Quality Observation Card

QOC No QOC-WOOD-FEB23-FPD (1)

Project Title CPCX07 REJUV PH2 TA 2022

Raise By FREDDY EERSTA PUTRA

Location CPCB07 Cellar Deck

Date Raised 2/22/2023

What did you observe? Bad Practices

What Cleanliness & Preservation

What Detail Cleanliness / Preservation - Foreign Material

Why Not Aware

What is/are the finding- Pipe spools sent to offshore without proper flange
protection (only thin masking tape instead of
plastic end cap is required for flange protection).

Note: Please include information such as reference documents, activities,


equipment details, and etc.
What is/are the potential quality non-compliance Piping integrity, material damaged
consequences/risks
Note: Insert which BSP Requirements are not followed and potential NCR that
might happen
Did a conversation take place? ☒

Was there an agreed remedial/correction or To install proper flange protection, to avoid


preventive action? If so, describe this material/flange damaged - Done

Note: Action taken should be Specific, Measurable, Attainable, Relevant, Time


Frame (SMART)
Has this been closed, or open? Closed

Target Close-Out Date 3/22/2023


If QOC is still open, please choose target close-out date. If QOC is closed,
leave this column empty
Actual Close-Out Target Date Click here to enter a date.
If QOC status is closed, leave column empty

Action Party Onshore Fabrication


If you are unsure who the action party is/are, please contact your QAQC Focal
Point for the appointed area.