6 12 175 40 4.525 181.000 0.888 160.728 IPC 23
BC Nov14/Str/559 14-Nov-2014 16+100 LHS A1 Retaining wall 6a 10 175 39 2.933 114.387 0.617 70.577 IPC 23
BC 7 10 150 15 7.292 109.380 0.617 67.487 IPC 23
BC 7 10 150 4 7.687 30.748 0.617 18.972 IPC 23
BC 7 10 150 11 7.502 82.522 0.617 50.916 IPC 23
BC 8 10 150 47 6.660 313.020 0.617 193.133 IPC 23
BC 9 10 150 36 7.722 277.992 0.617 171.521 IPC 23
BC 10 10 150 36 7.392 266.112 0.617 164.191 IPC 23
BC 10 4 6.937 27.748 0.617 17.121 IPC 23
BC Slab Bottom bar 6 10 175 92 7.270 668.840 0.617 412.67 IPC 23
BC Extra Slab bottom 7 10 175 184 2.100 386.400 0.617 238.41 IPC 23
BC Slab top main bar 8 10 175 92 8.780 807.760 0.617 498.39 IPC 23
BC Top haunch 9 10 200 162 1.020 165.240 0.617 101.95 IPC 23
BC Outer wall main rod 2 10 200 184 5.600 1,030.400 0.617 635.757 IPC 23
BC Extra raft top 3 10 200 182 2.100 382.200 0.617 235.817 IPC 23
BC Raft top Rod 4 10 200 92 8.210 755.320 0.617 466.032 IPC 23
BC Outer Wall inner rod 5 10 200 184 4.525 832.600 0.617 513.714 IPC 23
BC Bottom Hunch 9 10 200 162 1.090 176.580 0.617 108.950 IPC 23
BC Oct14/Str/987 31-Oct-2014 30100 LHS Top Hunch 10 10 200 162 1.062 172.044 0.617 106.151 IPC 23
BC Raft distribution 12 10 170 68 16.350 1,111.800 0.617 685.981 IPC 23
BC Raft Extra distribution 14 10 12 16.350 196.200 0.617 121.055 IPC 23
BC 15 10 16 16.250 260.000 0.617 160.420 IPC 23
BC Mid wall 22 10 165 184 3.790 697.360 0.617 430.271 IPC 23
BC Extra raft rod 25 12 200 91 2.000 182.000 0.888 161.616 IPC 23
BC L rod 26 12 175 10 4.572 45.720 0.888 40.599 IPC 23
BC 1 12 175 30 5.284 158.520 0.888 140.766 IPC 24
BC 2 16 175 31 7.471 231.601 1.578 365.466 IPC 24
BC 3 10 175 30 3.663 109.890 0.617 67.802 IPC 24
BC 4 12 175 31 4.640 143.840 0.888 127.730 IPC 24
BC 5 10 150 15 5.743 86.145 0.617 53.151 IPC 24
BC 5 10 150 11 5.953 65.483 0.617 40.403 IPC 24
BC 6 12 175 31 4.525 140.275 0.888 124.564 IPC 24
BC 20+220 LHS A1 side Ret Raft 6a 10 175 30 2.933 87.990 0.617 54.290 IPC 24
BC 7 10 150 15 5.743 86.145 0.617 53.151 IPC 24
BC 7 10 150 4 6.138 24.552 0.617 15.149 IPC 24
BC 7 10 150 11 5.953 65.483 0.617 40.403 IPC 24
BC 8 10 150 37 6.448 238.576 0.617 147.201 IPC 24
BC 9 10 150 34 6.173 209.882 0.617 129.497 IPC 24
BC 10 10 150 34 5.843 198.662 0.617 122.574 IPC 24
BC 10 4 5.388 21.552 0.617 13.298 IPC 24
DEC14/STR/478 20/12/2014
BC 1 12 175 30 5.284 158.520 0.888 140.766 IPC 24
BC 2 16 175 31 7.471 231.601 1.578 365.466 IPC 24
BC 3 10 175 30 3.663 109.890 0.617 67.802 IPC 24
BC 4 12 175 31 4.640 143.840 0.888 127.730 IPC 24
BC 5 10 150 15 5.743 86.145 0.617 53.151 IPC 24
BC 5 10 150 11 5.953 65.483 0.617 40.403 IPC 24
BC 6 12 175 31 4.525 140.275 0.888 124.564 IPC 24
BC 20+220 LHS A2 side Ret Raft 6a 10 175 30 2.933 87.990 0.617 54.290 IPC 24
BC 7 10 150 15 5.743 86.145 0.617 53.151 IPC 24
BC 7 10 150 4 6.138 24.552 0.617 15.149 IPC 24
BC 7 10 150 11 5.953 65.483 0.617 40.403 IPC 24
BC 8 10 150 37 6.448 238.576 0.617 147.201 IPC 24
BC 9 10 150 34 6.173 209.882 0.617 129.497 IPC 24
BC 10 10 150 34 5.843 198.662 0.617 122.574 IPC 24
BC 10 4 5.388 21.552 0.617 13.298 IPC 24
BC 1 16 150 44 6.424 282.656 1.578 446.031 IPC 24
BC 2 16 150 45 8.725 392.625 1.578 619.562 IPC 24
BC 3 12 150 44 4.038 177.672 0.888 157.773 IPC 24
BC 4 12 150 45 5.414 243.630 0.888 216.343 IPC 24
BC 5 10 150 17 8.387 142.579 0.617 87.971 IPC 24
BC 5 10 150 13 8.595 111.735 0.617 68.940 IPC 24
BC 6 16 150 45 5.232 235.440 1.578 371.524 IPC 24
BC LHS A1 Retaining Wall Raft 6a 16 150 44 3.831 168.564 1.578 265.994 IPC 24
BC 7 10 150 17 8.387 142.579 0.617 87.971 IPC 24
BC 7 10 150 5 8.877 44.385 0.617 27.386 IPC 24
BC 7 10 150 13 8.595 111.735 0.617 68.940 IPC 24
BC 8 10 150 53 7.320 387.960 0.617 239.371 IPC 24
BC 9 10 150 40 8.831 353.240 0.617 217.949 IPC 24
BC 10 10 150 40 8.400 336.000 0.617 207.312 IPC 24
BC Bra 10 4 7.927 31.708 0.617 19.564 IPC 24
Dec14/STR/491 20-Dec-2014 22+795
BC 1 16 150 44 6.424 282.656 1.578 446.031 IPC 24
BC 2 16 150 45 8.725 392.625 1.578 619.562 IPC 24
BC 3 12 150 44 4.038 177.672 0.888 157.773 IPC 24
BC 4 12 150 45 5.414 243.630 0.888 216.343 IPC 24
BC 5 10 150 17 8.387 142.579 0.617 87.971 IPC 24
BC 5 10 150 13 8.595 111.735 0.617 68.940 IPC 24
BC 6 16 150 45 5.232 235.440 1.578 371.524 IPC 24
BC LHS A2 Retaining Wall Raft 6a 16 150 44 3.831 168.564 1.578 265.994 IPC 24
BC 7 10 150 17 8.387 142.579 0.617 87.971 IPC 24
BC 7 10 150 5 8.877 44.385 0.617 27.386 IPC 24
BC 7 10 150 13 8.595 111.735 0.617 68.940 IPC 24
BC 8 10 150 53 7.320 387.960 0.617 239.371 IPC 24
BC 9 10 150 40 8.831 353.240 0.617 217.949 IPC 24
BC 10 10 150 40 8.400 336.000 0.617 207.312 IPC 24
BC Bra 10 4 7.927 31.708 0.617 19.564 IPC 24
BC 1 12 175 34 5.184 176.256 0.888 156.515 IPC 24
BC 2 16 175 35 7.271 254.485 1.578 401.577 IPC 24
BC 3 10 175 34 3.663 124.542 0.617 76.842 IPC 24
BC 4 12 175 35 4.640 162.400 0.888 144.211 IPC 24
BC 5 10 150 15 6.401 96.015 0.617 59.241 IPC 24
BC 5 10 150 11 6.611 72.721 0.617 44.869 IPC 24
BC 6 12 175 35 4.525 158.375 0.888 140.637 IPC 24
BC Dec14/STR/395 18-Dec-2014 17+002 LHS A1 Retaining wall 6a 10 175 34 2.933 99.722 0.617 61.528 IPC 24
BC 7 10 150 15 6.401 96.015 0.617 59.241 IPC 24
BC 7 10 150 4 6.796 27.184 0.617 16.773 IPC 24
BC 7 10 150 11 6.611 72.721 0.617 44.869 IPC 24
BC 8 10 150 41 6.248 256.168 0.617 158.056 IPC 24
BC 9 10 150 32 6.831 218.592 0.617 134.871 IPC 24
BC 10 10 150 32 6.501 208.032 0.617 128.356 IPC 24
BC 10 4 6.046 24.184 0.617 14.922 IPC 24
BC Slab bottom rod 6 10 175 112 7.345 822.640 0.617 507.569 IPC 24
BC Extra Slab bottom 7 10 175 222 2.100 466.200 0.617 287.645 IPC 24
BC Slab top main rod 8 12 175 112 9.387 1,051.344 0.888 933.593 IPC 24
BC Top Hunch 9 10 200 196 1.020 199.920 0.617 123.351 IPC 24
BC Top Hunch 10 10 200 196 0.991 194.236 0.617 119.844 IPC 24
BC Dec14/Str/274 13-Dec-2014 13+980 LHS Slab distribution 11 10 170 68 19.740 1,342.320 0.617 828.211 IPC 24
BC mid Wall distribution 13 10 170 84 19.680 1,653.120 0.617 1,019.975 IPC 24
BC Extra Slab rod 15 10 170 50 19.640 982.000 0.617 605.894 IPC 24
BC L rod 24 10 175 111 2.000 222.000 0.617 136.974 IPC 24
Road FEB15/HW/508 11-Feb-15 03+645 03+668 Kerb PCC Laying LHS 1 23.00 0.3 0.11 0.759 RAB 26
Road FEB15/HW/508 11-Feb-15 03+716 03+730 Kerb PCC Laying LHS 1 14.00 0.3 0.11 0.462 RAB 26
Road FEB15/HW/508 11-Feb-15 03+756 03+770 Kerb PCC Laying LHS 1 14.00 0.3 0.11 0.462 RAB 26
Road FEB15/HW/508 11-Feb-15 03+781 03+826 Kerb PCC Laying LHS 1 45.00 0.3 0.11 1.485 RAB 26
Road FEB15/HW/686 15-Feb-15 20+931 20+931 A1 A2 Kerb PCC Laying LHS 1 140 0.3 0.11 4.62 RAB 26
Road FEB15/HW/739 16-Feb-15 18+190 18+238 PCC Laying ( Friction Slab PCC) LHS 1 47.5 1.97 0.075 7.018 RAB 26
Road FEB15/HW/836 18-Feb-15 21+510 21+510 A2 Kerb PCC Laying LHS 1 70 0.55 0.11 4.235 RAB 26
Road FEB15/HW/949 20-Feb-15 31+300 31+300 A1 Kerb PCC LHS 1 70.00 0.550 0.100 3.85 RAB 26
Road FEB15/HW/949 20-Feb-15 31+300 31+300 A2 Kerb PCC LHS 1 46.20 0.550 0.100 2.541 RAB 26
Road FEB15/HW/950 20-Feb-15 31+300 31+300 A1 Kerb Laying LHS 70 RFI REQ. RAB 26
Road FEB15/HW/950 20-Feb-15 31+300 31+300 A2 Kerb Laying LHS 46.20 RFI REQ. RAB 26
Road FEB15/HW/951 20-Feb-15 31+490 31+490 A1 Kerb PCC LHS 1 97.00 0.550 0.100 5.335 RAB 26
Road FEB15/HW/951 20-Feb-15 31+490 31+490 A2 Kerb PCC LHS 1 72.00 0.550 0.100 3.96 RAB 26
Road FEB15/HW/759 17-Feb-15 15+290 15+400 Stone Pitching LHS 1 110 9.154 0.3 302.082 RAB 26
Road FEB15/HW/678 15-Feb-15 03+645 03+668 Kerb Laying LHS 1 23.00 23.00 RAB 26
Road FEB15/HW/678 15-Feb-15 03+716 03+730 Kerb Laying LHS 1 14.00 14.00 RAB 26
Road FEB15/HW/678 15-Feb-15 03+756 03+770 Kerb Laying LHS 1 14.00 14.00 RAB 26
Road FEB15/HW/678 15-Feb-15 03+781 03+826 Kerb Laying LHS 1 45.00 45.00 RAB 26
Road FEB15/HW/645 14-Feb-15 03+927 03+927 A1 A2 Kerb Laying LHS 1 140 140 RAB 26
Road FEB15/HW/644 14-Feb-15 04+895 04+895 A1 A2 Kerb Laying LHS 1 140 140 RAB 26
Road FEB15/HW/722 16-Feb-15 20+931 20+931 A1 A2 Kerb Laying LHS 1 140 140.00 RAB 26
Road FEB15/HW/679 15-Feb-15 21+305 21+384 A1 Kerb Laying LHS 1 79.00 79.00 RAB 26
Road FEB15/HW/679 15-Feb-15 21+418 21+453 A2 Kerb Laying LHS 1 35.00 35.00 RAB 26
Road FEB15/HW/950 20-Feb-15 31+300 31+300 A1 Kerb Laying LHS 70 70 RAB 26
Road FEB15/HW/950 20-Feb-15 31+300 31+300 A2 Kerb Laying LHS 46 46 RAB 26
Road FEB15/HW/1006 21-Feb-15 31+490 31+490 A1 Kerb Laying LHS 97 97 RAB 26
Road FEB15/HW/1006 21-Feb-15 31+490 31+490 A2 Kerb Laying LHS 72 72 RAB 26
VUP OCT14/HW/483 14/Oct/14 13+000 13+000 RE Panel Casting LHS 10 A4 45% 2.25 10.125 RAB 22
VUP OCT14/HW/483 14/Oct/14 13+000 13+000 RE Panel Casting LHS 3 L4 45% 2.782 3.756 RAB 22
VUP OCT14/HW/483 14/Oct/14 13+000 13+000 RE Panel Casting LHS 3 Q6 45% 1.658 2.238 RAB 22
VUP OCT14/HW/677 18/Oct/14 13+000 13+000 RE Panel Casting LHS 10 A4 45% 2.25 10.125 RAB 22
VUP OCT14/HW/677 18/Oct/14 13+000 13+000 RE Panel Casting LHS 3 Q6 45% 2.782 3.756 RAB 22
VUP OCT14/HW/677 18/Oct/14 13+000 13+000 RE Panel Casting LHS 3 L4 45% 1.38 1.863 RAB 22
VUP OCT14/HW/837 22-Oct-14 13+000 13+000 RE Panel Casting LHS 10 A4 45% 2.25 10.125 RAB 22
VUP OCT14/HW/837 22-Oct-14 13+000 13+000 RE Panel Casting LHS 3 P6 45% 2.505 3.382 RAB 22
VUP OCT14/HW/837 22-Oct-14 13+000 13+000 RE Panel Casting LHS 3 K4 45% 1.38 1.863 RAB 22
VUP AUG14/HW/389 19/Aug/14 17+700 17+750 RE wall Erection Ist
Layer LHS 8 55% 2.25 9.900 RAB 20
VUP AUG14/HW/389 19/Aug/14 17+700 17+750 RE wall Erection Ist
Layer LHS 2 55% 2.782 3.060 RAB 20
VUP AUG14/HW/389 19/Aug/14 17+700 17+750 RE wall Erection Ist LHS 3 55% 2.505 4.133 RAB 20
Layer
RE wall Erection Ist
VUP AUG14/HW/389 19/Aug/14 17+700 17+750 Layer LHS 4 55% 2.22 4.884 RAB 20
RE wall Erection Ist
VUP AUG14/HW/389 19/Aug/14 17+700 17+750 Layer LHS 17 55% 1.125 10.519 RAB 20
RE wall Erection II
VUP AUG14/HW/593 26/Aug/14 17+700 17+750 layer LHS 2 L4 55% 1.658 1.824 RAB 21
VUP AUG14/HW/593 26/Aug/14 17+700 17+750 RE wall Erection II
layer LHS 3 I2 55% 0.817 1.348 RAB 21
VUP AUG14/HW/593 26/Aug/14 17+700 17+750 RE wall Erection II
layer LHS 2 M4 55% 1.943 2.137 RAB 21
VUP AUG14/HW/593 26/Aug/14 17+700 17+750 RE wall Erection II LHS 3 N4 55% 2.22 3.663 RAB 21
layer
RE wall Erection II
VUP AUG14/HW/593 26/Aug/14 17+700 17+750 layer LHS 3 J2 55% 1.095 1.807 RAB 21
RE wall Erection II
VUP AUG14/HW/593 26/Aug/14 17+700 17+750 layer LHS 2 P6 55% 2.505 2.756 RAB 21
RE wall Erection II
VUP AUG14/HW/593 26/Aug/14 17+700 17+750 layer LHS 2 K4 55% 1.38 1.518 RAB 21
VUP AUG14/HW/49 02/Aug/14 17+750 17+840 RE Panel Erection II
Layer LHS 30 55% 2.25 37.125 RAB 20
VUP AUG14/HW/497 23/Aug/14 17+750 17+840 RE wall Erection III layeLHS 28 55% 2.25 34.650 RAB 20
VUP AUG14/HW/497 23/Aug/14 17+750 17+840 RE wall Erection III layeLHS 2 55% 1.125 1.238 RAB 20
Re Panel V Layer
NOV14/HW/547 14/Nov/14 17+750 17+840 Errection LHS 5 A4 55% 2.25 6.188 RAB 23
Re Panel V Layer
NOV14/HW/547 14/Nov/14 17+750 17+840 Errection LHS 4 L4 55% 1.658 3.648 RAB 23
Re Panel V Layer
NOV14/HW/547 14/Nov/14 17+750 17+840 Errection LHS 3 M4 55% 1.943 3.206 RAB 23
NOV14/HW/547 14/Nov/14 17+750 17+840 Re Panel V Layer
Errection LHS 4 N4 55% 2.2 4.840 RAB 23
NOV14/HW/547 14/Nov/14 17+750 17+840 Re Panel V Layer LHS 4 P6 55% 2.505 5.511 RAB 23
Errection
Re Panel V Layer
NOV14/HW/547 14/Nov/14 17+750 17+840 Errection LHS 5 Q6 55% 2.782 7.651 RAB 23
Re Panel V Layer
NOV14/HW/547 14/Nov/14 17+750 17+840 Errection LHS 2 I2 55% 0.817 0.899 RAB 23
Re Panel V Layer
NOV14/HW/547 14/Nov/14 17+750 17+840 Errection LHS 3 J2 55% 1.095 1.807 RAB 23
RE Panel Errection VI
NOV14/HW/1093 26/Nov/14 17+750 17+840 layer LHS 4 I2 55% 0.817 1.797 RAB 24
NOV14/HW/1093 26/Nov/14 17+750 17+840 RE Panel Errection VI LHS
layer 4 J2 55% 1.095 2.409 RAB 24
NOV14/HW/1093 26/Nov/14 17+750 17+840 RE Panel Errection VI LHS 4 K4 55% 1.38 3.036 RAB 24
layer
RE Panel Errection VI
NOV14/HW/1093 26/Nov/14 17+750 17+840 layer LHS 4 L4 55% 1.658 3.648 RAB 24
VUP JULY14/HW/299 09/Jul/14 17+752 17+840 RE Panel Erection A4 LHS 30 55% 2.25 37.125 RAB 19
VUP JULY14/HW/299 09/Jul/14 17+752 17+840 RE Panel Erection B2 LHS 29 55% 1.125 17.944 RAB 19
VUP Sep14/STR/565 22/Sep/14 17+752 17+840 RE Panel Errection LHS 16 A4 55% 2.25 19.800 RAB 21
VUP Sep14/STR/565 22/Sep/14 17+752 17+840 RE Panel Errection LHS 6 Q6 55% 2.782 9.181 RAB 21
VUP Sep14/STR/565 22/Sep/14 17+752 17+840 RE Panel Errection LHS 1 P6 55% 2.505 1.378 RAB 21
VUP Sep14/STR/565 22/Sep/14 17+752 17+840 RE Panel Errection LHS 2 L4 55% 1.658 1.824 RAB 21
VUP Sep14/STR/565 22/Sep/14 17+752 17+840 RE Panel Errection LHS 3 M4 55% 1.943 3.206 RAB 21
VUP Sep14/STR/565 22/Sep/14 17+752 17+840 RE Panel Errection LHS 2 N4 55% 2.22 2.442 RAB 21
VUP JULY14/HW/300 09/Jul/14 17+840 17+960 RE Panel Erection A4 LHS 37 55% 2.25 45.788 RAB 19
VUP JULY14/HW/300 09/Jul/14 17+840 17+960 RE Panel Erection B2 LHS 38 55% 1.25 26.125 RAB 19
VUP JULY14/HW/300 09/Jul/14 17+840 17+960 RE Panel Erection A5 LHS 1 55% 2.25 1.238 RAB 19
VUP JULY14/HW/300 09/Jul/14 17+840 17+960 RE Panel Erection Al4 LHS 1 55% 2.1 1.155 RAB 19
RE Panel Erection 2nd
VUP JULY14/HW/349 11/Jul/14 17+840 17+960 Layer A4 LHS 76 55% 2.25 94.050 RAB 19
RE Panel Erection 2nd
VUP JULY14/HW/349 11/Jul/14 17+840 17+960 Layer AL4 LHS 1 55% 2.1 1.155 RAB 19
VUP JULY14/HW/598 20/Jul/14 17+840 17+960 RE Panel III Layer
Erection A4 LHS 76 55% 2.25 94.050 RAB 19
VUP AUG14/HW/390 19/Aug/14 17+840 17+960 RE wall Erection 5th LayLHS 36 55% 2.25 44.550 RAB 20
RE wall Erection 5th
VUP AUG14/HW/390 19/Aug/14 17+840 17+960 Layer LHS 1 55% 1.91 1.051 RAB 20
RE Panel 6th Layer
VUP SEP14/HW/245 10/Sep/14 17+840 17+960 Erection LHS 33 A4 55% 2.25 40.838 RAB 21
RE Panel Erection 4th
VUP JULY14/HW/978 31/Jul/14 17+840 17+960 Layer LHS 76 55% 2.25 94.050 RAB 20
RE Panel Erection 4th
VUP JULY14/HW/978 31/Jul/14 17+840 17+960 Layer LHS 1 55% 1.91 1.051 RAB 20
NOV14/HW/383 09/Nov/14 17+840 17+960 Re Panel Errection VII LHS
Layer 19 A4 55% 2.25 23.513 RAB 23
NOV14/HW/383 09/Nov/14 17+840 17+960 Re Panel Errection VII LHS 1 Al4 55% 1.91 1.051 RAB 23
Layer
Re Panel Errection VII
NOV14/HW/383 09/Nov/14 17+840 17+960 Layer LHS 5 Q6 55% 2.782 7.651 RAB 23
Re Panel Errection VII
NOV14/HW/383 09/Nov/14 17+840 17+960 Layer LHS 6 P6 55% 2.505 8.267 RAB 23
VUP MAR14/HW/1128 28-Mar-14 17+969 17+969 A4-RE Panel LHS 5 45% 2.250 5.063 RAB 16
VUP MAR14/HW/1129 28-Mar-14 17+969 17+969 M4-RE Panel LHS 2 45% 1.943 1.749 RAB 16
VUP MAR14/HW/1130 28-Mar-14 17+969 17+969 P6-RE Panel LHS 1 45% 2.505 1.127 RAB 16
VUP MAR14/HW/1131 28-Mar-14 17+969 17+969 B2-RE Panel LHS 4 45% 1.125 2.025 RAB 16
VUP MAR14/HW/1132 28-Mar-14 17+969 17+969 I2-RE Panel LHS 2 45% 0.817 0.735 RAB 16
VUP MAR14/HW/1133 28-Mar-14 17+969 17+969 K4-RE Panel LHS 1 45% 1.380 0.621 RAB 16
VUP MAR14/HW/1215 30-Mar-14 17+969 17+969 A4-RE Panel LHS 5 45% 2.250 5.063 RAB 16
FEB15/HW/668 14-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/668 14-Feb-15 13+000 13+000 RE Panel Casting 3 Q6 45% 2.782 3.756 RAB 26
FEB15/HW/744 16-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/744 16-Feb-15 13+000 13+000 RE Panel Casting 3 Q6 45% 2.782 3.756 RAB 26
FEB15/HW/870 18-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/870 18-Feb-15 13+000 13+000 RE Panel Casting 3 Q6 45% 2.782 3.756 RAB 26
FEB15/HW/911 19-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/911 19-Feb-15 13+000 13+000 RE Panel Casting 3 I2 45% 0.817 1.103 RAB 26
FEB15/HW/911 19-Feb-15 13+000 13+000 RE Panel Casting 2 B2 45% 1.125 1.013 RAB 26
FEB15/HW/979 20-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/979 20-Feb-15 13+000 13+000 RE Panel Casting 3 I2 45% 0.817 1.103 RAB 26
FEB15/HW/979 20-Feb-15 13+000 13+000 RE Panel Casting 2 B2 45% 1.125 1.013 RAB 26
FEB15/HW/1071 22-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/1071 22-Feb-15 13+000 13+000 RE Panel Casting 3 I2 45% 0.817 1.103 RAB 26
FEB15/HW/1071 22-Feb-15 13+000 13+000 RE Panel Casting 2 B2 45% 1.125 1.013 RAB 26
FEB15/HW/1167 23-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/1167 23-Feb-15 13+000 13+000 RE Panel Casting 3 I2 45% 0.817 1.103 RAB 26
FEB15/HW/1167 23-Feb-15 13+000 13+000 RE Panel Casting 2 B2 45% 1.125 1.013 RAB 26
FEB15/HW/1217 24-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/1217 24-Feb-15 13+000 13+000 RE Panel Casting 3 I2 45% 0.817 1.103 RAB 26
FEB15/HW/1217 24-Feb-15 13+000 13+000 RE Panel Casting 2 B2 45% 1.125 1.013 RAB 26
FEB15/HW/1308 25-Feb-15 13+000 13+000 RE Panel Casting 3 K4 45% 1.38 1.863 RAB 26
FEB15/HW/1308 25-Feb-15 13+000 13+000 RE Panel Casting 3 I2 45% 0.817 1.103 RAB 26
FEB15/HW/1308 25-Feb-15 13+000 13+000 RE Panel Casting 2 B2 45% 1.125 1.013 RAB 26
