Item No./Description : 800(5)a Provision of Field Office for the Engineer (Rental Basis)
Unit of Measurement : mo
Output : 1
A. Labor
Name and Capacity No of Unit/s No. of Month/s Monthly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
91.86
Minor Tools (10% of labor cost)
F. Materials
A. Labor
B. Equipment
F. Materials
A. Labor
B. Equipment
F. Materials
A. Labor
B. Equipment
F. Materials
A. Labor
B. Equipment
F. Materials
A. Labor
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
191,307.32
a. Mobilization/ Demobilization (0.75% of Civil Works)
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
166,546.33
a. Mobilization/ Demobilization (0.75% of Civil Works)
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
138,501.39
a. Mobilization/ Demobilization (0.75% of Civil Works)
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
77,155.07
a. Mobilization/ Demobilization (0.75% of Civil Works)
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
54,219.25
a. Mobilization/ Demobilization (0.75% of Civil Works)
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 902(1)a1 Reinforcing Steel of Reinforced Concrete Structures for Two-Storey, Grade 40
Unit of Measurement : kg
Output per hour : 129.094
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Installation
a. Construction Foreman 1 1.00 100.36 100.36
b. Skilled Laborer 4 1.00 73.01 292.04
c. Unskilled Laborer 6 1.00 56.27 337.62
Stripping
a. Construction Foreman 1 0.56 100.36 56.20
b. Unskilled Laborer 6 0.56 56.27 189.07
Sub - Total for A 975.29
Name and Capacity Quantity No. of Day/s Daily Rental Rate Amount (PhP)
B. Equipment
Area = 205.01 m2
a. H-Frame 1.7 m x 1.2m, set 40 14.00 6.08 3,404.80
2 pcs H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
b. Shoring Jack, 3.8 m full extension 62 14.00 4.50 3,906.00
c. Adjustable U-head Jack, 0.6m 80 14.00 0.85 952.00
d. Adjustable Base Jack, 0.6m 80 14.00 0.85 952.00
e. 1-1/2" GI Pipe x 6.0 m 62 14.00 2.50 2,170.00
f. 1-1/2" GI Pipe x 3.0 m 16 14.00 1.25 280.00
g. 1-1/2" GI Pipe x 4.0 m 32 14.00 1.75 784.00
h. 1-1/2" GI Pipe x 1.0 m 216 14.00 0.50 1,512.00
i. Tie Rod x 0.60m 278 14.00 1.00 3,892.00
j. Round Wing Nut 558 14.00 0.15 1,171.80
F. Materials
Item No./Description : 1052(29) Micro Piles in Drilled Holes, 0.2m Ø (Ordinary Soil Condition)
Unit of Measurement : m
Output per hour : 3.00
A. Labor
Installation
a. Construction Foreman 1 1.00 100.36 100.36
b. Skilled Laborer 5 1.00 73.01 365.05
c. Unskilled Laborer 6 1.00 56.27 337.62
Fabrication of Cage Bar
a. Construction Foreman 4 0.25 100.36 100.36
b. Unskilled Laborer 8 0.25 56.27 112.54
Sub - Total for A 1,015.93
Hourly Rental
Name and Capacity Quantity No. of Day/s Amount (PhP)
Rate
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1046(2)a1 100mm CHB Non-Load Bearing (including Reinforcing Steel)
Unit of Measurement : m2
Output per hour : 3.825
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1046(2)a2 150mm CHB Non-Load Bearing (including Reinforcing Steel)
Unit of Measurement : m2
Output per hour : 3.18
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1010(1) Frames (Jambs, Sill, Head, Transoms and Mullions)
Unit of Measurement : set
Output : 1.00
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
(Labor cost for these items are to be considered/included in the installation of doors, windows, and other fabricated materials.)
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
(Labor cost for these items are to be considered/included in the installation of doors, windows, and other fabricated materials.)
