Quality Observation Card

QOC No QOC-WOOD-MAR23-FEP-XXX (8)

Project Title CPCX07 REJUV PH1 TA 2023

Raise By FREDDY EERSTA PUTRA

Location CPCB07 Main Deck

Date Raised 3/18/2023

What did you observe? Bad Practices

What Cleanliness & Preservation

What Detail Cleanliness / Preservation - Preservation Method

Why Not Aware

What is/are the finding It was found fabricated pipe spools sent to
offshore without proper flanges protection- no
plastic cap or plywood protection, only duct tape
attached (size 12” Class 600)
Spool#300-PV-61432-6141-003/1
WPK # 1011-180-FA15-WPK-001

Note: Please include information such as reference documents, activities,


equipment details, and etc.
What is/are the potential quality non-compliance Flange damaged, repair/rework, process leak.
consequences/risks
Note: Insert which BSP Requirements are not followed and potential NCR that
might happen
Did a conversation take place? ☒

Was there an agreed remedial/correction or Done, closed.


preventive action? If so, describe this

Note: Action taken should be Specific, Measurable, Attainable, Relevant, Time


Frame (SMART)
Has this been closed, or open? Closed

Target Close-Out Date 3/25/2023


If QOC is still open, please choose target close-out date. If QOC is closed,
leave this column empty
Actual Close-Out Target Date Click here to enter a date.
If QOC status is closed, leave column empty

Action Party Onshore Fabrication


If you are unsure who the action party is/are, please contact your QAQC Focal
Point for the appointed area.
Spool#300-PV-61432-6141-003/1

DEP 31.38.01.31_2019 Shop and Field Fabrication of Piping