FEB15/HW/667 14-Feb-15 13+000 13+000 Friction Slab Casting 2 1.6 1 45% 1.44 RAB 26
FEB15/HW/811 17-Feb-15 13+000 13+000 Friction Slab Casting 2 1.6 1 45% 1.44 RAB 26
MNB FEB15/STR/535 30-Dec-13 35+825 35+825 Curtain wall Excavation Span I LHS 1 15.528 1.850 1.150 33.04 RAB 26
MNB DEC13/STR/2383 30-Dec-13 31490 31490 Structure Excavation RHS 1 13.370 20.353 6.471 1,760.89 RAB 26
MNB DEC13/STR/2383 30-Dec-13 31490 31490 Deduction of PQC & DLC RHS -1 13.370 8.500 0.450 (51.14) RAB 26
MJB FEB15/STR/432 18-Feb-15 3002 3002 A1 Return wall LHS 1 8.678 6.250 0.150 8.136 RAB 26
MNB FEB15/STR/448 19-Feb-15 3200 3200 A1 A2 Approach Slab LHS 2 13.350 3.200 0.150 12.816 RAB 26
MNB FEB15/STR/562 24-Feb-15 20931 20931 A1 Toe Wall PCC LHS 1 10.078 0.975 0.150 1.474 RAB 26
MNB FEB15/STR/562 24-Feb-15 20931 20931 A2 Toe Wall PCC LHS 1 10.078 0.975 0.150 1.474 RAB 26
MNB FEB15/STR/490 20-Feb-15 21510 21510 A1 A2 Approach Slab LHS 2 13.350 3.200 0.150 12.816 RAB 26
MNB FEB15/STR/440 18-Feb-15 24400 24400 A1 Approach Slab LHS 1 13.350 3.200 0.150 6.408 RAB 26
MNB FEB15/STR/493 20-Feb-15 24460 24460 A2 Approach Slab LHS 1 13.350 3.200 0.150 6.408 RAB 26
MNB FEB15/STR/352 14-Feb-15 31490 31+490 A2 Approach Slab LHS 1 13.350 3.200 0.150 RFI REQ. RAB 26
MNB FEB15/STR/396 16-Feb-15 31490 31490 A2 Approach Slab LHS 1 13.350 3.200 0.150 6.408 RAB 26
MNB FEB15/STR/423 17-Feb-15 31490 31490 A1 Approach Slab LHS 1 13.350 3.200 0.150 6.408 RAB 26
MNB FEB15/STR/357 14-Feb-15 35825 35+825 A1 A2 Approach Slab LHS 2 13.350 3.200 0.150 12.816 RAB 26
MNB FEB15/Str/582 25-Feb-15 22300 22300 Curtain wall III lift LHS 1 28.025 0.450 0.200 2.522 RAB 26
MNB FEB15/Str/529 22-Feb-15 22388 22388 Curtain wall I lift LHS 1 24.733 1.650 0.550 22.445 RAB 26
MNB FEB15/Str/579 25-Feb-15 24460 24460 Curtain wall II lift LHS 1 44.980 0.450 0.750 15.181 RAB 26
MNB FEB15/Str/568 24-Feb-15 35825 35825 Curtain wall I lift LHS 1 15.528 1.650 0.550 14.092 RAB 26
MNB FEB15/Str/538 22-Feb-15 40045 40045 Curtain wall I lift LHS 1 10.427 1.650 0.550 9.463 RAB 26
MNB FEB15/Str/552 23-Feb-15 40045 40045 Curtain wall II lift LHS 1 10.427 0.750 0.750 5.865 RAB 26
MNB FEB15/Str/586 24-Feb-15 40045 40045 Curtain wall II lift LHS 1 10.427 0.450 0.750 3.519 RAB 26
MNB FEB15/Str/581 25-Feb-15 22388 22388 Curtain wall II lift RHS 1 24.733 0.750 0.750 13.912 RAB 26
MNB FEB15/Str/364 15-Feb-15 30165 30165 Curtain wall II lift RHS 1 61.808 0.750 0.750 34.767 RAB 26
MNB JUNE14/STR/988 22-May-14 14600 14600 A1 A2 Toe Wall Raft RHS 2 12.835 0.875 0.350 7.861 RAB 18
MNB Jun14/STR/962 21-May-14 14800 14800 A1 A2 Toe Wall Raft RHS 2 13.108 0.875 0.350 8.029 RAB 18
MNB JUNE14/STR/1031 23-May-14 15465 15465 A1 A2 Toe Wall Raft RHS 1 16.942 0.875 0.350 5.188 RAB 18
BC Nov14/Str/1046 27-Nov-14 16770 16770 Toe Wall Raft LHS 1 9.600 0.875 0.350 2.94 RAB 24
BC Nov14/Str/1123 30-Nov-14 16770 16770 A1 side Toe wall LHS 1 9.826 0.875 0.350 3.01 RAB 24
MNB MAY14/STR/601 13-May-14 38200 38200 Toe Wall Raft LHS 2 7.895 0.875 0.350 4.836 RAB 17
MNB MAY14/STR/862 17-May-14 38200 38200 Toe Wall Raft RHS 2 8.383 0.875 0.350 5.135 RAB 17
MNB MAY14/STR/863 17-May-14 39020 39020 A1 A2 Toe Wall Raft RHS 2 8.326 0.875 0.350 5.100 RAB 17
MNB JUNE14/STR/520 10-Jul-14 40045 40045 A1 A2 Toe Wall Raft RHS 2 10.278 0.875 0.350 6.295 RAB 19
MNB MAY14/STR/870 17-May-14 44120 44120 Toe Wall Raft LHS 2 9.611 0.875 0.350 5.887 RAB 17
MNB JUNE14/STR/990 22-May-14 44914 44914 A1 A2 Toe Wall Raft RHS 2 9.578 0.875 0.350 5.867 RAB 18
MNB JAN15/STR/537 22-Feb-15 44+914 44+914 A1 A2 Toe Wall I lift LHS 2 9.645 0.875 0.350 5.908 RAB 26
MNB JAN15/STR/553 23-Feb-15 44+914 44+914 A2 Toe Wall II lift LHS 1 9.645 0.350 0.900 3.038 RAB 26
MJB FEB15/str/342 14-Feb-15 3+002 3+002 A2 Ret Wall Raft LHS 1 7.574 6.050 0.250 11.456 RAB 26
MJB FEB15/str/342 14-Feb-15 3+002 3+002 A2 Ret Wall Raft LHS 0.5 7.574 2.550 0.750 7.243 RAB 26
MJB FEB15/str/342 14-Feb-15 3+002 3+002 A2 Ret Wall Raft LHS 0.5 7.574 2.700 0.450 4.601 RAB 26
MJB FEB15/str/342 14-Feb-15 3+002 3+002 A2 Ret Wall Raft LHS 1 7.574 0.800 0.750 4.544 RAB 26
MJB DEC14/Str/571 23-Dec-14 03+433 03+433 A1 Ret Wall Raft LHS 1 7.231 5.250 0.250 9.491 RAB 26
MJB DEC14/Str/571 23-Dec-14 03+433 03+433 A1 Ret Wall Raft LHS 0.5 7.231 2.000 0.550 3.977 RAB 26
MJB DEC14/Str/571 23-Dec-14 03+433 03+433 A1 Ret Wall Raft LHS 0.5 7.231 2.500 0.350 3.164 RAB 26
MJB DEC14/Str/571 23-Dec-14 03+433 03+433 A1 Ret Wall Raft LHS 1 7.231 0.750 0.550 2.983 RAB 26
MJB DEC14/Str/571 23-Dec-14 03+433 03+433 A2 Ret Wall Raft LHS 1 8.244 5.250 0.250 10.820 RAB 26
MJB DEC14/Str/571 23-Dec-14 03+433 03+433 A2 Ret Wall Raft LHS 0.5 8.244 2.000 0.550 4.534 RAB 26
MJB DEC14/Str/571 23-Dec-14 03+433 03+433 A2 Ret Wall Raft LHS 0.5 8.244 2.500 0.350 3.607 RAB 26
MJB DEC14/Str/571 23-Dec-14 03+433 03+433 A2 Ret Wall Raft LHS 1 8.244 0.750 0.550 3.401 RAB 26
MNB Nov14/Str/963 25-Nov-14 2130 2130 Raft LHS 1 17.250 22.000 0.400 151.800 RAB 23
MNB Nov14/Str/963 25-Nov-14 2130 2130 Shear Key LHS 1 22.000 0.700 0.800 12.320 RAB 23
MNB Sep14/Str/880 25-Sep-14 3927 3927 Raft LHS 1 15.500 38.200 0.400 236.840 RAB 21
MNB Sep14/Str/880 25-Sep-14 3927 3927 Shear Key LHS 1 38.200 0.700 0.800 21.392 RAB 21
MNB May14/str/1238 23-Mar-14 6750 6750 Raft LHS 1 32.800 17.250 0.400 226.320 RAB 15
MNB May14/str/1238 23-Mar-14 6750 6750 Shear Key LHS 1 32.800 0.700 0.800 18.368 RAB 15
MNB MAY14/Str/424 10-May-14 14600 14600 Raft Concrete LHS 1 38.200 15.500 0.400 236.840 RAB 17
MNB MAY14/Str/424 10-May-14 14600 14600 Shear Key LHS 1 38.200 0.700 0.800 21.392 RAB 17
MNB APR'14/STR/1371 29-Apr-14 14800 14800 Raft RCC LHS 1 38.200 15.500 0.400 236.840 RAB 17
MNB APR'14/STR/1371 29-Apr-14 14800 14800 Shear Key LHS 1 38.200 0.700 0.800 21.392 RAB 17
MNB May14/str/1326 24-Mar-14 15465 15465 Raft Span II LHS 1 26.400 19.550 0.450 232.254 RAB 15
MNB May14/str/1326 24-Mar-14 15465 15465 Shear Key LHS 1 26.400 0.675 0.750 13.365 RAB 15
MNB May14/str/1384 25-Mar-14 15465 15465 Raft Span I LHS 1 32.900 19.550 0.450 289.438 RAB 15
MNB May14/str/1384 25-Mar-14 15465 15465 Shear Key LHS 1 32.900 0.675 0.750 16.656 RAB 15
MNB May14/str/719 13-Mar-14 16185 16237 Raft LHS 1 38.200 16.000 0.400 244.480 RAB 15
MNB May14/str/719 13-Mar-14 16185 16237 Shear Key LHS 1 38.200 0.700 0.800 21.392 RAB 15
VUP NOV13/STR/70 4-Nov-13 17969 17969 Span I Raft LHS 1 11.900 13.750 0.800 130.900 RAB 11
VUP NOV13/STR/70 4-Nov-13 17969 17969 Shear Key LHS 1 11.900 0.500 0.400 2.380 RAB 11
MNB FEB14/STR/818 15-Feb-14 19070 19145 Raft LHS 1 38.200 17.250 0.400 263.580 RAB 14
MNB FEB14/STR/818 15-Feb-14 19070 19145 Shear Key LHS 1 38.200 0.700 0.800 21.392 RAB 14
MNB APR'14/STR/1379 29-Apr-14 20931 20931 Raft RCC LHS 1 32.800 15.500 0.400 203.360 RAB 17
MNB APR'14/STR/1379 29-Apr-14 20931 20931 Shear Key LHS 1 32.800 0.700 0.800 18.368 RAB 17
MNB May14/str/672 12-Mar-14 21401 21401 Raft LHS 1 27.400 17.250 0.400 189.060 RAB 15
MNB May14/str/672 12-Mar-14 21401 21401 Shear Key LHS 1 27.400 0.700 0.800 15.344 RAB 15
MNB May14/str/940 18-Mar-14 21500 21975 Raft LHS 1 28.150 15.500 0.400 174.530 RAB 15
MNB May14/str/940 18-Mar-14 21500 21975 Shear Key LHS 1 28.150 0.700 0.800 15.764 RAB 15
MNB May14/str/1197 22-Mar-14 21500 21975 Raft LHS 1 28.150 15.500 0.400 174.530 RAB 15
MNB May14/str/1197 22-Mar-14 21500 21975 Shear Key LHS 1 28.150 0.700 0.800 15.764 RAB 15
MNB JUL14/STR/930 19-Jul-14 22300 22300 Raft S-II LHS 1 17.250 28.150 0.400 194.235 RAB 19
MNB JUL14/STR/930 19-Jul-14 22300 22300 Shear Key LHS 1 28.150 0.700 0.800 15.764 RAB 19
MNB AUG14/STR/675 24-Aug-14 22300 22300 Raft Span I LHS 1 17.250 28.150 0.400 194.235 RAB 20
MNB AUG14/STR/675 24-Aug-14 22300 22300 Shear Key LHS 1 28.150 0.700 0.800 15.764 RAB 20
MNB JUN14/STR/371 10-Jun-14 22388 22388 Raft LHS 1 22.000 17.250 0.4 151.800 RAB 18
MNB JUN14/STR/371 10-Jun-14 22388 22388 Shear Key LHS 1 22.000 0.700 0.8 12.320 RAB 18
MNB NOV14/STR/945 24-Nov-14 23039 23039 Raft LHS 1 15.500 43.600 0.400 270.320 RAB 23
MNB NOV14/STR/945 24-Nov-14 23039 23039 Shear Key LHS 1 43.600 0.700 0.800 24.416 RAB 23
MNB AUG14/STR/704 25-Aug-14 24065 24065 Raft LHS 1 15.500 37.000 0.500 286.750 RAB 20
MNB AUG14/STR/704 25-Aug-14 24065 24065 Raft LHS 1 37.000 0.650 0.700 16.835 RAB 20
MNB NOV14/STR/922 23-Nov-14 24065 24065 Raft LHS 1 16.000 43.600 0.400 279.040 RAB 23
MNB NOV14/STR/922 23-Nov-14 24065 24065 Raft LHS 1 43.600 0.700 0.800 24.416 RAB 23
MNB AUG14/STR/654 23-Aug-14 30165 30165 Raft LHS 1 16.000 27.400 0.400 175.360 RAB 20
MNB AUG14/STR/654 23-Aug-14 30165 30165 Shear Key LHS 1 27.400 0.700 0.800 15.344 RAB 20
MNB Sep14/Str/492 13-Sep-14 30165 30165 Raft LHS 1 16.000 27.400 0.400 175.360 RAB 21
MNB Sep14/Str/492 13-Sep-14 30165 30165 Shear Key LHS 1 27.400 0.800 0.700 15.344 RAB 21
MNB JUN14/STR/847 19-Jun-14 30355 30355 Raft S-I LHS 1 15.500 28.150 0.4 174.530 RAB 18
MNB JUN14/STR/847 19-Jun-14 30355 30355 Shear Key LHS 1 28.150 0.700 0.8 15.764 RAB 18
MNB JUL14/STR/1139 25-Jul-14 30355 30355 Raft S-II LHS 1 15.500 28.150 0.400 174.530 RAB 19
MNB JUL14/STR/1139 25-Jul-14 30355 30355 Shear Key LHS 1 28.150 0.700 0.800 15.764 RAB 19
MNB MAY14/Str/590 13-May-14 31305 31305 Raft Concrete LHS 1 11.200 16.750 0.400 75.040 RAB 17
MNB MAY14/Str/590 13-May-14 31305 31305 Shear Key LHS 1 11.200 0.700 0.800 6.272 RAB 17
MNB Sep14/Str/762 22-Sep-14 31490 31490 Raft LHS 1 16.000 13.350 0.450 96.120 RAB 21
MNB Sep14/Str/762 22-Sep-14 31490 31490 Shear Key LHS 1 13.350 0.675 0.750 6.758 RAB 21
MNB May14/str/1403 25-Mar-14 38200 38200 Raft LHS 1 16.600 16.200 0.400 107.568 RAB 15
MNB May14/str/1403 25-Mar-14 38200 38200 Shear Key LHS 1 16.600 0.800 0.700 9.296 RAB 15
MNB May14/str/866 15-Mar-14 41987 41987 Raft LHS 1 22.000 16.000 0.400 140.800 RAB 15
MNB May14/str/866 15-Mar-14 41987 41987 Shear Key LHS 1 22.000 0.700 0.800 12.320 RAB 15
MNB FEB14/STR/262 5-Feb-14 43700 43700 Raft LHS 1 15.500 22.000 0.400 136.400 RAB 14
MNB FEB14/STR/262 5-Feb-14 43700 43700 Shear Key LHS 1 0.700 22.000 0.800 12.320 RAB 14
MNB FEB14/STR/209 4-Feb-14 44120 44120 Raft LHS 1 16.000 22.000 0.400 140.800 RAB 14
MNB FEB14/STR/209 4-Feb-14 44120 44120 Shear Key LHS 1 0.700 22.000 0.800 12.320 RAB 14
MNB FEB14/STR/1367 24-Feb-14 44914 44914 Raft Span II LHS 1 32.800 16.000 0.400 209.920 RAB 15
MNB FEB14/STR/1367 24-Feb-14 44914 44914 Shear Key LHS 1 32.800 0.700 0.8 18.368 RAB 15
MNB FEB14/STR/1365 24-Feb-14 44914 44914 Raft Span I LHS 1 27.400 16.000 0.400 175.360 RAB 15
MNB FEB14/STR/1365 24-Feb-14 44914 44914 Shear Key LHS 1 27.400 0.700 0.8 15.344 RAB 15
MJB JUN14/STR/78 03-Jun-14 03+002 03+002 LP1 PILE CAP LHS 1 10.300 4.300 1.500 66.435 RAB 18
MJB JUN14/STR/78 03-Jun-14 03+002 03+002 Deduction LHS -8 3.140 0.250 0.050 (0.314) RAB 18
MJB JUN14/STR/203 05-Jun-14 03+002 03+002 LP2 Pile Cap LHS 1 10.300 4.300 1.500 66.435 RAB 18
MJB JUN14/STR/203 05-Jun-14 03+002 03+002 Deduction LHS -8 3.140 0.250 0.050 (0.314) RAB 18
MJB JUN14/STR/303 09-Jun-14 03+002 03+002 LA2 Pile Cap LHS 1 13.750 7.300 1.500 150.563 RAB 18
MJB JUN14/STR/303 09-Jun-14 03+002 03+002 Deduction LHS -12 3.140 0.250 0.050 (0.471) RAB 18
MJB Aug14/STR/331 12-Aug-14 03+433 03+433 LP4 Pile Cap LHS 2 6.825 3.475 1.500 71.151 RAB 20
MJB Aug14/STR/331 12-Aug-14 03+433 03+433 LP4 Pile Cap LHS 1 3.350 10.300 1.500 51.758 RAB 20
MJB Aug14/STR/331 12-Aug-14 03+433 03+433 LP4 Pile Cap LHS -12 3.140 0.250 0.050 (0.471) RAB 20
MJB Aug14/STR/574 12-Aug-14 03+433 03+433 LP7 Pile Cap LHS 2 6.825 3.475 1.500 71.151 RAB 20
MJB Aug14/STR/574 12-Aug-14 03+433 03+433 LP7 Pile Cap LHS 1 3.350 10.300 1.500 51.758 RAB 20
MJB Aug14/STR/574 12-Aug-14 03+433 03+433 LP7 Pile Cap LHS -12 3.140 0.250 0.050 (0.471) RAB 20
MJB Aug14/STR/669 24-Aug-14 03+433 03+433 LP5 Pile Cap LHS 2 6.825 3.475 1.500 71.151 RAB 20
MJB Aug14/STR/669 24-Aug-14 03+433 03+433 LP5 Pile Cap LHS 1 3.350 10.300 1.500 51.758 RAB 20
MJB Aug14/STR/669 24-Aug-14 03+433 03+433 LP5 Pile Cap LHS -12 3.140 0.250 0.050 (0.471) RAB 20
MJB Aug14/STR/636 23-Aug-14 03+433 03+433 LP1 Pile Cap LHS 2 6.825 3.475 1.500 71.151 RAB 20
MJB Aug14/STR/636 23-Aug-14 03+433 03+433 LP1 Pile Cap LHS 1 3.350 10.300 1.500 51.758 RAB 20
MJB Aug14/STR/636 23-Aug-14 03+433 03+433 LP1 Pile Cap LHS -12 3.140 0.250 0.050 (0.471) RAB 20
MJB Aug14/STR/691 23-Aug-14 03+433 03+433 LP8 Pile Cap LHS 2 6.825 3.475 1.500 71.151 RAB 20
MJB Aug14/STR/691 23-Aug-14 03+433 03+433 LP8 Pile Cap LHS 1 3.350 10.300 1.500 51.758 RAB 20
MJB Aug14/STR/691 23-Aug-14 03+433 03+433 LP8 Pile Cap LHS -12 3.140 0.250 0.050 (0.471) RAB 20
MJB Sep14/Str/06 1-Sep-14 03+433 03+433 LP2 Pile Cap LHS 2 6.825 3.475 1.500 71.151 RAB 21
MJB Sep14/Str/06 1-Sep-14 03+433 03+433 LP2 Pile Cap LHS 1 3.350 10.300 1.500 51.758 RAB 21
MJB Sep14/Str/06 1-Sep-14 03+433 03+433 LP2 Pile Cap LHS -12 3.140 0.250 0.050 (0.471) RAB 21
MJB Sep14/Str/240 8-Sep-14 03+433 03+433 LP6 Pile Cap LHS 2 6.825 3.475 1.500 71.151 RAB 21
MJB Sep14/Str/240 8-Sep-14 03+433 03+433 LP6 Pile Cap LHS 1 3.350 10.300 1.500 51.758 RAB 21
MJB Sep14/Str/240 8-Sep-14 03+433 03+433 LP6 Pile Cap LHS -12 3.140 0.250 0.050 (0.471) RAB 21
MJB Sep14/Str/593 18-Sep-14 03+433 03+433 LP3 Pile Cap LHS 2 6.825 3.475 1.500 71.151 RAB 21
MJB Sep14/Str/593 18-Sep-14 03+433 03+433 LP3 Pile Cap LHS 1 3.350 10.300 1.500 51.758 RAB 21
MJB Sep14/Str/593 18-Sep-14 03+433 03+433 LP3 Pile Cap LHS -12 3.140 0.250 0.050 (0.471) RAB 21
LA1 Abt Pile
MJB Sep14/Str/644 18-Sep-14 03+433 03+433 Cap LHS 1 13.750 7.300 1.500 150.563 RAB 21
MJB OCT14/STR/169 8-Oct-14 03+433 03+433 LA2 Pile Cap LHS 1 13.750 7.300 1.500 150.563 RAB 22
MJB APR14/STR/988 21-Apr-14 04+895 04+960 LP 4 Pile Cap LHS 1 3.350 4.300 1.500 21.608 RAB 16
MJB APR14/STR/988 21-Apr-14 04+895 04+960 LP 4 Pile Cap LHS 2 3.475 2.650 1.500 27.626 RAB 16
MJB APR14/STR/988 21-Apr-14 04+895 04+960 LP 4 Pile Cap LHS -6 0.785 0.050 (0.236) RAB 16
MJB APR14/STR/1193 25-Apr-14 04+895 04+960 LP 2 Pile Cap LHS 1 3.350 4.300 1.500 21.608 RAB 16
MJB APR14/STR/1193 25-Apr-14 04+895 04+960 LP 2 Pile Cap LHS 2 3.475 2.650 1.500 27.626 RAB 16
MJB APR14/STR/1193 25-Apr-14 04+895 04+960 LP 2 Pile Cap LHS -6 0.785 0.050 (0.236) RAB 16
MJB APR14/STR/1131 24-Apr-14 04+895 04+960 LP 3 Pile Cap LHS 1 3.350 4.300 1.500 21.608 RAB 16
MJB APR14/STR/1131 24-Apr-14 04+895 04+960 LP 3 Pile Cap LHS 2 3.475 2.650 1.500 27.626 RAB 16
MJB APR14/STR/1131 24-Apr-14 04+895 04+960 LP 3 Pile Cap LHS -6 0.785 0.050 (0.236) RAB 16
MJB APR14/STR/1081 23-Apr-14 04+895 04+960 LP 5 Pile Cap LHS 1 3.350 4.300 1.500 21.608 RAB 16
MJB APR14/STR/1081 23-Apr-14 04+895 04+960 LP 5 Pile Cap LHS 2 3.475 2.650 1.500 27.626 RAB 16
MJB APR14/STR/1081 23-Apr-14 04+895 04+960 LP 5 Pile Cap LHS -6 0.785 0.050 (0.236) RAB 16
MJB APR14/STR/1083 23-Apr-14 04+895 04+960 LP 6 Pile Cap LHS 1 3.350 4.300 1.500 21.608 RAB 16
MJB APR14/STR/1083 23-Apr-14 04+895 04+960 LP 6 Pile Cap LHS 2 3.475 2.650 1.500 27.626 RAB 16
MJB APR14/STR/1083 23-Apr-14 04+895 04+960 LP 6 Pile Cap LHS -6 0.785 0.050 (0.236) RAB 16
MJB APR14/STR/1407 30-Apr-14 04+895 04+960 LP 7 Pile Cap LHS 1 3.350 4.300 1.500 21.608 RAB 17
MJB APR14/STR/1407 30-Apr-14 04+895 04+960 LP 7 Pile Cap LHS 2 3.475 2.650 1.500 27.626 RAB 17
MJB APR14/STR/1407 30-Apr-14 04+895 04+960 LP 7 Pile Cap LHS -6 0.785 0.050 (0.236) RAB 17
MJB APR14/STR/1409 30-Apr-14 04+895 04+960 LP 8 Pile Cap LHS 1 3.350 4.300 1.500 21.608 RAB 17
MJB APR14/STR/1409 30-Apr-14 04+895 04+960 LP 8 Pile Cap LHS 2 3.475 2.650 1.500 27.626 RAB 17
MJB APR14/STR/1409 30-Apr-14 04+895 04+960 LP 8 Pile Cap LHS -6 0.785 0.050 (0.236) RAB 17
MJB APR14/STR/1258 26-Apr-14 04+895 04+960 LP 1 Pile Cap LHS 1 3.350 4.300 1.500 21.608 RAB 17
MJB APR14/STR/1258 26-Apr-14 04+895 04+960 LP 1 Pile Cap LHS 2 3.475 2.650 1.500 27.626 RAB 17
MJB APR14/STR/1258 26-Apr-14 04+895 04+960 LP 1 Pile Cap LHS -6 0.785 0.050 (0.236) RAB 17
MJB MAY14/STR/246 07-May-14 04+895 04+960 LA1 Pile Cap LHS 1 13.750 7.300 1.500 150.563 RAB 17
MJB MAY14/STR/246 07-May-14 04+895 04+960 LA1 Pile Cap LHS -12 0.785 0.050 (0.471) RAB 17
MJB MAY14/STR/345 09-Apr-14 04+895 04+960 LA2 Pile Cap LHS 1 13.750 7.300 1.500 150.563 RAB 17
MJB MAY14/STR/345 09-Apr-14 04+895 04+960 LA2 Pile Cap LHS -12 0.785 0.050 (0.471) RAB 17
MJB NOV13/STR/937 26-Nov-13 03+002 02+960 RA2 Pile Cap RHS 1 13.750 7.300 1.500 150.563 RAB 11
MJB NOV13/STR/937 26-Nov-13 03+002 02+960 RA2 Pile Cap RHS -12 0.785 0.050 (0.471) RAB 11
MJB DEC13/STR/234 6-Dec-13 03+002 02+960 RA1 Pile Cap RHS 1 13.750 7.300 1.500 150.563 RAB 12
MJB DEC13/STR/234 6-Dec-13 03+002 02+960 RA1 Pile Cap RHS -12 0.785 0.050 (0.471) RAB 12
MJB FEB15/STR/507 21-Feb-2015 3+002 3+002 A2 Ret Wall I lift LHS 1 7.575 0.711 2.400 12.926 RAB 26