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Installation
a. Construction Foreman 1 45.00 100.36 4,516.20
b. Skilled Laborer 1 60.00 73.01 4,380.60
c. Unskilled Laborer 1 60.00 56.27 3,376.20
Name and Capacity Quantity No. of Day/s Daily Rental Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Installation
a. Construction Foreman 1 36.00 100.36 3,612.96
b. Skilled Laborer 1 48.00 73.01 3,504.48
c. Unskilled Laborer 1 48.00 56.27 2,700.96
Name and Capacity Quantity No. of Day/s Daily Rental Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Installation
a. Construction Foreman 1 27.00 100.36 2,709.72
b. Skilled Laborer 1 36.00 73.01 2,628.36
c. Unskilled Laborer 1 36.00 56.27 2,025.72
Name and Capacity Quantity No. of Day/s Daily Rental Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Installation
a. Construction Foreman 1 18.00 100.36 1,806.48
b. Skilled Laborer 1 24.00 73.01 1,752.24
c. Unskilled Laborer 1 24.00 56.27 1,350.48
Name and Capacity Quantity No. of Day/s Daily Rental Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Installation
a. Construction Foreman 1 9.00 100.36 903.24
b. Skilled Laborer 1 12.00 73.01 876.12
c. Unskilled Laborer 1 12.00 56.27 675.24
Name and Capacity Quantity No. of Day/s Daily Rental Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1021(1)c Plain Cement Floor Finish with Floor Hardener
Unit of Measurement : m2
Output per hour : 5.95
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1053(3)a2 50 mm Ø G.l. Pipe Handrail Fully Welded on vertical Railing on 19 mm bar stiffener
Unit of Measurement : m
Output per hour : 6.255
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1003(1)a1 4.5mm Fiber Cement Board on Metal Frame Ceiling
Unit of Measurement : m2
Output per hour : 1.243
A. Labor
Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1014(1)b1 Prepainted Metal Sheets ( Corrugated, Long Span,0.5mm thk)
Unit of Measurement : m2
Output per hour : 2.076
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Fabrication
a. Construction Foreman 1 1.00 100.36 100.36
b. Skilled Laborer 2 1.00 73.01 146.02
c. Unskilled Laborer 2 1.00 56.27 112.54
Erection
a. Skilled Laborer 3 0.49 73.01 107.32
b. Unskilled Laborer 3 0.49 56.27 82.72
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (15 CL)
Unit of Measurement : l.s.
Output per hour : 1.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
MDP - Flush Mounted, NEMA 1 Enclosure w/ Ground Te set 1.00 115,731.20 115,731.20
Main: 700at, 800af, 3p, 240v, 65 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 600at, 600af, 3p, 240v
40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
Minor Tools (10% of labor cost) 2,180.06
Sub - Total for B 2,180.06
C. Total (A + B) 23,980.70
D. Output = 1
E. Direct Unit Cost (C ÷ D) 23,980.70
F. Materials
-
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 19.00 1,975.29 37,530.51
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 715.00 12,870.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 390.00 2,340.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 190.00 760.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 190.00 5,700.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 26.00 312.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 126.00 1,890.00
i. Wye, 50mm dia. pc 12.00 81.00 972.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 120.00 240.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 37.00 1,332.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 59.00 236.00
q. Clean Out with cover, 50mm dia. pc 4.00 21.00 84.00
r. uPVC P-trap, 50mm dia. pc 59.00 107.00 6,313.00
s. PVC Cement can 8.00 190.00 1,520.00
t. Consumables 5% 2,960.03
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Water Closet - Complete w/ fittings and acc. set 15.00 6,850.00 102,750.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 165.00 2,970.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,500.00 13,000.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 330.00 990.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 59.00 280.00 16,520.00
l. Mirror sq.m. 36.00 5,379.20 193,651.20
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 20,560.26
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
dd. Electrical Works for Pumps from Main Breaker l.s. 1.00 15,000.00 15,000.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (12 CL)
Unit of Measurement : l.s.
Output per hour : 1.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
MDP - Flush Mounted, NEMA 1 Enclosure w/ Ground Te set 1.00 115,731.20 115,731.20
Main: 700at, 800af, 3p, 240v, 65 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 600at, 600af, 3p, 240v
40at, 50af, 2p, 240v in NEMA 3R enclosure set 2.00 1,200.00 2,400.00
40at, 50af, 3p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
Minor Tools (10% of labor cost) 1,951.34
Sub - Total for B 1,951.34
C. Total (A + B) 21,464.69
D. Output = 1
E. Direct Unit Cost (C ÷ D) 21,464.69
F. Materials
-
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 16.00 1,975.29 31,604.64
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 715.00 12,870.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 390.00 2,340.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 190.00 760.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 190.00 5,700.00
f. Elbow, 150mm dia. - 90 deg bend pc 5.00 538.33 2,691.65
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 26.00 312.00
h. Wye, 150mm dia. pc 4.00 1,136.21 4,544.84
h. Wye, 100mm dia. pc 15.00 126.00 1,890.00
i. Wye, 50mm dia. pc 12.00 81.00 972.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 120.00 240.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 37.00 1,332.00
o. Clean Out with cover, 150mm dia. pc 9.00 627.90 5,651.10
p. Clean Out with cover, 100mm dia. pc 4.00 59.00 236.00
q. Clean Out with cover, 50mm dia. pc 4.00 21.00 84.00
r. uPVC P-trap, 50mm dia. pc 53.00 107.00 5,671.00
s. PVC Cement can 8.00 190.00 1,520.00
t. Consumables 5% 2,663.73
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Water Closet - Complete w/ fittings and acc. set 15.00 6,850.00 102,750.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 165.00 2,970.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,500.00 13,000.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 330.00 990.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 53.00 280.00 14,840.00
l. Mirror sq.m. 36.00 5,379.20 193,651.20
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 20,476.26
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
-
-
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (9 CL)
Unit of Measurement : l.s.
