Bali Dump Final

Actual crest
4070/L

Continue dumping for


10 meter from current
crest before resloped
4070/L

10 meter
4050/L

Dumping Limit
4044/L
Design

Crest design 4030/L


Crest design
4075/L (Not constructed)
Bali Dump Final

4120/L
Continue
dumping 10 m

45 m
Resloped 2H:1V Next Lift to
(26.7o) 4120/L
4075/L

Current situation
March 06

75 m

37`°

25 m 100 m 25 m

150 m Design

Resloped 2H : 1V

Current situation
Carstenz OBS Configuration

Design Parameters
1. CNI Lower Carstenz Stockpile Design used as starting point (up to 3760)
2. Overall Inter-ramp Slope on OBS = 25°
3. Dumped 3 lifts high (15 m lifts), at angle of repose (37°)
4. As dumped, 36m wide working area for re-sloping & capping.
5. Once 3 lifts are completed, re-sloping work can begin.
6. Re-sloped 2H : 1V (26.7°)
7. Re-sloping to occur Inter-ramp
8. All Haul Truck ramps remain as permanent access
9. Limestone capping to occur after re-sloping
10. 5m drainage and access area left after capping
11. Drainage area can be sloped as required along strike for flow into main
permanent drainage system
Carstenz OBS Configuration

Designed Dump
Crest & Toe

Resloped
2H : 1V
(26.7°)

= Dumped Surface
45 m
= Re-sloping Cut
= Re-sloping Fill
37°
= Re-sloped Surface
= 5m Limestone Cap
= Final OBS Surface
Carstenz OBS Configuration

5 m Limestone
Cap

Final Dump Surface Designed Dump


Crest & Toe
2H : 1V
(26.7°)

Resloped
2H : 1V
(26.7°) 5m Drainage
& Access

= Dumped Surface
45 m
= Re-sloping Cut
= Re-sloping Fill
37°
= Re-sloped Surface
= 5m Limestone Cap
= Final OBS Surface