MJB DEC14/Str/448 20-Dec-14 3002 3002 LA2 Abt cap LHS 1 13.750 1.375 0.500 9.453 RAB 26
MJB FEB15/Str/414 17-Feb-15 3002 3002 Dirt wall LHS 1 13.750 1.997 0.300 8.238 RAB 26
MJB FEB15/Str/414 17-Feb-15 3002 3002 Dirt wall Bracket LHS 1 13.250 0.450 0.300 1.789 RAB 26
MJB FEB15/Str/414 17-Feb-15 3002 3002 Return wall LHS 2 2.750 1.997 0.300 3.295 RAB 26
MJB FEB15/Str/414 17-Feb-15 3002 3002 haunch LHS 2 1.497 0.500 0.023 0.034 RAB 26
MNB FEB15/Str/561 23-Feb-15 14+600 14+600 A2 RT wall IV lift LHS 1 8.868 0.424 1.200 4.512 RAB 26
MNB FEB15/Str/548 23-Feb-15 14+655 14+655 A1 RT wall IV lift LHS 1 8.905 0.425 1.200 RFI REQ. RAB 26
MNB FEB15/Str/559 23-Feb-15 14+800 14+800 A1 RT wall IV lift LHS 1 8.944 0.427 1.200 4.583 RAB 26
MNB Nov13/Str/746 19-Nov-13 16754 16754 A1RT Wall I lift LHS 1 6.202 0.472 1.200 3.513 RAB 26
MNB Feb15/STR/362 15-Feb-15 22388 22388 A1&A2 Wall final lift LHS 2 17.25 1.414 0.400 19.513 RAB 26
MNB Feb15/STR/362 15-Feb-15 22388 22388 Mid wall final lift LHS 3 13.75 5.014 0.400 82.731 RAB 26
MNB Feb15/STR/362 15-Feb-15 22388 22388 Haunch LHS 8 13.75 0.5 0.023 1.238 RAB 26
MNB JUN14/STR/97 2-Jan-00 21510 21510 Deck Slab LHS 1 28.150 13.750 0.400 154.825 RAB 26
MNB JUN14/STR/97 2-Jan-00 21510 21510 Bracket LHS 1 13.250 0.450 0.300 1.789 RAB 26
MNB FEB15/Str/406 16-Feb-15 22388 22388 Deck Slab LHS 1 13.750 22.000 0.400 121.000 RAB 26
MNB FEB15/Str/406 16-Feb-15 22388 22388 Bracket LHS 2 13.250 0.450 0.300 3.578 RAB 26
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-1 LHS 1 0.700 0.700 0.478 0.234 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-2 LHS 1 0.700 0.700 0.479 0.235 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-3 LHS 1 0.700 0.700 0.410 0.201 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-4 LHS 1 0.700 0.700 0.411 0.201 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-5 LHS 1 0.700 0.700 0.341 0.167 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-6 LHS 1 0.700 0.700 0.342 0.168 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-7 LHS 1 0.700 0.700 0.272 0.133 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-8 LHS 1 0.700 0.700 0.273 0.134 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-9 LHS 1 0.700 0.700 0.203 0.099 RAB 18
MJB JUN14/STR/816 19-Jun-14 3002 Pedestal LP1 Pedestal-10 LHS 1 0.700 0.700 0.204 0.100 RAB 18
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 1 LHS 1 0.700 0.700 0.205 0.100 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 2 LHS 1 0.700 0.700 0.203 0.099 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 3 LHS 1 0.700 0.700 0.273 0.134 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 4 LHS 1 0.700 0.700 0.271 0.133 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 5 LHS 1 0.700 0.700 0.342 0.168 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 6 LHS 1 0.700 0.700 0.340 0.167 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 7 LHS 1 0.700 0.700 0.411 0.201 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 8 LHS 1 0.700 0.700 0.409 0.200 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 9 LHS 1 0.700 0.700 0.480 0.235 RAB 19
MJB JUL14/STR/129 3-Jul-14 3002 Pedestal LP2 -Pedestal 10 LHS 1 0.700 0.700 0.478 0.234 RAB 19
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 1 LHS 2 0.700 0.700 0.478 0.468 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 2 LHS 2 0.700 0.700 0.479 0.469 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 3 LHS 2 0.700 0.700 0.410 0.402 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 4 LHS 2 0.700 0.700 0.411 0.403 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 5 LHS 2 0.700 0.700 0.341 0.334 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 6 LHS 2 0.700 0.700 0.342 0.335 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 7 LHS 2 0.700 0.700 0.272 0.267 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 8 LHS 2 0.700 0.700 0.273 0.268 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 9 LHS 2 0.700 0.700 0.203 0.199 RAB 24
MJB DEC14/Str/503 21-Dec-14 3002 3+002 Pedastal 10 LHS 2 0.700 0.700 0.204 0.200 RAB 24
MJB DEC14/Str/540 22-Dec-14 3002 3+002 Pedastal 1 LHS 1 0.700 0.700 0.482 0.236 RAB 24
MJB DEC14/Str/540 22-Dec-14 3002 3+002 Pedastal 2 LHS 1 0.700 0.700 0.413 0.202 RAB 24
MJB DEC14/Str/540 22-Dec-14 3002 3+002 Pedastal 3 LHS 1 0.700 0.700 0.344 0.169 RAB 24
MJB DEC14/Str/540 22-Dec-14 3002 3+002 Pedastal 4 LHS 1 0.700 0.700 0.276 0.135 RAB 24
MJB DEC14/Str/540 22-Dec-14 3002 3+002 Pedastal 5 LHS 1 0.700 0.700 0.207 0.101 RAB 24
MJB DEC14/Str/615 24-Dec-14 3002 3+002 Deck Slab LP1-LP2 LHS 1 20.000 13.750 0.200 55.000 RAB 24
MJB DEC14/Str/615 24-Dec-14 3002 3+002 Deck Slab LP1-LP2 LHS 4 1.230 1.040 0.300 1.535 RAB 24
MJB DEC14/Str/615 24-Dec-14 3002 3+002 Deck Slab LP1-LP2 LHS 4 1.050 1.040 0.150 0.655 RAB 24
MJB DEC14/Str/615 24-Dec-14 3002 3+002 Deck Slab LP1-LP2 LHS 8 0.450 2.080 0.300 2.246 RAB 24
MJB DEC14/Str/615 24-Dec-14 3002 3+002 Deck Slab LP1-LP2 LHS 10 0.300 0.670 0.300 0.603 RAB 24
MJB DEC14/Str/615 24-Dec-14 3002 3+002 Cross girder Casting LHS 8 2.080 1.100 0.300 5.491 RAB 24
MJB DEC14/Str/617 24-Dec-14 3002 3+002 Deck Slab LP2-LA2 LHS 1 20.000 13.750 0.200 55.000 RAB 24
MJB DEC14/Str/617 24-Dec-14 3002 3+002 Deck Slab LP2-LA2 LHS 4 1.230 1.040 0.300 1.535 RAB 24
MJB DEC14/Str/617 24-Dec-14 3002 3+002 Deck Slab LP2-LA2 LHS 4 1.050 1.040 0.150 0.655 RAB 24
MJB DEC14/Str/617 24-Dec-14 3002 3+002 Deck Slab LP2-LA2 LHS 8 0.450 2.080 0.300 2.246 RAB 24
MJB DEC14/Str/617 24-Dec-14 3002 3+002 Deck Slab LP2-LA2 LHS 10 0.300 0.670 0.300 0.603 RAB 24
MJB DEC14/Str/617 24-Dec-14 3002 3+002 Cross girder Casting LHS 8 2.080 1.100 0.300 5.491 RAB 24
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 1 LHS 1 0.700 0.700 0.475 0.233 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 2 LHS 1 0.700 0.700 0.483 0.237 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 3 LHS 1 0.700 0.700 0.406 0.199 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 4 LHS 1 0.700 0.700 0.414 0.203 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 5 LHS 1 0.700 0.700 0.338 0.166 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 6 LHS 1 0.700 0.700 0.345 0.169 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 7 LHS 1 0.700 0.700 0.269 0.132 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 8 LHS 1 0.700 0.700 0.277 0.136 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 9 LHS 1 0.700 0.700 0.200 0.098 RAB 22
MJB OCT14/STR/438 18-Oct-14 3433 PEDESTAL LP2 -Pedestal 10 LHS 1 0.700 0.700 0.208 0.102 RAB 22
MJB OCT14/STR/483 20-Oct-14 3433 Deck Slab LP1-LP2 Slab LHS 1 20.000 13.750 0.200 55.000 RAB 22
MJB OCT14/STR/483 20-Oct-14 3433 Deck Slab LP1-LP2 Slab LHS 4 1.230 1.040 0.300 1.535 RAB 22
MJB OCT14/STR/483 20-Oct-14 3433 Deck Slab LP1-LP2 Slab LHS 4 1.050 1.040 0.150 0.655 RAB 22
MJB OCT14/STR/483 20-Oct-14 3433 Deck Slab LP1-LP2 Slab LHS 8 0.450 2.080 0.300 2.246 RAB 22
MJB OCT14/STR/483 20-Oct-14 3433 Deck Slab LP1-LP2 Slab LHS 10 0.300 0.670 0.300 0.603 RAB 22
MJB OCT14/STR/483 20-Oct-14 3433 Deck Slab Cross Girder LHS 8 2.080 1.100 0.300 5.491 RAB 22
MJB OCT14/STR/522 21-Oct-14 3433 Deck Slab LP2-LP3 Slab LHS 1 20.000 13.750 0.200 55.000 RAB 22
MJB OCT14/STR/522 21-Oct-14 3433 Deck Slab LP2-LP3 Slab LHS 4 1.230 1.040 0.300 1.535 RAB 22
MJB OCT14/STR/522 21-Oct-14 3433 Deck Slab LP2-LP3 Slab LHS 4 1.050 1.040 0.150 0.655 RAB 22
MJB OCT14/STR/522 21-Oct-14 3433 Deck Slab LP2-LP3 Slab LHS 8 0.450 2.080 0.300 2.246 RAB 22
MJB OCT14/STR/522 21-Oct-14 3433 Deck Slab LP2-LP3 Slab LHS 10 0.300 0.670 0.300 0.603 RAB 22
MJB OCT14/STR/522 21-Oct-14 3433 Deck Slab Cross Girder LHS 8 2.080 1.100 0.300 5.491 RAB 22
MJB OCT14/STR/571 22-Oct-14 3433 Deck Slab LP3-LP4 Slab LHS 1 20.000 13.750 0.200 55.000 RAB 22
MJB OCT14/STR/571 22-Oct-14 3433 Deck Slab LP3-LP4 Slab LHS 4 1.230 1.040 0.300 1.535 RAB 22
MJB FEB14/Str/04 1-Feb-14 3002 Deck slab RA1-RP1 RHS 1 20.000 13.750 0.200 55.000 RAB 14
MJB FEB14/Str/04 1-Feb-14 3002 Deck slab RA1-RP1 RHS 4 1.230 1.040 0.300 1.535 RAB 14
MJB FEB14/Str/04 1-Feb-14 3002 Deck slab RA1-RP1 RHS 4 1.050 1.040 0.150 0.655 RAB 14
MJB FEB14/Str/04 1-Feb-14 3002 Deck slab RA1-RP1 RHS 8 0.450 2.080 0.300 2.246 RAB 14
MJB FEB14/Str/04 1-Feb-14 3002 Deck slab RA1-RP1 RHS 10 0.300 0.670 0.300 0.603 RAB 14
MJB FEB14/Str/269 6-Feb-14 3002 Deck slab RP1-RP2 RHS 1 20.000 13.750 0.200 55.000 RAB 14
MJB FEB14/Str/269 6-Feb-14 3002 Deck slab RP1-RP2 RHS 4 1.230 1.040 0.300 1.535 RAB 14
MJB FEB14/Str/269 6-Feb-14 3002 Deck slab RP1-RP2 RHS 4 1.050 1.040 0.150 0.655 RAB 14
MJB FEB14/Str/269 6-Feb-14 3002 Deck slab RP1-RP2 RHS 8 0.450 2.080 0.300 2.246 RAB 14
MJB FEB14/Str/269 6-Feb-14 3002 Deck slab RP1-RP2 RHS 10 0.300 0.670 0.300 0.603 RAB 14
MJB FEB14/Str/399 8-Feb-14 3002 Deck slab RP2-AR2 RHS 1 20.000 13.750 0.200 55.000 RAB 14
MJB FEB14/Str/399 8-Feb-14 3002 Deck slab RP2-AR2 RHS 4 1.230 1.040 0.300 1.535 RAB 14
MJB FEB14/Str/399 8-Feb-14 3002 Deck slab RP2-AR2 RHS 4 1.050 1.040 0.150 0.655 RAB 14
MJB FEB14/Str/399 8-Feb-14 3002 Deck slab RP2-AR2 RHS 8 0.450 2.080 0.300 2.246 RAB 14
MJB FEB14/Str/399 8-Feb-14 3002 Deck slab RP2-AR2 RHS 10 0.300 0.670 0.300 0.603 RAB 14
MJB JAN14/Str/1534 30-Jan-14 3002 Cross Girder RA1-RP1 RHS 8 2.080 1.100 0.300 5.491 RAB 14
MJB JAN14/Str/1344 27-Jan-14 3002 Cross Girder RA2-PR8 RHS 8 2.080 1.100 0.300 5.491 RAB 14
MJB FEB14/Str/135 3-Feb-14 3002 Cross Girder RP1-RP2 RHS 8 2.080 1.100 0.300 5.491 RAB 14
MJB FEB14/Str/271 6-Feb-14 3002 Cross Girder RA2-RP2 RHS 8 2.080 1.100 0.300 5.491 RAB 14
MJB JAN14/Str/1321 25-Jan-14 3002 Deck slab RA1-RP1 RHS 1 20.000 13.750 0.200 55.000 RAB 13
MJB JAN14/Str/1321 25-Jan-14 3002 Deck slab RA1-RP1 RHS 4 1.230 1.040 0.300 1.535 RAB 13
MJB JAN14/Str/1321 25-Jan-14 3002 Deck slab RA1-RP1 RHS 4 1.050 1.040 0.150 0.655 RAB 13
MJB JAN14/Str/1321 25-Jan-14 3002 Deck slab RA1-RP1 RHS 8 0.450 2.080 0.300 2.246 RAB 13
MJB JAN14/Str/1321 25-Jan-14 3002 Deck slab RA1-RP1 RHS 10 0.300 0.670 0.300 0.603 RAB 13
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 1 RHS 1 0.700 0.700 0.207 0.101 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 2 RHS 1 0.700 0.700 0.202 0.099 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 3 RHS 1 0.700 0.700 0.276 0.135 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 4 RHS 1 0.700 0.700 0.271 0.133 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 5 RHS 1 0.700 0.700 0.345 0.169 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 6 RHS 1 0.700 0.700 0.340 0.167 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 7 RHS 1 0.700 0.700 0.413 0.202 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 8 RHS 1 0.700 0.700 0.408 0.200 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 9 RHS 1 0.700 0.700 0.482 0.236 RAB 15
MJB MAR14/Str/279 6-Mar-14 3433 Pedestal RP6 -Pedestal 10 RHS 1 0.700 0.700 0.477 0.234 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 1 RHS 1 0.700 0.700 0.209 0.102 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 2 RHS 1 0.700 0.700 0.200 0.098 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 3 RHS 1 0.700 0.700 0.277 0.136 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 4 RHS 1 0.700 0.700 0.269 0.132 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 5 RHS 1 0.700 0.700 0.346 0.170 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 6 RHS 1 0.700 0.700 0.338 0.166 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 7 RHS 1 0.700 0.700 0.415 0.203 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 8 RHS 1 0.700 0.700 0.407 0.199 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 9 RHS 1 0.700 0.700 0.484 0.237 RAB 15
MJB MAR14/Str/220 5-Mar-14 3433 Pedestal RP7 -Pedestal 10 RHS 1 0.700 0.700 0.475 0.233 RAB 15
MJB MAR14/Str/767 14-Mar-14 3433 Pedestal RP1 -Pedestal 1 RHS 1 0.700 0.700 0.200 0.098 RAB 15
MJB MAR14/Str/767 14-Mar-14 3433 Pedestal RP1 -Pedestal 2 RHS 1 0.700 0.700 0.208 0.102 RAB 15
MJB MAR14/Str/767 14-Mar-14 3433 Pedestal RP1 -Pedestal 3 RHS 1 0.700 0.700 0.269 0.132 RAB 15
MJB MAR14/Str/767 14-Mar-14 3433 Pedestal RP1 -Pedestal 4 RHS 1 0.700 0.700 0.277 0.136 RAB 15
MJB JAN14/STR/1194 24-Jan-14 03+002 02+960 AR1 to RP1 -01 RHS 1 11.239 RAB 13
MJB JAN14/STR/1194 24-Jan-14 03+002 02+960 AR1 to RP1 -02 RHS 1 11.150 RAB 13
MJB JAN14/STR/1194 24-Jan-14 03+002 02+960 AR1 to RP1 -03 RHS 1 11.150 RAB 13
MJB JAN14/STR/1194 24-Jan-14 03+002 02+960 AR1 to RP1 -04 RHS 1 11.150 RAB 13
MJB JAN14/STR/1194 24-Jan-14 03+002 02+960 AR1 to RP1 -05 RHS 1 11.239 RAB 13
MJB JAN14/STR/1473 29-Jan-14 03+002 02+960 PR1 - PR2 -01 RHS 1 11.239 RAB 13
MJB JAN14/STR/1473 29-Jan-14 03+002 02+960 PR1 - PR2 -02 RHS 1 11.150 RAB 13
MJB JAN14/STR/1473 29-Jan-14 03+002 02+960 PR1 - PR2 -03 RHS 1 11.150 RAB 13
MJB JAN14/STR/1473 29-Jan-14 03+002 02+960 PR1 - PR2 -04 RHS 1 11.150 RAB 13
MJB JAN14/STR/1473 29-Jan-14 03+002 02+960 PR1 - PR2 -05 RHS 1 11.239 RAB 13
MJB JAN14/STR/1472 29-Jan-14 03+002 02+960 PR2 - AR2 -01 RHS 1 11.239 RAB 13
MJB JAN14/STR/1472 29-Jan-14 03+002 02+960 PR2 - AR2 -02 RHS 1 11.150 RAB 13
MJB JAN14/STR/1472 29-Jan-14 03+002 02+960 PR2 - AR2 -03 RHS 1 11.150 RAB 13
MJB JAN14/STR/1472 29-Jan-14 03+002 02+960 PR2 - AR2 -04 RHS 1 11.150 RAB 13
MJB JAN14/STR/1472 29-Jan-14 03+002 02+960 PR2 - AR2 -05 RHS 1 11.239 RAB 13
MJB JAN14/STR/1128 23-Jan-14 04+960 04+895 AR1 to RP1 -01 RHS 1 11.239 RAB 14
MJB JAN14/STR/1128 23-Jan-14 04+960 04+895 AR1 to RP1 -02 RHS 1 11.150 RAB 14
MJB JAN14/STR/1128 23-Jan-14 04+960 04+895 AR1 to RP1 -03 RHS 1 11.150 RAB 14
MJB JAN14/STR/1128 23-Jan-14 04+960 04+895 AR1 to RP1 -04 RHS 1 11.150 RAB 14
MJB JAN14/STR/1128 23-Jan-14 04+960 04+895 AR1 to RP1 -05 RHS 1 11.239 RAB 14
MJB JAN14/STR/1087 22-Jan-14 04+960 04+895 AR2 to RP8 -01 RHS 1 11.239 RAB 14
MJB JAN14/STR/1087 22-Jan-14 04+960 04+895 AR2 to RP8 -02 RHS 1 11.150 RAB 14
MJB JAN14/STR/1087 22-Jan-14 04+960 04+895 AR2 to RP8 -03 RHS 1 11.150 RAB 14
MJB JAN14/STR/1087 22-Jan-14 04+960 04+895 AR2 to RP8 -04 RHS 1 11.150 RAB 14
MJB JAN14/STR/1087 22-Jan-14 04+960 04+895 AR2 to RP8 -05 RHS 1 11.239 RAB 14
MJB JAN14/STR/1478 29-Jan-14 04+960 04+895 PR1 - PR2 -01 RHS 1 11.239 RAB 14
MJB JAN14/STR/1478 29-Jan-14 04+960 04+895 PR1 - PR2 -02 RHS 1 11.150 RAB 14
MJB JAN14/STR/1478 29-Jan-14 04+960 04+895 PR1 - PR2 -03 RHS 1 11.150 RAB 14
MJB JAN14/STR/1478 29-Jan-14 04+960 04+895 PR1 - PR2 -04 RHS 1 11.150 RAB 14
MJB JAN14/STR/1478 29-Jan-14 04+960 04+895 PR1 - PR2 -05 RHS 1 11.239 RAB 14
MJB FEB14/STR/166 4-Feb-14 04+960 04+895 PR2 - PR3 -01 RHS 1 11.239 RAB 14
MJB FEB14/STR/166 4-Feb-14 04+960 04+895 PR2 - PR3 -02 RHS 1 11.150 RAB 14
MJB FEB14/STR/166 4-Feb-14 04+960 04+895 PR2 - PR3 -03 RHS 1 11.150 RAB 14
MJB FEB14/STR/166 4-Feb-14 04+960 04+895 PR2 - PR3 -04 RHS 1 11.150 RAB 14
MJB FEB14/STR/166 4-Feb-14 04+960 04+895 PR2 - PR3 -05 RHS 1 11.239 RAB 14
MJB FEB14/STR/216 5-Feb-14 04+960 04+895 PR4 - PR5 -01 RHS 1 11.239 RAB 14
MJB FEB14/STR/216 5-Feb-14 04+960 04+895 PR4 - PR5 -02 RHS 1 11.150 RAB 14
MJB FEB14/STR/216 5-Feb-14 04+960 04+895 PR4 - PR5 -03 RHS 1 11.150 RAB 14
MJB FEB14/STR/216 5-Feb-14 04+960 04+895 PR4 - PR5 -04 RHS 1 11.150 RAB 14
MJB FEB14/STR/216 5-Feb-14 04+960 04+895 PR4 - PR5 -05 RHS 1 11.239 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR5 - PR6 -01 RHS 1 11.239 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR5 - PR6 -02 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR5 - PR6 -03 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR5 - PR6 -04 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR5 - PR6 -05 RHS 1 11.239 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR6 - PR7 -01 RHS 1 11.239 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR6 - PR7 -02 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR6 - PR7 -03 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR6 - PR7 -04 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR6 - PR7 -05 RHS 1 11.239 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR7 - PR8 -01 RHS 1 11.239 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR7 - PR8 -02 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR7 - PR8 -03 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR7 - PR8 -04 RHS 1 11.150 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR7 - PR8 -05 RHS 1 11.239 RAB 14
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR3 - PR4 -01 RHS 1 11.239 RAB 17
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR3 - PR4 -02 RHS 1 11.150 RAB 17
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR3 - PR4 -03 RHS 1 11.150 RAB 17