Output per hour : 1.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
MDP - Flush Mounted, NEMA 1 Enclosure w/ Ground Te set 1.00 55,368.30 55,368.30
Main: 400at, 600af, 3p, 240v, 42 kaic
Branches: 1 - 60at, 50af, 2p, 240v
2 - 50at, 50af, 2p, 240v
1 - 400at, 400af, 3p, 240v
40at, 50af, 3p, 240v in NEMA 3R enclosure set 1.00 1,200.00 1,200.00
30at, 50af, 2p, 240v in NEMA 3R enclosure 2.00 1,200.00 2,400.00
20at, 50af, 2p, 240v in NEMA 3R enclosure 1.00 1,200.00 1,200.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
Minor Tools (10% of labor cost) 1,686.87
Sub - Total for B 1,686.87
C. Total (A + B) 18,555.56
D. Output = 1
E. Direct Unit Cost (C ÷ D) 18,555.56
F. Materials
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 13.00 1,975.29 25,678.77
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 18.00 715.00 12,870.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 6.00 390.00 2,340.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 4.00 190.00 760.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 30.00 190.00 5,700.00
f. Elbow, 150mm dia. - 90 deg bend pc 3.00 538.33 1,614.99
g. Elbow, 50mm dia. - 90 deg bend pc 12.00 26.00 312.00
h. Wye, 150mm dia. pc 2.00 1,136.21 2,272.42
h. Wye, 100mm dia. pc 15.00 126.00 1,890.00
i. Wye, 50mm dia. pc 12.00 81.00 972.00
j. Wye Reducer, 150mm dia. - 100mm dia. pc 4.00 807.29 3,229.16
k.Wye, Reducer, 100mm dia. - 75mm dia. pc 2.00 120.00 240.00
m. uPVC Tee, 150mm dia. x 150mm dia. pc 4.00 926.89 3,707.56
n. uPVC Tee, 50mm dia. x 50mm dia. pc 36.00 37.00 1,332.00
o. Clean Out with cover, 150mm dia. pc 7.00 627.90 4,395.30
p. Clean Out with cover, 100mm dia. pc 4.00 59.00 236.00
q. Clean Out with cover, 50mm dia. pc 4.00 21.00 84.00
r. uPVC P-trap, 50mm dia. pc 47.00 107.00 5,029.00
s. PVC Cement can 8.00 190.00 1,520.00
t. Consumables 5% 2,367.44
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Water Closet - Complete w/ fittings and acc. set 15.00 6,850.00 102,750.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 18.00 165.00 2,970.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 2.00 6,500.00 13,000.00
g. Gate Valve, 50mm dia. pc 3.00 980.00 2,940.00
h. Gate Valve, 32mm dia. pc 6.00 627.00 3,762.00
i. Gate Valve, 20mm dia. pc 3.00 330.00 990.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 4" pc 47.00 280.00 13,160.00
l. Mirror sq.m. 36.00 5,379.20 193,651.20
m. Handrail (PWD) set 2.00 4,500.00 9,000.00
n. Consumables 5% 20,392.26
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (6 CL)
Unit of Measurement : l.s.
