RENCANA ANGGARAN BIAYA


PROGRAM : PENYEDIAAN DAN PENGOLAHAN AIR BAKU
KEGIATAN : PEMBANGUNAN SUMUR-SUMUR AIR TANAH
PEKERJAAN : PEMBANGUNAN SU
SUMUR BO
BOR & MCK DE
DESA PA
PASIE JE
JEUMPA
KECAMATAN : KAWAY XVI
TAHUN : 2009

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.)
RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

1 2 3 4 5
III. PEKERJAAN PENGADAAN DAN
PEMASANGAN WATER TANK DAN ACCESORIS
1 Water Tank 3000 Liter   1.00 Bh Taksir 3,325,000.00
2 Pipa Besi Galvanis 3/4" + Accesoris   10.00 M' Taksir 105,000.00
3 Pipa PVC 3/4" + Accesoris 75.00 M' Taksir 24,000.00
4 Kran Air + Accesoris   6.00 Bh Taksir 48,000.00
Sub Total III
IV. PEKERJAAN LAIN-LAIN
1 Septic Tank + Rembesan   1.00 Unit Taksir 2,375,000.00
2 Kusen Pintu WC   2.00 Bh Taksir 214,000.00
3 Bovenlight   4.00 Bh Taksir 119,000.00
RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

JUMLAH HARGA
(Rp.)
RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

3,325,000.00
1,050,000.00
1,800,000.00
288,000.00
6,463,000.00

2,375,000.00
428,000.00
476,000.00
RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

DAFTAR ANALISA HARGA SATUAN UPAH


LOKASI : DALAM WILAYAH KABUPATEN ACEH BARAT
(Kec. Kaway XVI, Kec. Pante Ceureumen, Kec. Sungai Mas, Panton Reu)
BIDANG : CIPTA KARYA
TAHUN : 2009

1. Anl. A.1 1 M3 Galian Tanah

  0.750 Pekerja @Rp 36,000.00 Rp   - Rp 27,000.00


RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

8. Anl. G.50k 1 m2 Plesteran 1 : 4 T. 15 cm


0.089 zak Semen PC @Rp   47,000.00 Rp 4,183.00
0.019 m3 Pasir Pasang @Rp   79,800.00 Rp 1,516.20
  0.100 Tukang @Rp   54,000.00 Rp 5,400.00
0.010 Kepala Tukang @Rp   59,000.00 Rp 590.00
0.300 Pekerja @Rp   36,000.00 Rp 10,800.00
0.015 Mandor @Rp   47,000.00 Rp 705.00
Jumlah ………….. Rp   5,699.20 Rp 17,495.00

9. Anl. G.5 0h 1 m2 Plestera n Tras ra m 1 : 2 T. 10 cm


0.178 zak Semen PC @Rp   47,000.00 Rp 8,366.00
0.011 m3 Pasir Pasang @Rp   79 800 00 Rp 877 80
RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

15. Anl. Supl. IIIa 1 m2 Lantai Keramik 30 x 30 cm


1.000 m2 Keramik 30 x 30 cm @Rp   57,000.00 Rp 57,000.00
0.016 zak Semen Putih @Rp   146,000.00 Rp 2,336.00
0.025 m3 Perekat (G.16) @Rp   614,934.00 Rp 15,373.35
0.250 Tukang @Rp   54,000.00 Rp 13,500.00
0.025 Kepala Tukang @Rp   59,000.00 Rp 1,475.00
0.500 Pekerja @Rp   36,000.00 Rp 18,000.00
  0.025 Mandor @Rp   47,000.00 Rp 1,175.00
Jumlah ………….. Rp   74,709.35 Rp 34,150.00

15. Anl. Supl. IIIc 1 m2 Lantai Keramik Kulit Jeruk 20 x 20 cm


1.000 m2 Keramik 20 x 20 cm @Rp   61 800 00 Rp 61 800 00
RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

DAFTAR HARGA UPAH DAN BAHAN


LOKASI : DALAM WILAYAH KABUPATEN ACEH BARAT
(Kec. Kaway XVI, Kec. Pante Ceureumen, Kec. Sungai Mas, Panton Reu)
BIDANG : CIPTA KARYA
TAHUN : 2009
Sudah term
NO. URAIAN JUMLAH KETE
1 2 3
A. U P A H
1 Mandor Lapangan Rp.   47,000.00 /Hari
RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

1 2 3
43 Genteng Beton Rp. 4,800.00 /Bh
44 Perabung Genteng Beton Rp. 6,200.00 /Bh
45 Kayu Seumantok/Setara Rp. 2,850,000.00 /M3
46 Kayu Seumantok Kuda-kuda/Setara Rp. 2,850,000.00 /M3
47 Kayu Tarahan/Rangka Plafond Rp. 1,948,000.00 /M3
48 Kayu Bakar Rp. 428,000.00 /M3
49 Kayu Meurante Rp. 2,375,000.00 /M3
50 Kayu Kamper/Krueng Rp. 2,375,000.00 /M3
51 Kayu Medang Rp. 2,375,000.00 /M3
52 Papan Meurante Rp.   47,500.00 /Lbr 
53 Kayu Perancah Rp. 1,948,000.00 /M3
RELATED TITLES
1.8K views 1 0

penawaran_sumur_bor_dan_mck_pasie_jeumpa
(1).xls 
Uploaded by swatched

Penawan Sumur Bor Full description


Rks Sumur Bor Sumurbor 100 SUMUR BOR.xlsx Analis
    mtr.xlsx Satuan
Save Embed Share Print

JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULLE)


PROGRAM : PENYEDIAAN DAN PENGOLAHAN AIR BAKU
KEGIATAN : PEMBANGUNAN SUMUR-SUMUR AIR TANAH
PEKERJAAN : PEMBANGUNAN SUMUR BOR & MCK DESA PASIE JEUMPA
KECAMATAN : KAWAY XVI
TAHUN : 2009

JUMLAH JANGKA WAKTU PELAKSANAAN


NO. URAIAN PEKERJAAN HARGA BOBOT BULAN KE-I BULAN KE-II BULAN KE-III BULAN KE-IV BULAN K
(Rp.) I II III IV I II III IV I II III IV I II III IV I II

A. PEKERJAAN PERSIAPAN   5,322,000.00   4.662   0.52   0.52   0.52   0.52   0.52   0.52   0.52   0.52 0.52

B. PEKERJAAN SUMUR BOR    22,468,000.00   19.683   2.19   2.19   2.19   2.19   2.19   2.19   2.19   2.19 2.19

C. PEKERJAAN MEMBANGUN BARU MCK 


I. PEKERJAAN TANAH   697,652.25   0.611   0.20   0.20 0.20
II. PEKERJAAN PASANGAN DAN BETON   59,187,672.63   51.850   3.70   3.70   3.70   3.70   3.70   3.70   3.70   3.70   3.70   3.70   3.70   3.70   3.70 3.70
III PEKERJAAN SANITASI DAN ELEKTRIKAL   3 414 500 00   2.991   0.43   0.43   0.43   0.43   0.43   0.43