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR3 - PR4 -04 RHS 1 11.150 RAB 17
MJB FEB14/STR/335 7-Feb-14 04+960 04+895 PR3 - PR4 -05 RHS 1 11.239 RAB 17
MJB DEC14/STR/613 23-Dec-14 03+002 02+960 AL1 to LP1 -01 LHS 1 11.239 RAB 24
MJB JAN14/STR/1194 23-Dec-14 03+002 02+960 AL1 to LP1 -02 LHS 1 11.150 RAB 24
MJB JAN14/STR/1194 23-Dec-14 03+002 02+960 AL1 to LP1 -03 LHS 1 11.150 RAB 24
MJB JAN14/STR/1194 23-Dec-14 03+002 02+960 AL1 to LP1 -04 LHS 1 11.150 RAB 24
MJB JAN14/STR/1194 23-Dec-14 03+002 02+960 AL1 to LP1 -05 LHS 1 11.239 RAB 24
MJB JAN14/STR/1473 23-Dec-14 03+002 02+960 PL1 - PL2 -01 LHS 1 11.239 RAB 24
MJB JAN14/STR/1473 23-Dec-14 03+002 02+960 PL1 - PL2 -02 LHS 1 11.150 RAB 24
MJB JAN14/STR/1473 23-Dec-14 03+002 02+960 PL1 - PL2 -03 LHS 1 11.150 RAB 24
MJB JAN14/STR/1473 23-Dec-14 03+002 02+960 PL1 - PL2 -04 LHS 1 11.150 RAB 24
MJB JAN14/STR/1473 23-Dec-14 03+002 02+960 PL1 - PL2 -05 LHS 1 11.239 RAB 24
MJB JAN14/STR/1472 23-Dec-14 03+002 02+960 PL2 - AL2 -01 LHS 1 11.239 RAB 24
MJB JAN14/STR/1472 23-Dec-14 03+002 02+960 PL2 - AL2 -02 LHS 1 11.150 RAB 24
MJB JAN14/STR/1472 23-Dec-14 03+002 02+960 PL2 - AL2 -03 LHS 1 11.150 RAB 24
MJB JAN14/STR/1472 23-Dec-14 03+002 02+960 PL2 - AL2 -04 LHS 1 11.150 RAB 24
MJB JAN14/STR/1472 23-Dec-14 03+002 02+960 PL2 - AL2 -05 LHS 1 11.239 RAB 24
RFI No
S.NO Structure Date Actual Chainage Description Total Wt. (Kg) RABILL Remarks
NAPC/BKEL/
MJB FEB14/STR/1455 2/26/2014 03+433 RP1 Pier wall I Lift 529.498 IPC-15
MJB FEB14/STR/1457 2/26/2014 03+433 RP1 Pier wall Final Lift 529.498 IPC-15
MJB FEB'14/STR/1461 2/26/2014 04+895 RP7-RP8 Deck slab&Cross Girder 11138.703 IPC-15
MJB MAR 14/STR/621 3/12/2014 03+433 RP2 Pier cap 5564.129 IPC-15
MJB MAR 14/STR/987 3/19/2014 03+433 RP3 Pier cap 5564.129 IPC-15
MJB MAR'14/STR/1227 3/23/2014 03+433 RA2-RP8 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR'14/STR/1229 3/23/2014 03+433 RA1-RP1 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR'14/STR/1231 3/23/2014 03+433 RP4-RP5 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR'14/STR/1288 3/24/2014 03+433 RP1-RP2 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR'14/STR/1296 3/24/2014 03+433 RP7-RP8 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR'14/STR/1300 3/24/2014 03+433 RP3-RP4 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR'14/STR/1371 3/25/2014 03+433 RP2-RP3 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR'14/STR/1373 3/25/2014 03+433 RP5-RP6 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR'14/STR/1375 3/25/2014 03+433 RP6-RP7 Deck slab& Cross Girder 11138.703 IPC-15
MJB MAR14/STR/149 3/4/2014 03+433 RP2 Pier wall 542.128 IPC-15
MJB MAR14/STR/282 3/6/2014 03+433 ABT PILE CAP RA2 4990.173 IPC-15
MJB MAR14/STR/287 3/6/2014 04+895 AR1 Dirt wall 298.264 IPC-15
MJB MAR14/STR/391 3/8/2014 03+433 AR1 Dirt wall 298.264 IPC-15
MJB MAR14/STR/546 3/11/2014 03+433 AR2 Dirt wall 298.264 IPC-15
MJB MAR14/STR/552 3/11/2014 03+433 Abutment Wall 4289.580 IPC-15
MJB MAR14/STR/60 3/2/2014 04+895 A2 RT WALL RAFT 298.264 IPC-15
MJB MAR14/STR/623 3/12/2014 03+433 ABT PILE CAP RA1 4990.173 IPC-15
MJB MAR14/STR/909 3/18/2014 03+433 RP3 Pier wall 782.255 IPC-15
MJB MAR 14/STR/1696 3/30/2014 04+895 PL 4/5 Pile 964.358 IPC 16
MJB MAR 14/STR/1692 3/30/2014 04+895 PL 5/5 Pile 964.358 IPC 16
MJB MAR 14/STR/1690 3/30/2014 04+895 PL 1/5 Pile 964.358 IPC 16
MJB MAR 14/STR/1688 3/30/2014 04+895 PL 2/2 Pile 964.358 IPC 16
MJB MAR 14/STR/1665 3/29/2014 04+895 PL 6/2 Pile 964.358 IPC 16
MJB MAR 14/STR/1669 3/29/2014 04+895 PL 7/1 Pile 964.358 IPC 16
MJB MAR 14/STR/1671 3/29/2014 04+895 AL 2/4 Pile 975.811 IPC 16
MJB MAR 14/STR/1686 3/30/2014 04+895 AL 1/9 Pile 975.811 IPC 16
MJB MAR 14/STR/1663 3/29/2014 04+895 PL 8/2 Pile 964.358 IPC 16
MJB MAR 14/STR/1661 3/29/2014 04+895 AL 2/3 Pile 975.811 IPC 16
MJB MAR 14/STR/1752 3/31/2014 04+895 PL 4/3 Pile 964.358 IPC 16
MJB MAR 14/STR/1762 3/31/2014 04+895 PL 7/4 Pile 964.358 IPC 16
MJB MAR 14/STR/1704 3/30/2014 04+895 AL 1/2 Pile 975.811 IPC 16
MJB MAR 14/STR/1750 3/31/2014 04+895 PL 3/4 Pile 964.358 IPC 16
MJB MAR 14/STR/1748 3/31/2014 04+895 PL 5/3 Pile 964.358 IPC 16
MJB MAR 14/STR/1745 3/31/2014 04+895 PL 2/4 Pile 964.358 IPC 16
MJB MAR 14/STR/1764 3/31/2014 04+895 AL 2/7 Pile 975.811 IPC 16
MJB MAR 14/STR/1760 3/31/2014 04+895 AL 1/6 Pile 975.811 IPC 16
MJB MAR 14/STR/1758 3/31/2014 04+895 PL 6/3 Pile 964.358 IPC 16
MJB MAR 14/STR/1756 3/31/2014 04+895 PL 8/4 Pile 964.358 IPC 16
MJB MAR 14/STR/1754 3/31/2014 04+895 AL 2/6 Pile 975.811 IPC 16
MJB MAR 14/STR/1746 3/31/2014 04+895 PL 1/3 Pile 964.358 IPC 16
MJB MAR 14/STR/1744 3/31/2014 04+895 PL 2/4 Pile 964.358 IPC 16
MJB MAR 14/STR/1742 3/31/2014 04+895 AL 1/3 Pile 975.811 IPC 16
MJB MAR 14/STR/1708 3/30/2014 04+895 AL 2/10 Pile 975.811 IPC 16
MJB MAR 14/STR/1706 3/30/2014 04+895 AL 1/7 Pile 975.811 IPC 16
MJB MAR 14/STR/1580 3/28/2014 04+895 PL 3/6 Pile 964.358 IPC 16
MJB MAR 14/STR/1655 3/29/2014 04+895 PL 5/2 Pile 964.358 IPC 16
MJB MAR 14/STR/1649 3/29/2014 04+895 AL 1/4 Pile 975.811 IPC 16
MJB MAR 14/STR/1651 3/29/2014 04+895 PL 2/5 Pile 964.358 IPC 16
MJB MAR 14/STR/1594 3/28/2014 04+895 AL 2/11 Pile 975.811 IPC 16
MJB MAR 14/STR/1584 3/28/2014 04+895 AL 2/1 Pile 975.811 IPC 16
MJB MAR 14/STR/1586 3/28/2014 04+895 PL 8/3 Pile 964.358 IPC 16
MJB MAR 14/STR/1588 3/28/2014 04+895 PL 6/6 Pile 964.358 IPC 16
MJB MAR 14/STR/1592 3/28/2014 04+895 PL 7/6 Pile 964.358 IPC 16
MJB MAR 14/STR/1576 3/28/2014 04+895 PL 1/6 Pile 964.358 IPC 16
MJB MAR 14/STR/1578 3/28/2014 04+895 PL 5/6 Pile 964.358 IPC 16
MJB MAR 14/STR/1582 3/28/2014 04+895 PL 4/6 Pile 964.358 IPC 16
MJB MAR 14/STR/1457 3/26/2014 04+895 PL 8/5 Pile 964.358 IPC 16
MJB MAR 14/STR/1572 3/28/2014 04+895 AL 1/8 Pile 975.811 IPC 16
MJB MAR 14/STR/1574 3/28/2014 04+895 PL 2/1 Pile 964.358 IPC 16
MJB MAR 14/STR/1517 3/27/2014 04+895 PL 8/1 Pile 964.358 IPC 16
MJB MAR 14/STR/1525 3/27/2014 04+895 AL 2/12 Pile 975.811 IPC 16
MJB MAR 14/STR/1455 3/26/2014 04+895 PL 7/3 Pile 964.358 IPC 16
MJB MAR 14/STR/1521 3/27/2014 04+895 AL 2/5 Pile 975.811 IPC 16
MJB MAR 14/STR/1523 3/27/2014 04+895 PL 8/6 Pile 964.358 IPC 16
MJB MAR 14/STR/1590 3/28/2014 04+895 AL 1/10 Pile 975.811 IPC 16
MJB MAR 14/STR/1663 3/29/2014 04+895 AL 1/2 Pile 975.811 IPC 16
MJB MAR 14/STR/1700 3/30/2014 04+895 AL 2/4 Pile 975.811 IPC 16
MJB MAR 14/STR/1702 3/30/2014 04+895 PL 6/4 Pile 964.358 IPC 16
MJB MAR 14/STR/1694 3/30/2014 04+895 PL 3/5 Pile 964.358 IPC 16
MJB MAR 14/STR/1698 3/30/2014 04+895 AL 2/9 Pile 975.811 IPC 16
MJB MAR 14/STR/1519 3/27/2014 04+895 PL 6/1 Pile 964.358 IPC 16
MJB MAR 14/STR/1507 3/27/2014 04+895 PL 1/4 Pile 964.358 IPC 16
MJB FEB15/HW/862 18-Feb-15 03+433 03+433 Mastic Laying LHS 1 180 12.75 38.5% 883.58 RAB 26
MJB FEB15/HW/862 18-Feb-15 03+433 03+433 Mastic
Mastic Laying
Laying (Approach
(DeductionPorti LHS 2 3.50 12.75 38.5% 34.36 RAB 26
MJB FEB15/HW/862 18-Feb-15 03+433 03+433 against Expension Joint LHS -10 0.65 12.75 38.5% (31.91) RAB 26
MJB FEB15/HW/794 17-Feb-15 03+927 03+927 Portion)
BC Laying LHS 1 45 12.75 61.5% 352.86 RAB 26
MJB FEB15/HW/684 15-Feb-15 03+927 03+927 Mastic Laying LHS 1 45 12.75 38.5% 220.89 RAB 26
MJB FEB15/HW/648 14-Feb-15 04+895 04+895 BC Laying LHS 1 187 12.75 61.5% 1,466.31 RAB 26
MJB FEB15/HW/648 14-Feb-15 04+895 04+895 BC Laying (Deduction against LHS -10 0.65 12.75 61.5% (50.97) RAB 26
MJB FEB15/HW/647 14-Feb-15 04+895 04+895 Mastic Laying LHS 1 180 12.75 38.5% 883.58 RAB 26
MJB FEB15/HW/647 14-Feb-15 04+895 04+895 Mastic Laying
Mastic Laying (Approach
(DeductionPorti LHS 2 3.5 12.75 38.5% 34.36 RAB 26
MJB FEB15/HW/647 14-Feb-15 04+895 04+895 against Expension Joint LHS -10 0.65 12.75 38.5% (31.91) RAB 26
MNB FEB15/HW/1302 25-Feb-15 02+130 02+130 Portion)
Mastic Laying LHS 1 22 12.75 38.5% 107.99 RAB 26
MNB FEB15/HW/1301 25-Feb-15 30+165 30+165 Mastic Laying LHS 1 56.34 12.75 38.5% 276.56 RAB 26
MNB FEB15/HW/953 20-Feb-15 41+987 41+987 A1 A2 Approach Slab Mastic L LHS 2 3.50 12.75 38.5% 34.36 RAB 26
MNB FEB15/HW/954 20-Feb-15 43+700 43+700 A1 A2 Approach Slab Mastic L LHS 2 3.50 12.75 38.5% 34.36 RAB 26
MNB FEB15/HW/791 17-Feb-15 38+200 38+200 Mastic Laying in Approach Por RHS 2 3.5 12.75 38.5% 34.36 RAB 26
MNB FEB15/HW/793 17-Feb-15 44+914 44+914 Mastic Laying in Approach Por RHS 2 3.5 12.75 38.5% 34.36 RAB 26
Raft bottom main rod 1 16 200 78.00 41.97 3,273.57 1.578 5,165.69
Outer wall main rod 2 12 200 156.00 9.73 1,517.20 0.888 1,347.27
Extra raft top 3 10 200 546.00 3.50 1,911.00 0.617 1,179.09
Raft bottom Extra rod 25 16 180 308.00 4.05 1,247.40 1.578 1,968.40
Raft bottom main rod 1 12 180 77.00 32.06 2,468.44 0.888 2,191.97
Extra bottom wall rod 1a 25 180 154.00 5.10 785.83 3.853 3,027.81
Outer wall main rod 2 12 180 154.00 13.49 2,077.33 0.888 1,844.66
Raft top Extra raft rod 3 20 180 154.00 4.20 646.80 2.466 1,595.01
Raft top Extra raft rod 3a 16 180 154.00 4.20 646.80 1.578 1,020.65
Raft top main rod 4 16 180 77.00 26.80 2,063.91 1.578 3,256.85
Outer Wall inner main rod 5 25 360 78.00 9.20 717.38 3.853 2,764.05
Outer Wall inner rod 5a 20 360 78.00 9.20 717.38 2.466 1,769.05
MNB 15+465 Outer wall haunch rod 9 10 200 280.00 1.10 308.56 0.617 190.38
Mid wall haunch rod 10 10 200 840.00 1.09 917.28 0.617 565.96
Raft distribution 12 12 180 272.00 14.15 3,849.34 0.888 3,418.22
Shear Key main rod 20 10 150 255.00 3.91 997.82 0.617 615.65
Shear Key Dist. rod 21 10 40.00 26.62 1,064.80 0.617 656.98
Mid Wall main rod 22 12 180 462.00 9.60 4,436.72 0.888 3,939.81
Bottom Mid Wall haunch rod 22 b 16 180 462.00 3.51 1,622.91 1.578 2,560.96
Raft bottom Extra rod 25 16 180 231.00 4.05 935.55 1.578 1,476.30
MNB 34+960 Deck slab 4,031.26
Inner wall main rod 1 16 200 41.00 6.43 263.63 1.578 416.01
Outer wall rod 2 12 200 41.00 8.76 359.28 0.888 319.04
Top main extra main rod 3 10 200 41.00 4.07 166.95 0.617 103.01
Top main rod 4 12 200 41.00 5.37 220.25 0.888 195.58
Footing top distribution 5 10 150 31.00 8.00 248.00 0.617 153.02
Footing bottom main rod 6 12 200 41.00 5.30 217.38 0.888 193.04
MNB APR13/STR/227 23-Apr-13 31+305
Footing bottom extra main rod 6a 10 200 41.00 2.47 101.11 0.617 62.38
IPC-09
MJB Sep13/STR/248 6-Sep-13 4+895
RFI No Bar Bar No. of Wt/M
Structure NAPC/BKEL/ Date Actual Chainage CA Chainage Description No. Dia Spacing bars Total Wt. (Kg) Remarks
Cutting Length ( Total Cutting Lengt (Kg)
Top Rod a4 12 4.00 19.57 78.29 0.888 69.52
Top Rod a5 10 87.00 1.89 164.60 0.617 101.56
a6 12 200 54.00 3.21 173.56 0.888 154.12
a6a 12 200 44.00 3.33 146.70 0.888 130.27
a7 10 87.00 1.42 123.71 0.617 76.33
a8 10 200 14.00 4.24 59.36 0.617 36.63 IPC-09
MJB Sep13/STR/248 6-Sep-13 4+895 a8a 10 200 10.00 3.78 37.80 0.617 23.32
a9 10 200 87.00 2.04 177.65 0.617 109.61
a10 10 8.00 19.32 154.56 0.617 95.36
a11 10 16.00 3.34 53.44 0.617 32.97
25 1,000 38.00 0.59 22.42 3.853 86.38
Mesh 8 4.00 4.20 16.80 0.395 6.64
Lift hook 25 4.00 3.00 12.00 3.853 46.24
Dowel bars 16 6.00 2.30 13.78 1.578 21.75
Dowel bars 12 4.00 2.32 9.28 0.888 8.24
Dowel bars 12 4.00 1.77 7.08 0.888 6.29
Dowel bars 12 24.00 1.00 23.88 0.888 21.21
Ext-17 a1 32 6.00 21.63 129.77 6.320 820.13
Bottom Second layer a2 32 6.00 16.80 100.80 6.320 637.06
Bottom mid rod a3 32 2.00 16.80 33.60 6.320 212.35
Bottom centre rod a3a 25 2.00 20.57 41.14 3.868 159.13
Top Rod a4 12 4.00 19.57 78.29 0.888 69.52
Top Rod a5 10 87.00 1.89 164.60 0.617 101.56
a6 12 200 54.00 3.21 173.56 0.888 154.12
a6a 12 200 44.00 3.33 146.70 0.888 130.27
a7 10 87.00 1.42 123.71 0.617 76.33
a8 10 200 14.00 4.24 59.36 0.617 36.63
MJB Sep13/STR/250 6-Sep-13 4+895 a8a 10 200 10.00 3.78 37.80 0.617 23.32 IPC-09
a9 10 200 87.00 2.04 177.65 0.617 109.61
a10 10 8.00 19.32 154.56 0.617 95.36
a11 10 16.00 3.34 53.44 0.617 32.97
25 1,000 38.00 0.59 22.42 3.853 86.38
Mesh 8 4.00 4.20 16.80 0.395 6.64
Lift hook 25 4.00 3.00 12.00 3.853 46.24
Dowel bars 16 6.00 2.30 13.78 1.578 21.75
Dowel bars 12 4.00 2.32 9.28 0.888 8.24
Dowel bars 12 4.00 1.77 7.08 0.888 6.29
Dowel bars 12 24.00 1.00 23.88 0.888 21.21
Ext-18 a1 32 6.00 21.63 129.77 6.320 820.13
Bottom Second layer a2 32 6.00 16.80 100.80 6.320 637.06
Bottom mid rod a3 32 2.00 16.80 33.60 6.320 212.35
Bottom centre rod a3a 25 2.00 20.57 41.14 3.868 159.13
Top Rod a4 12 4.00 19.57 78.29 0.888 69.52
Top Rod a5 10 87.00 1.89 164.60 0.617 101.56
a6 12 200 54.00 3.21 173.56 0.888 154.12
a6a 12 200 44.00 3.33 146.70 0.888 130.27
a7 10 87.00 1.42 123.71 0.617 76.33
a8 10 200 14.00 4.24 59.36 0.617 36.63
MJB Sep13/STR/287 7-Sep-13 4+895 a8a 10 200 10.00 3.78 37.80 0.617 23.32 IPC-09
a9 10 200 87.00 2.04 177.65 0.617 109.61
a10 10 8.00 19.32 154.56 0.617 95.36
a11 10 16.00 3.34 53.44 0.617 32.97
25 1,000 38.00 0.59 22.42 3.853 86.38
Mesh 8 4.00 4.20 16.80 0.395 6.64
Lift hook 25 4.00 3.00 12.00 3.853 46.24
Dowel bars 16 6.00 2.30 13.78 1.578 21.75
Dowel bars 12 4.00 2.32 9.28 0.888 8.24
Dowel bars 12 4.00 1.77 7.08 0.888 6.29
Dowel bars 12 24.00 1.00 23.88 0.888 21.21
Ext-19 a1 32 6.00 21.63 129.77 6.320 820.13
Bottom Second layer a2 32 6.00 16.80 100.80 6.320 637.06
Bottom mid rod a3 32 2.00 16.80 33.60 6.320 212.35
Bottom centre rod a3a 25 2.00 20.57 41.14 3.868 159.13
Top Rod a4 12 4.00 19.57 78.29 0.888 69.52
Top Rod a5 10 87.00 1.89 164.60 0.617 101.56
a6 12 200 54.00 3.21 173.56 0.888 154.12
a6a 12 200 44.00 3.33 146.70 0.888 130.27
a7 10 87.00 1.42 123.71 0.617 76.33
a8 10 200 14.00 4.24 59.36 0.617 36.63
MJB Sep13/STR/289 7-Sep-13 4+895 a8a 10 200 10.00 3.78 37.80 0.617 23.32 IPC-09
a9 10 200 87.00 2.04 177.65 0.617 109.61
a10 10 8.00 19.32 154.56 0.617 95.36
a11 10 16.00 3.34 53.44 0.617 32.97
25 1,000 38.00 0.59 22.42 3.853 86.38
Mesh 8 4.00 4.20 16.80 0.395 6.64
Lift hook 25 4.00 3.00 12.00 3.853 46.24
Dowel bars 16 6.00 2.30 13.78 1.578 21.75
Dowel bars 12 4.00 2.32 9.28 0.888 8.24
Dowel bars 12 4.00 1.77 7.08 0.888 6.29
Dowel bars 12 24.00 1.00 23.88 0.888 21.21
Ext-20 a1 32 6.00 21.63 129.77 6.320 820.13
Bottom Second layer a2 32 6.00 16.80 100.80 6.320 637.06
Bottom mid rod a3 32 2.00 16.80 33.60 6.320 212.35
Bottom centre rod a3a 25 2.00 20.57 41.14 3.868 159.13
Top Rod a4 12 4.00 19.57 78.29 0.888 69.52
Top Rod a5 10 87.00 1.89 164.60 0.617 101.56
a6 12 200 54.00 3.21 173.56 0.888 154.12
a6a 12 200 44.00 3.33 146.70 0.888 130.27
a7 10 87.00 1.42 123.71 0.617 76.33
a8 10 200 14.00 4.24 59.36 0.617 36.63
MJB Sep13/STR/330 8-Sep-13 4+895 a8a 10 200 10.00 3.78 37.80 0.617 23.32 IPC-09
a9 10 200 87.00 2.04 177.65 0.617 109.61
a10 10 8.00 19.32 154.56 0.617 95.36
a11 10 16.00 3.34 53.44 0.617 32.97
25 1,000 38.00 0.59 22.42 3.853 86.38
Mesh 8 4.00 4.20 16.80 0.395 6.64
Lift hook 25 4.00 3.00 12.00 3.853 46.24
Dowel bars 16 6.00 2.30 13.78 1.578 21.75
Dowel bars 12 4.00 2.32 9.28 0.888 8.24
Dowel bars 12 4.00 1.77 7.08 0.888 6.29
Dowel bars 12 24.00 1.00 23.88 0.888 21.21
Ext-21 a1 32 6.00 21.63 129.77 6.320 820.13
Bottom Second layer a2 32 6.00 16.80 100.80 6.320 637.06
Bottom mid rod a3 32 2.00 16.80 33.60 6.320 212.35
Bottom centre rod a3a 25 2.00 20.57 41.14 3.868 159.13
Top Rod a4 12 4.00 19.57 78.29 0.888 69.52
Top Rod a5 10 87.00 1.89 164.60 0.617 101.56
a6 12 200 54.00 3.21 173.56 0.888 154.12
a6a 12 200 44.00 3.33 146.70 0.888 130.27
a7 10 87.00 1.42 123.71 0.617 76.33
a8 10 200 14.00 4.24 59.36 0.617 36.63
MJB Sep13/STR/344 9-Sep-13 4+895 a8a 10 200 10.00 3.78 37.80 0.617 23.32 IPC-09
a9 10 200 87.00 2.04 177.65 0.617 109.61
a10 10 8.00 19.32 154.56 0.617 95.36
a11 10 16.00 3.34 53.44 0.617 32.97
25 1,000 38.00 0.59 22.42 3.853 86.38
Mesh 8 4.00 4.20 16.80 0.395 6.64
Lift hook 25 4.00 3.00 12.00 3.853 46.24
Dowel bars 16 6.00 2.30 13.78 1.578 21.75
Dowel bars 12 4.00 2.32 9.28 0.888 8.24
Dowel bars 12 4.00 1.77 7.08 0.888 6.29
Dowel bars 12 24.00 1.00 23.88 0.888 21.21
Ext-22 a1 32 6.00 21.63 129.77 6.320 820.13
Bottom Second layer a2 32 6.00 16.80 100.80 6.320 637.06
Bottom mid rod a3 32 2.00 16.80 33.60 6.320 212.35
Bottom centre rod a3a 25 2.00 20.57 41.14 3.868 159.13
Top Rod a4 12 4.00 19.57 78.29 0.888 69.52
Top Rod a5 10 87.00 1.89 164.60 0.617 101.56
a6 12 200 54.00 3.21 173.56 0.888 154.12
a6a 12 200 44.00 3.33 146.70 0.888 130.27
a7 10 87.00 1.42 123.71 0.617 76.33
a8 10 200 14.00 4.24 59.36 0.617 36.63
MJB Sep13/STR/346 9-Sep-13 4+895 a8a 10 200 10.00 3.78 37.80 0.617 23.32 IPC-09
a9 10 200 87.00 2.04 177.65 0.617 109.61
a10 10 8.00 19.32 154.56 0.617 95.36
a11 10 16.00 3.34 53.44 0.617 32.97
25 1,000 38.00 0.59 22.42 3.853 86.38
Mesh 8 4.00 4.20 16.80 0.395 6.64
Lift hook 25 4.00 3.00 12.00 3.853 46.24
Dowel bars 16 6.00 2.30 13.78 1.578 21.75
Dowel bars 12 4.00 2.32 9.28 0.888 8.24
Dowel bars 12 4.00 1.77 7.08 0.888 6.29