Output per hour : 1.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
MDP - Flush Mounted, NEMA 1 Enclosure w/ Ground Te set 1.00 20,835.10 20,835.10
Main: 200at, 225af, 2p, 240v, 22 kaic
Branches: 1 - 60at, 50af, 2p, 240v
1 - 40at, 50af, 2p, 240v
1 - 100at, 50af, 2p, 240v
LPA - Flush Mounted, NEMA 1 Enclosure w/ Ground Ter set 1.00 15,176.20 15,176.20
Main: 60at, 2p, 240v (lugs only)
Branches: 4 - 15at, 50af, 2p, 230v
6 - 20at, 50af, 2p, 240v
3 - 30at, 50af, 2p, 240v
LPB - Flush Mounted, NEMA 1 Enclosure w/ Ground Ter set 1.00 8,509.80 8,509.80
Main: 40at, 2p, 240v
Branches: 2 - 15at, 50af, 2p, 230v
3 - 20at, 50af, 2p, 240v
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
Minor Tools (10% of labor cost) 807.70
Sub - Total for B 807.70
C. Total (A + B) 8,884.65
D. Output = 1
E. Direct Unit Cost (C ÷ D) 8,884.65
F. Materials
-
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 2.00 1,975.29 3,950.58
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 16.00 715.00 11,440.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 7.00 390.00 2,730.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 13.00 190.00 2,470.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 18.00 190.00 3,420.00
f. Elbow, 100mm dia. - 90 deg bend pc 6.00 81.00 486.00
g. Elbow, 50mm dia. - 90 deg bend pc 24.00 26.00 624.00
h. Wye, 100mm dia. pc 9.00 126.00 1,134.00
i. Wye, 50mm dia. pc 6.00 81.00 486.00
j. Wye Reducer, 100mm dia. - 75mm dia. pc 2.00 120.00 240.00
k.Wye, Reducer, 100mm dia. - 50mm dia. pc 10.00 100.00 1,000.00
l.Wye, Reducer, 75mm dia. - 50mm dia. pc 5.00 89.00 445.00
m. uPVC Tee, 100mm dia. x 100mm dia. pc 3.00 135.00 405.00
n. uPVC Tee, 50mm dia. x 50mm dia. pc 22.00 37.00 814.00
o. Clean Out with cover, 150mm dia. pc 1.00 627.90 627.90
p. Clean Out with cover, 75mm dia. pc 3.00 36.00 108.00
q. Clean Out with cover, 100mm dia. pc 10.00 59.00 590.00
r. uPVC P-trap, 50mm dia. pc 36.00 107.00 3,852.00
s. PVC Cement can 6.00 190.00 1,140.00
t. Consumables 5% 1,200.53
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Water Closet - Complete w/ fittings and acc. set 9.00 6,850.00 61,650.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
d. Concrete Counter Sink - 1 Faucet set 4.00 2,895.00 11,580.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 10.00 165.00 1,650.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 1.00 6,500.00 6,500.00
g. Gate Valve, 50mm dia. pc 2.00 980.00 1,960.00
h. Gate Valve, 32mm dia. pc 3.00 627.00 1,881.00
i. Gate Valve, 20mm dia. pc 3.00 330.00 990.00
j. Check Valve, 50mm dia. pc 1.00 954.00 954.00
k. S.S Floor Drain 4' x 2" pc 36.00 280.00 10,080.00
l. Mirror sq.m. 18.00 5,379.20 96,825.60
m. Handrail (PWD) set 1.00 4,500.00 4,500.00
n. Consumables 5% 13,161.93
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. B.I. Pipe 75mm dia lm 15.00 984.00 14,760.00
b. B.I. Pipe 65mm dia lm 24.00 708.00 16,992.00
c. Fittings (Elbow, Tee, Reducer, etc) l.s. 1.00 3,175.20 3,175.20
d. Fire
e. Fire Hose Cabinet10
Extinguisher, with
lbsFire Extinguisher
Capacity, Wall set 3.00 24,000.00 72,000.00
Mounted, HCFC 123 set 6.00 6,825.00 40,950.00
f. FDC Siamese Twin: Two-Way unit 1.00 6,500.00 6,500.00
g. Overhead Water Tank 2000 US Gal unit 1.00 167,000.00 167,000.00
i. Concrete m³ 15.45 3,475.00 53,688.75
j. Rebar kg 648.90 31.00 20,115.90
k. Plaster Finish m² 66.00 84.25 5,560.50
l. Cement Based Waterproofing bag 159.00 45.00 7,155.00
m. .60 x .60 Manhole ea 2.00 21,000.00 42,000.00
n. End-Suction Centrifugal Water Pump, TDH 22m,
2.0HP, 60GPM unit 2.00 36,780.00 73,560.00
o. Booster Pump, TDH 25m, 3HP, 80GPM unit 1.00 39,300.00 39,300.00
Sub - Total for F 562,757.35
G. Direct Unit Cost (E + F) 624,601.12
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 12% of G 74,952.13
I. Contractor's Profit (CP) 8% of G 49,968.09
J. Value Added Tax (VAT) 5% of (G + H + I) 37,476.07
K. Total Unit Cost (G + H + I + J) 786,997.41
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description : 1102(21) Power Load Center, Switchgear, and Panel Boards (3 CL)
Unit of Measurement : l.s.
