You are on page 1of 2

Electric Operations Technical & Leadership Summit May 3-5, 2022

Agenda subject to change.

Tuesday, May 3, 2022


8:00 AM – 8:00 PM Registration
1:00 PM – 2:30 PM Keynote

Jefferson A – Hybrid Room Harrison A Harrison B Harrison C Harrison D Harrison E Jefferson B – Hybrid
Committee Planning Room
2:30 PM – 3:30 PM Electronic Manual Library Open Session Open Session Moving from Hammers to Distribution Automation LiDAR and Drones Planning Session
System and Management Coming Soon Coming Soon Computers: New technology System Op|System Dis patch Technology for Substation Reliability
Substation for line crews Engineering
Overhead Substation

3:30 PM – 4:30 PM Reliability Improvement via Alliant High School Cable Preparation for Keeping Current: Updating Meter Site Testing The Importance of Planning Session
Data Analytics Recruitment Program Terminating and Splicing network models Metering Reconditioning SF6 & Safety & Training
Reliability Overhead Underground System Op|System Dispatch Inventory Management
Substation
4:50 PM – 7:30 PM Networking Reception and Exhibits
Wednesday, May 4, 2022
7:00 AM – 8:00 AM Breakfast and Exhibits
Jefferson A – Hybrid Room Harrison A Harrison B Harrison C Harrison D Harrison E Jefferson B – Hybrid
Committee Planning Room
8:00 AM – 9:00 AM Electrification Landscape at Open Session New Solutions for Working in Where have at the Operators Current Issues in Grounding Manufactured Distribution Planning Session
ComEd Coming Soon Heights in any Industry gone? Training and retaining Overhead Poles Substation
Reliability Safety & Training Operators Codes and Standards
System Op|System Dispatch

9:00 AM – 10:00 AM Send in the Dogs: Spot Utilities and General Use and Purpose of Cameras Distributed Energy Resource There’s an App for that: EV Charging Across the Planning Session
Robot Technology Standards for Electrical in Manholes Management System Analytics at the Meter Nation Overhead
Substation Safety in the Workplace Underground (DERMS) System Op|System Dispatch Codes and Standards
Safety & Training Reliability

10:00 AM – 11:00 AM Exhibits


11:00 AM – 12:00 PM What is New in Wild Life Utility Pole Safety Instrument Transformer Open Session Follow the Data: Reducing the EV Impact on the Planning Session
Guarding Issues Safety & Training Testing Coming Soon frequency of dispatching Distribution System and Underground
Overhead Metering troublemen Evergy BTM Battery Pilot
System Op|System Dispatch Program
Reliability

12:00 PM - 1:15 PM Lunch and Exhibits


1:15 PM – 2:15 PM Asset Management Open Session Open Session Open Session Which Pole is the Right Pole: Vac Excavations with Air Planning Session
Inspection Programs: The Coming Soon Coming Soon Coming Soon Pole treatments and Storm vs. Water Metering
Evolution from Concept to hardening Underground
Concrete Overhead
Reliability
Electric Operations Technical & Leadership Summit May 3-5, 2022
Agenda subject to change.

Wednesday, May 4, 2022 - Continued


Jefferson A – Hybrid Room Harrison A Harrison B Harrison C Harrison D Harrison E Jefferson B – Hybrid
Committee Planning Room
2:15 PM – 3:15 PM Asset Lens Recruiting and Retention, Reliability Initiatives to meet System Improvement Open Session Hierarchy of Control: More Planning Session
Reliability with Lead Cable Splicing Reliability KPIs Upgrades – An Evergy Coming Soon than just PPE System Op|System
and Network Knowledge Overhead Perspective Safety & Training Dispatch
Underground Codes and Standards

3:15 PM – 3:30 PM Break


3:30 PM – 4:30 PM Where Have all the Materials Open Session Restoration Activates with Safely Working Around a Open Session AMI Maintenance Planning Session
gone? Strategies for moving Coming Soon AMI in the Driver’s Seat Self Healing Smart Grid Coming Soon Activities: How to Plan for Codes and Standards
forward with construction System Op|System Dispatch Safety & Training the future
projects Metering
Reliability

5:00 PM – 6:00 PM Committee Planning and Recap Reception


Thursday, May 5, 2022
7:30 AM – 8:30 AM Breakfast
Jefferson A – Hybrid Room Harrison A Harrison B Harrison C Harrison D Harrison E
8:30 AM – 9:30 AM Overhead Line Failure Supply Chain Issues Porcelain Cutout Breaking Storm Response in the Field The Move to Solid Dielectric In the Balance: Making
Investigations – A Brief Affecting Materials at Issues and with Operators Switches time for training with
Overview of the Do's and Utilities Overhead System Op|System Underground current workloads
Don’ts Codes and Standards Dispatch Substation
Reliability

9:30 AM – 10:30 AM Cable Commissioning There’s an App for that: Usage of Electronic Reclosers Taking a Technical at Strategic Undergrounding's Arc Flash Protection
Testing (KCI) Mobility with Outage in the Field Electric Tripsafe Distribution Pole Structural Role in the 21st Century Grid Safety & Training
Reliability Management Systems and Telerupters Analysis Software Underground
System Op|System Overhead Codes and Standards
Dispatch

10:30 AM – 10:45 AM That’s a Wrap

MEAenergy.org pg. 2 of 2

You might also like