Dowel bars 12 24.00 1.00 23.88 0.888 21.21
Ext-23 a1 32 6.00 21.63 129.77 6.320 820.13
Bottom Second layer a2 32 6.00 16.80 100.80 6.320 637.06
Bottom mid rod a3 32 2.00 16.80 33.60 6.320 212.35
Bottom centre rod a3a 25 2.00 20.57 41.14 3.868 159.13
MNB DEC13/STR/2119 27-Dec-13 15+465 A1 Ret Bracket 10 4.00 11.11 44.44 0.617 27.42 IPC-13
PR 1/8 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2230 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 2/8 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2232 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 3/9 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2234 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 4/8 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2236 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 5/6 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2238 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 6/12 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2241 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
Bottom Distribution bar S1 20 125 28.00 12.13 339.64 2.466 837.55
Bottom Distribution bar S1 20 125 55.00 8.66 476.03 2.466 1,173.88
Bottom main bar S2 20 125 28.00 12.13 339.64 2.466 837.55
3+433 RP8 PILE Bottom main bar S2 20 125 55.00 8.66 476.03 2.466 1,173.88
MJB DEC13/STR/2258 28-Dec-13 CAP Top Distribution bar S3 12 125 28.00 12.20 341.66 0.888 303.39 IPC 13
Top Distribution bar S3 12 125 55.00 8.73 479.99 0.888 426.23
Top main bar S4 12 125 28.00 12.20 341.66 0.888 303.39
Top main bar S4 12 125 55.00 8.73 479.99 0.888 426.23
Ring S5 12 150 20.00 17.09 341.88 0.888 303.59
PR 1/9 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2260 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 2/9 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2262 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 3/10 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2264 28-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 4/9 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2266 29-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 5/7 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2268 29-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 1/10 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2270 29-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 2/10 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2272 29-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 3/11 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2274 29-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
Bottom Distribution bar S1 20 125 28.00 12.13 339.64 2.466 837.55
Bottom Distribution bar S1 20 125 55.00 8.66 476.03 2.466 1,173.88
Bottom main bar S2 20 125 28.00 12.13 339.64 2.466 837.55
3+433 RP7 PILE Bottom main bar S2 20 125 55.00 8.66 476.03 2.466 1,173.88
MJB DEC13/STR/2276 29-Dec-13 CAP Top Distribution bar S3 12 125 28.00 12.20 341.66 0.888 303.39 IPC 13
Top Distribution bar S3 12 125 55.00 8.73 479.99 0.888 426.23
Top main bar S4 12 125 28.00 12.20 341.66 0.888 303.39
Top main bar S4 12 125 55.00 8.73 479.99 0.888 426.23
Ring S5 12 150 20.00 17.09 341.88 0.888 303.59
1 12 175 39.00 5.37 209.48 0.888 186.02
2 16 175 40.00 7.65 305.84 1.578 482.62
3 10 175 39.00 3.66 142.86 0.617 88.14
4 12 175 40.00 4.64 185.60 0.888 164.81
5 10 150 15.00 7.28 109.26 0.617 67.41
5 10 150 11.00 7.49 82.43 0.617 50.86
6 12 175 40.00 4.53 181.00 0.888 160.73
MNB DEC13/STR/2280 29-Dec-13 20+931 6a 10 175 39.00 2.93 114.39 0.617 70.58 IPC-13
7 10 150 15.00 7.28 109.26 0.617 67.41
7 10 150 4.00 7.68 30.72 0.617 18.95
7 10 150 11.00 7.49 82.43 0.617 50.86
8 10 150 47.00 6.62 311.27 0.617 192.05
9 10 150 36.00 7.71 277.70 0.617 171.34
10 10 150 36.00 7.38 265.82 0.617 164.01
A1 Retaining wall 10 4.00 6.93 27.72 0.617 17.10
1 12 175 39.00 5.38 209.64 0.888 186.16
2 16 175 40.00 7.65 306.16 1.578 483.12
3 10 175 39.00 3.66 142.86 0.617 88.14
4 12 175 40.00 4.64 185.60 0.888 164.81
5 10 150 15.00 7.30 109.44 0.617 67.52
5 10 150 11.00 7.51 82.57 0.617 50.94
6 12 175 40.00 4.53 181.00 0.888 160.73
MNB DEC13/STR/2282 29-Dec-13 20+931 6a 10 175 39.00 2.93 114.39 0.617 70.58 IPC-13
7 10 150 15.00 7.30 109.44 0.617 67.52
7 10 150 4.00 7.69 30.76 0.617 18.98
7 10 150 11.00 7.51 82.57 0.617 50.94
8 10 150 47.00 6.63 311.65 0.617 192.29
9 10 150 36.00 7.73 278.14 0.617 171.61
10 10 150 36.00 7.40 266.26 0.617 164.28
A2 Retaining wall 10 4.00 6.94 27.76 0.617 17.13
MNB DEC13/STR/2298 29-Dec-13 21+401 A1 Ret Bracket 10 4.00 6.83 27.32 0.617 16.86 IPC-13
MNB DEC13/STR/2305 29-Dec-13 38+200 A2 Ret Bracket 10 4.00 5.53 22.14 0.617 13.66 IPC-13
PR 2/11 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2325 30-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 6/10 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2327 30-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 5/8 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2329 30-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 6/7 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2311 29-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 6/11 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2313 29-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 4/10 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2331 30-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
PR 5/11 Pile 20 16.00 20.81 332.88 2.470 822.21
MJB DEC13/STR/2333 30-Dec-13 3+433 IPC 13
Ring rod 8 150 1.00 359.86 359.86 0.395 142.14
Bottom Distribution bar S1 20 125 28.00 12.13 339.64 2.466 837.55
Bottom Distribution bar S1 20 125 56.00 8.66 484.68 2.466 1,195.22
MJB
RP1-RP2 Deck slab FEB'14/STR/2686-Feb-14 3+002
RFI No Bar Bar No. of Wt/M
Structure NAPC/BKEL/ Date Actual Chainage CA Chainage Description No. Dia Spacing bars Total Wt. (Kg) Remarks
Cutting Length ( Total Cutting Lengt (Kg)
16 8.00 20.00 160.03 1.578 252.53 IPC-14
Crash barrier distribution rod a5
16 12.00 13.75 165.05 1.578 260.45 IPC-14
Distribution rod in Exp joint Area a6
Main bar in Girder location a7 10 40.00 1.20 48.00 0.617 29.62 IPC-14
MJB
RP1-RP2 Deck slab FEB'14/STR/2686-Feb-14 3+002 Main bar between Girder 10 200 96.00 1.49 143.04 0.617 88.26 IPC-14
location a8
10 200 24.00 2.59 62.21 0.617 38.38 IPC-14
Main bar in Cantilevar location a9
Distibution bar in Cantilevar 10 4.00 11.77 47.08 0.617 29.05 IPC-14
location a10
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-14
Distibution bar in Cantilevar 16 200 48.00 1.09 52.51 1.578 82.86 IPC-14
location a12
10 16.00 2.22 35.52 0.617 21.92 IPC-14
Distibution bar in Girder location a13
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC-14
a1 16 44.00 4.74 208.56 1.578 329.11 IPC-14
a2 12 200 28.00 4.85 135.86 0.888 120.64 IPC-14
MJB FEB14/STR/967 18-Feb-14 3+433 3+433 a3 16 10.00 4.74 47.40 1.578 74.80 IPC-14
a4 8 200 120.00 1.04 124.80 0.395 49.30 IPC-14
RP5 Pier wall a5 8 200 14.00 4.14 57.96 0.395 22.89 IPC-14
a1 16 44.00 3.81 167.55 1.578 264.40 IPC-14
a2 12 200 18.00 4.85 87.34 0.888 77.55 IPC-14
MJB FEB14/STR/965 18-Feb-14 3+433 3+433 a3 16 10.00 3.81 38.08 1.578 60.09 IPC-14
a4 8 200 80.00 1.04 83.20 0.395 32.86 IPC-14
RP4 Pier wall a5 8 200 9.00 4.14 37.26 0.395 14.72 IPC-14
Top main rod a1 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-14
Top main rod a1 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-14
Bottom main rod a2 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-14
Bottom main rod a2 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-14
Top distribution rod a3 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-14
Bottom distribution rod a4 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-14
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC-14
Distribution rod in Exp joint 16 12.00 13.75 165.05 1.578 260.45 IPC-14
Area a6
Main bar in Girder location a7 10 40.00 1.20 48.00 0.617 29.62 IPC-14
Main bar between Girder 10 200 96.00 1.49 143.04 0.617 88.26 IPC-14
location a8
10 200 24.00 2.59 62.21 0.617 38.38 IPC-14
Main bar in Cantilevar location a9
RP4-RP5 Deck slab MJB
& Cross Girder 19-Feb-14 FEB'14/STR/1014
4+895 Distibution bar in Cantilevar 10 4.00 11.77 47.08 0.617 29.05 IPC-14
location a10
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-14
Distibution bar in Cantilevar 16 200 48.00 1.09 52.51 1.578 82.86 IPC-14
location a12
Distibution bar in Girder 10 16.00 2.22 35.52 0.617 21.92 IPC-14
location a13
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC-14
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC-14
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC-14
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC-14
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC-14
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC-14
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC-14
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC-14
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC-14
1 20 180 53.00 7.63 404.50 2.466 997.49 IPC-14
2 16 180 54.00 10.12 546.26 1.578 862.00 IPC-14
3 12 180 53.00 4.36 230.97 0.888 205.10 IPC-14
4 12 180 54.00 6.29 339.55 0.888 301.52 IPC-14
5 10 150 18.00 10.11 181.94 0.617 112.26 IPC-14
5 10 150 17.00 10.42 177.16 0.617 109.31 IPC-14
6 16 180 54.00 6.07 327.56 1.578 516.90 IPC-14
MNB FEB14/STR/1200 21-Feb-14 22,300.000 6a 20 180 53.00 4.67 247.72 2.466 610.88 IPC-14
7 10 150 18.00 10.11 181.94 0.617 112.26 IPC-14
7 10 150 5.00 10.69 53.46 0.617 32.98 IPC-14
7 10 150 17.00 10.42 177.16 0.617 109.31 IPC-14
8 10 150 64.00 8.36 535.34 0.617 330.31 IPC-14
9 10 150 46.00 10.65 489.99 0.617 302.33 IPC-14
10 10 150 46.00 10.12 465.57 0.617 287.25 IPC-14
A1 side Retaining Wall Raft 10 4.00 9.54 38.17 0.617 23.55 IPC-14
Top main rod a1 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-14
Top main rod a1 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-14
Bottom main rod a2 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-14
Bottom main rod a2 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-14
Top distribution rod a3 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-14
Bottom distribution rod a4 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-14
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC-14
Distribution rod in Exp joint 16 12.00 13.75 165.05 1.578 260.45 IPC-14
Area a6
Main bar in Girder location a7 10 40.00 1.20 48.00 0.617 29.62 IPC-14
Main bar between Girder 10 200 96.00 1.49 143.04 0.617 88.26 IPC-14
location a8
10 200 24.00 2.59 62.21 0.617 38.38 IPC-14
Main bar in Cantilevar location a9
RP5-RP6 Deck slab MJB
& Cross Girder 21-Feb-14 FEB'14/STR/1149
4+895 Distibution bar in Cantilevar 10 4.00 11.77 47.08 0.617 29.05 IPC-14
location a10
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-14
Distibution bar in Cantilevar 16 200 48.00 1.09 52.51 1.578 82.86 IPC-14
location a12
Distibution bar in Girder 10 16.00 2.22 35.52 0.617 21.92 IPC-14
location a13
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC-14
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC-14
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC-14
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC-14
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC-14
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC-14
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC-14
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC-14
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC-14
Top main rod a1 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-14
Top main rod a1 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-14
Bottom main rod a2 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-14
Bottom main rod a2 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-14
Top distribution rod a3 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-14
Bottom distribution rod a4 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-14
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC-14
Distribution rod in Exp joint 16 12.00 13.75 165.05 1.578 260.45 IPC-14
Area a6
Main bar in Girder location a7 10 40.00 1.20 48.00 0.617 29.62 IPC-14
Main bar between Girder 10 200 96.00 1.49 143.04 0.617 88.26 IPC-14
location a8
10 200 24.00 2.59 62.21 0.617 38.38 IPC-14
Main bar in Cantilevar location a9
RP6-RP7 Deck slab MJB
& Cross Girder 24-Feb-14 FEB'14/STR/1329
4+895 Distibution bar in Cantilevar 10 4.00 11.77 47.08 0.617 29.05 IPC-14
location a10
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-14
Distibution bar in Cantilevar 16 200 48.00 1.09 52.51 1.578 82.86 IPC-14
location a12
Distibution bar in Girder 10 16.00 2.22 35.52 0.617 21.92 IPC-14
location a13
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC-14
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC-14
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC-14
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC-14
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC-14
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC-14
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC-14
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC-14
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC-14
Raft bottom main rod 1 16 200 76.00 29.88 2,270.80 1.578 3,583.33 IPC-14
Outer wall main rod 2 12 200 152.00 7.52 1,142.89 0.888 1,014.88 IPC-14
Extra raft top 3 10 200 345.00 3.50 1,207.50 0.617 745.03 IPC-14
Raft top Rod 4 12 200 76.00 27.75 2,108.92 0.888 1,872.72 IPC-14
Outer Wall inner rod 5 12 200 152.00 4.21 639.77 0.888 568.11 IPC-14
Bottom Hunch 9 10 200 150.00 1.44 216.60 0.617 133.64 IPC-14
10 200 552.00 1.44 797.09 0.617 491.80 IPC-14
30+165 Raft inner wall bottom haunch 10
MNB FEB14/STR/1368 24-Feb-14 SPAN-I Raft distribution 12 10 175 280.00 15.35 4,298.00 0.617 2,651.87 IPC-14
Raft Extra distribution 14 10 24.00 15.29 366.96 0.617 226.41 IPC-14
Raft Extra distribution 19 10 8.00 15.35 122.80 0.617 75.77 IPC-14
Shear Key main rod 20 10 150 183.00 3.92 716.45 0.617 442.05 IPC-14
Shear Key Dist. rod 21 10 10.00 27.51 275.10 0.617 169.74 IPC-14
Mid wall 22 12 200 552.00 4.21 2,323.37 0.888 2,063.15 IPC-14
Extra Bottom wall rod 22b 10 200 552.00 1.81 1,000.22 0.617 617.14 IPC-14
Raft bottom main rod 1 16 200 81.00 35.74 2,894.62 1.578 4,567.70 15
Outer wall main rod 2 12 200 162.00 8.25 1,336.99 0.888 1,187.24 15
Extra raft top 3 10 200 486.00 3.50 1,701.00 0.617 1,049.52 15
Raft top Rod 4 12 200 81.00 33.20 2,689.36 0.888 2,388.15 15
Outer Wall inner rod 5 12 200 162.00 4.93 798.34 0.888 708.92 15
Bottom Hunch 9 10 200 162.00 1.44 233.93 0.617 144.33 15
Bottom Hunch 10 10 200 690.00 1.49 1,025.34 0.617 632.63 15
MNB FEB14/STR/1366 24-Feb-14 44+914 SPAN-II Raft distribution 12 10 175 336.00 16.35 5,493.60 0.617 3,389.55 15
Raft Extra distribution 14 10 28.00 16.29 456.12 0.617 281.43 15
Raft Extra distribution 19 10 8.00 16.35 130.80 0.617 80.70 15
Shear Key main rod 20 10 150 219.00 3.91 856.95 0.617 528.74 15
Shear Key Dist. rod 21 10 10.00 32.91 329.10 0.617 203.05 15
Mid wall 22 12 200 690.00 4.93 3,400.32 0.888 3,019.48 15
Extra Bottom wall rod 22b 10 200 690.00 2.04 1,408.29 0.617 868.91 15
Extra raft rod 25 16 200 345.00 3.40 1,173.00 1.578 1,850.99 15
Raft bottom main rod 1 16 200 81.00 30.34 2,457.22 1.578 3,877.49 15
Outer wall main rod 2 12 200 162.00 8.23 1,333.91 0.888 1,184.51 15
Extra raft top 3 10 200 405.00 3.50 1,417.50 0.617 874.60 15
Raft top Rod 4 12 200 81.00 27.80 2,251.96 0.888 1,999.74 15
Outer Wall inner rod 5 12 200 162.00 4.92 796.72 0.888 707.48 15
Bottom Hunch 9 10 200 162.00 1.44 233.93 0.617 144.33 15
Bottom Hunch 10 10 200 554.00 1.44 799.98 0.617 493.59 15
MNB FEB14/STR/1364 24-Feb-14 44+914 SPAN-I Raft distribution 12 10 175 280.00 16.35 4,578.00 0.617 2,824.63 15
Raft Extra distribution 14 10 24.00 16.29 390.96 0.617 241.22 15
Raft Extra distribution 19 10 8.00 16.35 130.80 0.617 80.70 15
Shear Key main rod 20 10 150 183.00 3.92 716.45 0.617 442.05 15
Shear Key Dist. rod 21 10 10.00 27.51 275.10 0.617 169.74 15
Mid wall 22 12 200 552.00 4.92 2,714.74 0.888 2,410.69 15
Extra Bottom wall rod 22b 10 200 552.00 2.04 1,126.63 0.617 695.13 15
Extra raft rod 25 16 200 276.00 3.40 938.40 1.578 1,480.80 15
Top main rod IST layer C1 32 13.00 13.46 174.98 6.313 1,104.65
Top main rod II layer C2 32 13.00 13.33 173.29 6.313 1,093.98
Bottom main rod C3 20 13.00 13.54 176.02 2.466 434.07
Side distribution rod C4 16 6.00 15.50 93.00 1.578 146.75
Side distribution rod C5 16 6.00 10.93 65.58 1.578 103.49
stirrups end portion C6 10 120 2.00 5.68 11.36 0.617 7.01
stirrups between 10 120 14.00 6.44 90.16 0.617 55.63
ped.1&2( middle portion) C6
