You are on page 1of 1

Finished Complaint Report Details(Customer Fault (Delight))

No. of
Finish Date- Days
Item Sent to Taken(Star
Dispatch ting Date
Item Customer/ People/War To Finish Branch(Co
Sr.No. ComplaintNo OA No. Log Date Start Date Item No Description. Fault Remarks Action Taken Code ehouse Date) de)

Replacement of
'U' Tube
Manometer has
been sent vide RCCPL
Blaine tube was sent under C0102220017. packing list no. PRIVATE
But upon opening of box, U-tube was found C.C336 dated LIMITED(C326 MUMBAI(4
1 C2403220007 C201783 3/24/2022 3/24/2022 AIM-390 broken again. Image attached. 25.03.22 02) 3/25/2022 1 0)

Please note this customer had purchased many


equipments and supply of the same and Replacement of
installation was delayed during COVID. Swan Neck
Installation was completed during last week of assembly with On- MGM
December 2020 (CSR attached). But the
instruments were lying idle for one year. Now off Switch has COLLEGE OF
the academic year has just started. As a special been sent vide ENGINEERING
case, please arrange to send the replacement packing list no. &
parts (Swan neck & Switch) to Aimil, Vashi at the C.C329 dated TECHNOLOGY( MUMBAI(4
2 C1903220010 C193830 3/19/2022 3/22/2022 AIM-105 earliest. 22.03.22 C31090) 3/22/2022 0 0)

Replacement of
Bracket for
Release valve has
been given to M/s
Commercial
EDI engineer vide
Compressio packing list no. COMMERCIAL
AIM 320E- n Testing FOCG210981 EQUIPMENTS(
3 C1003220067 C214077 3/10/2022 3/15/2022 DG-1 Ma Slow Fast Lever Broken, needs replacement dated 16.03.22 C00156) 3/16/2022 1 DELHI(10)

You might also like