The document is a method statement comments sheet for erecting and dismantling independent scaffolding with a cantilever on a construction project. It includes a method statement and risk assessment for the scaffolding work. Key personnel are asked to review the documents and indicate whether the work is approved, approved with comments, or requires revision and resubmittal. The scaffolding subcontractor who originated the method statement is also asked to sign the form.
The document is a method statement comments sheet for erecting and dismantling independent scaffolding with a cantilever on a construction project. It includes a method statement and risk assessment for the scaffolding work. Key personnel are asked to review the documents and indicate whether the work is approved, approved with comments, or requires revision and resubmittal. The scaffolding subcontractor who originated the method statement is also asked to sign the form.
The document is a method statement comments sheet for erecting and dismantling independent scaffolding with a cantilever on a construction project. It includes a method statement and risk assessment for the scaffolding work. Key personnel are asked to review the documents and indicate whether the work is approved, approved with comments, or requires revision and resubmittal. The scaffolding subcontractor who originated the method statement is also asked to sign the form.
REFERENCE No. : M1467-MCL-BMES-MSS-005 REV. : 01 DATE : 18.08.2019
Method Statement and Risk Assessment for Erection Adaption
SUBJECT : PROJECT No.: M1467 and Dismantling of Independent Scaffolding with Cantilever
Please find enclosed:
No. of ITEM DRAWING/DOCUMENT NO. REV DESCRIPTION Copies Method Statement and Risk Assessment for Erection Adaption 1 1 M1467-MCL-BMES-MSS-005 01 and Dismantling of Independent Scaffolding with Cantilever
Review by Name Signature Date Y/N/NA
Project Manager Luke Watson
Construction Manager Prabhu Srinivasulu
HSE Manager Joby John
QA/QC Engineer Ramil Magano
MEP Manager Robert Heard
Others
This section to be completed by Construction Manager:
A - Approved B – Approved with Comments C – Revise & resubmit Work may proceed subject to incorporate Work may proceed Work may not proceed of comments indicated
Name: Designation: Signature: Date:
This section to be completed by HSE Manager:
A – Approved B – Approved with Comments C – Revise & resubmit Work may proceed subject to incorporate Work may proceed Work may not proceed of comments indicated Joby John Safety Manager Name: Designation: Signature: Date:
This section to be completed by QA/QC Engineer:
A - Approved B – Approved with Comments C – Revise & resubmit Work may proceed subject to incorporate Work may proceed Work may not proceed of comments indicated
Name: Designation: Signature: Date:
Originator Subcontractor:
DANIEL SARMIENTO SCAFFOLDING DESIGNER 18.08.2019
Name: Designation: Signature: Date:
QMS012 (UAE) 01/19 – Rev.13 (AMC) Page 1 of 1 Method Statement Comments Sheet Form