ANALYSIS
PO: VSCWLL-13
JOB COMPLETION REPORT
Transformers Oil Process
and Analysis
Po :VSCWLL-13
Content
❖ Introduction
❖ Scope of work
❖ Site Preparation
❖ Oil sampling
❖ Oil circulation
❖ Handover
❖ Annexures
• Annexure 3 – Report sheet (Vacuum & Oil Process) -TR4004J3 (Day 1).
• Annexure 4 – Report sheet (Vacuum & Oil Process) -TR4004J3 (Day 2).
• Annexure 5 – BDV Results for TR4004J3 Main tank 1st Cycle & 2nd cycle
• Annexure 6 – BDV Results for TR4004J3 OLTC 1st Cycle & 2nd cycle
Po :VSCWLL-13
Introduction
The main objective of this project describes Transformer Oil Processing and Testing
(BDV & DGA Analysis) at Bapco . PGP contracting carried out the services on
Transformer Id TR4004J3 under the supervision of Voltech.
Scope of work:
• Transformer Vacuuming
• Filling oil from storage tank to Main body with BDV test.
Po :VSCWLL-13
Po :VSCWLL-13
Safety
In BAPCO Area 4 transformer units , all necessary safety PPEs and procedures
are followed by PGP employees as per the BAPCO safety Policies .
Po :VSCWLL-13
Note:
The Activities described in this report is for TR4004J3 Transformer unit.
Work summary
Manpower -3
• Safety talk and Tool box talk
• Transformer circulation 1st cycle
completed .
3 30.6.2022 TR4004J3
• Transformer circulation 2nd cycle
completed.
• HouseKeeping
Transformers Oil Process
and Analysis
Po :VSCWLL-13
Site preparation
All necessary tools and equipment were mobilized to site and stored in allocated area
and barricaded.
Oil sampling:
Oil samples has been taken from the new barrels and existing transformer before
commencing the work. These sample are subjected to DGA & BDV test ( refer test
results in Annexures)
Transformers Oil Process
and Analysis
Po :VSCWLL-13
The breakdown voltage test performed before filtration . Refer BDV results for new
oil & old transformer in Annexures
Po :VSCWLL-13
Po :VSCWLL-13
Oil circulation :
Oil in the Transformer were circulated on required cycles and ensured the BDV and
PPM values are at correct parameters . Refer BDV results for transformer TR4004J3 in
annexures.
Final Inspection :
• Ensure releasing of gases from the transformers.
• Ensured No leakage of oil in any part of unit.
• Ensured oil level in the conservator.
• Ensured that all valves are in normal Position.
Handover :
After completion of final inspection , Ensured all the tools and materials are cleared
from the site with proper housekeeping and handover to client .
VACUUM & OIL PROCESSING
PGP CONTRACTING
Annexure -1
OIL BREAKDOWN VOLTAGE TEST
Sample point BARREL OIL & STORAGE TANK Sampling Date 27.9.2022 & 29.6.2022
O, AREA 2
TR4004J3
022
Remarks
(Activities)
PGP CONTRACTING
VACUUM & OIL PROCESSING
O, AREA 2
TR4004J3
022
Remarks
(Activities)
PGP CONTRACTING
OIL BREAKDOWN VOLTAGE TEST