You are on page 1of 8

LABORATORIUM MEKANIKA TANAH

Form CPT-1-1/4
FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA

CONE PENETRATION TEST (1)

Project : Pembangunan Gedung Yayasan Yatim Piatu Terpadu


Ordered by : Yayasan Syeikh Eid Al - Thani Cabang Indonesia
Location : Desa Teupin Batee Sub District
District/City
Code/point/depth : TBT/S05 Date of Testing
Tested by : RIZ Equipment/Method
Description of soil : ------------
Depth Cone Resistance Sleeve Friction S Sleeve Resistance FR Estimated Soil
(m) "CR" (kg/cm 2) "SF" (kg/cm2) (kg/cm) CR/SF 90%.FR
0.00 0.00 0.00 0 Unclassified
0.20 19.87 0.33 7 60 Sand + Silt
0.40 31.87 0.33 13 97 Sand + Gravel
0.60 39.87 0.33 20 121 Sand + Gravel
0.80 42.87 0.33 27 130 Sand + Gravel
1.00 49.73 0.66 40 75 Fine Sand
1.20 54.73 0.66 53 83 Coarse Sand
1.40 59.73 0.66 66 91 Sand + Gravel
1.60 66.73 0.66 80 101 Sand + Gravel
1.80 74.73 0.66 93 113 Sand + Gravel
2.00 99.60 1.00 113 100 Sand + Gravel
2.20 129.60 1.33 140 97 Sand + Gravel
2.40 164.60 2.00 180 82 Coarse Sand
2.60 169.60 2.00 220 85 Coarse Sand
2.80 171.60 2.00 259 86 Coarse Sand
3.00 174.46 2.00 299 87 Coarse Sand
3.20 END OF CPT
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
6.20
6.40
6.60
6.80
7.00
7.20
7.40
7.60
7.80
8.00
8.20
8.40
8.60
8.80
9.00
9.20
9.40
9.60
9.80
10.00
LABORATORIUM MEKANIKA TANAH
Form CPT-1-1/4 Page :
FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA

CONE PENETRATION TEST (2)

Project : Pembangunan Gedung Yayasan Yatim Piatu Terpadu


Ordered by : Yayasan Syeikh Eid Al -Thani Cabang Indonesia
Location : Desa Teupin Batee Sub District : Kec. Blang Bintang
District/City : Aceh Besar
Code/point/depth : TBT/S05 Date of Testing : March 04, 2007
Tested by : RIZ Equipment/Method : BBT
Description of soil : ------------

CONE RESISTANCE AND SLEEVE FRICTION (kg/cm^2)

0 50 100 150 200 0.00 4.00 8.00 12.00 16.00 20.00 24.00
0.00 0.00
0.40 0.40
0.80 Lapisan I 0.80
1.20 1.20
1.60 1.60
2.00 2.00
2.40 2.40
2.80 2.80
3.20 Lapisan II 3.20
3.60 3.60
4.00 4.00
4.40 4.40
4.80 4.80
5.20 5.20
5.60 5.60
6.00 6.00
6.40 6.40
6.80 6.80
7.20 7.20
7.60 7.60
8.00 8.00
Depth (m)
Depth (m)

8.40 8.40
8.80 8.80
9.20 9.20
9.60 9.60
10.00 10.00
10.40 10.40
10.80 10.80
11.20 11.20
11.60 11.60
12.00 12.00
12.40 12.40
12.80 12.80
13.20 13.20
13.60 13.60
14.00 14.00
14.40 14.40
14.80 14.80
15.20 15.20
15.60 15.60
16.00 16.00
16.40 16.40
16.80 16.80
17.20 17.20
17.60 17.60
18.00 18.00
18.40 18.40
18.80 18.80
19.20 19.20
19.60 19.60
Cone Resistance (kg/cm2) Sleeve Friction (kg/cm2)
20.00 20.00