Output per hour : 1.00
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
MDP - Flush Mounted, NEMA 1 Enclosure w/ Ground Te set 1.00 20,835.10 20,835.10
Main: 150at, 225af, 2p, 240v, 22 kaic
Branches: 1 - 40at, 50af, 2p, 240v
1 - 60at, 50af, 2p, 240v
1 - 100at, 50af, 2p, 240v
LPA - Flush Mounted, NEMA 1 Enclosure w/ Ground Ter set 1.00 14,008.80 14,008.80
Main: 60at, 2p, 240v (lugs only)
Branches: 3 - 15at, 50af, 2p, 230v
7 - 20at, 50af, 2p, 240v
2 - 30at, 50af, 2p, 240v
LPB - Flush Mounted, NEMA 1 Enclosure w/ Ground Ter set 1.00 8,509.80 8,509.80
Main: 30at, 2p, 240v
Branches: 2 - 15at, 50af, 2p, 230v
3 - 20at, 50af, 2p, 240v
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
Minor Tools (10% of labor cost) 786.25
Sub - Total for B 786.25
C. Total (A + B) 8,648.78
D. Output = 1
E. Direct Unit Cost (C ÷ D) 8,648.78
F. Materials
-
a. uPVC pipe, 150mm dia. x 3m, S-1000 length 2.00 1,975.29 3,950.58
b. uPVC pipe, 100mm dia. x 3m, S-1000 length 16.00 715.00 11,440.00
c. uPVC pipe, 75mm dia. x 3m, S-1000 (vent) length 7.00 390.00 2,730.00
d. uPVC pipe, 50mm dia. x 3m, S-1000 length 13.00 190.00 2,470.00
e. uPVC pipe, 50mm dia. x 3m, S-1000 (vent) length 18.00 190.00 3,420.00
f. Elbow, 100mm dia. - 90 deg bend pc 6.00 81.00 486.00
g. Elbow, 50mm dia. - 90 deg bend pc 24.00 26.00 624.00
h. Wye, 100mm dia. pc 9.00 126.00 1,134.00
i. Wye, 50mm dia. pc 6.00 81.00 486.00
j. Wye Reducer, 100mm dia. - 75mm dia. pc 2.00 120.00 240.00
k.Wye, Reducer, 100mm dia. - 50mm dia. pc 10.00 100.00 1,000.00
l.Wye, Reducer, 75mm dia. - 50mm dia. pc 5.00 89.00 445.00
m. uPVC Tee, 100mm dia. x 100mm dia. pc 3.00 135.00 405.00
n. uPVC Tee, 50mm dia. x 50mm dia. pc 22.00 37.00 814.00
o. Clean Out with cover, 150mm dia pc 1.00 627.90 627.90
p. Clean Out with cover, 75mm dia pc 3.00 36.00 108.00
q. Clean Out with cover, 100mm dia. pc 10.00 59.00 590.00
r. uPVC P-trap, 50mm dia. pc 30.00 107.00 3,210.00
s. PVC Cement can 6.00 190.00 1,140.00
t. Consumables 5% 1,200.53
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Water Closet - Complete w/ fittings and acc. set 9.00 6,850.00 61,650.00
b. Urinal (Trough) set 3.00 9,500.00 28,500.00
c. Concrete Counter Sink - 3 Faucet set 6.00 6,028.00 36,168.00
d. Concrete Counter Sink - 1 Faucet set 4.00 2,895.00 11,580.00
e. Faucet, Hose Bibb, Brass 12mm dia. pc 10.00 165.00 1,650.00
f. Wall Hung Lavatory - Complete w/ fittings & acc. set 1.00 6,500.00 6,500.00
g. Gate Valve, 50mm dia. pc 2.00 980.00 1,960.00
h. Gate Valve, 32mm dia. pc 3.00 627.00 1,881.00
i. Gate Valve, 20mm dia. pc 3.00 330.00 990.00
j. Check Valve, 50mm dia. pc 2.00 954.00 1,908.00
k. S.S Floor Drain 4' x 2" pc 30.00 280.00 8,400.00
l. Mirror sq.m. 18.00 5,379.20 96,825.60
m. Handrail (PWD) set 1.00 4,500.00 4,500.00
n. Consumables 5% 13,125.63
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
F. Materials