2024 (3 rd shift)
1. Lube oil leak (check all possible locations like crank case, inspection covers, LO filter, AOP,
MOP, PRV etc.) and top-up requirement -NO
2. Jacket CW outlet temperature (TG status in field) – South cylinder TG showing higher value
of 85 deg C , north cylinder Side temperature is 50 deg C.
3. Packing CW outlet temperature (TG status in field)-Working
4. Packing vent pressure (seal leak off) of all cylinders- 0.2 kgf/cm2
5. Abnormal sound/vibration -No
6. Machine parameters- found within normal range values
7. Lube oil filter DP increase and change over frequency – 0.45 kgf/cm2, no changeover since
compressor startup.
8. Lubricator pumps functioning and level top up- yes, level is healthy.
9. Hydro-com system functioning (including pump) - yes
10. N2 to compressor blind status- blinded condition
11. Compressor PSVs status- lined up condition
12. AOP and CW pump in auto- yes
13. Inner/outer compartment (distance piece) DPs – 700 mm H2O for both cylinders
14. Motor current- 65A
15. Discharge pressure / temperature- 32.7 kgf/cm2, 94 deg C
16. Actuator leaks- No
17. Any other leaks at valves/flanges/piping- No
18. Any unusual smell (eg. H2S)- Nil