Company: PT. Saga Mas Asia Title: Report Daily Activity Build Barge 339ft
Phone: 085363886688
Email: adityakristanto88@gmail.com
Kondisi Lapangan:
Cuaca : Minggu (Hujan 12.00-sore)
Man power : hari minggu hanya beberapa orang yang masuk
Berikut laporan hari:
Tank
Group: Tank
Ganti bracket web long bhd yang putus
Group: Tank
Fit up collar yang belum di pasang
Group: Tank
Fr 37-42 P Vt 3, cek fit up
- fit up vertical stanchion to web bottom OK
Group: Tank
Fr 37-42 P Vt 3, cek fit up
- gap stanchion to web bottom OK
Group: Tank
Fr 42-47 P Vt 3, cek fit up
- perlu geser bracket long bhd to web deck
Group: Tank
Fr 42-47 P Vt 3, cek fit up
- gap girder deck wp web transbhd ok
Welding Tank
Erection (S ideshell)
Main Deck
S ide S hell
S ideboard
Group: Sideboard
Welding inspection 4 panel oleh foreman & QC
Group: Sideboard
Welding inspection by OS, Sudah inspect 8 panel, dan langsung proses repair
Group: Sideboard
Welding inspection by OS, Sudah inspect 8 panel, dan langsung proses repair
Group: Sideboard
1 panel sideboard selesai repair, dilanjutkan grinda terlebih dahulu, baru blasting painting
Pushpad
Group: Pushpad
Welding inspection by OS, Comment
- miss weld overhead doubler h-beem
Group: Pushpad
Frame push pad sesuai request OS untuk bending, jadi tidak terputus habis
Group: Pushpad
Welding area push pad
Chine
Group: Chine
Fr 42-52 S, fit up round bar untuk chine
Knuckle
Group: Knuckle
Fr 47-52 P, welding root & filler join knuckle to round bar
Group: Knuckle
Fr 47-52 P, welding root & filler join knuckle to round bar
Fender
Group: Fender
Fr 42-52, fender
Group: Fender
Section P, welding overhead fender to sideshell
Group: Fender
Section P, welding vertical fender to sideshell
Group: Fender
Section P & S, welding normal fender to deck
Group: Fender
Section P, proses welding fender
Winch House
Bollard
Group: Bollard
Section P, fit up bracket bollard