1. With the given table below, solve for the following:

Expected Duration (week)


ACTIVITY PREDECESSOR Most
Pessimistic Likely Optimistic
A - 2 4 9
B A 5 8 14
C B 4 10 13
D B 4 7 10
E C 11 14 20
F D 9 13 16
G E,F 2 4 6

a. Construct a project network (5 points)

[ITEL305– SIA2]
Seatwork 3 Page 1 of 4
Republic of the Philippines
Laguna State Polytechnic University
Province of Laguna

Expected Duration (week)


ACTIVITY PREDECESSOR Mean Variance
Pessimistic Most Likely Optimistic Duration
A - 2 4 9 4.5 1.36
B A 5 8 14 8.5 2.25
C B 4 10 13 9.5 2.25
D B 4 7 10 7 1
E C 11 14 20 14.5 2.25
F D 9 13 16 12.83 1.36
G E,F 2 4 6 4 04
b. Complete the table and find the expected/mean duration and variance
of each activity (5 points)

c. Perform forward and backward passes for this network (5 points)

[ITEL305– SIA2]
Seatwork 3 Page 2 of 4
Republic of the Philippines
Laguna State Polytechnic University
Province of Laguna

d. Find the Critical Path and Expected Project Completion Time (5 points)
A 4.5 1.36
B 8.5 2.25
C 9.5 2.25
E 14.5 2.25
G 4 0.4
41 weeks 8.51

e. Create a GANTT Chart for this table and use the Mean duration for your timeline (5 points)

2. Assuming that the Critical Path is ACEGH, complete the table below. Find the mean duration
and variance. (5 pts)
Duration (week) Mean
Activity Variance
O M P Duration
A 1 2 3  2 0.11
B 2 3 4  3  0.11
C 1 2 3  2  0.11
D 2 4 6  4  0.44
E 1 4 7  4  1.00
F 1 2 9  3  1.78
G 3 4 11  5  1.78
H 1 2 3  2  0.11

[ITEL305– SIA2]
Seatwork 3 Page 3 of 4
Republic of the Philippines
Laguna State Polytechnic University
Province of Laguna

3. What is the probability of the project time completion within 16 weeks (use a standard normal
distribution table)? (5 pts)

A 2 0.1
C 2 0.1
E 4 1
G 5 1.7
H 1 0.1

15weeks 3

Sigma2 = 3
Sigma = Sqrt(3)
= 1.73weeks