Company: PT. Saga Mas Asia Title: Report Daily Activity Build Barge 339ft
Phone: 085363886688
Email: adityakristanto88@gmail.com
Kondisi Lapangan:
Cuaca : kamis (Hujan 10.00-13.20)
Man power :
Berikut laporan hari:
Welding Tank
Tank
Group: Tank
Fr 47-52 P Vt 2, fit up stanchion & diagonal
Leveling
Group: Leveling
Leveling deck untuk acuan erection kepala
Group: Leveling
Leveling deck untuk acuan erection kepala, sisi kiri lebih tinggi 7mm
S ideboard
Group: Sideboard
Welding join plate sideboard
Group: Sideboard
Welding inspection by OS untuk 4 Panel trakhir, welder langsung jalan repair, comment
- miss capping
- miss weld
- round weld
- porosity
Group: Sideboard
Welding join plate to H-Beem Pintu sideboard
Group: Sideboard
Welding inspection by OS, Comment:
- miss round weld
Bow
Group: Bow
Fr 52-57 S, welding inspection by OS, area bottom FP,comment
- porosity
- H/L plate
- undercut
- Grinda
- Buang Support
- repair semua marking kuning
- crack house pipe
Group: Bow
Fr 52-57 S, welding inspection by OS, area bottom FP & anchor pocket
Group: Bow
Fr 52-57 S, welding inspection by OS, area bottom FP & anchor pocket
Group: Bow
Fr 52-57 S, welding inspection by OS, area bottom FP
Group: Bow
Fr 52-57, Repair hi/low plate
Man Hole
Winch House
Blasting
Group: Blasting
Hasil blasting SA 2 eksternal sideboard
Group: Blasting
Inspect Welding SA 2 menggunakan pasir silica untuk eksternal sideboard
Painting
Group: Painting
Painting pengaplikasian Jotamastic 90ALU RT A, ketebalan 90 micron eksternal
Group: Painting
Pengukuran ketebalan Cat saat basah yaitu 125micron, untuk kering 90micron
Dan painting dilakukan tipis terlebih dahulu, dan nnt dilanjutkan pencapaian ketebalan saat sudah erection
Group: Painting
Pengeluaran Cat
1 kaleng Jotamastic 90 ALU RT A
1 kaleng tinner
1 kaleng Jotamastic 90, STD Comp B