5 02.11.98 V2-P2 Para modification 2.2 page 76, 21.1-21.4 (Corrigendum issued ACS-15)
7 14.03.12 IRSOD- Hight of ROB-FOB, Power line crossing, Clearances, Min hight from RL
8 10.10.02 V3 EMU
14 24.05.06 V2-P2 Para-3.0 -Appendix IV-Power line crossing, Electrical clearance - Appendix -I
15 24.05.06 V2-P2 Appendix IV-Power line crossing (Corrigendum issued for ACS-05)
20 03.11.10 V2-P2 Para 20.1 - Tengent track Portal uprights, Mast carring more than one OHE
23 28.08.12 V2-P2 Appendix I Para-20.1 to 230.8 & new add para 20.9
28 28.12.15 V2-P2 Para-33- Appendix- I, 1500v DC OHE conv to 25kv (Add para 33) -Contact wire gredient
30 26.11.19 V2-P1 Appendix-VIII- Para 21020 & 11.2 ( e ) - Hight of hight gauge (Rev ACS-32)
32 09.10.20 V2-P1 Appendix- VIII- Para 21020 & 11.2 ( e ) - Hight of hight gauge (old ACS-30) - 4.78m
33 27.10.21 V2-P2 Appendix-I- Para 18.12 - Arrangement of traction masts near LC & abutments of bridges