stirrups between 10 120 13.00 7.16 93.08 0.617 57.43
ped.2&3( middle portion) C6
stirrups between 10 120 13.00 7.16 93.08 0.617 57.43
ped.3&4( middle portion) C6
stirrups between 10 120 14.00 6.44 90.16 0.617 55.63
ped.4&5( middle portion) C6
Stirrups in Pedastal location C7 12 20.00 6.74 134.88 0.888 119.77
Stirrups in Pedastal location C7 12 20.00 5.94 118.88 0.888 105.57
stirrups between ped.1( middle 25 120 22.00 5.82 128.04 3.853 493.34
portion) C8
MJB
RP1 Pier cap MAR 14/STR/395
8-Mar-14 3+433 stirrups between ped.2( middle 25 120 20.00 6.80 136.00 3.853 524.01 IPC-15
portion) C8
stirrups between ped.3( middle 25 120 10.00 7.04 70.40 3.853 271.25
portion) C8
Inner Stirrups in cantilevar C9 10 120 76.00 4.28 325.43 0.617 200.79
Inner Stirrups in pier C9 10 120 35.00 5.03 176.12 0.617 108.67
Inner Stirrups in cantilevar C9 10 120 76.00 2.99 226.94 0.617 140.02
Inner Stirrups in cantilevar C9 10 120 35.00 3.74 130.76 0.617 80.68
1nos pedastal P1 12 14.00 2.88 40.29 0.888 35.78
2nos pedastal P1 12 14.00 2.74 38.36 0.888 34.06
3nos pedastal P1 12 14.00 2.60 36.43 0.888 32.35
3nos pedastal P2 12 14.00 2.60 36.43 0.888 32.35
4nos pedastal P1 12 14.00 2.46 34.50 0.888 30.63
4nos pedastal P2 12 14.00 2.46 34.50 0.888 30.63
5nos pedastal P1 12 14.00 2.33 32.56 0.888 28.92
5nos pedastal P2 12 14.00 2.33 32.56 0.888 28.92
2 Legged Stirrups in middle P3 12 100 30.00 2.02 60.72 0.888 53.92
Jacking point mesh 8 12.00 3.08 36.90 0.395 14.58
Mesh For PEDASTAL 8 20.00 5.18 103.60 0.395 40.92
Mesh For PEDASTAL 8 20.00 5.18 103.60 0.395 40.92
Top main rod IST layer C1 32 13.00 13.46 174.98 6.313 1,104.65
Top main rod II layer C2 32 13.00 13.33 173.29 6.313 1,093.98
Bottom main rod C3 20 13.00 13.54 176.02 2.466 434.07
Side distribution rod C4 16 6.00 15.50 93.00 1.578 146.75
Side distribution rod C5 16 6.00 10.93 65.58 1.578 103.49
stirrups end portion C6 10 120 2.00 5.68 11.36 0.617 7.01
stirrups between 10 120 14.00 6.44 90.16 0.617 55.63
ped.1&2( middle portion) C6
stirrups between 10 120 13.00 7.16 93.08 0.617 57.43
ped.2&3( middle portion) C6
stirrups between 10 120 13.00 7.16 93.08 0.617 57.43
ped.3&4( middle portion) C6
stirrups between 10 120 14.00 6.44 90.16 0.617 55.63
ped.4&5( middle portion) C6
Stirrups in Pedastal location C7 12 20.00 6.74 134.88 0.888 119.77
Stirrups in Pedastal location C7 12 20.00 5.94 118.88 0.888 105.57
stirrups between ped.1( middle 25 120 22.00 5.82 128.04 3.853 493.34
portion) C8
MJB
RP2 Pier cap MAR 14/STR/621
12-Mar-14 3+433 stirrups between ped.2( middle 25 120 20.00 6.80 136.00 3.853 524.01 IPC-15
portion) C8
stirrups between ped.3( middle 25 120 10.00 7.04 70.40 3.853 271.25
portion) C8
Inner Stirrups in cantilevar C9 10 120 76.00 4.28 325.43 0.617 200.79
Inner Stirrups in pier C9 10 120 35.00 5.03 176.12 0.617 108.67
Inner Stirrups in cantilevar C9 10 120 76.00 2.99 226.94 0.617 140.02
Inner Stirrups in cantilevar C9 10 120 35.00 3.74 130.76 0.617 80.68
1nos pedastal P1 12 14.00 2.88 40.29 0.888 35.78
2nos pedastal P1 12 14.00 2.74 38.36 0.888 34.06
3nos pedastal P1 12 14.00 2.60 36.43 0.888 32.35
3nos pedastal P2 12 14.00 2.60 36.43 0.888 32.35
4nos pedastal P1 12 14.00 2.46 34.50 0.888 30.63
4nos pedastal P2 12 14.00 2.46 34.50 0.888 30.63
5nos pedastal P1 12 14.00 2.33 32.56 0.888 28.92
RP4-RP5 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 23-Mar-14 3+433 Distibution bar in Cantilevar a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
location
MAR'14/STR/1231
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar
location a12 16 200 48.00 1.09 52.51 1.578 82.86 IPC-15
Main bar in Girder location a7 10 40.00 1.20 48.00 0.617 29.62 IPC-15
Main bar between Girder
location a8 10 200 96.00 1.49 143.04 0.617 88.26 IPC-15
RA2-RP8 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 23-Mar-14 3+433 Distibution bar in Cantilevar
location a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
MAR'14/STR/1227
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar
location a12 16 200 48.00 1.09 52.51 1.578 82.86 IPC-15
RA1-RP1 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 23-Mar-14 3+433 Distibution bar in Cantilevar
a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
location
MAR'14/STR/1229
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar
a12 16 200 48.00 1.09 52.51 1.578 82.86 IPC-15
location
Distibution bar in Girder
location a13 10 16.00 2.22 35.52 0.617 21.92 IPC-15
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC-15
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC-15
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC-15
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC-15
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC-15
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC-15
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC-15
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC-15
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC-15
Top main rod a1 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-15
Top main rod a1 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-15
Bottom main rod a2 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-15
Bottom main rod a2 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-15
Top distribution rod a3 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-15
Bottom distribution rod a4 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-15
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC-15
RP1-RP2 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 24-Mar-14 3+433 Distibution bar in Cantilevar a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
location
MAR'14/STR/1288
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar a12 48.00 1.09 52.51 1.578 82.86 IPC-15
location 16 200
RP7-RP8 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 24-Mar-14 3+433 Distibution bar in Cantilevar
location a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
MAR'14/STR/1296
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar
location a12 16 200 48.00 1.09 52.51 1.578 82.86 IPC-15
Distibution bar in Girder a13 16.00 2.22 35.52 0.617 21.92 IPC-15
location 10
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC-15
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC-15
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC-15
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC-15
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC-15
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC-15
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC-15
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC-15
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC-15
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC-15
RP3-RP4 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 24-Mar-14 3+433 Distibution bar in Cantilevar a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
location
MAR'14/STR/1300
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar
location a12 16 200 48.00 1.09 52.51 1.578 82.86 IPC-15
RP2-RP3 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 25-Mar-14 3+433 Distibution bar in Cantilevar
location a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
MAR'14/STR/1371
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar
location a12 16 200 48.00 1.09 52.51 1.578 82.86 IPC-15
Distibution bar in Girder a13 16.00 2.22 35.52 0.617 21.92 IPC-15
location 10
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC-15
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC-15
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC-15
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC-15
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC-15
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC-15
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC-15
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC-15
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC-15
Top main rod a1 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-15
Top main rod a1 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-15
Bottom main rod a2 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC-15
Bottom main rod a2 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC-15
Top distribution rod a3 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-15
Bottom distribution rod a4 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC-15
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC-15
RP5-RP6 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 25-Mar-14 3+433 Distibution bar in Cantilevar
location a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
MAR'14/STR/1373
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar
location a12 16 200 48.00 1.09 52.51 1.578 82.86 IPC-15
RP6-RP7 Deck slab Main bar in Cantilevar location a9 10 200 24.00 2.59 62.21 0.617 38.38 IPC-15
&
MJB Cross Girder 25-Mar-14 3+433 Distibution bar in Cantilevar
a10 10 4.00 11.77 47.08 0.617 29.05 IPC-15
location
MAR'14/STR/1375
Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC-15
Distibution bar in Cantilevar
location a12 16 200 48.00 1.09 52.51 1.578 82.86 IPC-15
stirrups between
ped.3&4( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
stirrups between
C6 10 120 14.00 6.44 90.16 0.617 55.63 IPC 17
ped.4&5( middle portion)
Stirrups in Pedastal location C7 12 20.00 6.74 134.88 0.888 119.77 IPC 17
Stirrups in Pedastal location C7 12 20.00 5.94 118.88 0.888 105.57 IPC 17
stirrups between ped.1( middle C8 22.00 5.82 128.04 3.853 493.34 IPC 17
portion) 25 120
stirrups between
ped.2&3( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
stirrups between
ped.3&4( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
stirrups between
ped.4&5( middle portion) C6 10 120 14.00 6.44 90.16 0.617 55.63 IPC 17
Stirrups in Pedastal location C7 12 20.00 6.74 134.88 0.888 119.77 IPC 17
Stirrups in Pedastal location C7 12 20.00 5.94 118.88 0.888 105.57 IPC 17
stirrups between ped.1( middle
portion) C8 25 120 22.00 5.82 128.04 3.853 493.34 IPC 17
stirrups between
ped.3&4( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
stirrups between ped.3( middle C8 10.00 7.04 70.40 3.853 271.25 IPC 17
portion) 25 120
Inner Stirrups in cantilevar C9 10 120 76.00 4.28 325.43 0.617 200.79 IPC 17
Inner Stirrups in pier C9 10 120 35.00 5.03 176.12 0.617 108.67 IPC 17
Inner Stirrups in cantilevar C9 10 120 76.00 2.99 226.94 0.617 140.02 IPC 17
Inner Stirrups in cantilevar C9 10 120 35.00 3.74 130.76 0.617 80.68 IPC 17
1nos pedastal P1 12 14.00 2.88 40.29 0.888 35.78 IPC 17
2nos pedastal P1 12 14.00 2.74 38.36 0.888 34.06 IPC 17
3nos pedastal P1 12 14.00 2.60 36.43 0.888 32.35 IPC 17
3nos pedastal P2 12 14.00 2.60 36.43 0.888 32.35 IPC 17
4nos pedastal P1 12 14.00 2.46 34.50 0.888 30.63 IPC 17
4nos pedastal P2 12 14.00 2.46 34.50 0.888 30.63 IPC 17
5nos pedastal P1 12 14.00 2.33 32.56 0.888 28.92 IPC 17
5nos pedastal P2 12 14.00 2.33 32.56 0.888 28.92 IPC 17
2 Legged Stirrups in middle P3 12 100 30.00 2.02 60.60 0.888 53.81 IPC 17
Jacking point mesh 8 12.00 3.08 36.90 0.395 14.58 IPC 17
Mesh For PEDASTAL 8 20.00 5.18 103.60 0.395 40.92 IPC 17
Mesh For PEDASTAL 8 20.00 5.18 103.60 0.395 40.92 IPC 17
Top main rod IST layer C1 32 13.00 13.46 174.98 6.313 1,104.65 IPC 17
Top main rod II layer C2 32 13.00 13.33 173.29 6.313 1,093.98 IPC 17
Bottom main rod C3 20 13.00 13.54 176.02 2.466 434.07 IPC 17
Side distribution rod C4 16 6.00 15.50 93.00 1.578 146.75 IPC 17
Side distribution rod C5 16 6.00 10.93 65.58 1.578 103.49 IPC 17
stirrups end portion C6 10 120 2.00 5.68 11.36 0.617 7.01 IPC 17
stirrups between
ped.1&2( middle portion) C6 10 120 14.00 6.44 90.16 0.617 55.63 IPC 17
stirrups between
C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
ped.3&4( middle portion)
stirrups between
ped.4&5( middle portion) C6 10 120 14.00 6.44 90.16 0.617 55.63 IPC 17
Stirrups in Pedastal location C7 12 20.00 6.74 134.88 0.888 119.77 IPC 17
Stirrups in Pedastal location C7 12 20.00 5.94 118.88 0.888 105.57 IPC 17
stirrups between ped.1( middle
portion) C8 25 120 22.00 5.82 128.04 3.853 493.34 IPC 17
stirrups between
ped.2&3( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
stirrups between
ped.3&4( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
stirrups between
ped.4&5( middle portion) C6 10 120 14.00 6.44 90.16 0.617 55.63 IPC 17
Stirrups in Pedastal location C7 12 20.00 6.74 134.88 0.888 119.77 IPC 17
Stirrups in Pedastal location C7 12 20.00 5.94 118.88 0.888 105.57 IPC 17
stirrups between ped.1( middle
C8 25 120 22.00 5.82 128.04 3.853 493.34 IPC 17
portion)
LP 7 Pier cap stirrups between ped.2( middle
MJB MAY14/Str/822 17-May-14 04+895 04+960 portion) C8 25 120 20.00 6.80 136.00 3.853 524.01 IPC 17
stirrups between
ped.2&3( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
stirrups between
ped.3&4( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 17
MJB LP 4 Pier cap 17-May-14 04+895 04+960 stirrups between ped.2( middle
MAY14/Str/824 portion) C8 25 120 20.00 6.80 136.00 3.853 524.01 IPC 17
stirrups between
C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 18
ped.2&3( middle portion)
stirrups between
ped.3&4( middle portion) C6 10 120 13.00 7.16 93.08 0.617 57.43 IPC 18
stirrups between
ped.4&5( middle portion) C6 10 120 14.00 6.44 90.16 0.617 55.63 IPC 18
Stirrups in Pedastal location C7 12 20.00 6.74 134.88 0.888 119.77 IPC 18
Stirrups in Pedastal location C7 12 20.00 5.94 118.88 0.888 105.57 IPC 18
stirrups between ped.1( middle
C8 25 120 22.00 5.82 128.04 3.853 493.34 IPC 18
portion)
LP 1 Pier cap stirrups between ped.2( middle
MJB JUN14/Str/661 16-Jun-14 03+002 03+002 portion) C8 25 120 20.00 6.80 136.00 3.853 524.01 IPC 18
stirrups between
ped.4&5( middle portion) C6 10 120 14.00 6.44 90.16 0.617 55.63 IPC 18
Stirrups in Pedastal location C7 12 20.00 6.74 134.88 0.888 119.77 IPC 18
Stirrups in Pedastal location C7 12 20.00 5.94 118.88 0.888 105.57 IPC 18
stirrups between ped.1( middle
portion) C8 25 120 22.00 5.82 128.04 3.853 493.34 IPC 18
MJB LP 2 Pier cap 18-Jun-14 03+002 03+002 stirrups between ped.2( middle C8 20.00 6.80 136.00 3.853 524.01 IPC 18
JUN14/Str/755 portion) 25 120
stirrups between ped.3( middle C8 10.00 7.04 70.40 3.853 271.25 IPC 18
portion) 25 120
Inner Stirrups in cantilevar C9 10 120 76.00 4.28 325.43 0.617 200.79 IPC 18
Inner Stirrups in pier C9 10 120 35.00 5.03 176.12 0.617 108.67 IPC 18
Inner Stirrups in cantilevar C9 10 120 76.00 2.99 226.94 0.617 140.02 IPC 18
Inner Stirrups in cantilevar C9 10 120 35.00 3.74 130.76 0.617 80.68 IPC 18
1nos pedastal P1 12 14.00 2.88 40.29 0.888 35.78 IPC 18
2nos pedastal P1 12 14.00 2.74 38.36 0.888 34.06 IPC 18
3nos pedastal P1 12 14.00 2.60 36.43 0.888 32.35 IPC 18
3nos pedastal P2 12 14.00 2.60 36.43 0.888 32.35 IPC 18
4nos pedastal P1 12 14.00 2.46 34.50 0.888 30.63 IPC 18
4nos pedastal P2 12 14.00 2.46 34.50 0.888 30.63 IPC 18
5nos pedastal P1 12 14.00 2.33 32.56 0.888 28.92 IPC 18
5nos pedastal P2 12 14.00 2.33 32.56 0.888 28.92 IPC 18
2 Legged Stirrups in middle P3 12 100 30.00 2.02 60.60 0.888 53.81 IPC 18
MJB JUL14/STR/1110 25-Jul-14 41987 41987 Deck Slab (MNB) 10,621.00 IPC 19
Raft bottom main rod 16 86.00 46.15 3,969.07 1.578 6,263.20 IPC 20
Outer wall main rod 12 172.00 7.63 1,312.36 0.888 1,165.38 IPC 20
Extra raft top 12 624.00 3.50 2,184.00 0.888 1,939.39 IPC 20
Raft top Rod 10 86.00 44.01 3,784.86 0.617 2,335.26 IPC 20
Outer Wall inner rod 12 172.00 4.32 743.12 0.888 659.89 IPC 20
Bottom Hunch 10 150.00 1.44 216.60 0.617 133.64 IPC 20
Bottom Hunch 10 966.00 1.44 1,394.90 0.617 860.66 IPC 20
MNB AUG14/STR/589 21-Aug-14 24+460 Raft distribution 10 448.00 15.35 6,876.80 0.617 4,242.99 IPC 20
Raft Extra distribution 10 72.00 15.29 1,100.88 0.617 679.24 IPC 20
Raft Extra distribution 10 8.00 15.35 122.80 0.617 75.77 IPC 20
Shear Key main rod 10 255.00 3.91 997.82 0.617 615.65 IPC 20
Shear Key Dist. rod 10 10.00 43.71 437.10 0.617 269.69 IPC 20
Mid wall 12 1,106.00 4.31 4,761.33 0.888 4,228.06 IPC 20
Extra Bottom wall rod 10 1,092.00 1.85 2,019.11 0.617 1,245.79 IPC 20
Extra raft rod 16 546.00 3.40 1,856.40 1.578 2,929.40 IPC 20
Raft bottom main rod 16 81.00 29.88 2,420.20 1.578 3,819.07 IPC 20
Outer wall main rod 12 162.00 7.52 1,218.08 0.888 1,081.65 IPC 20
Extra raft top 10 340.00 3.50 1,190.00 0.617 734.23 IPC 20
Raft top Rod 12 81.00 27.80 2,251.96 0.888 1,999.74 IPC 20
Outer Wall inner rod 12 162.00 4.21 681.86 0.888 605.49 IPC 20
Bottom Hunch 10 160.00 1.44 231.04 0.617 142.55 IPC 20
Bottom Hunch 10 552.00 1.44 797.09 0.617 491.80 IPC 20
Raft distribution 10 280.00 16.35 4,578.00 0.617 2,824.63 IPC 20
