Professional Documents
Culture Documents
in the
state of Odisha on Hybrid Annuity Mode (HAM) (Pkg OD ‐4)
DAILY PROGRESS REPORT
Date: 16/Jul/22
Length Executed Quantity Executed Amount in Lakhs
S No Description of Item Up to Up to Up to
Unit Today Up to Date Unit Today Up to Date Today Up to Date
Previous Previous Previous
I.ROAD WORKS
1 Excavation Km's - - - Cum - - -
2 Earth work Upto Emb Top Km's 30.37 - 30.37 Cum 1,586,497.19 - 1,586,497.190 3,825.15 - 3,825.15
3 Earth work Upto Subgrade Top Km's 22.69 - 22.69 Cum 195,576.15 - 195,576.150 1,224.19 - 1,224.19
4 GSB Km's 13.88 - 13.88 MT 35,442.96 - 35,442.960 678.58 - 678.58
5 CTB Km's - - - Cum - - - - -
6 WMM/AIL Km's - - - Cum - - - - - -
7 DBM Km's - - - Cum - - - - - -
8 BC Km's - - - Cum - - - - - -
II.STRUCTURE WORKS
1 Box Culverts Nos 21.10 21.10 811.75 - 811.75
2 HPC Nos 0.00 - - - -
3 Minor Bridges Nos 0.30 0.30 72.04 - 72.04
4 LVUP Nos 2.59 2.59 529.59 - 529.59
5 Flyover/Viaduct/AUP Nos 0.40 0.40 42.72 - 42.72
6 Major Bridge Nos - - -
7 ROB Nos - - -
8 RE Wall Sqm - - -
Total 7,184.03 - 7,184.03
B. AGGREGATE PRODUCTION
Quantity
Consumed
S No Description of Item Up to Physical Stock
Unit Today Up to Date Up to date
Previous
1 Quarrying of Boulders MT 160725.10 160,725.10 147294.787 13,430.31
2 40mm Aggregate MT 1420.37 1,420.37 1,420.37
3 20mm Aggregate MT 6485.79 6,485.79 3530.034 2,955.75
4 10mm Aggregate MT 5124.59 5,124.59 2,582.132 2,542.46
5 6mm Aggregate MT -
6 Dust MT 7473.71 7,473.71 16.02 7,457.69
7 GSB Material MT 126629.30 126,629.30 72087.53 54,541.77
8 M Sand MT 15445.74 15,445.74 3223.427 12,222.31
Development of Six Lane Karki - Kaliagura Section of NH-130-CD from Km 226+500 to Km 249+000 under Raipur Visakhapatnam Economic Corridor in the
state of Odisha on Hybrid Annuity Mode (HAM) (Pkg OD ‐4)
DAILY PROGRESS REPORT
Date: 16/Jul/22
C. MATERIAL PROCUREMENT D. PLANT PRODUCTION
Quantity Quantity
E. MACHINERY
Quantity
Balance to Break down Break down
S No Description of Item Reason for breakdown
Unit Required Mobilized be if any since
Mobilised
1 Excavator Nos 2
2 Loader Nos 2
3 Tipper Nos 14
4 Water Tanker Nos 1
5 Transit Mixer Nos 6
6 Earth Compactors Nos 1
7 Grader Nos 2
F. CRITICAL ISSUES
1 Sufficient Operators / drivers are not available for machinary, mechanical department has not given updated driver operator details
2
3
G. REASON FOR SHORTFALL IF ANY
1 RMC Plant Breakdown
2
3
S Consumed as on Physical Stock at
Description Unit Scope Procured as on date Remarks
No date Site
1 GSB Material MT 353942 126629.30 72087.53 54541.77
2 40mm Aggregate MT 189407 1420.37 - 1420.37
Lateral
S. Clearance
Drawing Status Chainage RHS
Type of Structure Contractor's Name
No.
(m) Submitted Approved U-Trough Slab Wall Raft PCC Excavation km Excavation PCC Raft Wall Slab U-Trough
Lateral
S. Clearance
Drawing Status Chainage RHS
Type of Structure Contractor's Name
No.
(m) Submitted Approved U-Trough Slab Wall Raft PCC Excavation km Excavation PCC Raft Wall Slab U-Trough
Financial Progress
Quantity Executed Amount
Weightage in %
Sr.no. Stage for measurement of Physical Progress Unit Qty. Total Amount Unit Rate Up to Remarks
to BPC Today Up to Date Up to Previous Today Up to Date
Previous
1 2 3 4 5 6 7 8 9 10 11 12 13 14
B- New realignment/bypass
(1) Earthwork up to
(a) Embankment Top Km 43.228 13.680% 544,464,000 12595170 30.370 - 30.370 382,515,307 - 382,515,307
(b) Subgrade Top Km 43.228 5.860% 233,228,000 5395299 22.690 - 22.690 122,419,342 - 122,419,342
(2) Granular work (sub- base, base, shoulders)
(a) GSB Km 43.228 5.310% 211,338,000 4,888,915 13.880 - 13.880 67,858,135 - 67,858,135
(b) CTB Km 43.228 4.970% 197,806,000 4575877 - - - - - -
(c) AIL Km 43.228 2.340% 93,132,000 2154437 - - - - - -
(3) Shoulders Km 43.228 2.610% 103,878,000 2403026
(4) Bituminous Work
(a) DBM Km 43.228 8.530% 339,494,000 7853567 - - - - - -
(b) BC Km 43.228 5.690% 226,462,000 5238780 - - - - - -
(5) Rigid Pavement
(a) Concrete Work Km
(1) Culverts
a) Box Culverts
i) Box Culverts - Foundation Nos 72 1.590% 63,282,000 878917 47.00 47.00 41,309,083 - 41,309,083
ii) Box Culverts - Substructure Nos 72 1.950% 77,610,000 1077917 26.00 26.00 28,025,833 - 28,025,833
iii) Box Culverts - Superstructure Nos 72 1.260% 50,148,000 696500 17.00 17.00 11,840,500 - 11,840,500
b) Pipe Culverts Nos 68 0.400% 15,920,000 234118
Other works
1 2 3 4 5 6 7 8 9 10 11 12 13 14
(iii) Road side drains
a) Lined Drain Km 24.684 1.470% 58,506,000 2370199 - - -
b) Unlined Drain Km 15.864 0.940% 37,412,000 2358296 - - -