3.

Risk Control
Proposed Control Measure Due Date/ Status
  (actual date)

Be specific in specifying due


Indicate specific Engineering Control, Admin.
dates for each proposed control
Control and/or PPE
measure

Presence of Engineering Controls Eliminations: use of fish


stonefish net to physically remove hazard

PPE: Wear thick-soled shoes as it is easy to


(60 days) May 12-july 10, 2022
mistake them for a rock and step on them.
Sturdy footwear should be worn on reef flats or
while wading on soft-bottom substrates
adjacent to rocky or weedy areas. Shuffle your feet
along the bottom to avoid stepping directly on the fish.
Presence of Engineering Controls Eliminations: Scrape off
barnacles the barnacles using a metal knife and thick
along the gloves as their scraping against them may
stairway to the cause cuts. Put warning sign
 (60 days) May 12-july 10, 2022
swimming area If it is hard to scrape off, use a calcium remover
or a mild acid such as oxalic or phosphoric acid
to remove that don’t scrape off.

Presence of  Substitution: Replace any old, outdated,


open fuse box damaged parts of the fuse box such as cables
and circuit breakers
(60 days) May 12-july 10, 2022 
Substitution: If the metal service panel is badly
rusted, it may be necessary to replace both the
box and all the circuit breakers that protect the
circuits or putting a lock on the outside cover.
Presence of Engineering Controls Elimination: incase the
PVC pipe sticking PVC pipe in cement underneath the
stumbling the (60 days) May 12-july 10, 2022 
walkway to avoid the hazard of tripping over or
way wrapping the pipe with an opaque material, or
more commonly, by painting it. Put a warning
sign or a barrier to prevent unprotected
exposure to the fall hazard
Presence of
uneven
pavement
 Administrative Controls:
Renovate the uneven pavement to mitigate or (60 days) May 12-july 10, 2022 
avoid the safety risk that uneven surfaces pose.