MNB AUG14/STR/653 23-Aug-14 30+165
Raft Extra distribution 10 8.00 16.29 130.32 0.617 80.41 IPC 20
Raft Extra distribution 10 16.00 14.04 224.64 0.617 138.60 IPC 20
Raft Extra distribution 10 8.00 16.35 130.80 0.617 80.70 IPC 20
Shear Key main rod 10 183.00 3.91 716.08 0.617 441.82 IPC 20
Shear Key Dist. rod 10 10.00 27.51 275.10 0.617 169.74 IPC 20
Mid wall 12 552.00 4.21 2,323.37 0.888 2,063.15 IPC 20
Extra Bottom wall rod 10 544.00 1.81 985.73 0.617 608.19 IPC 20
Checked By,QS, ILFS MJB Sep14/Str/877 25-Sep-14 3433 LP6 Accepted By,QS,NAPC
RFI No Bar Bar No. of Wt/M
Structure NAPC/BKEL/ Date Actual Chainage CA Chainage Description No. Dia Spacing bars Total Wt. (Kg) Remarks
Cutting Length ( Total Cutting Lengt (Kg)
stirrups between 22.00
ped.1( middle portion) C8 25 120 5.82 128.04 3.853 493.34 IPC 21
MJB Sep14/Str/877 25-Sep-14 3433 LP6 stirrups between
C8 25 120 20.00 6.80 136.00 3.853 524.01 IPC 21
ped.2( middle portion)
stirrups between 10.00
ped.3( middle portion) C8 25 120 7.04 70.40 3.853 271.25 IPC 21
Inner Stirrups in cantilevar C9 10 120 76.00 4.28 325.43 0.617 200.79 IPC 21
Inner Stirrups in pier C9 10 120 35.00 5.03 176.12 0.617 108.67 IPC 21
Inner Stirrups in cantilevar C9 10 120 76.00 2.99 226.94 0.617 140.02 IPC 21
Inner Stirrups in cantilevar C9 10 120 35.00 3.74 130.76 0.617 80.68 IPC 21
1nos pedastal P1 12 14.00 2.88 40.29 0.888 35.78 IPC 21
2nos pedastal P1 12 14.00 2.74 38.36 0.888 34.06 IPC 21
3nos pedastal P1 12 14.00 2.60 36.43 0.888 32.35 IPC 21
3nos pedastal P2 12 14.00 2.60 36.43 0.888 32.35 IPC 21
4nos pedastal P1 12 14.00 2.46 34.50 0.888 30.63 IPC 21
4nos pedastal P2 12 14.00 2.46 34.50 0.888 30.63 IPC 21
5nos pedastal P1 12 14.00 2.33 32.56 0.888 28.92 IPC 21
5nos pedastal P2 12 14.00 2.33 32.56 0.888 28.92 IPC 21
2 Legged Stirrups in middle P3 12 100 30.00 2.02 60.72 0.888 53.92 IPC 21
Jacking point mesh 8 12.00 3.08 36.90 0.395 14.58 IPC 21
Mesh For PEDASTAL 8 20.00 5.18 103.60 0.395 40.92 IPC 21
Mesh For PEDASTAL 8 20.00 5.18 103.60 0.395 40.92 IPC 21
Top main rod IST layer C1 32 13.00 13.46 174.98 6.313 1,104.65 IPC 21
Top main rod II layer C2 32 13.00 13.33 173.29 6.313 1,093.98 IPC 21
Bottom main rod C3 20 13.00 13.54 176.02 2.466 434.07 IPC 21
Side distribution rod C4 16 6.00 15.50 93.00 1.578 146.75 IPC 21
Side distribution rod C5 16 6.00 10.93 65.58 1.578 103.49 IPC 21
stirrups end portion C6 10 120 2.00 5.68 11.36 0.617 7.01 IPC 21
stirrups between 14.00
C6 10 120 6.44 90.16 0.617 55.63 IPC 21
ped.1&2( middle portion)
stirrups between 13.00
ped.2&3( middle portion) C6 16 120 7.05 91.62 1.578 144.58 IPC 21
Top main rod IST layer C1 32 13.00 13.46 174.98 6.313 1,104.65 IPC 22
Top main rod II layer C2 32 13.00 13.33 173.29 6.313 1,093.98 IPC 22
Bottom main rod C3 20 13.00 13.54 176.02 2.466 434.07 IPC 22
Side distribution rod C4 16 6.00 15.50 93.00 1.578 146.75 IPC 22
Side distribution rod C5 16 6.00 10.93 65.58 1.578 103.49 IPC 22
stirrups end portion C6 10 120 2.00 5.68 11.36 0.617 7.01 IPC 22
stirrups between 14.00
C6 10 120 6.44 90.16 0.617 55.63 IPC 22
ped.1&2( middle portion)
stirrups between 13.00
ped.2&3( middle portion) C6 16 120 7.05 91.62 1.578 144.58 IPC 22
Inner Stirrups in cantilevar C9 10 120 76.00 4.28 325.43 0.617 200.79 IPC 22
Inner Stirrups in pier C9 10 120 35.00 5.03 176.12 0.617 108.67 IPC 22
Inner Stirrups in cantilevar C9 10 120 76.00 2.99 226.94 0.617 140.02 IPC 22
Inner Stirrups in cantilevar C9 10 120 35.00 3.74 130.76 0.617 80.68 IPC 22
1nos pedastal P1 12 14.00 2.88 40.29 0.888 35.78 IPC 22
2nos pedastal P1 12 14.00 2.74 38.36 0.888 34.06 IPC 22
3nos pedastal P1 12 14.00 2.60 36.43 0.888 32.35 IPC 22
3nos pedastal P2 12 14.00 2.60 36.43 0.888 32.35 IPC 22
4nos pedastal P1 12 14.00 2.46 34.50 0.888 30.63 IPC 22
4nos pedastal P2 12 14.00 2.46 34.50 0.888 30.63 IPC 22
5nos pedastal P1 12 14.00 2.33 32.56 0.888 28.92 IPC 22
5nos pedastal P2 12 14.00 2.33 32.56 0.888 28.92 IPC 22
2 Legged Stirrups in middle P3 12 100 30.00 2.02 60.72 0.888 53.92 IPC 22
Jacking point mesh 8 12.00 3.08 36.90 0.395 14.58 IPC 22
Mesh For PEDASTAL 8 20.00 5.18 103.60 0.395 40.92 IPC 22
Mesh For PEDASTAL 8 20.00 5.18 103.60 0.395 40.92 IPC 22
Slab top Extra T1a 16 200 138.00 6.88 949.99 1.578 1,499.09 IPC 22
Slab top Extra T1b 16 200 345.00 4.50 1,552.50 1.578 2,449.85 IPC 22
Slab top main rod T1 12 200 69.00 37.56 2,591.78 0.888 2,301.50 IPC 22
Slab Top Dis T2 12 100 138.00 37.38 5,158.72 0.888 4,580.94 IPC 22
Slab Bottom Dis T3 10 150 240.00 14.09 3,382.08 0.617 2,086.74 IPC 22
Slab Dist T4 10 150 240.00 14.09 3,382.08 0.617 2,086.74 IPC 22
Inner Wall Dist T7 12 8.00 13.66 109.28 0.888 97.04 IPC 22
Outter Wall Dist W4 16 100 280.00 27.64 7,738.64 1.578 12,211.57 IPC 22
MNB OCt14/Str/360 15-Oct-14 24065 Outer Wall inner Dist W5 16 100 112.00 14.48 1,622.21 1.578 2,559.84 IPC 22
Outer Wall Haunch W5a 10 100 112.00 14.54 1,628.48 0.617 1,004.77 IPC 22
Outer Wall Haunch H1 12 150 184.00 2.05 377.20 0.888 334.95 IPC 22
Mid Wall Haunch H2 12 150 920.00 1.86 1,711.20 0.888 1,519.55 IPC 22
Haunch Distr H3 16 12.00 13.66 163.92 1.578 258.67 IPC 22
Bracket Main Rod C1 12 150 178.00 2.34 416.16 0.888 369.55 IPC 22
Bracket Dist Rod C2 12 8.00 13.16 105.28 0.888 93.49 IPC 22
10 300 136.00 2.40 326.40 0.617 201.39 IPC 22
2-Legged stripps C3
10 300 68.00 2.14 145.52 0.617 89.79 IPC 22
Top main rod a1 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC 22
Top main rod a1 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC 22
Bottom main rod a2 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC 22
Bottom main rod a2 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC 22
Top distribution rod a3 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC 22
Bottom distribution rod a4 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC 22
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC 22
Distribution rod in Exp joint 16 12.00 13.75 165.05 1.578 260.45 IPC 22
Area a6
Main bar in Girder location a7 10 40.00 1.20 48.00 0.617 29.62 IPC 22
Main bar between Girder 10 200 96.00 1.49 143.04 0.617 88.26 IPC 22
location a8
10 200 24.00 2.59 62.21 0.617 38.38 IPC 22
LA1-LP1 Deck Main bar in Cantilevar location a9
slab
MJB 16/10/2014 4+895 & Distibution bar in Cantilevar 10 4.00 11.77 47.08 0.617 29.05 IPC 22
Oct14/Str/371 location a10
Cross
Girder Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC 22
Distibution bar in Cantilevar 16 200 48.00 1.09 52.51 1.578 82.86 IPC 22
location a12
Distibution bar in Girder 10 16.00 2.22 35.52 0.617 21.92 IPC 22
location a13
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC 22
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC 22
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC 22
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC 22
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC 22
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC 22
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC 22
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC 22
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC 22
Slab bottom rod 6 12 190 73.00 28.71 2,095.98 0.888 1,861.23 IPC 22
Extra Slab bottom 7 10 190 365.00 3.61 1,315.83 0.617 811.86 IPC 22
Slab top main rod 8 12 190 73.00 31.72 2,315.49 0.888 2,056.15 IPC 22
Top Hunch 10 10 200 690.00 1.49 1,025.34 0.617 632.63 IPC 22
Slab distribution 11 12 225 230.00 14.09 3,241.16 0.888 2,878.15 IPC 22
Wall distribution 13 12 225 84.00 15.84 1,330.73 0.888 1,181.69 IPC 22
Slab Extra distribution 14 10 24.00 14.10 338.40 0.617 208.79 IPC 22
MNB Oct14/Str/431 17-Oct-14 30355
Mid wall distribution 15 12 225 168.00 13.99 2,350.66 0.888 2,087.38 IPC 22
Bracket Dist. 16 12 10.00 13.16 131.60 0.888 116.86 IPC 22
Bracket Main 17 12 150 184.00 1.94 356.41 0.888 316.49 IPC 22
Extra Top wall rod 22a 16 190 584.00 2.31 1,346.41 1.578 2,124.64 IPC 22
Extra Slab rod 24 16 190 292.00 3.49 1,019.08 1.578 1,608.11 IPC 22
26 10 400 140.00 2.10 294.00 0.617 181.40 IPC 22
2-Legged stripps 10 400 70.00 1.90 133.00 0.617 82.06 IPC 22
Top main rod IST layer C1 32 13.00 13.46 174.98 6.313 1,104.65 IPC 22
Top main rod II layer C2 32 13.00 13.33 173.29 6.313 1,093.98 IPC 22
Bottom main rod C3 20 13.00 13.54 176.02 2.466 434.07 IPC 22
Side distribution rod C4 16 6.00 15.50 93.00 1.578 146.75 IPC 22
Side distribution rod C5 16 6.00 10.93 65.58 1.578 103.49 IPC 22
stirrups end portion C6 10 120 2.00 5.68 11.36 0.617 7.01 IPC 22
stirrups between C6 10 120 14.00 6.44 90.16 0.617 55.63 IPC 22
ped.1&2( middle portion)
stirrups between 13.00
ped.2&3( middle portion) C6 16 120 7.05 91.62 1.578 144.58 IPC 22
Top main rod IST layer C1 32 13.00 13.46 174.98 6.313 1,104.65 IPC 22
Top main rod II layer C2 32 13.00 13.33 173.29 6.313 1,093.98 IPC 22
Bottom main rod C3 20 13.00 13.54 176.02 2.466 434.07 IPC 22
Side distribution rod C4 16 6.00 15.50 93.00 1.578 146.75 IPC 22
Side distribution rod C5 16 6.00 10.93 65.58 1.578 103.49 IPC 22
stirrups end portion C6 10 120 2.00 5.68 11.36 0.617 7.01 IPC 22
stirrups between 14.00
C6 10 120 6.44 90.16 0.617 55.63 IPC 22
ped.1&2( middle portion)
stirrups between 13.00
ped.2&3( middle portion) C6 16 120 7.05 91.62 1.578 144.58 IPC 22
MJB
Top main rod a1 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC 23
Top main rod a1 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC 23
Bottom main rod a2 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC 23
Bottom main rod a2 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC 23
Top distribution rod a3 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC 23
Bottom distribution rod a4 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC 23
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC 23
Distribution rod in Exp joint 16 12.00 13.75 165.05 1.578 260.45 IPC 23
Area a6
Main bar in Girder location a7 10 40.00 1.20 48.00 0.617 29.62 IPC 23
Main bar between Girder 10 200 96.00 1.49 143.04 0.617 88.26 IPC 23
location a8
10 200 24.00 2.59 62.21 0.617 38.38 IPC 23
LP6-LP7 Deck slab LP6-LP7 Deck Main bar in Cantilevar location a9
& slab
MJB Cross Girder 27-Oct-14 4+895 & Distibution bar in Cantilevar 10 4.00 11.77 47.08 0.617 29.05 IPC 23
Cross location a10
Oct14/Str/754 Girder Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC 23
Distibution bar in Cantilevar 16 200 48.00 1.09 52.51 1.578 82.86 IPC 23
location a12
Distibution bar in Girder 10 16.00 2.22 35.52 0.617 21.92 IPC 23
location a13
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC 23
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC 23
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC 23
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC 23
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC 23
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC 23
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC 23
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC 23
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC 23
Top main rod a1 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC 23
Top main rod a1 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC 23
Bottom main rod a2 16 200 94.00 13.75 1,292.88 1.578 2,040.16 IPC 23
Bottom main rod a2 12 200 93.00 13.78 1,281.35 0.888 1,137.84 IPC 23
Top distribution rod a3 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC 23
Bottom distribution rod a4 10 150 89.00 19.54 1,739.06 0.617 1,073.00 IPC 23
Crash barrier distribution rod a5 16 8.00 20.00 160.03 1.578 252.53 IPC 23
Distribution rod in Exp joint 16 12.00 13.75 165.05 1.578 260.45 IPC 23
Area a6
Main bar in Girder location a7 10 40.00 1.20 48.00 0.617 29.62 IPC 23
Main bar between Girder 10 200 96.00 1.49 143.04 0.617 88.26 IPC 23
location a8
10 200 24.00 2.59 62.21 0.617 38.38 IPC 23
LP7-LP8 Deck slab LP7-LP8 Deck Main bar in Cantilevar location a9
& slab
MJB Cross Girder 28-Oct-14 4+895 & Distibution bar in Cantilevar 10 4.00 11.77 47.08 0.617 29.05 IPC 23
Cross location a10
Oct14/Str/793 Girder Extra rod in Exp joint Area a11 10 200 134.00 3.57 478.38 0.617 295.16 IPC 23
Distibution bar in Cantilevar 16 200 48.00 1.09 52.51 1.578 82.86 IPC 23
location a12
Distibution bar in Girder 10 16.00 2.22 35.52 0.617 21.92 IPC 23
location a13
2-Legged stripps a14 10 200 130.00 0.84 109.20 0.617 67.38 IPC 23
Top rod d5 20 6.00 13.73 82.38 2.466 203.15 IPC 23
Top side rod d6 20 4.00 13.73 54.92 2.466 135.43 IPC 23
Distribution rod d8 12 160.00 2.06 329.60 0.888 292.68 IPC 23
2-Legged stirupps d10 16 125 144.00 2.94 423.94 1.578 668.97 IPC 23
Bottom rod d11 16 24.00 2.06 49.44 1.578 78.02 IPC 23
Bottom side rod d12 12 16.00 2.06 32.96 0.888 29.27 IPC 23
Link rod 10 120.00 0.32 38.88 0.617 23.99 IPC 23
Mesh 8 28.00 3.58 100.24 0.395 39.59 IPC 23
1 16 200 48.00 6.69 321.22 1.578 506.88 IPC 23
2 16 200 49.00 9.26 453.74 1.578 716.00 IPC 23
3 12 200 48.00 4.04 193.82 0.888 172.12 IPC 23
4 12 200 49.00 5.41 265.29 0.888 235.57 IPC 23
5 10 150 17.00 9.24 157.05 0.617 96.90 IPC 23
5 10 150 13.00 9.45 122.80 0.617 75.77 IPC 23
6 16 150 49.00 5.23 256.37 1.578 404.55 IPC 23
MNB Oct14/Str/861 29-Oct-14 14600 A1 side Retaining Wall Raft 6a 16 15 48.00 3.83 183.89 1.578 290.18 IPC 23
7 10 150 17.00 9.24 157.05 0.617 96.90 IPC 23
7 10 150 5.00 9.73 48.64 0.617 30.01 IPC 23
7 10 150 13.00 9.45 122.80 0.617 75.77 IPC 23
Slab bottom rod 6 10 190 79.00 38.69 3,056.51 0.617 1,885.87 IPC25
Extra Slab bottom 7 10 190 553.00 3.50 1,935.50 0.617 1,194.20 IPC25
Slab top main rod 8 10 190 79.00 41.35 3,266.89 0.617 2,015.67 IPC25
Top Hunch 10 10 200 966.00 1.43 1,378.48 0.617 850.52 IPC25
Slab distribution 11 10 225 392.00 14.10 5,527.20 0.617 3,410.28 IPC25
Wall distribution 13 10 225 88.00 16.35 1,438.80 0.617 887.74 IPC25
Slab Extra distribution 14 10 32.00 14.10 451.20 0.617 278.39 IPC25
MNB MAR14/Str/1387 25-Mar-14 16+185
Mid wall distribution 15 10 225 264.00 14.00 3,696.00 0.617 2,280.43 IPC25
MNB DEC14/Str/524 21-Dec-14 44+914 44+914 Drainage Spouts span - I RHS 1 6.000 RAB 24
MNB DEC14/Str/524 21-Dec-14 44+914 44+914 Drainage Spouts span - II RHS 5 5.000 RAB 24
MNB JAN14/Str/167 8-Jan-15 38+200 38+200 Drainage Spouts LHS 3 3.000 RAB 25
MNB FEB15/STR/219 8-Feb-15 38+200 38+200 Flexible Apron LHS 1 22.144 2.024 0.450 20.169 RAB 26A
MNB FEB15/STR/219 8-Feb-15 38+200 38+200 Flexible Apron LHS 1 22.144 1.899 0.300 12.615 RAB 26A
MNB FEB15/STR/219 8-Feb-15 38+200 38+200 Flexible Apron LHS 1 25.848 0.976 0.750 18.921 RAB 26A
MNB FEB15/STR/223 8-Feb-15 41+987 41+987 Flexible Apron LHS 1 28.466 3.000 0.450 38.429 RAB 26A
MNB FEB15/STR/223 8-Feb-15 41+987 41+987 Flexible Apron LHS 1 28.466 2.875 0.300 24.552 RAB 26A
MNB FEB15/STR/226 8-Feb-15 44+120 44+120 Flexible Apron LHS 1 28.148 2.563 0.450 32.464 RAB 26A
MNB FEB15/STR/226 8-Feb-15 44+120 44+120 Flexible Apron LHS 1 28.148 2.438 0.300 20.587 RAB 26A
MNB FEB15/STR/226 8-Feb-15 44+120 44+120 Flexible Apron LHS 1 32.326 0.437 0.750 10.595 RAB 26A
MNB FEB15/STR/217 8-Feb-15 38+200 38+200 Flexible Apron RHS 1 25.848 6.000 0.450 69.790 RAB 26A
MNB FEB15/STR/217 8-Feb-15 38+200 38+200 Flexible Apron RHS 1 25.848 5.875 0.300 45.56 RAB 26A
MNB FEB15/STR/221 8-Feb-15 41+987 41+987 Flexible Apron RHS 1 29.899 1.073 0.450 14.437 RAB 26A
MNB FEB15/STR/221 8-Feb-15 41+987 41+987 Flexible Apron RHS 1 29.899 0.948 0.300 8.503 RAB 26A
MNB FEB15/STR/221 8-Feb-15 41+987 41+987 Flexible Apron RHS 1 33.346 4.927 0.750 123.222 RAB 26A
MNB DEC14/Str/525 21-Dec-14 43+700 43+700 Flexible apron RHS 1 28.356 6.000 0.450 76.561 RAB 24
MNB DEC14/Str/525 21-Dec-14 43+700 43+700 Flexible apron RHS 1 28.356 5.875 0.300 49.977 RAB 24
MNB DEC14/Str/527 21-Dec-14 44+120 44+120 Flexible apron RHS 1 29.640 6.000 0.450 80.028 RAB 24
MNB DEC14/Str/527 21-Dec-14 44+120 44+120 Flexible apron RHS 1 29.640 5.875 0.300 52.241 RAB 24
MNB DEC14/Str/526 21-Dec-14 44+914 44+914 Flexible apron RHS 1 68.105 6.000 0.450 183.884 RAB 24
MNB DEC14/Str/526 21-Dec-14 44+914 44+914 Flexible apron RHS 1 68.105 5.875 0.300 120.035 RAB 24
MNB FEB15/STR/218 8-Feb-15 38+200 38+200 Rigid Apron Laying LHS 1 17.120 2.800 0.300 14.381 RAB 26A
MNB FEB15/STR/222 8-Feb-15 41+987 41+987 Rigid Apron Laying LHS 1 22.393 2.800 0.300 18.810 RAB 26A
MNB FEB15/STR/225 8-Feb-15 44+120 44+120 Rigid Apron Laying LHS 1 22.585 2.800 0.300 18.971 RAB 26A
VUP Oct'13/STR/660 25-Oct-13 17+969 17+969 Rubble Soiling LHS 1 13.050 1.250 12.200 199.013 RAB 11
VUP Oct'13/STR/660 25-Oct-13 17+969 17+969 Rubble Soiling LHS 1 12.200 0.800 0.850 8.296 RAB 11
VUP Oct'13/STR/660 25-Oct-13 17+969 17+969 Rubble Soiling LHS 1 12.200 0.200 0.400 0.976 RAB 11
