Professional Documents
Culture Documents
2022
Dear Sir ,
We thank for your above mentioned enquiry and pleased to quote as detailed
below, subject to the Terms and condition mentioned here under.
S.No. Safety Marshal Item Discription MAKE UNIT QUANTITY UNIT RATE TOTAL
1 Nos
Single Pully 1 MT 10 650 6500
2 Nos
Single Pully Load 2 ton 10 1180 11800
3 Nos
1.5 ton tirfor- With 10 wire 5 9700 48500
4 Nos
3/4 ton tirfor- With 10 wire 2 14970 29940
5 Nos
Pull lift 1 ton 8 4500 36000
6 Thaparia Nos
Spanner Set Ring and D/E- From 10-11 to 30-32 all size 10 2050 20500
8 Thaparia Nos
Guy rod spanner D/E 36-42 5 1850 9250
9 Thaparia pair
Cutting Plair 10 257 2570
10 Thaparia Nos
500 gms Hammer 5 550 2750
11 Thaparia
5 KGHammer 4 3450 13800
12 Meter
Manila Rope 3/4 inch or 20mm 200 65 13000
13
D Shakle 0.5 Mt- 1 MT Only avilable 10 90 900
14
D Shakle 1 Mt 10 90 900
15
D Shakle 2 Mt 10 160 1600
16
Siling 1 mtrs- 16mm Wire dia 15 670 10050
17
Siling 2 mtrs-16mm Wire dia 10 820 8200
18
Belt siling 2 ton 2mtrs 10 350 3500
19 Nos
Ladder trolley 2 42000 84000
We are very glad to receive your valuable offer, so that we are able to quote
our best rates.
Thanking You,
Yours truly,
LEON ENTERPRISES