Radhi Apriadi / 0441110054


TabeL (2.2) Faktor Kapasitas Daya Dukung Terzaghi

F deg Nc Nq Ng Kp

0 5.7 1.0 0.0 10.8


5 7.3 1.6 0.5 12.2
10 9.6 2.7 1.2 14.7
15 12.9 4.4 2.5 18.6
20 17.7 7.4 5.0 25.0
5 25.1 12.7 9.7 35.0
30 37.2 22.5 19.7 52.0
34 52.6 36.5 36.0
35 57.8 41.4 42.4 82.0
40 95.7 81.3 100.4 141.0
45 172.3 173.3 297.5 298.0
48 258.3 287.9 780.1
50 347.5 415.1 1153.2 800.0
Sumber : Books & Monograph TEKNIK PONDASI
Oleh : Dr. Ir. Suhardjito Pradoto

SO1
Lapisan
qc Ng Æ Nc Nq V
I 84.35 105.44 40.13 97.66 83.65 0.17

II

Dari Data Sondir SO1 Lapisan 1

Jenis Tanah Rumus CPT Qult (kg/cm2) Qult (t/m2)

Untuk Tanah Tak


48 - 0,009 ( 300 -qc )1,5 19.498 194.98
Berkohesi

Untuk Tanah
5 + 0,34 qc 33.679 336.79
Lempung
Berat Beban Beban
Titik B Tebal
L (m) Pondasi Titik Titik+Berat
Pondasi (m) (m)
(ton) (ton) Pondasi
B 1.5 1.5 0.35 2.178 12 14.178
D 1.5 1.5 0.35 2.178 5 7.178
F 1.5 1.5 0.35 2.178 31 33.178
J 1.5 1.5 0.35 2.178 29 31.178

Titik Lapisan Wu (Beban Titik +


Qall=Qult /SF Pall=QallxA KONDISI
Pondasi Tanah Berat Pondasi)

B I 64.99 146.24 14.18 Aman


D I 64.99 146.24 7.18 Aman
F I 64.99 146.24 33.18 Aman
J I 64.99 146.24 31.18 Aman
24.02

x= 31.06012
γt
A N γs γw c
PI S ( Ø(º) Nc
LA ( t/m³ ) ( t/m³ ) ( t/m³ )
t/m³ )
Lapisan I 1.65 1.7 1 0.17 40.13 97.66

Lapisan II - 1.79 1 0 0.00 0.00

Berat Beban Beban


Titik B L Tebal
Pondasi Titik Titik+Berat
Pondasi (m) (m) (m)
(ton) (ton) Pondasi
B 1.5 1.5 0.35 2.178 12 14.178
D 1.5 1.5 0.35 2.178 5 7.178
F 1.5 1.5 0.35 2.178 31 33.178
J 1.5 1.5 0.35 2.178 29 31.178 (1,3*$G$6*$I$6)+( J19*$J$6)+(0

B A
Nama Lap. L γ Dw Df
Kolom Tanah (m) ( t/m³ ) (m) (m)
(m) ( m² )

B I 1.50 1.50 2.25 0.7 1.15 1.5


D I 1.50 1.50 2.25 0.7 1.15 1.5
F I 1.50 1.50 2.25 0.7 1.15 1.5
J I 1.50 1.50 2.25 0.7 1.15 1.5

Lapisan Ketebalan Lapisan ( m )

Lap I 2
Lap II 1
Nq Ng SF

83.65 105.44 3

0.00 0.00 3

(1,3*$G$6*$I$6)+( J19*$J$6)+(0,4*G19*C12*$K$6)

q
Qult Qall Pall
(t/m²) (t/m²) (t/m²)
Wu Kondisi
(t/m²)

2.1425 245.088 81.696 183.82 14.2 aman


2.1425 245.088 81.696 183.82 7.2 aman
2.1425 245.088 81.696 183.82 33.2 aman
2.1425 245.088 81.696 183.82 31.2 aman
Titik B L
H B1' = B/2 L1' = L/2 N = H/B1' M = L1'/B1'
Pondasi (m) (m)