MNB FEB15/STR/216 8-Feb-15 38+200 38+200 Rigid Apron Laying RHS 1 17.900 4.800 0.300 25.776 RAB 26A
MNB FEB15/STR/220 8-Feb-15 41+987 41+987 Rigid Apron Laying RHS 1 23.826 4.800 0.300 34.309 RAB 26A
MNB MAY14/STR/125 04-May-14 43+700 43+700 Rigid Floor Apron RHS 1 22.550 4.800 0.300 32.472 RAB 17
MNB FEB15/STR/224 8-Feb-15 44+120 44+120 Rigid Apron Laying RHS 1 25.100 4.800 0.300 36.144 RAB 26A
MNB MAY14/STR/126 04-May-14 44+120 44+120 Rigid Floor Apron RHS 1 22.644 4.800 0.300 32.607 RAB 17
MNB NOV14/STR/924 23-Nov-14 44+914 44+914 Rigid Floor Apron RHS 1 62.008 4.800 0.300 89.292 RAB 23
MJB DEC14/Str/504 41994-May-14 3002 3002 LP1&2 Bearing LHS 20 40.000 36.000 9.600 276,480 RAB 24
MJB Oct14/Str/844 29-Oct-14 3433 3433 LP2 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB Oct14/Str/786 28-Oct-14 3433 3433 LP4 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB Oct14/Str/786 28-Oct-14 3433 3433 LP5 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB Oct14/Str/786 28-Oct-14 3433 3433 LP6 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB Oct14/Str/786 28-Oct-14 3433 3433 LP7 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB Oct14/Str/900 30-Oct-14 3433 3433 LP1 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB Nov14/Str/89 3-Nov-14 3433 3433 LP1 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB Nov14/Str/89 3-Nov-14 3433 3433 LP8 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB Nov14/Str/276 7-Nov-14 3433 3433 LP3 LHS 10 40.000 36.000 9.600 138,240 RAB 23
MJB MAY14/STR/973 20-May-14 4895 4895 LP4 LHS 10 40.000 36.000 9.600 138,240 RAB 17
MJB MAY14/STR/971 20-May-14 4895 4895 LP2 LHS 10 40.000 36.000 9.600 138,240 RAB 17
MJB MAY14/STR/1032 21-May-14 4895 4895 LP6 LHS 70 40.000 36.000 9.600 967,680 RAB 17
MJB JAN14/STR/1322 25-Jan-14 3002 2962 RA1 & RA2 RHS 10 40.000 36.000 9.600 138,240 RAB 13
MJB JAN14/STR/1323 25-Jan-14 3002 2962 RP1 & RP2 RHS 20 40.000 36.000 9.600 276,480 RAB 13
MJB MAR14/STR/1010 20-Mar-14 3433 3433 RP6,RP3,RP4 RHS 30 40.000 36.000 9.600 414,720 RAB 15
MJB MAR14/STR/1322 24-Mar-14 3433 3433 RA1,RA2 RHS 10 40.000 36.000 9.600 138,240 RAB 15
MJB MAR14/STR/825 15-Mar-14 3433 3433 RP1 RHS 10 40.000 36.000 9.600 138,240 RAB 15
MJB MAR14/STR/826 15-Mar-14 3433 3433 RP7 RHS 10 40.000 36.000 9.600 138,240 RAB 15
MJB MAR14/STR/945 19-Mar-14 3433 3433 RP8,RP4,RP5 RHS 30 40.000 36.000 9.600 414,720 RAB 15
MJB JAN14/STR/392 9-Jan-14 4960 4895 RA1 & RA2 RHS 10 40.000 36.000 9.600 138,240 RAB 13
MJB JAN14/STR/393 9-Jan-14 4960 4895 RP1 - RP8 RHS 80 40.000 36.000 9.600 1,105,920 RAB 13
LA2 Bearing
MJB DEC14/STR/541 22-Dec-14 3002 3002 Fixing LHS 5 40.000 36.000 9.600 69,120 RAB 26A
MNB FEB15/STR/526 22-Feb-15 3200 3200 A1 A2 Approach Slab LHS 2 13.250 3.500 0.300 27.825 RAB 26
MNB FEB15/STR/516 21-Feb-15 21510 21510 A1 A2 Approach Slab LHS 2 12.000 3.500 0.300 25.200 RAB 26
MNB FEB15/STR/492 20-Feb-15 23750 23750 A2 Approach Slab LHS 1 13.250 3.200 0.300 12.720 RAB 26
MNB FEB15/STR/304 12-Feb-15 24065 24065 A2 Approach Slab LHS 1 13.250 3.500 0.300 13.913 RAB 26
MNB FEB15/STR/439 18-Feb-15 24065 24065 A1 Approach Slab LHS 1 13.250 3.500 0.300 13.913 RAB 26
MNB FEB15/STR/463 19-Feb-15 24460 24460 A1 Approach Slab LHS 1 13.250 3.500 0.300 13.913 RAB 26
MNB FEB15/STR/530 22-Feb-15 24460 24460 A2 Approach Slab LHS 1 13.250 3.500 0.300 13.913 RAB 26
MNB FEB15/STR/465 19-Feb-15 30355 30355 A1 Approach Slab LHS 1 13.250 3.500 0.300 13.913 RAB 26
MNB FEB15/STR/441 18-Feb-15 31490 31490 A2 Approach Slab LHS 1 13.250 3.500 0.300 13.913 RAB 26
MNB FEB15/STR/464 19-Feb-15 31490 31490 A1 Approach Slab LHS 1 13.250 3.500 0.300 13.913 RAB 26
MNB FEB15/STR/424 17-Feb-15 35825 35825 A1 Approach Slab LHS 1 13.250 3.500 0.300 13.913 RAB 26
BC Feb15/STR/512 21-Feb-15 16770 16770 A1 A2 Ret Wall Crash Barrier LHS 2 6.202 12.404 RAB 26
BC Feb15/STR/345 14-Feb-15 17002 17002 A1 A2 Ret Wall Crash Barrier LHS 2 6.136 12.272 RAB 26
BC Feb15/STR/345 14-Feb-15 17002 17002 Structure LHS 1 8.100 8.100 RAB 26
MJB Feb15/STR/292 12-Feb-15 3433 3433 LP1-Lp2 Crash Barrier LHS 1 20.000 20.000 RAB 26
MJB Feb15/STR/293 12-Feb-15 3433 3433 LP2-Lp3 Crash Barrier LHS 1 20.000 20.000 RAB 26
MJB Feb15/STR/343 12-Feb-15 3433 3433 LA1-Lp1 Crash Barrier LHS 1 20.000 20.000 RAB 26
MJB Feb15/STR/509 21-Feb-15 3433 3433 A2 Ret Wall Crash Barrier LHS 1 8.244 8.244 RAB 26
MJB Feb15/STR/557 23-Feb-15 3433 3433 A2 Ret Wall Crash Barrier LHS 2 2.750 5.500 RAB 26
MJB Feb15/STR/556 24-Feb-15 3433 3433 A1 Ret Wall Crash Barrier LHS 1 7.231 7.231 RAB 26
MNB Feb15/STR/491 20-Feb-15 22300 22300 Structure A1 LHS 1 28.150 28.150 RAB 26
MNB Feb15/STR/549 23-Feb-15 22300 22300 A1Ret Wall Crash Barrier LHS 1 9.632 9.632 RAB 26
MNB Feb15/STR/549 23-Feb-15 22300 22300 A1 A2 Ret Wall Crash Barrier LHS 1 9.070 9.070 RAB 26
MNB Feb15/STR/580 25-Feb-15 22388 22388 Crash Barrier Road Edge LHS 1 22.000 22.000 RAB 26
MNB Feb15/STR/443 18-Feb-15 30355 30355 A2 Ret Wall Crash Barrier LHS 1 8.099 8.099 RAB 26
MNB Feb15/STR/551 23-Feb-15 30355 30355 A1 A2 Approach slab CB LHS 2 3.500 7.000 RAB 26
MNB Feb15/STR/550 23-Feb-15 31490 31490 A1 A2 Approach slab CB LHS 2 3.500 7.000 RAB 26
MNB Feb15/STR/521 21-Feb-15 35825 35825 A1 A2 Approach slab CB LHS 2 3.500 7.000 RAB 26
MNB Feb15/STR/379 15-Feb-15 30165 30165 Structure RHS 2 27.400 54.800 RAB 26
MJB Nov14/Str/1033 27-Nov-14 3433 3433 LP6 Exp Jnt LHS 1 12.950 12.95 RAB 24
MJB Nov14/Str/1056 28-Nov-14 3433 3433 LP5 LP4 Exp Jnt LHS 2 12.950 25.900 RAB 24
MJB DEC14/Str/1 1-Dec-14 3433 3433 LP3 Exp jnt LHS 1 12.950 12.950 RAB 24
MJB DEC14/Str/34 2-Dec-14 3433 3433 LP2 Exp jnt LHS 1 12.950 12.950 RAB 24
MJB DEC14/Str/210 10-Dec-14 3433 3433 LP1 Exp jnt LHS 1 12.950 12.950 RAB 24
MJB Nov14/Str/64 2-Nov-14 04+895 04+895 LP1 Exp joint LHS 1 12.950 12.950 RAB 23
MJB Nov14/Str/64 2-Nov-14 04+895 04+895 LP2 Exp joint LHS 1 12.950 12.950 RAB 23
MJB Nov14/Str/227 6-Nov-14 04+895 04+895 LP4 Exp Jnt LHS 1 12.950 12.950 RAB 23
MJB Nov14/Str/227 6-Nov-14 04+895 04+895 LP5 Exp Jnt LHS 1 12.950 12.950 RAB 23
MJB Nov14/Str/381 10-Nov-14 04+895 04+895 LP6 Exp Jnt LHS 1 12.950 12.950 RAB 23
MJB Nov14/Str/455 12-Nov-14 04+895 04+895 LP7 Exp Jnt LHS 1 12.950 12.950 RAB 23
MJB Nov14/Str/455 12-Nov-14 04+895 04+895 LP8 Exp Jnt LHS 1 12.950 12.950 RAB 23
MJB DEC14/Str/460 20-Dec-14 4895 4895 Exp jnt LHS 1 12.950 12.950 RAB 24
MJB Nov14/Str/381 10-Nov-14 04+895 04+895 LP3 Exp Jnt LHS 1 12.950 wrong entry RAB 25
MJB Jan15/Str/746 27-Dec-14 04+895 04+895 LA2 Exp Jnt LHS 1 12.950 12.950 RAB 25
MJB Jan15/Str/104 6-Jan-15 3+433 3+433 LA2 Exp Jnt LHS 1 12.950 12.950 RAB 25
MJB Jan15/Str/151 8-Jan-15 3+433 3+433 LA1 Exp Jnt LHS 1 12.950 12.950 RAB 25
MJB MAR14/STR/1014 20-Mar-14 04+895 04+960 AR1 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/1015 20-Mar-14 04+895 04+960 AR2 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/1013 20-Mar-14 04+895 04+960 RP1 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/949 19-Mar-14 04+895 04+960 RP2 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/702 14-Mar-14 04+895 04+960 RP7 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/829 15-Mar-14 04+895 04+960 RP3 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/770 14-Mar-14 04+895 04+960 RP4 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/911 18-Mar-14 04+895 04+960 RP5 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/912 18-Mar-14 04+895 04+960 RP6 Exp joint RHS 1 13.750 13.750 RAB 15
MJB MAR14/STR/950 19-Mar-14 04+895 04+960 RP8 Exp joint RHS 1 13.750 13.750 RAB 15
MJB Jan15/Str/31 3-Jan-15 3+433 3+433 LP7 Exp Jnt LHS 1 12.950 12.950 RAB 25
MJB Jan15/Str/58 4-Jan-15 3+433 3+433 LP8 Exp Jnt LHS 1 12.950 12.950 RAB 25
Total Quantity (RM) 383.550
Upto Previous IPC's 383.550
Qty in this IPC -
Road FEB15/HW/758 17-Feb-15 15+290 15+400 Filter Media Laying foLHS 1 110 8.354 0.15 137.841 RAB 26
MJB MAY14/STR/669 15-May-14 03+002 02+962 LA1/1 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/232 07-May-14 03+002 02+962 LA1/10 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/134 05-May-14 03+002 02+962 LA1/11 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/234 07-May-14 03+002 02+962 LA1/12 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/1131 23-May-14 03+002 02+962 LA1/2 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/609 14-May-14 03+002 02+962 LA1/3 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/749 16-May-14 03+002 02+962 LA1/4 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/136 05-May-14 03+002 02+962 LA1/5 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/326 09-May-14 03+002 02+962 LA1/6 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/671 15-May-14 03+002 02+962 LA1/7 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/338 09-May-14 03+002 02+962 LA1/8 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/171 06-May-14 03+002 02+962 LA2/1 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/1133 23-May-14 03+002 02+962 LA2/10 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/956 20-May-14 03+002 02+962 LA2/11 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/555 13-May-14 03+002 02+962 LA2/12 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/324 09-May-14 03+002 02+962 LA2/2 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/56 03-May-14 03+002 02+962 LA2/3 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/173 06-May-14 03+002 02+962 LA2/4 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/277 08-May-14 03+002 02+962 LA2/5 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/683 15-May-14 03+002 02+962 LA2/6 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/497 12-May-14 03+002 02+962 LA2/7 LHS 1 20.000 20.000 RAB 17
MJB 12-May-14 03+002 02+962 LA2/8 LHS 1
MJB MAY14/STR/681 15-May-14 03+002 02+962 LA2/9 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/334 09-May-14 03+002 02+962 LP1/1 LHS 1 25.000 25.000 RAB 17
MJB MAY14/STR/675 15-May-14 03+002 02+962 LP1/2 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/904 19-May-14 03+002 02+962 LP1/3 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/677 15-May-14 03+002 02+962 LP1/4 LHS 1 25.000 25.000 RAB 17
MJB MAY14/STR/181 06-May-14 03+002 02+962 LP1/5 LHS 1 25.000 25.000 RAB 17
MJB MAY14/STR/611 14-May-14 03+002 02+962 LP1/6 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/753 16-May-14 03+002 02+962 LP1/7 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/817 17-May-14 03+002 02+962 LP1/8 LHS 1 25.000 25.000 RAB 17
MJB MAY14/STR/54 03-May-14 03+002 02+962 LP2/1 LHS 1 25.000 25.000 RAB 17
MJB MAY14/STR/411 10-May-14 03+002 02+962 LP2/2 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/960 20-May-14 03+002 02+962 LP2/3 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/815 17-May-14 03+002 02+962 LP2/4 LHS 1 25.000 25.000 RAB 17
MJB MAY14/STR/228 07-May-14 03+002 02+962 LP2/5 LHS 1 25.000 25.000 RAB 17
MJB MAY14/STR/679 15-May-14 03+002 02+962 LP2/6 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/900 19-May-14 03+002 02+962 LP2/7 LHS 1 20.000 20.000 RAB 17
MJB MAY14/STR/685 15-May-14 03+002 02+962 LP2/8 LHS 1 25.000 25.000 RAB 17
MJB JUL14/STR/438 9-Jul-2014 03+433 03+433 LA1/1 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/1107 25-Jul-2014 03+433 03+433 LA1/10 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/1078 24-Jul-2014 03+433 03+433 LA1/11 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/994 22-Jul-2014 03+433 03+433 LA1/12 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/745 16-Jul-2014 03+433 03+433 LA1/2 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/703 15-Jul-2014 03+433 03+433 LA1/4 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/793 17-Jul-2014 03+433 03+433 LA1/6 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/890 19-Jul-2014 03+433 03+433 LA1/7 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/795 17-Jul-2014 03+433 03+433 LA1/8 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/996 22-Jul-2014 03+433 03+433 LA1/9 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/1076 24-Jul-2014 03+433 03+433 LA2/10 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/1111 25-Jul-2014 03+433 03+433 LA2/12 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/1278 30-Jul-2014 03+433 03+433 LA2/2 LHS 1 20.000 20.000 RAB 20
MJB JUN14/STR/861 20-Jun-14 03+433 03+433 LA2/3 LHS 1 20.000 20.000 RAB 18
MJB JUL14/STR/1276 30-Jul-2014 03+433 03+433 LA2/4 LHS 1 20.000 20.000 RAB 20
MJB JUL14/STR/988 22-Jul-2014 03+433 03+433 LA2/5 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/1109 25-Jul-2014 03+433 03+433 LA2/6 LHS 1 20.000 20.000 RAB 19
MJB Aug14/STR/2 1-Aug-2014 03+433 03+433 LA2/7 LHS 1 20.000 20.000 RAB 20
MJB JUL14/STR/1103 25-Jul-2014 03+433 03+433 LA2/8 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/898 19-Jul-2014 03+433 03+433 LA2/9 LHS 1 20.000 20.000 RAB 19
MJB JUN14/STR/1410 29-Jun-14 03+433 03+433 LP1/1 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/434 9-Jul-2014 03+433 03+433 LP1/10 LHS 1 20.000 20.000 RAB 19
MJB JUNE14/STR/993 23-Jun-14 03+433 03+433 LP1/12 LHS 1 20.000 20.000 RAB 18
MJB JUN14/STR/758 18-Jun-14 03+433 03+433 LP1/2 LHS 1 20.000 20.000 RAB 18
MJB JUL14/STR/60 2-Jul-2014 03+433 03+433 LP1/3 LHS 1 20.000 20.000 RAB 19
MJB JUN14/STR/1327 28-Jun-14 03+433 03+433 LP1/4 LHS 1 20.000 20.000 RAB 19
MJB JUN14/STR/524 13-Jun-14 03+433 03+433 LP1/5 LHS 1 20.000 20.000 RAB 18
MJB JUN14/STR/664 16-Jun-14 03+433 03+433 LP1/6 LHS 1 20.000 20.000 RAB 18
MJB JUN14/STR/404 11-Jun-14 03+433 03+433 LP1/7 LHS 1 20.000 20.000 RAB 18
MJB JUL14/STR/331 6-Jul-2014 03+433 03+433 LP1/8 LHS 1 20.000 20.000 RAB 19
MJB JUL14/STR/344 7-Jul-2014 03+433 03+433 LP1/9 LHS 1 20.000 20.000 RAB 19
MJB Aug13/Str/837 29-Aug-13 04+895 04+960 Pier RP 1/5 R/s 1 0.246 9.842 2.426 RAB 09
MJB Aug13/Str/839 29-Aug-13 04+895 04+960 Pier RP 1/6 R/s 1 0.246 9.842 2.426 RAB 09
MJB Sep13/Str/304 7-Sep-13 04+895 04+960 Pier RP 4/5 R/s 1 0.246 9.842 2.426 RAB 09
MJB Sep13/Str/257 6-Sep-13 04+895 04+960 Pier RP 4/6 R/s 1 0.246 9.842 2.426 RAB 09
MJB Aug13/Str/831 29-Aug-13 04+895 04+960 Pier RP 6/5 R/s 1 0.246 9.842 2.426 RAB 09
MJB Aug13/Str/958 31-Aug-13 04+895 04+960 Pier RP 6/6 R/s 1 0.246 9.842 2.426 RAB 09
MJB Aug13/Str/833 29-Aug-13 04+895 04+960 Pier RP 7/5 R/s 1 0.246 9.842 2.426 RAB 09
MJB Sep13/Str/1173 29-Sep-13 04+895 04+960 Pier RP 7/6 R/s 1 0.246 9.842 2.426 RAB 09
MJB Sep13/Str/566 14-Sep-13 04+895 04+960 Pier RP 8/5 R/s 1 0.246 9.842 2.426 RAB 09
MJB Sep13/Str/1243 30-Sep-13 04+895 04+960 Pier RP 8/6 R/s 1 0.246 9.842 2.426 RAB 09
MJB Sep13/Str/1245 30-Sep-13 04+895 04+960 Pier RP 7/6 R/s 1 0.246 9.842 2.426 RAB 09
MJB Sep13/Str/564 14-Sep-13 04+895 04+960 Pier RP 8/5 R/s 1 0.246 9.842 2.426 RAB 09
MJB Sep13/Str/255 6-Sep-13 04+895 04+960 Pier RP 8/6 R/s 1 0.246 9.842 2.426 RAB 09
MJB May13/str/574 28.05.13 03+002 02+960 Intial load test RHS 1 1.000 RA Bill 5
MJB Sep13/STR/814 21-Sep-13 03+002 02+960 Intial load test RHS 1 1.000 RAB 09
MJB DEC'13/STR/1589 22-Dec-13 03+002 02+960 Intial Lateral load test RHS 1 1.000 RAB 12
MJB DEC'13/STR/1289 19-Dec-13 03+002 02+960 Intial Lateral load test RHS 1 1.000 RAB 12
MJB JULY13/STR/489 31-Jul-13 03+433 03+433 Intial load test RHS 1 1.000 RAB 07
MJB Sep13/STR/1226 30-Sep-13 03+433 03+433 Intial load test RHS 1 1.000 RAB 09
MJB NOV'13/STR/719 21-Nov-13 03+433 03+433 Intial Vertical load test RHS 1 1.000 RAB 11
MJB DEC'13/STR/2457 31-Dec-13 03+433 03+433 Intial Lateral load test RHS 1 1.000 RAB 13
MJB APR13/STR/309 30-Apr-13 04+895 04+960 Intial load test RHS 1 1.000 RA Bill 4
MJB NOV'13/STR/1145 30-Nov-13 04+895 04+960 Intial Vertical load test RHS 1 1.000 RAB 11
MJB NOV'13/STR/1146 30-Nov-13 04+895 04+960 Vertical load RHS 1 1.000 RAB 11
MJB DEC13/STR/1589 22-Dec-13 03+002 02+960 Routine lateral load test RHS 1 1.000 RAB 12
MJB DEC13/STR/1715 23-Dec-13 03+002 02+960 Routine lateral load test RHS 1 1.000 RAB 12
MJB DEC13/STR/1290 19-Dec-13 03+002 02+960 Routine lateral load test RHS 1 1.000 RAB 12
MJB DEC13/STR/1412 20-Dec-13 03+433 03+433 Routine lateral load test RHS 1 1.000 RAB 12
MJB DEC13/STR/1906 25-Dec-13 03+433 03+433 Routine vertical load test RHS 1 1.000 RAB 12
MJB DEC13/STR/2240 28-Dec-13 03+433 03+433 Routine vertical load test RHS 1 1.000 RAB 13
MJB JUL13/STR/55 8-Jul-13 04+895 04+960 Routine vertical load test RHS 1 1.000 RAB 07
MJB Aug13/STR/256 9-Aug-13 04+895 04+960 Routine vertical load test RHS 1 1.000 RAB 08
MJB DEC13/STR/1492 21-Dec-13 04+895 04+960 Routine lateral load test RHS 1 1.000 RAB 12
MJB JAN14/STR/1332 25-Jan-14 04+895 04+960 Routine vertical load test RHS 1 1.000 RAB 13
Page No : 310